Appl ic a t ion L i fecyc le Management

Solution Implementation with SAP SolutionManager

Solution ManagementApplication Lifecycle ManagementSAP AG

Page 2: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 2/90

© 2010 SAP AG. All rights reserved. / Page 2

Disc la imer  

The information in this presentation is confidential and proprietary to SAP and may not be disclosed without the permission of SAP. This presentation is not subject to your license agreement or any other service or subscription agreement with SAP. SAP has no obligation to pursue any course of business outlined in this document or any related presentation, or to develop or release any functionality mentioned therein. This document, or any related presentation and SAP's strategy and possible future developments, products and or platforms directions and functionality are all subject to change and may be changed by SAP at any time 

for any reason without notice. The information on this document is not a commitment, promise or legal obligation to deliver any material, code or functionality. This document is provided without a warranty of any kind, either express or implied, including but not limited to, the implied warranties of merchantability, fitness for a particular purpose, or non-infringement. This document is for informational purposes and may not be incorporated into a contract. SAP assumes no responsibility for errors or omissions in this document, except if such damages were caused by SAP intentionally or grossly negligent.

All forward-looking statements are subject to various risks and uncertainties that could cause actual results to differ materially from expectations. Readers are cautioned not to place undue reliance on these forward-looking statements, which speak only as of their dates, and they should not be relied upon in making purchasing decisions.

Page 3: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 3/90

© 2010 SAP AG. All rights reserved. / Page 3

1) Concept of Solution Implementation in SAP Solution Manager

2) ASAP Methodology

3) Walkthrough a Project Example

4) GlobalASAP Methodology

5) Summary

Agenda

Page 4: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 4/90

1) Concept of Solution Implementation in SAP Solution Manager

2) ASAP Methodology

3) Walkthrough a Project Example

4) GlobalASAP Methodology

5) Summary

Agenda

© SAP 2010 / Page 4

Page 5: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 5/90

©  SAP AG 2010. All rights reserved. / Page 5

Appl ic a t ion L i fecyc le ManagementAn approach in six phases of ITIL application management

Solution Documentation Central documentation of processes, system landscape,

custom code, partner applications, …

Template Management Standardize configuration across

multiple projects

Test Management

Change impact analysis End-to-end test management

Technical Operations

Central monitoring & alerting infrastructure Unique End-User Experience monitoring Central administration tools

Change Control Management Integrated quality management Synchronized transports of various components Controlled and documented adjustment of business

processes incl. approval process

Maintenance Management

Management of correctivesoftware packages

Business Process Operations Ensure business continuity Provide Business KPIs Business process benchmarking

Application Incident Management Integrated service desk Involvement of partners in problem resolution Provide root-cause analysis for complex

landscapes with diverse technology stacks

Upgrade Management Comprehensive project support

for release transitions

Solution Implementation Discover and realize enhanced

business functionality Avoid disruption of business

Require-ments

Design

Deploy

Operate

Optimize

Buildand Test

Landscape Transformation Management of business and IT

driven changes in SAP landscapes

Page 6: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 6/90

SAP Solution Manager is your application management platform tomanage your entire SAP solution landscape

SAP Solut ion Manager Overview

SAP Solution Manager: the central platform that provides the integratedcontent, tools, and methodologies that you need to implement,

support , operate, and monitor your SAP solution landscape

SAP Solution Manager

• provides tools, content and best practicesfor the complete life-cycle

• integrates central administration ofSAP NetWeaver to facilitateadministration tasks

• One single source of truth: containsdocumentation about the systemlandscape, all processes anddocumentation

Page 7: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 7/90

Methodica l f ramew ork

Deliverables Accelerators Milestones Services

How c an you suppor t pro jec t team s us ing SAP

Solut ion Manager for sof tw are implem entat ion?

Pro jec t Admin is t ra t ion and Bus iness B luepr in t v iaSAP Solut ion Manager!

Manage your team organization!

Manage the project deliverables in time!

Manage your project via one common Methodology!

Manage your project transparent!

Key User

IT Infrastruct ure Team

QUALITY MANAGEMENT

Program Management

BusinessProcess Operation

SAP Technical OperationsC us tom D ev elopment T es t & Quality Team

Business ProcessChampion

IT

BUSINESS

Dirk JungProject Manager

Lara SommerApplication Implementation

Kur t MaierQuality Manager

Anne K leinSystem Administrator

Projec t Team

Requir ement

Design Build TestPreparation

Timeline

June 01st, 2009 August 15th, 2009 October 20th, 2009 November 1st, 2009May 01st, 2009

Deploy

Single source of information

P*:800Q*:800D*:800

SAP N etW eaverIntegration

S APN etW eav erC omposition

S R M S CM E RPP LMC RM

SAP N etW eaverIntegration

S APN etW eav erC omposition

S R M S CM E RPP LMC RM

Customer System Landscape Environment

SAPN etW eaverIntegration

S APN etW eav erC omposition

S R M SC M E RPP LMC RM

SAPN etW eaverIntegration

S APN etW eav erC omposition

S R M SC M E RPP LMC RM

SAP N etW eaverIntegration

S AP N etW eav erC omposition

S R M SC M E RPP LMC RM

SAP N etW eaverIntegration

S AP N etW eav erC omposition

S R M SC M E RPP LMC RM

SAP NetW eaverIntegration

S AP N etW eaverC ompos ition

S RM S C M E R PPLMC RM

SAP NetW eaverIntegration

S AP N etW eaverC ompos ition

S RM S C M E R PPLMC RM

E*:800

Central Business Blueprintscope

On sourc e of in form at ion for your pro jec t conf igurat ion,

development and tes t !

Page 8: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 8/90

1) Concept of Solution Implementation in SAP Solution Manager

2) ASAP Methodology

3) Walkthrough a Project Example

4) GlobalASAP Methodology

5) Summary

Agenda

© SAP 2010 / Page 8

Page 9: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 9/90

Del iver ing Succ essfu l Solut ions

Ac c elerat edSAP (ASAP) Met hodology

Descr ip t ion

http://service.sap.com/asap

AcceleratedSAP (ASAP) provides proven, comprehensive,repeatable and rich implementation methodology to streamlineprojects.

ASAP covers implementations, upgrades, global template androllout, and more.

More info

Page 10: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 10/90

ASAP Implem entat ion Phases

Initiate, planand set up your

SAP project

Capturerequirements,

documentsolution and

technical design

Implementbusiness and

process require-ments based

on the BusinessBlueprint

Complete thepreparation forsystem cutover

Initial productionsupport after

cutover;transition to

supportprocesses

RunimplementedSAP solution

RunProject

PreparationBlueprint Realization

FinalPreparation

Go-LiveSupport

Page 11: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 11/90

Rec ent Development : St reaml ined Roadmaps

ASAP Core extends coverage to the entire value chain

New content for: Value Management, Modeling, SOA, Solution Manager, …

New Service links to SAP Service Browser

Significantly revised and updated content for traditional ASAP areaslike Blueprint, Testing, etc. including accelerators and samples

The new ASAP Core significantly improves quality of content over entireproject delivery lifecycle

RunProject

PreparationBlueprint Realization

FinalPreparation

Go-LiveSupport

Page 12: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 12/90

ASAP Roadm aps Support t he Process

Purpose:Project-independent use: Tailored access to roadmap contentUse in a project: Track project progress along thework packages of the roadmap

In SAP Solution Manager

Purpose:Content in read-only format to learnand leverage available accelerators

HTML Version

Page 13: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 13/90

Roadm ap Use

SAP standard roadmaps are delivered with the ST-ICO component.

All roadmaps can be assigned to solution manager projects.

Possibility to create Customer specific methodology Roadmaps

Roadmaps offer …

Detailed information for all project phases andtasks

Accelerators

Status tracking

Storage for administrative documents

Page 14: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 14/90

Roadm ap Use

Documents in Project-Related Roadmap

Project-related roadmaps offer storage and documentation of …

Phase-related meeting minutes documentation

Assignment of project administration related documents

Page 15: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 15/90

Roadm ap Use

SAP Solution Manager offers the creation of customer-specific methodology for all possible project types.

Page 16: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 16/90

Roadmap Def in i t ionCreation of Customer-Specific Roadmaps

Creation of Customer-Specific Roadmaps allows:

Definition of own phases and tasks

Creation of new structures

Definition of specific entry screens

Definition of content and/or descriptions

Assignment of accelerators

Page 17: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 17/90

Roadmaps Add Value to t he Implementat ion

Why and how youshould do it

Who participates

Subject area

Accelerators,samples, templates

What to do, andwhen to do it

Page 18: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 18/90

ASAP Implem entat ion RoadmapHow the Deliverable Groups Map to SAP Solution Manager

SAP Solution Manager in ImplementationRealization

FinalPreparation

Go LiveSupport

BlueprintProject

PreparationRun SAP

Provide initialplanning and

preparation foryour SAP project

Document thebusiness process

requirements

Implementbusiness

and processrequirements

Complete thepreparation for

Go-Live

Cutover to liveproductiveoperation &

continuous support

Operate yourSAP Solution

Issue Tracking / Monitoring / Reporting

Roadmaps

Project Administration

Define SystemLandscape

Project DefinitionDefine Business

Blueprint

Configuration

Development

CustomizingSynchronization

Testing

End User Training

& Documentation

Handover

Solution Directory

Custom Code/Technical Operation

Technical Infra-structure Mgmt.

End-User

Support

ChangeManagement

ApplicationManagement

Business ProcessOperation

SAP Solution Manager – Supportingimplementation features

Define Enhance-ments & Develop.

Page 19: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 19/90

How Do I Get the La t es t Conten t?

ST-ICO Download from /swdc

Page 20: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 20/90

Standard ized approach for the ent i re pro jec t team that he lps to : Mitigate risks

Attack key time consumers

Reduce project costs and related effort

Proven procedure out l in ing :

Key activities / deliverables

Guidance on how to master critical pain points

The sequence and dependencies of the different project activities

Cent ra l po in t o f acc ess and guidance for the pro jec t :

in a comprehensive structured format

available as offline version (HTML format)

Flexible content updates via SAP Service Marketplace

Seam less int egrat ion w i t h in SAP Solut ion Manager!

ASAP Roadm apsSummary of Benefits

Page 21: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 21/90

1) Concept of Solution Implementation in SAP Solution Manager

2) ASAP Methodology

3) Walkthrough a Project Example

4) GlobalASAP Methodology

5) Summary

Agenda

© SAP 2010 / Page 21

Page 22: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 22/90

Picture

The Project Preparation function enables you asproject manager to initiate, plan, and prepare yourproject. You define your features of your projectplan, agree on project standards, draw up aschedule and assemble the project team. You also

define the implementation scope and plan fortechnical requirements and infrastructure.

Prepare your pr oject in SAP Solution M anager

Define yourProject Type

Document theProject Charter

Definethe Project

Methodology

Define youProject

Organization

Define theProject System

Landscape

Define yourMilestones

InnovationRequirements

Page 23: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 23/90

© 2010 SAP AG. All rights reserved. / Page 23

Define Your Requirem ent sProject Preparation

Configuration

Testing

End User

Training

Blueprint

Solution

Upgrade/ Maintenance

TemplateProject

GlobalRoll-out

Project

Preparation

BPR

Modeling Tool

End-to -End approac h f rom SAP’s Business Process Reposi tor y or c usto mer-

spec i f i c requ i rements to product i ve cust omer so lu t ions .

Page 24: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 24/90

Page 25: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 25/90

Project TypeSelect and displays your project approach

Define your project type

Implementation ProjectUsed for new system implementation

Template ProjectUsed to create a template for other projects

Upgrade Project

Used for technical and/or functional system upgrade Maintenance Project

Used to maintain an existing customer solution

Safeguarding ProjectUsed to resolve a critical situation during the implementation oruse of an SAP solution

Optimization ProjectUsed e.g. for service delivery to optimize the performance ofbusiness processes or a software solution

Provid e a sol idbasis for

imp lementing yoursof tware

succ essful ly andrunning your

project ef fect ively

Project M anager…

Page 26: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 26/90

Define Projec tAssign General Data

Define general project data

Person responsible for the project

Project language: Determines in which language the selectedbusiness content is displayed and stored

Overall project status and time frame for plan and actual data

Define general dataof the project

Project M anager…

Page 27: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 27/90

Pro jec t Descr ip t ionCreate and assign your project description centrally

Project Description

provides a consistent presentation of information

delivers a clear statement if project scope

aligns stakeholders around the scope of a project

formally gains stakeholders commitment to project

Document theproject scope

clearly and pr ovidethis informat ion

centr al ly as basis

for your pr o jectcalculat ion on

budg et, t ime andresources

Project M anager…

Page 28: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 28/90

Project RoadmapSelect or define your methodical framework for your project

Select / Maintain your project roadmap

use a SAP standard delivered roadmap or

create your company specific roadmap to drive your projectproperly (RMDEF, RMAUTH)

re-use the roadmap of your choice in all implementation andupgrade projects to reduce time, cost and risk

Roadmaps

provides a methodical framework for projects via

phases

work packages

–  activities/ deliverables

– 

tasks / methods displays the navigation structure

delivers milestones, services, topic descriptions, acceleratorswhich are aligned to the roadmap structure

Provid e a clear

project methodologyto manage your

project eff ic iently on-t ime and w ithin

budget

Reduce ineffect ive

template anddocument searches

by providingaccelerators and

user specif ic wor kl ists to your t eam

Project M anager…

Page 29: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 29/90

Mainta in Your Pro jec t Roadmap

Manage your deliverables and project status easily

Page 30: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 30/90

People Invol vedManage your project team centrally

Assign your project resources in preparation for

allocating project team members to roadmap work packages,activities/ deliverables and tasks / methods

assigning project role and maintaining authorizations to teammembers

restricting authorization on node level

reporting your project status

Reallocate assigned roadmap work packages, activities/ deliverables and tasks / methods to new team membersby replacing project team members centrally

Provide

transparency andreduce your t imeand ef fort via a

centr al maintainedpeople m anagement

Providetransparency of

pr oject tasks andact ivi t ies via wor k

l ists

Project M anager…

Page 31: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 31/90

Key User

IT Infrastructure Team

QUALITY MANAGEMENT

Program Management

BusinessProcess Operation

SAP TechnicalOperations

Custom Development Test & Quality Team

Business ProcessChampion

IT

BUSINESS

People Invol vedManage your team organization

Projec t Organizat ion

Mainta ined Pro jec t Team Mem bers

Page 32: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 32/90

People Invol vedManage your project work packages

Assign team members to tasks andactivities

Re-use team member informationmaintained on the overall project teammember list

Provide team members with individual work

lists to increase your team efficiency Ease your monitoring of the current status

of the project

Page 33: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 33/90

System LandscapeMaintain your planned systems landscape for a faster project start

Define your system landscape for a transparent systemmanagement

logical components group together different systems with thesame product release

decoupling the logical and physical systems

transparency across all projects

readiness for process models documentation before systemavailability

centrally changes transparent to all projects

A ssure a quickproject s tar t w i thout

technicaldependencies

Decouple proc essmodel

documentation and

system availabil i ty

Reduc e the systemcomp lexity andpr ovide a clearproject system

landscape

System Ad ministrator..

Page 34: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 34/90

System Landsc apeMaintain your planned and existing systems for your project

Prod SystemQA Syste mDev Syst em

SAP NetWeaverIntegration

SAP NetWeaver

Composition

SRM SCM ERPPLMCRM

SAP NetWeaverIntegration

SAP NetWeaver

Composition

SRM SCM ERPPLMCRM

Custom er System Landsc ape Env i ronment

SAP NetWeaverIntegration

SAP NetWeaver

Composition

SRM SCM ERPPLMCRM

SAP NetWeaverIntegration

SAP NetWeaver

Composition

SRM SCM ERPPLMCRM

SAP NetWeaverIntegration

SAP NetWeaver

Composition

SRM SCM ERPPLMCRM

SAP NetWeaverIntegration

SAP NetWeaver

Composition

SRM SCM ERPPLMCRM

SAP NetWeaverIntegration

SAP NetWeaver

Composition

SRM SCM ERPPLMCRM

SAP NetWeaverIntegration

SAP NetWeaver

Composition

SRM SCM ERPPLMCRM

Eval Syst em

Page 35: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 35/90

Mi les tonesReflect your project critical milestones

Assign the milestones to your Quality Gate Managementin SAP Solution Manager

establish one single quality process via SAP Solution Manager

transparency across application and technology stacks

Detailed information on Quality Gate Management areprovided via www.service.sap.com/ALM

Reflect your pr ojectcr i t ical mi lestonesin your pr oject as

part of your def inedGovernance

Process

Reuse you rmilestones youdef ined in your

Roadmap

Project M anager…

Page 36: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 36/90

Def ine St at us Values for your pro jec t

Add Status Values in thesame manner as

documents

Page 37: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 37/90

Define K ey Words for your projec t

Add Key Words in thesame manner as

documents

Page 38: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 38/90

Def ine Tab Vis ib i l i ty for your pro jec t

Choose which tabs willbe visible for your

project

Page 39: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 39/90

Define Projec tDocumentation Types

Define document types Create own document types and import template

Change existing document types/templates

Define the pr ojectstandards, l ikedocumentat ion

types, key wor dsand status values

Project M anager…

Blueprint

Will be used forblueprint generation

Several documents

Determines whether more than one document of the documentation type can beattached to one structure item (e.g. one template for business blueprint perprocess)

Global Doc

Document Typeautomatically assigned toall projects or only to oneproject

File extension

Determines which editor tolaunch if no template is set

Page 40: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 40/90

Def ine Doc ument at ion Types for your pro jec t

Select Document Typesto add to your project

Page 41: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 41/90

Picture

The purpose of the Business Blueprint phase is tooutline the current situation as defined inworkshops so you can compile a BusinessBlueprint documenting the target state of thesolution being implemented and the resultantrequirements. The conceptual design draw up by

the project team members therefore describeshow your enterprise wants to map its businessprocesses using SAP and non-SAP systems.

Prepare your Business Blueprint in SAP Solution M anager

Draw yourconceptual

design

Document yourproject asstructure

Distribute thework to your

team

Define how theprocesses runin the systems

Document theprocesses onbusiness level

Assign thebusiness team

to the processes

Page 42: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 42/90

Worki ng w i t h the Business Bluepr intStructure Items

Define/Maintain/Assign your structure item and use Organizational units (e.g. Sales Group, Service Group, Billing

Group) to document groups affected by the project in their dailywork

Master Data (e.g. Pricing Conditions, Cross Selling Data,Marketing Attributes) to document data which are related to thebusiness processes

Business Scenario on a three-level structure layer (BusinessScenario, Business process, Process steps) and BusinessScenario related Organizational unit and Master Data

Interface Scenarios between logical componentsDraw yourconc eptual designfor your pr o ject on

a struct ured level

Business Process Expert..

Page 43: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 43/90

Bus iness B luepr in t St ruc t ure I tem s

Maintain Organizat ional Uni ts , Master Data and

Inter faces

Page 44: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 44/90

Bus iness B luepr in t St ruc t ure

Document your project as a structure based on Businessscenarios, business processes and process steps

Incorporate virtual levels (using name conventions andprefixes) if you need to work with additional levels

Complete your scenario’s definition by linking or assigningmaster data and organizational units which shows how the

company is organized Get a graphical display of your component-specific or cross-

component scenario

Support your documentation

Model your business processes in ARIS for SAP NetWeaver

and use a standard interface to transfer structure to a SAPSolution Manager project.

Once your project is completed and live, use SolutionDocumentation Assistant to verify your documented businessprocess structure and to check the completeness of yourdocumentation

Document yourproject as a

structur e based on

business view s

Business Process Expert..

Page 45: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 45/90

Page 46: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 46/90

Bus iness B luepr in t St ruc t ureScoping of a Customer Solution using Business Process Repository

SAP Solution Manager

Customer specific

solution

SAP’s deliveredimplementation content(documentation, IMG

assignment, testcases,...)

Page 47: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 47/90

Implem entat ion Content Onl ine View

ht tps: / / implementat ioncontent .sap.com/bpr  

Page 48: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 48/90

Business Process St ruc t ure: Pot ent i a l Sourc esDiscover - Implementation Content

Implementation content in form of the Business Process Repository (BPR) serves as

starting point for business process documentation

F4 help to access BPR

2500 pre-defied businessscenarios and processes

Can be imported into SAPSolution Manager businessblueprint or solutions

Can be imported at businessscenario, business process,business process step level

Functionality

Reduces the effort creating aninitial documentation ofbusiness processes

Possibility to verify existingdocumentation with SAP

standards

SAP implementation contentwording potentially notcomprehensive to companyspecific wording

Potentially manual adjustmentsneeded to suit companyspecific process flow

Example: Business scenario imported from BPR into Business Blueprint

Choose ‘BPR’ as documentation source

Select SAP standardbusiness scenario andrelated products versionsfrom BPR selection help

Benefits

Limitations

Page 49: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 49/90

Page 50: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 50/90

Business Proc ess St ruc t ure: In ter fac esDefinition and Assignments

Interfaces are documented in the structure, and then can be assigned to the Graphics.

Example: Interface scenario structure element

3. New InterfaceDefined

4. Assign toGraphics Tab

Page 51: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 51/90

Process Admin is t ra t ionDistribute the work

Manage roles and responsibilities to define your businessblueprint

Assign Team Members to business process structure nodes(business scenario, business process or business processstep)

Provide team members with individual work lists

Create projectmember speci f icw ork packages

Provide the w orkpackages to your

pr oject members

Get ful l pr ojectt ransparency

Team Lead ..

Page 52: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 52/90

Process Admin is t ra t ionExample

Page 53: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 53/90

Page 54: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 54/90

Process Document at ionDocument how your processes run on a business level

Define and describe processes on a business level (Purpose,Process Flow, Result, for instance)

Access business scenario and business processdocumentation if you used predefined implementation contentfrom Business Process Repository

Create your project-specific documentation

Reflect your actual scenarios and process documentation andinclude requirements, implementation options, and processflow

Use your initial test perception to supply input for requirementsregarding enhancements and customer developments(including interface definition, program developments and datatransfer)

Mark your documentation on Business Blueprint relevance forthe final document

Define and d escr ibepr ocesses on abusiness level

(Purpose, Process

Flow, Result , forinstance)

Team M ember ..

Page 55: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 55/90

Process Document at ionAssign Documents to Structure Nodes

Create/ link, edit, store, upload and download requirementdocuments

Predefined document types for

SAP-delivered documents, e.g. scenario descriptions,installation guides, accelerators …

Blueprint relevant documentation

Configuration documentation Developments - interfaces, forms, reports, defined in

project administration

Reporting features to track and filter documentsDefine and assignprocess

documentat ion to

pr ocesses on abusiness level

Team M ember ..

Page 56: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 56/90

Business Bluepr int Doc ument at ion

BusinessScenario

Business

Process

ProcessStep

Componente.g., SAP ERP

Transactions

ScenarioDocs

ProcessDocs

ProcessSteps Docs

KeyDecision

DocsKeyDecision

Docs

KeyDecision

DocsKey

DecisionDocs

KeyDecision

DocsKeyDecision

Docs

GapDocsGap

Docs

GapDocsGap

Docs

Func.

SpecsFunc.Specs

Func.SpecsFunc.

Specs

TransactionTab

Page 57: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 57/90

End Users In volvedProvide transparency of End Users who execute the process

Assign End Users affected by the project Get transparency on project affected Users (End User,

Organizations or Job descriptions)

Reuse the your End User assignments to distribute the e-learning maps to them

Providetr ansparency of EndUsers w ho execute

the proc ess

Business Process Expert

Page 58: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 58/90

Bluepr in t Sta tus - Get transparency and report your

Business Blueprint status to your management

Analyze administration information which supports focusing onspecific data such as status of work lists or planned dates

Analyze the assignments in the project structure whichsupports focusing on information on scenario, process andprocess step level

Repor t yourbusiness blueprintto ident i fy t im e and

task cr i t ical issues

Team L ead…

Page 59: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 59/90

Page 60: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 60/90

Pro jec t St a tus

Get transparency and report your project status

Get your final approval for the Business Blueprint Lock the Business Blueprint phase centrally

Prevent changes being made to

Process structure

Blueprint-relevant documents

Administrative data

Create your Business Blueprint document as an MS Worddocument and store it as a final version in SAP SolutionManager (PDF-File)

End your BusinessBlueprint p hase

clearly

Project M anager…

Page 61: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 61/90

Final Approval and Lock of t he Business

Bluepr int

Get your final approvalfor the projectdocumentation

Lock the BusinessBlueprint

Page 62: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 62/90

© SAP AG 2009. All rights reserved. / Page 62

Note: 

Re-use of existing configuration possible.Translation or process structure can be triggeredusing SAP standard translation tools.

Overv iew of Conf igura t ion Act iv i t ies

Legend:

IMG –> SAP Implementation Guide

BC Set -> Business Configuration Set

CATT -> Computer Aided Test Tool

Configuration  Configure processes using predefined

IMG activities

Create and assign BC Sets

Development  Assign global customer-specific

developments (programs, transactions etc.)

Test Cases  Record sample / master data as CATTs

Create standard test cases (test casedescription, CATTs, eCATTs )

Page 63: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 63/90

Business Bluepr int and Conf igurat ion

Facilitates the preparation for your test activities

Benefits: Improved transparency as all project documents are managed in the same context including Test Cases

Same handling for Manual Test Cases and Automated Test Cases for Test Planning, Execution and Reporting

Reduced effort for upcoming Test activities (e.g. Test Case selection via Attributes)

Create, upload and maintain Test Cases

Manual Test Cases

Automated Tests eCATT

3rd party (e.g. HP Quick Test Professional,Compuware Test Partner, ..)

Business Process attributes and Test Case

attributes to allow systematic Test Planning andReporting

Priority

Status

Keywords / Customer attributese.g. relevance for legal requirements, Test Phases, …

Responsible Person

Linkse.g. Connect Test Case to business process description / 

requirement to allow traceability

Features for Test Preparation:

Assign/Upload Test Cases to Business Processes

Test Case Descriptionbased on customerspecific template:

Page 64: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 64/90

Test Planning, Ex ec ut ion and Repor t ing

Assign Tester to Test PackageBusiness Blueprint with assigned Test Cases Generate Test Plans and Packagesfor selected Test Cases

Test Planning

Test Scope Identification

• Blueprint for new Solution

• Change Impact Analysis

for Solution UpdateTest Coverage check

• Test Case review andcreation of missing

test cases

• Test Case Assignment Report

• Sign-Off of Test Scope

Test Planning

• Select Test Casesfor specific Phases (Test Plan)

• Distribute Test Casesto Testers (Test Package)

• Define Test Workf low ( Sequences )

Test ExecutionTester Worklist to start manual and automated Tests Integrated Service Desk

Test Reporting

Key Capabilities• Predefined Test Systems

• E-Mail notification via Workflow• Status and Result

Documentation

Role based Capabilities:

• Status Reporting

(Realtime & BI)

• Messages Reporting

(Realtime & BI)

• Test Progress (BI)

Status Analysis Status Progress

Page 65: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 65/90

Typic al Test Proc ess in SAP Solut ion Manager 

BusinessBlueprint

Change ImpactAnalysis

Test Planning

Test Execution

Test Reporting

Business Process ExpertQuality Expert

Design, change Business Blueprint

Perform Technical and Business Configuration

Develop/maintain manual Test Cases

Develop/maintain automated Test Cases

Assign Attributes and create T-BOMs

Check Availability of T-BOMs and Test Cases Run Analysis for intended Change Evaluate Result Create Test Plan

Create/Update Test Plans / Test Packages

Assign Tester

Setup Test Sequences

Release Test Plan – Sign Off

Get E-Mail Notification

Access Tester Worklist Perform manual Test Perform automated Test Document Result

Perform Test Status Overview and Analysis

Check Message Overview

Check Test Progress

Test Sign Off

Quality ManagerTest Coordinator

Test Coordinator

Tester

Test CoordinatorQuality ManagerProject Manager

Page 66: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 66/90

© 2010 SAP AG. All rights reserved. / Page 66

SAP Solut io n Manage r 

Blueprint

Service Desk

Testing

Configuration

Change Requests

Upgrade

Service Delivery

System MonitoringSystem Administration

Tasks

Business Process and Interface MonitoringData Volume/Data Consistency Management

Job Documentation

Root Cause AnalysisEnd User Experience

Learning Maps

Scope

Quality Gates

IssuesBusiness ProcessChange Analyzer

Solution Documentation Assistant

MaintenanceOptimizer

Appl ic at ion Li fecyc le ManagementSAP Solution Manager Platform - Architecture

Custom Development ManagementCockpit

Page 67: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 67/90

Solut ion Di rect ory Through the Solut ion

L i fecyc le

FeasibilityCheck

Service

ProjectPreparation

Implementation/Template/Upgrade Project

Solution Directory

SAP Solution Manager

Blueprint Configuration TestSupport/Optimize Upgrade

MaintenanceProject

UpgradeProject

Going LiveCheck

Service

CopyProcesses

SMAService

BPMService

SMOService

Access withService Tools

Update orRe-copy

Processes

Access withService Tools

CreateAnd

Synch

Access withService Tools

Copyprocesses

Go L 

i  ve

TIC

Page 68: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 68/90

1) Concept of Solution Implementation in SAP Solution Manager

2) ASAP Methodology

3) Walkthrough a Project Example

4) GlobalASAP Methodology

5) Summary

Agenda

© SAP 2010 / Page 68

Page 69: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 69/90

Page 70: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 70/90

© 2010 SAP AG. All rights reserved. / Page 70

SAP Solut ion Ma nage r 

Template(definition of global processes,

examples for local processes)

Solution(Execution of processes)

Project(Implementation of global and local

processes)

Global Rollout Cut Over

Compare and Adjust(Verification that all global processes

are implemented locally)

Solution DocumentationAssistant

(Verification that all global processesare executed locally)

SAP Solut ion Manager del ivers End-to-End governanc e o f g lobal proc esses

Single source of the truth(process description and execution)

Gover nanc e for Global Projec ts us ing Tem plat e

Management and Solut ion Docum entat ion Ass is tant

Page 71: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 71/90

© SAP AG 2010 All rights reserved. / Page 71

Local Systems Requirements finalized in Local Implementation Projects

Templat e Management Suppor t ing Global Rol lout –Process Overview (I)

Roll out globaltemplate

1Create globaltemplate

2

SUBSIDIARY A– Imp l . Pro jec t

T1V1

SUBSIDIARY B– Imp l . Pro jec t

T1V1

SUBSIDIARY C– Impl . Pr o ject

T1V1

Solu t io n Di re ct or y – Solu t io n

Implemented project state reflected in operativesolution(s)

Implement

global template3

T1V1

HEADQUARTERS – Tem p lat e Pr o jec tEnterprise Requirements – Template Projects

T1V1T1V1 T1V1

Page 72: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 72/90

© SAP AG 2010 All rights reserved. / Page 72

Local Systems Requirements finalized in Local Implementation Projects

Templat e Management Suppor t ing Global Rol lout –Process Overview (II)

SUBSIDIARY A– Imp l . Pro jec t

T1V1

SUBSIDIARY B– Imp l . Pro jec t

T1V1

SUBSIDIARY C– Impl . Pr o ject

T1V1

Solu t io n Di re ct or y – Solu t io n

Implemented project state reflected in operativesolution(s)

T1V1

HEADQUARTERS – Tem p lat e Pr o jec tEnterprise Requirements – Template Projects

Roll in template

requirements4

T1V2

Create newtemplate version

5

Roll out newtemplate version

6

Implement new

templateversion(compare &

adjust)

7

T1V2 T1V2 T1V2

T1V1T1V2T1V1T1V2T1V1T1V2 T1V1T1V2T1V2

Page 73: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 73/90

© SAP AG 2010 All rights reserved. / Page 73

Template Packaging &

Roll-out

Template

Configuration

Setup global project framework 

Create a template project

Assign project team members, roles, and responsibilities

Create required number of templates

Select standard scenarios from other templates (if applicable)

VisibilityControls template use

Open for public useClosed for public use, template „under construction“

Global Rollout Functionality Controls the use of global attributes

Template Creat ion

Template

Business Blueprint

Template

Project Preparation

Page 74: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 74/90

© SAP AG 2010 All rights reserved. / Page 74

Define global processes and requirements 

Select SAP predefined implementation content

Refine template process structure, e.g., by making use of short cuts

Assign template(s) to process structure

Set global attributes to determine scope of process changes in local roll-out projects

Document global business and technical requirements

The Global Attribute 

Changes to business scenarios, processes and process stepsallowed?If so, to what extent?

Template Creat ion

Template Packaging &

Roll-out

Template

Configuration

Template

Project Preparation

Template

Business Blueprint

Page 75: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 75/90

© SAP AG 2010 All rights reserved. / Page 75

Global e lem ents

- no changes allowed -

Loca l e lemen ts

- full authorization forchanges -

Template Creat ionThe Global Attribute

Harm on ized e lem ents

( s tandard comp le te / s t andardpar t ia l / har moni zed)

- some changes allowed -

The Global Attribute defines the scope of changes allowed in local rollout projects

Documen-tation

Countryversions

Localdevelop-ments

IMG structuresand settings

Globalcustomerdevelopments

Organiza-tional structure

Master datadocuments

Global and inte-grated processes

Localprocesses

Template Packaging &

Roll-out

Template

Configuration

Template

Project Preparation

Template

Business Blueprint

Page 76: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 76/90

Page 77: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 77/90

A d

Page 78: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 78/90

1) Concept of Solution Implementation in SAP Solution Manager

2) ASAP Methodology

3) Walkthrough a Project Example

4) GlobalASAP Methodology

5) Summary

Agenda

© SAP 2010 / Page 78

H l i t i A h

Page 79: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 79/90

Hol ist i c Approac hIntegration from project to solution

“Using the SAP Solution Manager tool is an excellent way of covering the live cycle of a 

solution. It enables us to control every step, from the design, to the realization to the IT operation of the system, and guaranteeing a full tracking and a very effective introduction of the system. We considered we obtained substantial benefits with this adoption, reducing TCO and above all we were successful to manage complex projects and edge operations” 

Martin Flegenheimer, IT Director, Ferrero Germany

Roadmap, Blueprint, and Implementation

Change Control Management

MaintenanceManagement

Monitoring &

Reporting

Application Incident Management

TestingOperations

Page 80: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 80/90

Page 81: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 81/90

Appl ic a t ion L i fecyc le Management

Page 82: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 82/90

Appl ic a t ion L i fecyc le Managementto integrated E2E Application Lifecycle Management

Modeling

(process structure change)

Solution Manager

TestAutomation

AutomatedTest

Scripts

TrainingManagement

End-UserTraining

TestManagement

Testing

JobManagement

Job

Documentation,

Scheduling

IncidentManagement

Ticketing

TestAutomation

AutomatedTest

Scripts

TrainingManagement

End-UserTraining

TestManagement

Testing

JobManagement

Job

Documentation,

Scheduling

IncidentManagement

Ticketing

Modeling

ProcessModel

SolutionOperations

MonitoringRoot Cause

SolutionDocumentation

Documentsand

Publishing

Configuration,Environment Management

SolutionConfiguration

Build, Release & DeploymentManagement

CodeConfiguration

Documentation

© 2010 SAP AG. All rights reserved. / Page 82

Appl ic a t ion L i fecyc le Management

Page 83: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 83/90

Appl ic a t ion L i fecyc le Management… to Best Practices

ARIS

(process structure change)

Process Model5-7 Levels

Process Model3 Levels(IT View)

Solution Manager

TestPlan

LearningMap

Script

Mapping

TestAutomation

AutomatedTest

ScriptsTesting

Solution

IncidentManagement

Ticketing

© 2010 SAP AG. All rights reserved. / Page 83

TestManagement

TrainingManagement

JobManagement

Job

Documentation,

Scheduling

End-UserTraining

Ex per t Guided Im plement at ion

Page 84: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 84/90

© 2010 SAP AG. All rights reserved. / Page 84

Expert-Guided Implementation = knowledge transfer incl. live configuration of the SAPsystems for SAP Solution Manager, Guided Self Services and more

Day 1 Day 2 Day 3 Day 4 Day 5

SAP expert explains step-by-stepconfiguration using training materials,

2. Ex ec ut ion, 2-3 hours on the same day

Participants have direct accessto an SAP expert who directlysupports them remotely, ifnecessary, during the execution

1. Emp ow er ing, Web session, 1-2 hours each morning

Participants executedemonstrated steps withintheir own project, on theirown SAP SolutionManager software

3. Exper t i se on dem and, during execution

Each day will be thebase for the nextday‘s empowerment

4. Dai ly feedback to SAP exper t

2. Empow er ing

3. Empoweri ng

5. Empow ering

4. Empower ing

Ex per t -Guided Im plement at ion“Training on the Job” at Its Best

Benef i t s for You

Page 85: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 85/90

© 2010 SAP AG. All rights reserved. / Page 85

Benef i t s for YouAs Our Valued SAP Customer or SAP Partner

Advantages

Direct configuration of your SAP Solution Manager Implemented scenarios are ready for use after delivery Execution of all activities in defined time frame Unique combination of remote training and expertise on demand

Direct remote access to SAP expert

Cost-effective, step-by-step and short-term training, from experts for experts withoutany travel expense

Fixed time slot delivery matched to time zone Available delivery slots published on the SAP

Service Marketplace Web site Plan and self-register online based on your team’s

project

Select your training

SAP Support Portal http://service.sap.com/esacademy

-> Expert Guided Implementation Sessions

Direct Link:SAP Support Portal - Expert Guided Implementation

Addi t iona l In form at ion

Page 86: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 86/90

© 2010 SAP AG. All rights reserved. / Page 86

In format ion Sources

Overview: Solution Implementation and Application Life-Cycle Managementhttp://service.sap.com/alm >> Processes >> Solution Implementation (Innovation Management)

Technical Papers: SAP Solution Manager Media Library

http://service.sap.com/alm >> SAP Solution Manager and Tools >> Media Library

Learning maps: Documentation of Core Business Processes andSolution Documentation Assistanthttp://service.sap.com/rkt-solman >> SAP Solution Manager 7.0 - Enhancement Package 1 (EHP1) >>

Requirements and Design Phases with SAP Solution Manager

Onsite training: Implementation Projects with SAP Solution Managerhttp://service.sap.com/education >> Training Catalog >> Course Search >> SMI310

Consulting Services: Quick start for projects in SAP Solution Manager

E-mail: [email protected]

Addi t iona l In form at ion

Fur t her Reading and Train ing for Tem plat es

Page 87: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 87/90

© 2010 SAP AG. All rights reserved. / Page 87

Fur t her Reading and Train ing for Tem plat es

General information on SAP Solution Manager:

http://service.sap.com/solutionmanager

http://service.sap.com/rkt-solman- SAP Solution Manager Learning Map

Template Management Training: SM510 Global Rollout (eLearning) SMI310 Implementation Tools in Detail (Classroom training, see next slide)Both courses can be booked under: http://www.sap.com/services/education

Online Help:

Available on the SAP Help Portal – SAP Solution Manager 7.0.Topics “Compare and Adjust with Template Source” and “Global Rollout with a Template”.

GlobalASAP Methodology

http://service.sap.com/roadmaps

Tips and Tricks on Working with Templates

http://service.sap.com/solutionmanager -> Media Library -> Technical Papers -> HandlingTemplates in SAP Solution Manager

Appl ic at ion Li fecyc le Management

Page 88: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 88/90

© SAP AG 2010. All rights reserved. / Page 88

Require-ments

Design

Deploy

Build &Test

Optimize

Operate

ALM

Appl ic at ion Li fecyc le ManagementAvailable Information Assets

service.sap.com/alm*www.sdn.sap.com/irj/sdn/alm

ALM Processes

SAP Solution Manager & Tools

Customer Center of Expertise

Methodologies

Services

Customer Successes

* Requires login credentials to the SAP Service Marketplace

Page 89: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 89/90

© SAP AG 2010. All rights reserved. / Page 89© SAP 2008 / Page 89

SAP keeps look ing forw ard

THANK YOU!

© 2010 SAP AG All Righ t s Reser ved

Page 90: 2010_12_21_Solution Implementation with SM

8/7/2019 2010_12_21_Solution Implementation with SM

http://slidepdf.com/reader/full/20101221solution-implementation-with-sm 90/90

No part of this publication may be reproduced or transmi tted in any form or for any purpose without the express permission of SAP AG. The information contained hereinmay be changed without prior notice.

Some software products marketed by SAP AG and its dist ributors contain proprietary software components of other software vendors.Microsoft, Windows, Excel, Outlook, and PowerPoint are registered trademarks of Microsoft Corporation.

IBM, DB2, DB2 Universal Database, System i, System i5, System p, System p5, System x, System z, System z10, System z9, z10, z9, iSeries, pSeries, xSeries, zSeries,eServer, z/VM, z/OS, i5/OS, S/390, OS/390, OS/400, AS/400, S/390 Parallel Enterprise Server, PowerVM, Power Architecture, POWER6+, POWER6, POWER5+,POWER5, POWER, OpenPower, PowerPC, BatchPipes, BladeCenter, System Storage, GPFS, HACMP, RETAIN, DB2 Connect, RACF, Redbooks, OS/2, Parallel Sysplex,MVS/ESA, AIX, Intelligent Miner, WebSphere, Netfinity, Tivoli and Informix are trademarks or registered trademarks of IBM Corporation.

Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

Adobe, the Adobe logo, Acrobat, PostScript, and Reader are either trademarks or registered trademarks of Adobe Systems Incorporated in the United States and/or othercountries.

Oracle is a registered trademark of Oracle Corporation.

UNIX, X/Open, OSF/1, and Motif are registered trademarks of the Open Group.

Citrix, ICA, Program Neighborhood, MetaFrame, WinFrame, VideoFrame, and MultiWin are trademarks or registered trademarks of Citrix Systems, Inc.HTML, XML, XHTML and W3C are trademarks or registered trademarks of W 3C®, World Wide Web Consortium, Massachusetts Institute of Technology.

Java is a registered trademark of Sun Microsystems, Inc.

JavaScript is a registered trademark of Sun Microsystems, Inc., used under license for technology invented and implemented by Netscape.

SAP, R/3, SAP NetWeaver, Duet, PartnerEdge, ByDesign, Clear Enterprise, SAP BusinessObjects Explorer and other SAP products and services mentioned herein as wellas their respective logos are trademarks or registered trademarks of SAP AG in Germany and other countries.

Business Objects and the Business Objects logo, BusinessObjects, Crystal Reports, Crystal Decisions, Web Intelligence, Xcelsius, and other Business Objects products andservices mentioned herein as well as their respective logos are trademarks or registered trademarks of SAP France in the United States and in other countries.

All other product and service names mentioned are the trademarks of their respective companies. Data contained in this document serves informational purposes only.National product specifications may vary.

The information in this document is proprietary to SAP. No part of thi s document may be reproduced, copied, or transmitted in any form or for any purpose without the

express prior written permission of SAP AG.This document is a preliminary version and not subject to your license agreement or any other agreement with SAP. This document contains only intended strategies,developments, and functionalities of the SAP® product and is not intended to be binding upon SAP to any particular course of business, product strategy, and/ordevelopment. Please note that this document is subject to change and may be changed by SAP at any time without notice.

SAP assumes no responsibility for errors or omissions in this document. SAP does not warrant the accuracy or completeness of the information, text, graphics, links, or otheritems contained within this material. This document is provided without a warranty of any kind, either express or implied, including but not limited to the implied warranties ofmerchantability, fitness for a particular purpose, or non-infringement.

SAP shall have no liability for damages of any kind including without limi tation direct, special, indirect, or consequential damages that may result from the use of thesematerials. This limitation shall not apply in cases of intent or gross negligence.

The statutory liability for personal injury and defective products is not affected SAP has no control over the information that you may access through the use of hot links

© 2010 SAP AG. Al l Righ t s Reser ved