Project Purpose
Construct short and mid-term roadway
improvements to improve traffic operations
on the local road network in conjunction with
occupancy of the Mark Center by Department
of Defense organizations (BRAC-133)
Project Area
I-395 at Seminary Road and Mark Center
Progress to Date• Stakeholder Meetings
� Kick-off
� Coordination with City of Alexandria, VDOT, and Department of Defense
• Data Gathering and Documentation� Preliminary field review
� Traffic counts for environmental studies and pedestrian bridge analysis
• Preliminary Roadway Engineering
Public Information Meeting
• Purpose: To provide the public with information
regarding the project’s preliminary design
• Date: Thursday, November 3, 2011
• Time: 6:00 p.m. to 8:00 p.m.
• Location: West End Community Redevelopment
Center at Landmark Mall
5801 Duke Street, Alexandria
Work in Progress / Upcoming Tasks
• Preliminary construction drawings
• Pedestrian bridge recommendations
• Environmental documentation
• Public meeting
• Design-Build contract procurement
Project Schedule
Item Timeframe
Preliminary Engineering August – November 2011
Public Meeting November 2011
Pedestrian Bridge Recommendation November 2011
Categorical Exclusion November 2011
Construction Begins Summer 2012