11
2011 MF LRG New Orleans, LA MAINTENANCE CENTER ALBANY MSgt Watkins INTRODUCTION

2011 MF LRG New Orleans, LA MAINTENANCE CENTER ALBANY MSgt Watkins INTRODUCTION

Embed Size (px)

Citation preview

Page 1: 2011 MF LRG New Orleans, LA MAINTENANCE CENTER ALBANY MSgt Watkins INTRODUCTION

2011 MF LRG New Orleans, LA

MAINTENANCE CENTER ALBANY

MSgt Watkins

INTRODUCTION

Page 2: 2011 MF LRG New Orleans, LA MAINTENANCE CENTER ALBANY MSgt Watkins INTRODUCTION

2011 MF LRG New Orleans, LA

Maintenance Center Albany MFCS Management Team

Program Management Branch Head: Harold Eidson Project Section Supervisor: Blase Goodman Project Lead: Jim Clanton Planner/Estimator: Rob Tyler Industrial Engineering Tech: Keith Hamsley MFP Liaison: MSgt Watkins Assistant MFP Liaison: SSgt Collins Contractor Service Support: Kevin Adams

MCA MFCS TEAM

Page 3: 2011 MF LRG New Orleans, LA MAINTENANCE CENTER ALBANY MSgt Watkins INTRODUCTION

2011 MF LRG New Orleans, LA

Assets Completed FY11

Mobile Facilities: (5) JU-01s (8) JF-05s – Army Assets (5) KA-31s (1) AM-01 (1) CA-01 (1) CA-04 (1) SU-03

TQGs: (28) Preserved in an ‘RFU’ status

PRODUCTION

Page 4: 2011 MF LRG New Orleans, LA MAINTENANCE CENTER ALBANY MSgt Watkins INTRODUCTION

2011 MF LRG New Orleans, LA

Assets in Process/Scheduled FY11:

SCHEDULE

Page 5: 2011 MF LRG New Orleans, LA MAINTENANCE CENTER ALBANY MSgt Watkins INTRODUCTION

2011 MF LRG New Orleans, LA

Assets in Process/Scheduled FY11:

TQGs: (51) Preservation for ‘RFU’ status (3) Repair

Lift-Off Hinge: (28) Cast hinges due in August Send to Marine Container for CSC testing

SCHEDULE

Page 6: 2011 MF LRG New Orleans, LA MAINTENANCE CENTER ALBANY MSgt Watkins INTRODUCTION

2011 MF LRG New Orleans, LA

ROC LOC REMOVAL

ROC LOC Removal/Storage Video

Page 7: 2011 MF LRG New Orleans, LA MAINTENANCE CENTER ALBANY MSgt Watkins INTRODUCTION

2011 MF LRG New Orleans, LA

ROC LOC INSTALL

ROC LOC Install Video

Page 8: 2011 MF LRG New Orleans, LA MAINTENANCE CENTER ALBANY MSgt Watkins INTRODUCTION

2011 MF LRG New Orleans, LA

LIFT-OFF HINGE VIDEO

LIFT-OFF HINGE VIDEO

Page 9: 2011 MF LRG New Orleans, LA MAINTENANCE CENTER ALBANY MSgt Watkins INTRODUCTION

2011 MF LRG New Orleans, LA

Issues/Concerns

Parts Issues Obsolete parts No longer required items in MF configurations

Fleet Returned MFs:

• SOMFs panels need to be securely fastened

• Naval Messages need to annotate what is missing from the inventory.

Fleet Assistance:

• For information

• For missing assets

ISSUES/CONCERNS

Page 10: 2011 MF LRG New Orleans, LA MAINTENANCE CENTER ALBANY MSgt Watkins INTRODUCTION

2011 MF LRG New Orleans, LA

Maintenance Center Albany MFCS Team POCs

Project Lead: Jim Clanton• 229-639-7477

Planner/Estimator: Rob Tyler• 229-639-6834

Industrial Engineering Tech: Keith Hamsley• 229-639-7470

MFP Liaison: MSgt Watkins• 229-639-9060 (DSN: 567)

Assistant MFP Liaison: SSgt Collins• 229-639-7207 (DSN: 567) Contactor Service Support: Kevin Adams• 229-639-7061 (DSN: 567)

MCA MFCS TEAM POCS

Page 11: 2011 MF LRG New Orleans, LA MAINTENANCE CENTER ALBANY MSgt Watkins INTRODUCTION

2011 MF LRG New Orleans, LA

1111

ARE THERE ANY QUESTIONS?

QUESTIONS