www.fugroconsultants.com www.fugroconsultants.com
Fugro Consultants, Inc.
Mark Zellman, PG, GISP
21 September 2012
Conducting GIS Work Within a
Nuclear Safety-Related Quality
Assurance Quality Control
(QA/QC) Program
GIS in the Rockies 2012
www.fugroconsultants.com
INTRODUCTION
Fugro Consultants, Inc. (FCL)
– FCL is a division of FUGRO.
– Global company which focuses on
geologic and geotechnical related
projects – including siting studies
and hazard analysis for nuclear
power plants
– The FCL QA/QC program was
developed to meet U.S. Nuclear
Regulatory Commission (NRC)
requirements for our work in the
nuclear power industry
www.fugroconsultants.com
WHAT IS QA/QC
Quality Assurance (QA) is an objective review which takes place through a system of external
and independent audit procedures. The QA review is conducted by a third party to assess the
effectiveness of the QC program and the quality, completeness, accuracy, and precision of a
product.
Quality Control (QC) is a system of routine technical activities implemented to measure and
control the quality of a product as it is being compiled. QC procedures include technical reviews,
accuracy checks, and the use of approved standardized procedures.
U.S. Nuclear Regulatory Commission (US NRC) Quality assurance (QA) comprises all planned and systematic actions that are necessary to provide
adequate confidence that a structure, system, or component will perform satisfactorily in service.
Attributes of a QA program include procedures, recordkeeping, inspections, corrective actions, and
audits.
The U.S. Nuclear Regulatory Commission (NRC) reviews and inspects QA programs and their
implementation for nuclear steam system suppliers; architect-engineering firms; suppliers of safety-
related and commercial-grade products and services; calibration and testing laboratories; and holders of
NRC construction permits, operating licenses, and combined licenses in quality-related areas. In
conducting these inspections, the NRC's objective is to determine whether licensees and their
contractors are meeting the agency's requirements. In particular, the NRC reviews the QA programs for
commercial nuclear power plants. In addition, for operating nuclear power plants, the NRC reviews any
changes that reduce previous commitments to the plant’s QA program (U.S. NRC, 2012)
www.fugroconsultants.com
WHY USE QA/QC?
To ensure that high quality and accurate information is being produced for
the design of vital infrastructure.
www.fugroconsultants.com
OVERALL QA/QC PROGRAM STRUCTURE
QA/QC Manual • Establishes QA/QC program
• Applies to multiple projects
• Overseen by QA/QC manager *
*
Software
Control
GIS
Documents
GIS EXPERT
Insert Your
Name Here
• QA/QC Manual sub-sections which
directly apply to GIS work
• Written with input from GIS staff
www.fugroconsultants.com
GIS QA/QC PROCEDURE DOCUMENT
GIS Procedure Document (Sub-section of the QA/QC Manual)
– Responsibilities / Roles
• Project Manager, GIS Supervisor, Preparer, Verifier
– Process
• Folder Structure
• GIS Documents / File Naming
• Metadata
• Verification of GIS Documents
• Revision Tracking
• Final Data Delivery
– Records / Documentation
• GIS Request Form, Data Tracking Sheets, GIS Verification Sheet,
etc…
www.fugroconsultants.com
GIS TASK WORFLOW
Project
Manager
GIS
Request
GIS
Supervisor
GIS
Preparer
GIS
Verifier
GIS Task/s
Task
Complete?
Yes/No
Delivery of
Product
Task
Assignment
Yes No
www.fugroconsultants.com
Software validation is governed by two documents…
– Commercial Grade Dedication Plan • Commercial-grade dedication is a process by which a commercial-grade item (CGI) is
designated for use as a basic component. This acceptance process is undertaken to
provide reasonable assurance that a CGI to be used as a basic component will perform
its intended safety function and, in this respect, is deemed equivalent to an item
designed and manufactured under a 10 CFR Part 50, Appendix B, quality assurance
program. This assurance is achieved by identifying the critical characteristics of the item
and verifying their acceptability by inspections, tests, or analyses by the purchaser or
third-party dedicating entity. (U.S. NRC, 2012)
SOFTWARE VALIDATION
– Software Installation and Checkout Plan
• User manual
• Verification of installation and results
• Tests the software to ensure results
are reproducible and performs as
expected
www.fugroconsultants.com
SOFTWARE VALIDATION CONTINUED…
To meet the NRC software validation requirements FCL has performed
software validation on an as-needed basis
– Involves developing methods to test that the software creates reliable
and reproducible results.
ESRI Products:
– ESRI has performed and prepared V&V documents; they are available
for a large cost. As a result FCL has developed our own V&V for ESRI
software.
When to conduct V&V
– Anytime the software code changes (OS or software updates)
www.fugroconsultants.com
DOCUMENTATION
Documentation is necessary to track the assignment of tasks, data sources,
data processing steps, and other aspects of GIS work
Detailed documentation is crucial
Plan ahead for tracking and storing documentation
In short: QA/QC = Documentation
www.fugroconsultants.com
After the release of Rev-0 report
Prior to release of Rev-0 report
REVISIONS TO GIS DOCUMENTS
File 1_RevA EDIT
PROCESS File 1_RevB
File 1_Rev0 EDIT
PROCESS File 1_Rev1
EDIT
PROCESS File 1_RevC*
EDIT
PROCESS File 1_Rev2**
*Each “Rev” is labeled with an increasing letter value
**Each “Rev” is labeled with an increasing number value
The process applies to both GIS data files and map documents
www.fugroconsultants.com
DATA
How you search for and obtain data will probably be
affected
Data sources should be scrutinized
– Acceptable sources
– Unacceptable sources
Process of downloading and documenting the data
source
– Screen capture
– Entry into project notes
– Add to tracking sheet
Field data
– Process for handling data collected in the field
– Versioning – preliminary borings, as-built
borings, etc.
www.joesdata.com
Joe’s Page of GIS Data
Map Data
Vector Data
Map of the Day
Funny Cat Pix
Joe’s Bio
www.fugroconsultants.com
WHAT CAN I EXPECT?
Training – project specific QA/QC training
Software
– Potential limitations on software use
– Updates and upgrades need consideration
GIS work
– Documentation and paperwork
– Organized system to file the documentation
– Structured work flow process
– Working within established work roles
– Data mining considerations – where can I get data?
www.fugroconsultants.com
OTHER CONSIDERATIONS
File and map naming conventions
Time and cost increase
www.fugroconsultants.com
CONCLUSION
QA/QC program development is a long and rigorous process
Internal audits are very helpful
Working under a QA/QC plan will affect the way you collect data, handle
data, and perform work
It is important to stay active with documentation – DON’T FALL BEHIND
Software validation could pose a challenge
Communication with others involved is very important
QA/QC programs deliver reliable and well-documented information
Practices from an implemented QA/QC program will influence your regular
style of work in a positive way
– Lessons learned, and processes developed for documents/data created
under a safety-related process can and should influence how non-
safety-related documents/data are created.
www.fugroconsultants.com
REFERENCES
U.S. NRC, 2012, Commercial Grade Dedication, http://www.nrc.gov/reactors/new-
reactors/oversight/quality-assurance/vendor-insp/comm-grade-dedication.html (Date Accessed:
17 Sept 2012)