72
STRATEGIC PLAN 2013 - 2018

2013 - 2018 STRATEGIC PLAN - PPOA Strate… · 1.5 rationale for strategic planning ... 3.2 swot analysis of ppoa ... cbl dg dpp fke gm gok hod fke hra ict ifmis ippmt eacc kam kepsa

Embed Size (px)

Citation preview

STRATEGIC PLAN2013 - 2018

1 | ppoa.go.ke

CHAPTER ONE

INTRODUCTION

1.1 BACKGROUND

1.2 KENYA DEVELOPMENT CHALLENGES

1.3 THE KENYA VISION 2030

1.4 THE ROLE OF PPOA IN THE ACHIEVEMENT OF VISION 2030

1.5 RATIONALE FOR STRATEGIC PLANNING

1.6 PLANNING ASSUMPTIONS

1.7 METHODOLOGY OF DEVELOPING THE PLAN

1.8 ORGANIZATION OF THE PLAN

9

9

10

10

11

11

12

12

INSTITUTIONAL REVIEW

2.1 MANDATE

2.2 FUNCTIONS

2.5 MISSION

2.6 CORE VALUES

2.7 ORGANIZATIONAL STRUCTURE

13

13

14

14

2.3 POWERS

2.4 VISION

14

14

15

CHAPTER TWO

CHAPTER THREE

SITUATIONAL ANALYSIS3.1 EVALUATION OF PAST PERFORMANCE 17

LIST OF TABLES

LIST OF FIGURES

ABBREVIATIONS AND ACRONYMS

PREFACE

FOREWORD

EXECUTIVE SUMMARY

3

3

4

6

7

8

CONTENT

PPOA Strategic Plan 2013 - 2018

PPOA Strategic Plan 2013 - 2018

2 | ppoa.go.ke

STRATEGIC ANALYSIS

CHAPTER FOUR

4.1 STRATEGIC THEMES

4.2 STRATEGIC OBJECTIVES

4.3 STRATEGIES

23

24

25

CHAPTER FIVE

IMPLEMENTATION MATRIX 28

CHAPTER SIX

INSTITUTIONAL STRUCTURE

6.1 BOARDS

6.2 OFFICE OF THE DIRECTOR-GENERAL

6.3 DIRECTORATES

58

58

59

CHAPTER SEVEN

RESOURCE MOBILIZATION

61

62

7.1 FINANCIAL RESOURCE REQUIREMENT

7.2 STRATEGIES FOR RESOURCE MOBILIZATION

CHAPTER EIGHT

MONITORING AND EVALUATION

8.1 OBJECTIVES OF MONITORING AND EVALUATION

8.2 MONITORING AND EVALUATION FRAMEWORK

8.3 PROJECTED KEY PERFORMANCE INDICATORS

63

63

63

CONTENT

3.2 SWOT ANALYSIS OF PPOA

3.3 STAKEHOLDER ANALYSIS

19

20

TABLE 1: STAKEHOLDER ANALYSIS

TABLE 2: STRATEGIC THEMES, OBJECTIVES AND STRATEGIES

20

25

TABLE 3: FINANCIAL RESOURCE REQUIREMENTS 61

TABLE 4: KEY PERFORMANCE INDICATORS 64

3 | ppoa.go.ke

LIST OF TABLES

FIGURE 1: CURRENT ORGANIZATIONAL STRUCTURE 16

LIST OF FIGURES

CONTENT

PPOA Strategic Plan 2013 - 2018

ABBREVIATIONS AND ACRONYMS

ARB

BPR

CBL

DG

DPP

FKE

GM

GOK

HOD

FKE

HRA

ICT

IFMIS

IPPMT

EACC

KAM

KEPSA

KIPPRA

KISM

KENAO

KPIs

KRA

LAN

M&E

MOU

MPI

MTP

NEMA

OECD

OPB

- Administrative Review Board

- Business Process Reengineering

- Capacity Building Levy

- Director General

- Directorate of Public Prosecution

- Federation of Kenya Employers

- General Manager

- Government of Kenya

- Head of Department

- Federation of Kenya Employers

- Human Resources and Administration

- Information Communication Technology

- Integrated Financial Management Information System

- Internal Procurement Performance Monitoring Tool

- Ethics And Anti-Corruption Commission

- Kenya Association of Manufacturers

- Kenya Private Sector Alliance

- Kenya Institute of Public Policy Research and Analysis

- Kenya Institute of Supplies Management

- Kenya National Audit Office

- Key Performance Indicators

- Kenya Revenue Authority

- Local Area Network

- Monitoring and Evaluation

- Memorandum of Understanding

- Market Price Index

- Medium Term Plan

- National Environmental Management Authority

- Organization for Economic Co-operation and Development

- Operational Budget

PAC - Parliamentary Accounts Committee

4 | ppoa.go.ke

PPOA Strategic Plan 2013 - 2018

PPOA - Public Procurement Oversight Authority

PPOAB - Public Procurement Oversight Advisory Board

SME - Small and Micro Enterprises

SWOT - Strengths, Weaknesses, Opportunities and Threats

PPP - Public Private Partnership

PPDA - Public Procurement Disposal Act

TNA - Training Needs Analysis

CBL - Capacity Building Levy

ERP - Enterprise Resource Planning

KEBS - Kenya Bureau of Standards

SLO - State Law Office

TOR - Terms of Reference

PE - Procuring Entity

PPARB - Public Procurement Administrative Review Board

PPD - Public Procurement Directorate

5 | ppoa.go.ke

ABBREVIATIONS AND ACRONYMS

PPOA Strategic Plan 2013 - 2018

I have the pleasure of introducing the Strategic Plan of the Public Procurement Oversight that covers a Five-year period 2013 - 2018. This Plan builds on the achievements of the Strategic Plan for the year 2010 – 2014. The Board and the management of PPOA took a significant step of planning for the Authority for a period of five years through the Strategic Plan covering the period 2010 – 2014 that aimed at propelling the PPOA to a high performance path in achieving its mandate with specific objectives of creating an alignment of the Authority’s operations with the overall Government Agenda as portrayed in the Kenya Vision 2030 and the MTP II (2013-2018). The Authority is a key player in ensuring accountability in public expenditure through the procurement and disposal process.

This Strategic Plan provides the PPOA’s business model, describing the key activities that we intend to carry out, the objectives and key result areas and also identifying the resources that will be required. The Strategic Plan has been prepared on the premise that the envisioned Public Procurement and Assets Disposal Bill, 2014 will be enacted by parliament and assented to by H.E the President. The envisioned robust law is aimed at strengthening procurement planning and the administrative review process, promoting growth of the Kenyan economy through gender mainstreaming and encouraging micro and small enterprises through participation in public procurement under preference and reservation schemes, ensuring transparency and accountability by streamlining the functions at the National Government, County Governments and all other procuring entities across the board. We also aim at strengthening the Authority through setting up Regional Offices across the country to facilitate increased access to our services.

The achievement of the goals set in this Strategic Plan is the responsibility of all of us. We look forward, with confidence, to the realization of all the milestones we have set for ourselves in this Strategic Plan. Finally I wish to express the commitment and support of the Board and my own support to Management and strategic part-ners of the Authority in the implementation of the Strategic Plan.

Mr. Patrick MtangeChairman, Advisory Board OCTOBER 2013

The plan is an outcome of a consultative process involving various stakeholders and has identified opportuni-ties in advancing the quality of public procurement and the great role this could play in the Country’s develop-ment. The strategic plan is therefore a shared statement among the various stakeholders of the way forward and the goals to be achieved in the planning period.

PREFACE

6 | ppoa.go.ke

PPOA Strategic Plan 2013 - 2018

The Public Procurement Oversight Authority (PPOA) is established under an Act of Parliament, the Public Procurement and Disposal Act, 2005. In addition, the Act established the Public Procurement OversightAdvisory Board and the Public Procurement Administrative Review Board. The mandate of PPOA is to ensure that procurement procedures and regulations are complied with as established under the Public Procurement and Disposal Act, 2005, Regulations, 2006 and other Regulations. The Vision of PPOA is to be the leading public procurement and disposal regulator, globally. PPOA’s Mission is to enhance national socio-economic development by facilitating and ensuring the implementation of an effective and efficient public procurement and disposal system. To achieve its mandate, the Board and the management identified the need of aligning the Authority’s strategic plan with the overall Government Agenda as documented in the Kenya Vision 2030 and the MTP II (2013-2018). A key enabler in the achievement of the Government aspirations is the utilization of an efficient and effective public procurement system.

I appeal to the Government, development partners, well-wishers and other Authority’s stakeholders to gener-ously extend their financial, material and moral support for the successful implementation of the PPOA Strate-gic Plan 2013-2018.

I thank Management and staff of PPOA for their patience, commitment and dedication to ensure timely prepa-ration of this plan. I also thank the Advisory Board for their contribution to the preparation of the StrategicPlan.

Maurice Juma MBSDirector GeneralOCTOBER 2013

The process of the preparation of the Strategic Plan was participatory and included consultations with staff of the Authority as well as other key stakeholders. In preparing this strategic plan, the Authority took into account the dynamic operating environment and the challenges it poses to the procurement systems and stakehold-ers.This strategic plan documents strategies that will enable the Authority to respond adequately to these changes and challenges. The development of the Strategic Plan involved benchmarking with other national and international public agencies in order to identify the strategic and key result areas of focus for theAuthority. The Strategic Plan covers a period of five years and has a costed implementation plan as well as a monitoring and evaluation framework. Successful implementation of the strategic plan will require a combined effort of the various stakeholders. However, the primary responsibility of implementing this plan lies with the board, management and employees of PPOA.

FOREWORD

7 | ppoa.go.ke

PPOA Strategic Plan 2013 - 2018PPOA Strategic Plan 2013 - 2018

3) To strengthen the policy, legal, regulatory; and research and development framework for public procurement and disposal system;

The Public Procurement Oversight Authority is established under an Act of Parliament, the Public Procurement and Disposal Act, 2005. Among other things, the Act established a semi-autonomous oversight body, the Public Procurement Oversight Authority (PPOA), Public Procurement Oversight Advisory Board (PPOAB) and the Public Procurement Administrative Review Board (PPARB). The PPOA is among other responsibilities charged with ensuring that all procurement entities observe the provisions of the law.

For each identified strategic issues, appropriate objectives have been stated. The strategic objectives are to:

1) To ensure compliance with the Public Procurement and Disposal Act, 2005; Regulations, 2006; and PPOA guidelines;

2) To build capacity of persons and institutions involved in public procurement;

4) To uphold fairness and promote public confidence in the public procurement system;

5) To improve human resource management, systems and infrastructure to provide quality service to stake holders;

6) To enhance the use of technology in order to increase efficiency and effective service delivery;

7) To enhance financial sustainability;

8) To improve the image of the Authority and enhance customer service; and

9) To incorporate the risk management culture within the Authority.

This strategic plan provides a roadmap for addressing challenges facing the public procurement system and PPOA as an institution. The strategic themes identified for the planning period are: compliance; capacity building; regulatory framework; institutional capacity and corporate image.

Appropriate strategies and activities have also been identified for each objective. An implementation plan which details for each objective, the strategies, activities, implementing actors, timelines, resources, expected output and the indicators, has been provided. In addition, a resource mobilization mechanism is presented in chapter seven. During the planning period, the PPOA will require approximately Kshs. 6.9 billion. The institu-tional structure and a monitoring and evaluation framework for ensuring successful implementation of the strategic plan has been provided in chapters six and eight respectively.

EXECUTIVE SUMMARY

8 | ppoa.go.ke

PPOA Strategic Plan 2013 - 2018

Procurement is one of the critical areas of Kenya’s public financial management system which is continuously undergoing reforms. The reforms are aimed at enhancing efficiency of utilization of public resources; ensuring fiscal stability which is key to creating an enabling environment for private sector led growth; and strengthen governance and transparency in the management of public finances. One of the key achievements of the public financial management reforms was the enactment of the Public Procurement and Disposal Act, 2005 which became operational on 1st January 2007 with the gazettement of the Public Procurement and Disposal Regulations 2006.

(i) The Public Procurement and Disposal (Public Private Partnerships) Regulations, 2009 which were replaced with the Public Private Partnerships Act, 2013.

(ii) The Public Procurement and Disposal (Amendment) Regulations, 2009 on CDF committees.

(iii) The Public Procurement and Disposal (Preference and Reservations) Regulations, 2011.

(iv) The Finance Act 2009 establishing the Constituency Roads Tender Committee

(v) The Finance Act 2010 empowering the Director General to impose a debarment based on the recommendation of a law enforcement agency with an investigative mandate.

A major milestone in procurement reforms came with the promulgation of The Constitution of Kenya, 2010 which reinforced the need for public procurement to be conducted in accordance with a system that is fair, equitable, transparent, competitive and cost effective. It also provides opportunity for enactment of a new procurement law by 2014.Plan.

The Kenya Vision 2030 highlights the various challenges that the country will face in its quest to achieve the vision of a globally competitive and prosperous nation. These challenges include: greater competition at the international level emanating from changing global economic trends; ensuring continued macroeconomic stability; minimizing institutional risks, especially related to governance and security; scaling up the quantity and quality of infrastructure, especially the condition of roads, access to and reliability of water, affordableelectricity and efficient port and rail services; promoting efficiency through adoption of new technologies, reducing costs of doing business; and raising the level of investments from the estimated 20% of GDP in 2006 to 31.3% of GDP by 2012/ 2013 and then remain above 32% for the 2014 - 2030 period.

The Act inter alia established a semi-autonomous oversight body, PPOA, PPOAB and PPARB. Since the pub-lication of the regulations in 2006 a number of changes and developments in the procurement system have occasioned introduction of new regulations and amendments to the law, namely:

CHAPTER ONE

INTRODUCTION

1.1 BACKGROUND

1.2 KENYA DEVELOPMENT CHALLENGES

1.2. 1 Long Term Development Challenges

PPOA Strategic Plan 2013 - 2018

9 | ppoa.go.ke

These include addressing the challenges of the implementation of the first medium term report such as bureaucratic procurement procedures; slow pace of legislative reforms e.g procurement law and low levels of Public Private Partnerships engagements. The challenge of high unemployment rate is compounded by an increasing number of youths leaving school and unable to find gainful employment; the large number of Ken-yans still living in poverty; high inequality in income distribution; inequity in gender; considerable disparities in development among different regions of the country; low savings and investment rates; insecurity; persisting corruption and weak governance; poor infrastructure; and slow progress in achieving structural changes in the economy, and over reliance on agriculture and export of primary products.

1.2.1 Medium Term Development Challenges

To accelerate the growth of the economy, the Government developed a long term blue print for the country; the Kenya Vision 2030. The aim of the Kenya Vision 2030 is to make Kenya a globally competitive and pros-perous country by transforming it into an industrialized middle income nation providing high quality of life for all its citizens in a clean and secure environment. Attainment of the Kenya Vision 2030 also aims at achieving the Millennium Development Goals (MDGs).

1.3 THE KENYA VISION 2030

The Vision 2030 has identified key initiatives/ flagship projects to spearhead the socio-economic transforma-tion in the country. Successful implementation of various flagship projects will contribute towards the social-economic development in the country and will also enhance the living standards of the citizens. The vehicle by which the flagship projects are implementable is through procurement and the key enabler in the delivery of these projects is a sound, efficient and effective public procurement system. To this end, PPOA is expected to play a key role in the development, implementation and regulation of the public procurement system so as to ensure that the Government gets value for money.

1.4 THE ROLE OF PPOA IN THE ACHIEVEMENT OF VISION 2030

To continue implementing the Kenya Vision 2030, the Government will implement the second Medium Term Plan II outlining the strategies for the years 2013-2017. The Government recognizes the need for involvement and participation of citizens and all other stakeholders in achieving the objectives of the Kenya Vision 2030. It also recognizes the need for prudent management of the country’s scarce resources.

Kenya Vision 2030 is anchored on three pillars; -

The Economic pillar: Aims at providing prosperity for all Kenyans by attaining an annual growth rate of 10% per annum and sustaining it through the Vision period. Under this pillar, flagship projects have been identified in tourism, agriculture, manufacturing, wholesale and retail, business process outsourcing and financial services.

i.

The Social pillar: Seeks to build a just and cohesive society with social equity in a clean and secureenvironment. To achieve this, the priority sectors identified include education and training, health, water and sanitation, environment, housing and urbanization, gender, youth and vulnerable groups.

ii.

The Political pillar: Aims to realize an issue based, people centered, result oriented and accountable democratic system. The specific areas identified for achievement of this priority are respect for the rule of law, protection of individual rights and freedom, electoral and political processes, democracy and public service delivery, transparency and accountability, security, peace building and conflict resolution.

iii.

10 | ppoa.go.ke

PPOA Strategic Plan 2013 - 2018

Through the development and implementation of this strategic plan, PPOA will benefit in a number of ways. These will include:

The strategic planning process was aimed at identifying and selecting the most appropriate strategies of utiliz-ing the Authority’s limited resources in areas with greatest potential impact. This strategic plan takes into account PPOA’s internal and external environment; including political factors, legal and regulatory framework, Government policies, technological trends and economic factors among others. The plan also takes into consideration our learning experience from the implementation of the Public Procurement and Disposal Act, 2005, the Constitution of Kenya, 2010, the 2nd Medium Term Plan and experiences from the implementation of the previous plan which has necessitated a new strategic thinking and planning.

1.5 RATIONALE FOR STRATEGIC PLANNING

In the preparation of the strategic plan, the following assumptions were made:

1.6 PLANNING ASSUMPTIONS

The existence of an effective and efficient procurement system will ensure reduction of wastage in Govern-ment expenditure, eradication of corruption; and increased transparency and accountability in public procure-ment processes. The system will also guarantee protection or advancement of persons, categories of persons or groups previously disadvantaged by unfair competition or discrimination.

PPOA therefore has an important role to play in the realization of Vision 2030, the Medium Term Plan and implementation of flagship projects through ensuring compliance of the provisions of the public procurement and asset disposal law, facilitating capacity building for the procuring entities, suppliers, contractors and other stakeholders as well as advising on the appropriate policies and regulations towards the improvement of public procurement and asset disposal system.

Clarity on the overall Mission and Vision of PPOA resulting in concerted efforts to achieve a shared goal.i)

Increased organizational effectiveness resulting from the clear direction provided by the Plan through setting objectives.

ii)

Developing a more proactive posture to deal with environmental challenges and take advantage of antici-pated opportunities.

iii)

The Government will continue to support PPOA and provide adequate budgetary allocations; i)

The Capacity Building (CBL) Levy shall be operationalized;ii)

The Authority will continue to attract technical and financial support from development partners;iii)

There shall be an optimal staffing level;iv)

The procure to pay system of the IFMIS will be operationalized;v)

The stakeholders shall cooperate with PPOA in the various activities; andvi)

There shall be socio-economic and political stability in the country.vii)

Improved stakeholder motivation and positive response achieved by communicating the Strategic Plan.iv)

Provision of a framework for tracking performance and taking corrective actions.v)

PPOA Strategic Plan 2013 - 2018

11 | ppoa.go.ke

A participatory approach of the strategic planning process was used in the development of this strategic plan. The methodology entailed review of various documents, several strategic planning workshops were also held with the PPOAB, PPARB, Management and staff including other stakeholders.

1.7 METHODOLOGY OF DEVELOPING THE PLAN

This strategic plan consists of eight chapters:

Chapter one is the introduction, which covers the background of PPOA, Kenya development challenges, the Kenya Vision 2030, the role of PPOA in the achievement of Vision 2030, the rationale for strategic planning, planning assumptions, the methodology of developing the plan and organization of the plan.

Chapter two provides the institutional review covering the mandate, functions, vision, mission, core values and current organizational structure.

Chapter three presents situation analysis covering an evaluation of PPOA’s past performance, the internal environment, external environment and stakeholder analysis.

Chapter four covers the strategic themes, objectives and strategies.

Chapter five presents the implementation matrix, which covers for each of the strategic objectives, the strat-egies, proposed actions, implementing actors, time frame, resource requirements, expected outputs and output indicators.

Chapter six covers the institutional structure.

Chapter seven highlights the resource requirements and resource mobilization strategies.

Chapter eight covers monitoring and evaluation framework for managing performance.

1.8 ORGANIZATION OF THE PLAN

12 | ppoa.go.ke

PPOA Strategic Plan 2013 - 2018

Arising from the above, the mandate of PPOA is to ensure that procurement procedures and regulations are complied with as established under the Public Procurement and Disposal Act, 2005 and Regulations, 2006.

PPOA is an independent regulatory body established under the Public Procurement and Disposal Act, 2005 which came into operation on 1st January 2007 with the publication of the Public Procurement and Disposal Regulations, 2006. The purpose of the Public Procurement and Disposal Act is to establish procedures for procurement and disposal of unserviceable, obsolete or surplus store and equipment by public entities in order to achieve the following objectives:

CHAPTER TWO

INSTITUTIONAL REVIEW

2.1 MANDATE

The functions of PPOA are set out in Section 9 of the Act. These are:

2.2 FUNCTIONS

Maximize economy and efficiency;i)

Promote competition and ensure that competitors are treated fairly;ii)

Promote integrity and fairness ;iii)

Increase transparency and accountability ;iv)

Increase public confidence andv)

Facilitate the promotion of local industry and economic development.vi)

Ensuring that procurement procedures established under the Act are complied with;i)

Monitoring and reporting on the public procurement system and recommend improvements;ii)

Assisting in the implementation and operation of the public procurement system by;

• Preparing and distributing manuals, guidelines, standard procurement documents and formats to be used by procuring entities,

• Providing advice and assistance to procuring entities,

• Act on complaints received from stakeholders

• Developing, promoting and supporting the training and professional development of the persons involved in procurement,

• Issuing written directions to public entities with respect to procurement including the conduct of procurement proceedings and dissemination of information on procurements, and

• Ensuring that procuring entities engage procurement professionals in their procurement.

iii)

iv) Initiating public procurement policy and propose amendments to the Act; and

PPOA Strategic Plan 2013 - 2018

13 | ppoa.go.ke

Performing such other functions and duties as are provided for under the Act.v)

2.4 POWERS

• Reviews / Assessment;

• Investigation;

• Termination of procurement process / Contract;

• Transferring of procurement responsibility;

• Enforce the decisions of the review board; and

• Imposition of sanctions against errant suppliers and recommend administrative actions against officers who breach the law.

A vibrant procurement and disposal system for attainment of Kenya’s Vision 2030.

2.3 VISION

To facilitate access to procurement opportunities through enabling regulation that fosters value for money for national socio-economic development.

2.4 MISSION

PPOA, in its endeavor to realize its vision and mission, upholds the following core values:

PPOA will endeavor to act in a transparent, predictable and understandable manner to its stakeholders.

PPOA will deal with its stakeholders in a just and impartial manner

PPOA will endeavor to satisfy its customers’ needs.

2.5 CORE VALUES

Transparencyi)

Equitabilityii)

Customer focusiii)

PPOA staff will embrace togetherness and team spirit in carrying out their duties. Synergy among the staff members shall be highly valued for better achievement of objectives.

Teamworkiv)

PPOA will endeavor to be impartial in carrying out its mandate

Objectivityv)

PPOA board and staff members will strive to be professional, honest, fair and ethical at all times.

Integrityvi)

In the performance of their duties, PPOA Boards and staff shall be bold in the execution of their dutieand shall be prepared to mitigate any risks or challengess.

Couragevii)

14 | ppoa.go.ke

PPOA Strategic Plan 2013 - 2018

There are two boards namely, the PPOAB PPARB. PPOA is headed by the Director-General and has two directorates namely; the Directorate of Technical Services and the Directorate of Finance and Administration each headed by a General Manager.

The Directorate of Technical Services is structured into four functional departments: Compliance; Capacity Building; Administrative Review Secretariat; and Policy and Research.

The Directorate of Finance and Administration is structured into three functional departments: Finance; Human Resource and Administration; and Procurement.

The Authority also has the Corporate Services, Internal Audit and ICT departments.

2.6 ORGANIZATIONAL STRUCTURE

2.6.1 Organization of the Authority

PPOA’s approved establishment is 72 but currently has an in-post of 61 members of staff spread across the various functional areas.

2.6.2 Staff establishment

PPOA Strategic Plan 2013 - 2018

15 | ppoa.go.ke

16 |

ppo

a.go

.ke

10. O

rgan

izat

ion

Cha

rt

Fig

ure

1: C

urre

nt o

rgan

izat

iona

l str

uctu

re a

s pe

r th

e jo

b ev

alua

tion

Ad

viso

ry B

oar

d

Dir

ecto

r -

Gen

eral

“Sen

ior”

and

“pr

inci

pal”

mer

ely

indi

cate

pro

mot

iona

l pos

ition

s, b

utno

t rep

ortin

g/ li

ne re

latio

nshi

ps.

GM

- F

inan

ce &

Ad

min

GM

- T

echn

ical

Ser

vice

s

Hea

d o

fD

ivis

ions

Man

ager

- L

evy

Ad

min

Man

ager

-H

R &

Ad

min

Man

ager

-Fi

nanc

eM

anag

er -

Co

rpo

rate

Ser

vice

s

Man

ager

-In

tern

al A

udit

Man

ager

-P

olic

y &

Res

earc

h

Man

ager

-C

apac

ity

Bui

ldin

g

Man

ager

-C

om

plia

nce

Man

ager

-A

RB

Sec

reta

riat

Sen

ior

Offi

cer

-AR

B

Pri

ncip

alO

ffice

r-A

RB

Sen

ior

Co

mp

lianc

eO

ffice

r

Pri

ncip

alC

om

plia

nce

Offi

cer

Sen

ior

Cap

acit

yB

uild

ing

Offi

cer

Pri

ncip

alC

apac

ity

Bui

ldin

gO

ffice

r

Sen

ior

Lib

eria

n

Pri

ncip

alLi

ber

ian

Sen

ior

Po

licy

& R

esea

rch

Offi

cer

Sen

ior

Inte

rnal

Aud

it

Sen

ior

Leg

alO

ffice

r

Sen

ior

Co

rpo

rate

Co

mm

Offi

cer

Sen

ior

ICT

Offi

cer

Sen

ior

Acc

oun

tant

Sen

ior

Pro

cure

men

tO

ffice

r

Sen

ior

HR

&A

dm

inO

ffice

r

Pri

ncip

al H

R

& A

dm

inO

ffice

r

Pri

ncip

alP

rocu

rem

ent

Offi

cer

Pri

ncip

alA

cco

unta

ntP

rinc

ipal

ICT

Offi

cer

Pri

ncip

alC

orp

ora

teC

om

mO

ffice

r

Pri

ncip

alLe

gal

Offi

cer

Pri

ncip

alIn

tern

alA

udit

Pri

ncip

alP

olic

y &

Res

earc

hO

ffice

r

Sen

ior

Sec

urit

yO

ffice

r

Sen

ior

Levy

Ad

min

Offi

cer

Pri

ncip

alLe

vyA

dm

inO

ffice

r

Man

ager

-IC

T

Hea

d o

fD

epts

CE

O

Job

Gro

ups

Hea

d o

fS

ecti

ons

Op

erat

ions

Offi

cers

54321

Not

e

TE

CH

NIC

AL

OFF

ICE

RS

AS

SIS

TAN

TS

SU

PP

OR

T S

TAFF

6 &

7

8 &

9

10,1

1, 1

2

PPOA has recorded major achievements in various areas since its inception. Key among these are:

CHAPTER THREE

SITUATIONAL ANALYSIS

3.1 EVALUATION OF PAST PERFORMANCE

In ensuring compliance with the policies, rules and regulations of Public Procurement and Disposal Act, the Authority has undertaken the following initiatives:

3.1.1. Compliance

Pilot assessment of the country’s procurement system using the OECD/DAC benchmarkingmethodology;

i)

Promote competition and ensure that competitors are treated fairly;ii)

In the area of capacity building PPOA has undertaken several initiatives including:

3.1.2. Capacity Building

Capacity building strategy and training manual have been developed; andi)

Over 30,000 have been persons trained since 2008.ii)

Review/Audit have been carried out in 38 PEs. In addition the 1st procurement audit/review manual was revised and 2nd edition issued;

iii)

Investigations have been carried out in 10 procurement proceedings;iv)

Developed an IPPMT for use by the PEs and piloted in 20 PE’s; andv)

Initiated the process of debarring errant suppliers.vi)

i)

ii)

iii)

iv)

In the area of policy and research PPOA has undertaken several initiatives including:

3.1.3. Policy and Research

Development, revision and distribution of standard tender documents, procurement manuals, guidelines and standard procurement formats;

Stakeholder participation in public procurement policy initiation through sectoral, regional and national stakeholders forums;

Periodical review of market price index for common user items;

Prequalification of procuring agents and authorization of insurance companies to issue bid bonds;

Issuance of written directions to PEs and other stakeholders with respect to conduct of procurement and disposal proceedings and dissemination of information through PPOA circulars; and

v)

PPOA Strategic Plan 2013 - 2018

17 | ppoa.go.ke

Developed compendia of proposed amendments and Regulations to the Procurement Law in thefollowing areas:

vi)

• PPP’s

• Preference and reservations

• County governments

• CDF

3.1.4 ICT

Developed and redesigned the PPOA website;i)

Developed the Procurement Portal for posting procurement notices;ii)

Developed the e-Learning portal;iii)

Registered and trained 2000 persons through e-learning; andiv)

Participated in the design of the “procure to pay” module in the re-engineered IFMIS.v)

3.1.5 Administrative Review

The Authority continued to offer administrative support to the Review Board and has achieved the following:

374 cases heard and determined from the year 2007 to 2012;i)

Decentralization of hearing of cases with 3 cases heard in the counties in 2012;ii)

Dissemination of Boards decisions through the PPOA website; andiii)

ARB Decisions digest prepared for the period 2008 to 2010.iv)

3.1.6 Institutional capacity

The Authority continued to offer administrative support to the Review Board and has achieved the following:

Developed and implemented a performance management system;i)

Recruited 61 staff;ii)

Established a staff pension scheme;iii)

Conducted training needs analysis and implemented the training recommendations;iv)

Prepared policies and procedures manuals;v)

Installed the ERP system;vi)

Publication of contract awards and information supplement; and vii)

Carried out various public awareness campaigns.viii)

18 | ppoa.go.ke

PPOA Strategic Plan 2013 - 2018

Legal framework for public procurement anchored in the constitution and the existence of PPDA 2005;i)

Institutional structures are in place i.e. the PPOA, PPOAB and PPARB;ii)

A team of talented, multi skilled and committed staff;iii)

Enabling working environment;iv)

A good information and communication technology infrastructure with a sound administrative structure;and

v)

3.2 SWOT ANALYSIS OF PPOA

This section addresses the strengths, weaknesses, opportunities and threats of PPOA.

3.2.1 Strengths

Insufficient staffing levels;

Inadequate office space;ii)

i)

Weak linkages with key stakeholders such as EACC, State Law office, KENAO;iii)

Inadequate financial resources;iv)

Weak planning, programming, monitoring, evaluation and reporting system;v)

Inadequate presence in the counties;vi)

Inadequate retention scheme; andvii)

Limited synergies between departments.viii)

3.2.2 Weaknesses

Legal framework for public procurement anchored in the Constitution;

Goodwill from the Government, Development Partners and the public;ii)

i)

Existence of similar regulatory bodies in other countries from which PPOA can learn and borrow best practices;

iii)

Existence of institutions that can promote professionalism in procurement e.g. Universities, KISM, colleges;

iv)

Developments in ICT e.g. fibre optic cable and mobile phone technology that could be utilized to facilitate the attainment of PPOA mandate;

v)

Potential to generate own funds e.g. through the Capacity Building Levy;vi)

Public Finance reforms agenda supports enhancing public procurement; andvii)

Opportunity to partner with other similar organizations e.g. EACC, KENAO, TI, Centre for CorporateGovernance, KISM, UN Women, Efficiency Monitoring Unit on governance issues.

viii)

3.2.3 Opportunities

PPOA Strategic Plan 2013 - 2018

19 | ppoa.go.ke

Reliance on the Exchequer;

Inadequate technical and infrastructural capacity among some PEs;ii)

i)

Low level of awareness among the public on the existence and role of PPOA;iii)

Low level of professionalism in public procurement;iv)

Inadequate technical and financial capacity among suppliers e.g. SMEs to take part in public procure-ment;

v)

Negative perceptions about public procurement;vi)

Inability to operationalize the CBL; andvii)

Inadequate provision for the disposal of public assets in the Act.viii)

3.2.2 Weaknesses

PPOA has many stakeholders; some of the key stakeholders are summarized in Table 1.

3.4 STAKEHOLDER ANALYSIS

Table 1: Stakeholder analysis

- Feedback

1. Government of Kenya - Financial support

- Facilitate Legislation

- Policy Formulation

- PPOA to deliver on its mandate

- Efficient and effective procurement system in place

- Policy direction

- Adjudication of matters arising from disputed procurement proceedings

- Successful strategy implementation

- Training and capacity building

- Compliance with statutory and administrative obligations

Stakeholder Stakeholder’s Role Stakeholders Expectation

Public Procurement Oversight Advisory Board and Public Procurement Administration Review Board

2.

- Efficient Service delivery

- Commitment

- Conducive working environment

- Training and capacity building

- Commensurate reward for performance

Staff3.

- Implementers of procurement policies, guidelines and procedures

- Cost effective and efficient supply chain management system that facilitates the achievement of Vision 2030 objectives.

Procuring entities (PEs)4.

20 | ppoa.go.ke

PPOA Strategic Plan 2013 - 2018

Stakeholder Stakeholder’s Role Stakeholders Expectation

- Advice and guidance in procurement process

- Provision of relevant procure-ment documents/manuals

- Capacity building

- Compliance with the procure-ment law

- Transparency, equity and fairness in the procurement process

- Prompt payment

- Facilitate implementation of Preference & Reservations Regulations targeting Youth, Women and Persons with Disabilities

- Capacity building

- Providers of goods, works and services

- Feedback on performance of the procurement system

- Compliance with the procure-ment law

Suppliers/Bidders5.

- Transparency and accounta-bility in the utilization of public funds

- Efficient and effective procurement system in place

- Technical and financial supportDevelopment Partners6.

- Provide advice based on industry needs

- Set Curriculums to enhance Training and research in public procurement

- Training and capacity building in procurement

Training institutions 8.

- Support from the Authority in ensuring compliance to laws and regulations

- Accountability in the use of public funds

- Proper application of funds in procurement

- Collaboration

- Expert opinion

- Information on breaches and offences related to procure-ment

- Mitigating abuse of public funds

- Collection of capacity building levy

- Conformation of quality

- Environmental compliance

- Prosecution and resolution of cases relating to procurement

Regulatory, oversight and Law enforcement agencies e.g. KEBS, NEMA, KENAO, KRA, EACC, Police, DPP, SLO e.t.c.

7.

PPOA Strategic Plan 2013 - 2018

21 | ppoa.go.ke

Stakeholder Stakeholder’s Role Stakeholders Expectation

- Timely delivery of quality public goods and services

- Beneficiaries of public services

- Community monitoring of the public procurement system

General public9.

- Social accountability- Community monitoring of the public procurement system

Civil Society / Non-State Actors

10.

- Fairness and transparency in procurement process

- Promote good labour practices among suppliers and contrac-tors

Private sector associations e.g. KEPSA, KAM,FKE

12.

- Support and collaboration in professional development

- Promote ethical practicesProfessional bodies e.g. KISM13.

- Social accountability

- Collaboration

- Public education and aware-ness

- Advocacy , outreach, social mobilization and strategic partnershipof capacity building levy

- Reporting and exposure

- Responsible Journalism

Media11.

22 | ppoa.go.ke

PPOA Strategic Plan 2013 - 2018

The identified strategic themes, as informed by the Authority’s mandate, functions and the situational analysis are as follows:

CHAPTER FOUR

STRATEGIC ANALYSIS

4.1 STRATEGIC THEMES

The procurement law outlines several provisions relating to governance structures, systems and procedures that PEs are expected to comply with. However, the level of compliance among the PEs is still not satisfactory. The Authority needs to strengthen its capacity and enforcement mechanism as a way of enhancing compli-ance.

4.1.1 Compliance

In so doing the Authority shall institute measures that will widen and deepen use of procurement and asset disposal reviews and assessments, contract audits and investigations among others and establish linkages with other Government enforcement agencies. Further, the Authority needs to benchmark the procurement system with a view of modernizing and streamlining the procurement processes.

PPOA is mandated to promote and support training and development of professionals and build the capacity of persons involved in public procurement. As a way of enhancing professionalism in public procurement, PPOA shall continue to partner with the Kenya Institute of Supplies Management (KISM) and other profession-al bodies involved in public procurement.

4.1.2 Capacity building

PPOA will collaborate with institutions of higher learning in development of procurement professionals with the requisite knowledge skills and ethical standards. Also, as a way of enhancing compliance, PPOA will seek to support PEs with the requisite systems and equipment.

The Constitution of Kenya under section 227 has underscored the need for a public procurement and disposal system that is fair, equitable, transparent, competitive and cost effective. The same provision envisages an Act of Parliament that describes a framework within which policies relating to procurement and disposal shall be implemented and include categories of preference and reservation, protection and advancement of disadvan-taged persons and sanctions against errant contractors and other persons that default tax obligations, integri-ty and fair employment laws and practices. To achieve this, the PPDA 2005 must be reviewed by December 2014 as per the Constitution. Subsequent subsidiary legislations and policy guidelines will have to be devel-oped and disseminated to all stakeholders keeping with the Vision 2030.

4.1.3 Policy, Legal and Regulatory framework

Apart from strengthening the enforcement mechanism, it is imperative to undertake research that will inform reforms, review and operationalisation of all provisions of the envisaged law; to make it more relevant and responsive to national development goals and international best practices.

PPOA Strategic Plan 2013 - 2018

23 | ppoa.go.ke

The ARB was established with a mandate to review complaints from candidates who are aggrieved by the outcomes of procurement proceedings. In discharging this responsibility, the ARB has strived to exercise impartiality and demonstrate consistency in its decisions. With the advent of devolution and the ensuing fiscal decentralization, the level of procurement activities in the counties will increase, hence the need to decentralize the ARB services to the counties.

4.1.4 Administrative Review

Efficiency in the ARB will be enhanced by embracing the use of technology in the processing of requests for review and in the preservation of previous Board decisions and other relevant documents for ease of accessi-bility and quick retrieval for reference by the Board, the Secretariat and clients. Strategic succession manage-ment for the Board and Secretariat is desirable.

PPOA undertook its first recruitment exercise in December, 2010. Effective January 2011 all recruited staff took over their substantive positions in line with the job evaluation exercise which was finalized in July 2008. There is need to implement a performance management system in PPOA. In addition, an outsourcing policy is required to compliment services in various Departments.

4.1.5 Institutional capacity

Resource mobilization strategies need to be enhanced. These include the operationalization of the Capacity Building Levy, grants from Development Partners and increased GOK funding. The financial management systems will also be enhanced to ensure accountability and efficient use of resources.

There is need to implement ICT systems that will enhance business processes and ensure efficient use of resources.

The Authority has embarked on a total quality management system through the implementation of ISO 9001:2008. The standard operating procedures have been developed. The Authority shall develop and imple-ment an Institutional Risk Management Policy Framework.

The Authority has undertaken commendable publicity initiatives such as the development of its website, televi-sion and radio infomercials and participation in public sector programs and other corporate social responsibili-ty (CSR) activities. These initiatives should be enhanced in order to improve the corporate image of PPOA using various publicity campaigns.

PPOA has recently installed a customer relationship management system to improve the process of customer relations and thereby enhance delivery of service.

The objectives of PPOA for the planning period are:

4.2 STRATEGIC OBJECTIVES

To ensure compliance with the Public Procurement and Disposal law and PPOA guidelines and establish a framework to monitor and report on the functioning of the procurement system.

1)

To develop, promote and support training and professional development of persons involved in public procurement.

2)

To strengthen the policy, legal, regulatory, research and development framework for public procurement and asset disposal system;

3)

24 | ppoa.go.ke

PPOA Strategic Plan 2013 - 2018

To uphold fairness and promote public confidence in the public procurement system4)

To improve human resources management, systems and infrastructure to provide quality services to stakeholders.

5)

To enhance the use of technology in order to increase efficiency and effective service delivery6)

To enhance financial sustainability;7)

To improve corporate image of the Authority and enhance customer service; and8)

To incorporate the risk management culture within the Authority9)

To enable achievement of the specified objectives, a set of relevant strategies were formulated. These are presented in Table 2.

4.3 STRATEGIES

Table 2: Strategic themes, objectives and strategies

Compliance

Theme Objective Strategy

To ensure compliance with the Public Procure-ment and Disposal law and PPOA guidelines and establish a framework to monitor and report on the functioning of the procurement system.

Enhance prompt handling of complaints

Enhance prompt investigations ii)

i)

Enhance the Capacity to undertake debarmentiii)

Enhance review of tender noticesiv)

Enhance Review of mandatory reports to PPOAv)

Enhance Procurement assessmentsvi)

Enhance procurement reviewsvii)

Introduce and Enhance Contract Auditsviii)

Develop and implement a monitoring framework of the procurement and disposal situation using OECD/ DAC Methodology of Assessment of Procurement Systems (MAPS)

x)

Enhance implementation of the internal procurement performance monitoring tool (IPPMT)

ix)

Capacitybuilding

To develop, promote and support training and professional development of persons involved in public procurement

Strengthen capacity building programmes for PEs

Improve the capacity of marginalized groups to effec-tively participate in public procurement

ii)

i)

Enhance Skills, knowledge and understanding among the PEs on the public procurement law and Supply Chain Management

iii)

PPOA Strategic Plan 2013 - 2018

25 | ppoa.go.ke

Theme Objective Strategy

Enhance professionalism in public procurement among PE’s

iv)

Strengthen procurement and supply chain manage-ment in devolved system of government

v)

Use of ICT to facilitate capacity building programsvi)

Policy, Legal,Regulatoryand Researchframework

To strengthen the policy, legal, regulatory, research and development frame-work for public procure-ment and asset disposal system;

Enhance profile of the procurement function and profession to strategic levels

i)

Review the PPDA law to be aligned to the constitution, vision 2030 and international best practice

ii)

Operationalise provisions of the public procurement and asset disposal law

iii)

Manage public procurement and asset disposal stakeholders consultations

iv)

Strengthen procurement research and developmentv)

AdministrativeReview

To uphold fairness and promote public confi-dence in the public procurement system

Enhance efficiency in handling Applications for Review

Enhance compliance with the public procurement lawii)

i)

Enhance capacity of the PPARB Secretariatiii)

Enhance capacity of the Review Boardiv)

Provision of relevant reference materials for the PPARBv)

Promote a culture of continuous learning and improvement

vi)

Increase access to PPARB Servicesvii)

Institutionalcapacity

To improve human resources management, systems and infrastruc-ture to provide quality services to stakeholders.

To attract, develop and retain qualified and skilled human resources;

Improve performance managementii)

i)

Introduce knowledge management and improve records management within PPOA

iii)

Decentralize PPOA operations by establishing seven regional offices

iv)

Institutionalize quality management systemv)

26 | ppoa.go.ke

PPOA Strategic Plan 2013 - 2018

Theme Objective Strategy

To enhance the use of technology in order to increase efficiency and effective service delivery

Enhance utilization of ICT

Improve ICT systems through business process re-en-gineering.

ii)

i)

Utilize the IFMIS P2P Procurement Moduleiii)

Establish connectivity in the regional officesiv)

To enhance financial sustainability

Resource mobilization

Resource utilization ii)

i)

Supplier Managementiii)

To improve corporate image of the Authority and enhance customer service

Enhance public awareness of PPOA

Enhance media managementii)

i)

Foster strong communication culture within PPOAiii)

Enhance stakeholder involvementiv)

Rebrandingv)

To incorporate the risk management culture within the Authority

Establish the Risk Management System

Carry out legal auditii)

i)

PPOA Strategic Plan 2013 - 2018

27 | ppoa.go.ke

28 |

ppo

a.go

.ke

Cha

pter

five

pre

sent

s th

e im

plem

enta

tion

mat

rix w

hich

cov

ers

the

stra

tegi

c th

emes

, str

ateg

ic o

bjec

tives

, str

ateg

ies,

act

iviti

es, i

mpl

emen

ting

acto

rs, t

ime

fram

e, re

sour

ce re

quire

men

ts, e

xpec

ted

outp

uts

and

outp

ut in

dica

tors

.

Ob

ject

ive

1: T

o e

nsur

e co

mp

lianc

e w

ith

the

Pro

cure

men

t an

d D

isp

osa

l Act

, 200

5; R

egul

atio

ns, 2

006;

and

PP

OA

’s g

uid

elin

es

(at

Hea

dq

uart

ers

and

Reg

iona

l Offi

ces)

CH

AP

TER

FIV

E

IMP

LEM

EN

TAT

ION

MAT

RIX

CO

MP

LIA

NC

E D

EP

T 2

013

- 20

17 S

TR

AT

EG

IC P

LAN

PR

OP

OS

ALS

Str

ateg

yE

xpec

ted

Out

com

e(s)

Act

ivit

yO

utp

ut In

dic

ato

rK

PIs

Imp

lem

enti

ngA

cto

rsT

imel

ine

Dec

embe

r 20

13

12

34

5To

tal

Res

our

ces

(Ksh

. Mill

ion)

per

yea

r

OP

B

Mar

ch 2

014

July

201

4 -

July

201

8C

ompl

ianc

e D

ept

Com

plia

nce

Dep

t

Com

plia

nce

Dep

t

ICT

Dep

tYe

ar 1

: 5%

Year

2 :

10%

Year

3 :

15%

Year

4 :

20%

Year

5 :

25%

- R

educ

ed n

o of

day

s ta

ken

to h

andl

e co

mpl

aint

s a

s fo

llow

s

- Is

sue

ack

now

ledg

emen

t l

ette

r /

cor

resp

onde

nce

with

in 3

day

s a

fter

rece

ipt o

f the

com

plai

nt

- Ti

me

take

n to

ack

now

ledg

e a

rec

eipt

of t

he c

ompl

aint

- N

o. o

f com

plai

nts

han

dled

- A

naly

ze th

e c

ompl

aint

s

Des

ign

& im

plem

ent a

disp

ute

reso

lutio

nm

echa

nism

with

in th

eP

Es

Red

uced

lead

tim

eta

ken

to h

andl

eco

mpl

aint

s

- C

ircul

ar is

sued

- A

n am

ende

d la

wIn

crea

sed

com

plia

nce

Enh

ance

prom

ptha

ndlin

g of

co

mpl

aint

s

Sys

tem

in p

lace

Impl

emen

t an

auto

mat

ed c

ompl

aint

s’re

port

ing

syst

em

- Ti

me

take

n to

han

dle

com

plai

nts

29 |

ppo

a.go

.ke

Str

ateg

yE

xpec

ted

Out

com

e(s)

Act

ivit

yO

utp

ut In

dic

ato

rK

PIs

Imp

lem

enti

ngA

cto

rsT

imel

ine

July

201

4 -

July

201

8

July

201

3 -

July

201

8

12

34

5To

tal

Res

our

ces

(Ksh

. Mill

ion)

per

yea

r

OP

B

45.0

12.0

10.0

9.0

8.0

6.0

255

55

55

July

201

3 -

July

201

8

July

201

3 -

July

201

8

Com

plia

nce

Dep

t

Com

plia

nce

/ D

G /

Cor

pora

te S

ervi

ces

/ A

dvis

ory

Boa

rd

Com

plia

nce

Dep

tN

o. o

f PE

s id

entifi

ed

No.

of I

nves

tigat

ions

com

plet

ed

No.

of I

nves

tigat

ions

com

plet

ed

- 60

day

s to

fina

lize

cas

e

- Li

st o

f deb

arre

d p

erso

ns

Inve

stig

atio

n re

port

s

No.

of d

ebar

men

tca

ses

rece

ived

No.

of d

ebar

men

tca

ses

final

ized

List

of d

ebar

red

pers

ons

Pre

pare

inve

stig

atio

nre

port

& s

hare

the

repo

rt w

ith th

epr

ocur

ing

entit

y fo

rco

mm

ents

and

impl

emen

tatio

n of

repo

rtre

com

men

datio

ns

Sha

re th

e fin

al re

port

with

oth

er e

nfor

cem

ent

agen

cies

as

appr

opria

te

- R

ecei

ve r

ecom

men

datio

ns f

or d

ebar

men

t

- C

omm

unic

ate

to p

artie

s

- A

naly

sis

of th

e ca

ses

- H

earin

g of

the

case

s

- R

ecom

men

datio

n to

the

Adv

isor

y bo

ard

- C

omm

unic

ate

the

dec

isio

n of

the

Boa

rd

Des

ign

the

PE

iden

tified

for

the

inve

stig

atio

nLi

st o

f PE

s id

entifi

ed

Eng

agem

ent L

ette

rs

Incr

ease

dco

mpl

ianc

e

Incr

ease

dco

mpl

ianc

e w

ithth

e la

w

Enh

ance

prom

ptIn

vest

igat

ions

Enh

ance

the

capa

city

toun

dert

ake

deba

rmen

t

No.

of i

nves

tigat

ions

unde

rtak

enC

ondu

ct In

vest

igat

ion

30 |

ppo

a.go

.ke

Str

ateg

yE

xpec

ted

Out

com

e(s)

Act

ivit

yO

utp

ut In

dic

ato

rK

PIs

Imp

lem

enti

ngA

cto

rsT

imel

ine

12

34

5To

tal

Res

our

ces

(Ksh

. Mill

ion)

per

yea

r

July

201

3 -

July

201

8

July

201

3 -

July

201

8

OP

B

OP

B

OP

B

53.7

13.5

12.4

11.3

9.0

7.5

Qua

rter

ly

July

201

3 -

July

201

8

Com

plia

nce

Dep

t

Com

plia

nce

Dep

t

Com

plia

nce

Dep

t

July

201

3 -

July

201

8C

ompl

ianc

e D

ept

July

201

3 -

July

201

8C

ompl

ianc

e D

ept

Com

plia

nce

Dep

tTe

nder

not

ices

anal

ysis

repo

rt

Rev

iew

with

in14

day

s af

ter

rece

ipt

of th

e re

port

.

Year

1 -

100

Year

2 -

120

Year

3 -

150

Ye

ar 4

- 1

65Ye

ar 5

- 1

80

- R

evie

w /

Ana

lysi

s r

epor

ts

Cor

resp

onde

nces

/le

tter

s to

PE

s fo

rno

n-co

mpl

ianc

e

No.

of r

epor

tsca

ptur

ed /

pos

ted

100%

pos

ting

Com

plia

nce

Dep

t /IC

TQ

uart

erly

List

of P

Es

iden

tified

Eng

agem

ent l

ette

rs

No.

of P

Es

asse

ssed

Sig

ned

agre

ed a

ctio

npl

ans

- S

crut

iniz

e th

e su

pply

ord

ers

and

cont

ract

s

Pos

ting

of c

ontr

acts

on

the

PP

OA

web

site

Iden

tify

and

enga

ge

PE

s se

lect

ed fo

r th

eas

sess

men

t

Con

duct

pro

cure

men

tas

sess

men

ts in

sele

cted

PE

s

Hol

d ex

it m

eetin

gs /

debr

iefin

g se

ssio

nan

d si

gnin

g of

act

ion

plan

s

Ana

lyze

tend

er n

otic

es

No.

of t

ende

r no

tices

revi

ewed

Incr

ease

dco

mpl

ianc

e w

ithth

e la

w

Incr

ease

dco

mpl

ianc

e w

ithth

e la

w

Incr

ease

dco

mpl

ianc

e w

ithth

e la

w

Enh

ance

revi

ew o

fte

nder

notic

es

Enh

ance

revi

ew o

fm

anda

tory

repo

rts

toP

PO

A

Enh

ance

proc

urem

ent

asse

ssm

ents

No.

of n

otic

esca

ptur

edP

ost /

cap

ture

the

notic

e in

form

atio

n in

data

base

31 |

ppo

a.go

.ke

July

201

3 -

July

201

8

Com

plia

nce

Offi

cers

Rev

iew

con

sulta

nts

Sha

re th

e fin

al re

port

with

oth

er e

nfor

cem

ent

agen

cies

as

appr

opria

te

Pre

pare

aud

it /

revi

ewre

port

s &

sha

re th

ere

port

with

the

proc

urin

g en

tity

for

com

men

ts a

ndim

plem

enta

tion

ofre

port

reco

mm

enda

tions

Rev

iew

repo

rts

Cor

resp

onde

nces

/le

tter

s to

PE

s

Str

ateg

yE

xpec

ted

Out

com

e(s)

Act

ivit

yO

utp

ut In

dic

ato

rK

PIs

Imp

lem

enti

ngA

cto

rsT

imel

ine

12

34

5To

tal

Res

our

ces

(Ksh

. Mill

ion)

per

yea

r

July

201

3 -

July

201

8

July

201

3 -

July

201

8

OP

B

344

84.8

75.2

67.2

60.8

56.0

Qua

rter

ly

July

201

3 -

July

201

8

Com

plia

nce

Dep

t

July

201

3 -

July

201

8

Rev

iew

con

sulta

nts

Com

plia

nce

Offi

cers

Com

plia

nce

Dep

t

Com

plia

nce

Dep

t

Year

1 –

35

Year

2 –

38

Year

3 –

42

Year

4 –

43

Year

5 -

53

List

of P

Es

iden

tified

Eng

agem

ent l

ette

rs /

mee

tings

No.

of c

onsu

ltanc

ies

com

mis

sion

edC

ompl

ianc

e O

ffice

rs

No.

of P

Es

revi

ewed

Iden

tify

and

enga

geP

Es

sele

cted

for

the

audi

t / re

view

Eng

age

cons

ulta

nts

to c

ondu

ct a

udit

/re

view

s

Con

duct

Pro

cure

men

tau

dit /

revi

ew in

sele

cted

PE

s

Pre

pare

ass

essm

ent

repo

rts

& s

hare

the

repo

rt w

ith th

epr

ocur

ing

entit

y fo

rco

mm

ents

and

impl

emen

tatio

n of

repo

rtre

com

men

datio

ns

Ass

essm

ent r

epor

ts

Incr

ease

dco

mpl

ianc

e E

nhan

cepr

ocur

emen

tre

view

s

32 |

ppo

a.go

.ke

Str

ateg

yE

xpec

ted

Out

com

e(s)

Act

ivit

yO

utp

ut In

dic

ato

rK

PIs

Imp

lem

enti

ngA

cto

rsT

imel

ine

12

34

5To

tal

Res

our

ces

(Ksh

. Mill

ion)

per

yea

r

OP

B

22.6

3530

2520

10Ju

ly 2

013

- Ju

ly 2

018

July

201

3 -

July

201

8

Com

plia

nce

Offi

cers

Year

1 –

35

Year

2 –

38

Year

3 –

42

Year

4 –

43

Year

5 -

53

List

of P

Es

&co

ntra

cts

iden

tified

Eng

agem

ent l

ette

rs /

mee

tings

Com

plia

nce

Offi

cers

No.

of c

ontr

acts

audi

ted

Iden

tify

and

enga

geth

e P

Es

with

con

trac

tsto

be

audi

ted

Con

duct

con

trac

tau

dit /

revi

ewin

sel

ecte

d P

Es

Incr

ease

dco

mpl

ianc

eIn

trod

uce

and

enha

nce

cont

ract

aud

its

July

201

3 -

July

201

8C

ompl

ianc

e O

ffice

rs

Sha

re th

e fin

al re

port

with

oth

er e

nfor

cem

ent

agen

cies

as

appr

opria

te

Pre

pare

con

trac

ts’

audi

t / re

view

repo

rts

&

shar

e th

e re

port

with

the

proc

urin

g en

tity

for

com

men

ts a

ndim

plem

enta

tion

ofre

port

reco

mm

enda

tions

Con

trac

t aud

it re

port

s

Cor

resp

onde

nces

/le

tter

s to

PE

s

OP

B

22.6

7.4

6.2

4.5

2.7

1.8

Ann

ual

July

201

3 -

July

201

8

ICT

Dep

t

Com

plia

nce

Dep

t

An

Aut

omat

edR

evis

ed T

ool

List

of s

take

hold

ers

/P

Es

iden

tified

Valid

atio

n w

orks

hop

/m

eetin

gs

Iden

tified

stak

ehol

ders

Pilo

t Aut

omat

ed T

ool

Enh

ance

impl

emen

tatio

n of

the

Inte

rnal

Pro

cure

men

tP

erfo

rman

ceM

onito

ring

Tool

(IPP

MT)

Aut

omat

e th

e IP

PM

T

Incr

ease

dco

mpl

ianc

eE

nhan

ceim

plem

enta

tion

of th

e in

tern

alpr

ocur

emen

tpe

rform

ance

mon

itorin

gto

ol (I

PP

MT)

Com

plia

nce

Dep

t

ICT

Dep

t

No.

of P

Es

impl

emen

ting

the

Tool

20 P

Es

impl

emen

ting

the

Aut

omat

ed T

ool

Impl

emen

tatio

nre

port

s

Pilo

t Aut

omat

ed T

ool i

nse

lect

ed P

Es

33 |

ppo

a.go

.ke

Str

ateg

yE

xpec

ted

Out

com

e(s)

Act

ivit

yO

utp

ut In

dic

ato

rK

PIs

Imp

lem

enti

ngA

cto

rsT

imel

ine

12

34

5To

tal

Res

our

ces

(Ksh

. Mill

ion)

per

yea

r

Str

ateg

yE

xpec

ted

Out

com

e(s)

Act

ivit

yO

utp

ut In

dic

ato

rK

PIs

Imp

lem

enti

ngA

cto

rsT

imel

ine

12

34

5To

tal

Res

our

ces

(Ksh

. Mill

ion)

per

yea

r

July

201

3 -

July

201

8

ICT

Dep

t

Com

plia

nce

Dep

tYe

ar 1

- 2

00Ye

ar 2

- 5

00Ye

ar 3

- 1

000

Year

4 -

200

0Ye

ar 5

- 3

000

Year

1 -

30

Year

2 -

100

Year

3 -

300

Year

4 -

100

0Ye

ar 5

- 2

000

No.

of P

Es

usin

g th

eto

olIC

T D

ept

Com

plia

nce

Dep

t

Rol

l out

impl

emen

tatio

nof I

PP

MT

in id

entifi

ed P

Es.

Con

duct

trai

ning

on

impl

emen

tatio

n of

the

tool

No.

of u

sers

trai

ned

Dec

embe

r 20

13

2014

- 2

018

55

50

80

1225

Cap

acity

bui

ldin

gC

apac

ity b

uild

ing

polic

y in

pla

ce

1 TN

A re

port

afte

rev

ery

2 ye

ars

1 TN

A re

port

on

visi

on 2

030

Trai

ning

nee

dsan

alys

is re

port

Cap

acity

bui

ldin

g /

com

plia

nce

- C

arry

out

trai

ning

ne

eds

anal

ysis

am

ong

stak

ehol

ders

(P

E’S

, Yo

uth,

SM

ES

&

wom

en)

- C

arry

out

TN

A fo

r

PE

’s im

plem

entin

g

visi

on 2

030

Dev

elop

cap

acity

build

ing

polic

yS

tren

gthe

nca

paci

tybu

ildin

gpr

ogra

ms

for

PE

s

Impr

oved

prof

essi

onal

ism

in p

ublic

proc

urem

ent

prac

tice

Dev

elop

cap

acity

build

ing

polic

y

OP

B*

=O

pera

tiona

l Bud

get

Ob

ject

ive

2: T

o b

uild

cap

acit

y o

f p

erso

ns a

nd in

stit

utio

ns in

volv

ed in

pro

cure

men

t (b

oth

at

Nat

iona

l and

Co

unty

Go

vern

men

ts)

TH

EM

E 2

: CA

PAC

ITY

BU

ILD

ING

34 |

ppo

a.go

.ke

Str

ateg

yE

xpec

ted

Out

com

e(s)

Act

ivit

yO

utp

ut In

dic

ato

rK

PIs

Imp

lem

enti

ngA

cto

rsT

imel

ine

12

34

5To

tal

Res

our

ces

(Ksh

. Mill

ion)

per

yea

r

2014

- 2

018

2014

- 2

018

51

11

19

51

11

15

101

11

114

11

13 15

50

50

5

2014

- 2

015

July

201

3 -

July

201

8

Cap

acity

bui

ldin

g

2013

- 2

018

Cap

acity

bui

ldin

g

Com

plia

nce

Dep

t

Cap

acity

bui

ldin

g

Ann

ual r

epor

t on

preq

ualifi

edco

nsul

tant

s

No.

of c

ontr

acts

Trai

ning

cal

enda

r in

plac

e O

pera

tiona

l ann

ual

trai

ning

cal

enda

r

Ann

ual r

epor

t on

perfo

rman

ce o

ftr

aine

rs

Cap

acity

bui

ldin

g

Trai

ning

impa

ctas

sess

men

t rep

ort

Ent

er in

to c

ontr

acts

with

sel

ecte

dco

nsul

tant

s to

trai

nP

Es

Dev

elop

a tr

aini

ngca

lend

ar

360

372

384

396

408

1920

2013

- 2

018

No.

of c

apac

itybu

ildin

g pr

ogra

ms

unde

rtak

en

Qua

rter

ly re

port

s

Year

1 :

Impa

ctas

sess

men

t rep

orts

(IA

R)

Year

3 :

IAR

Year

5 :

IAR

Cap

acity

bui

ldin

gU

nder

take

cap

acity

build

ing

prog

ram

s

Car

ry o

ut tr

aini

ngim

pact

ass

essm

ent

Dev

elop

a d

atab

ase

of e

xter

nal t

rain

ers

Trai

ner’s

dat

a ba

se in

plac

e

Year

1 -

15

Year

2 -

18

Year

3 -

20

Year

4 -

20

Year

5 -

20

Car

ry o

ut T

OT

for

trai

ners

(PP

OA

and

exte

rnal

trai

ners

)

No.

of t

rain

ers

trai

ned

2013

- 2

018

1520

2525

3011

5

20,0

00 W

omen

28,5

00 Y

outh

500

Per

sons

livi

ngw

ith d

isab

ility

in5

year

s)

1,00

0 M

argi

naliz

ed

Cap

acity

bui

ldin

g-

Trai

ning

of;

- P

oten

tial y

outh

bid

ders

- P

eopl

e liv

ing

with

dis

abilit

y-

Mar

gina

lized

gr

oups

-

Wom

en g

roup

s

No.

of y

outh

, wom

en,

pers

ons

livin

g w

ithdi

sabi

lity

&m

argi

naliz

ed g

roup

s /

pers

ons

trai

ned.

Incr

ease

the

num

ber

ofdi

sadv

anta

ged

grou

ps

part

icip

atin

g in

publ

icpr

ocur

emen

t

Impr

ove

the

capa

city

of

disa

dvan

tage

dgr

oups

toef

fect

ivel

ypa

rtic

ipat

e in

publ

icpr

ocur

emen

t

35 |

ppo

a.go

.ke

Str

ateg

yE

xpec

ted

Out

com

e(s)

Act

ivit

yO

utp

ut In

dic

ato

rK

PIs

Imp

lem

enti

ngA

cto

rsT

imel

ine

12

34

5To

tal

Res

our

ces

(Ksh

. Mill

ion)

per

yea

r

2013

- 2

018

22

22

210

Cap

acity

bui

ldin

gN

o. o

f SM

Es

owne

r’sse

nsiti

zed.

Trai

n S

ME

on

oppo

rtun

ities

ava

ilabl

ein

pub

lic p

rocu

rem

ent

- In

crea

sed

com

plia

nce

- va

lue

for

mon

ey in

pub

lic p

rocu

rem

ent

Enh

ance

ski

lls,

know

ledg

e an

dun

ders

tand

ing

amon

g th

e P

Es

on th

e pu

blic

proc

urem

ent

law

and

sup

ply

chai

nm

anag

emen

t

Year

1 -

500

Year

2 -

100

0

Year

3 -

150

0

Year

4 -

200

0

Year

5 -

250

0

2013

- 2

018

1015

2530

3511

5C

apac

ity b

uild

ing

No.

of P

erso

ns tr

aine

dTr

ain

vario

us P

Es

on th

e pu

blic

proc

urem

ent l

aw,

regu

latio

ns, S

TD’S

,m

anua

ls, a

ndci

rcul

ars

issu

edby

the

auth

ority

.

Year

1 -

340

0

Year

2 -

440

0

Year

3 -

494

0

Year

4 -

524

0

Year

5 -

544

0

2013

- 2

018

22

22

210

CD

’s D

istr

ibut

edC

apac

ity b

uild

ing

Issu

ing

of b

roch

ures

and

flier

s on

spe

cific

emer

ging

issu

es.

Pre

para

tion

of tr

aini

ngm

ater

ials

for

diffe

rent

stak

ehol

ders

on

the

publ

ic p

rocu

rem

ent

law

Trai

ning

mat

eria

lsbu

rned

on

CD

’s.

Trai

ning

mat

eria

lsde

velo

ped

and

valid

ated

.

Incr

ease

dco

mpl

ianc

ean

d et

hica

lpr

actic

es

Incr

ease

dac

cess

to tr

aini

ngm

ater

ials

Enh

ance

prof

essi

onal

ism

in p

ublic

proc

urem

ent

thro

ugh

colla

bora

tion

with

key

stak

ehol

ders

Enh

ance

acce

ss to

publ

icpr

ocur

emen

tin

form

atio

nm

ater

ials

Year

1 -

15,

000

Year

2 -

15,

500

Year

3 -

16,

000

Year

4 -

16,

500

Year

5 -

17,

000

2014

- 2

018

00

00

1C

ompl

ianc

e /

Pol

icy

/C

apac

ity /

KIS

M /

Cor

pora

te s

ervi

ces

M.O

.U o

n co

llabo

ratio

nar

eas

in p

lace

Sig

ned

M.O

.U in

plac

e -

Iden

tify

colla

bora

tion

are

as

- Id

entif

y K

ey s

take

hold

ers.

1

36 |

ppo

a.go

.ke

Str

ateg

yE

xpec

ted

Out

com

e(s)

Act

ivit

yO

utp

ut In

dic

ato

rK

PIs

Imp

lem

enti

ngA

cto

rsT

imel

ine

12

34

5To

tal

Res

our

ces

(Ksh

. Mill

ion)

per

yea

r

- In

crea

sed

com

plia

nce

- va

lue

for

mon

ey in

pub

lic p

rocu

rem

ent

Enh

ance

ski

lls,

know

ledg

e an

dun

ders

tand

ing

amon

g th

e P

Es

on th

e pu

blic

proc

urem

ent

law

and

sup

ply

chai

nm

anag

emen

t

2013

- 2

018

1015

2530

3511

5C

apac

ity b

uild

ing

No.

of P

erso

ns tr

aine

dTr

ain

vario

us P

Es

onth

e pu

blic

proc

urem

ent l

aw,

regu

latio

ns, S

TD’S

,m

anua

ls, a

nd c

ircul

ars

issu

ed b

y th

e au

thor

ity.

Year

1 -

340

0

Year

2 -

440

0

Year

3 -

494

0

Year

4 -

524

0

Year

5 -

544

0

2013

- 2

018

22

22

210

CD

’s D

istr

ibut

edC

apac

ity b

uild

ing

Issu

ing

of b

roch

ures

and

flier

s on

spe

cific

emer

ging

issu

es.

Pre

para

tion

of tr

aini

ngm

ater

ials

for

diffe

rent

stak

ehol

ders

on

the

Pub

lic p

rocu

rem

ent

law

Trai

ning

mat

eria

lsbu

rned

on

CD

’s.

Trai

ning

mat

eria

lsde

velo

ped

and

valid

ated

.

Incr

ease

dco

mpl

ianc

ean

d et

hica

lpr

actic

es

Incr

ease

dac

cess

totr

aini

ngm

ater

ials

Enh

ance

prof

essi

onal

ism

in p

ublic

proc

urem

ent

thro

ugh

colla

bora

tion

with

key

stak

ehol

ders

Enh

ance

acce

ssto

pub

licpr

ocur

emen

tin

form

atio

nm

ater

ials

Year

1 -

15,

000

Year

2 -

15,

500

Year

3 -

16,

000

Year

4 -

16,

500

Year

5 -

17,

000

Year

1 -

3

Year

2 -

5

Year

3 -

6

Year

4 -

8

Year

5 -

8

2014

- 2

018

00

00

1C

ompl

ianc

e /

Pol

icy

/C

apac

ity /

KIS

M /

Cor

pora

te s

ervi

ces

M.O

.U o

n co

llabo

ratio

nar

eas

in p

lace

Sig

ned

M.O

.U in

plac

e -

Iden

tify

colla

bora

tion

are

as

- Id

entif

y K

ey s

take

hold

ers.

1

2013

- 2

018

11

11

15

Cap

acity

bui

ldin

gN

o. o

f pro

fess

iona

lbo

dies

trai

ned

Trai

n pr

ofes

sion

albo

dies

on

publ

icpr

ocur

emen

t Law

37 |

ppo

a.go

.ke

Str

ateg

yE

xpec

ted

Out

com

e(s)

Act

ivit

yO

utp

ut In

dic

ato

rK

PIs

Imp

lem

enti

ngA

cto

rsT

imel

ine

12

34

5To

tal

Res

our

ces

(Ksh

. Mill

ion)

per

yea

r

2013

- 2

018

CB

/ IC

T-

Rev

iew

and

Dev

elop

new

e-L

earn

ing

mod

ules

- U

se o

f vid

eo -

c

onfe

renc

ing.

- P

opul

ariz

e e-

lear

ning

dur

ing

capa

city

bui

ldin

g pr

ogra

ms.

No.

of m

odul

esde

velo

ped

Wid

en th

esc

ope

ofca

paci

tybu

ildin

gpr

ogra

ms.

Use

of I

T to

faci

litat

eca

paci

tybu

ildin

g pr

ogra

ms

Year

1 -

3

Year

2 -

5

Year

3 -

6

Year

4 -

8

Year

5 -

10

Year

1 -

3

Year

2 -

5

Year

3 -

6

Year

4 -

8

Year

5 -

8

2013

- 2

018

11

11

15

Cap

acity

bui

ldin

gN

o. o

f pro

fess

iona

lbo

dies

trai

ned

Trai

n pr

ofes

sion

albo

dies

on

publ

icpr

ocur

emen

t Law

Str

ateg

yE

xpec

ted

Out

com

e(s)

Act

ivit

yO

utp

ut In

dic

ato

rK

PIs

Imp

lem

enti

ngA

cto

rsT

imel

ine

12

34

5To

tal

Res

our

ces

(Ksh

. Mill

ion)

per

yea

r

June

201

4

June

201

4

2 2

2 2

Pol

icy

& R

esea

rch

Pol

icy

& R

esea

rch

/Te

chni

cal D

epts

/C

orpo

rate

Ser

vice

s

Iden

tify

area

s of

the

publ

ic p

rocu

rem

ent

law

that

requ

iream

endm

ents

Pre

pare

Lay

man

’sD

raft

for

amen

ding

the

Act

Com

pend

ia o

fpr

opos

edam

endm

ents

Laym

an’s

Dra

ft B

illA

ppro

ved

Laym

an’s

Dra

ft B

ill

Str

ong

lega

lan

d re

gula

tory

fram

ewor

k fo

rP

ublic

Pro

cure

men

tan

d A

sset

Dis

posa

l

Con

tinua

llyim

prov

e th

epu

blic

proc

urem

ent

polic

y, le

gal

and

regu

lato

ryfra

mew

ork

toal

ign

it to

natio

nal

obje

ctiv

es a

ndgo

als

App

rove

dC

ompe

ndiu

m

Ob

ject

ive

3: T

o s

tren

gth

en t

he p

olic

y, le

gal

, reg

ulat

ory

, res

earc

h an

d d

evel

op

men

t fr

amew

ork

fo

r p

ublic

pro

cure

men

t an

d

asse

t d

isp

osa

l sys

tem

;

TH

EM

E 3

: PO

LIC

Y, R

ES

EA

RC

H a

nd R

EG

ULA

TO

RY

FR

AM

EW

OR

K

38 |

ppo

a.go

.ke

Str

ateg

yE

xpec

ted

Out

com

e(s)

Act

ivit

yO

utp

ut In

dic

ato

rK

PIs

Imp

lem

enti

ngA

cto

rsT

imel

ine

12

34

5To

tal

Res

our

ces

(Ksh

. Mill

ion)

per

yea

r

July

201

3 –

June

201

8 5

43

21

15

June

201

4

July

201

3 –

June

201

8

July

201

3 –

June

201

8

1516

1718

2086

2524

2322

2111

4

Pol

icy

& R

esea

rch

/Te

chni

cal D

epts

/C

orpo

rate

Ser

vice

s

Pol

icy

& R

esea

rch

/D

G

Pol

icy

& R

esea

rch

Pol

icy

& R

esea

rch

/Te

chni

cal D

epts

Con

duct

pub

licco

nsul

tatio

ns o

n th

edr

afts

Con

duct

pub

licco

nsul

tatio

ns o

n th

edr

afts

Iden

tify

prov

isio

ns to

be o

pera

tiona

lized

Dev

elop

and

revi

ewst

anda

rd p

rocu

rem

ent

and

disp

osal

guid

elin

es, m

anua

ls,

docu

men

ts a

ndfo

rmat

s.

List

of p

rovi

sion

s fo

rop

erat

iona

lizat

ion

Dev

elop

ed o

r re

vise

dgu

idel

ines

, man

uals

,do

cum

ents

and

form

ats

SH

C R

epor

ts

SH

C R

epor

ts

App

rove

d La

yman

’sD

raft

Reg

ulat

ions

Ye

ar 1

– 2

Year

2 –

2

Year

3 –

2

Year

4 –

2

Year

5 –

2

No.

of M

anua

lsYe

ar 1

– 3

Year

2 –

5

Year

3 –

7

Year

4 –

8

Year

5 –

10

8 N

o. o

f sta

keho

lder

cons

ulta

tive

foru

ms

annu

ally

No.

of i

dent

ified

prov

isio

ns fo

rop

erat

iona

lizat

ion

Incr

ease

dco

mpl

ianc

e an

d st

rong

regu

lato

ryfra

mew

ork

Ope

ratio

naliz

eal

l pro

visi

ons

of th

e P

ublic

Pro

cure

men

tan

d A

sset

Dis

posa

l Law

July

201

3 –

June

201

8

July

201

3 –

June

201

8

Pol

icy

& R

esea

rch

Pol

icy

& R

esea

rch

Issu

e ad

vice

and

dire

ctiv

es.

Rev

iew

/ a

ppro

vesp

ecia

lly p

erm

itted

proc

urem

ent

proc

edur

es

Lett

ers

of a

dvic

e

Spe

cial

ly p

erm

itted

proc

urem

ent

proc

edur

esre

view

ed /

app

rove

d

10 d

ays

from

dat

e of

rece

ipt o

f req

uest

10 d

ays

from

dat

eof

rece

ipt o

f req

uest

39 |

ppo

a.go

.ke

Str

ateg

yE

xpec

ted

Out

com

e(s)

Act

ivit

yO

utp

ut In

dic

ato

rK

PIs

Imp

lem

enti

ngA

cto

rsT

imel

ine

12

34

5To

tal

Res

our

ces

(Ksh

. Mill

ion)

per

yea

r

June

201

42

2

June

201

4

June

201

4

June

201

5

2025

3035

4015

0

11

11

15

11

Pol

icy

& R

esea

rch

Pol

icy

& R

esea

rch

/D

G

Pol

icy

& R

esea

rch

Pol

icy

& R

esea

rch

Gui

delin

es a

nd s

ampl

eor

gani

zatio

n st

ruct

ures

for

vario

us c

lass

es

List

of P

Es.

Impl

emen

tatio

n st

atus

repo

rts

List

of s

take

hold

ers

Foru

m s

ched

ule

No.

of s

take

hold

ers

mee

tings

hel

d

Rep

ort o

fst

akeh

olde

r an

alys

is

No.

of P

Es

with

enha

nced

str

uctu

res

July

201

3 –

June

201

88

910

1112

50P

olic

y &

Res

earc

hM

arke

t Pric

e In

dex

(MP

I)N

o. o

f Prin

ted

MP

I Ye

ar 1

– 4

Year

2 –

4

Year

3 –

4

Year

4 –

4

Year

5 –

4

Year

1 –

10

Year

2 –

12

Year

3 –

15

Year

4 –

17

Year

5 –

20

Gui

delin

esdi

strib

uted

to a

ll P

Es

Incr

ease

d pr

ofile

of p

rocu

rem

ent

func

tion

Incr

ease

dfe

edba

ck o

npu

blic

proc

urem

ent

syst

em

Enh

ance

profi

le o

fpr

ocur

emen

tfu

nctio

n an

dpr

ofes

sion

tost

rate

gic

leve

ls

Red

uced

proc

urem

ent

spen

d on

com

mon

use

rite

ms

To s

tren

gthe

npr

ocur

emen

tre

sear

ch

Man

age

publ

icpr

ocur

emen

tan

d di

spos

alst

akeh

olde

rco

nsul

tatio

ns

July

201

3 –

June

201

820

3050

Pol

icy

& R

esea

rch

Und

erta

ke s

take

hold

eran

alys

is a

nd s

ched

ule

stak

ehol

ders

foru

ms

Con

duct

sta

keho

lder

foru

m

Issu

e gu

idel

ines

on

the

proc

urem

ent

orga

niza

tion

stru

ctur

esfo

r va

rious

cla

sses

of

entit

ies

and

PS

Cba

sed

on b

asel

ine

surv

ey

Mon

itor

impl

emen

tatio

nof

bas

elin

e pr

opos

als

inP

Es

Con

duct

Mar

ket P

rice

Inde

xing

Con

duct

Cou

ntry

Pro

cure

men

tA

sses

smen

t (C

PA)

CPA

Rep

ort

Incr

ease

dkn

owle

dge

ofth

e fu

nctio

n on

spec

ific

issu

es

Year

1 –

1Ye

ar 5

– 1

40 |

ppo

a.go

.ke

Str

ateg

yE

xpec

ted

Out

com

e(s)

Act

ivit

yO

utp

ut In

dic

ato

rK

PIs

Imp

lem

enti

ngA

cto

rsT

imel

ine

23

45

Tota

l

Res

our

ces

(Ksh

. Mill

ion)

per

yea

r

1

July

201

3 –

June

201

8

July

201

3 –

June

201

8

July

201

3 –

June

201

8

June

201

4

July

201

4 –

June

201

8

.07

.08

.09

.1.2

1112

1415

52

1010

Pol

icy

& R

esea

rch

GM

/ T

S

Pol

icy

& R

esea

rch

/C

orpo

rate

ser

vice

s

GM

/ T

S

Pol

icy

& R

esea

rch

/C

orpo

rate

ser

vice

s

Pol

icy

& R

esea

rch

Pol

icy

& R

esea

rch

Con

duct

stu

dies

on

emer

ging

issu

es o

npu

blic

pro

cure

men

t

Pre

pare

qua

rter

lyst

atut

ory

repo

rts

onpr

ocur

emen

t situ

atio

ns

Pre

pare

ann

ual

stat

utor

y re

port

s on

proc

urem

ent s

ituat

ions

Dev

elop

rese

arch

stra

tegy

Impl

emen

tatio

n of

the

stra

tegy

Str

ateg

y de

velo

ped

Impl

emen

tatio

n st

atus

repo

rts

Stu

dy re

port

s

Cus

tom

ized

OE

CD

-D

AC

MA

PS

str

ateg

y

Ann

ual r

epor

ts

No.

of s

tudi

es

Year

1 –

2Ye

ar 2

– 3

Ye

ar 3

– 4

Ye

ar 4

– 2

Ye

ar 5

– 2

No.

of r

epor

ts

Year

1 –

4Ye

ar 2

– 4

Ye

ar 3

– 4

Ye

ar 4

– 4

Ye

ar 5

– 4

Year

2 –

1

Year

3 –

1

Year

4 –

1

Year

5 –

1

July

201

3 –

June

201

83

45

67

25P

olic

y &

Res

earc

hR

evam

p th

e P

PO

AR

esou

rce

Cen

tre

Libr

ary

stoc

k

Vis

itor

repo

rts

e-lib

rary

in p

lace

No.

of v

isito

rsfo

r th

e R

esou

rce

cent

re u

tiliz

atio

n

No.

of r

epor

ts

Year

1 –

1Ye

ar 2

– 1

Ye

ar 3

– 1

Ye

ar 4

– 1

Ye

ar 5

– 1

Ope

ratio

nal s

trat

egy

in p

lace

1015

2017

2082

.4.5

.6.7

.8

41 |

ppo

a.go

.ke

Str

ateg

yE

xpec

ted

Out

com

e(s)

Act

ivit

yO

utp

ut In

dic

ato

rK

PIs

Imp

lem

enti

ngA

cto

rsT

imel

ine

23

45

Tota

l

Res

our

ces

(Ksh

. Mill

ion)

per

yea

r

Ob

ject

ive

4: T

o u

pho

ld f

airn

ess

and

pro

mo

te p

ublic

co

nfid

ence

in t

he p

ublic

pro

cure

men

t sy

stem

TH

EM

E 4

: AD

MIN

IST

RA

TIV

E R

EV

IEW

July

201

3 –

June

201

4

June

eve

ry y

ear

July

201

3 –

June

201

4

1

July

201

3 –

June

201

4

Qua

rter

ly

ICT

OP

B*

ICT

OP

B*

51

22

212

2425

3035

4015

4

OP

B*

AR

B S

ecre

taria

t /A

R B

oard

/ IC

T

AR

B S

ecre

taria

t /A

R B

oard

AR

B S

ecre

taria

t /IC

T

AR

B S

ecre

taria

t /IC

T /

Cor

pora

te s

ervi

ces

AR

B S

ecre

taria

t /C

ompl

ianc

e

Con

duct

a b

usin

ess

proc

ess

re-e

ngin

eerin

gof

AR

B p

roce

sses

Pro

cess

Req

uest

s fo

rR

evie

w:

- R

ecei

ving

of R

eque

sts

- A

naly

sis

- H

earin

g-

Dec

isio

n

Ado

pt a

nd u

tiliz

e th

edo

cum

ent m

anag

emen

tsy

stem

Ado

pt a

nd u

tiliz

e th

ecu

stom

er re

latio

nshi

pm

anag

emen

t sys

tem

- Fo

llow

up

on i

mpl

emen

tatio

n of

Boa

rd D

ecis

ions

.

- Le

tter

s to

the

PE

’s

- R

epor

t on

emer

ging

iss

ues

Con

sulta

ncy

repo

rt

Tim

e-lin

es fo

r he

arin

gan

d de

term

inat

ion

ofca

ses

redu

ced.

Leve

lof S

yste

mut

ilizat

ion

by A

RB

Leve

l of

Sys

tem

utiliz

atio

n by

AR

B

Year

1 –

21

days

Year

2 –

20

days

Year

3 –

19

days

Year

4 –

18

days

Year

5 -

17

days

100%

util

izat

ion

of th

e sy

stem

Qua

rter

lyG

M -

TS /

AR

BS

ecre

taria

t /C

apac

ity B

uild

ing

/P

olic

y /

Com

plia

nce

Est

ablis

h a

syst

em fo

rsh

arin

g B

oard

’sob

serv

atio

ns /

reco

mm

enda

tions

with

Tech

nica

l Dep

artm

ents

- Fr

amew

ork

for

inf

orm

atio

n sh

arin

g-

Four

join

t mee

tings

he

ld a

nnua

lly

100%

util

izat

ion

of th

e sy

stem

- Q

uart

erly

Sta

tus

re

port

Tim

elin

ess

inhe

arin

g an

dde

term

inat

ion

ofca

ses.

Enh

ance

Effi

cien

cy in

hand

ling

App

licat

ions

for

Rev

iew

Enh

ance

PE

sco

mpl

ianc

ew

ith P

PAR

BD

ecis

ions

Enh

ance

Com

plia

nce

with

the

publ

icpr

ocur

emen

tLa

w

- R

evis

ed p

roce

sses

im

plem

ente

d

42 |

ppo

a.go

.ke

Str

ateg

yE

xpec

ted

Out

com

e(s)

Act

ivit

yO

utp

ut In

dic

ato

rK

PIs

Imp

lem

enti

ngA

cto

rsT

imel

ine

23

45

Tota

l

Res

our

ces

(Ksh

. Mill

ion)

per

yea

r

1

By

June

of e

ach

year

By

June

of e

ach

year

July

201

4 -

June

201

8

July

201

3 -

June

201

5

AR

B S

ecre

taria

t /D

Gs

offic

e /

AR

B

AR

B S

ecre

taria

t /D

Gs

Offi

ce

Trai

n A

RB

Sec

reta

riat

staf

f

Org

aniz

e st

udy

tour

sfo

r th

e P

PAR

B

Org

aniz

e tr

aini

ngs

for

Boa

rd M

embe

rs

Stu

dy to

ur re

port

s

No.

of g

roup

trai

ning

s

No.

of B

oard

Mem

bers

trai

ned

No.

of t

rain

ing

requ

ests

No.

of o

ffice

rs tr

aine

d

22

23

312

June

201

4 -

June

201

8 2.

51

12

28.

5A

RB

Sec

reta

riat /

Pro

cure

men

t Uni

t D

evel

op a

nd p

ublis

hdi

gest

s of

pre

viou

sP

PAR

B d

ecis

ions

No.

of D

iges

tspu

blis

hed

Year

1 -

3 d

iges

tsYe

ar 2

- 1

dig

est

Year

3 -

1 d

iges

tYe

ar 4

- 1

dig

est

Year

5 -

1 d

iges

t

July

201

3 –

June

201

8

July

201

3 –

June

201

8

HR

&A

dmin

.O

PB

*

HR

&A

dmin

. O

PB

*

AR

B S

ecre

taria

t /H

R &

Adm

in.

AR

B S

ecre

taria

t /H

R D

ept

Str

engt

hen

the

Sec

reta

riat t

hrou

ghad

equa

te s

taffi

ng

Vaca

nt P

ositi

on fi

lled

Pro

posa

l for

add

ition

alst

affin

g

100%

sta

ffes

tabl

ishm

ent

achi

eved

Rev

iew

ed s

taff

esta

blis

hmen

t ful

lyim

plem

ente

d

At l

east

6 re

ques

tspe

r fin

anci

al y

ear

At l

east

6 o

ffice

rspe

r fin

anci

al y

ear

At l

east

one

stu

dyto

ur p

er fi

nanc

ial y

ear

1 N

o. S

ensi

tizat

ion

/In

duct

ion

trai

ning

1 gr

oup

trai

ning

per

year

on

rele

vant

emer

ging

issu

es

9 B

oard

mem

bers

trai

ned

on C

orpo

rate

Gov

erna

nce

Enh

ance

d qu

ality

of P

PAR

Bse

rvic

es

Enh

ance

the

capa

city

of

the

Boa

rd

Enh

ance

d qu

ality

and

cons

iste

ncy

of P

PAR

Bde

cisi

ons

Pro

visi

on o

fre

leva

ntre

fere

nce

mat

eria

ls fo

rP

PAR

B

54

33

217

July

201

4 –

June

201

50

42

6A

RB

Sec

reta

riat /

HR

& A

dmin

. /IC

T /

Pro

cure

men

t Uni

t

Str

engt

hen

the

Sec

reta

riat t

hrou

ghpr

ovis

ion

of a

dequ

ate

faci

litie

s

Furn

iture

& E

quip

men

tpr

ocur

ed-

Fully

equ

ippe

dS

ecre

taria

t

- Fu

lly fu

rnis

hed

Sec

reta

riat

Effe

ctiv

e an

def

ficie

ntS

ecre

taria

tse

rvic

es

Enh

ance

capa

city

of th

e P

PAR

BS

ecre

taria

t

43 |

ppo

a.go

.ke

Str

ateg

yE

xpec

ted

Out

com

e(s)

Act

ivit

yO

utp

ut In

dic

ato

rK

PIs

Imp

lem

enti

ngA

cto

rsT

imel

ine

23

45

Tota

l

Res

our

ces

(Ksh

. Mill

ion)

per

yea

r

1

June

201

4

Oct

ober

201

4

Apr

il 20

15

June

201

6

Apr

il 20

17

AR

B S

ecre

taria

t /P

rocu

rem

ent u

nit

Pub

lish

the

AR

BS

tand

ard

Ope

ratin

gP

roce

dure

s

Enh

ance

dqu

ality

and

cons

iste

ncy

ofP

PAR

Bde

cisi

ons

Qui

ck /

sm

ooth

indu

ctio

n of

new

staf

f and

boa

rd

Con

duct

stu

dies

on

emer

ging

issu

esre

leva

nt to

PPA

RB

Con

sulta

ncy

Rep

orts

on:

- R

evie

w o

f A

dmin

istr

ativ

e R

evie

w fe

es-

With

draw

al &

ter

min

atio

n of

cas

es-

Tren

ds o

f App

eals

in d

iffer

ent c

lass

es o

f P

.Es

- G

uide

lines

for

de

term

inat

ion

of

cost

s-

Impl

emen

tatio

n of

A

RB

Ord

ers

Ope

ratin

g P

roce

dure

sha

ndbo

ok

10

00

01

June

201

4 -

June

201

8

June

201

4

ICT

OP

B*

AR

B S

ecre

taria

t /IC

T

AR

B S

ecre

taria

t /P

rocu

rem

ent u

nit

Dig

itiza

tion

of P

PAR

BD

iges

tsN

o. o

f Dig

ests

avai

labl

e in

dig

ital

form

at

Year

1 –

3 d

iges

tsYe

ar 2

– 1

dig

est

Year

3 -

1 d

iges

tYe

ar 4

– 1

dig

est

Year

5 –

1 d

iges

t

Year

1 -

Dev

elop

men

tan

d P

rintin

g of

hand

book

Year

1 -

2 re

port

s

Year

2 -

1 re

port

Year

3 -

1 re

port

Year

4 –

1 re

port

Enh

ance

dqu

ality

of P

PAR

BS

ervi

ces

Pro

mot

e a

cultu

re o

fco

ntin

uous

lear

ning

and

impr

ovem

ent

3.5

22

20

9.5

June

201

4 -

June

201

8 1

51

11

9A

RB

Sec

reta

riat /

Pro

cure

men

t uni

tB

indi

ng o

f pre

viou

sP

PAR

B d

ecis

ions

Dec

isio

ns in

yea

rlyvo

lum

es fr

om y

ear

2007

to y

ear

2017

Year

1 -

1 v

olum

eYe

ar 2

- 1

1 vo

lum

esYe

ar 3

- 1

vol

ume

Year

4 -

1 v

olum

eYe

ar 5

- 1

vol

ume

44 |

ppo

a.go

.ke

Str

ateg

ic O

bje

ctiv

e 5:

To

Imp

rove

the

Hum

an R

eso

urce

Man

agem

ent,

Sys

tem

s an

d In

fras

truc

ture

to

Pro

vid

e Q

ualit

yS

ervi

ces

to S

take

hold

ers

TH

EM

E 5

: IN

ST

ITU

TIO

NA

L C

APA

CIT

Y

Str

ateg

yE

xpec

ted

Out

com

e(s)

Act

ivit

yO

utp

ut In

dic

ato

rK

PIs

Imp

lem

enti

ngA

cto

rsT

imel

ine

12

34

5To

tal

Res

our

ces

(Ksh

. Mill

ion)

per

yea

r

Aug

ust 2

013

61

00

07

HR

Rev

iew

of P

PO

A J

obev

alua

tion

Rep

ort

Rep

ort

s o

n:

1) R

atio

naliz

ed

org

anog

ram

2) W

orkl

oad

anal

ysis

re

port

3) S

alar

y &

re

mun

erat

ion

s

truc

ture

Str

engt

hene

dor

gani

zatio

nst

ruct

ure,

staf

fing

&eq

uita

ble

rem

uner

atio

nsy

stem

Att

ract

,d

evel

op a

ndre

tain

qua

li�ed

and

ski

lled

hum

anre

sour

ces

App

rove

d Jo

b

Eva

luat

ion

Rev

iew

Rep

ort

July

201

3 -

June

201

8 3

3.5

3.5

55

20A

RB

Sec

reta

riat

Con

duct

Ann

ual

Rev

iew

of P

PAR

Bac

tiviti

es

- A

nnua

l ret

reat

repo

rts

with

act

ion

plan

s fo

r i

mpl

emen

tatio

n-

Per

form

ance

repo

rt

1 re

port

per

yea

r

July

201

3 -

June

201

8 0

010

100

20H

R &

Adm

in. /

AR

BS

ecre

taria

tD

ecen

tral

ize

AR

BS

ecre

taria

t Ser

vice

sN

o. o

f reg

ions

with

AR

B D

esk

Offi

cers

Year

1 –

1 re

gion

Year

2 –

2 re

gion

sYe

ar 3

– 2

regi

ons

Year

4 –

2 re

gion

s

Enh

ance

dqu

ality

of P

PAR

Bse

rvic

es

Incr

ease

acce

ss to

PPA

RB

Ser

vice

s

Str

ateg

yE

xpec

ted

Out

com

e(s)

Act

ivit

yO

utp

ut In

dic

ato

rK

PIs

Imp

lem

enti

ngA

cto

rsT

imel

ine

12

34

5To

tal

Res

our

ces

(Ksh

. Mill

ion)

per

yea

r

22

35

7

Cre

ate

awar

enes

s on

AR

B m

anda

te a

ndop

erat

ions

CS

/P

olic

yO

PB

*

July

201

3 -

June

201

8

July

201

3 –

June

201

8

19A

RB

Sec

reta

riat

AR

B S

ecre

taria

t CS

/P

olic

y

Incr

ease

the

prop

ortio

nof

hea

rings

con

duct

edin

cou

ntie

s /

Reg

ions

No.

of c

ount

y sp

ecifi

che

arin

gs c

ondu

cted

out o

f Nai

robi

Year

1 –

5Ye

ar 2

– 7

Year

3 –

10

Year

4 –

12

Year

5 –

15

Qua

rter

ly

45 |

ppo

a.go

.ke

All

vaca

nt &

budg

eted

posi

tions

fille

d

22

22

2A

ugus

t 201

310

HR

Sta

ff re

crui

tmen

t &se

lect

ion

Und

erta

ke tr

aini

ng &

deve

lopm

ent

All

budg

eted

vac

ant

posi

tions

adv

ertis

edN

o. o

f vac

ant

posi

tions

fille

d

All

appr

oved

&bu

dget

edR

egio

nal o

ffice

staf

f pos

ition

s fil

led

2020

2030

30D

ecem

ber

2013

120

HR

Fillin

g of

vac

anci

es in

the

regi

onal

offi

ceN

o. o

f reg

iona

lpo

sitio

ns fi

lled

Mai

ntai

nop

timum

sta

ffing

at h

qtrs

120

125

130

140

145

July

201

3 -

June

201

866

0H

R90

% o

f app

rove

des

tabl

ishm

ent i

n po

stm

aint

aine

d

% o

f app

rove

des

tabl

ishm

ent i

npo

st m

aint

aine

d

Enh

ance

dco

mpe

tenc

y &

effic

ienc

y

510

1520

25Ju

ly 2

013

-Ju

ne 2

018

75H

R1)

TN

A re

port

2) T

rain

ing

cale

ndar

3) E

nsur

e m

in 5

day

s

trai

ning

for

ever

y

offi

cer

4) T

rain

ing

repo

rts

% c

ompl

ianc

e w

ithTN

A re

port

/ tr

aini

ngpo

licy

& s

ched

ule

11

11

1-d

o-5

HR

1) P

olic

y fo

rmul

atio

nN

o. o

f offi

cers

trai

ned

11

11

1-d

o-5

HR

2) P

roje

ct

impl

emen

tatio

nN

o. o

f offi

cers

trai

ned

Str

ateg

yE

xpec

ted

Out

com

e(s)

Act

ivit

yO

utp

ut In

dic

ato

rK

PIs

Imp

lem

enti

ngA

cto

rsT

imel

ine

12

34

5To

tal

Res

our

ces

(Ksh

. Mill

ion)

per

yea

r

Aug

ust 2

013

Aug

ust 2

013

132

10

00

10

00

0

HR

HR

Rev

iew

recr

uitm

ent &

trai

ning

pol

icy

4) C

aree

r pr

ogre

ssio

n

gui

delin

es

5) C

ompa

rativ

e st

udy

&

ana

lysi

s

Rev

iew

PP

OA

HR

polic

ies

& p

roce

dure

sm

anua

l

Rev

iew

ed tr

aini

ng &

recr

uitm

ent p

olic

y

App

rove

d R

evis

edP

PO

A H

R M

anua

lR

evis

ed P

PO

A H

RM

anua

l

App

rove

d tr

aini

ng&

recr

uitm

ent

revi

ew re

port

Impr

oved

term

san

d co

nditi

ons

of s

ervi

ce

Str

eam

lined

trai

ning

&re

crui

tmen

tpo

licy

46 |

ppo

a.go

.ke

Str

ateg

yE

xpec

ted

Out

com

e(s)

Act

ivit

yO

utp

ut In

dic

ato

rK

PIs

Imp

lem

enti

ngA

cto

rsT

imel

ine

12

45

Tota

l

Res

our

ces

(Ksh

. Mill

ion)

per

yea

r

3

11

11

1-d

o-5

HR

3) L

egal

asp

ects

in

pub

lic p

rocu

rem

ent

No.

of o

ffice

rs tr

aine

d

11

11

1-d

o-5

HR

4) S

trat

egic

pla

nnin

gN

o. o

f offi

cers

trai

ned

11

11

1-d

o-5

HR

5) In

duct

ion

trai

ning

No.

of o

ffice

rs tr

aine

d

11

11

1-d

o-5

HR

6) P

erfo

rman

ce

man

agem

ent

No.

of o

ffice

rs tr

aine

d

11

11

1-d

o-5

HR

7) C

onfli

ct

man

agem

ent

No.

of o

ffice

rs tr

aine

d

11

11

1-d

o-5

HR

8) F

oren

sic

audi

tN

o. o

f offi

cers

trai

ned

11

11

1-d

o-5

HR

9) T

rain

ing

of tr

aine

rsN

o. o

f offi

cers

trai

ned

11

11

1-d

o-5

HR

10) N

egot

iatio

n sk

illsN

o. o

f offi

cers

trai

ned

Bro

adkn

owle

dge

&pe

rspe

ctiv

es

57

910

-do-

31H

RIn

trod

uce

empl

oyee

exch

ange

pro

gram

s

Intr

oduc

e m

anag

emen

ttr

aine

e pr

ogra

m

Exc

hang

e pr

ogra

ms

&M

OU

sN

o. o

f exc

hang

epr

ogra

ms

Sm

ooth

succ

essi

onm

anag

emen

t

1020

2020

20-d

o-90

HR

Man

agem

ent t

rain

eepr

ogra

mA

ppro

ved

prog

ram

Dev

elop

and

impl

emen

tcu

lture

cha

nge

prog

ram

Per

form

ance

cultu

ral

embe

dded

52

22

220

13 /

14

and

cont

inuo

us13

HR

/A

ll de

part

men

tsC

ultu

re c

hang

epr

ogra

m im

plem

ente

d%

of i

mpr

oved

perfo

rman

ce

Pro

paga

te m

issi

on,

visi

on a

nd c

ore

valu

esA

lignm

ent o

fin

divi

dual

and

corp

orat

em

issi

on

2013

/ 1

4 an

dco

ntin

uous

OP

BH

R /

All

depa

rtm

ents

Enh

ance

sta

ffco

mm

itmen

t Le

vel o

f sta

ffco

mm

itmen

t

Dee

pen

perfo

rman

ceco

ntra

ctin

g &

pro

gres

sm

onito

ring

PC

cas

cade

d to

the

indi

vidu

alle

vels

2013

/ 1

4 an

dco

ntin

uous

OP

BH

R /

All

depa

rtm

ents

PP

OA

ann

ual

perfo

rman

ce c

ontr

act

agre

emen

t

Per

form

ance

targ

ets

for

indi

vidu

als

iden

tified

Impr

ove

Per

form

ance

Man

agem

ent

47 |

ppo

a.go

.ke

22

22

2

11

11

1

10

Impl

emen

tcr

oss-

cutt

ing

publ

ic s

ecto

rpr

ogra

ms

of c

ross

-cut

ting

publ

ic s

ecto

rpr

ogra

ms

mai

nstr

eam

edin

PP

OA

2013

/ 1

4 an

dco

ntin

uous

5H

R /

All

depa

rtm

ents

Impl

emen

tatio

npr

ogra

ms

for

cros

s-cu

ttin

gpu

blic

sec

tor

No.

of c

ross

-cut

ting

publ

ic s

ecto

rpr

ogra

ms

impl

emen

ted

55

55

5Im

plem

ent

cros

s-cu

ttin

gpu

blic

sec

tor

prog

ram

s

Mot

ivat

ed s

taff

July

201

3 -

June

201

825

HR

Bes

t per

form

ers

reco

gniti

on s

chem

e &

sanc

tions

for

non-

perfo

rmer

s

No.

of o

ffice

rsaw

arde

d an

dsa

nctio

ned

Dev

elop

&au

tom

ate

perfo

rman

cem

onito

ring

syst

em

Sep

tem

ber

2013

HR

/ IC

T /

All

dpts

Aut

omat

ed to

ols

for

perfo

rman

cem

onito

ring

% o

f aut

omat

ion

ofP

MS

Intr

oduc

e pr

oduc

tivity

impr

ovem

ent s

yste

ms

(Kai

zen,

Qua

lity

circ

les,

Wor

k-st

udy,

WIT

S, e

tc.)

Em

ploy

eepr

oduc

tivity

impr

oved

22

22

2Ju

ly 2

013

-Ju

ne 2

018

10H

RN

o. o

f pro

duct

ivity

syst

ems

intr

oduc

ed%

of i

mpr

ovem

ent i

npr

oduc

tivity

Str

ateg

yE

xpec

ted

Out

com

e(s)

Act

ivit

yO

utp

ut In

dic

ato

rK

PIs

Imp

lem

enti

ngA

cto

rsT

imel

ine

12

34

5To

tal

Res

our

ces

(Ksh

. Mill

ion)

per

yea

r

Str

eam

lined

reco

rds

&kn

owle

dge

polic

y

11

11

Sep

tem

ber

2013

6H

R /

Rec

ords

/ IC

TR

evie

w a

ndim

plem

ent a

utom

ated

PP

OA

reco

rds

&kn

owle

dge

man

agem

ent p

olic

y

Rec

ords

& k

now

ledg

em

anag

emen

t pol

icy

impl

emen

ted

% o

f im

plem

enta

tion

of re

cord

s &

KM

mgt

polic

y

Enh

ance

def

ficie

ncy

HR

/ R

ecor

ds /

ICT

Leve

l of a

utom

atio

n%

of a

utom

atio

nre

cord

s &

KM

mgt

polic

y

Stu

dy o

n es

tabl

ishm

ent

of re

gion

al o

ffice

sIm

prov

edac

cess

to P

PO

Ase

rvic

es b

yco

untie

s

2

00

00

22

Est

ablis

hmen

t of 7

regi

onal

offi

ces

Iden

tify

and

equi

p of

fices

inth

e 7

regi

ons

July

201

3 H

RR

epor

t on

esta

blis

hmen

t and

oper

atio

nalis

atio

n of

regi

onal

offi

ces

App

rove

d re

port

on

regi

onal

offi

ces

4050

6070

250

30D

ecem

ber

2013

-Ju

ne 2

018

HR

Ope

ratio

nal r

egio

nal

offic

esYe

ar 1

: 1

Year

2: 2

Year

3: 2

Year

4: 2

Intr

oduc

ekn

owle

dge

man

agem

ent

& Im

prov

ere

cord

sm

anag

emen

tin

PP

OA

Dec

entr

aliz

eP

PO

Aop

erat

ions

by esta

blis

hing

7 re

gion

alof

fices

48 |

ppo

a.go

.ke

Str

ateg

ic O

bje

ctiv

e 6:

To

enh

ance

the

use

of

tech

nolo

gy

in o

rder

to

incr

ease

effi

cien

cy a

nd e

ffec

tive

ser

vice

del

iver

y

Str

ateg

yE

xpec

ted

Out

com

e(s)

Act

ivit

yO

utp

ut In

dic

ato

rK

PIs

Imp

lem

enti

ngA

cto

rsT

imel

ine

12

34

5To

tal

Res

our

ces

(Ksh

. Mill

ion)

per

yea

r

July

201

4

July

201

4 -

June

201

8

July

201

4 –

June

201

82

34

56

20

22

ICT

/ A

ll de

part

men

ts

ICT

/ A

ll de

part

men

ts

ICT

/A

ll de

part

men

ts

Rev

ised

the

ICT

polic

y

Und

erta

ke re

gula

rup

date

s on

our

web

site

s:w

ww

.pp

oa.

go

.ke

ww

w.t

end

ers.

go

.ke

Und

erta

kem

aint

enan

ce o

f the

Loca

l Are

a N

etw

ork

(LA

N)

Rev

ised

ICT

polic

y

No.

of N

ew c

onte

nts

post

ed o

n th

ew

ebsi

tes

Ope

ratio

nal L

AN

Year

1 :

50Ye

ar 2

: 70

Year

3 :

100

Year

4 :

150

Year

5 :

200

Ope

ratio

nal L

AN

in p

lace

Incr

ease

def

ficie

ncy

inus

ing

ICT

syst

ems

Incr

ease

dle

vel o

f acc

ess

to in

form

atio

n

Effi

cien

cy a

ndin

crea

sed

use

of th

e LA

N

Enh

ance

utiliz

atio

n of

ICT

Ope

ratio

nal I

CT

polic

y

2025

2530

30

010

010

00

0

130

100

100

100

100

600

200

Form

ulat

e, d

evel

op &

impl

emen

t PP

OA

adm

inis

trat

ion

man

ual

Acq

uisi

tion

and

mai

nten

ance

of

offic

e sp

ace

and

utilit

ies

Str

eam

lined

oper

atio

ns

Iden

tify

and

equi

p ad

ditio

nal

offic

es

July

201

3 -

June

201

8H

R /

All

depa

rtm

ents

Adm

inis

trat

ion

man

ual

(tran

spor

t, ge

nera

lof

fice

serv

ices

,se

curit

y, e

tc)

Sea

mle

ssad

min

istr

ativ

e &

oper

atio

nal s

yste

ms

App

rove

d lo

ngte

rm p

lan

for

owne

rshi

p of

offic

e bl

ock

for

PP

OA

June

201

820

0H

RB

udge

t pro

ject

ions

for

own

HQ

.P

PO

A o

wne

d of

fice

bloc

k

Sep

tem

ber

2013

HR

Ope

ratio

nal o

ffice

sYe

ar 1

: 1 o

ffice

floo

r

Mai

ntai

n ef

ficie

ntad

min

istr

ativ

e&

ope

ratio

nal

syst

ems

Str

ateg

yE

xpec

ted

Out

com

e(s)

Act

ivit

yO

utp

ut In

dic

ato

rK

PIs

Imp

lem

enti

ngA

cto

rsT

imel

ine

12

34

5To

tal

Res

our

ces

(Ksh

. Mill

ion)

per

yea

r

49 |

ppo

a.go

.ke

Str

ateg

yE

xpec

ted

Out

com

e(s)

Act

ivit

yO

utp

ut In

dic

ato

rK

PIs

Imp

lem

enti

ngA

cto

rsT

imel

ine

12

34

5To

tal

Res

our

ces

(Ksh

. Mill

ion)

per

yea

r

June

201

4

1015

2025

3010

0

ICT

/ A

ll de

part

men

tsU

nder

take

ICT

trai

ning

need

s as

sess

men

t

- N

o. o

f peo

ple

reg

iste

red

for

the

cou

rse

- N

o. o

f peo

ple

trai

ned

Enh

anci

ng th

ee-

Lear

ning

sys

tem

Trai

ning

nee

dsas

sess

men

t rep

ort

July

201

4 –

June

201

8IC

T /

All

depa

rtm

ents

31

11

17

July

201

4IC

T /

Cap

acity

bui

ldin

g

Con

duct

ICT

trai

ning

Impr

oved

prof

essi

onal

ism

in p

ublic

proc

urem

ent

prac

tice

No.

of s

taff

trai

ned

Year

1 :

50Ye

ar 2

: 70

Year

3 :

100

Year

4 :

150

Year

5 :

200

Year

1 -

500

Year

2 -

100

0Ye

ar 3

- 1

500

Year

4 -

200

0Ye

ar 5

- 2

500

July

201

42

2IC

T /

All

depa

rtm

ents

Bus

ines

s pr

oces

sre

-eng

inee

ring

toid

entif

y ap

prop

riate

ICT

syst

ems

BP

R R

epor

tO

pera

tiona

l BP

Rre

port

App

rove

d IC

T TN

Ain

pla

ceE

nhan

ced

skills

& c

ompe

tenc

ies

of s

taff

in IC

T

Incr

ease

def

ficie

ncy

inop

erat

ions

July

201

3

July

201

35

22

22

41

11

1

118IC

T /

Com

plia

nce

ICT

/A

ll de

part

men

ts

Des

ign,

dev

elop

and

depl

oy a

n in

tera

ctiv

eW

eb b

ased

Inte

rnal

Pro

cure

men

tP

erfo

rman

ceM

onito

ring

Tool

.

Acq

uire

and

impl

emen

ten

hanc

ed fe

atur

es o

fth

e do

cum

ent

man

agem

ent s

yste

m

- A

n op

erat

iona

l I

PP

MT

tool

in p

lace

- N

o. o

f PE

’s u

sing

the

IPP

MT

- N

o. o

f dig

itize

d d

ocum

ents

in th

e s

yste

m

Year

1 :

300

Year

2 :

500

Year

3 :

800

Year

4 :

1000

Year

5 :

1500

Tim

ely

and

effic

ient

proc

urem

ent

mon

itorin

g

Enh

ance

def

ficie

ncy

indo

cum

ent

man

agem

ent

July

201

33

11

11

7IC

T /

AR

BA

cqui

re a

nd in

stal

l the

audi

o re

cord

ing

syst

em

- O

pera

tiona

l Aud

io r

ecor

ding

sys

tem

in p

lace

An

oper

atio

nal

audi

o re

cord

ing

syst

em

Fast

er d

eliv

ery

of d

ecis

ions

Year

1 -

30

Year

2 -

100

Year

3 -

300

Year

4 -

100

0Ye

ar 5

- 2

000

Impr

ove

ICT

syst

ems

thro

ugh

busi

ness

proc

ess

re-e

ngin

eerin

g

50 |

ppo

a.go

.ke

Str

ateg

yE

xpec

ted

Out

com

e(s)

Act

ivit

yO

utp

ut In

dic

ato

rK

PIs

Imp

lem

enti

ngA

cto

rsT

imel

ine

12

34

5To

tal

Res

our

ces

(Ksh

. Mill

ion)

per

yea

r

22

22

210

Acq

uire

and

impl

emen

ten

hanc

ed fe

atur

es o

fth

e C

usto

mer

sR

elat

ions

Man

agem

ent

Sys

tem

- N

o. o

f mod

ules

of

the

ER

P in

use

- R

epor

ts g

ener

ated

fro

m th

e va

rious

mod

ules

of t

he s

yste

m

- E

nhan

ce th

e us

e of

the

Fin

ance

mod

ule

of t

he E

RP

- E

nhan

ce u

se o

f P

rocu

rem

ent m

odul

e o

f the

ER

P

- A

cqui

re a

nd i

mpl

emen

t enh

ance

d f

eatu

res

of th

e H

R m

odul

e of

the

ER

P

- N

o. o

f res

pons

es to

cus

tom

ers

gene

rate

d f

rom

the

syst

em

July

201

3IC

T /

Cor

pora

te s

ervi

ces

/A

ll de

part

men

tal

head

s

23

34

517

020

12

225

July

201

4 –

June

201

8IC

T /

Fina

nce

/P

rocu

rem

ent /

HR

Enh

ance

def

ficie

ncy

inFi

nanc

ial

Man

agem

ent

Year

1 :

300

Year

2 :

500

Year

3 :

800

Year

4 :

1000

Year

5 :

1500

Year

1 -

500

Year

2 -

100

0Ye

ar 3

- 1

500

Year

4 -

200

0Ye

ar 5

- 2

500

July

201

5IC

T /

All

depa

rtm

ents

Acq

uire

and

inst

all t

hevi

deo

conf

eren

cing

syst

em

Ope

ratio

nal V

ideo

conf

eren

cing

sys

tem

An

oper

atio

nal

vide

o co

nfer

enci

ngsy

stem

in p

lace

Enh

ance

def

ficie

ncy

incu

stom

erre

latio

ns

Effi

cien

t ser

vice

deliv

ery

51

11

19

July

201

3Ye

ar 1

: 50

00

Year

2 :

8000

Ye

ar 3

: 10

000

Year

4 :

1200

0 Ye

ar 5

: 20

000

ICT

/A

ll de

part

men

tsD

esig

n, d

evel

op a

ndde

ploy

an

inte

ract

ive

Web

site

- A

n In

tera

ctiv

e w

ebsi

te

- N

o. o

f hits

on

the

web

site

Enh

ance

acc

ess

to in

form

atio

n

ICT

/IF

MIS

dep

artm

ent

IFM

IS P

2P s

yste

min

stal

led

and

oper

atio

nal

Ope

ratio

nal I

FMIS

P2P

mod

ule

July

201

45

5IC

T /

All

depa

rtm

ents

Des

ign,

dev

elop

and

depl

oy a

mon

itorin

g,ev

alua

tion

and

repo

rtin

g sy

stem

Mon

itorin

g, e

valu

atio

nan

d re

port

ing

syst

emde

velo

ped

Aut

omat

em

onito

ring,

eval

uatio

n an

dre

port

ing

syst

em

July

201

4IC

T /

IFM

IS d

epar

tmen

tP

rovi

de s

uppo

rt fo

rth

e im

plem

enta

tion

ofIF

MIS

P2P

No.

of e

ntiti

espi

lotin

g IF

MIS

P2P

syst

em

Year

1 -

5Ye

ar 2

- 1

0Ye

ar 3

- 1

5

Effi

cien

tpr

ocur

emen

tsy

stem

Util

ize

the

IFM

IS P

2PP

rocu

rem

ent

Mod

ule

An

oper

atio

nal

mon

itorin

g,ev

alua

tion

and

repo

rtin

g sy

stem

in p

lace

July

201

3

51 |

ppo

a.go

.ke

Str

ateg

yE

xpec

ted

Out

com

e(s)

Act

ivit

yO

utp

ut In

dic

ato

rK

PIs

Imp

lem

enti

ngA

cto

rsT

imel

ine

12

34

5To

tal

Res

our

ces

(Ksh

. Mill

ion)

per

yea

r

Mec

hani

sm to

col

lect

the

CB

L in

pla

ce1.

1.1

Dev

elop

aco

ncep

t pap

er o

n th

eco

llect

ion

the

CB

L

22

July

201

3Fi

nanc

e /

Pol

icy

and

Res

earc

h 1.

1 In

crea

sed

fund

ing

thro

ugh

Cap

acity

Bui

ldin

g Le

vy

App

rove

d co

ncep

tpa

per

1.0

Res

ourc

em

obiliz

atio

n

102

12Ju

ly 2

014

DG

/ F

inan

ce /

HR

&A

/ IC

T 1.

1.2

Ope

ratio

naliz

eco

llect

ion

of th

e C

BL

Am

ount

of C

BL

colle

cted

Year

2 -

100

MYe

ar 3

- 2

00M

Year

4 -

300

MYe

ar 5

- 4

00M

0PD

July

201

3P

PO

AB

/ D

G /

Fina

nce

1.2.

1 Id

entif

ypr

ospe

ctiv

e do

nors

and

area

s of

inte

rest

Fina

ncin

g ag

reem

ents

with

Dev

elop

men

tP

artn

ers

No.

of a

gree

men

tsw

ith D

evel

opm

ent

Par

tner

s

1.2

Incr

ease

dfin

anci

al a

ndte

chni

cal

supp

ort f

rom

Dev

elop

men

tP

artn

ers

thro

ugh

gran

ts a

nddo

natio

ns.

Str

ateg

yE

xpec

ted

Out

com

e(s)

Act

ivit

yO

utp

ut In

dic

ato

rK

PIs

Imp

lem

enti

ngA

cto

rsT

imel

ine

12

34

5To

tal

Res

our

ces

(Ksh

. Mill

ion)

per

yea

r

July

201

310

1010

1010

50

8055

55

515

0

ICT

/C

apac

ity b

uild

ing

/H

R /

IFM

IS

ICT

Con

duct

use

r tr

aini

ngon

IFM

IS P

2P

Acq

uire

and

impl

emen

tIC

T sy

stem

s in

all

regi

onal

offi

ces

No.

of t

rain

ings

No.

of p

eopl

e tr

aine

d

Year

1 -

100

0Ye

ar 2

- 2

000

Year

3 -

300

0Ye

ar 4

- 4

000

Year

5 -

500

0

July

201

4 –

June

201

8Ye

ar 1

: 3

Year

2 :

4N

o. o

f reg

iona

l offi

ces

conn

ecte

d to

the

Hea

dqua

rter

s

Est

ablis

hco

nnec

tivity

in th

eR

egio

nal

Offi

ces

Incr

ease

def

ficie

ncy

inop

erat

ions

Str

ateg

ic O

bje

ctiv

e 7:

To

enh

ance

fina

ncia

l sus

tain

abili

ty

52 |

ppo

a.go

.ke

Str

ateg

yE

xpec

ted

Out

com

e(s)

Act

ivit

yO

utp

ut In

dic

ato

rK

PIs

Imp

lem

enti

ngA

cto

rsT

imel

ine

12

34

5To

tal

Res

our

ces

(Ksh

. Mill

ion)

per

yea

r

Janu

ary

and

Apr

ilan

nual

ly

Dec

embe

r 20

13

OP

DP

PO

AB

/ D

G /

Fina

nce

PP

OA

B /

DG

/Fi

nanc

e

1.3.

1 B

uild

a c

ase

for

addi

tiona

l fun

ding

thro

ugh

the

annu

alan

d su

pple

men

tary

budg

et

Con

duct

use

r tr

aini

ngon

IFM

IS P

2P

1.4

Incr

ease

din

com

e fro

mot

her

sour

ces

1.4.

1 C

harg

e fo

rse

rvic

es o

ffere

d by

the

Aut

horit

y

Com

plia

nce,

Tec

hnic

al,

Pro

cure

men

t and

Fina

ncia

l rep

orts

App

rove

d an

nual

budg

et a

ndpr

ocur

emen

t pla

n

2.1.

2 P

repa

ratio

n of

repo

rts

for

Man

agem

ent a

ndot

her

stak

ehol

ders

2.1.

1 P

repa

re d

etai

led

budg

et a

ndpr

ocur

emen

t pla

n

Ann

ual a

ndsu

pple

men

tary

bud

get

Sch

edul

e of

fees

for

capa

city

bui

ldin

g,do

cum

ents

, rev

iew

s,A

RB

fees

, cas

e di

gest

,sa

le o

f ten

der

docu

men

ts,

deba

rmen

t pol

icy

hand

book

,m

embe

rshi

p fe

es

Year

1 -

8 M

Year

2 -

10

M

Year

3 -

13

MYe

ar 4

- 1

5 M

Year

5 -

18

M

OP

D

OP

D

0.5

Mon

thly

/Q

uart

erly

Janu

ary

annu

ally

Man

ager

s

Man

ager

s /

Pro

cure

men

t2.

1 E

ffici

ent

utiliz

atio

n of

fund

s

Qua

rter

ly, m

onth

lyan

d an

nual

repo

rts

in th

e re

quire

dfo

rmat

s

100%

util

izat

ion

offu

nds

Janu

ary

2015

PP

OA

B /

DG

/Fi

nanc

e2.

1.3

Dev

elop

and

impl

emen

t an

Inve

stm

ent P

olic

y

- In

vest

men

t pol

icy

- N

atio

nal T

reas

ury

app

rova

l-

Impl

emen

tatio

n p

rogr

ess

repo

rt

- A

ppro

ved

inv

estm

ent p

olic

y-

Inte

rest

ear

ned

1.3

Incr

ease

dfu

ndin

g fro

m th

eG

over

nmen

tth

roug

hE

xche

quer

rele

ases

2.0

Res

ourc

eut

ilizat

ion

0.5

11.

51.

52

7A

nnua

llyFi

nanc

e /

Inte

rnal

audi

tC

ertifi

ed a

nnua

lfin

anci

al s

tate

men

tsU

nqua

lified

aud

itce

rtifi

cate

from

KE

NA

O

Year

1 -

500

MYe

ar 2

- 5

50M

Year

3 -

650

MYe

ar 4

- 7

00M

Year

5 -

800

M

1

OP

DD

ecem

ber

&Ju

ne a

nnua

llyFi

nanc

e /

Pro

cure

men

t2.

1.4

cond

uct p

erio

dic

Sto

ck ta

king

Sto

ck ta

king

and

fixed

ass

ets

repo

rtR

econ

cile

d st

ock

taki

ng a

nd fi

xed

asse

ts re

port

s

53 |

ppo

a.go

.ke

Janu

ary

and

Apr

ilA

nnua

lly23

Fina

nce,

Pro

cure

men

t,H

uman

Res

ourc

ean

d A

dmin

istr

atio

nan

d IC

T M

anag

ers

3.1.

1 A

utom

ate

finan

cial

, pro

cure

men

t,hu

man

reso

urce

and

adm

inis

trat

ion

man

agem

ent a

ndfix

ed a

sset

sm

anag

emen

proc

esse

s

Inte

grat

e fin

anci

alm

anag

emen

t sys

tem

Fina

nce

/P

rocu

rem

ent /

Sup

plie

rs

3.1

Tim

ely

and

accu

rate

dat

aca

ptur

e

3.0

Aut

omat

ion

of fi

nanc

ial

syst

ems

Tim

ely

and

accu

rate

repo

rts

gene

rate

dfro

m th

e sy

stem

33

34

10

Str

ateg

yE

xpec

ted

Out

com

e(s)

Act

ivit

yO

utp

ut In

dic

ato

rK

PIs

Imp

lem

enti

ngA

cto

rsT

imel

ine

12

34

Tota

l

Res

our

ces

(Ksh

. Mill

ion)

per

yea

r

5

Con

tinuo

us

Con

tinuo

us

OP

D

OP

D

77.2

TO

TAL

Fina

nce

/P

rocu

rem

ent

4.1.

1 H

ave

list o

fsu

pplie

rs.

Get

dis

coun

ts fo

rgo

ods

/ se

rvic

espr

ocur

ed

4.1.

2 P

aym

ent o

fcr

edito

rs w

ithin

cre

dit

perio

d

Cos

t sav

ings

Red

uced

com

plai

nts

4.1

Effi

cien

tse

rvic

es4.

0 S

uppl

ier

Man

agem

ent

Y 1

10%

of t

otal

cos

tsa

ving

s in

all

year

s

Pay

men

ts m

ade

with

in 3

0 da

ys o

fde

liver

y

Str

ateg

yE

xpec

ted

Out

com

e(s)

Act

ivit

yO

utp

ut In

dic

ato

rK

PIs

Imp

lem

enti

ngA

cto

rsT

imel

ine

12

34

5To

tal

Res

our

ces

(Ksh

. Mill

ion)

per

yea

r

Med

ia e

ngag

emen

tst

rate

gy in

pla

ce

Med

ia p

olic

y in

pla

ce

Dev

elop

and

impl

emen

tm

edia

eng

agem

ent

stra

tegy

Dev

elop

med

ia p

olic

y

Sep

tem

ber

2013

Ann

ually

Aug

ust 2

013

Lega

l & C

orpo

rate

affa

irs

Lega

l & C

orpo

rate

affa

irsIn

crea

sed

posi

tive

med

iaco

vera

ge

App

rove

den

gage

men

tst

rate

gy

App

rove

d m

edia

polic

yE

nhan

cem

edia

man

agem

ent

00

00

0

Lega

l & C

orpo

rate

affa

irs1

No.

mee

ting

per

year

Hol

d m

eetin

gs w

ithm

edia

hou

ses

No.

of m

eetin

gs h

eld

0

1010

1010

5010

11

11

51

Ob

ject

ive

8: T

o im

pro

ve im

age

of

the

Aut

hori

ty a

nd e

nhan

ce c

usto

mer

ser

vice

54 |

ppo

a.go

.ke

Str

ateg

yE

xpec

ted

Out

com

e(s)

Act

ivit

yO

utp

ut In

dic

ato

rK

PIs

Imp

lem

enti

ngA

cto

rsT

imel

ine

12

35

Tota

l

Res

our

ces

(Ksh

. Mill

ion)

per

yea

r

July

201

4

Sep

tem

ber

2013

5Le

gal &

Cor

pora

teaf

fairs

/ C

apac

itybu

ildin

g de

pt

Dev

elop

a s

take

hold

erin

volv

emen

t str

ateg

y

Con

clud

e co

llabo

rativ

eM

oUs

with

key

stak

ehol

ders

and

law

enfo

rcem

ent a

genc

ies

Org

aniz

e st

akeh

olde

rsfo

rum

Col

labo

rativ

e M

oUs

Sig

ned

MoU

’sLe

gal &

Cor

pora

teaf

fairs

Sta

keho

lder

str

ateg

yin

pla

ce

Lega

l & C

orpo

rate

affa

irs

Lega

l & C

orpo

rate

affa

irsN

ew b

rand

Reb

rand

ing

of P

PO

AR

epos

ition

ing

of P

PO

A a

fter

10 y

ears

of

exis

tenc

e

Reb

rand

ing

Dev

elop

men

t of n

ewbr

and

App

rove

dst

akeh

olde

r st

rate

gy

10

00

10

50

00

0

1017

.520

22.5

5015

11

150

541

Per

cal

enda

rN

o. o

f sta

keho

lder

sm

eetin

g he

ldYe

ar 1

- 8

Year

2 -

10

Year

3 -

12

Year

4 -

14

Year

5 -

16

Dev

elop

and

impl

emen

t an

inte

rnal

com

mun

icat

ion

stra

tegy

Enh

ance

dco

mm

unic

atio

nam

ongs

t sta

ff

Lega

l & C

orpo

rate

affa

irsO

PD

July

201

3 -

June

201

8A

ppro

ved

inte

rnal

com

mun

icat

ion

stra

tegy

- Q

uart

erly

sta

ff m

eetin

gs

- B

i-ann

ual

new

slet

ter

- In

tera

ctiv

e w

eb f

orum

for

staf

f

July

201

3 –

June

201

8Le

gal &

Cor

pora

teaf

fairs

Eng

age

med

ia to

influ

ence

pos

itive

repo

rtin

g an

d re

duce

nega

tive

cont

ents

No.

of p

ositi

vere

port

ing

70%

pos

itive

repo

rtin

g1

11

15

1

4

55 |

ppo

a.go

.ke

Str

ateg

yE

xpec

ted

Out

com

e(s)

Act

ivit

yO

utp

ut In

dic

ato

rK

PIs

Imp

lem

enti

ngA

cto

rsT

imel

ine

12

34

5To

tal

Res

our

ces

(Ksh

. Mill

ion)

per

yea

r

Str

ateg

yE

xpec

ted

Out

com

e(s)

Act

ivit

yO

utp

ut In

dic

ato

rK

PIs

Imp

lem

enti

ngA

cto

rsT

imel

ine

12

34

5To

tal

Res

our

ces

(Ksh

. Mill

ion)

per

yea

r

Lega

l & C

orpo

rate

affa

irs

Lega

l & C

orpo

rate

affa

irs

App

rove

d C

SC

Per

cent

age

Year

1 -

78

Year

2 -

80

Year

3 -

82

Year

4 -

85

Year

5 -

90

Rev

iew

and

impl

emen

t cus

tom

erse

rvic

e ch

arte

r

Con

duct

sur

vey

toas

sess

cus

tom

ersa

tisfa

ctio

n an

dbr

and

perc

eptio

n

Incr

ease

dun

ders

tand

ing

of c

usto

mer

need

s

Iden

tify

key

cust

omer

san

d se

rvic

ere

quire

men

tsso

as

toim

prov

ecu

stom

erse

rvic

ede

liver

y

Rev

iew

ed C

usto

mer

serv

ice

char

ter

Sur

vey

repo

rt

10

00

10

33

33

153

Sep

tem

ber

2013

July

201

3 -

June

201

8

July

201

3 -

June

201

8

Lega

l & C

orpo

rate

affa

irs10

0% a

dher

ence

to s

ervi

ce s

tand

ards

Impr

oved

cust

omer

serv

ice

deliv

ery

Ens

ure

full

utiliz

atio

nof

Cus

tom

erR

elat

ions

hip

Man

agem

ent S

yste

m(C

RM

)

CR

M R

epor

tsO

PD

Aug

ust 2

013

OP

DLe

gal &

Cor

pora

teaf

fairs

/ H

uman

Res

ourc

es

Des

igna

te d

edic

ated

cust

omer

ser

vice

offic

ers

/ de

sks

Ded

icat

ed c

usto

mer

serv

ice

desk

/ o

ffice

rs2

No.

cus

tom

erse

rvic

e de

sks

Sep

tem

ber

2013

Dev

elop

the

Inte

rnal

Aud

it P

olic

y an

dP

roce

dure

s M

anua

l

Enh

ance

the

perfo

rman

ceof

the

Inte

rnal

Aud

it fu

nctio

n

Cle

ar ro

les

and

man

date

of

Aud

it fu

nctio

n

App

rove

d P

olic

ym

anua

lP

olic

y M

anua

lIn

tern

al A

udit

Inte

rnal

Aud

itU

pdat

ed IA

Cha

rter

51

11

1

Sep

tem

ber

2013

Rev

iew

the

Inte

rnal

Aud

it C

hart

erA

ppro

ved

Rev

ised

IAC

hart

er

Aut

omat

e th

e In

tern

alA

udit

Pro

cess

esIn

crea

sed

effic

ienc

y in

the

perfo

rman

ce o

fau

dit

assi

gnm

ents

Inte

rnal

Aud

it /

ICT

9Ju

ly 2

013

–Ju

ne 2

018

Aut

omat

ed a

udit

syst

em in

pla

ceO

pera

tiona

lau

tom

ated

aud

itsy

stem

Ob

ject

ive

9: T

o in

corp

ora

te t

he r

isk

man

agem

ent

cult

ure

wit

hin

the

auth

ori

ty

56 |

ppo

a.go

.ke

Str

ateg

yE

xpec

ted

Out

com

e(s)

Act

ivit

yO

utp

ut In

dic

ato

rK

PIs

Imp

lem

enti

ngA

cto

rsT

imel

ine

12

34

5To

tal

Res

our

ces

(Ksh

. Mill

ion)

per

yea

r

July

201

3 –

June

201

8In

tern

al A

udit

/M

anag

emen

tO

pera

tiona

l Reg

iste

rin

pla

ceD

evel

op a

Ris

kR

egis

ter

App

rove

d re

gist

er

Est

ablis

h th

eris

km

anag

emen

tsy

stem

Inte

rnal

Aud

it /

Man

agem

ent

Ope

ratio

nal P

olic

yin

pla

ceIm

plem

ent t

heIn

stitu

tiona

l Ris

kM

anag

emen

t Pol

icy

Fram

ewor

k (IR

MP

F)

Min

imiz

e th

e ris

kex

posu

res

and

impa

ct

App

rove

d po

licy

122 1

July

201

3 –

June

201

8

July

201

3 –

June

201

8Im

plem

ent t

heIn

stitu

tiona

l Ris

kM

anag

emen

t Pol

icy

Fram

ewor

k (IR

MP

F)

Est

ablis

h th

eris

km

anag

emen

tsy

stem

Min

imiz

e th

e ris

kex

posu

res

and

impa

ct

App

rove

d po

licy

Ope

ratio

nal P

olic

yin

pla

ceIn

tern

al A

udit

/M

anag

emen

t 2

2

July

201

3 –

June

201

8D

evel

op a

Ris

kR

egis

ter

App

rove

d re

gist

erO

pera

tiona

l Reg

iste

rin

pla

ceIn

tern

al A

udit

/M

anag

emen

t1

1

QM

R /

KE

BS

/M

anag

emen

t2

No.

aud

it re

port

spe

r ye

arIm

plem

ent c

orru

ptio

npr

even

tive

mea

sure

sE

limin

atio

n of

corr

upt p

ract

ices

- B

asel

ine

surv

ey r

epor

t on

corr

uptio

n p

erce

ptio

n

12

11

61

July

201

3 –

June

201

8

Man

agem

ent /

Boa

rd-

Red

uced

per

cept

ion

inde

x

- N

o. o

f sta

ff tr

aine

d

Impl

emen

t cor

rupt

ion

prev

entiv

e m

easu

res

Elim

inat

ion

ofco

rrup

t pra

ctic

es-

Bas

elin

e su

rvey

rep

ort o

n co

rrup

tion

per

cept

ion

- A

nti-C

orru

ptio

n t

rain

ings

11

11

51

July

201

3 –

June

201

8

QM

R /

Boa

rd /

Man

agem

ent

- 2

No.

Inte

rnal

qua

lity

audi

t r

epor

ts p

er y

ear

- M

inim

um 2

No.

of

mee

tings

per

yea

r

- N

o. o

f tra

inin

gs c

ondu

cted

Mai

ntai

ning

ISO

900

1Q

ualit

y M

anag

emen

tS

yste

m

Enh

ance

the

qual

ity o

f ser

vice

Inst

itutio

naliz

equ

ality

man

agem

ent

syst

em

- Im

plem

ente

d s

tand

ard

oper

atin

g p

roce

dure

s

- Q

ualit

y m

anag

emen

t r

evie

w m

eetin

gs

- S

taff

and

boar

d m

embe

rs tr

aine

d

33

33

153

QM

R /

KE

BS

/M

anag

emen

t2

No.

aud

it re

port

spe

r ye

arC

oord

inat

e A

nnua

lS

urve

illanc

e A

udits

Mai

nten

ance

of

ISO

Cer

tifica

tion

Aud

its c

ondu

cted

by

cert

ifica

tion

Bod

y1

21

16

1Ju

ly 2

013

–Ju

ne 2

018

July

201

3 –

June

201

8

57 |

ppo

a.go

.ke

Year

1

2013

/ 2

014

Year

2

2014

/ 2

015

Year

3

2015

/ 2

016

Year

4

2016

/ 2

017

Year

5

2017

/ 2

018

KE

Y

Lega

l & C

orpo

rate

affa

irsA

tleas

t 3 s

igne

dco

ntra

cts

Con

trac

t ext

erna

lle

gal s

ervi

ce p

rovi

ders

Effi

cien

tm

anag

emen

t of

lega

l ris

ks

List

of a

ppro

ved

lega

l ser

vice

pro

vide

rs5

55

528

8

44

44

4

Str

ateg

yE

xpec

ted

Out

com

e(s)

Act

ivit

yO

utp

ut In

dic

ato

rK

PIs

Imp

lem

enti

ngA

cto

rsT

imel

ine

12

35

Tota

l

Res

our

ces

(Ksh

. Mill

ion)

per

yea

r

4

Str

engt

hen

the

capa

city

of t

he le

gal

func

tion

thro

ugh

cont

inuo

us tr

aini

ng

Effi

cien

tm

anag

emen

t of

lega

l ris

ks

Lega

l & C

orpo

rate

affa

irs /

Hum

anR

esou

rces

20Ju

ne 2

013

-Ju

ly 2

018

Sep

tem

ber

2013

Cer

tifica

tes

ofat

tend

ance

/pa

rtic

ipat

ion

Atle

ast 5

day

s of

trai

ning

per

lega

lof

ficer

per

ann

um

June

201

3 -

July

201

8Le

gal &

Cor

pora

teaf

fairs

Car

ry o

ut le

gal a

udit

Effi

cien

tm

anag

emen

t of

lega

l ris

ks

Lega

l aud

it re

port

A re

port

eve

ry tw

oye

ars

Year

1 –

1Ye

ar 3

– 1

Year

5 –

1

22

Dec

embe

r 20

13C

reat

e a

fully

fled

ged

lega

l dep

artm

ent

Enh

ance

the

capa

city

of

the

Lega

lFu

nctio

n to

man

age

lega

lris

ks

Effi

cien

tm

anag

emen

t of

lega

l ris

ks

Incr

ease

d nu

mbe

r of

lega

l offi

cers

3 N

o. a

dditi

onal

lega

l offi

cers

Lega

l & C

orpo

rate

affa

irs /

Hum

anR

esou

rces

OP

D

26

CHAPTER SIX

INSTITUTIONAL STRUCTURE

6.1 BOARDS

6.1.1 Public Procurement Oversight Advisory Board (PPOAB)

The functions of the Advisory Board are:

To advise PPOA generally on the exercise of its powers and the performance of its functions;i)

To approve the estimates of the revenue and expenditures of PPOA;ii)

To recommend the appointment or termination of the Director-General in accordance with the Act; andiii)

To approve debarment of persons and perform such other functions and duties as are provided for under the PPOA Act.

iv)

This Board is a continuation of the Public Procurement Complaints Review and Appeal Board (PPCRAB) that was established under the Exchequer and Audit (Public Procurement) Regulation, 2001. The Board was established to promote and uphold fairness in the public procurement system through judicious and impartial adjudication of matters arising from disputed procurement proceedings.

6.1.2 Public Procurement Administrative Review Board (PPARB)

As the Chief Executive Officer, the Director-General is responsible for the implementation of the Board’s deci-sions in a results-oriented and timely manner to achieve PPOA’s goals, objectives and other agreed upon performance targets. Specific functions of the DG include:

6.2 OFFICE OF THE DIRECTOR - GENERAL

Overseeing the day-to-day business of PPOA;i)

Overseeing the development and implementation of the strategic plan and annual operating budgets;ii)

Ensuring that proper internal control and monitoring systems are in place;iii)

Coordinating preparation and submissions of proposals, statutory reports and other reports for consider-ation by the Board and other relevant authorities;

iv)

Overseeing the implementation of corporate policies and programs;viii)

Ensuring effective communication between the management and the Board;v)

Ensuring continuous improvement of the quality and value of services provided by PPOA;vi)

Overseeing continuous achievement of PPOA’s operating goals, objectives and performance targets;vii)

Maintaining a conducive work environment that is capable of attracting and retaining skilled and motivated employees;

ix)

58 | ppoa.go.ke

PPOA Strategic Plan 2013 - 2018

Fostering corporate culture that promotes ethical practices and good corporate governance;x)

Acting as the principal spokesperson of PPOA; andxi)

Any other lawful duties as may be assigned by the Board. xii)

Analysis of the current and expected future operations of the Authority shows that some closely related func-tions can be put together to form Directorates. Amalgamation of related functions will enhance synergy and will result in efficient and effective management within PPOA. There exist two Directorates namely:

Within a Directorate, there are Departments and Sections/Units. Each Directorate is headed by a General Manager. In addition, there is the Internal Audit Department which reports directly to the Advisory Board. The functions of each directorate are as follows:

6.3 DIRECTORATES

Technical services i)

Finance and Administrationii)

This Directorate is responsible for the Authority’s technical services which include Compliance, Capacity Build-ing, Policy and Research, and the Administrative Review Board Secretariat. Specific functions include:

6.3.1 Directorate of Technical services

The Finance and Administration Directorate is responsible for the provision of support services that include finance, human resource and administration, information communication and technology (ICT), procurement,

6.3.1 Directorate of Finance and Administration

Formulation and implementation of technical services policies and procedures;i)

Ensuring compliance with the PPOA Act;ii)

Development and distribution of manuals and other standard documents;iii)

Development of policies, issuing directives as well as providing the necessary advice and assistance to procuring entities;

iv)

Handling complaints arising from concerning public procurement and disposal proceedings;v)

Undertaking capacity building for persons involved in public procurement;vi)

Initiating public procurement policy and proposing subsequent amendments to the law;vii)

Undertaking research on best practices in public procurement and identifying appropriate sources for the required procurement data and information and developing appropriate databases;

viii)

Providing regular reports on procurement data and information; ix)

Ensuring that the PPARB decisions are made within time and that decisions are implemented; andx)

Any other lawful duties as may be assigned by the Director General.xi)

PPOA Strategic Plan 2013 - 2018

59 | ppoa.go.ke

legal and corporate communication. Specific functions include:

Formulation and implementation of sound financial, human resource management , ICT, administration, customer service and corporate communication policies and procedures;

i)

Accounting for PPOA’s resources;ii)

Managing the planning and budgeting process in line with the Public financial Management policies and guidelines;

iii)

Developing strategies for sourcing and application of funds;iv)

Implementing adequate financial and internal controls;v)

Procuring goods and services for PPOA;vi)

Management of ICT systems within PPOA;vii)

Monitoring and evaluation of the activities of PPOA;viii)

Cultivating a positive image of PPOA; andix)

Any other lawful duties as may be assigned by the Director General.x)

The Internal Audit department performs the following functions:

6.3.3 Internal Audit department

Evaluates and provides reasonable assurance that risk management, control, and governance systems are functioning as intended and will enable the organisation's objectives and goals to be met;

i)

Reports risk management issues and internal controls deficiencies identified directly to the audit commit-tee and provides recommendations for improving the organization’s operations, in terms of both efficient and effective performance;

ii)

Reports risk management issues and internal controls deficiencies identified directly to the Audit Commit-tee of the Advisory Board and provides recommendations for improving the organization’s operations, in terms of both efficient and effective performance;

iii)

Evaluates information security and associated risk exposures;iv)

Carries out timely and continuous audits;v)

Verifies and monitors the financial transactions of the Authority; andvi)

Carries out investigations where necessary.vii)

60 | ppoa.go.ke

PPOA Strategic Plan 2013 - 2018

PPOA Strategic Plan 2013 - 2018

61 | ppoa.go.ke

One of the critical assumptions that PPOA is making for effective implementation of this Strategic Plan isavailability of required resources. Table 3 shows the projected recurrent budget and a summary of PPOA’s resource requirements for the implementation of various strategic plan objectives.

CHAPTER SEVEN

RESOURCE MOBILIZATION

7.1 FINANCIAL RESOURCE REQUIREMENT

Table 3: Financial Resource Requirements

To ensure compliance with the Procurement and Disposal Law and PPOA guidelines and establish a framework to monitor and report on the functioning of the procurement system

Theme

1.

Objective 2013 /14 2013 /15 2013 /16 2013 /17 2013 /18 TOTAL

86.3 105.5 122 138.8 157.7 610.3

To develop, promote and support training and professional develop-ment of persons involved in public procurement

2. 423 415 456 459 499 2252

To strengthen the Policy, legal, regulatory , research and develop-ment framework for public procure-ment and asset disposal system

3. 124.47 109.58 121.69 126.8 167 649.54

To uphold fairness and promote public confidence in the public procurement systems

4. 49 49.5 59.5 68 62 288

To Improve on the Infrastructure, systems and Human resources to provide quality service

5. 168 467 492 434 455 2016

To enhance the use of technology in order to increase efficiency and effectiveness in service delivery

6. 135 114 51 59 66 425

Strategic plan resourcerequirements per objective Kshs. "Millions"

62 | ppoa.go.ke

PPOA Strategic Plan 2013 - 2018

During the strategic planning period, PPOA will require approximately Kshs 6.9 million.

To implement the proposed activities, PPOA will put in place resource mobilization strategies which include:

7.2 STRATEGIES FOR RESOURCE MOBILIZATION

The Government is the major financier to the Authority and PPOA plans to lobby for additional funding from the Government for establishment of regional offices, purchase of office premises for headquarters and increase staff compliment.

a) Enhanced Support From the Government

PPOA seeks to attract technical and financial support from Development Partners.

b) Development Partners

The Authority will put in place measures to ensure prudent resource management. These will include:

c) Prudent Management of Available Resources

To enhance its financial capabilities the Authority will seek authority to operationalization of the collection of Capacity Building Levy.

d) Capacity Building Levy

Implementation of efficient and effective processes and procedures;i)

Application of ICT in the various processes;ii)

Outsourcing services to compliment internal capacity;iii)

Implementing transport policy;iv)

Stringent financial discipline;v)

Savings from anti-corruption efforts; andvi)

Risk assessments.vii)

To Enhance financial sustainability

Theme

7.

Objective 2013/14 2013/15 2013/16 2013/17 2013/18 TOTAL

TOTAL 1118.77 1390.58 1421.19 1421.1 1612.2 6963.8

6 21 6.5 4.5 6 44

To improve corporate image and enhance customer service

8. 103 91 94 116 182.5 587

To incorporate the risk management culture within the Authority

9. 24 18 18 15 17 92

PPOA Strategic Plan 2013 - 2018

63 | ppoa.go.ke

In order for PPOA to attain the goals that it has set, it is of fundamental importance that the various strategies are implemented. Successful implementation of the plan requires sourcing and deploying the requisite resources and putting in place an adequate M & E framework. The M&E framework will enable the Authority to measure performance against set standards so as to ensure effective implementation of the set goals and objectives.

CHAPTER EIGHT

MONITORING AND EVALUATION

8.1 OBJECTIVES OF MONITORING AND EVALUATION

The monitoring and evaluation process will involve preparation of annual work plans by each Directorate and Department. The work plans will be linked to the objectives, strategies and activities as documented in the implementation matrix. In addition, departmental work plans will be cascaded to individual officers work plans which will then be linked to PPOA’s performance management system.

The Authority will implement an automated monitoring, evaluation and reporting system whose main objective is to measure the efficiency , effectiveness and impact of the implementation of the strategic plan. It will also facilitate timely and accurate data capture and analysis for reporting progress of implementation.

Further, the following actions will be undertaken to ensure successful implementation of the strategic plan:

8.2 MONITORING AND EVALUATION FRAMEWORK

Table 3 shows the projected key performance indicators.

8.3 PROJECTED KEY PERFORMANCE INDICATORS

Establish an M & E committee comprising of the Director General, General Manager (Technical services), General Manager (Finance and Administration) and the HODs to champion implementation of the Strate-gic Plan.

i.

The M & E committee will hold quarterly meetings chaired by the DG to review the status of the Strategic Plan implementation. In addition, emerging issues requiring strategy change will be addressed.

ii.

General Manager (Technical services) and General Manager (Finance and Administration) will hold monthly meetings with HODs to review the status of the Strategic Plan implementation as it relates to their respec-tive Directorates.

iii.

The M & E Committee will report quarterly to the Advisory Board on the progress made towards the attain-ment of the strategic objectives.

iv.

The Strategic Plan will be reviewed annually to ensure that necessary changes in the objectives, strategy and activities informed by emerging issues are effected.

v.

64 | ppoa.go.ke

PPOA Strategic Plan 2013 - 2018

Table 4: Key Performance indicators

OBJECTIVE 2013/ 15 2013/ 16 2013/ 17 2013/ 18 TOTAL

Strategic plan resource requirementsper objective Kshs. "Millions"

Number of assessments 100 120 150 165 180

Number of reviews /audits 35 38 42 47 53

No. of contracts audited 24 36 60 82 98

No. of trained officers 14,000 15,000 15,500 16,000 16,500

No. of training need analysis 1 0 1 0 1

No. of Quarterly Reports 4 4 4 4 4

No. of Annual Reports 1 1 1 1 1

No. of stakeholders forum 10 12 15 17 20

No. of Manuals 3 5 7 8 10

No. of Printed MPI 4 4 4 4 4

No of Days taken for hearing and determinationof cases 21 20 19 18 17

No. of people trained through theE-learning system 500 1000 1500 2000 2500

Automation level within Authority 65% 70% 75% 80% 85%

No. of PE’s using the IFMIS P2P - 15 60 100 150

No. of Hits on the website 5000 8000 10000 12000 20000

Customer satisfaction index 78% 80% 82% 85% 90%

No. of ISO 9001 quality audits undertaken per year 4 4 4 4 4

PPOA Strategic Plan 2013 - 2018

65 | ppoa.go.ke

OBJECTIVE 2013 /15 2013 /16 2013 /17 2013 /18 TOTAL

Strategic plan resource requirementsper objective Kshs. "Millions"

Implementation of training needs analysis 55% 60% 65% 70% 75%

Performance management system implementation 75% 80% 90% 95% 95%

Income from other sources 8M 10M 13M 15M 18M

Resource utilization 100% 100% 100% 100% 100%

Notes

66 | ppoa.go.ke

PPOA Strategic Plan 2013 - 2018

Notes

PPOA Strategic Plan 2013 - 2018

67 | ppoa.go.ke

68 | ppoa.go.ke

PPOA Strategic Plan 2013 - 2018

Notes

Design & Layout by:- Modelarc Creative Ltd, t: +254 (0) 724 742 057, e: [email protected], w: modelarccreative.co.ke

Public Procurement Oversight AuthorityNational Bank Building, 11th Floor, Harambee Avenue, NairobiP. O Box 58535 - 00200 NairobiTel: +254 20 2213106 / 2213107 / 3244000Fax: 0203244377Email: [email protected], [email protected] Website: www.ppoa.go.ke