10
2013 National LTAP/TTAP Annual Summer Conference

2013 National LTAP/TTAP Annual Summer Conference

Embed Size (px)

Citation preview

Page 1: 2013 National LTAP/TTAP Annual Summer Conference

2013 National LTAP/TTAP Annual Summer Conference

Page 2: 2013 National LTAP/TTAP Annual Summer Conference

Arkansas Technology Transfer Program

Page 3: 2013 National LTAP/TTAP Annual Summer Conference

Concerns Benefit Disadvantages

• http://web.ewu.edu/groups/contracts/documents/RFP%20Manual.pdf

Page 4: 2013 National LTAP/TTAP Annual Summer Conference

LTAP/TTAP Selection Process

How do you select the trainers for your Center?

Page 5: 2013 National LTAP/TTAP Annual Summer Conference

One Center contracts 100% of their training: Engineering Firm Five Year ContractTwo Centers use the bidding process for trainersover a certain dollar amount.

Three Centers have used the bidding process.

Page 6: 2013 National LTAP/TTAP Annual Summer Conference

LTAP/TTAP Instructors Selection Process for Trainers: Experience Best Qualified Reference Subject Matter Experts Availability Price

Trainers are: Present or Former: FHWA, DOT, TTAP, LTAP, University, Contractor, Other Centers and Joint Training

Page 8: 2013 National LTAP/TTAP Annual Summer Conference

New Questions• How would the bidding process strengthen the

LTAP/TTAP Program?

• Can the bidding process save resources: short term and long term?

• Can the bidding process be a good way to promote safety and upcoming technologies?

• Can it change the way Centers monitor training in their areas?

Page 9: 2013 National LTAP/TTAP Annual Summer Conference

Arkansas Technology Transfer

Program

Questions and Feedback

Page 10: 2013 National LTAP/TTAP Annual Summer Conference