ANALYSTS BRIEFING : No.3/2013
August 22, 2013
1
8/10/2019 20130823 EGCO AnalystBriefing2Q2013 01
2/56
2
Highlights
Q2/2013 Financial Results
EGCO Groups Overview
Highlights Q2/2013 Financial Results EGCO Groups Overview
8/10/2019 20130823 EGCO AnalystBriefing2Q2013 01
3/56
3
Highlights
Q2/2013 Highlights
Project Highlights
New Project Acquisition
Post Q2/2013 Highlights
Divestment of EGCO's investment in JV
Signing Power Purchase Agreement
Highlights Q2/2013 Financial Results EGCO Groups Overview
8/10/2019 20130823 EGCO AnalystBriefing2Q2013 01
4/56
4
TWF
Chaiyaphum
COD: July 18, 2013
Solarco
Phase 1: Suphan BuriPhase 2-5: Nakhon Pathom
SCOD: December 2013
GIDEC
Songkhla
SCOD: January 2014
XPCL
Xayaburi, Laos PDR
SCOD: January 2019
COD Achievement: 1 project
Under Construction: 4 projects
NED Expansion
Lopburi
COD: May 2, 2013
Highlights Q2/2013 Financial Results EGCO Groups Overview
8/10/2019 20130823 EGCO AnalystBriefing2Q2013 01
5/56
5
NEDExpansion
Project Description
Type: Solar Power Plant
Contracted Capacity: 8 MW
Location: Wang Ploeng, Lopburi Province
Shareholders: EGCO 33.33%, CLP 33.33%, DGA 33.33%
Project Progress
- COD on May 2, 2013
Highlights Q2/2013 Financial Results EGCO Groups Overview
8/10/2019 20130823 EGCO AnalystBriefing2Q2013 01
6/56
6
Theppana Wind Farm Power Project (TWF)
Project Description
Type: Wind Farm Power Plant
Contracted Capacity: 6.9 MW
Location: Watabak, Chaiyaphum Province
Shareholders: EGCO 90%, PVI Group 10%
Project Progress
COD on July 18, 2013.
Highlights Q2/2013 Financial Results EGCO Groups Overview
8/10/2019 20130823 EGCO AnalystBriefing2Q2013 01
7/56
7
Solarco Solar Power Project (Solarco)
Project Description
Type: Solar Power Plants
Contracted Capacity: 6x9.5 MW
Location: Phase 1 - Suphan Buri Province
Phase 2-6 - Nakhon Pathom Province
Shareholders: EGCO 49%, Yanhee Solar Power 51%
Expected COD: September - December 2013
Project Progress
- Most of PV module and main equipment were delivered to site,
construction work is ongoing.
- Ending Q2/2013, the progress of work was from 36.60%
87.60%.
Highlights Q2/2013 Financial Results EGCO Groups Overview
8/10/2019 20130823 EGCO AnalystBriefing2Q2013 01
8/56
8
Hat Yai Municipal Waste Power Plant (GIDEC)
Project Description
Type: Municipal Solid Waste Plant
Contracted Capacity: 6.5 MW
Location: Hat Yai, Songkhla Province
Shareholders: EGCO 50%, IEC Green Energy 50%
Expected COD : January 2014
Project Progress
- The construction work for main equipment is ongoing.
- Ending Q2/2013, the progress of work was 85%.
Highlights Q2/2013 Financial Results EGCO Groups Overview
8/10/2019 20130823 EGCO AnalystBriefing2Q2013 01
9/56
Xayaburi Power Company Limited (XPCL)
Project Description
Type: Hydropower Project, Run of River
Installed Capacity: 1,285 MW
Contracted Capacity with EGAT: 1,220 MW
Contracted Capacity with EDL: 60 MW
Location: Xayaburi District, Laos PDR
Shareholder: EGCO 12.5%, CK 57.5%, Natee Synergy 25%,
PT Construction and Irrigation Co., Ltd. 5%SCOD: January 2019
Project Progress
- The design and excavation work of the three main structures,
namely Navigation Lock, Spillway and Intermediate Block are
ongoing.
- Ending Q2/2013, the progress of work was 10.13%. 9
Highlights Q2/2013 Financial Results EGCO Groups Overview
8/10/2019 20130823 EGCO AnalystBriefing2Q2013 01
10/56
10
Highlights
Q2/2013 Highlights
Project Highlights
New Project Acquisition
Post Q2/2013 Highlights
Divestment of EGCO's investment in JV
Signing Power Purchase Agreement
Highlights Q2/2013 Financial Results EGCO Groups Overview
8/10/2019 20130823 EGCO AnalystBriefing2Q2013 01
11/56
11
Boco Rock Wind Farm (BRWF)
BRWFStage-1
Project Description
Type: Wind Farm Power Plant (Green field)
Installed Capacity: 113 MW
Turbine: Totaling 67 GE Wind Turbine Generators (WTG)
- 58 WTG x 1.7 MW
- 9 WTG x 1.6 MW
Location: New South Wales, Australia
PPA: 15 years with Energy Australia Pty Ltd.
(100% of output purchased by Energy Australia)
Shareholders: EGCO 100%
SCOD: February 2015
Highlights Q2/2013 Financial Results EGCO Groups Overview
8/10/2019 20130823 EGCO AnalystBriefing2Q2013 01
12/56
12
Highlights
Q2/2013 Highlights
Project Highlights
New Project Acquisition
Post Q2/2013 Highlights
Divestment of EGCO's investment in JV
Signing Power Purchase Agreement
Highlights Q2/2013 Financial Results EGCO Groups Overview
8/10/2019 20130823 EGCO AnalystBriefing2Q2013 01
13/56
13
Conal Holding Corporation (Conal)
Details of Divestment
Sale all existing EGCOs share in Conal (40% of shares in Conal)
Conal holds the share in:
1) Alto Power Management Corporation, a management company
2) Southern Philippines Power Corporation, a 55 MW diesel power plant
3) Western Mindanao Power Plant Corporation, a 110 MW diesel power plant
Highlights Q2/2013 Financial Results EGCO Groups Overview
8/10/2019 20130823 EGCO AnalystBriefing2Q2013 01
14/56
14
Highlights
Q2/2013 Highlights
Project Highlights
New Project Acquisition
Post Q2/2013 Highlights
Divestment of EGCO's investment in JV
Signing Power Purchase Agreement
Highlights Q2/2013 Financial Results EGCO Groups Overview
8/10/2019 20130823 EGCO AnalystBriefing2Q2013 01
15/56
15
New Khanom Power Plant (KN4)
Project Description
Type: Combined Cycle Power Plant
Installed Capacity: 977 MW
Contracted Capacity: 930 MW
Location: Khanom, Nakhon Si Thammarat Province
Shareholder: EGCO 100%
SCOD: June 2016
Highlights Q2/2013 Financial Results EGCO Groups Overview
8/10/2019 20130823 EGCO AnalystBriefing2Q2013 01
16/56
16
Highlights Q2/2013 Financial Results EGCO Groups Overview
Highlights
Q2/2013 Financial Results
EGCO Groups Overview
8/10/2019 20130823 EGCO AnalystBriefing2Q2013 01
17/56
17
Million Baht
2,041
+ 251
or
14.02%1,790
6,100
76
4,310
1,714
Power
Generation
Others Gain on
Combination
Highlights Q2/2013 Financial Results EGCO Groups Overview
1,98457
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
Q2/2012 Q2/2013
8/10/2019 20130823 EGCO AnalystBriefing2Q2013 01
18/56
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
8,000
9,000
6M 12 6M 13
4,132
+ 617
or
17.55%3,515
7,825
4,0163,380
116
135
4,310
Highlights Q2/2013 Financial Results EGCO Groups Overview
Power
Generation
Others Gain on
Combination
Million Baht
18
8/10/2019 20130823 EGCO AnalystBriefing2Q2013 01
19/56
59 299
(18)
0
500
1,000
1,500
2,000
2,500
3,000
3,500
4,000
4,500
5,000
5,500
6,000
6,500
6M 20136M 2012
Million Baht
Increase in AP
KEGCO 214
Rayong 36
BLCP (94)
GPG (97)
Operating Performances
BLCP 280 EGCOM Tara 5GEC-SPP 235 Conal (2)
QPL 162 Rayong (2)
EGCO Cogen 150 Roi ET green (14)
NED 24 GPG (33)
SPP3 16 KEGO (119)
SPP4 6 NTPC (194)
ESCO 6 EGCO (221)
Result from Acquisition
QPL 450 SPP5 46
GPS 58 TWF (2)
NED 23 GIDEC (4)
SPP2 46 APPC (19)
SPP3 25 MME (14)
SPP4 18 EGCO (350)
3,574
3,8734,150
2773,515
4,132
4,132
Result from Deferred tax
EGCO 317
KEGCO 6
SPP3 (3)Conal (7)
GEC (9)
BLCP (71)
Rayong (103)
QPL (150)
Highlights Q2/2013 Financial Results EGCO Groups Overview
19
8/10/2019 20130823 EGCO AnalystBriefing2Q2013 01
20/56
25%
21%20%
9%
KEGCO 116 MB,2%
ESCO 81 MB, 2%
BLCP 1,223 MB
GPG(KK2) 958 MB
SPP 414 MB(GEC,
EGCO COGEN,ROI-
ET Green)
Note: Excluding EGCO, MME , APPC , GIDEC, TWF
Quezon 1,022 MB
(QPL,QMS,PEPOI)
Conal 33 MB, 1%
8%
8%
3%
ET 67 MB, 1%
NTPC 377 MB
Rayong 167 MB
SOLAR 367 MB(GPS, SPP2-5, NED)
Highlights Q2/2013 Financial Results EGCO Groups Overview
20
8/10/2019 20130823 EGCO AnalystBriefing2Q2013 01
21/56
USD 759 M
THB 12,360 M
JPY 314 M
Total Outstanding
(Baht Equivalent)THB 34,470 M
Total Outstanding
As of 30 June 2013
USD 750 M
THB 16,402 M
JPY 314 M
THB 39,340 M
Total Outstanding
As of 31 March 2013
21
AUD 44 M
Highlights Q2/2013 Financial Results EGCO Groups Overview
8/10/2019 20130823 EGCO AnalystBriefing2Q2013 01
22/56
Debt23,588
Equity55,156
Debt Equity
Debt
49,619Equity67,555
Debt Equity
0.41
0.28 0.28
0.230.21
0.25
0.70
0.66
0.73
0.150.11
0.18 0.18 0.17
0.23
0.410.39
0.43
0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
EGCO+Subsidiaries EGCO only
EGCO + Subsidiaries
Unit: MB
Times (X)
EGCO only
Unit: MB
Highlights Q2/2013 Financial Results EGCO Groups Overview
22
8/10/2019 20130823 EGCO AnalystBriefing2Q2013 01
23/56
Highlights Q2/2013 Financial Results EGCO Groups Overview
23
Q2/2013
Beginning B alance of Cash and Deposi ts at f inancia l inst i tut ions 1,217
Net Cash Received from Operating Activities 148
Dividend received from subsidiaries
JVs & Other 2,601
Net Cash Payments in Investing Activities (1,707)
Investment in subsidiaries & JVs (210)
Shareholder Loan (1,315)
Others (182)
Net Cash Payments in Financing Activities (1,547)
Loans from financial institution (net) 405
Interest Payment (241)
Dividend Payment (1,711)
Ending B alance of Cash and Cash Deposi ts at f inancia l inst i tut ions 713
8/10/2019 20130823 EGCO AnalystBriefing2Q2013 01
24/56
24
Highlights Q2/2013 Financial Results EGCO Groups Overview
Highlights
Q2/2013 Financial Results
EGCO Groups Overview
8/10/2019 20130823 EGCO AnalystBriefing2Q2013 01
25/56
25
EGCO Groups Overview EGCO Shareholders
Progress of Work
Portfolio and Corporate Strategies
Highlights Q2/2013 Financial Results EGCO Groups Overview
8/10/2019 20130823 EGCO AnalystBriefing2Q2013 01
26/56
26* Nuclear Damage Liability Facilitation Fund
TEPCO50%
Mitsubishi
50%
EGAT
25.41%
TEPDIA
23.94%
ThaiInvestors
19.44%
ForeignInvestors
20.88%
NVDR10.43%NVDR
10.33%
As of March 22, 2013
NDF*
50.11%
Others
49.89%
Highlights Q2/2013 Financial Results EGCO Groups Overview
8/10/2019 20130823 EGCO AnalystBriefing2Q2013 01
27/56
27
EGCO Groups Overview EGCO Shareholders
Progress of Work
Portfolio and Corporate Strategies
Highlights Q2/2013 Financial Results EGCO Groups Overview
8/10/2019 20130823 EGCO AnalystBriefing2Q2013 01
28/56
28
TP Cogeneration Project (TP Cogen)
Project Description
Type: Cogeneration Power Plant
Installed Capacity: 125 MW
Contracted Capacity with EGAT : 90 MW
Contracted Capacity with IUs: 20 MW with 50 T/Hr of steam
Location: Ban Pong, Ratchaburi Province
Shareholder: EGCO 100%
SCOD: June 2016
Project Progress
- In process of EIA study for power plant and natural gas pipeline,
EPC Selection, PPA & SPA negotiation with customer and
conceptual design for natural gas pipeline.
- Other necessary project development activities are ongoing.
Highlights Q2/2013 Financial Results EGCO Groups Overview
8/10/2019 20130823 EGCO AnalystBriefing2Q2013 01
29/56
29
SK Cogeneration Project (SK Cogen)
Project Description
Type: Cogeneration Power Plant
Installed Capacity: 125MW
Contracted Capacity with EGAT : 90 MW
Contracted Capacity with IUs: 20 MW with 50 T/Hr of steam
Location: Ban Pong, Ratchaburi Province
Shareholder: EGCO 100%
SCOD: June 2016
Project Progress
- In process of EIA study for power plant and natural gas pipeline,
EPC Selection, PPA & SPA negotiation with customer and
conceptual design for natural gas pipeline.
- Other necessary project development activities are ongoing.
Highlights Q2/2013 Financial Results EGCO Groups Overview
8/10/2019 20130823 EGCO AnalystBriefing2Q2013 01
30/56
30
TJ Cogeneration Project (TJ Cogen)
Project Description
Type: Cogeneration Power Plant
Installed Capacity: 125MW
Contracted Capacity with EGAT: 90 MW
Contracted Capacity with IUs: 16 MW with 10T/Hr of steam
Location: Klongluang, Pathum Thani Province
Shareholder: EGCO 100%
SCOD: June 2017
Project Progress
- In process of EIA study for power plant and natural gas pipeline,
EPC Selection and conceptual design for natural gas pipeline.
- Other necessary project development activities are ongoing.
Highlights Q2/2013 Financial Results EGCO Groups Overview
8/10/2019 20130823 EGCO AnalystBriefing2Q2013 01
31/56
31
Quezon Expansion Project
Project Description
Type: Coal Fired Power Plant
Installed Capacity: 500 MW
Location: Quezon Province, The Philippines
Shareholders: EGCO and MPG Corp
Expected COD: Q1/2018
Project Progress
- Development and investment terms are under negotiation.
Highlights Q2/2013 Financial Results EGCO Groups Overview
8/10/2019 20130823 EGCO AnalystBriefing2Q2013 01
32/56
32
EGCO Groups Overview EGCO Shareholders
Progress of Work
Portfolio and Corporate Strategies
Highlights Q2/2013 Financial Results EGCO Groups Overview
8/10/2019 20130823 EGCO AnalystBriefing2Q2013 01
33/56
33
Currently, EGCO Groups portfolio comprises of 19 operating power plants, totalingcontracted
capacity 4,510.32 MWe.
Highlights Q2/2013 Financial Results EGCO Groups Overview
IPPs Renewable
Rayong 1,174.99 1,174.99 NED 63.00 21.00
KEGCO 748.00 748.00 SPP2 8.00 8.00
GPG (Khaeng Khoi 2) 1,468.00 734.00 SPP3 8.00 8.00
BLCP 1,346.50 673.25 SPP4 6.00 6.00
3,330.24 SPP5 8.00 8.00
SPPs GPS (Phase 1-4) 26.00 15.60
EGCO COGEN 110.85 88.68 TWF 6.90 6.21
ROI-ET GREEN 8.80 6.19 72.81
GEC-GCC 107.00 53.50
GEC-NKCC 126.00 63.00 Overseas
GEC-SCC 121.00 60.50 NTPC (Nam Theun 2) 1,070.00 374.50
GEC-GYG 20.20 10.10 QUEZON 460.00 450.80
281.97 825.30
Power Plant MW EquityContracted Cap.
(MW)Power Plant MW Equity
Contracted Cap.
(MW)
8/10/2019 20130823 EGCO AnalystBriefing2Q2013 01
34/56
34
IPPs SPPs Renewable Overseas
Q1/2013
281.97 MWe
66.60 MWe
3,330.24 MWe
851.70 MWe
Total 4,530.51 MWe
IPPs SPPs Renewable Overseas
Current Portfolio
281.97 MWe
72.81 MWe
3,330.24 MWe
825.30 MWe
Total 4,510.32 MWe
Highlights Q2/2013 Financial Results EGCO Groups Overview
Remark: Increase in Renewable portion from TWF; 6.21 MWe
Decrease in Oversea portion from sale of Conal; 26.4 MWe
8/10/2019 20130823 EGCO AnalystBriefing2Q2013 01
35/56
Under Construction Potential Project
Solarco 57.00 27.93
GIDEC 6.50 3.25
BRWF 113.00 113.00 250.00
XPCL 1,280.00 160.00
1,234.18
Under Development
TJ Cogeneration 90.00 90.00
TP Cogeneration 90.00 90.00
SK Cogeneration 90.00 90.00270.00
250.00
New Khanom Power
Plant
930.00 930.00
Quezon Expansion
Project500.00
Power Plant MW EquityContracted Cap.
(MW)
Contracted Cap.
(MW)Power Plant MW Equity
35
Currently, EGCO Groups portfolio consists of 5 under construction power plants, 3 under
development projects and 1 potential project, totaling contracted capacity 1,754.18 MWe.
Consequently, EGCO Groups
portfolio will become
6,264.50 MWe.
Highlights Q2/2013 Financial Results EGCO Groups Overview
8/10/2019 20130823 EGCO AnalystBriefing2Q2013 01
36/56
36
Under Construction Under Development
Potential Project
Q1/2013
270 MWe
1,150 MWe
197.39 MWe
Total 1,617.39 MWe
Under Construction Under Development
Potential Project
Current Portfolio
250 MWe
270 MWe
1,234.18 MWe
Total 1,754.18 MWe
Highlights Q2/2013 Financial Results EGCO Groups Overview
Remark: Increased in Under Construction portion from KN4 and BRWF; 930 MWe and 113 MWe respectively
8/10/2019 20130823 EGCO AnalystBriefing2Q2013 01
37/56
37
Highlights Q2/2013 Financial Results EGCO Groups Overview
IPPs SPPs
Renewable Overseas
Under Construction Under Development
Potential Project
270 MWe
3,330.24 MWe
281.97 MWe
66.60 MWe
851.70
MWe
197.39 MWe
Q1/2013
Total 6,147.90 MWe
1,150 MWe
IPPs SPPs
Renewable Overseas
Under Construction Under Development
Potential Project
Current Portfolio
Total 6,264.50 MWe
3,330.24 MWe
281.97 MWe
72.81 MWe
851.70
MWe
1,234.18 MWe
270 MWe
250 MWe
8/10/2019 20130823 EGCO AnalystBriefing2Q2013 01
38/56
EGCO Groups other business portfolio comprises of 5 companies:
38
Absolute Power P Co., Ltd. (APPC) Bio Diesel
Manambang Muara Enim Co., Ltd. (MME) Coal Mining
Eastern Water Resources Development and Management Plc. (EASTW) Water
Company Business Type
EGCO Engineering and Service Co., Ltd. (ESCO) O&M
Egcom Tara Co., Ltd. (Egcom Tara) Water
Highlights Q2/2013 Financial Results EGCO Groups Overview
8/10/2019 20130823 EGCO AnalystBriefing2Q2013 01
39/56
New KhanomPower Plant
TP Cogeneration
SK Cogeneration
New KhanomPower Plant
Projects in pipeline
Xayaburi
Hydro Power
TJ Cogeneration
Quezon
Expansion
Potential Projects
Under Development Projects
Under Construction ProjectsSolarco
GIDEC
2013 2014 2015 2016 2017 2018 2019 2020
39
BRWF
8/10/2019 20130823 EGCO AnalystBriefing2Q2013 01
40/56
40
Operate power plant portfolio to achieve optimum efficiency
Manage projects under construction to achieve on
time/on budget completion
Secure new investment opportunities in Thailand and Asia
Pacific Region
Highlights Q2/2013 Financial Results EGCO Groups Overview
8/10/2019 20130823 EGCO AnalystBriefing2Q2013 01
41/56
Q&A
41
8/10/2019 20130823 EGCO AnalystBriefing2Q2013 01
42/56
THANK YOU
42
8/10/2019 20130823 EGCO AnalystBriefing2Q2013 01
43/56
43
8/10/2019 20130823 EGCO AnalystBriefing2Q2013 01
44/56
44
Q2/2013 Financial ResultsEGCO Groups Overview
As of June 2013, Thailands Power Installed Capacity was 33,141.02 MW.
EGAT 15,010.13 MW
IPP 12,741.69 MW
SPP 2,984.60 MW
IMPORT 2,404.60 MW
Total 33,141.02 MW
45.3%
38.4%
9.0%
7.3%
EGAT IPP SPP IMPORT
8/10/2019 20130823 EGCO AnalystBriefing2Q2013 01
45/56
45
Q2/2013 Financial ResultsEGCO Groups Overview
* OTHERS = Fuel Oil, Diesel, Renewable
Natural Gas is the primary source of fuel for Thailands Power Generation.
66.7%
16.7%
13.7%
2.8%
NATURAL GAS HYDRO COAL OTHERS*
NATURAL GAS 22,102.19 MW
HYDRO 5,540.78 MW
COAL 4,556.00 MW
OTHERS* 942.05 MW
Total 33,141.02 MW
8/10/2019 20130823 EGCO AnalystBriefing2Q2013 01
46/56
46
Q2/2013 Financial ResultsEGCO Groups Overview
23,900.21 MW
(May 24, 2011)
26,121.10 MW
(April 26, 2012) + 1.8%
26,598.14 MW
(May 16, 2013)
15,000
20,000
25,000
30,000
2008 2009 2010 2011 2012 2013
8/10/2019 20130823 EGCO AnalystBriefing2Q2013 01
47/56
Key Financial Data:
FX Variance MD&A
Q2/2013 Financial ResultsEGCO Groups Overview
47
Q2/2012 Q2/2013 +/-
EGCO (40.00) (680.29) (640.29)
Rayong Power Plant (0.04) - 0.04
KEGCO 0.00 0.01 0.01
EGCO Cogen (6.80) (8.19) (1.40)
Roi-Et Green (8.10) (0.85) 7.25
ESCO (3.00) 10.48 13.48
ET - - -
PEPOI (0.35) 1.43 1.78
Quezon 94.33 (11.13) (105.46)
QMS (0.85) 0.45 1.30
SPP2 (0.20) (2.01) (1.81)
SPP3 0.33 - (0.33)
SPP4 0.67 - (0.67)
SPP5 - 0.22 0.22
TWF - (4.01) (4.01)
YEH - (17.78) (17.78)
Total Subs FX 35.99 (711.68) (747.67)
BLCP 510.48 377.18 (133.30)
GPG (87.25) (124.09) (36.84)
GEC(GCC, NKCC, SCC, GYG) (27.63) (36.38) (8.75)
CONAL 1.01 0.38 (0.63)
NTPC 176.87 288.50 111.64
NED (0.03) 0.00 0.03
GPS - - -
APPC - - -
GIDEC - - -
MME - 0.02 0.02
Total JVEs FX 573.46 505.63 (67.83)Grand Total 609.44 (206.05) (815.50)
8/10/2019 20130823 EGCO AnalystBriefing2Q2013 01
48/56
* FX gains/losses from Income Statements including financial cost from foreign currency loans (EGCO & Subs) and JVs 48
6M/2012 6M/2013
Debt to Equity (Time) 0.56 0.73Net Debt to Equity (Time) 0.42 0.74
Net Profit before FX* (Million Baht) 7,783.23 4,123.66
EPS (Baht) 6.94 7.68
Operating Cash Flow / share (Baht) 1.38 3.24BV / share (Baht) 125.44 126.81
Financial Ratio Highlights
Q2/2013 Financial ResultsEGCO Groups Overview
Key Financial Data:
8/10/2019 20130823 EGCO AnalystBriefing2Q2013 01
49/56
49
Segmental Operating Results, Ended June 30, 2013
Q2/2013 Financial ResultsEGCO Groups Overview
Key Financial Data:
Subsidiaries Joint VenturesJoint
Ventures
Power Generation Power Generation Others Others
EGCO
Rayong
power
plant
KEGCO EGCO
Cogen
Roi-Et
Green SPP4 SPP3 YEH SPP2 SPP5 TWF QPL BLCP GPG
GCC,
NKCC,
SCC,
GYG
NED CONAL NTPC GPS APPC GI DEC ESCO ET PEPOI QMS MME
Sales of Electricity - 1,110 1,079 1,244 167 23 29 - 31 30 - 4,796 - - - - - - - - - 8,509 - - - - - - 8,509
- Capacity Payment - 1,051 1,046 59 20 - - - - - - - - - - - - - - - - 2,176 - - - - - - 2,176
- Energy Payment - 61 32 1,186 147 23 29 - 31 30 - 4,796 - - - - - - - - - 6,334 - - - - - - 6,334
Sales of Water - - - - - - - - - - - - - - - - - - - - - - - 153 - - - 153 153
Service Income - - - - - - - - - - - - - - - - - - - - - 364 - 169 40 - 573 574
Cost of Sales - 761 679 1,131 81 19 25 - 27 26 - 2,814 - - - - - - - - - 5,563 - 44 - - - 44 5,607
Cost of Services - - - - - - - - - - - - - - - - - - - - - - 249 - 116 31 - 396 396
Gross Profit - 350 399 113 87 5 5 - 4 4 - 1,981 - - - - - - - - - 2,948 115 109 53 9 - 286 3,234
EBITDA (643) 830 739 148 75 70 91 19 93 88 (1) 2,293 2,093 1,515 503 215 161 1,054 139 (15) (3) 9,465 107 97 40 8 (14) 238 9,704
EBIT (667) 278 278 79 66 55 72 19 73 70 (1) 1,883 1,567 1,132 366 167 78 795 100 (15) (3) 6,391 95 89 40 8 (14) 219 6,610
Net Profit before FX (658) 167 115 63 54 35 45 6 47 45 (3) 984 1,223 958 299 119 33 376 73 (19) (4) 3,958 81 67 31 6 (13) 174 4,132
Net Profit (837) 167 115 62 65 35 45 (10) 47 45 (7) 962 1,287 939 292 119 34 459 73 (19) (4) 3,870 80 67 32 7 (13) 174 4,044
6M2013
Grand
Total
Holding
Total
Other
businesses
Total
Power
generation
Subsidiaries
8/10/2019 20130823 EGCO AnalystBriefing2Q2013 01
50/56
50
Segmental Operating Results, Ended June 30, 2012
Q2/2013 Financial ResultsEGCO Groups Overview
Key Financial Data:
Subsidiaries Joint Ventures
Power Generation Power Generation Others Others
EGCO
Rayong
power
plant
KEGCO EGCO
Cogen
Roi-Et
Green SPP4 SPP3 YEH SPP2 SPP5 TWF QPL BLCP GPG
GCC,
NKCC,
SCC,
GYG
NED CONAL NTPC GPS APPC GI DEC ESCO ET PEPOI QMS MME
Sales of Electricity - 1,090 863 711 191 58 60 - 14 - - 3,226 - - - - - - - - - 6,213 - - - - - - 6,213
- Capacity Payment - 1,015 833 36 26 - - - - - - - - - - - - - - - - 1,910 - - - - - - 1,910
- Energy Payment - 75 31 675 165 58 60 - 14 - - 3,226 - - - - - - - - - 4,303 - - - - - - 4,303
Sales of Water - - - - - - - - - - - - - - - - - - - - - - - 144 - - - 144 144
Service Income - - - - - - - - - - - - - - - - - - - - - - 355 - 164 3 - 523 523
Cost of Sales - 760 714 787 81 18 19 - 5 - - 1,955 - - - - - - - - - 4,340 - - - - - - 4,340
Cost of Services - - - - - - - - - - - - - - - - - - - - - - 240 41 110 2 - 393 393
Gross Profit - 329 150 (77) 110 40 41 - 10 - - 1,270 - - - - - - - - - 1,873 115 103 54 2 - 274 2,147
EBITDA 4,192 801 487 9 94 46 43 (15) 11 - - 795 1,925 1,739 270 146 167 1,266 50 - - 12,027 95 96 40 2 - 232 12,259
EBIT 4,166 243 24 (64) 84 30 26 (15) 11 - - 597 1,411 1,293 134 112 80 1,051 35 - - 9,218 85 85 40 2 - 211 9,429
Net Pr of it befor e FX 3, 927 235 14 (87) 68 11 8 (15) 2 - - 530 1,109 1,087 72 72 41 570 0 - - 7,660 74 62 30 0 - 168 7,828
Net Profit 3,966 235 14 (87) 72 12 8 (15) 2 - - 628 1,262 1,077 71 72 44 620 14 - - 7,994 71 61 30 (0) - 162 8,157
6M2012
Grand
Total
Holding
Total
Other
businesses
Total
Power
generation
8/10/2019 20130823 EGCO AnalystBriefing2Q2013 01
51/56
-
5,000
10,000
15,000
2008 2009 2010 2011 2012
2,
249
2,
952
4
,783
2,
127
4,
004
5,
577
5,
643
5,
476
5,
816
5,
311
10,
175
10,
018
10,
036
10,
617
10,
770
8,
960
9,
329
9,
857
8,
813
10,
848
-
-
4,
976
6,
361
5,
770
REGCO KEGCO BLCP KK II NT2
-
10,000
20,000
30,000
2008 2009 2010 2011 2012
3,
894
3,
722
2,
535
2,
258
2,
167
3,
212
2,
319
2,
788
2,
170
1,
762
20,
25
5
17,
909
17,
706
17,
868
18,
505
20,
74
1
22,
506
22,750
22,655
29,
649
-
-
6,
317
7,
672
8,
107
Net Generation
GWh
Electricity Sales
MM Baht
REGCO and KEGCO receive the capacity payment (Rayong Power Plant) or availability payment (KEGCO) for maintaining the availability of the power plants, regardless of whether the electric power will be supplied to EGAT or not.
EGAT is the sole off taker for electricity produced by Rayong Power Plant and KEGCO under long term cost-plus based Power Purchase Agreements (PPAs). 51
Annual Net Generation & Electricity Sales for the Year 2008-2012
Operating Performance (IPPs) :
8/10/2019 20130823 EGCO AnalystBriefing2Q2013 01
52/56
Million Baht
52
Major Maintenance Expenses for the Year 2012
Quarter Total
Actual Actual Actual Actual
Spare Parts 0.92 17.06 54.17 12.45 84.60
Service Charge 8.18 25.17 64.60 57.21 155.16
Total 9.10 42.23 118.77 69.66 239.76
Quarter Total
Actual Actual Actual Actual
Spare Parts 13.08 37.40 47.96 29.88 128.32
Service Charge 16.07 33.63 86.38 11.86 147.94
Total 29.15 71.03 134.34 41.74 276.26
KEGCO
Rayong Power Plant
1 2 3 4
1 2 3 4
Q2/2013 Financial ResultsEGCO Groups Overview
Operating Performance (IPPs) :
8/10/2019 20130823 EGCO AnalystBriefing2Q2013 01
53/56
53
Million Baht
Q2/2013 Financial ResultsEGCO Groups Overview
Major Maintenance Expenses for the Year 2013
Operating Performance (IPPs) :
Quarter 1 2 3 4 Total
Actual Actual Budget Budget
Spare Parts 10.67 2.12 13.48 0.00 26.27
Service Charge 25.74 23.12 21.49 9.51 79.86
Total 36.41 25.24 34.97 9.51 106.13
Quarter 1 2 3 4 Total
Actual Actual Budget Budget
Spare Parts 19.09 15.93 36.85 115.37 187.23
Service Charge 21.84 33.03 37.11 71.86 163.84
Total 40.93 48.96 73.95 187.23 351.07
Rayong Power Plant
KEGCO
8/10/2019 20130823 EGCO AnalystBriefing2Q2013 01
54/56
Q2/2013 Financial ResultsEGCO Groups Overview
Operating Performance Equivalent Availability Factor
Operating Performance (IPPs) :
Rayong Power Plant
Target EAF (%) Actual EAF (%) Target EAF (%) Actual EAF (%) Target EAF (%) Actual EAF (%) Target EAF (%) Actual EAF (%)
CCGT #1 99.00 99.95 97.14 98.78 98.91 99.98 88.16 91.57
CCGT #2 98.88 99.95 97.89 98.69 90.76 94.02 97.16 98.10
CCGT #3 98.38 99.35 79.21 90.89 98.91 93.46 97.28 96.51
CCGT #4 99.44 99.87 98.26 98.78 77.72 78.20 69.10 74.91
Rayong Power Plant
Target EAF (%) Actual EAF (%) Target EAF (%) Actual EAF (%) Target EAF (%) Actual EAF (%) Target EAF (%) Actual EAF (%)
CCGT #1 81.85 85.83 98.44 99.06 98.80 - 95.90 -
CCGT #2 99.63 99.66 97.60 98.47 82.25 - 96.74 -
CCGT #3 90.19 92.95 97.60 98.44 99.64 - 95.90 -
CCGT #4 99.49 100.00 98.31 99.10 97.87 - 96.65 -
KEGCO
T arget EAF (%) Actual EAF (%) T arget EAF (%) Actual EAF (%) T arget EAF (%) Actual EAF (%) T arget EAF (%) Actual EAF (%)
Barge #1 93.00 88.94 89.27 - - - - -
Barge #2 91.00 98.76 91.00 99.75 91.00 89.78 90.39 99.69
CCGT #3 81.82 86.77 88.60 74.60 88.60 94.40 86.60 93.91
KEGCO
T arget EAF (%) Actual EAF (%) T arget EAF (%) Actual EAF (%) T arget EAF (%) Actual EAF (%) T arget EAF (%) Actual EAF (%)
Barge #1 - - - - - - - -
Barge #2 94.00 99.51 63.01 66.83 78.67 - 92.90 -
CCGT #3 79.87 87.31 80.53 86.88 91.66 - 66.22 -
2012
Plant Type1Q12 2Q12 3Q12 4Q12
2013
Plant Type1Q13 2Q13 3Q13 4Q13
2012
Plant Type
1Q12 2Q12 3Q12 4Q12
2013
Plant Type1Q13 2Q13 3Q13 4Q13
8/10/2019 20130823 EGCO AnalystBriefing2Q2013 01
55/56
55
Q2/2013 Financial ResultsEGCO Groups Overview
Net Generation and Fuel Consumption
Operating Performance (IPPs) :
Rayong Power Plant
CCGT #1- 4 1Q12 2Q12 3Q12 4Q12 1Q13 2Q13
Net Generation
- By Natural Gas (GWh) 1,138 1,101 1,044 722 979 1,146
- By Secondary Fuel (GWh) 0.160 - - - - 0.170
Fuel Consumption
- By Natural Gas (MMBTU) 9,823,707 9,515,501 9,025,465 6,287,046 8,432,352 9,904,901
- By Secondary Fuel (Million Litre) 0.040 - - - - 0.040
KEGCOBarge # 2 1Q12 2Q12 3Q12 4Q12 1Q13 2Q13
Net Generation
- By Natural Gas (GWh) 141 145 131 146 142 98
- By Secondary Fuel (GWh) - - - - - -
Fuel Consumption
- By Natural Gas (MMBTU) 1,775,680 1,850,363 1,676,533 1,875,388 1,791,289 1,286,936
- By Secondary Fuel (Million Litre) - - - - - -
CCGT # 3 1Q12 2Q12 3Q12 4Q12 1Q13 2Q13
Net Generation
- By Natural Gas (GWh) 1,192 983 1,284 1,290 1,162 1,181
- By Secondary Fuel (GWh) - - - - - -
Fuel Consumption
- By Natural Gas (MMBTU) 9,604,779 10,842,732 10,335,010 10,286,267 9,404,137 9,571,503
- By Secondary Fuel (Million Litre) - 0.005 0.017 0.004 0.012 0.01
2013
2013
2012
2012