Rod RaboldVice President, SERBCA Board of Directors
SERBCA TECH TALKBAS Control Strategies for Energy Savings in Buildings
SOUTHEAST CHAPTER
2014 2
Energy Conservation Measures with the Largest Impact at UNC
• AHU - Discharge Air Temperature (DAT) reset strategy
• AHU - Proper Economizer and Heat Recovery system operations
• AHU - Preventing simultaneous heating and cooling
• VAV - Terminal zone minimum cfm air flow setpoints
2014 3
UNC BAS Control StandardsProvided to Designers
2014 4
AHU Required Sensors
2014 5
AHU Required Sequence Logic
2014 6
Preheat Valve Logic
2014 7
CHW Valve Logic
2014 8
DAT Setpoint Reset LogicCooling Requests and Return Humidity Using Low Select
to calculate DAT Setpoint
2014 9
DAT Setpoint Reset LogicCooling Requests and Return Humidity Using Cascade
to calculate DAT Setpoint
2014 10
DAT Reset Using Terminal Load
Terminals must be calibrated and working properly to ensure correct cooling call request are being generated.Reset values are adjustable from the front end so each building can be fine tuned.If terminals are not providing accurate cooling call requests then consider return air temperature to reset the AHU
2014 11
DAT Setpoint Reset LogicReturn Air and Return Humidity using low select
2014 12
DAT Setpoint Reset LogicReturn Air and Return Humidity using cascade
2014 13
DAT Reset Using Return Temperature
Using return air temperature produces the best performance if zone temperature adjustment is limited and heating and cooling setpoints (with dead bands) are uniformly set.
2014 14
Terminal Zone Temp SetpointHeating and cooling dead bands and limited adjustment
2014 15
Graphic Reset Information
2014 16
Summary DAT Strategy
• AHU discharge air resets can provide significant energy savings.
• If terminals are calibrated and performing a cooling request logic can be used.
• If terminals are poorly performing use return air temperature for reset.
• Reset parameters must be monitored and adjusted per each building. The resets need to be displayed on the graphic so they are easily understood by the staff.