18
Hunter/Crescent Area Triangle Commissioner  Polly T rot tenberg New York City Department  of  Transportation Presented on March 18 th , 2014 to Queens Community Board 2 Transportation Committee Proposal

2014 03 Hunter Crescent Qn Cb2

Embed Size (px)

DESCRIPTION

Hunter/Crescent Area Triangle

Citation preview

  • 5/20/2018 2014 03 Hunter Crescent Qn Cb2

    1/18

    Hunter/CrescentArea

    Triangle

    CommissionerPolly

    Trottenberg New

    York

    City

    Department

    of

    Transportation

    PresentedonMarch18th,2014to QueensCommunityBoard2TransportationCommittee

    Proposal

  • 5/20/2018 2014 03 Hunter Crescent Qn Cb2

    2/18

    ProjectArea

    Subway

    Stations

    BusStop

  • 5/20/2018 2014 03 Hunter Crescent Qn Cb2

    3/18

    ProjectBackground

    Walkthrough conducted with LIC Partnership

    identified several street safety concerns

    Dept. of Health & Mental & Hygiene

    requested improvements to pedestrian and

    bicycling connection from Court Square

    subway to Queens Plaza South

    Community request for crossing at Hunter St

    and 43rdAve

  • 5/20/2018 2014 03 Hunter Crescent Qn Cb2

    4/18

    Merging

    Conflict

    Disjointed

    Circulation

    TrafficNetworkIssues

  • 5/20/2018 2014 03 Hunter Crescent Qn Cb2

    5/18

    ExistingIssues

    Nocrosswalk

    28thstreetis

    verywide

    28th Street/HunterStreetat42nd Road

    Narrowpedestrianisland

  • 5/20/2018 2014 03 Hunter Crescent Qn Cb2

    6/18

    ExistingIssues Hunter/27th Streetsat43rd Avenue

    Lackofpedestrian

    connections

  • 5/20/2018 2014 03 Hunter Crescent Qn Cb2

    7/18

    ExistingIssues

    44thDrive:

    Highvolumeof

    pedestrianscrossing

    Longcrosswalk

    CrescentStreet:

    Nocrosswalk

    Verywideonewaystreet

    Encouragesspeeding

    CrescentStreet&44th Drive

  • 5/20/2018 2014 03 Hunter Crescent Qn Cb2

    8/18

    ExistingIssues JacksonAve/44th Drive

    Longcrossingdistances

    Softcornersallowfor

    fastturns

  • 5/20/2018 2014 03 Hunter Crescent Qn Cb2

    9/18

    Paintedand/ortextured

    surfaces

    Pedestrian

    Islands Pavementmarkings

    Newsignage

    Flexibledelineators

    RapidResponseToolkit

    HillsideAve

  • 5/20/2018 2014 03 Hunter Crescent Qn Cb2

    10/18

    ProposedNetworkChanges

    ConvertHunterSttotwo

    wayallowsdirectaccess

    from44th Drto42nd Rd/28th

    SttoQueensPlaza

    ConvertingCrescent

    Stto

    two

    way

    allows

    trafficfrom43rd Ave

    toQueensPlazaS

    Eliminatesmerge

  • 5/20/2018 2014 03 Hunter Crescent Qn Cb2

    11/18

    Proposed

    Enlarge

    pedestriansafety

    islandtoprovide

    adequaterefuge

    Newflush

    center

    medianto

    calmtraffic

    Newlane

    markings

    clarifylane

    designation

    28th Street/HunterStreetat42nd Road

  • 5/20/2018 2014 03 Hunter Crescent Qn Cb2

    12/18

    Proposed

    Concrete

    extension

    continues

    pedestrian

    path

    Newstop control

    &crosswalks

    (under

    investigation)

    Hunter,27th &CrescentStreets

    at43rd Avenueto44th Drive

    New

    direction

  • 5/20/2018 2014 03 Hunter Crescent Qn Cb2

    13/18

    Proposed

    Newstop control

    &crosswalks

    (under

    investigation)

    Hunter,27th &CrescentStreets

    at43rd Avenueto44th Drive

    New

    direction

    Newstop control&

    crosswalks

    (under

    investigation)

    Paintedsidewalk

    extensioncalms

    trafficandutilizeswideroad

  • 5/20/2018 2014 03 Hunter Crescent Qn Cb2

    14/18

    Proposed

    Allowrightturn

    excepttrucks

    Painted

    neckdownshortenscrossing

    slowsturns

    Painted

    neckdown

    New

    direction

    CrescentStreet&44th Drive

    Notruckturns,use

    43

    rd

    to

    access

    neighborhood

    Newlandscaped

    concrete

    pedestrianislands

  • 5/20/2018 2014 03 Hunter Crescent Qn Cb2

    15/18

    ProposedParkingChanges

    12Spots

    +2Spots

    +5Spots

    Investigatingadditional

    parkingreg changes

    Newloading

    regulations

  • 5/20/2018 2014 03 Hunter Crescent Qn Cb2

    16/18

    Benefits

    Clarifiesnetworks

    Saferpedestriancrossings

    Reducesspeeding/calmstraffic

    Completespedestriannetwork

    Addspublicspace

  • 5/20/2018 2014 03 Hunter Crescent Qn Cb2

    17/18

    Summary

    Extend sidewalk on Crescent St from Hunter St to 43rdAve with LIC

    Partnership for planter maintenance

    Extend 27th

    St triangle to intersection between Hunter St and 43rd

    Ave

    Enlarge green pedestrian safety islands at 42nd Rd and 28th St and clarify lane

    assignments

    Convert Hunter St between 44th Dr and 43rdAve; & Crescent St from 42nd Rd

    to 43rdAve from one-way to two-way traffic

    Install green pedestrian safety island at 44th Dr / Hunter St with truck turn

    restriction

    Investigate all-way stop control at Hunter St & 43rdAve; Crescent St & 44th Rd;

    Crescent St & 42nd Rd

  • 5/20/2018 2014 03 Hunter Crescent Qn Cb2

    18/18

    www.nyc.gov/dotThank

    You