2014 Shutdown Schedule & UCN FY-2013 Resources 1 February 20, 2013

2014 Shutdown Schedule & UCN FY-2013 Resources 1 February 20, 2013

Embed Size (px)

Citation preview

Page 1: 2014 Shutdown Schedule & UCN FY-2013 Resources 1 February 20, 2013

2014 Shutdown Schedule & UCN FY-2013 Resources

1

February 20, 2013

Page 2: 2014 Shutdown Schedule & UCN FY-2013 Resources 1 February 20, 2013

Upstream Section of BL1U 2

nEDMExperiment

Region

Page 3: 2014 Shutdown Schedule & UCN FY-2013 Resources 1 February 20, 2013

UCN Installation Schedule

N

2014 Shutdown4 months

3

Page 4: 2014 Shutdown Schedule & UCN FY-2013 Resources 1 February 20, 2013

2011 2015201420132012 2016 2017ACTIVITY

J A J OJ A J O J A J OJ A J O J A J OJ A J O J A

Schedule( 2010-2016 )2011 2015201420132012 2016 2017

Cleanup M11,1A/1B roof-beamDismantle PIENU & M13-DS

MESON HALL (& Vault):

Core M13 I-block

UCN APPARATUS:

Spallation Target & R/HUCN Source

BEAMLINE 1U:Kicker

SeptumDipoleBeamline (incl Quads, PS,…)

Design & Review Order/Fabricate/Deliver

Test

Mod/Fab/Assy

Order/Fabricate

Design & Review

Design & Review Order/Fabricate InstallTest

Specify/Conceptual design

Design/Fabricate InstallMove

COMMISSION @ TRIUMFBeamline Commissioning

HELIUM LIQUEFIER:

Upgrade He Liquefier System

He Liquefier SystemProcure

Install/Test & Run @ RCNP

Procure/Install

Install

Kicker Beamtube InstallDesign/Order Fabr

Install

Test

MILESTONES Shutdown Activities Activities Elsewhere(KEK, RCNP, CERN, Acsion)

Non-Shutdown Activities

Mod. 1VQ4/Q5; BL1V & Shld

Install

Dismantle M13-US, Mod.Shld

UCN Schedule (Draft)

Design/Order/Fabricate Test

Install

Install

Design/Fabr

Shielding Procure shielding blocksDesign & Review Install InstallInstall

4

Page 5: 2014 Shutdown Schedule & UCN FY-2013 Resources 1 February 20, 2013

2014 UCN Installation Schedule 5

UCN Installation 1 (Jan-May/2014): BL1U, Vault and Upstream Section

Page 6: 2014 Shutdown Schedule & UCN FY-2013 Resources 1 February 20, 2013

2014 S/D Schedule & Resources

UCN Installation 1 (Jan-May/2014): BL1U, Vault and Upstream Section

Late Dec/2013 Remove large shielding blocks outside (3 days) Start Jan.2/2014 Week 1 RPG survey & prepare for S/D work Week 2 Remove Warm blocks (layers A-D); Disconn.services; Remove 1A vault comp.’s Week 3 Cleanup/Layout BL1U; Specify location for coring of Immovable-block (and tx.) Week 4 1BVB2 mods (and 1B mods) Week 4 - 6 Install stands for kicker,septum,1UB2; Install & Align kicker-beamtube Week 7 Install & Align septum magnet Week 8 Install & Align 1UB2 magnet and 1UM6 Week 9 Reinstall 1A vault comp.’s; Install Notch-monitor; Install 1AUM5,1UBB2

Week 6 - 8 Install rough-in services (Electrical, Water, Air) Week 9 - 10 Finish Electrical (AC & DC), Water, Air services

Week 10 Finish all vacuum connections Week 11 Leak check & ready to pull vacuum Week 12 Pull vacuum & check-out vacuum controls Week 13 General check-out and ready to cover Week 14 - 15 Restore vault & 1A shielding and prepare for beam

Resources: 3 Beamlines techs (2 BL + Alignment), 13 weeks [39 person-weeks]1 Crane Operator + 2 Riggers, 7 weeks [21 person-weeks]Vacuum Group [6 person-weeks]Services: Outside Contractors, 5 weeks [6 person-weeks]

Mostly Contractors

Clo

se U

p

M

ain

Wor

k

Ope

n U

p2014 UCN Installation Schedule & Resources 6

Page 7: 2014 Shutdown Schedule & UCN FY-2013 Resources 1 February 20, 2013

Resource Requirements 7

Preparations for 2014 Shutdown: (Design, Procurement, Assembly of Subsystems)

Items/Subsystems Eng. DWGs Procurement Assy./Testing(needed Jan-2014) (incl Modeling)

Vault-BL1A Shielding Saf. / UCN DO UCN n/a

Septum Mods UCN UCN MS / UCN BL / UCNSeptum Vacuum Box UCN UCN MS / UCN BL / UCNSeptum Stand UCN UCN MS / UCN BL / UCN

1UAM5/1UBB2 Diag. DO MS /Diag. / ET ET / Diag.

1BVB2 Stand Mod. Eng.Div. DO MS BL

Dipole Vacuum Box UCN UCN MS BL

1AM4(ToF)/1AM4.5 Diag. UCN Diag. / UCN Diag. / UCN

Kicker Beamtube UCN UCN UCN BL Kicker Stand UCN UCN MS / UCN BL

Page 8: 2014 Shutdown Schedule & UCN FY-2013 Resources 1 February 20, 2013

Preparations for 2014 Shutdown: [ Time Estimate in Person-Weeks ]

Items/Subsystems Eng. DWGs Procurement Assy./Testing(needed Jan-2014) (incl Modeling)

Vault-BL1A Shielding Saf.[3]/UCN[4] DO [7] UCN [3] n/a

Septum Mods UCN [8] UCN [4] MS [2] / UCN [1] BL [10] / UCN [2]Septum Vacuum Box UCN [3.5] UCN [6] MS [6] / UCN [1] BL [6] / UCN [3]Septum Stand UCN [3.5] UCN [6] MS [5] / UCN [1] BL [4] / UCN [2]

1UAM5/1UBB2 Diag. [8] DO [7] MS[6]/Diag.[2]/ET[4] ET [3] / Diag. [7]

1BVB2 Stand Mod. Eng.Div. DO MS BL [0.5]

Dipole Vacuum Box UCN [1] UCN [6] MS [8] BL [1]

1AM4(ToF)/1AM4.5 Diag. [3] Stu. [3] Diag. [2] / Stu. [5] Diag. [2] / Stu. [6]

Kicker Beamtube UCN [3.5] UCN [5.5] UCN [3.5] BL [2.5]Kicker Stand UCN [3.5] UCN [6.5] MS [5] / UCN [2.5] BL [4]

Resource Requirements 8

Page 9: 2014 Shutdown Schedule & UCN FY-2013 Resources 1 February 20, 2013

Summary: Resource Requirements 9

[ Time Estimate in Person-Weeks ]

Meson-Hall Cleanup 2013 (+ 2014 non-S/D?)

M11 Platform (2013 ) 2013 non-S/D CleanupPG [12] PG [70]BL [4] BL [34]

EL [16]

Preparations for 2014 S/D (2013)

Safety [3] DO [14] MS [32]BL [28]Diag. [24]ET [7]

UCN.Eng [46]UCN.Des [34]UCN.Stu [14]

2014 S/D (UCN Installation)PG [21]BL [39]Vac [6]Con.[6]

Page 10: 2014 Shutdown Schedule & UCN FY-2013 Resources 1 February 20, 2013

FINIS

10

Page 11: 2014 Shutdown Schedule & UCN FY-2013 Resources 1 February 20, 2013

List of Major Milestones

2013 – May UCN Beamline Review

2014 – May BL1U US-section (Kicker beamtube, Septum, Dipole) Installed.

2014 – Aug UCN/nEDM RCNP phase completed.Begin Uninstall for transport to TRIUMF.

2015 – Apr UCN Source received at TRIUMF.(Unpack and Begin Cold Tests of UCN Source)

2015 – July BL1U DS-section Installed.

2016 – July Commission UCN Facility using low intensity beam.

11

Page 12: 2014 Shutdown Schedule & UCN FY-2013 Resources 1 February 20, 2013

Summary: (Reference Scenario)

1. Vault mods: Cleanup issues; BL1B & Vault mods

Jan.2-Mar.29 Rewire Vault Quads for Steering Capability Work Estimate 2 weeks; 1 BL, 1 Contractor (Electrician)

2. Cleanup: M11 experiment area and above 1A/1B shielding blocks

Jan.2-Feb.28 M11 Platform Work Estimate 4 weeks; 1 crane operator, 2 riggers, 1 BL

Mar.1-Aug.30 Cleanup M11 expt area and above 1A/1B shielding blocks Work Estimate 12 weeks; 1 crane operator, 2 riggers, 1 BL

3. Dismantle: M13 expt area (PIENU,Q6,Q7) and Infrastructure/Services

Finish Mar.29 PIENU BG/Calib and remove detectors (PIENU personnel)

Apr.1-Jun.30 Remove PIENU and clear M13 floor area Work Estimate 6 weeks; 1 crane operator, 2 riggers, 1 BL

Jul.1-Sep.30 Remove PIENU-M13 infrastructure & services Work Estimate 8 weeks; 1 crane operator, 1 rigger, 2 BL, 2 EL

Person-Week Sums Shutdown & Meson-Hall Cleanup 2013 [ Time Estimate in Person-Weeks]

2013 Shutdown M11 Platform (2013 ) 2013 non-ShutdownBL [2] PG [12] PG [70]Contr [2] BL [4] BL [34]

EL [16]

Page 13: 2014 Shutdown Schedule & UCN FY-2013 Resources 1 February 20, 2013

Any possible storage solutions left on-site?

MOB

ISAC II

ISAC I

RH

M.S.

Construction

ARIEL

A

D.O./StoresPlant Grp.

Hh

Ff

Constr.

He Fac

Cycl

MH

PH

Gg

Page 14: 2014 Shutdown Schedule & UCN FY-2013 Resources 1 February 20, 2013

Comments:

4. UCN Installation 1 (Jan-May/2014): BL1U, Vault and Upstream Section

Page 15: 2014 Shutdown Schedule & UCN FY-2013 Resources 1 February 20, 2013

Comments:

4. UCN Installation 1 (Jan-May/2014): BL1U, Vault and Upstream Section

Late Dec/2013 Remove large shielding blocks outside (3 days) Start Jan.2/2014 Week 1 RPG survey & prepare for S/D work Week 2 Remove Warm blocks (layers A-D); Disconn.services; Remove 1A vault comp.’s Week 3 Cleanup/Layout BL1U; Specify location for coring of Immovable-block (and tx.) Week 4 - 5 1BVB2 mods (and 1B mods) Week 5 - 7 Install stands for kicker,septum,1UB2; Install & Align kicker-beamtube Week 8 Install & Align septum magnet Week 9 Install & Align 1UB2 magnet and 1UM6 Week 10 Reinstall 1A vault comp.’s; Install Notch-monitor; Install 1AUM5/1UBB2

Week 7 - 9 Install rough-in services (Electrical, Water, Air) Week 10 - 11 Finish Electrical (AC & DC), Water, Air services

Week 11 Finish all vacuum connections Week 12 Leak check & ready to pull vacuum Week 13 Pull vacuum & check-out vacuum controls Week 14 General check-out and ready to cover Week 15 - 16 Restore vault & 1A shielding and prepare for beam

Resources: 3 Beamlines techs (2 BL + Alignment), 13 weeks [39 person-weeks]1 Crane Operator + 2 Riggers, 7 weeks [21 person-weeks]Vacuum Group [6 person-weeks]Services: Outside Contractors, 5 weeks [6 person-weeks]

Mostly Contractors (?)

Clo

se U

p

M

ain

Wor

k

Ope

n U

p

Page 16: 2014 Shutdown Schedule & UCN FY-2013 Resources 1 February 20, 2013

Preparations for 2014 Shutdown: (Design, Procurement, Assembly of Subsystems)

Items/Subsystems Eng. DWGs Procurement Assy./Testing(needed Jan-2014) (incl Modeling)

Vault-BL1A Shielding Saf. / UCN DO UCN n/a

Septum Mods UCN UCN MS / UCN BL / UCNSeptum Vacuum Box UCN UCN MS / UCN BL / UCNSeptum Stand UCN UCN MS / UCN BL / UCN

1UAM5/1UBB2 Diag. DO MS /Diag. / ET ET / Diag.

1BVB2 Stand Mod. Eng.Div. DO MS BL

Dipole Vacuum Box UCN UCN MS BL

1AM4(ToF)/1AM4.5 Diag. UCN Diag. / UCN Diag. / UCN

Kicker Beamtube UCN UCN UCN BL Kicker Stand UCN UCN MS / UCN BL

SEM for BL1B Diag. D.O. Diag. Diag.(M.Trinczek)

Page 17: 2014 Shutdown Schedule & UCN FY-2013 Resources 1 February 20, 2013

Preparations for 2014 Shutdown: [ Time Estimate in Person-Weeks ]

Items/Subsystems Eng. DWGs Procurement Assy./Testing(needed Jan-2014) (incl Modeling)

Vault-BL1A Shielding Saf.[3]/UCN[4] DO [7] UCN [3] n/a

Septum Mods UCN [8] UCN [4] MS [2] / UCN [1] BL [10] / UCN [2]Septum Vacuum Box UCN [3.5] UCN [6] MS [6] / UCN [1] BL [6] / UCN [3]Septum Stand UCN [3.5] UCN [6] MS [5] / UCN [1] BL [4] / UCN [2]

1UAM5/1UBB2 Diag. [8] DO [7] MS[6]/Diag.[2]/ET[4] ET [3] / Diag. [7]

1BVB2 Stand Mod. Eng.Div. [1.5] DO [3] MS [2] BL [2]

Dipole Vacuum Box UCN [1] UCN [6] MS [8] BL [1]

1AM4(ToF)/1AM4.5 Diag. [3] UCN [6] Diag. [2] / UCN [5] Diag. [2] / UCN [6]

Kicker Beamtube UCN [3.5] UCN [5.5] UCN [3.5] BL [2.5]Kicker Stand UCN [3.5] UCN [6.5] MS [5] / UCN [2.5] BL [4]

SEM for BL1B Diag. [2] D.O. [2] Diag. [3] Diag. [3](M.Trinczek)

UCN Designer (need to hire)

Page 18: 2014 Shutdown Schedule & UCN FY-2013 Resources 1 February 20, 2013

Person-Week Sums: Summary [ Time Estimate in Person-Weeks ]

Shutdown & Meson-Hall Cleanup 2013 & 2014

2013 S/D M11 Platform (2013 ) 2013 non-S/DBL [4] PG [12] PG [70]

BL [4] BL [34]EL [16]

2014 S/DPG [21]BL [39]Vac [6]Con.[6]

Preparations for 2014 S/D (2012,2013)

Safety [3] Eng.Div [1.5]DO [19] MS [34]BL [29.5]Diag. [32]ET [7]

UCN.Eng [46]UCN.Des [34]UCN.Stu [17]

Page 19: 2014 Shutdown Schedule & UCN FY-2013 Resources 1 February 20, 2013

Preparations for 2014 Shutdown: [ Time Estimate in Person-Weeks ]

(Deferral Options - Prioritized)

Items/Subsystems Eng. DWGs Procurement Assy./Testing(needed Jan-2014) (incl Modeling)

Vault-BL1A Shielding Saf.[3]/UCN[4] DO [7] UCN [3] n/a

Septum Mods UCN [8] UCN [4] MS [2] / UCN [1] BL [10] / UCN [2]Septum Vacuum Box UCN [3.5] UCN [6] MS [6] / UCN [1] BL [6] / UCN [3]Septum Stand UCN [3.5] UCN [6] MS [5] / UCN [1] BL [4] / UCN [2]

1UAM5/1UBB2 Diag. [8] DO [7] MS[6]/Diag.[2]/ET[4] ET [3] / Diag. [7]

1BVB2 Stand Mod. Eng.Div. [1.5] DO [3] MS [2] BL [2]

Dipole Vacuum Box UCN [1] UCN [6] MS [8] BL [1]

1AM4(ToF)/1AM4.5 Diag. [3] UCN [6] Diag. [2] / UCN [5] Diag. [2] / UCN [6]

Kicker Beamtube UCN [3.5] UCN [5.5] UCN [3.5] BL [2.5]Kicker Stand UCN [3.5] UCN [6.5] MS [5] / UCN [2.5] BL [4]

SEM for BL1B Diag. [2] D.O. [2] Diag. [3] Diag. [3](M.Trinczek)

Page 20: 2014 Shutdown Schedule & UCN FY-2013 Resources 1 February 20, 2013

JOA J

2012

JOA J

2013

JOA J

2014

A J O

2015

Oct. 17, 2012

Major TasksJ A J O

2016

ARIEL & Shutdown Plan (2012-2016) - DRAFT

Install Kicker, UCN Beam line, Services & Controls

Complete Shielding & Commissioning Tests

Mod Vault Quads (rem. Steerers), 1BVB2, and BL1A/1B

Install Kicker Ceramic beam Tube & Services

Install Base Layer of UCN Shielding to Run BL/1A

Core through M13 Block

2012

/ 2

013

2014

2015

Complete M20 Front end & M9A Front end work

Install Septum & Dipole (with services, where possible)

Remove & Store M13 Front end, Hot Blocks & Crumbling Blocks

Install UCN Spallation Target & R/Handling System, & UCN Source

Install UCN Shielding

Legend:

Shutdown Jobs

Non Shutdown Jobs

Reconfigure Vault-to-1A Shld, and beamline Shld to run 1A

Cleanup (incl M11 Expt area, above 1A/1B shielding blocks)

ARIEL & E-Linac MilestonesTunnel &Bldg Avail

LC (50Kw)e-Beam

100Kwe-Beam

E-HallAvailable

Construction

Install & Connect ELBT & EINJ-2 in E-Hall

Cryogenic Plant (delivery & operational)

Test & Commission High Power RF System (Klystron & HVPS)

Install EHBT from ACM to Target Hall

Install & Connect EACA, Test & Comm Beam in E-Hall (50kW & 100kW)

AR

IEL

& E

-Lin

acS

hu

tdo

wn

s

Complete IRIS

Complete EMMA

Hel liquefier system (and UCN upgrade) Procure & InstDsgn

2016

Procure & Inst Upgrades

Dismantle M13 Expt area (PIENU,Q6,Q7) & Infrastructure/Services

Assess: Cleanup of M11, M13, above 1A/1B; BL1B & Vault mods