Department of Transportation and Infrastructure
StandardSpecifications
for Highway Construction
January 2015
JA
The as pprepwill n It is to-daof AStanthe C Bid Iof Wcons Requshalentir The as d The govespecQuaIntroStanSpecand Con
ANUARY
USE O
standards pre-printed pared as denot compet
the responate copy of
Agreement, ndard SpecCrown Con
tems in theWork and clestruction pro
uirements ol form partrety.
Standard Sefined in th
Standard ern the pecifically notntity are
oduction; Dndard Condcifications
requisite tract.
Y 2015
OF NEW BR
in the DTI componen
esign aids ently serve
sibility of thf the StandTerms of
cifications. struction C
e Standard early identifovisions to
of the Notict of the C
Specificatiohe Definition
Specificatiorformance ed as a bidfound undivision 800ditions. Itunderstandbehaviour
FORE
RUNSWICK
Standard Snts of a coor as a ma
e those purp
he Bidder/Cdard ConstrPayment "The Stand
Contracts Ac
Specificatiofy the scopproduce th
ce of Tendontract as
ns rely on tns (Item 00
ons form pof the Con
d Quantity.der the fo
0 - Payment is imperad this inter
of the C
EWORD
K PROVINC
Specificatioonstructionanual of deposes.
Contractor truction Con"A", Generadard Specifct.
ons are intee, material
he specified
er are incoif they ha
the use of s03).
part of the ntractor ev Items whollowing Dnt & Adjustative thatr-relationshontractor w
CIAL STAN
ns are inte Contract. esign proce
to ensure thntract includal Conditiofications are
ended to berequireme
d end produ
orporated bad appeare
specific wo
Contract ven thoughhich are notDivisions: tments; andusers of
hip to the owithin the
DARDS
nded to be They are
edures and
hey have ading the Ar
ons "B", ane complian
e completents, and sp
uct.
by referenceed here in
rds and ph
Documents an Item it noted as Division 0d Division these Stanoverall Cocontext o
used e not
d they
an up-rticles d the t with
units pecific
e and their
rases
s and s not a bid
000 - 900 - ndard ntract
of the
DEPA
Janua
100 101 102 103 106 107 108 116 121 130 131 136 137
200 201 203 204 205 208 210 231 259
ARTMENT
ary, 2015
Table of CoClearing Grubbing Removing Common EUnclassifieSolid Rock Ditching Borrow Metal Pipe Metal Pipe Subdrain Subdrain O
Table of CoProduction Aggregate Shoulder MFine GradinCold MillingShoulder RShoulder SBituminous
STANof TRANS
000000
ontents
Isolated TreeExcavation d Excavation Excavation
- Large
Outlet
ontents of Highway ABase/Subbas
Material ng g - Asphalt Co
Rumble Strips Subdrain s Tack Coat
NDARD SPPORTATIO
TA
STANDA
DIVISIO
000 Table o001 Termino002 Abbrev003 Definitio005 Authorit006 Permits
DIVI
s
DIVISION 20
Aggregates se
oncrete
ECIFICATION and INF
ABLE OF CON
ARD SPEC
ON 000 - INTR
of Contents ology iations ons ty of the Engi
s
ISION 100 - G
00 - PAVEME
IONS FRASTRUC
NTENTS
CIFICATION
RODUCTION
ineer
GRADING
140 Con141 Con142 Prec161 Foun166 Bac167 Bac169 Indu182 Cha186 Rem191 App199 Stan
ENT STRUCT
260 Asp261 Asp262 Part263 Full 264 Micr265 Chip267 Pulv284 Sho299 Stan
CTURE
NS
N
ncrete Pipe ncrete Pipe - Lcast Concretendation Excakfilling Aroundkfill For Struc
uced Trench ain Link Fencemoval of Fenclication of Wa
ndard Drawing
TURE
halt Concretehalt Concretetial Depth RecDepth Recyc
ro Surfacing p Seal verizing ulder Process
ndard Drawin
Large e Box Culvertvation d Structures
ctures
e ce ater gs
e - Method Spe - (ERS) cycling cling
sing gs
Page 1 of 5
pecification
DEPA
Janua
300 301 302 304 305 311 312 321 322 331 332 335 341 342
400 401 404 406 407 408 409 410
ARTMENT
ary, 2015
Table of CoPortland CeConcrete inReinforcingTension SpSteel H PileSteel Pipe Steel SheeExcavationPrecast PrePost-TensioSteel SupeSteel LaminBridge Pot
Table of CoStorm SewPrecast CaSluice Box Frame WithAdjustmentRelocation Paving Cat
STANof TRANS
ontents ement Concren Structures g Steel plices es Piles
et Pile Cofferd Within Coffeestressed Cooning System
erstructure nated BearingBearings
ontents wer Pipe atch Basin
h Grate or Cot of Catch Basof Catch Bas
tch Basin Apr
NDARD SPPORTATIO
TA
DIVISI
ete
dams erdams ncrete Beams
m
gs
DIVIS
over sins and Mansin on
ECIFICATION and INF
ABLE OF CON
ON 300 - STR
s
SION 400 - M
nholes
IONS FRASTRUC
NTENTS
RUCTURES
343 Sea344 Fing345 Stee346 Guid348 Serv351 Wat361 Sho365 Eng366 Free371 Rem372 Rem381 Rem399 Stan
MUNICIPAL
415 Pipe416 Curb419 Con420 Asp423 Rem424 Rem425 Rem499 Stan
CTURE
led Expansioger Joint Asseel Ballastwall de Rail Systevice Duct - Stterproofing
oring ineered Fill e-Draining Bamoval of Asphmoval of Concmoval of Strucndard Drawin
e Zone Materib and Gutter
ncrete Sidewahalt Sidewalk
moval of Curbmoval of Sidewmoval of Undendard Drawin
on Joint Assememblies Angle m - Structuretructures
ackfill halt Concrete crete ctures gs
ial
alk k and Gutter walk erground Servgs
Page 2 of 5
mblies
es
- Structures
vices
DEPA
Janua
500 510 511 512 513 515
516
520 529 530 531 532 533 534 538 539 540
600 601 602 603 604 605 606 607 608 609 610 611 612
ARTMENT
ary, 2015
Table of CoGuide PostRemoval ofGuide Rail Removal ofEnergy-Abs
Removal ofTerminal Cast-in-PlaConcrete EUnder RoaUndergrounUndergrounPower PoinRemoval ofScrew BaseRemoval ofSign or Lig
Table of CoGeotextile Sediment CFilter ScreeJute Mats Erosion CoRemoval ofGabions Random RRock Weir Armour StoIndividual RGravel for F
STANof TRANS
DI
ontents ts f Guide Posts
f Guide Rail sorbing Guide
f Energy-Abs
ace Concrete Encased Roaddbed Duct nd Duct nd Junction Bnt f Power Pointe f Screw Baseht Base
ontents
Control Fenceen
ontrol Structurf Erosion Con
iprap
one ProtectionRock PlacemeFish Habitat
NDARD SPPORTATIO
TA
IVISION 500
s
e Rail Termin
orbing Guide
Barrier dbed Duct
Box
t
e
DIVISION
e
re ntrol Structure
n ent
ECIFICATION and INF
ABLE OF CON
- TRAFFIC C
al
Rail
N 600 - ENVI
e
IONS FRASTRUC
NTENTS
CONTROL DE
541 Rem542 Ligh543 Rem544 Med545 Rem550 Sign551 Rem552 Roa553 Rem554 Ove555 Ove556 Rem557 Ove558 Rem571 Pave576 Con599 Stan
RONMENTA
613 Tops614 Hyd615 Fert616 Mulc617 Roo618 Tree620 Tem621 Tem622 Fish623 Culv630 Soil 699 Stan
CTURE
EVICES
moval of Sign ht Standard moval of Lightdian Flashing moval of Medin Post moval of Sign adside Sign moval of Roaderhead Sign Serhead Sign Smoval of Overerhead Sign moval of Overement Markin
nstruction Trafndard Drawin
AL
soil roseeding tilizing ching
ot Wads es and Shrub
mporary Watemporary Wateh Rescue vert Erosion PReinforceme
ndard Drawin
or Light Base
t Standard Light an Flashing L
Post
dside Sign Structure FounStructure rhead Sign St
rhead Sign ngs ffic Control gs
s r Barrier r Control Wor
Protection ent gs
Page 3 of 5
e
Light
ndation
tructure
rks
DEPA
Janua
800 801 802 806 807 808
900 905 906 907 908 912 913 916 917 918 919 921 922 926 927 928 931 932 933
ARTMENT
ary, 2015
Table of CoHaulage - SHaulage - AOverhaul - Overhaul - Overhaul -
Table of CoSchedulingWork ScheSubcontracSupply of MHiring PracInsurance SSigns Traffic ConDetours MaintenancConstructioPits and QuExaminatioAsphalt CoGeotechnicScales andPrivate TruHeavy Equ
STANof TRANS
DI
ontents Soil, Rock andAsphalt ConcCommon ExcUnclassified Solid Rock E
ontents g edule ctors Materials ctices Schedule
trol Persons
ce of Traffic Fon Roads uarries
on of Soils Infooncrete Core Dcal Instrumend Weighing Prcks ipment
NDARD SPPORTATIO
TA
DIV
IN
IVISION 800
d Aggregaterete cavation Excavation
Excavation
DIVISION 90
Flow
ormation Data tation rocedures
ECIFICATION and INF
ABLE OF CON
ISION 700 - L
LIBRARNTERNAL US
- PAYMENTS
00 - STANDA
IONS FRASTRUC
NTENTS
LIBRARY
RY SE ONLY
S & ADJUST
810 Fixe811 Forc812 Extr820 Pay821 Adju825 Mob
ARD CONDIT
934 Bac936 Com941 Line946 Wor947 Disp948 Env951 Wor952 Safe953 Aud956 Con957 Fals958 Form961 Part962 Valu971 Adv996 Limi997 Spe998 Com999 Stan
CTURE
TMENTS
ed Rates ce Account ra Work ment Adjustmustment for Asbilization
TIONS
k - Up Alarmsmpaction es and Gradesrk Progressioposal Areas ironmental Rerking Conditioety Support Sited Safety P
nstruction Drasework mwork tnering ue Engineerinisements ited Funds cified Work
mpletion Date ndard Drawin
ments sphalt Binder
s
s n
equirementsons Systems rogram
awings and Ca
ng
gs
Page 4 of 5
r Price
alculations
DEPA
Janua
ARTMENT
ary, 2015
Sho Sta
- Ar- Te- G
Ins For Pla Affi
STANof TRANS
ort Form Contandard Constrrticles of Agreerms of Paymeneral Conditurance Schedrm of Tender
ans and Standidavit I
NDARD SPPORTATIO
TA
tract ruction Contraeement ment A tions B dule E F
dard Specificat
S
STANDA
ECIFICATION and INF
ABLE OF CON
APPEND
act
tions G
SUBJECT IN
ARD DRAW
IONS FRASTRUC
NTENTS
DIX
NDEX
WING INDE
CTURE
EX
Page 5 of 5
DEPA TABLE
Janua
IT
0
0
0
0
0
ARTMENT
E OF CONTE
ary, 2015
TEM
001 T
002 A
003 D
005 A
006 P
STANof TRANS
ENTS
Terminology .
Abbreviations
Definitions ....
Authority of th
Permits .........
NDARD SPPORTATIO
DESCR
.....................
....................
.....................
e Engineer ..
.....................
ECIFICATION and INF
INTRODUCTIO
RIPTION
.....................
.....................
.....................
.....................
.....................
IONS FRASTRUC
ON
............
............
...........
..............
..........
CTURE
NUMBEPAGE
2
4
5
1
1
DI
R OF ES
VISION 000
Page 000-1
DEPA TERM
Janua
001.1
001.2
001.3
001.4
001.5
ARTMENT
INOLOGY
ary, 2015
TERMINOL
.1 This do
.1 Itemto t
.2 Arti
.2 Whene
that anyrequesunaccedesignfollowed
.3 Unless
shall re
GENDER N
.1 Workingpronouintende
HEADINGS
.1 The heconvenmeanin
PARTICULA
.1 Particulthis doc
.2 Particul
CONFLICT
.1 Wheneany othpractice
.2 In the e
betwee
STANof TRANS
LOGY
ocument is div
m is generallythe Work.
icle is used to
ver in the Coything is, donsted, deemeptable, sati
nated, and sud by the word
otherwise spfer to this doc
NOTATION
g titles havinns such as he
ed to refer to p
S, TITLES and
adings, titles ience and for
ng of the Stand
AR SPECIFIC
lar Specificaticument and a
lar Specificati
S IN CODES
ver a conflict her referencee, the most str
event of a conen the choices
NDARD SPPORTATIO
vided into spec
y used with te
o reference an
ontract Docume or to be domed necesisfactory, unuch similar exds by the Eng
pecified in thecument.
ng a mascule, his and him
persons of eith
d CAPTIONS
and captionsr the ease of rdard Conditio
CATIONS
ions are definre particular a
ons shall prev
AND STAND
in interpretated documentringent require
nflict the Engs of action as n
ECIFICATION and INF
INTRODUCTIO
cific Items.
ext that conta
ny subsection
ments and in done, if, as, whsary, perm
nsatisfactory, xpressions thegineer or to t
e text, all refe
line gender, m are utilized her sex and a
s appearing inreference onlyns, Specificat
ned as Specifand specific to
vail over those
DARDS
tion, applicatio, including bement shall a
ineer shall benoted to be in
IONS FRASTRUC
ON
ains reference
of an Item.
documents reen, or where mitted, su suspendeden the expreshe Engineer
erences to Sp
such as woin these Spe
re gender neu
n this documey and in no wations and/or th
fications adopo a Contract.
e published h
on or directiobut not limiteapply to the W
e the sole judn conflict betw
CTURE
e to payment
esulting duringcontemplate
uitable, ap, sufficient, ssion shall haas the case m
pecifications,
orkman, workecifications foutral.
ent have beenay define, limhe Particular S
pted subsequ
erein whenev
on occurs betwed to related
Work.
dge of the moween the docu
and performa
g the Work it ed, requiredpproved, aauthorized,
ave the samemay be.
Items, Tables
kmen and for the sake of
n inserted as it or enlarge tSpecifications
uent to the pu
ver in conflict t
ween this doccodes and/o
ost stringent rements.
ITEM: 001
Page 001-1
ance related
is provided , directed, acceptable, specified,
e force as if
s or Figures
oreman and brevity, are
a matter of he scope or
s.
ublication of
therewith.
cument and or standard
equirement,
TER
Pag
001
RMINOLOGY
ge 001-2
1.6 CROSS
.1 Crosand
.1
.2
.3
Y
-REFERENC
ss-referencescan be categ
Inclusive re(xxx.2) or Coof the work ufor the adherof the Item.
Separate Itemportion of thewith or to Item (Item xappears as s
Standard Dra
DEPARTM
ES
s form an impgorized as follo
eference to aonstruction (xxunder the Itemrence to or th
m reference work under
the requiremxx) indicates uch in the Lis
awing refere
STANMENT of TR
INTRODUC
portant role in ows:
a portion of axx.4) section, m where the re performanc
ce to anotherthe Item wheents of thethat the cro
st of Approxim
ence to the ap
DARD SPERANSPORT
CTION
the interpreta
another Specifindicating thaeference is n
ce of the requ
r Specificationre the referen
e cross-refereoss-referencedmate Quantitie
pplicable draw
ECIFICATIOTATION an
ation of the S
fication Item, at the cross-reoted. There w
uirements of t
n Item (Item nce is noted isnced Item. Thd Item is a ses of the tend
wing.
ONS nd INFRAS
Standard Spec
in general toeferenced secwill be no sephe cross-refe
xxx), indicats carried out he cross-referseparate unitder documents
TRUCTUR
ITEM: 00
January, 20
cification Item
o the Materiaction forms paparate paymeerenced sectio
ting that somin accordancrence to the fut payment ans.
RE
01
15
ms
als art nt on
me ce ull nd
DEPA ABBR
Janua
002.1
ARTMENT
REVIATIONS
ary, 2015
ABBREVIA
.1 WherevContrac
AAACAISANAPASASAWBPCGCACSCWDEDTDFMTOPPCPCSSTRSI
AACHCACECHCSCSDREMEOEPESAGCLOPCPE PVRARCROSP
STANof TRANS
ATIONS
ver the followct Documents
SHTO CI SI SI EGNB CE TM
WS R
GSB AN/CSA SA WB ELG
I O
TO PSS CI CA
PC B
DTW
AP BDC P PA
R MM OS
P AL
C C P
C AP CP OW
CAP
NDARD SPPORTATIO
ing abbreviatis, their intent a
American AsAmerican CoAmerican IroAmerican NaAssociation oAmerican SoAmerican SoAmerican WeBureau of PuCanadian GeCanadian StaCanadian StaCanadian WeDepartment oDepartment oDepartment oMinistry of TrOntario ProviPrestressed CPortland CemSteel StructuTransportatioInternational
Average AnnCreosote HarCorrugated ACommon ExcCanadian HigAluminum CoAluminum CoDimension REnvironmentaEquivalent OEnvironmentaEquivalent SiGeneral CondLimit of ContrPre-cast ConPolyethylenePolyvinyl ChlReclaimed AsReinforced CRight of WayStructural Pla
ECIFICATION and INF
INTRODUCTIO
ions or terms and meaning s
Org
sociation of Soncrete Institutn and Steel In
ational Standaof Professionaociety of Civil Eociety for Testielding Societyublic Works, Deneral Standaandards Assoandards Assoelding Bureauof Environmenof Transportatof Fisheries aransportation incial StandarConcrete Inst
ment Associatres Painting C
on Research BSystem of Un
ual Daily Trafrdwood
Aluminum Allocavation ghway Bridgeoated Corrugaorrugated Steeatio for plastical Managemepening Size al Protection Pingle Axle Loaditions B of tract
ncrete Pipe
oride sphalt Pavem
Concrete Pipe
ate Corrugate
IONS FRASTRUC
ON
are used in tshall be as fo
ganizations
State Highwayte nstitute ards Institute al Engineers aEngineers ing and Matery Department of ards Board ociation ociation u nt and Local Gtion and Infrasand Oceans of Ontario rd Specificatiotitute tion Council Board nits
Terms
ffic
oy Pipe
e Design Codeated Steel Pipel Pipe-Archc pipe ent Manual (D
Plan ad the Contract
ment
d Aluminium A
CTURE
the Specificatollows:
y and Transpo
and Geoscien
rials
f Commerce
Government (structure (New
on
e pe
DTI)
Alloy Pipe
tions, the Pla
ortation Officia
ntists of New B
(New Brunswiw Brunswick)
ITEM: 002
Page 002-1
ns, or other
als
Brunswick
ick)
AB
Pag
002
002
BBREVIATION
ge 002-2
2.2 PUBLIC
.1 Whethe t
2.3 SI TERM
.1 Theout
.2 Oth
are .3 Wh
of m
Ph
Are
De
En
Fo
Le
NS
SPCSP SPCAPA SPCSPA SRE UNE WATCM
ATIONS AND
en publicationtime of the sig
MS e following tat under the te
her terms ande used.
here no units measure shal
hysical Quan
ea
ensity
nergy
orce
ngth
DEPARTM
Structural Structural Structural Solid RocUnclassifiWork Area
D REGULATIO
ns or regulatiogning of the C
ble of commorms of the Sta
d abbreviation
are indicatedll be millimetr
tity
STAMENT of TR
INTRODUC
Plate AluminPlate CorrugPlate Alumink Excavationed Excavationa Traffic Cont
ONS
ons are referreContract.
on metric termandard Speci
ns may be use
on the Plansres unless oth
C
square
square
hectar
square
gram p
kilogra
tonne
joule (
kilojou
megaj
Newto
kilonew
megan
micron
ANDARD SRANSPORT
CTION
Terms
um Coated Cated Aluminiuum Coated C
n trol Manual (D
ed to, the refe
ms and abbrevifications.
ed if they are
s for the measherwise noted
Common SI u
e millimetre
e metre
re
e kilometre
per cubic met
am per cubic
per cubic me
Newton metre
ule
oule
on
wton
newton
n
SPECIFICATATION an
Corrugated Steum Alloy Pipe
Corrugated Ste
DTI)
erence is to th
viations shall
referenced in
surement of led.
units
tre
metre
etre
e)
ATIONS nd INFRAS
eel Pipe -Arch eel Pipe-Arch
he latest versi
apply to all W
n the context
ength or dista
SI Sym
mm
m2
ha
km
g/m3 (m
kg/m
t/m J
kJ
MJ
N
kN
MN
m
TRUCTUR
ITEM: 00
January, 20
ion available
Work carried
in which they
ance, the unit
mbol
m2 2
a
m2
mg/L)
m3
m3
J
J
N
N
m
RE
02
15
at
y
DEPA ABBR
Janua
ARTMENT
REVIATIONS
ary, 2015
Physi
Light
Mass
Perme
Powe
Press
Stress
Temp
Time
Torqu Unit W
STANof TRANS
ical Quantity
eability
r
sure
s
perature
ue
Weight
NDARD SPPORTATIO
y
ECIFICATION and INF
INTRODUCTIO
Com
millimetre
metre
kilometre
lux
kilolux
milligram
gram
kilogram
tonne
metre per
metre per
watt
kilowatt
pascal
kilopasca
megapasc
newton pe
kilonewto
meganew
degree ce
second
minute
hour
day
year
newton m
kilonewto
IONS FRASTRUC
ON
mmon SI unit
e
r second
r year
l
cal
er square me
on per square
wton per squa
elsius
metre
on per cubic m
CTURE
ts
etre
metre
are metre
metre
SI Symbo
mm
m
km
lx
klx
mg
g
kg
t
m/s
m/a
W
kW
Pa
kPa
MPa
N/m2
kN/m2
MN/m2
C
s
min
h
d
a
Nm
kN/m3
ITEM: 002
Page 002-3
ol
AB
Pag
BBREVIATION
ge 002-4
Ph
Ve
Vis
Vis
Vo
Vo
Vo
NS
hysical Quan
elocity
scosity Dyna
scosity Kine
olume solid
olume fluid
olume Rate o
DEPARTM
tity
amic
matic
f Flow
STAMENT of TR
INTRODUC
C
metre
kilome
pascal
millipa
square
square
cubic m
cubic d
cubic m
millilitr
litre
kilolitre
cubic m
cubic m
litre pe
ANDARD SRANSPORT
CTION
Common SI u
per second
etre per hour
l second
ascal second
e millimetre p
e metre per se
millimetre
decimetre
metre
re
e
metre
metre per sec
er minute
SPECIFICATATION an
units
er second
econd
cond
ATIONS nd INFRAS
SI Sym
m/s
km/
Pa
mPa
mm2
m2/
mm
dm
m3
mL
L
kL
m3
m3/
L/m
TRUCTUR
ITEM: 00
January, 20
mbol
s
/h
s
as
2/s
/s
m3
m3 3
L
L 3
/s
in
RE
02
15
DEPA DEFIN
Janua
003.1
003.2
ARTMENT
NITIONS
ary, 2015
DESCRIPT
.1 The folmeanin
.2 Where
meaninof a cap
.3 Where
standarhaving
DEFINITIO
Actual Basimark-uemploy
Addendum Aggregate
Paveme Aggregate
and the Backslope - Bidder - a
represe Borrow - an
of-Way Bridge - any Bridge Leng
backs o Bridge Wid
betweerailing.
Change Or
Contracbasis of
Completion
comple
STANof TRANS
TION
llowing wordsng ascribed to
it is intendengs ascribed inpital letter for t
words and prd dictionary dregard to the
NS
ic Rate - rateps for the C
yee and not di
- see Tender
Base - the ent.
Subbase - the Subgrade.
- Slope betwe
a person, paentative, subm
n excavated m.
y Structure in
gth - the greaof abutment w
th - the cleaen the bottom
rder - a writtect Documentsf payment and
Date - the eted.
NDARD SPPORTATIO
s and phrasethem set out
ed that wordsn this definitiothe first letter
phrases are definition, Comcontext in wh
e per hour paContractors orectly accrued
Addendum
layer of crus
e layer of agg
een the back-o
artnership ormitting a tende
material used
excess of 3 m
ater dimensionwalls or betwee
r width of a m of curbs or,
en order issues or Quantitiesd time adjustm
date specifie
ECIFICATION and INF
INTRODUCTIO
es, wherever below in orde
s and phraseons item such of each word
not defined impilation of Ahich such word
id to the Conoverhead, prod to that empl
shed aggrega
gregate place
of-ditch and o
r corporationer for the Work
in constructio
m in span leng
n of a Structuen ends of Br
Structure me if curbs are
ed by the Ens or both, witments for the W
d in the Con
IONS FRASTRUC
ON
used in the er to provide c
es used in th words and p or each word
n this item tASTM Standards or phrases
ntractors empofit or other oyee.
ate placed as
ed as a distin
riginal ground
, acting direk.
on; the source
gth carrying ve
re measured ridge deck.
easured at rignot used, be
ngineer to thethin the scopeWork affected
ntract Docum
CTURE
Contract Docconsistency a
he Contract Dhrases shall bd of a phrase.
then reliance rd Definitions s are used.
ployee exclusadministrativ
s a distinct
ct layer betw
d.
ectly or thro
e of which is lo
ehicular and/o
along the cen
ght angles toetween the in
e Contractor, e of the Contd by the chan
ents on whic
cuments, shand clarity of in
Documents abe designated
should be pand/or ASTM
ive of any allve costs rela
layer directly
een the Aggr
ough a duly
ocated outsid
or pedestrian
ntre of the de
o the centre onner faces of
covering charact and estage.
ch the Contra
ITEM: 003
Page 003-1
all have the ntent.
are to have d by the use
placed on a M D653, and
owances or ated to the
y below the
regate Base
authorized
e the Right-
traffic.
eck between
of the deck f parapet or
anges in the ablishing the
act is to be
DE
Pag
FINITIONS
ge 003-2
Conformwhemea
Contract Contract
emppaym
Contract
GenAddsuchame
Culvert -
for t Day - a c Daylight
on a Dust - th
testethe w
Enginee
of Nsect
Thisundethroexplwill b
Equipme
maincom
Finished Foreslop
grou Highway
bounextra
Initial Wo
D
m - compliancere working toans complianc
t - as per the A
tor - the partyployees, who ment of all leg
t Documents neral Conditioenda incorpoh other docuendments to t
- any Structurhe passage o
calendar day
t shall refer a daily basis fr
he fine particed by standarwhole sample
er - the Chief New Brunswiction 1(1) of the
s shall includeer the Contraugh authorizlanations and be given.
ent - all macntenance, and
mpletion of the
d Grade - the g
pe - the Slopeund in case of
y - the whole nded by the a land which t
ork Schedule
DEPARTME
ce with reasoolerances arece with such to
Articles of Ag
y of the first is primarily lia
gal debts perta
- the execuons "B, Staorated into theuments as mhe Contract m
re, not classifiof water under
and shall incl
to the hours rom the Enviro
cles of a masrd sieve analy
e passing the
Engineer of thck otherwise e Contract.
e any personct and shall i
zed assistantdirections ne
chinery, and d also tools aWork.
grade to indic
e between thef a fill.
strip of land Right of Waythe Owner ma
- the Work sc
STAENT of TRA
INTRODUC
onable and ce not specifiedolerances.
reement of th
part to the Cable for the acaining to the W
ted Articles andard Specie Contract bemay be listemade pursuan
ed as a Bridgr any Roadwa
ude all days w
between sunonment Cana
s defined by ysis methods 100 mm sieve
he Departmenamed as th
n authorized binclude withouts, such as ecessary for th
vehicles, tognd apparatus
cate the finishe
e Shoulder an
reserved for ay lines, as at ay from time t
chedule subm
ANDARD SANSPORTA
CTION
ustomary mad. Where wo
e Standard C
Contract actingcceptable perfWork.
of Agreemenifications, Paefore the exeed in the Ant to the prov
ge, and/or draay or driveway
without excep
rise to sunsetada Weather w
the percentaon a sample
e size.
nt of Transpohe Engineer-A
by him/her tout being limiteEngineers,
he satisfactory
gether with th necessary fo
ed Pavement
nd the ditch, o
and secured present, or ao time acquire
mitted per Item
SPECIFICAATION and
anufacturing aorking toleran
Construction C
g directly or formance of t
nt, the Tendearticular Speccution of the
Articles of Agisions of the A
ainage systemy.
tion.
t. Sunrise andwebsite.
age passing ted prepared a
ortation and InArchitect as p
o perform on ed to any persTechnicians, y prosecution
he necessaryor the proper c
elevation of t
or between th
for the use oas said lines e during the p
m 906.
ATIONS d INFRAST
and constructnces are spec
Contract.
indirectly throthe Contract a
er, Terms of cifications, PArticles of A
greement anArticles of Ag
m which provid
d sunset time
he 75 micronand tested on
nfrastructure oper General
her/his behasons acting e
Inspectors, and completi
y supplies foconstruction a
the centre line
he Shoulder a
of the travellinmay be chan
progress of the
TRUCTURE
ITEM: 00
January, 20
tion tolerancecified, Confor
ough agents oand also for th
Payment "APlans and angreement, an
nd subsequegreement.
des an openin
es are availab
n size sieve a the fraction o
of the ProvincConditions B
alf any functioither directly oby whom a
ion of the Wo
or upkeep anand acceptab
e.
and the origin
g public, beinnged to include Contract.
E
03
15
es m
or he
A", ny nd nt
ng
le
as of
ce B
on or all rk
nd le
al
ng de
DEPA DEFIN
Janua
ARTMENT
NITIONS
ary, 2015
Laboratory by the O
Lane - the p Lump Sum
inclusivalthoug
Overbreak
the estaany roc
Overburden
exclusiv Overexcava
Enginee Owner - sha Pavement - Pavement
Subbasload to
Plans - sha
and otdimens
Professiona
practiceand Co
Profile - a c
excavadistinct
Progress E
the Ter Public Holid
New Br Quantity - th
to be uactual Docum
Right-of-Wa Roadbed -
(referen
STANof TRANS
- any official tOwner.
portion of a tra
Price - a Cove for the comgh a Quantity m
- the portion ablished paymck formation e
n - any materive of the grub
ation - all excer.
all be as state
- surface and/
Structure - ase, Aggregatethe Subgrade
all include all ther drawingssions and deta
al Engineer e in the Provinode of Ethics.
charted line intion and gradfrom a plan o
stimate - shams of Payme
day - shall incrunswick Day,
he amount prsed as an estaggregate ofents as determ
ay - the land s
that portion nced from cen
NDARD SPPORTATIO
testing facility
avelled way fo
ontract item fmpletion of themay be given
of any rock wment lines regncountered, o
al that must bbbed material.
cavation beyo
ed in the Gene
/or base mixes
all material pe Base and Pe.
graphical reps, or exact ails of the Wor
shall meannce of New B
ndicating gradding Work; takor overhead vi
ll have the sant "A" and the
clude the follo, Labour Day,
resented on thtimate of the f Work perfomined by mea
secured and re
of the Roadntreline).
ECIFICATION and INF
INTRODUCTIO
maintained b
or the moveme
for which paye Work define
in the Contra
which is excaardless of wh
or to any othe
be removed to
ond that spe
eral Condition
s whether Por
placed abovePavement prov
presentations reproductions
rk.
n a qualifiedBrunswick, an
des and distaken along a ciew.
ame meaninge General Con
owing Days o Remembran
he Tender FoWork. Final p
ormed or maasurements m
eserved to the
dway between
IONS FRASTRUC
ON
by the Owner
ent of a single
yment will be ed. Payment act Documents
avated, displachether the excr cause.
o access unde
ecified, perform
ns B section
rtland cement
e the Subgraviding suppor
including but s thereof, w
Professionalnd as defined
ances and usucentreline or o
g as progressnditions B.
only: New Yece Day, and C
orm is to be copayment to theterial furnishe
made by the E
e public for Hi
n the inside
CTURE
or any other t
e line of vehic
made at a sis not based os.
ced, or loosecess is due to
erlying suitab
med without
1(1).
t, asphalt con
ade which wrt for, and the
not limited towhich show
l Engineer reand bound b
ually depth ofother designa
s claim as at
ears Day, GoChristmas Da
onsidered as e Contractor ed in accord
Engineer.
ighway purpo
edges of Slo
testing facility
cles.
single tendereon a measure
ened outside athe inherent c
le constructio
the written o
crete and/or c
would include e distribution o
o Profiles, crothe location,
egistered or by the APEGN
f cut and heigated line. A si
ttributed to it b
ood Friday, Caay.
approximate will be made
dance with th
oses.
opes of ditch
ITEM: 003
Page 003-3
y designated
ed price, all ed Quantity,
and beyond character of
on materials,
order of the
chip seal.
Aggregate of the traffic
oss-sections character,
licensed to NB By-Laws
ght of fill for de view, as
by usage in
anada Day,
only, and is only for the
he Contract
es and fills
DE
Pag
FINITIONS
ge 003-4
Roadwathe appe
Shoulde
(refe Sidewalk Skew or
the case
Slope - r Soil Par
mate
Specifica
that base
Statutory
MonbirthprocChri
Stripping
rem Structure
strucfounclas
Subgrad
surfa Substan
accerem
D
ay - that portioSlopes (refe
ertaining to th
er - that portionerenced from
k - that portion
r Skew Angle Roadway withe of Culverts w
run to rise exp
rticle Sizes - erial;
bocogrsasil
cla
ations - the sdefine the p
ed.
y Holiday nday, the dayhday of the Sclamation of tistmas Day, a
g - either theoval of the as
e(s) - Bridgesctures, concrndation drainssed herein.
de - the layerace which for
ntial Completioeptance and oediation of oth
DEPARTME
on of the Righerenced from he Work.
n of the Roadcentreline) of
n of the Road
- the acute ah a line parallewith the centre
pressed as a r
the following
oulder averobble averravel partand partt part
exhay fine
to excons2 m
statements, pproducts, mate
shall include y fixed by proSovereign, Cathe Governor and Boxing Da
e removal of sphalt cement
s, Culverts, crete barriers,s and other fe
r, whether in ms the finishe
on - The conoccupancy, eher deficiencie
STAENT of TRA
INTRODUC
ht-of-Way reqcentreline),
way from the f the Slopes of
way construc
ngle formed bel to the face e line of the b
ratio.
soil particles
rage dimensiorage dimensioticle passing aticle passing aticle passing aibits no strenggrained soil oxhibit plasticitsiderable strem.
rovisions anderials and wo
the followingoclamation oanada Day, in Council as
ay.
topsoil and/ofrom the agg
catch basins, , cribbing, weatures which
cut or fill, ased elevation o
ndition of the xcept for the es as defined
ANDARD SANSPORTA
CTION
quired for consand includin
outside edgef ditches and
cted for the us
by the interseof the abutme
barrel.
sizes shall a
on greater thaon between 7a 75 mm sievea 4.75 mm siea 75 m sievegth when air dor the fine graty within a ranength when air
d requirementorkmanship u
g Days only: f the GovernNew Brunsws a general d
or Overburdenregate.
drop inlets, mwalls, buildingh may be enc
prepared to of this layer, de
Work when performance by the Engine
SPECIFICAATION and
struction, limig ditches, ch
es of the Lanefills.
e of pedestria
ction of a lineents, the cent
apply for the
an 300 mm. 5 and 300 mme and retainedeve and retaine and is non-pdried. ained portion onge of water cr dry. Also de
ts contained iupon which th
New Years nor in Counciwick Day, Labday of thanks
n or the actio
manholes, retgs, sewers, countered in t
support the efined at the c
the Work Sit of any cleaneer.
ATIONS d INFRAST
ited by the ouhannels and
e or Lanes to t
ans.
e normal to thtre line of the
terms used t
m. d on a 4.75 m
ned on a 75 mplastic to slight
of a soil that ccontents and eefined as parti
in the Contrahe Contract fo
Day, Good il for the celebour Day, thesgiving, Reme
on of water r
taining walls, service pipe
the Work and
Pavement Stcentreline.
te is ready fonup and/or fin
TRUCTURE
ITEM: 00
January, 20
utside edges oall Structure
the inside edg
e centre line opiers, or in th
to describe th
mm sieve. m sieve. tly plastic and
can be made exhibits icle finer than
act Documentfor the Work
Friday, Easteebration of the day fixed bembrance Da
resulting in th
overhead siges, sub-draind not otherwis
tructure; or th
or the Ownerishing, and th
E
03
15
of es
ge
of he
he
d
ts, is
er he by y,
he
gn s,
se
he
rs he
DEPA DEFIN
Janua
ARTMENT
NITIONS
ary, 2015
Substructurskewbawingwacast in
Superintend
Work. Superstruct
bearing Tender Add
has thecompondocume
Ticket - see Unit Price -
Equipmnecess
Utility - a fa
is not ltelevisio
Weight Cer
deliveredescribinforma
Work - incl
supplie Work Area Work Site
interest
STANof TRANS
re - all that pack of arches alls and wing place box culv
dent - the Co
ture - all thatgs of simple an
dendum - a ce effect of monent of the teents to which
e Weight Certi
- the amountment, materia
ary to comple
acility maintainimited to sanon services.
rtificate - a voued to and vee the Quantit
ation pertinent
udes all labod and installe
- the location
- the lands at, upon which
NDARD SPPORTATIO
part of the Sand tops of fprotection ra
verts and cas
ontractors au
t part of the nd continuous
change in a teodifying the tender and shathe Addendum
ficate.
t stated in thels, transporta
ete the Work a
ned by a munnitary sewer,
ucher, issued erified by the ty of material t and necessa
our, material ad or erected c
in the Work S
and premisesthe Work is to
ECIFICATION and INF
INTRODUCTIO
Structure belowfootings of rig
ailings, and fost in place con
uthorized repr
Structure sups spans, and t
ender issued ender. A Tenall be deemedm refers.
e Contract reation costs aand does not i
nicipality, publstorm sewer,
by the OwneOwners repupon which p
ary for the eva
and services complete at th
Site on which W
owned by tho be performe
IONS FRASTRUC
ON
ow the bearingid frames; inor the expresncrete arches.
resentative of
pported on pthe deck slab
prior to the tinder Addendud to take prece
epresenting thnd expensesinclude the HS
ic authority or, water, elect
r at the point presentative apayment of thaluation of the
required, as he place of bu
Work is being
he Owner or ed and as defi
CTURE
ngs of simplencluding but nsed purposes
f record in re
iers or abutmof rigid frame
me and date um shall be cedence over
he price per s, and any aST.
r regulated autric, gas, stea
of origin of a at the Work he load is to be load by the E
shown or deuilding.
g carried out.
r in which theined in the Co
e and continunot limited to s of winter co
esponsible ch
ments locatedes.
of tender cloconsidered asthose parts o
unit for all laand all other
uthority and inam, telephone
load to a trucSite. This vo
be based andEngineer and
escribed in th
e Owner has ontract Docum
ITEM: 003
Page 003-5
uous spans, ; backwalls, oncreteing -
harge of the
d above the
osing, which s an integral of the tender
abour, tools, incidentals
ncludes, but e and cable
k driver and oucher shall d shall show others.
he Contract,
proprietary ments.
DEPA AUTH
Janua
005.1
005.2
005.3
ARTMENT
ORITY OF TH
ary, 2015
ORDERS O
.1 The Cogiven a
.2 If the C
Engineaccorda
CONSTRU
.1 EquipmDocum
.2 The En
which f
UNAUTHO
.1 Any Wdescripnotifica
.2 Upon o
replace
.1 If tEngacc
STANof TRANS
HE ENGINEE
OF THE ENG
ontractor shalat any time by
Contractor dier, the Contance with term
CTION METH
ment and methents.
ngineer reservfails to consis
RIZED WOR
ork done or ptions detaileation, shall be
order of the ed by the Con
the Contractogineer may cacordance with
NDARD SPPORTATIO
ER
INEER
ll promptly any the Enginee
sagrees withtractor shall ms set out in
HODS AND E
hods used sh
ves the right ttently produc
RK
material suppd in the Coconsidered a
Engineer, unntractor, at his
or fails to coause unautho
h the terms of
PECIFICATON and INF
INTRODUCTIO
nd efficiently r with respect
any order, perform the the General C
EQUIPMENT
hall be approp
to order the de satisfactory
plied by the ontract Documas unauthorize
nauthorized Ws/her own exp
omply promptorized Work of the General
TIONS FRASTRUC
ON
comply with at to the Work
direction or i Work as inConditions.
priate to perfo
discontinuancey results.
Contractor wments, or esed and may n
Work or matepense.
tly with any or material to Conditions.
CTURE
all orders, diror the condu
instruction ginstructed and
orm the Work
e or use of an
which is beyostablished bynot be measu
erial shall be
order made be remedied
rections and ct thereof.
ven at any td shall serve
k outlined in th
ny Equipmen
ond the lines,y the Owner ured for paym
e remedied, r
under this S, removed or
ITEM: 005
Page 005-1
instructions
time by the e notice in
he Contract
t or method
grades, or by written
ent.
removed or
Section, the replaced in
DEPA PERM
Janua
006.1
ARTMENT
MITS
ary, 2015
DESCRIPT
.1 The Co
Item 94
.2 All otherequisitexpens
STANof TRANS
TION
ontractor sha48 and the Co
er permits reqte for the carse, unless oth
NDARD SPPORTATIO
ll review all pontract Docum
quired, but norrying out of erwise specif
ECIFICATION and INF
INTRODUCTIO
permits in forments.
ot forming pathe Work shafied.
IONS FRASTRUC
ON
rce for the W
art of the Conall be obtaine
CTURE
Work and the
ntract Documed by the Co
conditions as
ments but necontractor, at h
ITEM: 006
Page 006-1
s set out in
cessary and his/her own
DEPA TABLE
Janua
IT
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
ARTMENT
E OF CONTE
ary, 2015
TEM
01 C
02 G
03 R
06 C
07 U
08 S
16 D
21 B
30 M
31 M
36 S
37 S
40 C
41 C
42 P
61 F
66 B
67 B
69 In
82 C
86 R
91 A
99 S
106 - 1 108 - 1 136 - 1 137 - 1 140 - 1 161 - 1 161 - 2 161 - 3 161 - 4 161 - 5 161 - 6 161 - 7 182 - 1 182 - 2
STANof TRANS
ENTS
Clearing ........
Grubbing.......
Removal of Is
Common Exca
Unclassified E
Solid Rock Ex
Ditching ........
Borrow ..........
Metal Pipe ....
Metal Pipe L
Subdrain........
Subdrain Outl
Concrete Pipe
Concrete Pipe
Precast Concr
Foundation Ex
Backfilling Aro
Backfill For St
nduced Trenc
Chain Link Fe
Removal of Fe
Application of
Standard Draw
Shaping Solid RoSubdrainSubdrainTension Case 1.1Case 1.2Case 2.1Case 2.2Case 3.1FoundatiFoundatiChain LinChain Lin
NDARD SPPORTATIO
DESCR
.....................
.....................
olated Trees.
avation .........
Excavation ....
xcavation ......
.....................
.....................
.....................
Large.............
.....................
et .................
e....................
e - Large .......
rete Box Culv
xcavation .....
ound Structure
tructures .......
ch .................
ence ..............
ence .............
Water ..........
wings
of Overburdeck Transitions
n n Outlet Rod/Bar Asse
1 - Cross Culv2 - Cross Culv1 - Cross Culv2 - Cross Culv1 - Storm Draiion Excavatioion Excavationk Fence nk Gate
ECIFICATION and INF
GRADING
RIPTION
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
vert ...............
.....................
es ................
.....................
.....................
.....................
.....................
.....................
en at Top of Ss (longitudina
embly vert : Subgradvert : Subgradvert : Original vert : Original inage Culvert
on for Footingon for Footing
IONS FRASTRUC
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
Solid Rock Baal)
de Above Origde Above Orig Ground Abov Ground Abovt Longitudinals - Solid Rocs - Common
CTURE
NUMBEPAGE
.. 2
... 2
.... 1
.... 5
.... 2
... 5
.... 2
... 4
.... 4
.... 2
... 2
.... 2
... 4
.... 9
... 8
... 3
.... 2
.... 2
.... 2
.... 3
.... 1
.... 1
ackslope
ginal Ground ginal Ground ve Subgrade ve Subgrade l to the Centrek and Commoover Solid Ro
DI
R OF ES
- Trench 1- Trench > 1- Trench 2- Trench > 2
eline of Roadon Cases ock Case
VISION 100
Page 100-1
.2 m .2 m
2.2 m .2 m
dway
DEPA CLEA
Janua
101.1
101.2
101.3
101.4
ARTMENT
RING
ary, 2015
DESCRIPT
.1 This Itebrush, a
.2 Mercha
market
MATERIAL
.1 None id
SUBMITTA
.1 The Co
CONSTRU
.1 The Cospecific
.2 The En .3 Mercha
materiathe Com
.4 Before
licence
.1 ThePro
.2 If th
Wo
.5 The driTranspo .1 In f
Nosha
.6 Trees s
the eve
.7 Non-me101.4.6
.1 No of a
.2 All
eve
STANof TRANS
TION
em consists ofand slash.
antable Timbein the genera
S
dentified.
ALS
ontractor shall
CTION
ontractor shacally directed b
gineer shall id
antable timberal shall becommpletion Date
commencing, the Contract
e price shall boducts Market
he former liceork to the form
iver of any veortation Certif
filling out the ." shall be "xxall be identified
shall be cut soent of significa
erchantable tr6) using Equip
shredding, cha watercourse
other non-meenly distribute
NDARD SPPORTATIO
f cutting and s
er is defined aal vicinity of the
submit, upon
all carry out tby the Engine
dentify clearin
r shall be same the properte.
g clearing on tor shall offer t
be the currenting Board res
ensee decidemer licensees
ehicle transpoficate (TC) for
TC, "Other" x-xxxx" (the Cd.
o that stump hant snow cove
rees not fellepment designe
hipping, or plae or wetland.
erchantable trd over the gro
ECIFICATION and INF
GRADING
salvaging Me
as any timbee Contract.
n request, a co
the Work as er.
ng limits and b
lvaged, unlesty of the Cont
any part of to sell to the f
nt price negotsponsible for t
es to purchasspecifications
orting wood fr "Crown Land
(in the top rigContract num
height is not grer, to a height
d by cutting ed for that pur
acement of sh
rees, and all bound within th
IONS FRASTRUC
rchantable Ti
r for which th
opy of any pe
indicated in
buffer zone lim
ss otherwise tractor and sh
the Work Sitformer license
tiated betweethe area in wh
e the cut tims.
from the Word Permit Harve
ght corner) usmber); and the
reater than 0.as agreed wit
may be shredrpose, but sha
hredded or ch
brush and slahe clearing lim
CTURE
mber, and dis
he Contractor
rmit(s) require
the Contrac
mits with ribbo
approved by hall be remove
te that had bee all merchan
en the former hich the timbe
mber, the Con
rk Area(s) shaest" for each
se "DTI ROWe place name
.3 m above avth the Enginee
dded in placeall not be bulld
hipped materia
ash shall be smits.
sposing of all
r can find an
ed to carry ou
ct Documents
ns or similar m
the Engineeed from the W
been Crown ntable timber
licensee ander is harvested
ntractor shall
all have in thload.
W"; under "Hae of the clear
verage grounder.
e (to a stumpdozed down.
al shall occur
shredded or c
ITEM: 101
Page 101-1
other trees,
established
t the Work.
s and/or as
means.
r. Salvaged Work Site by
Land under involved.
d the Forest d.
perform the
he vehicle a
arvest Block ring location
d level, or in
p height per
within 30 m
chipped and
CL
Pag
101
101
101
EARING
ge 101-2
1.4.7 .3
.4
.8 Orna .9 The
sedi
.1
.10 Clea
exce
.11 The do c
.12 Initia
Planrem
.1
.13 Theskid
.1
.2
.14 Stocas a
1.5 MEASU .1 The
acco .1
.2 The
mea
1.6 BASIS O .1 Pay
Disposal by b
Notwithstanddisposed of stop of slope a
amental trees
Contractor imentation of
Directional hafor access bybe made to a
aring shall noept to provide
Contractor shcutting therein
al clearing of ns, and any ooval of merch
Non merchan
re shall be noding trees acr
Where clearinby the Enginecease Work i
In the case ofcomplete clea
ckpiling or loadapproved by th
REMENT FO
Quantity to ordance with t
All measurem
areas of remoasured for pay
OF PAYMENT
ment for Work
DEPARTM
burning is proh
ing 101.4.7.1such that the and toe of slop
s and shrubs s
shall limit gwatercourses
and felling andy heavy Equipavoid rutting so
ot be performeaccess throu
hall not use h by hand or b
merchantableother watercohantable timbe
ntable timber s
o long skids oross a waterc
ng of a steep eer or a repremmediately.
f Work suspenaring on the af
ding of merchhe Engineer.
OR PAYMENT
be measuredthis Item.
ments shall be
oval of merchyment as clear
T
k under this Ite
STAMENT of TR
GRADIN
hibited.
to 101.4.7.3,Engineer can
pe; and surve
shall not be di
ground disturs and wetlands
d harvesting spment. When oft ground are
ed within wetlugh the buffers
eavy Equipmy Equipment
e timber withiourses identifieer.
shall be remo
f timber on stourse.
slope in snowesentative of W
nsion per 101ffected area.
antable timbe
T
d for payment
e made in a ho
antable trees ring.
em shall be at
ANDARD SRANSPORT
NG
, all non-mercn set and gray cross-sectio
isturbed witho
rbance to ms.
shall be used cable skidde
eas.
land buffer zos, as approve
ent for clearinable to "reach
n 5 m of eithed during the
oved at the tim
eep slopes ad
w or ice conditWork Safe NB
.4.13.1, the C
er or waste ma
t shall be the
orizontal plane
within 5 m of
t the Unit Pric
SPECIFICATATION an
chantable treeade stakes forons.
out written per
minimize the
where groundrs are used, t
ones unless sed by the Engi
ng within 30 mh in" to cut an
her side of wae course of th
me of the Struc
djacent to wa
tions is suspeB for safety re
Contractor sha
aterials, adjac
e number of
e.
watercourses
ce.
ATIONS nd INFRAS
es, brush andr cut and fills,
rmission from
potential for
d conditions athe full range
such areas arneer.
m of stream bad yard out the
atercourses idhe Work, sha
cture installati
atercourses, a
nded through easons, the C
ll not be respo
cent to the high
hectares of l
s per 101.4.12
TRUCTUR
ITEM: 10
January, 20
d slash shall b, set stakes fo
the Engineer
r erosion an
are not suitabof cables sha
re frozen har
anks and shae timber.
dentified on thall be limited t
ion.
nd no felling o
a written ordeContractor sha
onsible to
hway, shall be
and cleared
2 shall be
RE
01
15
be or
r.
nd
le all
d,
all
he to
or
er all
e
in
DEPA GRUB
Janua
102.1
102.2
102.3
102.4
ARTMENT
BBING
ary, 2015
DESCRIPT
.1 This Ite .2 This Ite
operatio
MATERIAL
.1 None id
SUBMITTA
.1 The Co
CONSTRU
.1 The Cospecific
.1 The
of t .2 The Co .3 Grubbin
stumps
.1 In cgruthe
.4 Grubbin
original diversio
.1 Gru
to b
.5 The Conecessextra shhave fa
STANDAof TRANS
TION
m consists of
em also consison done by ot
S
dentified.
ALS
ontractor shall
CTION
ontractor shacally directed b
e Work shall itimber lying on
ontractor shall
ng shall be ca are removed
cut sections, aubbing shall be Engineer.
ng shall not beground, exc
ons for Structu
ubbing shall nbe wasted, as
ontractor shallary to redresshaping, hydro
allen as a resu
ARD SPECIPORTATIO
f the removal a
sts of removal hers.
submit, upon
all carry out tby the Engine
nclude dealingn the ground,
carry out the
arried out withand topsoil is
and in fill secte carried out
e carried out cept as approures are to be
not be carried indicated in t
be responsibs any areas g
oseeding and/lt of root seve
FICATIONON and INF
GRADING
and disposal o
of shredded a
request, a co
the Work as er.
g with stump due to clearin
Work in accor
h root rakes os left for salvag
tions where thto a width 2 m
in fill sectionsoved by the carried out.
out in swamphe Contract D
ble, at his/hergrubbed beyo/or mulching oerance due to
S FRASTRUC
of roots and st
and/or chippe
opy of any per
indicated in
height over 0ng by others.
rdance with Ite
or similar Equge under the e
he Subgrade m from the cle
s where the SuEngineer wh
ps and other aDocuments or
own expenseond the speciof the exposethe over-width
CTURE
tumps.
ed material left
rmit(s) required
the Contrac
.3 m, and with
em 946 and It
uipment, suchexcavation ite
is within 2.5 earing line or
ubgrade is mohere foundatio
areas where tby the Engine
e, to carry outfied limits, inc
ed ground, andh grubbing.
t behind from
d to carry out
ct Documents
h brush, slash
tem 948.
h that only them.
m of the origas otherwise
ore than 2.5 mon excavation
the underlyingeer.
t any remediacluding but nod removal of
ITEM: 102
Page 102-1
the clearing
the Work.
s and/or as
h and pieces
e roots and
inal ground, directed by
m above the n or stream
g material is
al measures ot limited to trees which
GR
Pag
102
102
102
RUBBING
ge 102-2
2.4 .6 Roodisp
.1
.2
.3
.7 Wherootdisp
.1
.8 No mBrid
2.5 MEASU
.1 The in ac
.1
2.6 BASIS O
.1 Pay
ots and stumpposed of within
The materialsspread out anoriginal groun
Where Roadbgrubbed matmaterial or B102.4.6.1.
Burying may Documents acovered with accordance w
ere the disposs and stumps
posed of outsid
Burning of gr
materials remge or any oth
REMENT FO
Quantity to bccordance wit
All measurem
OF PAYMENT
ment for Work
DEPARTM
s, with or withn the Work Sit
s may be placnd tramped fland, using a cra
bed fills exceeerials either oBorrow, and
be permitted and/or as appr
excavated mwith 614.4.
sal measuress, with or withode the Work S
ubbed materia
moved during er Structure.
OR PAYMENT
be measured fth this Item.
ments shall be
T
k under this Ite
STAMENT of TR
GRADIN
hout non-mercte by tub-grind
ced under fillsat in a uniformawler tractor o
ed 6 m in heigon the existinshall tramp t
at other locaroved by the Eaterial as dire
s of 102.4.6 aout non-mercSite in accorda
als shall not b
grubbing sha
T
for payment s
made in a ho
em shall be at
ANDARD SRANSPORT
NG
chantable treeding, or by bu
s over 5 m inm layer to a cof 20 t or heav
ght to Subgradng ground, or the materials
tions within thEngineer, if thected by the E
are determinehantable timbance with Item
be permitted.
all be permitte
shall be the nu
orizontal plane
t the Unit Pric
SPECIFICATATION an
es, brush andurial as follows
n height to Sucompact massvier.
de, the Contrar on the first ls to a 0.6 m
he Work Site he materials aEngineer, and
ed by the Engber, brush andm 947.
ed to be place
umber of hect
e.
ce.
ATIONS nd INFRAS
d slash as pers:
ubgrade, if thes no more tha
actor may plalift of compac thickness as
as indicated are spread out the surface h
gineer to be d slash as per
ed within 30 m
tares of grubb
TRUCTUR
ITEM: 10
January, 20
r 101.4 shall b
e materials aran 0.6 m abov
ace one layer octed excavates described
in the Contrat, tramped, anhydroseeded
unfeasible, thr 101.4 may b
m of a Culver
bing carried o
RE
02
15
be
re ve
of ed in
ct nd in
he be
rt,
ut
DEPA REMO
Janua
103.1
103.2
103.3
103.4
103.5
103.6
ARTMENT
OVAL OF ISO
ary, 2015
DESCRIPT
.1 This Iteisolated
.1 An
mm .2 An
MATERIAL
.1 None id SUBMITTA
.1 None id CONSTRU
.1 The Cospecific
.2 Isolated .3 Orname .4 The Co
property .5 The Co
MEASURE
.1 The Qustumps
BASIS OF P
.1 Payme
STof TRANS
OLATED TRE
TION
em consists od stumps.
isolated tree m above the ex
isolated stum
S
dentified.
ALS
dentified.
CTION
ontractor shacally directed b
d trees and st
ental trees an
ontractor shaly resulting fro
ontractor shall
MENT FOR P
uantity to be ms removed and
PAYMENT
nt for Work un
TANDARDPORTATIO
ES
of the remova
is defined as xisting ground
mp is defined a
all carry out tby the Engine
umps shall be
nd shrubs sha
l be responsom the Work.
carry out the
PAYMENT
measured ford disposed of
nder this Item
SPECIFICON and INF
GRADING
al and dispos
a tree havingd surface.
as a stump ha
the Work as er.
e clearly ident
ll not be distu
ible to repair,
removal in ac
r payment shain accordance
shall be at th
CATIONS FRASTRUC
sal of isolated
g a minimum
aving a minim
indicated in
tified as such
rbed without w
, at her/his o
ccordance wit
all be the nume with this Ite
he Unit Price.
CTURE
d trees comp
diameter of 1
um top diame
the Contrac
in the field, by
written permis
own expense
th 101.4 and 1
mber of isolam.
lete with stum
00 mm meas
eter of 300 mm
ct Documents
y the Enginee
ssion from the
, any damag
102.4.
ted trees and
ITEM: 103
Page 103-1
mps, and/or
sured at 300
m.
s and/or as
er.
e Engineer.
e to private
d/or isolated
DEPA COMM
Janua
106.1
106.2
106.3
106.4 106.4
ARTMENT
MON EXCAVA
ary, 2015
DESCRIPT
.1 This IteWork S
MATERIAL
.1 For temmeeting
SUBMITTA
.1 Submitt
CONSTRU
.1 Genera
.1 Thespe
.2 The .3 The
det
.4 Poldire
.1
.5 The
em
.1
.6 If a
ma
.1
.7 Wh
conSub
.1
.8 Tra
ind
STANDAof TRANS
ATION
TION
em consists oSite, of soil and
S
mporary streamg the requirem
ALS
tals are requir
CTION
al
e Contractor ecifically direct
e Contractor s
e Contractor tailed in the Co
lyethylene linection of flow a
The Contrac
e Contractor sbankments.
Low spots aDays Work
at any time duake all necess
The depth rcompacted t
here the Roanduct operatiobgrade, unles
Any surfaceshall be mailimit posted f
ansitions in cuicated on Stan
ARD SPECIPORTATIO
of the excavatd all other mat
m diversion chments of CGSB
red in accorda
shall carry outed by the Eng
shall carry out
shall construontract Docum
ners for tempand overlaps
ctor shall be re
shall maintain
and ruts that cor, if rain is im
uring the Worksary repairs to
utted and/or to meet the re
adbed being ons so that ths approved by
e constructed intained in a cfor the Work A
ut and fill condard Drawing
FICATIONON and INF
GRADING
tion and placeterials not clas
hannels, cleaB 51.34 shall
ance with any
ut the Work agineer.
the Work in a
ct offtakes anments.
porary streamshall be a min
esponsible for
n surface drai
could pond wamminent, as W
k the surface o reinstate the
displaced shaequirements o
constructed hrough-traffic y the Enginee
or exposed condition sucArea.
nditions, at thg 108-1.
S FRASTRUC
ement within ssified as solid
r polyethylenebe supplied b
cross-referen
as indicated i
accordance w
nd stream div
m diversions nimum of 300
r maintenance
nage during e
ater shall be rWork progresse
becomes rute surface grad
all be scarifieof this Item.
is subject todoes not trav
er.
by the Contrch that traffic c
he ends of b
CTURE
the Work Sited rock.
e liners a minby the Contrac
nced Item form
in the Contra
ith Item 946 a
version chan
shall be insmm in the dir
e and removal
excavation of
removed no laes during the
tted or displacde.
ed, moisture c
o through-traffvel directly on
ractor and sucan safely tra
bedrock cuts,
e or disposal
nimum of 6 mictor.
ming part of th
act Documents
and Item 948.
nels as ident
talled transverection of flow
of the liners.
f cuts and con
ater than the eDay.
ced, the Cont
conditioned, s
ffic, the Contn an undercut
bjected to thavel along it a
shall be car
ITEM: 106
Page 106-1
outside the
ils thick and
is Item.
s and/or as
tified and/or
erse to the .
nstruction of
end of each
tractor shall
shaped and
tractor shall t surface or
rough-traffic at the speed
rried out as
CO
Pag
106
OMMON EXCA
ge 106-2
6.4 .2 Exca
.1
.2
.3
AVATION
avation
The Contractbeen complet
The Contractoptimum usag
.1 Any matshall be s .1 The
time .2 Stoc
compor be
.3 Stock
assu
.4 Tops
.2 The Conrequiremthe top 60
.3 The Concommon placemen .1 Borro
place
.4 CommonstockpiledEngineer
.1 Stock
suppto en
.2 Stock
mateall comain
.3 Stock
shall over
.4 Work
Where the Sudepth below S
DEPARTM
tor shall not coted for the Wo
tor shall contrge of the exca
erial suitablesalvaged and
depth of excaof excavation
kpile(s) shall pletion of ditce a potential s
kpiling shall bred.
soil stockpiles
ntractor shall ents of 121.200 mm of the
ntractor shall excavation e
nt of any mate
ow shall not bed at a lesser
n material salvd such that thr.
kpiling of comporting the entnsure maximu
kpiles shall noerials, nor neaommon materntained at all ti
kpiles shall bebe shaped tothe edge of st
k will involve th
ubgrade requiSubgrade on a
STANDAMENT of TR
GRADIN
ommence anyork Area involv
rol the excavaavated materia
for topsoil, fd stockpiled at
avation of the n, between th
not be locatches and slopsource of silta
be carried ou
s shall be mul
separately e - Borrow A/ASubgrade.
conduct opeeither has beerial under Item
be placed in acost to the Ow
vaged by thehe material do
mmon materialtire weight andm recovery of
ot be placed ar property linerial is not posmes.
e built in layero maintain surtockpiles shal
he re-handling
ires undercutta plane parall
ARD SPECIRANSPORT
NG
y excavation uved.
ation and hanals is achieved
from cuts, ant the location(
topsoil layer e Contractor
ted where thepes as per Iteation to waterc
ut such that th
ched in accor
xcavate or oA1, as indicate
erations such een used or m 121.
areas where ewner, unless o
e Contractor fes not becom
shall be doned dimension of the stockpile
near a quarryes, tree lines ssible or pract
rs not exceedirface drainagel not be perm
g of excavated
ting, subexcavel to the Subg
FICATIONTATION an
until the origin
ndling of the d, as follows:
nd from fill ar(s) approved
shall be as dand the Engi
ey shall inhibem 946, blockcourses.
he maximum
rdance with It
otherwise salved in the Con
that all usashall be used
excavated maotherwise auth
for re-use othme saturated a
e on a well-drof the stockpild materials.
y/pit face, Strior drainage d
tical and acce
ing one metree before the nitted.
d material from
vation shall begrade cross-sl
S nd INFRAS
nal cross-sect
common mat
reas that shaby the Engin
determined in neer.
bit orderly cok or inhibit na
recovery of
tem 616.
vage materiantract Docume
able material d in the Wor
aterials could horized by the
her than as tat a location a
rained, level bles and in suc
ipping piles oditches such tess to the sto
e in thickness next layer is be
m stockpiles.
e carried out tlope.
TRUCTUR
ITEM: 10
January, 20
tion survey ha
terial such th
all be strippedeer.
the field at th
onstruction anatural drainage
the material
ls meeting thents, for use
resulting frork, prior to th
be hauled ane Engineer.
topsoil shall bpproved by th
base capable ch a manner a
or piles of othethat retrieval
ockpile shall b
and each layeegun. Dumpin
to the specifie
RE
06
15
as
at
d,
he
nd e,
is
he in
m he
nd
be he
of as
er of be
er ng
ed
DEPA COMM
Janua
106.4.2
106.4
ARTMENT
MON EXCAVA
ary, 2015
2 .4 Hauaut
.5 The
tha .6 In c
be wou
.7 Wh
bed .8 Exc
prodire
.9 Exc
Con .10 Bou
Item
.3 Placem
.1 Thecon
.2 The
sur .3 Em
Forlift.
.1
.4 Ma
mm
.1
.5 Ma
121in 1
.1
.6 Wh
thaas 1 m
STANDAof TRANS
ATION
uling of commthorized by the
e Contractor st would cause
cuts, the area shaped to eliuld impede na
here common drock Backslo
cavated mateoperty of the ected by the E
cavated matentractor and s
ulders 1 m3, om 108.
ment
e placement nform to lines
e placement rface drainage
mbankments sreslopes and e
On ungrubbapproved by
aterial placed tm.
The lift thicknproof that the
aterial placed 1.2 - Borrow A106.4.3.4.
In backfillingby the Engin
here embankmn 3:1, for the teach lift of fill
m.
ARD SPECIPORTATIO
mon excavatioe Engineer.
shall shape dite water to pon
between the timinate verticatural drainage
material is uopes shall be s
erial designateOwner and s
Engineer.
erial designateshall be dispos
or larger, that a
of excavated and grades p
of material se.
shall be consteach success
bed areas, swy the Engineer
to within 600
ness may be e specified de
in the top A/A1, as indica
g of undercuts neer.
ments are contop 2.5 m belois placed so th
FICATIONON and INF
GRADING
on over Aggre
tches to the linnd shall be rem
top of the Bacal or overhane.
underlain by ashaped as ind
ed by the Enshall be eithe
ed by the Engsed of in acco
are encounter
d material shaprovided.
hall be in lay
tructed such tsive lift shall be
wamps and rr.
mm below Su
increased to aensity can be a
600 mm of ated in the Co
deeper than
structed againow Subgrade hat the next lif
S FRASTRUC
egate Base/S
nes and grademoved.
ckslope and thnging faces, e
a deep bedrodicated on Sta
ngineer as suer stockpiled
gineer as waordance with It
red in the Wo
all be carried
yers, and eac
that the first le completed t
rough terrain
ubgrade shall
a maximum ofachieved thro
f the Subgraontract Docum
600 mm, the
nst an existingthe spreadingft is keyed in
CTURE
ubbase shall
es specified, a
he edge of theexposed roots
ock cut, the mandard Drawin
urplus and usor otherwise
ste, shall bectem 947.
ork shall be ha
out in accor
ch layer shal
lift when shapto the full widt
the initial lif
have a maxi
f 600 mm if thughout the en
ade shall mements, and sha
lift thicknesse
g earth sidehilg Equipment snto the sidehil
not be permi
and any grade
e ungrubbed ss and any ma
material at theng 106-1.
seable, shall placed in th
come the pro
andled in acco
rdance with It
l be shaped
ped forms theh prior to plac
ft thickness s
mum lift thick
he Contractor ntire lift.
eet the requiall be placed
es shall be as
l having a Sloshall cut into thl to a width no
ITEM: 106
Page 106-3
itted, unless
e conditions
surface shall aterial which
e top of the
remain the e Work, as
perty of the
ordance with
tem 941, to
to maintain
e toe of the cing the next
shall be as
ness of 300
can provide
irements of as specified
determined
ope steeper he sidehill
ot less than
CO
Pag
106
106
106
106
OMMON EXCA
ge 106-4
6.4.3 .7
.8
6.4 .4 Com
.1
.2
.3
6.4 .5 Culv
.1
6.4 .6 Driv
.1
AVATION
Where the Wthe other sidethe Roadbed side of the Ro
Excavated mconstructed sin the Contrac
.1 Maximumlimits sho
.2 Maximumdriven.
mpaction
The Contract936.
.1 Any isolathe specquality m
In cuts, the Sby a test strip
.1 If the Subprior to bDocumen
Each lift of exof 95% of the
verts
Where excavany existing p .1 The Cont
.2 Pipe deteand shallMaintena
.1 Salva
deter
.3 Unsalvagdisposed
veways
Driveways exutilizing mate
DEPARTM
Work involves pe, the spreadas each lift o
oadbed or the
material placeshall be a matct Documents
m 200 mm beown on the Pla
m 300 mm wh
tor shall carry
ated soft spotscified compactatching the su
Subgrade surfap.
bgrade has bebeing backfillents, to Subgra
xcavated matee maximum dry
vation involvespipe is not dam
tractor shall no
ermined by thel be re-used i
ance Depot.
ageable pipermined by the
geable pipe a of outside the
xcavated undrial excavated
STANDAMENT of TR
GRADIN
placement of ming Equipmenof material is p existing Road
ed behind Sterial meeting s, and shall ha
hind abutmenans; or
here Structure
y out moisture
s, or other aretion criteria surrounding ma
ace shall be c
een undercut,ed with Borro
ade.
erial, after play density.
s removal of maged and is
otify the Engin
e Engineer to in the Work S
e that is damEngineer, sha
nd waste shae Work Site.
der this Item d from the cros
ARD SPECIRANSPORT
NG
material firstlynt shall cut intplaced, so thadway Slope to
tructures or the requirem
ave lift thicknes
nt breastwalls
es shall be co
conditioning
eas within thehall be excavaterial, as dire
compacted to
, the undercutow A/A1-quali
cement per 1
Culverts, the salvaged for r
neer prior to e
be salvageabSite under Item
maged as a all be replace
all become the
shall be replssing whereve
FICATIONTATION an
y along one sito the edge oat the next lifto a width not l
in areas whents of 121.2sses as follow
or other earth
onstructed or t
and compact
e top 1.2 m ofvated and ba
ected by the E
97% of the co
t surface shality material, a
06.4.3, shall b
Contractor shre-use.
exposing any e
ble shall remam 140, or tra
result of thd by the Cont
e property of
laced the samer possible.
S nd INFRAS
de of the Roaof the previoust is keyed iness than 0.5 m
here Structur - Borrow A/A
ws:
h-retaining St
through which
tion in accord
f the Subgradackfilled with Engineer.
ontrol density
l be rolled witas indicated i
be compacted
hall take care
existing pipe.
ain the propertnsported to th
he Contractortractor.
the Contracto
me Day they
TRUCTUR
ITEM: 10
January, 20
adbed and thesly built side oto the adjacem.
res are to bA1, as indicate
ructures, to th
h piles shall b
dance with Ite
de, not meetinmaterial of th
y as determine
th a static rollen the Contra
d to a minimu
e to ensure th
ty of the Ownehe nearest DT
rs actions, a
or and shall b
y are remove
RE
06
15
en of nt
be ed
he
be
m
ng he
ed
er ct
m
at
er TI
as
be
d,
DEPA COMM
Janua
106.4.6
106.5
106.6
ARTMENT
MON EXCAVA
ary, 2015
6 .2 WhPavavo
.1
.2
MEASURE
.1 The Quexcavat
.2 The vol
on orig
.1 In tpay
.3 Excava
as defin
BASIS OF .1 Paymen
excavat
STANDAof TRANS
ATION
here excavatiovement shall oid damage to
The Contracbeyond the down expense
The excavatuse in embdisposed of o
MENT FOR P
uantity to be mted and place
lume shall beginal ground c
the areas to byable under th
ation of soft spned by this Ite
PAYMENT
nt for Work ution, as identif
ARD SPECIPORTATIO
on involves pabe cut to a n
o the adjacent
ctor shall be designated lime, of the areas
ted Pavementankment conoutside the W
PAYMENT
measured for ped, stockpiled a
e as measuredcross-sections
be grubbed, thhis Item shall
pots, deleteriom shall be me
under this Itemfied under the
FICATIONON and INF
GRADING
aved drivewaneat straight llands and Ro
responsible mits of the excs affected.
t shall be broknstruction, unl
Work Site.
payment shall and/or dispos
d in situ and cs surveyed by
he cross-sectioinclude mater
ous materials, easured for pa
m shall include Contract.
S FRASTRUC
ays, parking loline and edgeoadbed.
for damage txcavation and
ken down into less designat
be the numbsed of in accor
computed by y the Engineer
ons shall be trial in the grub
offtakes, streayment.
de a separate
CTURE
ots or other ae, and remove
to the Pavemfor the repair
pieces small ted by the E
er of cubic merdance with th
the average r on the natura
taken before gbbed layer rem
eam diversion
e Unit Price fo
abutting privated in a mann
ment and othr or restoration
enough to beEngineer as w
etres of commhis Item.
end area metal ground.
grubbing, andmoved under
channels and
or each type
ITEM: 106
Page 106-5
te lands the ner so as to
her surfaces n, at his/her
e suitable for waste to be
mon material
thod, based
the volume Item 102.
d driveways
of common
DEPA UNCLA
Janua
107.1
107.2
107.3
107.4
107.5
ARTMENT
ASSIFIED EX
ary, 2015
DESCRIPT
.1 This IteWork Scompos
MATERIAL
.1 For temmeeting
SUBMITTA
.1 Submitt
CONSTRU
.1 The Cospecific
.2 The Co .3 The Co
in the C .4 Polyeth
flow and
.1 The .5 The Co
excavat .6 The Co
excavat MEASURE
.1 The Qumateria
.2 The volon orig
.1 In tpay
.3 Excava
the exc
STANof TRANS
XCAVATION
TION
em consists oSite, of materiased of a mixtu
S
mporary streamg the requirem
ALS
tals are requir
CTION
ontractor shacally directed b
ontractor shall
ontractor shall Contract Docu
hylene liners fod overlaps sh
e Contractor s
ontractor shation in accord
ontractor shation in accord
MENT FOR P
uantity to be al excavated a
lume shall beginal ground c
the areas to byable under th
ation, per 106.avation of driv
NDARD SPPORTATIO
of the excavatals classified
ure and variab
m diversion chments of CGSB
red in accorda
all carry out tby the Engine
carry out the
construct offtments.
or temporary all be a minim
shall be respo
all handle mance with 106
all handle maance with 108
PAYMENT
measured forand either plac
e as measuredcross-sections
be grubbed, thhis Item shall
4, of offtakes,veways shall b
PECIFICATON and INF
GRADING
tion and placeunder neitherle and undete
hannels, cleaB 51.34 shall
ance with any
the Work as er.
Work in accor
takes and stre
stream diversmum of 300 mm
nsible for mai
material which6.4.
aterial which 8.4.
r payment shced, stockpiled
d in situ and cs surveyed by
he cross-sectioinclude mater
stream diversbe measured
TIONS FRASTRUC
ement within r common excermined distrib
r polyethylenebe supplied b
cross-referen
indicated in
rdance with Ite
eam diversion
sions shall be m in the direct
ntenance and
h would othe
would other
hall be the nud or disposed
computed by y the Engineer
ons shall be trial in the grub
rsion channelsfor payment.
CTURE
the Work Sitecavation nor bution of both.
e liners a minby the Contrac
nced Item form
the Contrac
em 946 and It
n channels as
installed tranction of flow.
d removal of th
erwise be cla
rwise be clas
umber of cubof in accorda
the average r on the natura
taken before gbbed layer rem
s, soft spots, d
e or disposal solid rock exc.
nimum of 6 mictor.
ming part of th
ct Documents
tem 948.
identified and
nsverse to the
he liners.
assified unde
ssified under
ic metres of ance with this I
end area metal ground.
grubbing, andmoved under
deleterious ma
ITEM: 107
Page