  • Department of Transportation and Infrastructure

    StandardSpecifications

    for Highway Construction

    January 2015

  • JA

    The as pprepwill n It is to-daof AStanthe C Bid Iof Wcons Requshalentir The as d The govespecQuaIntroStanSpecand Con

    ANUARY

    USE O

    standards pre-printed pared as denot compet

    the responate copy of

    Agreement, ndard SpecCrown Con

    tems in theWork and clestruction pro

    uirements ol form partrety.

    Standard Sefined in th

    Standard ern the pecifically notntity are

    oduction; Dndard Condcifications

    requisite tract.

    Y 2015

    OF NEW BR

    in the DTI componen

    esign aids ently serve

    sibility of thf the StandTerms of

    cifications. struction C

    e Standard early identifovisions to

    of the Notict of the C

    Specificatiohe Definition

    Specificatiorformance ed as a bidfound undivision 800ditions. Itunderstandbehaviour

    FORE

    RUNSWICK

    Standard Snts of a coor as a ma

    e those purp

    he Bidder/Cdard ConstrPayment "The Stand

    Contracts Ac

    Specificatiofy the scopproduce th

    ce of Tendontract as

    ns rely on tns (Item 00

    ons form pof the Con

    d Quantity.der the fo

    0 - Payment is imperad this inter

    of the C

    EWORD

    K PROVINC

    Specificatioonstructionanual of deposes.

    Contractor truction Con"A", Generadard Specifct.

    ons are intee, material

    he specified

    er are incoif they ha

    the use of s03).

    part of the ntractor ev Items whollowing Dnt & Adjustative thatr-relationshontractor w

    CIAL STAN

    ns are inte Contract. esign proce

    to ensure thntract includal Conditiofications are

    ended to berequireme

    d end produ

    orporated bad appeare

    specific wo

    Contract ven thoughhich are notDivisions: tments; andusers of

    hip to the owithin the

    DARDS

    nded to be They are

    edures and

    hey have ading the Ar

    ons "B", ane complian

    e completents, and sp

    uct.

    by referenceed here in

    rds and ph

    Documents an Item it noted as Division 0d Division these Stanoverall Cocontext o

    used e not

    d they

    an up-rticles d the t with

    units pecific

    e and their

    rases

    s and s not a bid

    000 - 900 - ndard ntract

    of the

  • DEPA

    Janua

    100 101 102 103 106 107 108 116 121 130 131 136 137

    200 201 203 204 205 208 210 231 259

    ARTMENT

    ary, 2015

    Table of CoClearing Grubbing Removing Common EUnclassifieSolid Rock Ditching Borrow Metal Pipe Metal Pipe Subdrain Subdrain O

    Table of CoProduction Aggregate Shoulder MFine GradinCold MillingShoulder RShoulder SBituminous

    STANof TRANS

    000000

    ontents

    Isolated TreeExcavation d Excavation Excavation

    - Large

    Outlet

    ontents of Highway ABase/Subbas

    Material ng g - Asphalt Co

    Rumble Strips Subdrain s Tack Coat

    NDARD SPPORTATIO

    TA

    STANDA

    DIVISIO

    000 Table o001 Termino002 Abbrev003 Definitio005 Authorit006 Permits

    DIVI

    s

    DIVISION 20

    Aggregates se

    oncrete

    ECIFICATION and INF

    ABLE OF CON

    ARD SPEC

    ON 000 - INTR

    of Contents ology iations ons ty of the Engi

    s

    ISION 100 - G

    00 - PAVEME

    IONS FRASTRUC

    NTENTS

    CIFICATION

    RODUCTION

    ineer

    GRADING

    140 Con141 Con142 Prec161 Foun166 Bac167 Bac169 Indu182 Cha186 Rem191 App199 Stan

    ENT STRUCT

    260 Asp261 Asp262 Part263 Full 264 Micr265 Chip267 Pulv284 Sho299 Stan

    CTURE

    NS

    N

    ncrete Pipe ncrete Pipe - Lcast Concretendation Excakfilling Aroundkfill For Struc

    uced Trench ain Link Fencemoval of Fenclication of Wa

    ndard Drawing

    TURE

    halt Concretehalt Concretetial Depth RecDepth Recyc

    ro Surfacing p Seal verizing ulder Process

    ndard Drawin

    Large e Box Culvertvation d Structures

    ctures

    e ce ater gs

    e - Method Spe - (ERS) cycling cling

    sing gs

    Page 1 of 5

    pecification

  • DEPA

    Janua

    300 301 302 304 305 311 312 321 322 331 332 335 341 342

    400 401 404 406 407 408 409 410

    ARTMENT

    ary, 2015

    Table of CoPortland CeConcrete inReinforcingTension SpSteel H PileSteel Pipe Steel SheeExcavationPrecast PrePost-TensioSteel SupeSteel LaminBridge Pot

    Table of CoStorm SewPrecast CaSluice Box Frame WithAdjustmentRelocation Paving Cat

    STANof TRANS

    ontents ement Concren Structures g Steel plices es Piles

    et Pile Cofferd Within Coffeestressed Cooning System

    erstructure nated BearingBearings

    ontents wer Pipe atch Basin

    h Grate or Cot of Catch Basof Catch Bas

    tch Basin Apr

    NDARD SPPORTATIO

    TA

    DIVISI

    ete

    dams erdams ncrete Beams

    m

    gs

    DIVIS

    over sins and Mansin on

    ECIFICATION and INF

    ABLE OF CON

    ON 300 - STR

    s

    SION 400 - M

    nholes

    IONS FRASTRUC

    NTENTS

    RUCTURES

    343 Sea344 Fing345 Stee346 Guid348 Serv351 Wat361 Sho365 Eng366 Free371 Rem372 Rem381 Rem399 Stan

    MUNICIPAL

    415 Pipe416 Curb419 Con420 Asp423 Rem424 Rem425 Rem499 Stan

    CTURE

    led Expansioger Joint Asseel Ballastwall de Rail Systevice Duct - Stterproofing

    oring ineered Fill e-Draining Bamoval of Asphmoval of Concmoval of Strucndard Drawin

    e Zone Materib and Gutter

    ncrete Sidewahalt Sidewalk

    moval of Curbmoval of Sidewmoval of Undendard Drawin

    on Joint Assememblies Angle m - Structuretructures

    ackfill halt Concrete crete ctures gs

    ial

    alk k and Gutter walk erground Servgs

    Page 2 of 5

    mblies

    es

    - Structures

    vices

  • DEPA

    Janua

    500 510 511 512 513 515

    516

    520 529 530 531 532 533 534 538 539 540

    600 601 602 603 604 605 606 607 608 609 610 611 612

    ARTMENT

    ary, 2015

    Table of CoGuide PostRemoval ofGuide Rail Removal ofEnergy-Abs

    Removal ofTerminal Cast-in-PlaConcrete EUnder RoaUndergrounUndergrounPower PoinRemoval ofScrew BaseRemoval ofSign or Lig

    Table of CoGeotextile Sediment CFilter ScreeJute Mats Erosion CoRemoval ofGabions Random RRock Weir Armour StoIndividual RGravel for F

    STANof TRANS

    DI

    ontents ts f Guide Posts

    f Guide Rail sorbing Guide

    f Energy-Abs

    ace Concrete Encased Roaddbed Duct nd Duct nd Junction Bnt f Power Pointe f Screw Baseht Base

    ontents

    Control Fenceen

    ontrol Structurf Erosion Con

    iprap

    one ProtectionRock PlacemeFish Habitat

    NDARD SPPORTATIO

    TA

    IVISION 500

    s

    e Rail Termin

    orbing Guide

    Barrier dbed Duct

    Box

    t

    e

    DIVISION

    e

    re ntrol Structure

    n ent

    ECIFICATION and INF

    ABLE OF CON

    - TRAFFIC C

    al

    Rail

    N 600 - ENVI

    e

    IONS FRASTRUC

    NTENTS

    CONTROL DE

    541 Rem542 Ligh543 Rem544 Med545 Rem550 Sign551 Rem552 Roa553 Rem554 Ove555 Ove556 Rem557 Ove558 Rem571 Pave576 Con599 Stan

    RONMENTA

    613 Tops614 Hyd615 Fert616 Mulc617 Roo618 Tree620 Tem621 Tem622 Fish623 Culv630 Soil 699 Stan

    CTURE

    EVICES

    moval of Sign ht Standard moval of Lightdian Flashing moval of Medin Post moval of Sign adside Sign moval of Roaderhead Sign Serhead Sign Smoval of Overerhead Sign moval of Overement Markin

    nstruction Trafndard Drawin

    AL

    soil roseeding tilizing ching

    ot Wads es and Shrub

    mporary Watemporary Wateh Rescue vert Erosion PReinforceme

    ndard Drawin

    or Light Base

    t Standard Light an Flashing L

    Post

    dside Sign Structure FounStructure rhead Sign St

    rhead Sign ngs ffic Control gs

    s r Barrier r Control Wor

    Protection ent gs

    Page 3 of 5

    e

    Light

    ndation

    tructure

    rks

  • DEPA

    Janua

    800 801 802 806 807 808

    900 905 906 907 908 912 913 916 917 918 919 921 922 926 927 928 931 932 933

    ARTMENT

    ary, 2015

    Table of CoHaulage - SHaulage - AOverhaul - Overhaul - Overhaul -

    Table of CoSchedulingWork ScheSubcontracSupply of MHiring PracInsurance SSigns Traffic ConDetours MaintenancConstructioPits and QuExaminatioAsphalt CoGeotechnicScales andPrivate TruHeavy Equ

    STANof TRANS

    DI

    ontents Soil, Rock andAsphalt ConcCommon ExcUnclassified Solid Rock E

    ontents g edule ctors Materials ctices Schedule

    trol Persons

    ce of Traffic Fon Roads uarries

    on of Soils Infooncrete Core Dcal Instrumend Weighing Prcks ipment

    NDARD SPPORTATIO

    TA

    DIV

    IN

    IVISION 800

    d Aggregaterete cavation Excavation

    Excavation

    DIVISION 90

    Flow

    ormation Data tation rocedures

    ECIFICATION and INF

    ABLE OF CON

    ISION 700 - L

    LIBRARNTERNAL US

    - PAYMENTS

    00 - STANDA

    IONS FRASTRUC

    NTENTS

    LIBRARY

    RY SE ONLY

    S & ADJUST

    810 Fixe811 Forc812 Extr820 Pay821 Adju825 Mob

    ARD CONDIT

    934 Bac936 Com941 Line946 Wor947 Disp948 Env951 Wor952 Safe953 Aud956 Con957 Fals958 Form961 Part962 Valu971 Adv996 Limi997 Spe998 Com999 Stan

    CTURE

    TMENTS

    ed Rates ce Account ra Work ment Adjustmustment for Asbilization

    TIONS

    k - Up Alarmsmpaction es and Gradesrk Progressioposal Areas ironmental Rerking Conditioety Support Sited Safety P

    nstruction Drasework mwork tnering ue Engineerinisements ited Funds cified Work

    mpletion Date ndard Drawin

    ments sphalt Binder

    s

    s n

    equirementsons Systems rogram

    awings and Ca

    ng

    gs

    Page 4 of 5

    r Price

    alculations

  • DEPA

    Janua

    ARTMENT

    ary, 2015

    Sho Sta

    - Ar- Te- G

    Ins For Pla Affi

    STANof TRANS

    ort Form Contandard Constrrticles of Agreerms of Paymeneral Conditurance Schedrm of Tender

    ans and Standidavit I

    NDARD SPPORTATIO

    TA

    tract ruction Contraeement ment A tions B dule E F

    dard Specificat

    S

    STANDA

    ECIFICATION and INF

    ABLE OF CON

    APPEND

    act

    tions G

    SUBJECT IN

    ARD DRAW

    IONS FRASTRUC

    NTENTS

    DIX

    NDEX

    WING INDE

    CTURE

    EX

    Page 5 of 5

  • DEPA TABLE

    Janua

    IT

    0

    0

    0

    0

    0

    ARTMENT

    E OF CONTE

    ary, 2015

    TEM

    001 T

    002 A

    003 D

    005 A

    006 P

    STANof TRANS

    ENTS

    Terminology .

    Abbreviations

    Definitions ....

    Authority of th

    Permits .........

    NDARD SPPORTATIO

    DESCR

    .....................

    ....................

    .....................

    e Engineer ..

    .....................

    ECIFICATION and INF

    INTRODUCTIO

    RIPTION

    .....................

    .....................

    .....................

    .....................

    .....................

    IONS FRASTRUC

    ON

    ............

    ............

    ...........

    ..............

    ..........

    CTURE

    NUMBEPAGE

    2

    4

    5

    1

    1

    DI

    R OF ES

    VISION 000

    Page 000-1

  • DEPA TERM

    Janua

    001.1

    001.2

    001.3

    001.4

    001.5

    ARTMENT

    INOLOGY

    ary, 2015

    TERMINOL

    .1 This do

    .1 Itemto t

    .2 Arti

    .2 Whene

    that anyrequesunaccedesignfollowed

    .3 Unless

    shall re

    GENDER N

    .1 Workingpronouintende

    HEADINGS

    .1 The heconvenmeanin

    PARTICULA

    .1 Particulthis doc

    .2 Particul

    CONFLICT

    .1 Wheneany othpractice

    .2 In the e

    betwee

    STANof TRANS

    LOGY

    ocument is div

    m is generallythe Work.

    icle is used to

    ver in the Coything is, donsted, deemeptable, sati

    nated, and sud by the word

    otherwise spfer to this doc

    NOTATION

    g titles havinns such as he

    ed to refer to p

    S, TITLES and

    adings, titles ience and for

    ng of the Stand

    AR SPECIFIC

    lar Specificaticument and a

    lar Specificati

    S IN CODES

    ver a conflict her referencee, the most str

    event of a conen the choices

    NDARD SPPORTATIO

    vided into spec

    y used with te

    o reference an

    ontract Docume or to be domed necesisfactory, unuch similar exds by the Eng

    pecified in thecument.

    ng a mascule, his and him

    persons of eith

    d CAPTIONS

    and captionsr the ease of rdard Conditio

    CATIONS

    ions are definre particular a

    ons shall prev

    AND STAND

    in interpretated documentringent require

    nflict the Engs of action as n

    ECIFICATION and INF

    INTRODUCTIO

    cific Items.

    ext that conta

    ny subsection

    ments and in done, if, as, whsary, perm

    nsatisfactory, xpressions thegineer or to t

    e text, all refe

    line gender, m are utilized her sex and a

    s appearing inreference onlyns, Specificat

    ned as Specifand specific to

    vail over those

    DARDS

    tion, applicatio, including bement shall a

    ineer shall benoted to be in

    IONS FRASTRUC

    ON

    ains reference

    of an Item.

    documents reen, or where mitted, su suspendeden the expreshe Engineer

    erences to Sp

    such as woin these Spe

    re gender neu

    n this documey and in no wations and/or th

    fications adopo a Contract.

    e published h

    on or directiobut not limiteapply to the W

    e the sole judn conflict betw

    CTURE

    e to payment

    esulting duringcontemplate

    uitable, ap, sufficient, ssion shall haas the case m

    pecifications,

    orkman, workecifications foutral.

    ent have beenay define, limhe Particular S

    pted subsequ

    erein whenev

    on occurs betwed to related

    Work.

    dge of the moween the docu

    and performa

    g the Work it ed, requiredpproved, aauthorized,

    ave the samemay be.

    Items, Tables

    kmen and for the sake of

    n inserted as it or enlarge tSpecifications

    uent to the pu

    ver in conflict t

    ween this doccodes and/o

    ost stringent rements.

    ITEM: 001

    Page 001-1

    ance related

    is provided , directed, acceptable, specified,

    e force as if

    s or Figures

    oreman and brevity, are

    a matter of he scope or

    s.

    ublication of

    therewith.

    cument and or standard

    equirement,

  • TER

    Pag

    001

    RMINOLOGY

    ge 001-2

    1.6 CROSS

    .1 Crosand

    .1

    .2

    .3

    Y

    -REFERENC

    ss-referencescan be categ

    Inclusive re(xxx.2) or Coof the work ufor the adherof the Item.

    Separate Itemportion of thewith or to Item (Item xappears as s

    Standard Dra

    DEPARTM

    ES

    s form an impgorized as follo

    eference to aonstruction (xxunder the Itemrence to or th

    m reference work under

    the requiremxx) indicates uch in the Lis

    awing refere

    STANMENT of TR

    INTRODUC

    portant role in ows:

    a portion of axx.4) section, m where the re performanc

    ce to anotherthe Item wheents of thethat the cro

    st of Approxim

    ence to the ap

    DARD SPERANSPORT

    CTION

    the interpreta

    another Specifindicating thaeference is n

    ce of the requ

    r Specificationre the referen

    e cross-refereoss-referencedmate Quantitie

    pplicable draw

    ECIFICATIOTATION an

    ation of the S

    fication Item, at the cross-reoted. There w

    uirements of t

    n Item (Item nce is noted isnced Item. Thd Item is a ses of the tend

    wing.

    ONS nd INFRAS

    Standard Spec

    in general toeferenced secwill be no sephe cross-refe

    xxx), indicats carried out he cross-referseparate unitder documents

    TRUCTUR

    ITEM: 00

    January, 20

    cification Item

    o the Materiaction forms paparate paymeerenced sectio

    ting that somin accordancrence to the fut payment ans.

    RE

    01

    15

    ms

    als art nt on

    me ce ull nd

  • DEPA ABBR

    Janua

    002.1

    ARTMENT

    REVIATIONS

    ary, 2015

    ABBREVIA

    .1 WherevContrac

    AAACAISANAPASASAWBPCGCACSCWDEDTDFMTOPPCPCSSTRSI

    AACHCACECHCSCSDREMEOEPESAGCLOPCPE PVRARCROSP

    STANof TRANS

    ATIONS

    ver the followct Documents

    SHTO CI SI SI EGNB CE TM

    WS R

    GSB AN/CSA SA WB ELG

    I O

    TO PSS CI CA

    PC B

    DTW

    AP BDC P PA

    R MM OS

    P AL

    C C P

    C AP CP OW

    CAP

    NDARD SPPORTATIO

    ing abbreviatis, their intent a

    American AsAmerican CoAmerican IroAmerican NaAssociation oAmerican SoAmerican SoAmerican WeBureau of PuCanadian GeCanadian StaCanadian StaCanadian WeDepartment oDepartment oDepartment oMinistry of TrOntario ProviPrestressed CPortland CemSteel StructuTransportatioInternational

    Average AnnCreosote HarCorrugated ACommon ExcCanadian HigAluminum CoAluminum CoDimension REnvironmentaEquivalent OEnvironmentaEquivalent SiGeneral CondLimit of ContrPre-cast ConPolyethylenePolyvinyl ChlReclaimed AsReinforced CRight of WayStructural Pla

    ECIFICATION and INF

    INTRODUCTIO

    ions or terms and meaning s

    Org

    sociation of Soncrete Institutn and Steel In

    ational Standaof Professionaociety of Civil Eociety for Testielding Societyublic Works, Deneral Standaandards Assoandards Assoelding Bureauof Environmenof Transportatof Fisheries aransportation incial StandarConcrete Inst

    ment Associatres Painting C

    on Research BSystem of Un

    ual Daily Trafrdwood

    Aluminum Allocavation ghway Bridgeoated Corrugaorrugated Steeatio for plastical Managemepening Size al Protection Pingle Axle Loaditions B of tract

    ncrete Pipe

    oride sphalt Pavem

    Concrete Pipe

    ate Corrugate

    IONS FRASTRUC

    ON

    are used in tshall be as fo

    ganizations

    State Highwayte nstitute ards Institute al Engineers aEngineers ing and Matery Department of ards Board ociation ociation u nt and Local Gtion and Infrasand Oceans of Ontario rd Specificatiotitute tion Council Board nits

    Terms

    ffic

    oy Pipe

    e Design Codeated Steel Pipel Pipe-Archc pipe ent Manual (D

    Plan ad the Contract

    ment

    d Aluminium A

    CTURE

    the Specificatollows:

    y and Transpo

    and Geoscien

    rials

    f Commerce

    Government (structure (New

    on

    e pe

    DTI)

    Alloy Pipe

    tions, the Pla

    ortation Officia

    ntists of New B

    (New Brunswiw Brunswick)

    ITEM: 002

    Page 002-1

    ns, or other

    als

    Brunswick

    ick)

  • AB

    Pag

    002

    002

    BBREVIATION

    ge 002-2

    2.2 PUBLIC

    .1 Whethe t

    2.3 SI TERM

    .1 Theout

    .2 Oth

    are .3 Wh

    of m

    Ph

    Are

    De

    En

    Fo

    Le

    NS

    SPCSP SPCAPA SPCSPA SRE UNE WATCM

    ATIONS AND

    en publicationtime of the sig

    MS e following tat under the te

    her terms ande used.

    here no units measure shal

    hysical Quan

    ea

    ensity

    nergy

    orce

    ngth

    DEPARTM

    Structural Structural Structural Solid RocUnclassifiWork Area

    D REGULATIO

    ns or regulatiogning of the C

    ble of commorms of the Sta

    d abbreviation

    are indicatedll be millimetr

    tity

    STAMENT of TR

    INTRODUC

    Plate AluminPlate CorrugPlate Alumink Excavationed Excavationa Traffic Cont

    ONS

    ons are referreContract.

    on metric termandard Speci

    ns may be use

    on the Plansres unless oth

    C

    square

    square

    hectar

    square

    gram p

    kilogra

    tonne

    joule (

    kilojou

    megaj

    Newto

    kilonew

    megan

    micron

    ANDARD SRANSPORT

    CTION

    Terms

    um Coated Cated Aluminiuum Coated C

    n trol Manual (D

    ed to, the refe

    ms and abbrevifications.

    ed if they are

    s for the measherwise noted

    Common SI u

    e millimetre

    e metre

    re

    e kilometre

    per cubic met

    am per cubic

    per cubic me

    Newton metre

    ule

    oule

    on

    wton

    newton

    n

    SPECIFICATATION an

    Corrugated Steum Alloy Pipe

    Corrugated Ste

    DTI)

    erence is to th

    viations shall

    referenced in

    surement of led.

    units

    tre

    metre

    etre

    e)

    ATIONS nd INFRAS

    eel Pipe -Arch eel Pipe-Arch

    he latest versi

    apply to all W

    n the context

    ength or dista

    SI Sym

    mm

    m2

    ha

    km

    g/m3 (m

    kg/m

    t/m J

    kJ

    MJ

    N

    kN

    MN

    m

    TRUCTUR

    ITEM: 00

    January, 20

    ion available

    Work carried

    in which they

    ance, the unit

    mbol

    m2 2

    a

    m2

    mg/L)

    m3

    m3

    J

    J

    N

    N

    m

    RE

    02

    15

    at

    y

  • DEPA ABBR

    Janua

    ARTMENT

    REVIATIONS

    ary, 2015

    Physi

    Light

    Mass

    Perme

    Powe

    Press

    Stress

    Temp

    Time

    Torqu Unit W

    STANof TRANS

    ical Quantity

    eability

    r

    sure

    s

    perature

    ue

    Weight

    NDARD SPPORTATIO

    y

    ECIFICATION and INF

    INTRODUCTIO

    Com

    millimetre

    metre

    kilometre

    lux

    kilolux

    milligram

    gram

    kilogram

    tonne

    metre per

    metre per

    watt

    kilowatt

    pascal

    kilopasca

    megapasc

    newton pe

    kilonewto

    meganew

    degree ce

    second

    minute

    hour

    day

    year

    newton m

    kilonewto

    IONS FRASTRUC

    ON

    mmon SI unit

    e

    r second

    r year

    l

    cal

    er square me

    on per square

    wton per squa

    elsius

    metre

    on per cubic m

    CTURE

    ts

    etre

    metre

    are metre

    metre

    SI Symbo

    mm

    m

    km

    lx

    klx

    mg

    g

    kg

    t

    m/s

    m/a

    W

    kW

    Pa

    kPa

    MPa

    N/m2

    kN/m2

    MN/m2

    C

    s

    min

    h

    d

    a

    Nm

    kN/m3

    ITEM: 002

    Page 002-3

    ol

  • AB

    Pag

    BBREVIATION

    ge 002-4

    Ph

    Ve

    Vis

    Vis

    Vo

    Vo

    Vo

    NS

    hysical Quan

    elocity

    scosity Dyna

    scosity Kine

    olume solid

    olume fluid

    olume Rate o

    DEPARTM

    tity

    amic

    matic

    f Flow

    STAMENT of TR

    INTRODUC

    C

    metre

    kilome

    pascal

    millipa

    square

    square

    cubic m

    cubic d

    cubic m

    millilitr

    litre

    kilolitre

    cubic m

    cubic m

    litre pe

    ANDARD SRANSPORT

    CTION

    Common SI u

    per second

    etre per hour

    l second

    ascal second

    e millimetre p

    e metre per se

    millimetre

    decimetre

    metre

    re

    e

    metre

    metre per sec

    er minute

    SPECIFICATATION an

    units

    er second

    econd

    cond

    ATIONS nd INFRAS

    SI Sym

    m/s

    km/

    Pa

    mPa

    mm2

    m2/

    mm

    dm

    m3

    mL

    L

    kL

    m3

    m3/

    L/m

    TRUCTUR

    ITEM: 00

    January, 20

    mbol

    s

    /h

    s

    as

    2/s

    /s

    m3

    m3 3

    L

    L 3

    /s

    in

    RE

    02

    15

  • DEPA DEFIN

    Janua

    003.1

    003.2

    ARTMENT

    NITIONS

    ary, 2015

    DESCRIPT

    .1 The folmeanin

    .2 Where

    meaninof a cap

    .3 Where

    standarhaving

    DEFINITIO

    Actual Basimark-uemploy

    Addendum Aggregate

    Paveme Aggregate

    and the Backslope - Bidder - a

    represe Borrow - an

    of-Way Bridge - any Bridge Leng

    backs o Bridge Wid

    betweerailing.

    Change Or

    Contracbasis of

    Completion

    comple

    STANof TRANS

    TION

    llowing wordsng ascribed to

    it is intendengs ascribed inpital letter for t

    words and prd dictionary dregard to the

    NS

    ic Rate - rateps for the C

    yee and not di

    - see Tender

    Base - the ent.

    Subbase - the Subgrade.

    - Slope betwe

    a person, paentative, subm

    n excavated m.

    y Structure in

    gth - the greaof abutment w

    th - the cleaen the bottom

    rder - a writtect Documentsf payment and

    Date - the eted.

    NDARD SPPORTATIO

    s and phrasethem set out

    ed that wordsn this definitiothe first letter

    phrases are definition, Comcontext in wh

    e per hour paContractors orectly accrued

    Addendum

    layer of crus

    e layer of agg

    een the back-o

    artnership ormitting a tende

    material used

    excess of 3 m

    ater dimensionwalls or betwee

    r width of a m of curbs or,

    en order issues or Quantitiesd time adjustm

    date specifie

    ECIFICATION and INF

    INTRODUCTIO

    es, wherever below in orde

    s and phraseons item such of each word

    not defined impilation of Ahich such word

    id to the Conoverhead, prod to that empl

    shed aggrega

    gregate place

    of-ditch and o

    r corporationer for the Work

    in constructio

    m in span leng

    n of a Structuen ends of Br

    Structure me if curbs are

    ed by the Ens or both, witments for the W

    d in the Con

    IONS FRASTRUC

    ON

    used in the er to provide c

    es used in th words and p or each word

    n this item tASTM Standards or phrases

    ntractors empofit or other oyee.

    ate placed as

    ed as a distin

    riginal ground

    , acting direk.

    on; the source

    gth carrying ve

    re measured ridge deck.

    easured at rignot used, be

    ngineer to thethin the scopeWork affected

    ntract Docum

    CTURE

    Contract Docconsistency a

    he Contract Dhrases shall bd of a phrase.

    then reliance rd Definitions s are used.

    ployee exclusadministrativ

    s a distinct

    ct layer betw

    d.

    ectly or thro

    e of which is lo

    ehicular and/o

    along the cen

    ght angles toetween the in

    e Contractor, e of the Contd by the chan

    ents on whic

    cuments, shand clarity of in

    Documents abe designated

    should be pand/or ASTM

    ive of any allve costs rela

    layer directly

    een the Aggr

    ough a duly

    ocated outsid

    or pedestrian

    ntre of the de

    o the centre onner faces of

    covering charact and estage.

    ch the Contra

    ITEM: 003

    Page 003-1

    all have the ntent.

    are to have d by the use

    placed on a M D653, and

    owances or ated to the

    y below the

    regate Base

    authorized

    e the Right-

    traffic.

    eck between

    of the deck f parapet or

    anges in the ablishing the

    act is to be

  • DE

    Pag

    FINITIONS

    ge 003-2

    Conformwhemea

    Contract Contract

    emppaym

    Contract

    GenAddsuchame

    Culvert -

    for t Day - a c Daylight

    on a Dust - th

    testethe w

    Enginee

    of Nsect

    Thisundethroexplwill b

    Equipme

    maincom

    Finished Foreslop

    grou Highway

    bounextra

    Initial Wo

    D

    m - compliancere working toans complianc

    t - as per the A

    tor - the partyployees, who ment of all leg

    t Documents neral Conditioenda incorpoh other docuendments to t

    - any Structurhe passage o

    calendar day

    t shall refer a daily basis fr

    he fine particed by standarwhole sample

    er - the Chief New Brunswiction 1(1) of the

    s shall includeer the Contraugh authorizlanations and be given.

    ent - all macntenance, and

    mpletion of the

    d Grade - the g

    pe - the Slopeund in case of

    y - the whole nded by the a land which t

    ork Schedule

    DEPARTME

    ce with reasoolerances arece with such to

    Articles of Ag

    y of the first is primarily lia

    gal debts perta

    - the execuons "B, Staorated into theuments as mhe Contract m

    re, not classifiof water under

    and shall incl

    to the hours rom the Enviro

    cles of a masrd sieve analy

    e passing the

    Engineer of thck otherwise e Contract.

    e any personct and shall i

    zed assistantdirections ne

    chinery, and d also tools aWork.

    grade to indic

    e between thef a fill.

    strip of land Right of Waythe Owner ma

    - the Work sc

    STAENT of TRA

    INTRODUC

    onable and ce not specifiedolerances.

    reement of th

    part to the Cable for the acaining to the W

    ted Articles andard Specie Contract bemay be listemade pursuan

    ed as a Bridgr any Roadwa

    ude all days w

    between sunonment Cana

    s defined by ysis methods 100 mm sieve

    he Departmenamed as th

    n authorized binclude withouts, such as ecessary for th

    vehicles, tognd apparatus

    cate the finishe

    e Shoulder an

    reserved for ay lines, as at ay from time t

    chedule subm

    ANDARD SANSPORTA

    CTION

    ustomary mad. Where wo

    e Standard C

    Contract actingcceptable perfWork.

    of Agreemenifications, Paefore the exeed in the Ant to the prov

    ge, and/or draay or driveway

    without excep

    rise to sunsetada Weather w

    the percentaon a sample

    e size.

    nt of Transpohe Engineer-A

    by him/her tout being limiteEngineers,

    he satisfactory

    gether with th necessary fo

    ed Pavement

    nd the ditch, o

    and secured present, or ao time acquire

    mitted per Item

    SPECIFICAATION and

    anufacturing aorking toleran

    Construction C

    g directly or formance of t

    nt, the Tendearticular Speccution of the

    Articles of Agisions of the A

    ainage systemy.

    tion.

    t. Sunrise andwebsite.

    age passing ted prepared a

    ortation and InArchitect as p

    o perform on ed to any persTechnicians, y prosecution

    he necessaryor the proper c

    elevation of t

    or between th

    for the use oas said lines e during the p

    m 906.

    ATIONS d INFRAST

    and constructnces are spec

    Contract.

    indirectly throthe Contract a

    er, Terms of cifications, PArticles of A

    greement anArticles of Ag

    m which provid

    d sunset time

    he 75 micronand tested on

    nfrastructure oper General

    her/his behasons acting e

    Inspectors, and completi

    y supplies foconstruction a

    the centre line

    he Shoulder a

    of the travellinmay be chan

    progress of the

    TRUCTURE

    ITEM: 00

    January, 20

    tion tolerancecified, Confor

    ough agents oand also for th

    Payment "APlans and angreement, an

    nd subsequegreement.

    des an openin

    es are availab

    n size sieve a the fraction o

    of the ProvincConditions B

    alf any functioither directly oby whom a

    ion of the Wo

    or upkeep anand acceptab

    e.

    and the origin

    g public, beinnged to include Contract.

    E

    03

    15

    es m

    or he

    A", ny nd nt

    ng

    le

    as of

    ce B

    on or all rk

    nd le

    al

    ng de

  • DEPA DEFIN

    Janua

    ARTMENT

    NITIONS

    ary, 2015

    Laboratory by the O

    Lane - the p Lump Sum

    inclusivalthoug

    Overbreak

    the estaany roc

    Overburden

    exclusiv Overexcava

    Enginee Owner - sha Pavement - Pavement

    Subbasload to

    Plans - sha

    and otdimens

    Professiona

    practiceand Co

    Profile - a c

    excavadistinct

    Progress E

    the Ter Public Holid

    New Br Quantity - th

    to be uactual Docum

    Right-of-Wa Roadbed -

    (referen

    STANof TRANS

    - any official tOwner.

    portion of a tra

    Price - a Cove for the comgh a Quantity m

    - the portion ablished paymck formation e

    n - any materive of the grub

    ation - all excer.

    all be as state

    - surface and/

    Structure - ase, Aggregatethe Subgrade

    all include all ther drawingssions and deta

    al Engineer e in the Provinode of Ethics.

    charted line intion and gradfrom a plan o

    stimate - shams of Payme

    day - shall incrunswick Day,

    he amount prsed as an estaggregate ofents as determ

    ay - the land s

    that portion nced from cen

    NDARD SPPORTATIO

    testing facility

    avelled way fo

    ontract item fmpletion of themay be given

    of any rock wment lines regncountered, o

    al that must bbbed material.

    cavation beyo

    ed in the Gene

    /or base mixes

    all material pe Base and Pe.

    graphical reps, or exact ails of the Wor

    shall meannce of New B

    ndicating gradding Work; takor overhead vi

    ll have the sant "A" and the

    clude the follo, Labour Day,

    resented on thtimate of the f Work perfomined by mea

    secured and re

    of the Roadntreline).

    ECIFICATION and INF

    INTRODUCTIO

    maintained b

    or the moveme

    for which paye Work define

    in the Contra

    which is excaardless of wh

    or to any othe

    be removed to

    ond that spe

    eral Condition

    s whether Por

    placed abovePavement prov

    presentations reproductions

    rk.

    n a qualifiedBrunswick, an

    des and distaken along a ciew.

    ame meaninge General Con

    owing Days o Remembran

    he Tender FoWork. Final p

    ormed or maasurements m

    eserved to the

    dway between

    IONS FRASTRUC

    ON

    by the Owner

    ent of a single

    yment will be ed. Payment act Documents

    avated, displachether the excr cause.

    o access unde

    ecified, perform

    ns B section

    rtland cement

    e the Subgraviding suppor

    including but s thereof, w

    Professionalnd as defined

    ances and usucentreline or o

    g as progressnditions B.

    only: New Yece Day, and C

    orm is to be copayment to theterial furnishe

    made by the E

    e public for Hi

    n the inside

    CTURE

    or any other t

    e line of vehic

    made at a sis not based os.

    ced, or loosecess is due to

    erlying suitab

    med without

    1(1).

    t, asphalt con

    ade which wrt for, and the

    not limited towhich show

    l Engineer reand bound b

    ually depth ofother designa

    s claim as at

    ears Day, GoChristmas Da

    onsidered as e Contractor ed in accord

    Engineer.

    ighway purpo

    edges of Slo

    testing facility

    cles.

    single tendereon a measure

    ened outside athe inherent c

    le constructio

    the written o

    crete and/or c

    would include e distribution o

    o Profiles, crothe location,

    egistered or by the APEGN

    f cut and heigated line. A si

    ttributed to it b

    ood Friday, Caay.

    approximate will be made

    dance with th

    oses.

    opes of ditch

    ITEM: 003

    Page 003-3

    y designated

    ed price, all ed Quantity,

    and beyond character of

    on materials,

    order of the

    chip seal.

    Aggregate of the traffic

    oss-sections character,

    licensed to NB By-Laws

    ght of fill for de view, as

    by usage in

    anada Day,

    only, and is only for the

    he Contract

    es and fills

  • DE

    Pag

    FINITIONS

    ge 003-4

    Roadwathe appe

    Shoulde

    (refe Sidewalk Skew or

    the case

    Slope - r Soil Par

    mate

    Specifica

    that base

    Statutory

    MonbirthprocChri

    Stripping

    rem Structure

    strucfounclas

    Subgrad

    surfa Substan

    accerem

    D

    ay - that portioSlopes (refe

    ertaining to th

    er - that portionerenced from

    k - that portion

    r Skew Angle Roadway withe of Culverts w

    run to rise exp

    rticle Sizes - erial;

    bocogrsasil

    cla

    ations - the sdefine the p

    ed.

    y Holiday nday, the dayhday of the Sclamation of tistmas Day, a

    g - either theoval of the as

    e(s) - Bridgesctures, concrndation drainssed herein.

    de - the layerace which for

    ntial Completioeptance and oediation of oth

    DEPARTME

    on of the Righerenced from he Work.

    n of the Roadcentreline) of

    n of the Road

    - the acute ah a line parallewith the centre

    pressed as a r

    the following

    oulder averobble averravel partand partt part

    exhay fine

    to excons2 m

    statements, pproducts, mate

    shall include y fixed by proSovereign, Cathe Governor and Boxing Da

    e removal of sphalt cement

    s, Culverts, crete barriers,s and other fe

    r, whether in ms the finishe

    on - The conoccupancy, eher deficiencie

    STAENT of TRA

    INTRODUC

    ht-of-Way reqcentreline),

    way from the f the Slopes of

    way construc

    ngle formed bel to the face e line of the b

    ratio.

    soil particles

    rage dimensiorage dimensioticle passing aticle passing aticle passing aibits no strenggrained soil oxhibit plasticitsiderable strem.

    rovisions anderials and wo

    the followingoclamation oanada Day, in Council as

    ay.

    topsoil and/ofrom the agg

    catch basins, , cribbing, weatures which

    cut or fill, ased elevation o

    ndition of the xcept for the es as defined

    ANDARD SANSPORTA

    CTION

    quired for consand includin

    outside edgef ditches and

    cted for the us

    by the interseof the abutme

    barrel.

    sizes shall a

    on greater thaon between 7a 75 mm sievea 4.75 mm siea 75 m sievegth when air dor the fine graty within a ranength when air

    d requirementorkmanship u

    g Days only: f the GovernNew Brunsws a general d

    or Overburdenregate.

    drop inlets, mwalls, buildingh may be enc

    prepared to of this layer, de

    Work when performance by the Engine

    SPECIFICAATION and

    struction, limig ditches, ch

    es of the Lanefills.

    e of pedestria

    ction of a lineents, the cent

    apply for the

    an 300 mm. 5 and 300 mme and retainedeve and retaine and is non-pdried. ained portion onge of water cr dry. Also de

    ts contained iupon which th

    New Years nor in Counciwick Day, Labday of thanks

    n or the actio

    manholes, retgs, sewers, countered in t

    support the efined at the c

    the Work Sit of any cleaneer.

    ATIONS d INFRAST

    ited by the ouhannels and

    e or Lanes to t

    ans.

    e normal to thtre line of the

    terms used t

    m. d on a 4.75 m

    ned on a 75 mplastic to slight

    of a soil that ccontents and eefined as parti

    in the Contrahe Contract fo

    Day, Good il for the celebour Day, thesgiving, Reme

    on of water r

    taining walls, service pipe

    the Work and

    Pavement Stcentreline.

    te is ready fonup and/or fin

    TRUCTURE

    ITEM: 00

    January, 20

    utside edges oall Structure

    the inside edg

    e centre line opiers, or in th

    to describe th

    mm sieve. m sieve. tly plastic and

    can be made exhibits icle finer than

    act Documentfor the Work

    Friday, Easteebration of the day fixed bembrance Da

    resulting in th

    overhead siges, sub-draind not otherwis

    tructure; or th

    or the Ownerishing, and th

    E

    03

    15

    of es

    ge

    of he

    he

    d

    ts, is

    er he by y,

    he

    gn s,

    se

    he

    rs he

  • DEPA DEFIN

    Janua

    ARTMENT

    NITIONS

    ary, 2015

    Substructurskewbawingwacast in

    Superintend

    Work. Superstruct

    bearing Tender Add

    has thecompondocume

    Ticket - see Unit Price -

    Equipmnecess

    Utility - a fa

    is not ltelevisio

    Weight Cer

    deliveredescribinforma

    Work - incl

    supplie Work Area Work Site

    interest

    STANof TRANS

    re - all that pack of arches alls and wing place box culv

    dent - the Co

    ture - all thatgs of simple an

    dendum - a ce effect of monent of the teents to which

    e Weight Certi

    - the amountment, materia

    ary to comple

    acility maintainimited to sanon services.

    rtificate - a voued to and vee the Quantit

    ation pertinent

    udes all labod and installe

    - the location

    - the lands at, upon which

    NDARD SPPORTATIO

    part of the Sand tops of fprotection ra

    verts and cas

    ontractors au

    t part of the nd continuous

    change in a teodifying the tender and shathe Addendum

    ficate.

    t stated in thels, transporta

    ete the Work a

    ned by a munnitary sewer,

    ucher, issued erified by the ty of material t and necessa

    our, material ad or erected c

    in the Work S

    and premisesthe Work is to

    ECIFICATION and INF

    INTRODUCTIO

    Structure belowfootings of rig

    ailings, and fost in place con

    uthorized repr

    Structure sups spans, and t

    ender issued ender. A Tenall be deemedm refers.

    e Contract reation costs aand does not i

    nicipality, publstorm sewer,

    by the OwneOwners repupon which p

    ary for the eva

    and services complete at th

    Site on which W

    owned by tho be performe

    IONS FRASTRUC

    ON

    ow the bearingid frames; inor the expresncrete arches.

    resentative of

    pported on pthe deck slab

    prior to the tinder Addendud to take prece

    epresenting thnd expensesinclude the HS

    ic authority or, water, elect

    r at the point presentative apayment of thaluation of the

    required, as he place of bu

    Work is being

    he Owner or ed and as defi

    CTURE

    ngs of simplencluding but nsed purposes

    f record in re

    iers or abutmof rigid frame

    me and date um shall be cedence over

    he price per s, and any aST.

    r regulated autric, gas, stea

    of origin of a at the Work he load is to be load by the E

    shown or deuilding.

    g carried out.

    r in which theined in the Co

    e and continunot limited to s of winter co

    esponsible ch

    ments locatedes.

    of tender cloconsidered asthose parts o

    unit for all laand all other

    uthority and inam, telephone

    load to a trucSite. This vo

    be based andEngineer and

    escribed in th

    e Owner has ontract Docum

    ITEM: 003

    Page 003-5

    uous spans, ; backwalls, oncreteing -

    harge of the

    d above the

    osing, which s an integral of the tender

    abour, tools, incidentals

    ncludes, but e and cable

    k driver and oucher shall d shall show others.

    he Contract,

    proprietary ments.

  • DEPA AUTH

    Janua

    005.1

    005.2

    005.3

    ARTMENT

    ORITY OF TH

    ary, 2015

    ORDERS O

    .1 The Cogiven a

    .2 If the C

    Engineaccorda

    CONSTRU

    .1 EquipmDocum

    .2 The En

    which f

    UNAUTHO

    .1 Any Wdescripnotifica

    .2 Upon o

    replace

    .1 If tEngacc

    STANof TRANS

    HE ENGINEE

    OF THE ENG

    ontractor shalat any time by

    Contractor dier, the Contance with term

    CTION METH

    ment and methents.

    ngineer reservfails to consis

    RIZED WOR

    ork done or ptions detaileation, shall be

    order of the ed by the Con

    the Contractogineer may cacordance with

    NDARD SPPORTATIO

    ER

    INEER

    ll promptly any the Enginee

    sagrees withtractor shall ms set out in

    HODS AND E

    hods used sh

    ves the right ttently produc

    RK

    material suppd in the Coconsidered a

    Engineer, unntractor, at his

    or fails to coause unautho

    h the terms of

    PECIFICATON and INF

    INTRODUCTIO

    nd efficiently r with respect

    any order, perform the the General C

    EQUIPMENT

    hall be approp

    to order the de satisfactory

    plied by the ontract Documas unauthorize

    nauthorized Ws/her own exp

    omply promptorized Work of the General

    TIONS FRASTRUC

    ON

    comply with at to the Work

    direction or i Work as inConditions.

    priate to perfo

    discontinuancey results.

    Contractor wments, or esed and may n

    Work or matepense.

    tly with any or material to Conditions.

    CTURE

    all orders, diror the condu

    instruction ginstructed and

    orm the Work

    e or use of an

    which is beyostablished bynot be measu

    erial shall be

    order made be remedied

    rections and ct thereof.

    ven at any td shall serve

    k outlined in th

    ny Equipmen

    ond the lines,y the Owner ured for paym

    e remedied, r

    under this S, removed or

    ITEM: 005

    Page 005-1

    instructions

    time by the e notice in

    he Contract

    t or method

    grades, or by written

    ent.

    removed or

    Section, the replaced in

  • DEPA PERM

    Janua

    006.1

    ARTMENT

    MITS

    ary, 2015

    DESCRIPT

    .1 The Co

    Item 94

    .2 All otherequisitexpens

    STANof TRANS

    TION

    ontractor sha48 and the Co

    er permits reqte for the carse, unless oth

    NDARD SPPORTATIO

    ll review all pontract Docum

    quired, but norrying out of erwise specif

    ECIFICATION and INF

    INTRODUCTIO

    permits in forments.

    ot forming pathe Work shafied.

    IONS FRASTRUC

    ON

    rce for the W

    art of the Conall be obtaine

    CTURE

    Work and the

    ntract Documed by the Co

    conditions as

    ments but necontractor, at h

    ITEM: 006

    Page 006-1

    s set out in

    cessary and his/her own

  • DEPA TABLE

    Janua

    IT

    1

    1

    1

    1

    1

    1

    1

    1

    1

    1

    1

    1

    1

    1

    1

    1

    1

    1

    1

    1

    1

    1

    1

    ARTMENT

    E OF CONTE

    ary, 2015

    TEM

    01 C

    02 G

    03 R

    06 C

    07 U

    08 S

    16 D

    21 B

    30 M

    31 M

    36 S

    37 S

    40 C

    41 C

    42 P

    61 F

    66 B

    67 B

    69 In

    82 C

    86 R

    91 A

    99 S

    106 - 1 108 - 1 136 - 1 137 - 1 140 - 1 161 - 1 161 - 2 161 - 3 161 - 4 161 - 5 161 - 6 161 - 7 182 - 1 182 - 2

    STANof TRANS

    ENTS

    Clearing ........

    Grubbing.......

    Removal of Is

    Common Exca

    Unclassified E

    Solid Rock Ex

    Ditching ........

    Borrow ..........

    Metal Pipe ....

    Metal Pipe L

    Subdrain........

    Subdrain Outl

    Concrete Pipe

    Concrete Pipe

    Precast Concr

    Foundation Ex

    Backfilling Aro

    Backfill For St

    nduced Trenc

    Chain Link Fe

    Removal of Fe

    Application of

    Standard Draw

    Shaping Solid RoSubdrainSubdrainTension Case 1.1Case 1.2Case 2.1Case 2.2Case 3.1FoundatiFoundatiChain LinChain Lin

    NDARD SPPORTATIO

    DESCR

    .....................

    .....................

    olated Trees.

    avation .........

    Excavation ....

    xcavation ......

    .....................

    .....................

    .....................

    Large.............

    .....................

    et .................

    e....................

    e - Large .......

    rete Box Culv

    xcavation .....

    ound Structure

    tructures .......

    ch .................

    ence ..............

    ence .............

    Water ..........

    wings

    of Overburdeck Transitions

    n n Outlet Rod/Bar Asse

    1 - Cross Culv2 - Cross Culv1 - Cross Culv2 - Cross Culv1 - Storm Draiion Excavatioion Excavationk Fence nk Gate

    ECIFICATION and INF

    GRADING

    RIPTION

    .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    vert ...............

    .....................

    es ................

    .....................

    .....................

    .....................

    .....................

    .....................

    en at Top of Ss (longitudina

    embly vert : Subgradvert : Subgradvert : Original vert : Original inage Culvert

    on for Footingon for Footing

    IONS FRASTRUC

    .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    ....................

    .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    Solid Rock Baal)

    de Above Origde Above Orig Ground Abov Ground Abovt Longitudinals - Solid Rocs - Common

    CTURE

    NUMBEPAGE

    .. 2

    ... 2

    .... 1

    .... 5

    .... 2

    ... 5

    .... 2

    ... 4

    .... 4

    .... 2

    ... 2

    .... 2

    ... 4

    .... 9

    ... 8

    ... 3

    .... 2

    .... 2

    .... 2

    .... 3

    .... 1

    .... 1

    ackslope

    ginal Ground ginal Ground ve Subgrade ve Subgrade l to the Centrek and Commoover Solid Ro

    DI

    R OF ES

    - Trench 1- Trench > 1- Trench 2- Trench > 2

    eline of Roadon Cases ock Case

    VISION 100

    Page 100-1

    .2 m .2 m

    2.2 m .2 m

    dway

  • DEPA CLEA

    Janua

    101.1

    101.2

    101.3

    101.4

    ARTMENT

    RING

    ary, 2015

    DESCRIPT

    .1 This Itebrush, a

    .2 Mercha

    market

    MATERIAL

    .1 None id

    SUBMITTA

    .1 The Co

    CONSTRU

    .1 The Cospecific

    .2 The En .3 Mercha

    materiathe Com

    .4 Before

    licence

    .1 ThePro

    .2 If th

    Wo

    .5 The driTranspo .1 In f

    Nosha

    .6 Trees s

    the eve

    .7 Non-me101.4.6

    .1 No of a

    .2 All

    eve

    STANof TRANS

    TION

    em consists ofand slash.

    antable Timbein the genera

    S

    dentified.

    ALS

    ontractor shall

    CTION

    ontractor shacally directed b

    gineer shall id

    antable timberal shall becommpletion Date

    commencing, the Contract

    e price shall boducts Market

    he former liceork to the form

    iver of any veortation Certif

    filling out the ." shall be "xxall be identified

    shall be cut soent of significa

    erchantable tr6) using Equip

    shredding, cha watercourse

    other non-meenly distribute

    NDARD SPPORTATIO

    f cutting and s

    er is defined aal vicinity of the

    submit, upon

    all carry out tby the Engine

    dentify clearin

    r shall be same the properte.

    g clearing on tor shall offer t

    be the currenting Board res

    ensee decidemer licensees

    ehicle transpoficate (TC) for

    TC, "Other" x-xxxx" (the Cd.

    o that stump hant snow cove

    rees not fellepment designe

    hipping, or plae or wetland.

    erchantable trd over the gro

    ECIFICATION and INF

    GRADING

    salvaging Me

    as any timbee Contract.

    n request, a co

    the Work as er.

    ng limits and b

    lvaged, unlesty of the Cont

    any part of to sell to the f

    nt price negotsponsible for t

    es to purchasspecifications

    orting wood fr "Crown Land

    (in the top rigContract num

    height is not grer, to a height

    d by cutting ed for that pur

    acement of sh

    rees, and all bound within th

    IONS FRASTRUC

    rchantable Ti

    r for which th

    opy of any pe

    indicated in

    buffer zone lim

    ss otherwise tractor and sh

    the Work Sitformer license

    tiated betweethe area in wh

    e the cut tims.

    from the Word Permit Harve

    ght corner) usmber); and the

    reater than 0.as agreed wit

    may be shredrpose, but sha

    hredded or ch

    brush and slahe clearing lim

    CTURE

    mber, and dis

    he Contractor

    rmit(s) require

    the Contrac

    mits with ribbo

    approved by hall be remove

    te that had bee all merchan

    en the former hich the timbe

    mber, the Con

    rk Area(s) shaest" for each

    se "DTI ROWe place name

    .3 m above avth the Enginee

    dded in placeall not be bulld

    hipped materia

    ash shall be smits.

    sposing of all

    r can find an

    ed to carry ou

    ct Documents

    ns or similar m

    the Engineeed from the W

    been Crown ntable timber

    licensee ander is harvested

    ntractor shall

    all have in thload.

    W"; under "Hae of the clear

    verage grounder.

    e (to a stumpdozed down.

    al shall occur

    shredded or c

    ITEM: 101

    Page 101-1

    other trees,

    established

    t the Work.

    s and/or as

    means.

    r. Salvaged Work Site by

    Land under involved.

    d the Forest d.

    perform the

    he vehicle a

    arvest Block ring location

    d level, or in

    p height per

    within 30 m

    chipped and

  • CL

    Pag

    101

    101

    101

    EARING

    ge 101-2

    1.4.7 .3

    .4

    .8 Orna .9 The

    sedi

    .1

    .10 Clea

    exce

    .11 The do c

    .12 Initia

    Planrem

    .1

    .13 Theskid

    .1

    .2

    .14 Stocas a

    1.5 MEASU .1 The

    acco .1

    .2 The

    mea

    1.6 BASIS O .1 Pay

    Disposal by b

    Notwithstanddisposed of stop of slope a

    amental trees

    Contractor imentation of

    Directional hafor access bybe made to a

    aring shall noept to provide

    Contractor shcutting therein

    al clearing of ns, and any ooval of merch

    Non merchan

    re shall be noding trees acr

    Where clearinby the Enginecease Work i

    In the case ofcomplete clea

    ckpiling or loadapproved by th

    REMENT FO

    Quantity to ordance with t

    All measurem

    areas of remoasured for pay

    OF PAYMENT

    ment for Work

    DEPARTM

    burning is proh

    ing 101.4.7.1such that the and toe of slop

    s and shrubs s

    shall limit gwatercourses

    and felling andy heavy Equipavoid rutting so

    ot be performeaccess throu

    hall not use h by hand or b

    merchantableother watercohantable timbe

    ntable timber s

    o long skids oross a waterc

    ng of a steep eer or a repremmediately.

    f Work suspenaring on the af

    ding of merchhe Engineer.

    OR PAYMENT

    be measuredthis Item.

    ments shall be

    oval of merchyment as clear

    T

    k under this Ite

    STAMENT of TR

    GRADIN

    hibited.

    to 101.4.7.3,Engineer can

    pe; and surve

    shall not be di

    ground disturs and wetlands

    d harvesting spment. When oft ground are

    ed within wetlugh the buffers

    eavy Equipmy Equipment

    e timber withiourses identifieer.

    shall be remo

    f timber on stourse.

    slope in snowesentative of W

    nsion per 101ffected area.

    antable timbe

    T

    d for payment

    e made in a ho

    antable trees ring.

    em shall be at

    ANDARD SRANSPORT

    NG

    , all non-mercn set and gray cross-sectio

    isturbed witho

    rbance to ms.

    shall be used cable skidde

    eas.

    land buffer zos, as approve

    ent for clearinable to "reach

    n 5 m of eithed during the

    oved at the tim

    eep slopes ad

    w or ice conditWork Safe NB

    .4.13.1, the C

    er or waste ma

    t shall be the

    orizontal plane

    within 5 m of

    t the Unit Pric

    SPECIFICATATION an

    chantable treeade stakes forons.

    out written per

    minimize the

    where groundrs are used, t

    ones unless sed by the Engi

    ng within 30 mh in" to cut an

    her side of wae course of th

    me of the Struc

    djacent to wa

    tions is suspeB for safety re

    Contractor sha

    aterials, adjac

    e number of

    e.

    watercourses

    ce.

    ATIONS nd INFRAS

    es, brush andr cut and fills,

    rmission from

    potential for

    d conditions athe full range

    such areas arneer.

    m of stream bad yard out the

    atercourses idhe Work, sha

    cture installati

    atercourses, a

    nded through easons, the C

    ll not be respo

    cent to the high

    hectares of l

    s per 101.4.12

    TRUCTUR

    ITEM: 10

    January, 20

    d slash shall b, set stakes fo

    the Engineer

    r erosion an

    are not suitabof cables sha

    re frozen har

    anks and shae timber.

    dentified on thall be limited t

    ion.

    nd no felling o

    a written ordeContractor sha

    onsible to

    hway, shall be

    and cleared

    2 shall be

    RE

    01

    15

    be or

    r.

    nd

    le all

    d,

    all

    he to

    or

    er all

    e

    in

  • DEPA GRUB

    Janua

    102.1

    102.2

    102.3

    102.4

    ARTMENT

    BBING

    ary, 2015

    DESCRIPT

    .1 This Ite .2 This Ite

    operatio

    MATERIAL

    .1 None id

    SUBMITTA

    .1 The Co

    CONSTRU

    .1 The Cospecific

    .1 The

    of t .2 The Co .3 Grubbin

    stumps

    .1 In cgruthe

    .4 Grubbin

    original diversio

    .1 Gru

    to b

    .5 The Conecessextra shhave fa

    STANDAof TRANS

    TION

    m consists of

    em also consison done by ot

    S

    dentified.

    ALS

    ontractor shall

    CTION

    ontractor shacally directed b

    e Work shall itimber lying on

    ontractor shall

    ng shall be ca are removed

    cut sections, aubbing shall be Engineer.

    ng shall not beground, exc

    ons for Structu

    ubbing shall nbe wasted, as

    ontractor shallary to redresshaping, hydro

    allen as a resu

    ARD SPECIPORTATIO

    f the removal a

    sts of removal hers.

    submit, upon

    all carry out tby the Engine

    nclude dealingn the ground,

    carry out the

    arried out withand topsoil is

    and in fill secte carried out

    e carried out cept as approures are to be

    not be carried indicated in t

    be responsibs any areas g

    oseeding and/lt of root seve

    FICATIONON and INF

    GRADING

    and disposal o

    of shredded a

    request, a co

    the Work as er.

    g with stump due to clearin

    Work in accor

    h root rakes os left for salvag

    tions where thto a width 2 m

    in fill sectionsoved by the carried out.

    out in swamphe Contract D

    ble, at his/hergrubbed beyo/or mulching oerance due to

    S FRASTRUC

    of roots and st

    and/or chippe

    opy of any per

    indicated in

    height over 0ng by others.

    rdance with Ite

    or similar Equge under the e

    he Subgrade m from the cle

    s where the SuEngineer wh

    ps and other aDocuments or

    own expenseond the speciof the exposethe over-width

    CTURE

    tumps.

    ed material left

    rmit(s) required

    the Contrac

    .3 m, and with

    em 946 and It

    uipment, suchexcavation ite

    is within 2.5 earing line or

    ubgrade is mohere foundatio

    areas where tby the Engine

    e, to carry outfied limits, inc

    ed ground, andh grubbing.

    t behind from

    d to carry out

    ct Documents

    h brush, slash

    tem 948.

    h that only them.

    m of the origas otherwise

    ore than 2.5 mon excavation

    the underlyingeer.

    t any remediacluding but nod removal of

    ITEM: 102

    Page 102-1

    the clearing

    the Work.

    s and/or as

    h and pieces

    e roots and

    inal ground, directed by

    m above the n or stream

    g material is

    al measures ot limited to trees which

  • GR

    Pag

    102

    102

    102

    RUBBING

    ge 102-2

    2.4 .6 Roodisp

    .1

    .2

    .3

    .7 Wherootdisp

    .1

    .8 No mBrid

    2.5 MEASU

    .1 The in ac

    .1

    2.6 BASIS O

    .1 Pay

    ots and stumpposed of within

    The materialsspread out anoriginal groun

    Where Roadbgrubbed matmaterial or B102.4.6.1.

    Burying may Documents acovered with accordance w

    ere the disposs and stumps

    posed of outsid

    Burning of gr

    materials remge or any oth

    REMENT FO

    Quantity to bccordance wit

    All measurem

    OF PAYMENT

    ment for Work

    DEPARTM

    s, with or withn the Work Sit

    s may be placnd tramped fland, using a cra

    bed fills exceeerials either oBorrow, and

    be permitted and/or as appr

    excavated mwith 614.4.

    sal measuress, with or withode the Work S

    ubbed materia

    moved during er Structure.

    OR PAYMENT

    be measured fth this Item.

    ments shall be

    T

    k under this Ite

    STAMENT of TR

    GRADIN

    hout non-mercte by tub-grind

    ced under fillsat in a uniformawler tractor o

    ed 6 m in heigon the existinshall tramp t

    at other locaroved by the Eaterial as dire

    s of 102.4.6 aout non-mercSite in accorda

    als shall not b

    grubbing sha

    T

    for payment s

    made in a ho

    em shall be at

    ANDARD SRANSPORT

    NG

    chantable treeding, or by bu

    s over 5 m inm layer to a cof 20 t or heav

    ght to Subgradng ground, or the materials

    tions within thEngineer, if thected by the E

    are determinehantable timbance with Item

    be permitted.

    all be permitte

    shall be the nu

    orizontal plane

    t the Unit Pric

    SPECIFICATATION an

    es, brush andurial as follows

    n height to Sucompact massvier.

    de, the Contrar on the first ls to a 0.6 m

    he Work Site he materials aEngineer, and

    ed by the Engber, brush andm 947.

    ed to be place

    umber of hect

    e.

    ce.

    ATIONS nd INFRAS

    d slash as pers:

    ubgrade, if thes no more tha

    actor may plalift of compac thickness as

    as indicated are spread out the surface h

    gineer to be d slash as per

    ed within 30 m

    tares of grubb

    TRUCTUR

    ITEM: 10

    January, 20

    r 101.4 shall b

    e materials aran 0.6 m abov

    ace one layer octed excavates described

    in the Contrat, tramped, anhydroseeded

    unfeasible, thr 101.4 may b

    m of a Culver

    bing carried o

    RE

    02

    15

    be

    re ve

    of ed in

    ct nd in

    he be

    rt,

    ut

  • DEPA REMO

    Janua

    103.1

    103.2

    103.3

    103.4

    103.5

    103.6

    ARTMENT

    OVAL OF ISO

    ary, 2015

    DESCRIPT

    .1 This Iteisolated

    .1 An

    mm .2 An

    MATERIAL

    .1 None id SUBMITTA

    .1 None id CONSTRU

    .1 The Cospecific

    .2 Isolated .3 Orname .4 The Co

    property .5 The Co

    MEASURE

    .1 The Qustumps

    BASIS OF P

    .1 Payme

    STof TRANS

    OLATED TRE

    TION

    em consists od stumps.

    isolated tree m above the ex

    isolated stum

    S

    dentified.

    ALS

    dentified.

    CTION

    ontractor shacally directed b

    d trees and st

    ental trees an

    ontractor shaly resulting fro

    ontractor shall

    MENT FOR P

    uantity to be ms removed and

    PAYMENT

    nt for Work un

    TANDARDPORTATIO

    ES

    of the remova

    is defined as xisting ground

    mp is defined a

    all carry out tby the Engine

    umps shall be

    nd shrubs sha

    l be responsom the Work.

    carry out the

    PAYMENT

    measured ford disposed of

    nder this Item

    SPECIFICON and INF

    GRADING

    al and dispos

    a tree havingd surface.

    as a stump ha

    the Work as er.

    e clearly ident

    ll not be distu

    ible to repair,

    removal in ac

    r payment shain accordance

    shall be at th

    CATIONS FRASTRUC

    sal of isolated

    g a minimum

    aving a minim

    indicated in

    tified as such

    rbed without w

    , at her/his o

    ccordance wit

    all be the nume with this Ite

    he Unit Price.

    CTURE

    d trees comp

    diameter of 1

    um top diame

    the Contrac

    in the field, by

    written permis

    own expense

    th 101.4 and 1

    mber of isolam.

    lete with stum

    00 mm meas

    eter of 300 mm

    ct Documents

    y the Enginee

    ssion from the

    , any damag

    102.4.

    ted trees and

    ITEM: 103

    Page 103-1

    mps, and/or

    sured at 300

    m.

    s and/or as

    er.

    e Engineer.

    e to private

    d/or isolated

  • DEPA COMM

    Janua

    106.1

    106.2

    106.3

    106.4 106.4

    ARTMENT

    MON EXCAVA

    ary, 2015

    DESCRIPT

    .1 This IteWork S

    MATERIAL

    .1 For temmeeting

    SUBMITTA

    .1 Submitt

    CONSTRU

    .1 Genera

    .1 Thespe

    .2 The .3 The

    det

    .4 Poldire

    .1

    .5 The

    em

    .1

    .6 If a

    ma

    .1

    .7 Wh

    conSub

    .1

    .8 Tra

    ind

    STANDAof TRANS

    ATION

    TION

    em consists oSite, of soil and

    S

    mporary streamg the requirem

    ALS

    tals are requir

    CTION

    al

    e Contractor ecifically direct

    e Contractor s

    e Contractor tailed in the Co

    lyethylene linection of flow a

    The Contrac

    e Contractor sbankments.

    Low spots aDays Work

    at any time duake all necess

    The depth rcompacted t

    here the Roanduct operatiobgrade, unles

    Any surfaceshall be mailimit posted f

    ansitions in cuicated on Stan

    ARD SPECIPORTATIO

    of the excavatd all other mat

    m diversion chments of CGSB

    red in accorda

    shall carry outed by the Eng

    shall carry out

    shall construontract Docum

    ners for tempand overlaps

    ctor shall be re

    shall maintain

    and ruts that cor, if rain is im

    uring the Worksary repairs to

    utted and/or to meet the re

    adbed being ons so that ths approved by

    e constructed intained in a cfor the Work A

    ut and fill condard Drawing

    FICATIONON and INF

    GRADING

    tion and placeterials not clas

    hannels, cleaB 51.34 shall

    ance with any

    ut the Work agineer.

    the Work in a

    ct offtakes anments.

    porary streamshall be a min

    esponsible for

    n surface drai

    could pond wamminent, as W

    k the surface o reinstate the

    displaced shaequirements o

    constructed hrough-traffic y the Enginee

    or exposed condition sucArea.

    nditions, at thg 108-1.

    S FRASTRUC

    ement within ssified as solid

    r polyethylenebe supplied b

    cross-referen

    as indicated i

    accordance w

    nd stream div

    m diversions nimum of 300

    r maintenance

    nage during e

    ater shall be rWork progresse

    becomes rute surface grad

    all be scarifieof this Item.

    is subject todoes not trav

    er.

    by the Contrch that traffic c

    he ends of b

    CTURE

    the Work Sited rock.

    e liners a minby the Contrac

    nced Item form

    in the Contra

    ith Item 946 a

    version chan

    shall be insmm in the dir

    e and removal

    excavation of

    removed no laes during the

    tted or displacde.

    ed, moisture c

    o through-traffvel directly on

    ractor and sucan safely tra

    bedrock cuts,

    e or disposal

    nimum of 6 mictor.

    ming part of th

    act Documents

    and Item 948.

    nels as ident

    talled transverection of flow

    of the liners.

    f cuts and con

    ater than the eDay.

    ced, the Cont

    conditioned, s

    ffic, the Contn an undercut

    bjected to thavel along it a

    shall be car

    ITEM: 106

    Page 106-1

    outside the

    ils thick and

    is Item.

    s and/or as

    tified and/or

    erse to the .

    nstruction of

    end of each

    tractor shall

    shaped and

    tractor shall t surface or

    rough-traffic at the speed

    rried out as

  • CO

    Pag

    106

    OMMON EXCA

    ge 106-2

    6.4 .2 Exca

    .1

    .2

    .3

    AVATION

    avation

    The Contractbeen complet

    The Contractoptimum usag

    .1 Any matshall be s .1 The

    time .2 Stoc

    compor be

    .3 Stock

    assu

    .4 Tops

    .2 The Conrequiremthe top 60

    .3 The Concommon placemen .1 Borro

    place

    .4 CommonstockpiledEngineer

    .1 Stock

    suppto en

    .2 Stock

    mateall comain

    .3 Stock

    shall over

    .4 Work

    Where the Sudepth below S

    DEPARTM

    tor shall not coted for the Wo

    tor shall contrge of the exca

    erial suitablesalvaged and

    depth of excaof excavation

    kpile(s) shall pletion of ditce a potential s

    kpiling shall bred.

    soil stockpiles

    ntractor shall ents of 121.200 mm of the

    ntractor shall excavation e

    nt of any mate

    ow shall not bed at a lesser

    n material salvd such that thr.

    kpiling of comporting the entnsure maximu

    kpiles shall noerials, nor neaommon materntained at all ti

    kpiles shall bebe shaped tothe edge of st

    k will involve th

    ubgrade requiSubgrade on a

    STANDAMENT of TR

    GRADIN

    ommence anyork Area involv

    rol the excavaavated materia

    for topsoil, fd stockpiled at

    avation of the n, between th

    not be locatches and slopsource of silta

    be carried ou

    s shall be mul

    separately e - Borrow A/ASubgrade.

    conduct opeeither has beerial under Item

    be placed in acost to the Ow

    vaged by thehe material do

    mmon materialtire weight andm recovery of

    ot be placed ar property linerial is not posmes.

    e built in layero maintain surtockpiles shal

    he re-handling

    ires undercutta plane parall

    ARD SPECIRANSPORT

    NG

    y excavation uved.

    ation and hanals is achieved

    from cuts, ant the location(

    topsoil layer e Contractor

    ted where thepes as per Iteation to waterc

    ut such that th

    ched in accor

    xcavate or oA1, as indicate

    erations such een used or m 121.

    areas where ewner, unless o

    e Contractor fes not becom

    shall be doned dimension of the stockpile

    near a quarryes, tree lines ssible or pract

    rs not exceedirface drainagel not be perm

    g of excavated

    ting, subexcavel to the Subg

    FICATIONTATION an

    until the origin

    ndling of the d, as follows:

    nd from fill ar(s) approved

    shall be as dand the Engi

    ey shall inhibem 946, blockcourses.

    he maximum

    rdance with It

    otherwise salved in the Con

    that all usashall be used

    excavated maotherwise auth

    for re-use othme saturated a

    e on a well-drof the stockpild materials.

    y/pit face, Strior drainage d

    tical and acce

    ing one metree before the nitted.

    d material from

    vation shall begrade cross-sl

    S nd INFRAS

    nal cross-sect

    common mat

    reas that shaby the Engin

    determined in neer.

    bit orderly cok or inhibit na

    recovery of

    tem 616.

    vage materiantract Docume

    able material d in the Wor

    aterials could horized by the

    her than as tat a location a

    rained, level bles and in suc

    ipping piles oditches such tess to the sto

    e in thickness next layer is be

    m stockpiles.

    e carried out tlope.

    TRUCTUR

    ITEM: 10

    January, 20

    tion survey ha

    terial such th

    all be strippedeer.

    the field at th

    onstruction anatural drainage

    the material

    ls meeting thents, for use

    resulting frork, prior to th

    be hauled ane Engineer.

    topsoil shall bpproved by th

    base capable ch a manner a

    or piles of othethat retrieval

    ockpile shall b

    and each layeegun. Dumpin

    to the specifie

    RE

    06

    15

    as

    at

    d,

    he

    nd e,

    is

    he in

    m he

    nd

    be he

    of as

    er of be

    er ng

    ed

  • DEPA COMM

    Janua

    106.4.2

    106.4

    ARTMENT

    MON EXCAVA

    ary, 2015

    2 .4 Hauaut

    .5 The

    tha .6 In c

    be wou

    .7 Wh

    bed .8 Exc

    prodire

    .9 Exc

    Con .10 Bou

    Item

    .3 Placem

    .1 Thecon

    .2 The

    sur .3 Em

    Forlift.

    .1

    .4 Ma

    mm

    .1

    .5 Ma

    121in 1

    .1

    .6 Wh

    thaas 1 m

    STANDAof TRANS

    ATION

    uling of commthorized by the

    e Contractor st would cause

    cuts, the area shaped to eliuld impede na

    here common drock Backslo

    cavated mateoperty of the ected by the E

    cavated matentractor and s

    ulders 1 m3, om 108.

    ment

    e placement nform to lines

    e placement rface drainage

    mbankments sreslopes and e

    On ungrubbapproved by

    aterial placed tm.

    The lift thicknproof that the

    aterial placed 1.2 - Borrow A106.4.3.4.

    In backfillingby the Engin

    here embankmn 3:1, for the teach lift of fill

    m.

    ARD SPECIPORTATIO

    mon excavatioe Engineer.

    shall shape dite water to pon

    between the timinate verticatural drainage

    material is uopes shall be s

    erial designateOwner and s

    Engineer.

    erial designateshall be dispos

    or larger, that a

    of excavated and grades p

    of material se.

    shall be consteach success

    bed areas, swy the Engineer

    to within 600

    ness may be e specified de

    in the top A/A1, as indica

    g of undercuts neer.

    ments are contop 2.5 m belois placed so th

    FICATIONON and INF

    GRADING

    on over Aggre

    tches to the linnd shall be rem

    top of the Bacal or overhane.

    underlain by ashaped as ind

    ed by the Enshall be eithe

    ed by the Engsed of in acco

    are encounter

    d material shaprovided.

    hall be in lay

    tructed such tsive lift shall be

    wamps and rr.

    mm below Su

    increased to aensity can be a

    600 mm of ated in the Co

    deeper than

    structed againow Subgrade hat the next lif

    S FRASTRUC

    egate Base/S

    nes and grademoved.

    ckslope and thnging faces, e

    a deep bedrodicated on Sta

    ngineer as suer stockpiled

    gineer as waordance with It

    red in the Wo

    all be carried

    yers, and eac

    that the first le completed t

    rough terrain

    ubgrade shall

    a maximum ofachieved thro

    f the Subgraontract Docum

    600 mm, the

    nst an existingthe spreadingft is keyed in

    CTURE

    ubbase shall

    es specified, a

    he edge of theexposed roots

    ock cut, the mandard Drawin

    urplus and usor otherwise

    ste, shall bectem 947.

    ork shall be ha

    out in accor

    ch layer shal

    lift when shapto the full widt

    the initial lif

    have a maxi

    f 600 mm if thughout the en

    ade shall mements, and sha

    lift thicknesse

    g earth sidehilg Equipment snto the sidehil

    not be permi

    and any grade

    e ungrubbed ss and any ma

    material at theng 106-1.

    seable, shall placed in th

    come the pro

    andled in acco

    rdance with It

    l be shaped

    ped forms theh prior to plac

    ft thickness s

    mum lift thick

    he Contractor ntire lift.

    eet the requiall be placed

    es shall be as

    l having a Sloshall cut into thl to a width no

    ITEM: 106

    Page 106-3

    itted, unless

    e conditions

    surface shall aterial which

    e top of the

    remain the e Work, as

    perty of the

    ordance with

    tem 941, to

    to maintain

    e toe of the cing the next

    shall be as

    ness of 300

    can provide

    irements of as specified

    determined

    ope steeper he sidehill

    ot less than

  • CO

    Pag

    106

    106

    106

    106

    OMMON EXCA

    ge 106-4

    6.4.3 .7

    .8

    6.4 .4 Com

    .1

    .2

    .3

    6.4 .5 Culv

    .1

    6.4 .6 Driv

    .1

    AVATION

    Where the Wthe other sidethe Roadbed side of the Ro

    Excavated mconstructed sin the Contrac

    .1 Maximumlimits sho

    .2 Maximumdriven.

    mpaction

    The Contract936.

    .1 Any isolathe specquality m

    In cuts, the Sby a test strip

    .1 If the Subprior to bDocumen

    Each lift of exof 95% of the

    verts

    Where excavany existing p .1 The Cont

    .2 Pipe deteand shallMaintena

    .1 Salva

    deter

    .3 Unsalvagdisposed

    veways

    Driveways exutilizing mate

    DEPARTM

    Work involves pe, the spreadas each lift o

    oadbed or the

    material placeshall be a matct Documents

    m 200 mm beown on the Pla

    m 300 mm wh

    tor shall carry

    ated soft spotscified compactatching the su

    Subgrade surfap.

    bgrade has bebeing backfillents, to Subgra

    xcavated matee maximum dry

    vation involvespipe is not dam

    tractor shall no

    ermined by thel be re-used i

    ance Depot.

    ageable pipermined by the

    geable pipe a of outside the

    xcavated undrial excavated

    STANDAMENT of TR

    GRADIN

    placement of ming Equipmenof material is p existing Road

    ed behind Sterial meeting s, and shall ha

    hind abutmenans; or

    here Structure

    y out moisture

    s, or other aretion criteria surrounding ma

    ace shall be c

    een undercut,ed with Borro

    ade.

    erial, after play density.

    s removal of maged and is

    otify the Engin

    e Engineer to in the Work S

    e that is damEngineer, sha

    nd waste shae Work Site.

    der this Item d from the cros

    ARD SPECIRANSPORT

    NG

    material firstlynt shall cut intplaced, so thadway Slope to

    tructures or the requirem

    ave lift thicknes

    nt breastwalls

    es shall be co

    conditioning

    eas within thehall be excavaterial, as dire

    compacted to

    , the undercutow A/A1-quali

    cement per 1

    Culverts, the salvaged for r

    neer prior to e

    be salvageabSite under Item

    maged as a all be replace

    all become the

    shall be replssing whereve

    FICATIONTATION an

    y along one sito the edge oat the next lifto a width not l

    in areas whents of 121.2sses as follow

    or other earth

    onstructed or t

    and compact

    e top 1.2 m ofvated and ba

    ected by the E

    97% of the co

    t surface shality material, a

    06.4.3, shall b

    Contractor shre-use.

    exposing any e

    ble shall remam 140, or tra

    result of thd by the Cont

    e property of

    laced the samer possible.

    S nd INFRAS

    de of the Roaof the previoust is keyed iness than 0.5 m

    here Structur - Borrow A/A

    ws:

    h-retaining St

    through which

    tion in accord

    f the Subgradackfilled with Engineer.

    ontrol density

    l be rolled witas indicated i

    be compacted

    hall take care

    existing pipe.

    ain the propertnsported to th

    he Contractortractor.

    the Contracto

    me Day they

    TRUCTUR

    ITEM: 10

    January, 20

    adbed and thesly built side oto the adjacem.

    res are to bA1, as indicate

    ructures, to th

    h piles shall b

    dance with Ite

    de, not meetinmaterial of th

    y as determine

    th a static rollen the Contra

    d to a minimu

    e to ensure th

    ty of the Ownehe nearest DT

    rs actions, a

    or and shall b

    y are remove

    RE

    06

    15

    en of nt

    be ed

    he

    be

    m

    ng he

    ed

    er ct

    m

    at

    er TI

    as

    be

    d,

  • DEPA COMM

    Janua

    106.4.6

    106.5

    106.6

    ARTMENT

    MON EXCAVA

    ary, 2015

    6 .2 WhPavavo

    .1

    .2

    MEASURE

    .1 The Quexcavat

    .2 The vol

    on orig

    .1 In tpay

    .3 Excava

    as defin

    BASIS OF .1 Paymen

    excavat

    STANDAof TRANS

    ATION

    here excavatiovement shall oid damage to

    The Contracbeyond the down expense

    The excavatuse in embdisposed of o

    MENT FOR P

    uantity to be mted and place

    lume shall beginal ground c

    the areas to byable under th

    ation of soft spned by this Ite

    PAYMENT

    nt for Work ution, as identif

    ARD SPECIPORTATIO

    on involves pabe cut to a n

    o the adjacent

    ctor shall be designated lime, of the areas

    ted Pavementankment conoutside the W

    PAYMENT

    measured for ped, stockpiled a

    e as measuredcross-sections

    be grubbed, thhis Item shall

    pots, deleteriom shall be me

    under this Itemfied under the

    FICATIONON and INF

    GRADING

    aved drivewaneat straight llands and Ro

    responsible mits of the excs affected.

    t shall be broknstruction, unl

    Work Site.

    payment shall and/or dispos

    d in situ and cs surveyed by

    he cross-sectioinclude mater

    ous materials, easured for pa

    m shall include Contract.

    S FRASTRUC

    ays, parking loline and edgeoadbed.

    for damage txcavation and

    ken down into less designat

    be the numbsed of in accor

    computed by y the Engineer

    ons shall be trial in the grub

    offtakes, streayment.

    de a separate

    CTURE

    ots or other ae, and remove

    to the Pavemfor the repair

    pieces small ted by the E

    er of cubic merdance with th

    the average r on the natura

    taken before gbbed layer rem

    eam diversion

    e Unit Price fo

    abutting privated in a mann

    ment and othr or restoration

    enough to beEngineer as w

    etres of commhis Item.

    end area metal ground.

    grubbing, andmoved under

    channels and

    or each type

    ITEM: 106

    Page 106-5

    te lands the ner so as to

    her surfaces n, at his/her

    e suitable for waste to be

    mon material

    thod, based

    the volume Item 102.

    d driveways

    of common

  • DEPA UNCLA

    Janua

    107.1

    107.2

    107.3

    107.4

    107.5

    ARTMENT

    ASSIFIED EX

    ary, 2015

    DESCRIPT

    .1 This IteWork Scompos

    MATERIAL

    .1 For temmeeting

    SUBMITTA

    .1 Submitt

    CONSTRU

    .1 The Cospecific

    .2 The Co .3 The Co

    in the C .4 Polyeth

    flow and

    .1 The .5 The Co

    excavat .6 The Co

    excavat MEASURE

    .1 The Qumateria

    .2 The volon orig

    .1 In tpay

    .3 Excava

    the exc

    STANof TRANS

    XCAVATION

    TION

    em consists oSite, of materiased of a mixtu

    S

    mporary streamg the requirem

    ALS

    tals are requir

    CTION

    ontractor shacally directed b

    ontractor shall

    ontractor shall Contract Docu

    hylene liners fod overlaps sh

    e Contractor s

    ontractor shation in accord

    ontractor shation in accord

    MENT FOR P

    uantity to be al excavated a

    lume shall beginal ground c

    the areas to byable under th

    ation, per 106.avation of driv

    NDARD SPPORTATIO

    of the excavatals classified

    ure and variab

    m diversion chments of CGSB

    red in accorda

    all carry out tby the Engine

    carry out the

    construct offtments.

    or temporary all be a minim

    shall be respo

    all handle mance with 106

    all handle maance with 108

    PAYMENT

    measured forand either plac

    e as measuredcross-sections

    be grubbed, thhis Item shall

    4, of offtakes,veways shall b

    PECIFICATON and INF

    GRADING

    tion and placeunder neitherle and undete

    hannels, cleaB 51.34 shall

    ance with any

    the Work as er.

    Work in accor

    takes and stre

    stream diversmum of 300 mm

    nsible for mai

    material which6.4.

    aterial which 8.4.

    r payment shced, stockpiled

    d in situ and cs surveyed by

    he cross-sectioinclude mater

    stream diversbe measured

    TIONS FRASTRUC

    ement within r common excermined distrib

    r polyethylenebe supplied b

    cross-referen

    indicated in

    rdance with Ite

    eam diversion

    sions shall be m in the direct

    ntenance and

    h would othe

    would other

    hall be the nud or disposed

    computed by y the Engineer

    ons shall be trial in the grub

    rsion channelsfor payment.

    CTURE

    the Work Sitecavation nor bution of both.

    e liners a minby the Contrac

    nced Item form

    the Contrac

    em 946 and It

    n channels as

    installed tranction of flow.

    d removal of th

    erwise be cla

    rwise be clas

    umber of cubof in accorda

    the average r on the natura

    taken before gbbed layer rem

    s, soft spots, d

    e or disposal solid rock exc.

    nimum of 6 mictor.

    ming part of th

    ct Documents

    tem 948.

    identified and

    nsverse to the

    he liners.

    assified unde

    ssified under

    ic metres of ance with this I

    end area metal ground.

    grubbing, andmoved under

    deleterious ma

    ITEM: 107

    Page