U D O T R E G I O N 4 P E R F O R M A N C E M O D E L 2 0 1 5
• INNOVATION • DEDICATION • PASSION• INTEGRITY • PUBLIC RESPONSIVENESS • FISCAL RESPONSIBILITY
UDOT’S CORE VALUES
It is the time of year when we set our target on the upcoming fiscal year and when we reflect on our success of the past year. This past year several changes within the Department required us to stop and analyze how we complete our work activities.
First, at the annual UDOT Conference, a vision and mission for the Department were revealed and the strategic goals of the Department were modified. These newly clarified initiatives and goals are provided on the next page of the Region Performance model. I encourage you to review these with
your coworkers and have a discussion about these goals. They are what drives our work here at UDOT. Every item that we do needs to have a correlation to our goals or we need to consider not doing that task. All of our project and maintenance code 1 budgets are centered around maintaining or improving our conditions related to these goals.
Second, with the expansion of the Zero Fatalities goal to now include crashes and injuries, UDOT has rolled out the ROADS safety program. This program is directly focused on UDOT employees. It is imperative that you are able to come to work each and every day to perform the needed tasks and at the end of the day return safely to your other family. This cultural change at UDOT will take some time to fully implement. Our goal is to create a respectful environment where each and every employee reviews their work conditions, upcoming job site, and their coworkers to ensure that safety is second to none. We should feel safe discussing safety. In this model you will see several charts and graphs that show how our Region is doing relative to this program. With slightly less than 6 months of data since this program began, we are starting to see the benefits. We have had more discussions on how and when we do our work items and the risk of some of these items than I have heard for many years. This is very encouraging to me and I look forward to reducing the equipment and general liability claims this year, but most of all reducing the number of employee accidents that occur on the job. We can be much safer so stay focused on the goal and we will be successful.
Thank you for all your hard work and dedication to the Department and the citizens and visitors of Utah.
Keep up the great work.
Rick TorgersonUDOT Region 4 Director
i i | U TA H D E PA R T M E N T O F T R A N S P O R TAT I O N
PERFORMANCE MODEL
UDOT VISION:
UDOT STRATEGIC GOALS:
UDOT MISSION:Innovating transportation solutions that strengthen Utah’s economy and enhance quality of life
UDOT EMPHASIS AREAS:• Integrated Transportation• Collaboration• Education• Transparency• Quality
2 0 1 5 R E G I O N F O U R P E R F O R M A N C E M E A S U R E S | i i i
STRATEGIC DIRECTION
TOP REASONS TO BE PROUD YOU LIVE AND WORK IN
Region Four covers over half of Utah’s land mass, totaling 48,300 square miles (57% of the State) and 11% of the State’s population
Region 4Region 4 includes: • 14 counties and 100 cities and towns
with a total population of approx 335,456 people
• 3 National Forests
• 5 National Parks
• 5 National Monuments
• 1 National Recreation Area
• 7 State Parks
• 10 State recreation Areas
• 15 Scenic Byways on State Highway routes
R4 2015 Employee Statistics: 368 full-time employees 74 new personnel 47 seasonal workers
Region Four Roads
* Center line Miles: a mile of highway without considering the number of lanes or width of shoulder.
Roadway Type State Total Miles * Region Total Miles * Region All Routes 5,865 2,993 51%Interstate 935 425 45%Level 1 2,960 1,291 44%Level 2 1,970 1,277 65%
Project Values FY 2015**
Number of Projects
Funds Number of Projects
Percent of Projects
Funds Percent of Funds
Design 722 $3.34B 138 19% $243M 7%Construction 194 $2.06B 56 29% $190M 9%
Close Out 346 $4.89B 94 27% $325M 7%Totals 1262 $10.29B 288 23% $758M 7%
State Values Region 4 Values
**This chart compares the percentage of Region 4 projects to the entire statewide program of projects and funds.
i v | U TA H D E PA R T M E N T O F T R A N S P O R TAT I O N
Images in this document have been used under Creative Commons Attributions-unported licenses for non-profit use from the following websites: http://www.brusheezy.com/http://www.sxc.hu/http://www.iconarchive.com/http://www.cgtextures.com/http://www.1001freefonts.com/http://www.qrstuff.com/http://www.clker.com/http://commons.wikimedia.org/http://www.vecteezy.com/http://www.pixel77.com/http://www.hongkiat.com/
Go to Region 4 at: www.udot.utah.gov/go/region4
Special Recognitions and Awards 1Preserve Infrastructure 3Pavement and Bridge Condition 4Road to ZERO Fatalities 5Fatality Report 6Roadway Safety 7Seat Belt Safety 8Employee Safety 9ROADS Program 10Innovation and Efficiency 11Permits 12Project Delivery 13Preconstruction: Design Team 15Preconstruction: Environmental Team 16Preconstruction: Right of Way / Utility 17Materials 18Maintenance 19Weather Impact 20Equipment 21Administrative Services 22Buildings and Grounds 23Wellness Council 24Communications 25
2 0 1 5 R E G I O N F O U R P E R F O R M A N C E M E A S U R E S | v
TABLE OF CONTENTS
45 Advancements 32 Trans Techs 6 Roadway Operations Manager I & II 4 Engineers 3 Office Technician positions
2015 Personnel Advancements:
Dale StapleyCareer Achievement
Shane WilliamsonEmployee of the Year
Jared BeardEngineer of the Year
Daryl Friant Leader of the Year
Keith SavageOutstanding Trans Tech
Tim Walden Expert of the Year
Justin WoodwardOutstanding Trans Tech
Nathan Freestone Outstanding Trans Tech
1 | U TA H D E PA R T M E N T O F T R A N S P O R TAT I O N
SPECIAL RECOGNITIONS AND AWARDS
Shane WilliamsonEmployee of the Year
WASHTO Dr. L.I. Hewes Award Region Four’s Preconstruction Team has developed GIS tools that support and enable communication and better decision, and charts a path for other work groups at UDOT to exploit GIS capabilities.
Standing- left to right: Rick Torgerson, Carlos Braceras, Shane Marshall, Monte Aldridge, Brandon Weight, Riley Lindsay, May Anderson, Sam Grimshaw, Eric Hansen, Devin Monroe, John Fraidenburg, Kelly Hall, Randall Taylor, Wendy Nez, Bill Mecham, Jared Barton Seated- left to right: Gernice White, Josh Peterson, Cameron Gay, Jared Beard, Silvia Barbre, Don Johnson, Ted Madden (Not pictured: Pam Higgins, Jeff Bunker, Paul Damron)
Governor’s Award for Excellence Monte Aldridge received the Governor’s Award for Excellence in the category of leadership. He continually aligns people and processes in the use of Geographic Information System (GIS) tools, implementation of 3D design and advancement of wildlife connectivity/vehicle collision reduction.
Carlos Braceras, Monte Aldridge, Governor Herbert
America’s Transportation Award Quality of Life/Community DevelopmentBluff Street at Red Hills Parkway InterchangeThis project improved safety for motorists, pedestrians and cyclists. The newly reconfigured intersection integrates bike/pedestrian paths into the intersection allowing for multimodal transportation under the busy roadway connecting communities safely. Ray Bentley, Branden Anderson, Dana Meier, Rick Torgerson
2015 Region Equipment Awards Station equipment was inspected and graded on usage, idle time and an overall inspection of appearance/cleanliness, safety features, maintenance and records.
East Area winner Emery Station 4457 West Area winner Escalante Station 4470
Bryan Blood, Jeff Johnson, Rick Torgerson (Not pictured: Dan Cottam, Gary Spencer, Warren Haycock, Andy Mortensen)
Bryan, Blood, Jeremy Larsen, Mike Christensen, Tate Weber, David McKee, Rick Torgerson (Not pictured: Robert Homer)
2 0 1 5 R E G I O N F O U R P E R F O R M A N C E M E A S U R E S | 2
Maintenance Management Quality Assurance Reporting (MMQA)2015 MMQA Accomplishment:Region Four is currently meeting or exceeding the Level of Maintenance (LOM) goals in 5 of the 12 activities that are reporting accurately. Six activities are currently not reporting correctly and will be updated in OMS when corrected.
MMQA data helps determine where to allocate funds among the various maintenance activities. Consistency and quality are reported by stations and monitored by the Asset Management Division.
2016 MMQA Goal: •Meet the Level of Maintenance (LOM) target•Improve data collection through the use of MMQA teams•Improve culverts and drainage•Improve roadway safety
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
MMQA YEARLY GRADE COMPARISON GRAPH
2010 Grade
2011 Grade
2012 Grade
2013 Grade
2014 Grade
2015 GradeTarget
3 | U TA H D E PA R T M E N T O F T R A N S P O R TAT I O N
PRESERVE INFRASTRUCTURE
Pavement Conditions
Bridge Conditions
86.5% 90.6%85.5%
100.0% 96.2%
13.5% 9.4%13.5%
3.8%1.0%
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
2009 2010 2011 2012-13 2014-15
INTERSTATE RIDE
GOOD FAIR POOR
41.6% 44.6%
58.4% 55.5% 52.9%
55.8% 53.4%36.8% 40.8% 43.7%
2.6% 2.0% 4.8% 3.7% 3.4%
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
2009 2010 2011 2012-13 2014-15
LEVEL 1
GOOD FAIR POOR
18.6% 18.3% 17.3% 19.0%12.2%
66.3% 63.4% 69.3% 64.5%
65.4%
15.1% 18.3%13.4% 16.5%
22.4%
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
2009 2010 2011 2012-13 2014-15
LEVEL 2 RIDE
GOOD FAIR POOR
31.8%40.8%
46.9%55.6%
31.4%
63.6%56.1% 46.9%
38.9%
59.5%
4.6% 3.1% 6.2% 5.5% 9.1%
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
2009 2010 2011 2012-13 2014-15
LEVEL 1 NON NHS RIDE
GOOD FAIR POOR
51.0% 48.1%
68.5%
55.3%61.8%
47.0% 50.9%
27.9%42.7%
37.2%
2.0% 1.0% 3.6% 2.0% 1.0%
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
2009 2010 2011 2012-13 2014-15
LEVEL 1 NHS RIDE
GOOD FAIR POOR
442 66%
22334%
/0%Good Fair Poor
2015 Accomplishment:
2016 System Performance Goal: Maintain an acceptable ride quality (fair or better) on all Interstate and Level 1 roadways. Maintain a bridge system rated in good condition and expand bridge management efforts by preparing a plan for every structure based on preservation, rehabilitation and replacement needs.
INTERSTATE
96%Good Condition
LEVEL 1 ROADS
Good to Fair condition97% 100%
BRIDGES
Good to Fair condition
*
Level 1 National Highway System (NHS): Federally designated roadways protected for transportation needs that may arise from national emergencies.
All State Highways not on NHS system.
Level 2 Roads: Recent Gas Tax increase will focus improvements to Level 2 Roads.
Level 1 Roads: All roadways exceeding 1000 cars or 200 Trucks per day.
*Data assumes “Good” condition for roadways with projects funded but not yet completed.
2 0 1 5 R E G I O N F O U R P E R F O R M A N C E M E A S U R E S | 4
PAVEMENT AND BRIDGES
Definition of Crash Levels: Level 1 are no injury crashesLevel 2 are possible injury crashesLevel 3 are Non-incapacitating Injury crashesLevel 4 are Incapacitating Injury crashesLevel 5 are Fatal Injury crashes
2016 Goal:Reduce fatalities by 2% every year
17 20 21 2035
0
10
20
30
40
50
60
70
2011 2012 2013 2014 2015
Level 5 Fatal Crashes by Year
5442
6551
January through June July through December Total
1,510 1,813 1,795 1,811 1,910
0500
1,0001,5002,0002,5003,0003,5004,0004,500
2011 2012 2013 2014 2015
Level 1 Crashes by Year
3,3753,835 3,919 3,928
341 380 377 373 426
0100200300400500600700800900
2011 2012 2013 2014 2015
Level 2 Crashes by Year
791 806 803 849
239 318 321 292 280
0100200300400500600700800
2011 2012 2013 2014 2015
Level 3 Crashes by Year
651 597576677
77 92 81 92 92
0
50
100
150
200
250
2011 2012 2013 2014 2015
Level 4 Crashes by Year
173 189163
198
2184 2623 2595 2588 2743
0
1000
2000
3000
4000
5000
6000
2011 2012 2013 2014 2015
TOTAL Crashes by Year
4,9695,549 5,60 5,623
5 | U TA H D E PA R T M E N T O F T R A N S P O R TAT I O N
ROAD TO FATALITIES
244253
233217 219
254
7667 59 46
7763
0
50
100
150
200
250
300
2009 2010 2011 2012 2013 2014
Num
ber o
f Fat
aliti
es
REGION FOUR - CUMULATIVE FATALITIES
STATEWIDE
REGION FOUR 25%31%
0
2
4
6
8
10
12
14
Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
REGION 4 -Fatal Crashes by Month
2014 2009-2013 Avg
Fatality Report 2015 Fatality Reduction Accomplishment:In 2014, Region Four had 63 fatalities accounting for 25% of the 254 Statewide Fatalities. This was an 18% decrease over 2013.
2016 Fatality Reduction Goal:The goal is Zero Fatalities with an emphasis on reducing fatalities by 2% per year.
Fatal Crashes2010 2011 2012 2013 2014
55 5442
6551
6760
46
7763
FATAL CRASHES / FATALITIES BY YEAR
Fatalities
2 0 1 5 R E G I O N F O U R P E R F O R M A N C E M E A S U R E S | 6
FATALITY REPORT
10 Miles Upgraded Guardrail
5 Miles Concrete Barrier
29 Miles Cable Barrier
249 Crash Cushions
260 Miles Centerline and Shoulder Rumble Strips
9 Miles Wildlife Fencing
11 “No Pass” pennants installed
2015 ACCOMPLISHMENT:
63%
25%9%
8%
8%
5%3%
3% 3%
2014 Crash Type
Roadway Departure
Speed Related
Intersection Related
DUI
Teen Driver
Pedestrian
Bicycle
Driver Distraction
Fatigue Related
In 2014, 63% of Fatalities in Region 4 were related to Roadway Departure
2016 Goal: • Install roadway departure countermeasures to protect lives and increase safety
Motorist Assist 14642%
Debris Removal 41
12%
Other Assist 8926%
Incident Assist 71
20%
IMT Activities by Type for UDOT Region 42015 Accomplishment:• Incident and Crash Clearance time Average
2.0Hours
2016 Goal:• Reduce Incident and Crash Clearance Time by 10 %• Improve signal timing on corridors and intersections• Install traffic message boards (ATMS)• Develop tools to measure speeds, delays, and ‘% stopping’ of vehicles on arterial corridors
Incident Assist Hours
172
UDOT Assist Hours
62
Incident Manhours
7 | U TA H D E PA R T M E N T O F T R A N S P O R TAT I O N
ROADWAY SAFETY
In 2014 there were 63 Fatalities in Region 4
43 involved vehicles where seat belts could have been worn
13 involved motorcycles or ATV’s
4 involved pedestrians
3 involved a bicyclist
0-19 20-29 30-39 40-49 50-59 60-69 70-79 80 &Over
Unknown
16%
14%
11%
14% 14%
6%
13%
2%
10%
Age Ranges of Fatalities•Highest risk age
group is 0-19•Secondary age groups are ages
20-29, 40-49, and 50-59
Age Group
At
Ris
k %
Seat Belt Used 32%
Seat Belt Not Used 56%
Seat Belt Unknown
12%
Seat Belt Usage in Fatal Crashes
LIVES LOST ON R4 ROADS IN 2014TOP FIVE DEADLY DRIVING BEHAVIORS
3Drowsy Driving
Z zZ 3
Distracted Driving
8
Aggressive Driving
11
Alcohol/Drug Impaired Driving
24Unrestrained
10 Miles Upgraded Guardrail
5 Miles Concrete Barrier
29 Miles Cable Barrier
249 Crash Cushions
260 Miles Centerline and Shoulder Rumble Strips
9 Miles Wildlife Fencing
11 “No Pass” pennants installed
2 0 1 5 R E G I O N F O U R P E R F O R M A N C E M E A S U R E S | 8
SEAT BELT SAFETY
2015 Acc
omplishm
ents:
*Reduced
Employe
e Equipm
ent Acci
dents by
8%
from 20
14, thro
ugh a va
riety of
behavio
r
based s
afety me
thods
2016 Emp
loyee Go
al: ROAD
S
*Reduce
accident
s by 10%
or more
*Mandato
ry defen
sive dri
ving cou
rse for
all emp
loyees
*Monthly
trainin
g exerci
se to re
duce
highest
acciden
t types
*Quarter
ly safet
y report
provide
d to
employe
es to cr
eate awa
reness
REGION 4 Employee Safety Statistics
Vecteezy.com/m
embers/sunshine-91
9 | U TA H D E PA R T M E N T O F T R A N S P O R TAT I O N
EMPLOYEE SAFETY
CAUTION15%14%12%12%11%11%10%9%9%7%7%7%6%6%5%5%5%5%5%4%4%4%4%4%3%3%
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Slip/Trip HazardsHearing
HeadSeat BeltsEye/Face
Situational AwarenessStruck by Potential
Fall ProtectionLifting/Bending
Reaching/TwistingCommunication
HandClean Environment
Proper PostureProtective/Reflective Clothing
Orderly StorageCorrect Tool for Task
Proper OperationsPinch Points
Clear Aisles/ExitsProper Use of Tool
Tool in Good ConditionFoot
ErgonomicsVehicle Condition
Pushing/Pulling
Total Safe and At Risk reported behaviors
Safe At Risk
ROADS
27% 28%22% 16%
34% 32%39% 39%
46%
59%53%
61%
39%47% 43% 44%
0%
10%
20%
30%
40%
50%
60%
70%
March April May June
Observation Cards Submitted
Admin/Office West East Region Avg.
RECOGNIZING • OBSERVING • ACHIEVING DEPARTMENT SAFETY
2016 GOAL: Our goal is a safer work environment for every employee! The best way to achieve this goal is through awareness, the ROADS program increases awareness.
Every UDOT Employee is encouraged to contribute to a culture of Safety. We do this by participating in the RECOGNIZING • OBSERVING • ACHIEVING DEPARTMENT SAFETY (ROADS) program. THE ROADS behavioral based safety training was rolled out state-wide in January 2015. The training highlighted how much we depend upon and care for each other. The goal is for each employee to complete an observation of work related safety practices, have a conversation with those observed, and return observation cards to the ROADS Safety committee for review. The findings from the observations will be used to help improve safety practices throughout the State.
2 0 1 5 R E G I O N F O U R P E R F O R M A N C E M E A S U R E S | 1 0
ROADS PROGRAM
Brine Tank in Cedar Maintenance • The new unit will be shared between 8 sheds. It is stainless
steel with a removable salt hopper for easy clean up. It has the capability to make up to 5000 GPH of Brine. The system will be fully automated to make brine to the exact salinity that is needed saving 4-5 man-hours per batch. The automation will also increase efficiency in loading of trucks and tracking of material with driver and truck ID #’s.
Specification Generator Tool and Summary of Items Export • The Specification Generator tool automatically pulls
supplemental specs, special provisions, and standard drawings from the web, inserts project and PIN numbers and saves them together. The Summary of Items Generator tool reduces manual entry by exporting PDBS data and automatically creating a Summary of Items sheet
Purchasing and Contract Guide • The Region 4 Purchasing and Contracts User Guide
provides quick access to updated purchasing rules, procurement personnel contact information, and contract search tools. In addition, the guide provides convenient access to Region 4’s frequently used contract list
Power Rebates for Lighting in Sheds • Lighting upgrades throughout the Region focused
on local power rebate programs. The upgrades have resulted in an average of 45% less kilowatts being used, which correlates to a dollar savings average of 52%
UPLAN Gallery Maps http://uplan.maps.arcgis.com/home/• Maps are developed that incorporate all the known
asset, environmental, planning, traffic-safety and operations data to provide a more complete picture of the states transportation network
3D Design and Construction• Using the new power inroads and open roads
technology we have seen benefits and efficiencies in day to day work and also the advantages it provides as we deliver a 3D product to Contractors www.udot.utah.gov/go/3-D
http
://w
ww
.icon
smin
d.co
m
Vect
eezy
.com
/mem
bers
/zha
olifa
ng
11 | U TA H D E PA R T M E N T O F T R A N S P O R TAT I O N
INNOVATION AND EFFICIENCY
http
://w
ww
.icon
smin
d.co
m
Vect
eezy
.com
/mem
bers
/zha
olifa
ng
66%
27%
4%3%
FY 2015 Number of Permits Processed by Percentage
EncroachmentSpecial EventsAccessManhole
Total # of Permits issued 2015 = 689
0
5
10
15
20
25
30
35
40
2011 2012 2013 FY 2014 FY 2015
9 8 7 68
25
37
24
28
25
3 4
1 24
15 16 17 16 15
Average Days to Process Permits by Type
Encroachments
Access
Manhole
Special Event
0 20 40 60 80 100
2010
2011
2012
2013
FY 2014
FY 2015
99
82
81
84
76
76
94
55
53
63
86
80
Access %
Overall %
% met Target
Permit Statistics:
Average number of days for permit processing showing year-to-year trend
2015 Accomplishment: Number of permits processed has increased and time to complete Access and Special Event Permits has improved
Permit issuance goal is to complete permit applications within 7 calendar days and Access Permits within 45 calendar days
2016 Permit Goal: Complete 80 percent of permit applications on time
2 0 1 5 R E G I O N F O U R P E R F O R M A N C E M E A S U R E S | 1 2
PERMITS
Budget2016 FY Cost Estimation Goal:BASE HIT = Have 90% of projects bid less than 110% of the Engineer’s Estimate.
2015 Accomplishment: Base Hits – 46/54 = 85%
2016 FY Cost Estimation Goal: HOMERUN = Have 50% of projects bid within 90% to 110% of Engineers Estimate.
2015 Accomplishment: Homeruns – 24/54 = 44%
Region 4 Project Bid OpeningsDifference between Engineers Estimate and
Contractors Bid (by percentage)
Sc o p e , Sc h e d u l e , B ud g e t1 3 | U TA H D E PA R T M E N T O F T R A N S P O R TAT I O N
PROJECT DELIVERY
2016 FY Cost Estimation Goal:BASE HIT = Have 90% of projects bid less than 110% of the Engineer’s Estimate.
2015 Accomplishment: Base Hits – 46/54 = 85%
Sc o p e , Sc h e d u l e , Bud g e t
Schedule2016 FY Advertising Goal: Advertise 85% of all projects prior to the committed advertised date.
2015 Advertising Accomplishment: 46/49 = 93.9%
Scope2016 FY Scoping Goal: Have 85% of all projects less than 5% over the original contract amount for Preservation and Rehabilitation projects and less than 9% for all other projects after Construction Complete.
2015 Accomplishment: 30/38 = 78.9%
Project Delivery Field
2016 FY Goal: Advertise 70% of projects between October and February.
2015 Accomplishment:30/50 = 60%
2 0 1 5 R E G I O N F O U R P E R F O R M A N C E M E A S U R E S | 1 4
DESIGN TEAM:• Work efficiently & effectively
• Clear Communication• Deliver quality, on-time projects
INNOVATION: 2016 GOAL:
ACCOMPLISHMENT: PERFORMANCE:
• SPECIFICATION GENERATOR TOOL: Allows designer to select specification documents from a drop-down menu which pulls and attributes all documents into the design folder• SUMMARY OF ITEMS EXPORT: Streamlines data required for Summary of Items sheet• POWER INROADS AND 3D DESIGN: Developing process to deliver 3D product to Contractors
• 85% Advertising on-time• Design Oversight on every project:
• Verify conformance to UDOT Standards and procedures • Single point of contact for each project team and designer• Information source for all users• Lead on Design Oversight Checklist
• I -15, Beaver Ridge climbing lanes • I -15, Pine Creek climbing lanes • SR -20, Passing lanes – CMGC with 3D electronic delivery• US -89, Ephraim to Pigeon Hollow passing lanes
2015 Larger Projects:98% Projects Advertised on-time
49 Projects Advertised
13 Projects designed in-house36 Projects designed with UDOT Consultants
“Arc
tom
econ
hum
ilis 3
4” b
y St
an S
hebs
. Lic
ense
d un
der C
C BY
-SA
3.0
via
Wik
imed
ia C
omm
ons -
htt
ps:/
/com
mon
s.wik
imed
ia.o
rg/w
iki/F
ile:A
rcto
mec
on_h
umili
s_34
.jpg#
/med
ia/F
ile:A
rcto
mec
on_h
umili
s_34
.jpg
1 5 | U TA H D E PA R T M E N T O F T R A N S P O R TAT I O N
PRECONSTRUCTION
“Arc
tom
econ
hum
ilis 3
4” b
y St
an S
hebs
. Lic
ense
d un
der C
C BY
-SA
3.0
via
Wik
imed
ia C
omm
ons -
htt
ps:/
/com
mon
s.wik
imed
ia.o
rg/w
iki/F
ile:A
rcto
mec
on_h
umili
s_34
.jpg#
/med
ia/F
ile:A
rcto
mec
on_h
umili
s_34
.jpg
0%
20%
40%
60%
80%
100%
PROJECTS COMPLETED IN PROGRESS
50
29
310
Active Documents in progress
24
Pending projects 24
Ontime 80 %
Late 20%
2015 PERFORMANCE
Encroachments
EIS or EA Internal Re-EvaluationsState fundedEnvironmental StudiesFederally fundedCategorical Exclusions
The Bearclaw Poppy is endemic to Washington County, Utah. It is a federally listed endangered species limited to barren, heavily gypsiferous soils in the immediate vicinity of St. George, Utah. Only a half-dozen populations are known, several of which are adjacent to or even within the urbanized area. The flower is pollinated by a rare solitary bee species. *The Long Valley population of the Bearclaw Poppy has been declining rapidly due to heavy off-road vehicle use in the area. Construction of the Southern Parkway and a new barrier fence constructed by UDOT, leading from the highway to the top of the Virgin Anticline, now effectively blocks any off-road vehicle access and assists the BLM to more effectively manage the area’s critical habitat.
*Retrieved from “https://en.wikipidia.org/w/index.php?title=Actomecon_humilis&oldid=587704131
2015 Accomplishment:• Provided professional oversight of 92 environmental documents• Developed documents for 40% of UDOT projects in FY-2015• 80.4% of projects were completed on schedule• 100% of environmental documents were completed before PS&E Review.
Innovation and Efficiencies: • Digital archive of GIS, cultural site forms, and survey reports on a shared drive that can be accessed throughout the Region greatly reducing research time • Developed innovative dual presentation strategy to reduce SHPO consultation time• Developed a centralized geodatabase of GIS data for wetlands/waters and T&E Projects that can be accessed through ArcPad• Used the UDOT Environmental Matrix for assistance with issues requiring specialized expertise which has yielded better results than previous requests for NEPA documents
2 0 1 5 R E G I O N F O U R P E R F O R M A N C E M E A S U R E S | 1 6
PRECONSTRUCTION
RIGHT OF WAY / UTILITY Team Innovations and Great Ideas
• Created a UPLAN map showing surplus parcels in Region 4
• Created a Gallery in UPLAN to House all Region 4 Right of Way and Survey Maps
• Created a UPLAN map that shows areas where old Right of Way plans have been georeferenced in ArcMap
• Implemented a GIS Based Utility Conflict Matrix on the Bluff and Sunset Project in St. George
• Used Terrestrial LiDAR technology on several projects to collect survey information
• Implemented techniques to tighten and ensure accuracy on the Project Survey Control
2015 ROW and Utility Accomplishments• Completed more than 100 requests for document review. Average Turn-Around time is about 1 Week
• Processed plans and documents to acquire more than 70 parcels to facilitate construction projects
• Completed Documentation for 5 surplus properties
• Completed more than 75 requests for Right of Way plan research. Average Turn-Around Time is about 3 days
• Completed 8 Utility Relocation Agreements, 5 Lighting Agreements, and 6 Letter of Agreements for smaller power hookups or minor utility work
• Completed 42 survey requests. All of these requests were completed in less than one month from the date of request. The average turn-around time for project related surveys was less than two weeks from request
2016 Goals• Move 90% of all Partial ROW Submittals from Review process to Acquisition within 30 days
• Complete Document Preparation of Surplus Properties within 120 days of receiving approval to prepare documents for Surplus
• Build Performance Dash Boards in the UDOT Interchange system to provide real-time performance tracking
• Respond to all information requests within 1 week
• Track all Utility Agreements in the UDOT Interchange System
• Geo-reference all Right of Way plans on routes US-6, US-89, I-15, I-70, US-191 in Region 4 using GIS
• Schedule all survey requests within 2 weeks from the date of request
1 7 | U TA H D E PA R T M E N T O F T R A N S P O R TAT I O N
PRECONSTRUCTION
154308
462
616
770924
1078
12321386
15401694
1848
263 293
574607
776
1018
1262
1485
17511853
1864
128 135 30281
33169 242 244 223 266
102 110
200
400
600
800
1000
1200
1400
1600
1800
2000
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Num
ber o
f IA'
s
2014 Independent Assurance Tests Completed for Region 4
IA's Cumulative Target
IA's Cumulative Total
IA's Completed (per month)
59
71%42
25%15
3% 2
57
21
70
10
20
30
40
50
60
702015 Accomplishment: 59 Mix Designs Verified
Total Mix Designs
Mix Designs verified 2-5 days
Mix Designs verified 5-10
Mix Designs verified over10/not verifiedMix Designs Verified
Mix Designs Reviewed &Researched /CoverMix Designs RequiringAdd.Verification/Info. Only
All Materials Techs are
Certified by Independent Assurance (IA’s)
2 x per year
100% of Certifications
were completed in 2014
2016 GOAL: Verify 75% of Mix Designs within 5 days and 100% within 10 days
2016 GOAL:Have all Trans Techs fully certified each yearComplete the majority of Certifications early in the year
2 0 1 5 R E G I O N F O U R P E R F O R M A N C E M E A S U R E S | 1 8
MATERIALS
AMOUNT OF PAINT USED:
76,466 GAL WHITE PAINT
49,629 GAL YELLOW PAINT
1,164,145 LBS REFLECTIVE BEADS
FY 2015 PAINT INFO
R4 Chip Seal Teams surfaced 491 lane miles in 2015.
Total Spent FY 2015: Chip Seal & Flush Coat $6,047,522
Lane Leveling $1,961,126Crack Seal $1,359,662Contractual Overlays $1,727,750
0
100
200
300
400
500
600
700
800
2009 2010 2011 2012 2013 2014 2015
44
410 309
58 28 30 2636
152
21
146 14256 46
96
154
17
6256
387
114
60
55
5373
1817
8
13
2
4524
1818
Num
ber o
f Pro
cesin
g Da
ys
120 Day Closeout Average Process Days
Comptroller Review
Region Review
Construction Complete -Region Recieves
Physical Completion -Construction Complete
Substantial Completion -Physical Completion
120 Day Goal
Maintenance 84%
Construction16%
2015 Trans Tech Hours
Trans Techswho worked Construction
106
Total Trans Techs 189
Trans Tech Numbers
Trans Tech I,
52
Trans Tech II,
68
Trans Tech III,
67
Trans Tech's by Classification
2015 Construction Accomplishment: • I-15, South Cedar Interchange• Traffic Signal at SR-63 & Center St.,
Bryce Canyon • Moab 500 West Ph3: Mill Creek
Bridge to Kane Creek• I-70; Floy to Crescent Jct. • US-89; Kanab to Kanab Creek Bridge• US-89; Arizona Line to Buck Tank Draw• US-191; Devil’s Canyon to Monticello• Ephraim Main St.; Phase 2 Main @
100 N Intersection• US-6; MP 201 To 203; Skyview to Tucker• I-70; MP 154 to Floy• US-89 Passing Lanes & Improve
Alton Intersection• I-15; Median Cable Barrier and Other Barrier• I-15; Wildcat to I-70• US-6; Grassy Trail to Icelander
• US-50; Scipio to Sevier County Line• Bluff Street Interchange at Red Hills Parkway• I-15; MP 20 to MP 24 Improvements• SR-24; Lyman to Bicknell• US-6; Passing Lanes MP 273 to MP 290• I-70; MP 141.1 to MP 147• US-89; Jct. SR-12 to Panguitch• Lions Park Trail & Transit Hub• SR-143; MP 12 to Cedar Breaks
North Boundary• SR-14; MP 35.4-35.7, Curve Improvements• US-89; Kanab Creek Bridge to MP 72.355• US-191; Blanding Cemetery to Devil’s Canyon• SR-116; Y Connect to Mt. Pleasant• SR-31; Retaining Walls at MP 4.1& 4.3• US-6; Soldier Summit to White River• I-15; Pine Creek Climbing Lanes & ITS/ATMS• I-15; Beaver Ridge Climbing Lanes Project• I-15; MP 108.0 to 188.6 Structure Protection• Various Locations; Install Rumble Strips• I-15; Beaver County Line to Dog Valley
2015 Maintenance Accomplishment: • SR-12 Rip Rap Replacement for
protection of bank• SR-276, I-70, SR-62, SR-160 and
SR-143 Cattle Guard Installations• US-6, SR-31, SR-153, US-89, US-
191, SR-128, SR-21, SR-24, SR-132, SR-10, SR-12, SR-143, Culvert Replacement and Extensions
• SR-95 Rockfall Blasting• SR-22, US-89, Fencing• US-89 Axtell Turn Lanes• SR-12 Scour Project• SR-12 Rock Cut Project• SR-117, SR-18, US-6, I-15, SR-21,
SR-143, Shouldering• SR-160 Extend shoulders • SR-12, Road Settlement Repair below
Bryce Canyon
1 9 | U TA H D E PA R T M E N T O F T R A N S P O R TAT I O N
MAINTENANCE / CONSTRUCTION
REGION 4 FY 2015 SNOW STATS:
NUMBER OF STORMS :
22PERCENT OF R4 MAINTENANCE
BUDGET SPENT ON SNOW :
10 %AMOUNT OF SALT USED:
37,167 CY
SNOW REMOVAL MAN-HOURS:
44,432 hrs
The UDOT Traffic app provides commuters and travelers with mobile access to information for Utah roadways from the Intelligent Transportation System (ITS). The available information includes:1) A zoomable, scrollable map-based display2) TravelWise alerts3) Current traffic conditions on Utah’s freeways and major surface streets4) Lists of accidents, road construction activities, and other hazards5) Special events that affect traffic (sports events, etc.)
6) Current road weather conditions and road weather forecasts7) Seasonal road closure status8) Closed-circuit television (CCTV) traffic camera images9) Electronic roadway sign messages
UDOT's Intelligent Transportation System (ITS) uses technology to save lives, time, and money. It is a computer-controlled system designed to monitor and manage traffic flow on freeways and major surface streets. System components include CCTV cameras, electronic roadway signs, traffic speed and volume
sensors, pavement sensors, and weather sensors.
511 is a free phone number that provides statewide travel information. What does 511 offer to Callers? •Traffic •Public Transit •Road Conditions •Lake Powell Ferry Services •Surrounding States Travel Information
Scan this QR Code to get the UDOT Traffic App
Road Weather Information Systems (RWIS) are placed strategically around the state to make area specific, accurate and timely weather reports to help maintenance crews and motorists. RWIS stations are Intelligent Transportation System (ITS) devices coordinated at the Traffic Operations Center. Variable Message Signs (VMS) inform motorists of incidents , congestion, debris, and scheduled construction on the roadway. 157 Cameras give real-time images of important intersections and roadways.
UDOT maintains roadways and facilities after severe weather and environmental events such as flooding, rain, landslides, lightning, earth movement, snow, high winds, etc.
Access to current road/weather conditions is available through the UDOT Traffic application for mobile phones and bycalling 511 Travel Info.
2 0 1 5 R E G I O N F O U R P E R F O R M A N C E M E A S U R E S | 2 0
WEATHER IMPACT
Vectee
zy.com
/mem
bers/la
varm
sg
86% of fleet equipped with
snow plow wings All 2005 or newer plow trucks
15
Trucks equipped
with double wings
Equipment idle time @
24.05% average region wide
2015 Accomplishments• Implemented a new equipment inspection and reward system• Replaced 8 broken frame plow trucks - 10 new trucks total• Purchased 1 new mini-excavator• Added 1 rental mower tractor
2016 Goals• Replace 6 more broken frame trucks• Purchase a snow cat for the Cedar Mountain area• Purchase one more mini-excavator• Implement a program to update and replace mowers and compressors• Purchase all new trucks with automatic grease systems and advanced lighting
*Finet is the software system used to process all payments
from UDOT.
2 1 | U TA H D E PA R T M E N T O F T R A N S P O R TAT I O N
EQUIPMENT
2015 Budget Accomplishment: Overall expenditures were under budget. Improvements focused on HVAC upgrades, lighting upgrades, new materials labs, and re-modeling of Maintenance Sheds. Budget for FY2016 is $56,236,730
The Administrative team provides Region leaders with accurate data to
make quality decisions.
2016 Budget Goal:The Budget goal is to utilize the funds given to improve the Region’s roadways, and provide services to the traveling public. Expenditures are to be within 1.5% of the fiscal year’s budget.
Region 4: 2015 Budget Report Budget Actual Under/(Over)
% Under Budget
Region 4 Administration $7,505,500 $7,484,260 $18,240 0.002%Total Operations $48,634,547 $48,469,179 $165,368 0.003%TOTAL Region 4 $56,140,047 $55,956,439 $183,608 0.003%
2016 Goal: •Utilize appropriate travel •Stay within budget
1008
10701056
Travel Requests
FY13 Travel
FY14 Travel
FY15 Travel
536529
508
Highway Damage Claims
FY13 Damage Claims
FY14 Damage Claims
FY15 Damage Claims
*Finet is the software system used to process all payments
from UDOT.
GAX/PRC
P-Card
Total
14331
2311
16642
18602
3209
21811
19950
3997
23947
Finet Transactions*FY15 FY14 FY13
2 0 1 5 R E G I O N F O U R P E R F O R M A N C E M E A S U R E S | 2 2
ADMINISTRATIVE SERVICES ACCOUNTING
ADMINISTRATIVE SERVICES CONTRACT ANALYST
ADMINISTRATIVE SERVICES WAREHOUSES
$412,352.00
$228,972.00
$ Spent FY 2015
Upgrades
Maintenance
187Major Tasks Completed
AREAS OF FOCUS:• Heating and Air Conditioning• Lighting• Building Preservation/Remodeling
217 329
2,041
2,587
0
500
1,000
1,500
2,000
2,500
3,000
Orders Inventory Transfer Over-the -Counter Region 4 Total
Region 4 Warehouse Transactions
Potential Costs to the Region $532,939.23
Actual Costs to the Region
$381,232.03 SAVINGS
$141,707.20 27%SAVINGS
Region 4 Purchasing Efficiency
Region 4 TOP THREE CONTRACTS:• Region 4 Culvert Cleaning Contract (used by regions 1,2 & 3)• Region 4 initiated Fold and Form Culvert Liner Contract
(now used statewide)• Region 4 Fence Installation Contract with Kanab Fence
(used to upgrade over $1 million in right-of-way fence)
Region 4 Warehouse Inventory Compliance:Total Inventory Value $ 1,362,378.24Discrepancy Value $ 1,919.50Compliance Percentage 0.014% GOAL: 0.5%
2015 Warehouse Accomplishments:• Monthly inventory control maintained limited discrepancy value.• Reduced commodity shortages through enhanced resource
sharing between warehouses.• Initiated the removal of stagnant and out-dated inventory items.• Improved customer service through limited closures and resource
coordination.
Vect
eezy
.com
/mem
bers
/lava
rmsg
2 3 | U TA H D E PA R T M E N T O F T R A N S P O R TAT I O N
ADMINISTRATIVE SERVICES BUILDINGS AND GROUNDS
CONTRACT ANALYST
Vect
eezy
.com
/mem
bers
/lava
rmsg 2015 Accomplishments:
• Received a $400 Wellness Council Mini Grant from PHEP Healthy Utah. This money was spent to purchase prizes for participation in the 2015 Wellness Walk/Run/Bike held at the Region Picnic including: Water bottles, pedometers, and a fitbit.• Received $250 from PEHP for participating in the Work Well Challenge where wellness councils throughout the state compete by scoring points for various wellness activities that support the Governor’s Work Well recommendations.• Began a Wellness Newsletter to inform employees of upcoming testing sessions with healthy articles.
0%5%
10%15%20%25%30%35%
2014 2015
21% 22%
12%
Healthy Utah Testing Session Participation
SpousesEmployees 309 Hrs
817.5 Hrs
0 200 400 600 800 1000
2014 FY
2015 FY
Employee Exercise Time Logged
Region Picnic Wellness Participants:
2016 Goals: • Increase employee participation at Healthy Utah Testing Sessions to 50%.• Increase employee use of available exercise time.• Support a Region Four culture of wellness by encouraging, informing and empowering employees to make positive choices for their health.
Promoting healthy lifestyles today, tomorrow, and for retirement
2 0 1 5 R E G I O N F O U R P E R F O R M A N C E M E A S U R E S | 2 4
WELLNESS COUNCIL
@UDOTRegionFour@RoadRespectUtah@travelwiseutah@UtahDOT@UDOTTraffic@ZeroFatalities@UDOTavy
/AdoptaUtahHighway/RoadRespectUtah/dontdrivestupid/udotsnap/travelwiseutah/utahdot/zerofatalities
Common Transportation Related Hashtags #RoadToZero #utflood #utsnow #utwind #utwx #ZeroFatalities
/uPlanUtahPlanning/UDOTResearch/udotsnap/UtahDOT/ZeroFatalities
/utahsnap /UtahDOT /UtahDOT
UDOT Projects
http://www.udot.utah.gov/projects
Responsive
UDOT communication efforts integrate a wide variety of tools and campaigns to accomplish the department’s Strategic Goals.
Educational
Collaborative
Transparent
UDOT REGION FOUR ORGANIZATION
2 5 | U TA H D E PA R T M E N T O F T R A N S P O R TAT I O N
COMMUNICATIONS
Collaborative
Rick TorgersonDirector
Kevin KitchenCommunications Mgr.
Jami GentryDirectors Asst.
Incident Management Traffic and Safety
PermitsRisk Management
Asset ManagementIndependent Assurance
Pavement DesignMaterials
Contracts Budget
InventoryPayroll
AccountsDamage Claims
Facilities
ConstructionMaintenance
TrainingProcess ReviewFederal Steward
Regional Closeout (RCS)
PlanningDesign
EnvironmentalUtilities
Right of WaySurvey
Project FundingResource AllocationProject Management
Project CloseoutPerformance Management
Region Four Directs and Coordinates the Needs
and Operations of Highway Users with:
Elected OfficialsStakeholders
MediaPublic
UDOT REGION FOUR ORGANIZATION
Mike MilesMaterials Engineer
Robert DowellOperations Engineer
Jim McConnellDistrict Engineer
Daryl FriantDistrict Engineer
Monte AldridgePreconstruction
Engineer
Dana MeierProgram Engineer
Kirk ThornockProgram Manager
The performance model for 2015 focuses on UDOT’s Strategic Goals: Preserve Infrastructure, Optimize Mobility, Zero Fatalities, and Keeping Utah Moving.
www.udot.utah.gov/go/region4
Timothy WaldenAdministrative
Services Manager
Washington CountyMetropolitan Planning
OrganizationProject ManagementLocal Government
2 0 1 5 R E G I O N F O U R P E R F O R M A N C E M E A S U R E S | 2 6
REGION FOUR TEAM