CURRICULUM VITAE Position Project Manager - Earthworks and Anchored Walls Project - Toquepala - Peru - Contract value: $ 22M - Project Type: Minning - Reinforce work team to help increase production and process improvement in one project with 2.5 million m3 of earthworks and 6441 m2 of Anchored walls. Client: Southern Copper Peru Corporation Time Period June / 2015 - August / 2015 Position Construction Manager - Courtyard Marriott Hotel - Lima - Peru - Contract value: $ 15 M - Project Type: Building construction - Work team reinforcement in the final stages of construction for client delivery (14 floors - 4 Underground levels of parking and 10 rooms levels). Client: Inversiones La Rioja Time Period August / 2015 - November / 2015 Position Project Manager - Naval Shipyard Arsenal of the Navy - Phase 1A - Lima - Peru - Contract value: $ 33 M - Project Type: Shipyard - Coordinate the initial process of Procurement, HSE / Quality / Environment procedures and standards, Staff Selection as well as, the initial construction works. Client: Servicios Industriales de la Marina - SIMA Perú S.A. Time Period November / 2015 - In process Position Project Manager - "Pillones" Transference Expansion Station - Peru - Contract value: $ 15M - Project Type: Railway - Transfer station construction, including 3 new railroad and construction of new buildings. Client: Peru Rail Time Period January / 2016 - February / 2016 Address Rua Helena Vaz da Silva, n.º 9, Palhais 2820 - 425 Charneca da Caparica Portugal PERSONAL INFORMATION Surname (s) / Name (s) Ferreira Dias, Luís Diogo Date of birth September 21th, 1982 Marital Status Married Phone (+51) 948 605 840 (Peru) E-mail [email protected] Nationality Portuguese Working Visa (Peru) 000899006 WORK EXPERIENCE Time Period April / 2013 - October / 2013 Position Construction Manager - Biding Mota-Engil Peru - Area development, within the company for Reinforced Concrete Works as Bridges, Viaducts, Tunnels, Buried Structures and Industry (Cement Plants, Mining Facilities). Time Period June / 2014 - June / 2015 Position Project Manager - "La Joya" Transference Expansion Station - Peru - Contract value: $ 12M - Project Type: Railway - Transfer station construction, including 2 new railroad, demolition and construction of new buildings. Client: Peru Rail Time Period October / 2014 - February / 2015 Position Project Manager - Macusani Hospital - Puno - Peru - Contract Value: $ 28 M - Type of Work: EPC - Building construction - Consisting of: Coordinate the engineering development phase of 1 Hospital (7500 m2 of construction). Client: Gobierno Regional de Puno Time Period October / 2013 - January / 2015 Position Construction Manager - Project CVPUE - Contract K141 - Permanent and temporary pipeline - Peru - Contract value: $ 33M - Type of work: Mining, Project with 14km Carbon Steel pipe line with Ø 0.90 m to supply water to the new mine concentrator. Client: Fluor / Cerro Verde Curriculum Vitae of: Ferreira Dias, Luís Diogo Page 1 of 3 Actualized: Lima - Peru, March 2016

2016-03-17 - CV Diogo Dias - English

Embed Size (px)

Citation preview

Page 1: 2016-03-17 - CV Diogo Dias - English

CURRICULUM VITAE

Position Project Manager - Earthworks and Anchored Walls Project - Toquepala - Peru - Contract value: $ 22M -

Project Type: Minning - Reinforce work team to help increase production and process improvement in one

project with 2.5 million m3 of earthworks and 6441 m2 of Anchored walls.

Client: Southern Copper Peru Corporation

Time Period June / 2015 - August / 2015

Position Construction Manager - Courtyard Marriott Hotel - Lima - Peru - Contract value: $ 15 M - Project Type:

Building construction - Work team reinforcement in the final stages of construction for client delivery (14

floors - 4 Underground levels of parking and 10 rooms levels).

Client: Inversiones La Rioja

Time Period August / 2015 - November / 2015

Position Project Manager - Naval Shipyard Arsenal of the Navy - Phase 1A - Lima - Peru - Contract value: $ 33 M -

Project Type: Shipyard - Coordinate the initial process of Procurement, HSE / Quality / Environment

procedures and standards, Staff Selection as well as, the initial construction works.

Client: Servicios Industriales de la Marina - SIMA Perú S.A.

Time Period November / 2015 - In process

PositionProject Manager - "Pillones" Transference Expansion Station - Peru - Contract value: $ 15M - Project Type:

Railway - Transfer station construction, including 3 new railroad and construction of new buildings.

Client: Peru Rail

Time Period January / 2016 - February / 2016

Address Rua Helena Vaz da Silva, n.º 9, Palhais

2820 - 425 Charneca da Caparica

Portugal

PERSONAL INFORMATION

Surname (s) / Name (s) Ferreira Dias, Luís Diogo

Date of birth September 21th, 1982

Marital Status Married

Phone (+51) 948 605 840 (Peru)

E-mail [email protected]

Nationality Portuguese

Working Visa (Peru) 000899006

WORK EXPERIENCE

Time Period April / 2013 - October / 2013

Position Construction Manager - Biding Mota-Engil Peru - Area development, within the company for Reinforced

Concrete Works as Bridges, Viaducts, Tunnels, Buried Structures and Industry (Cement Plants, Mining

Facilities).

Time Period June / 2014 - June / 2015

Position Project Manager - "La Joya" Transference Expansion Station - Peru - Contract value: $ 12M - Project Type:

Railway - Transfer station construction, including 2 new railroad, demolition and construction of new

buildings.

Client: Peru Rail

Time Period October / 2014 - February / 2015

Position Project Manager - Macusani Hospital - Puno - Peru - Contract Value: $ 28 M - Type of Work: EPC - Building

construction - Consisting of: Coordinate the engineering development phase of 1 Hospital (7500 m2 of

construction).

Client: Gobierno Regional de Puno

Time Period October / 2013 - January / 2015

Position Construction Manager - Project CVPUE - Contract K141 - Permanent and temporary pipeline - Peru - Contract

value: $ 33M - Type of work: Mining, Project with 14km Carbon Steel pipe line with Ø 0.90 m to supply water

to the new mine concentrator.

Client: Fluor / Cerro Verde

Curriculum Vitae of: Ferreira Dias, Luís Diogo Page 1 of 3 Actualized: Lima - Peru, March 2016

Page 2: 2016-03-17 - CV Diogo Dias - English

Time Period August / 2012 - March / 2013

Position Construction Manager - Heavy Road Construction and Massive Excavation - "Las Bambas" Mining Project -

Peru - Contract Value: $ 130 million - Type of Work: Road construction - Road Construction road with 270 km

divided into 5 parts for access to the Mining area. Responsible for all drainage works in 200 km (4 parts of the

project).

Client: Bechetel / Las Bambas

Time Period March / 2011 - July / 2012

Position Project Manager - Highway Câmara de Lobos / Estreito de Câmara de Lobos (Madeira Island - Portugal) -

Contract Value: € 60 million - Type of Work: Road construction - Consisting of: 5 Viaducts - Reinforced

concrete structure (Total length: 794,70m), 2 NATM tunnels (Total length: 690,00m), 1 overpass bridge

(Metallic), 3 underpass crossings (Reinforced concrete structure), 4 overpass crossings (reinforced concrete

structure), earth moving, drainage, paving, retaining walls and ancillary equipment / safety signs.

Client: Governo Regional da Madeira

Company Name Mota-Engil Peru, SA

Time Period May / 2010 - March / 2011

Position Project Manager Assistant - Grant Douro Interior - Lot 8 - Nozelos / Mogadouro (Trás-os-Montes - Portugal) -

Contract Value: € 4 million - Type of Work: road construction - Consisting of: 10 overpass crossings with

prefabricated trays (reinforced concrete structure), 4 underpasses in precast concrete and 1 u nderpass

pedestrian walkway in precast concrete.

Client: Ascendi

Time Period March / 2011 - July / 2012

Position Project Manager - New road connection Vasco Gil - Fundoa, Elevation 500,00m - 1st Phase (Madeira Island -

Portugal) - Contract Value: € 41 million - Type of Work: Road construction - Consisting of: 5 Viaducts -

Reinforced concrete structure (Total length: 712,00m), 1 NATM tunnel (Total length: 353,00m), 1 "Cover and

Cut" tunnel (Total length: 55,00m), 1 pier (reinforced concrete structure), 2 overpass crossings (r einforced

concrete structure), 1 overpass bridge (reinforced concrete structure), 1 hydraulic underpass crossing, e arth

moving, drainage, paving, retaining walls and ancillary equipment / safety signs.

Client: Governo Regional da Madeira

Time Period May / 2009 - April / 2010

Position Project Manager - Alcântara Project - Container Terminal in Alcântara (Lisbon - Portugal) - Contract Value: €

101 million - Type of Work: port/harbor construction work limited to: earth moving, subsoil drainage,

infrastructure (underground electricity and communication supply), paving, construction of new access doors

to the terminal, and demolition of 3 reinforced concrete buildings in the interior of the container terminal.

Client: Alcântara Terminal

Time Period August / 2009 - May / 2010

Position Project Manager Assistant - Lisbon Airport - Transfer of ALS FOG (Fuel Operating Group) (Lisbon - Portugal) -

Contract Value: € 30 million - Type of Work: Airport - Consisting of: 1 TBM (tunnel boring machine) tunnel

with ø 2,00m (total length: 431,30m), earthworks, drainage, infrastructure (underground electricity and

communication supply), paving, 2 buildings (offices and mechanical support), building of 3 metallic tanks and

ancillary network for collection and distribution of Jet A1 fuel, as well as construction of fire network.

Client: Lisbon Airport

Time Period October / 2005 - November / 2008

Position Project Manager Assistant - Lisbon Metro - Underground Red Line Extension - Saldanha Station (Lisbon - Av.

da República - Portugal) - Contract Value: € 38 million - Type of Work: underground railway construction -

Consisting of: Saldanha II Metro station - New construction using the "Cover and Cut" method, Saldanha I

Metro Station - Rehabilitation of the existing metro station and construction of the new interface at Saldanha

II metro station, through 2 galleries using the NATM tunnel method.

Client: Lisbon Metro

Time Period November / 2008 - May / 2009

PositionProject Manager - Lisbon Metro - Underground Red Line Extension - Saldanha Station (Lisbon - Av. da

República - Portugal) - Contract Value: € 38 million - Type of Work: underground railway construction -

Consisting of: replacement of all infrastructures at the surface, subsoil earth moving, construction of

infrastructures (electricity, communication, gas and water supply, and sewage), paving and ancillary works.

Client: Lisbon Metro

Curriculum Vitae of: Ferreira Dias, Luís Diogo Page 2 of 3 Actualized: Lima - Peru, March 2016

Page 3: 2016-03-17 - CV Diogo Dias - English

Oral Reading Interaction Production

Professional Professional Professional Professional

Professional Professional Average Average

Time Period September / 2004 - February / 2005

Position Quality and Environment Technician - Grant of Beiras Litoral and Alta - Art Works - Lot 1 - A25/IP5 -

IC2/Talhadas subsection (Aveiro - Portugal) - Contract Value: € 15 million - Type of Work: Road construction -

Consisting of: 3 Viaducts - Reinforced concrete structure, 8 Underpass crossings (Reinforced concrete

structure), 1 overpass crossing (reinforced concrete structure).

Client: Ascendi

Time Period February / 2005 - October / 2005

Position Project Manager Assistant - Lisbon Metro - Red Line extension - in TBM Tunnel (Lisbon - Alameda D. Afonso

Heriques / S. Sebastião - Portugal) - Contract Value: € 30 million - Type of Work: Railway - Consisting: 1 TBM

(tunnel Boring Machine) tunnel with ø 10,00m (Total length: 1.600,00m).

Client: Lisbon Metro

Type of business Construction and Public Works

EDUCATION AND TRAINING

Time Period February / 2004 - September / 2004

Position Project Manager Assistant - Buildings Dolce Vita and Dolce Farniente - Alto do Lumiar, Lots 3.7 and 3.8

(Lisbon - Portugal) - Contract Value: € 7.5 million - Type of Work: Building construction - Consisting of: 2

buildings with 13 and 15 floors.

Client: Private

Company Name Mota-Engil, Engenharia e Construção, SA

Title of qualification awarded Degree in Civil Engineering (Licenciatura Engenharia Civil)

Specialization: Construction

Professional Card Professional Order/Engineer (Portugal) - Full Member Nr. 64310

Time Period Bachelor of Civil Engineering (BCE): September / 2000 - January / 2004

Construction specialization: January / 2004 - October 2008

Name and type of organization

providing education and training Engineering Institute of Lisbon (ISEL - Instituto Superior de Engenharia de Lisboa)

Computer skills and competencesGood command of Microsoft Office;

Good command of Microsoft Project;

Knowledge in AutoCAD (user's perspective).

Knowledge in SAP (user's perspective).

Driving license Cars and Motorcycles

Spanish Good

English Average

PERSONAL SKILLS

First language Portuguese

Other language (s)

Self-evaluationUnderstanding Conversation

Writing

Curriculum Vitae of: Ferreira Dias, Luís Diogo Page 3 of 3 Actualized: Lima - Peru, March 2016