2016 NALIT Professional Development SeminarOn-Prem/Hybrid/Cloud: Why & How
Mike AllenEnterprise System Section ManagerOffice Of Legislative Information Technology (OLIT)Montana Legislative Branch
Cloud Services Granicus Audio/Video/Agenda SharePoint Online – DirSync to AD Adobe Online – DirSync to AD Applications for License Verification
Montana has a Hybrid Environment
Executive Branch Services Network infrastructure Data Canters – Helena & Miles City Oracle Database Hosting & Support MS Exchange & Network Services
LEG Infrastructure Services AD Forest & Domain Services Blade & Virtual Server Config & Support Hardware & Software Deployment & Support Firewall separating from Executive Branch
What did we start with?
Production Data Center 100 % Microsoft environment Active Directory 8 Virtual Host Blade Servers 45 Virtual Windows Servers VMWare/Site Replication Manager NetApp Storage Area Network (SAN) CommVault Backup
Disaster Recovery Data Center VMWare/Site Replication Manager 6 Physical Servers 20 Virtual Windows Servers NetApp Storage Area Network (SAN) CommVault Backup
The Why:
1. Amazon Cloud (AWS) Estimated bid is $148K per year plus
support Required VPN tunnel from Montana
infrastructure to AWS Required application support from OLIT Requires extensive open source
application training
Montana must replace the obsolete main frame processes for updating Montana laws (MCA).
The Open Source Environment called LAWSII was chosen, where do we host it?
2. Montana Executive Branch Estimated bid $73K per year Only basic server installation support Required OLIT to configure & support Requires extensive open source
application training
We had three Choices for hosting LAWSII – Used SWOT Analysis
3. Montana Legislative Branch Estimated bid $144K first year Following years $47K per year Includes full support & control Bid is incremental to the current OLIT
environment Requires extensive open source
application training
The Why:1. Amazon Cloud (AWS)
Prototype environment posed several challenges
VPN tunnel to AWS Uncontrolled security points from
several locations Challenging process control Required OLIT to support
Montana Chose #3 for several reasons2. Montana Executive Branch
Only basic server installation support No control over infrastructure processes Required OLIT to configure & support
3. Montana Legislative Branch Enables full process control Limits security points Includes full support Bid is incremental to current
infrastructure More flexibility for additions In-depth knowledge of current
infrastructure
How
Before
Production Data Center 100 % Microsoft environment Microsoft Active Directory 8 Virtual Host Blade Servers 45 Virtual Windows Servers VMWare/Site Replication Manager NetApp Storage Area Network (SAN) CommVault Backup
Disaster Recovery Data Center VMWare/Site Replication Manager 6 Physical Servers 20 Virtual Windows Servers NetApp Storage Area Network (SAN) CommVault Backup
Montana Chooses LAWSII Open Source EnvironmentAfter
Production Data Center 50 % Microsoft – 50% Open Source Microsoft Active Directory & LDAP 12 Virtual Host Blade Servers 45 Virtual Windows Servers 42 Red Hat Linux Virtual Servers VMWare/Site Replication Manager NetApp Storage Area Network (SAN) CommVault Backup
Disaster Recovery Data Center VMWare/Site Replication Manager 8 Physical Servers 20 Virtual Windows Servers 20 Red Hat Virtual Servers NetApp Storage Area Network (SAN) CommVault Backup
Lessons Learned Get Infrastructure personnel involved early in the process Understand the complexity before including cloud services Process control should be a key consideration Security has to be heavily considered in todays environment We are “Their Cloud”