2016 Transportation Alternatives Project Requests 01-Dec-15 District: Bristol Existing Projects Project Number: 16004 Name: Grayson County Trail Sponsor: Grayson County Applicant: Grayson County Total Cost: $417,231 Current Request: $288,000 Description: Construction of a sidewalk and trail along Industrial Lane, Corporate Lane, and through a field area terminating at Grayson County Recreation Park. Remarks: Average Score Priority Ranking 0 Total EN Funds Anticipated: $333,786 Project Number: 16005 Name: Rural Retreat Community Sidewalk Improvements Sponsor: Town of Rural Retreat Applicant: Town of Rural Retreal Total Cost: $550,575 Current Request: $440,640 Description: Construction of sidewalks along both sides of Railroad Avenue and along the east side of Church Street. Remarks: Average Score Priority Ranking 0 Total EN Funds Anticipated: $440,640 Project Number: 16033 Name: Heritage Walk Sponsor: Town of Wytheville Applicant: Town of Wytheville Total Cost: $845,332 Current Request: $182,076 Description: Construction of a pedestrian walkway from Main Street thru Elizabeth Brown Park to Washington Street. Remarks: Average Score Priority Ranking 0 Total EN Funds Anticipated: $676,265 1

2016 Transportation Alternatives Project Requests · 2016 Transportation Alternatives Project Requests 01-Dec-15 District: Bristol New Projects Project Number: 16041 Name: Solon Street

Embed Size (px)

Citation preview

2016 Transportation Alternatives Project Requests

01-Dec-15 District: Bristol

Existing Projects

Project

Number: 16004

Name: Grayson County Trail

Sponsor: Grayson County

Applicant: Grayson County

Total Cost: $417,231

Current Request: $288,000

Description: Construction of a sidewalk and trail along Industrial Lane, Corporate Lane, and through a field area terminating at Grayson County Recreation Park.

Remarks:Average

Score

Priority

Ranking0

Total EN Funds

Anticipated: $333,786

Project

Number: 16005

Name: Rural Retreat Community Sidewalk Improvements

Sponsor: Town of Rural Retreat

Applicant: Town of Rural Retreal

Total Cost: $550,575

Current Request: $440,640

Description: Construction of sidewalks along both sides of Railroad Avenue and along the east side of Church Street.

Remarks:Average

Score

Priority

Ranking0

Total EN Funds

Anticipated: $440,640

Project

Number: 16033

Name: Heritage Walk

Sponsor: Town of Wytheville

Applicant: Town of Wytheville

Total Cost: $845,332

Current Request: $182,076

Description: Construction of a pedestrian walkway from Main Street thru Elizabeth Brown Park to Washington Street.

Remarks:Average

Score

Priority

Ranking0

Total EN Funds

Anticipated: $676,265

1

2016 Transportation Alternatives Project Requests

01-Dec-15 District: Bristol

Existing Projects

Project

Number: 16077

Name: Downtown to Hospital Pedestrian Sidewalk

Sponsor: Town of Pennington Gap

Applicant: Town of Pennington Gap

Total Cost: $556,106

Current Request: $444,885

Description: Construction of sidewalk from Cecil Street to North Edwards Street.

Remarks:Average

Score

Priority

Ranking0

Total EN Funds

Anticipated: $444,885

Project

Number: 16083

Name: Powell River Trail

Sponsor: Town of Appalachia

Applicant: Town of Appalachia

Total Cost: $234,403

Current Request: $187,441

Description: Construction of a multi-use trail connecting the Town of Appalachia to the Town of Big Stone Gap.

Remarks:Average

Score

Priority

Ranking0

Total EN Funds

Anticipated: $187,441

New Projects

Project

Number: 16035

Name: North 4th Street Sidewalk

Sponsor: Town of Wytheville

Applicant: Town of Wytheville

Total Cost: $1,052,225

Current Request: $841,780

Description: Construction of a sidewalk/walkway from the Northwind Apartments to the shopping center located at the intersection of North 4th Street and Tazewell Street.

Remarks:Average

Score

Total EN Funds

Anticipated: $841,780

2

2016 Transportation Alternatives Project Requests

01-Dec-15 District: Bristol

New Projects

Project

Number: 16041

Name: Solon Street Sidewalk

Sponsor: Town of Gate City

Applicant: Town of Gate City

Total Cost: $316,585

Current Request: $253,268

Description: Rehabilitation of an existing sidewalk and construction of new sidewalk along Salon Street from Jackson Street to Bradford Street.

Remarks:Average

Score

Total EN Funds

Anticipated: $253,268

Project

Number: 16046

Name: Norton Riverwalk

Sponsor: City of Norton

Applicant: City of Norton

Total Cost: $771,992

Current Request: $617,954

Description: Construction of a trail along the Guest River in Norton.

Remarks:Average

Score

Total EN Funds

Anticipated: $617,954

Project

Number: 16053

Name: Rocky Gap Greenway

Sponsor: Bland County

Applicant: Bland County

Total Cost: $1,598,860

Current Request: $1,241,688

Description: Construction of a multi-use trail, trailhead, and rehabilitation of the historic Phoenix Bridge.

Remarks:Average

Score

Total EN Funds

Anticipated: $1,241,688

3

2016 Transportation Alternatives Project Requests

01-Dec-15 District: Bristol

New Projects

Project

Number: 16078

Name: Norton Road Pedestrian Improvements

Sponsor: Town of Wise

Applicant: Town of Wise

Total Cost: $666,000

Current Request: $532,000

Description: Construction of sidewalks on both sides of Norton Road from Main Street to Cherry Street.

Remarks:Average

Score

Total EN Funds

Anticipated: $532,000

Project

Number: 16082

Name: Dungannon Streetscape

Sponsor: Town of Dungannon

Applicant: Town of Dungannon

Total Cost: $241,310

Current Request: $141,000

Description: Construction of a Greenway in the Town's Central Business District.

Remarks:Average

Score

Total EN Funds

Anticipated: $141,000

Project

Number: 16089

Name: Salt Trail Land Bridge Connector

Sponsor: Town of Saltville

Applicant: Town of Saltville

Total Cost: $300,000

Current Request: $240,000

Description: Construction of a trail and bridge to serve as a connection to the Salt Trail.

Remarks:Average

Score

Total EN Funds

Anticipated: $240,000

4

2016 Transportation Alternatives Project Requests

01-Dec-15 District: Bristol

New Projects

Project

Number: 16097

Name: Back of the Dragon Scenic Overlook

Sponsor: Smyth County

Applicant: Smyth County

Total Cost: $920,000

Current Request: $736,000

Description: Rehabilitation of an existing overlook to improve it's safety and site amenities.

Remarks:Average

Score

Total EN Funds

Anticipated: $736,000

Cost : $8,470,619

Amount Requested : $6,146,732

Subtotal: Projects13

5

2016 Transportation Alternatives Project Requests

01-Dec-15 District: Salem

Existing Projects

Project

Number: 16006

Name: Mayo River Rail Trail

Sponsor: Patrick County

Applicant: Patrick County

Total Cost: $499,050

Current Request: $399,240

Description: Phase III construction of the Mayo River Rail Trail to include a bridge crossing of the Mayo River and trailheads at each end.

Remarks:Average

Score

Priority

Ranking0

Total EN Funds

Anticipated: $399,240

Project

Number: 16011

Name: Dick and Willie Passage

Sponsor: Henry County

Applicant: Henry County

Total Cost: $1,556,157

Current Request: $400,000

Description: Construction of a multi-use trail connecting the exisiting Dick & Willie Trail to the Henry County Soccer Complex.

Remarks:Average

Score

Priority

Ranking0

Total EN Funds

Anticipated: $1,244,928

Project

Number: 16024

Name: Boones Mill Rail Depot Restoration

Sponsor: Town of Boones Mill

Applicant: Town of Boones Mill

Total Cost: $250,000

Current Request: $200,000

Description: Restoration of the Depot to serve as a living museum and community meeting place.

Remarks:Average

Score

Priority

Ranking0

Total EN Funds

Anticipated: $200,000

6

2016 Transportation Alternatives Project Requests

01-Dec-15 District: Salem

Existing Projects

Project

Number: 16051

Name: Christiansburg Downtown Streetscaping

Sponsor: Town of Christiansburg

Applicant: Town of Christiansburg

Total Cost: $1,406,000

Current Request: $250,000

Description: Construction of streetscaping improvements in the Downtown Central Business District.

Remarks:Average

Score

Priority

Ranking0

Total EN Funds

Anticipated: $1,124,800

Project

Number: 16052

Name: Huckleberry Trail Extension

Sponsor: Montgomery County

Applicant: Montgomery County

Total Cost: $801,000

Current Request: $250,000

Description: Construction of a trail extension that will connect the Huckleberry Trail to the North Franklin Street sidewalk at Independence Boulevard.

Remarks:Average

Score

Priority

Ranking0

Total EN Funds

Anticipated: $640,800

Project

Number: 16084

Name: Rich Creek Downtown Improvements

Sponsor: Town of Rich Creek

Applicant: Town of Rich Creek

Total Cost: $816,117

Current Request: $225,000

Description: Sidewalk replacement and other improvements in downtown Rich Creek.

Remarks:Average

Score

Priority

Ranking0

Total EN Funds

Anticipated: $652,893

New Projects

7

2016 Transportation Alternatives Project Requests

01-Dec-15 District: Salem

New Projects

Project

Number: 16007

Name: Historic Gauge Dock Restoration

Sponsor: Town of Buchanan

Applicant: Town of Buchanan

Total Cost: $242,800

Current Request: $192,240

Description: Excavation and testing for the Buchanan Gauge Dock Restoration.

Remarks:Average

Score

Total EN Funds

Anticipated: $192,240

Project

Number: 16031

Name: Radford University Sidewalk Interconnectivity

Sponsor: City of Radford

Applicant: City of Radford

Total Cost: $814,977

Current Request: $651,902

Description: Construction of sidewalk along one side of Clement Street and Downey Street from Jefferson Street to Burlington Street.

Remarks:Average

Score

Total EN Funds

Anticipated: $651,902

Project

Number: 16045

Name: Colonial Avenue Boulevard

Sponsor: City of Roanoke

Applicant: Virginia Western Community College

Total Cost: $573,518

Current Request: $458,814

Description: Construction of inroad buffered bike lanes, sidwalks, pedestrian crosswalks, and intersection improvements at Overland Road, McNeil Road, and Winding Way Road.

Remarks:Average

Score

Total EN Funds

Anticipated: $458,814

8

2016 Transportation Alternatives Project Requests

01-Dec-15 District: Salem

New Projects

Project

Number: 16074

Name: Downtown Salem Streetscape and Intersection Improvements

Sponsor: City of Salem

Applicant: City of Salem

Total Cost: $600,000

Current Request: $480,000

Description: Reconstruction of sidewalks on Main Street from the intersection of Broad Street to InterWhite Oak Alley.

Remarks:Average

Score

Total EN Funds

Anticipated:$480,000

Project

Number: 16075

Name: Glade Creek Greenway

Sponsor: Town of Vinton

Applicant: Town of Vinton

Total Cost: $526,210

Current Request: $417,710

Description: Construction of the Glade Creek Greenway from Walnut Avenue to Gus Nicks Boulevard.

Remarks:Average

Score

Total EN Funds

Anticipated: $417,710

Project

Number: 16094

Name: Friensdship Lane/Carvins Creek Bridge Replacement

Sponsor: Roanoke County

Applicant: Roanoke County

Total Cost: $170,619

Current Request: $136,495

Description: Replacement of a pedestrian bridge allowing the next segment of the Tinker Creek Trail to be constructed.

Remarks:Average

Score

Total EN Funds

Anticipated: $136,495

Cost : $8,256,448

Amount Requested : $4,061,401

Subtotal: Projects12

9

2016 Transportation Alternatives Project Requests

01-Dec-15 District: Lynchburg

Existing Projects

Project

Number: 16010

Name: Appomattox Heritage Trail

Sponsor: Appomattox County

Applicant: Appomattox County

Total Cost: $546,442

Current Request: $218,577

Description: Phase 2 Multi-Use Trail construction.

Remarks:Average

Score

Priority

Ranking0

Total EN Funds

Anticipated: $437,154

Project

Number: 16030

Name: Blue Ridge Crozet Tunnel Rehabilitation and Trail

Sponsor: Nelson County

Applicant: Nelson County

Total Cost: $1,142,825

Current Request: $949,920

Description: Construction of the western trailhead and parking area, the western trail, and the western portal work.

Remarks:Average

Score

Priority

Ranking0

Total EN Funds

Anticipated: $949,920

Project

Number: 16062

Name: Route 43 Downtown Gateway

Sponsor: Town of Altavista

Applicant: Town of Altavista

Total Cost: $220,000

Current Request: $176,000

Description: Upgrade of the cabinets/conduits at the intersection of Bedford Avenue and 7th Street, and Bedford Avenue and Main Street to accomidate pedestrian signals.

Remarks:Average

Score

Priority

Ranking0

Total EN Funds

Anticipated: $176,000

10

2016 Transportation Alternatives Project Requests

01-Dec-15 District: Lynchburg

Existing Projects

Project

Number: 16063

Name: Buffalo Creek Pedestrian/Bicycle Bridge and Trail Connections

Sponsor: Town of Farmville

Applicant: Town of Farmville

Total Cost: $820,000

Current Request: $306,454

Description: Construction of the Buffalo Creek Pedestrian/Bicycle Bridge and trail connections to the existing Dogwood Trail, Sarah Terry Trail, and the Buffalo Creek Blueway.

Remarks:Average

Score

Priority

Ranking0

Total EN Funds

Anticipated:$652,000

Project

Number: 16096

Name: Banister River Gateway

Sponsor: Town of Halifax

Applicant: Town of Halifax

Total Cost: $291,164

Current Request: $232,931

Description: Completion of the Banister River Gateway.

Remarks:Average

Score

Priority

Ranking0

Total EN Funds

Anticipated: $232,931

New Projects

Project

Number: 16018

Name: Route 645 (Evergreen Road) Sidewalk

Sponsor: Town of Charlotte Courthouse

Applicant: Town of Charlotte Court House

Total Cost: $314,820

Current Request: $251,856

Description: Construction of new sidewalks along Route 645 from the entrance to the Randolph-Henry High School parking lot to intersection with Route 1106.

Remarks:Average

Score

Total EN Funds

Anticipated: $251,856

11

2016 Transportation Alternatives Project Requests

01-Dec-15 District: Lynchburg

New Projects

Project

Number: 16023

Name: Danville Multi-Use Connector Trail

Sponsor: City of Danville

Applicant: City of Danville

Total Cost: $319,824

Current Request: $239,868

Description: Construction of a trail that will tie into the existing northside trail that ends on Stinson Street and terminate at Danville Regional Airport.

Remarks:Average

Score

Total EN Funds

Anticipated: $239,868

Project

Number: 16044

Name: Dearington Elementary SRTS

Sponsor: City of Lynchburg

Applicant: City of Lynchburg

Total Cost: $210,305

Current Request: $168,244

Description: Construction of a sidewalk along Stoneridge Street.

Remarks:Average

Score

Total EN Funds

Anticipated: $168,244

Project

Number: 16095

Name: Tobacco Heritage Trail - Halifax County Extension

Sponsor: Halifax County

Applicant: Halifax County

Total Cost: $428,000

Current Request: $342,400

Description: Construction of a trail from the current Tobacco Heritage Trail at Berry Hill Plantation to Mirey Creek.

Remarks:Average

Score

Total EN Funds

Anticipated: $342,400

Cost : $4,293,380

Amount Requested : $2,886,250

Subtotal: Projects9

12

2016 Transportation Alternatives Project Requests

01-Dec-15 District: Richmond

Existing Projects

Project

Number: 16013

Name: Belvidere Street Gateway

Sponsor: City of Richmond

Applicant: City of Richmond

Total Cost: $486,000

Current Request: $388,800

Description: Construction of pedestrian and access improvements along Belvidere Street at the intersection of Idlewood Avenue, Spring Street, and Rowe Street.

Remarks:Average

Score

Priority

Ranking0

Total EN Funds

Anticipated: $388,800

Project

Number: 16017

Name: South Hill Downtown Revitalization

Sponsor: Town of South Hill

Applicant: Town of South Hill

Total Cost: $158,231

Current Request: $126,585

Description: Construction of sidewalks and other pedestrian improvements that will complete this downtown streetscaping project.

Remarks:Average

Score

Priority

Ranking0

Total EN Funds

Anticipated: $126,585

Project

Number: 16055

Name: Appomattox River Greenway Trail

Sponsor: City of Colonial Heights

Applicant: City of Colonial Heights

Total Cost: $90,000

Current Request: $72,000

Description: Construction of a trail along the Appomattox River from Roslyn Landing Park to Jennick Drive.

Remarks:Average

Score

Priority

Ranking0

Total EN Funds

Anticipated: $72,000

13

2016 Transportation Alternatives Project Requests

01-Dec-15 District: Richmond

Existing Projects

Project

Number: 16090

Name: South Side Depot Rehabilitation

Sponsor: City of Petersburg

Applicant: City of Petersburg

Total Cost: $450,000

Current Request: $360,000

Description: Phase II rehabilitation of the Southside Depot.

Remarks:Average

Score

Priority

Ranking0

Total EN Funds

Anticipated: $360,000

New Projects

Project

Number: 16012

Name: 1st and 2nd Street Buffered Bike Lanes

Sponsor: City of Richmond

Applicant: City of Richmond

Total Cost: $300,000

Current Request: $240,000

Description: Construction of a buffered bike lane along the one-way couplet of 1st Street and 2nd Street.

Remarks:Average

Score

Total EN Funds

Anticipated: $240,000

Project

Number: 16014

Name: Church Hill/29th Street Bike-Walk Boulevard

Sponsor: City of Richmond

Applicant: City of Richmond

Total Cost: $650,000

Current Request: $520,000

Description: Conversion of North 29th Street into a bike-walk boulevard.

Remarks:Average

Score

Total EN Funds

Anticipated: $520,000

14

2016 Transportation Alternatives Project Requests

01-Dec-15 District: Richmond

New Projects

Project

Number: 16015

Name: Maymont Neighborhood Sidewalks

Sponsor: City of Richmond

Applicant: City of Richmond

Total Cost: $800,000

Current Request: $640,000

Description: Construction of sidewalks in the Maymont Neighborhood.

Remarks:Average

Score

Total EN Funds

Anticipated: $640,000

Project

Number: 16016

Name: James River Branch Trail

Sponsor: City of Richmond

Applicant: City of Richmond

Total Cost: $450,000

Current Request: $360,000

Description: Conversion of an abandoned rail corridor into a trail.

Remarks:Average

Score

Total EN Funds

Anticipated: $360,000

Project

Number: 16019

Name: Brodnax Depot Renovation

Sponsor: Town of Brodnax

Applicant: Town of Broadnax

Total Cost: $438,275

Current Request: $315,245

Description: Renovation of the Brodnax Depot to serve as a trailhead facility on the Tobacco Heritage Trail.

Remarks:Average

Score

Total EN Funds

Anticipated: $315,245

15

2016 Transportation Alternatives Project Requests

01-Dec-15 District: Richmond

New Projects

Project

Number: 16020

Name: North Main Street Sidewalks

Sponsor: Town of Lawrenceville

Applicant: Town of Lawrenceville

Total Cost: $384,283

Current Request: $307,426

Description: Reconstruction of sidewalks along both sides of North Main Street from the Railroad Street Bridge to Hicks Street.

Remarks:Average

Score

Total EN Funds

Anticipated: $307,426

Project

Number: 16048

Name: Short Pump Park

Sponsor: Henrico County

Applicant: Henrico County

Total Cost: $310,215

Current Request: $248,172

Description: Construction of shared-use paths that will provide connectivity to/from West Broad Village mixed-use community.

Remarks:Average

Score

Total EN Funds

Anticipated: $248,172

Project

Number: 16060

Name: Boulevard Pedestrian Safety

Sponsor: City of Colonial Heights

Applicant: City of Colonial Heights

Total Cost: $120,000

Current Request: $96,000

Description: Right-of-way acquisition and design of pedestrian safety amenities along both sides of the Boulevard from A Avenue to Temple Avenue.

Remarks:Average

Score

Total EN Funds

Anticipated: $96,000

16

2016 Transportation Alternatives Project Requests

01-Dec-15 District: Richmond

New Projects

Project

Number: 16070

Name: Bailey Bridge Road Sidewalk

Sponsor: Chesterfield County

Applicant: Chesterfield County

Total Cost: $900,000

Current Request: $720,000

Description: Construction of a sidewalk along Bailey Bridge Road from Battlecreek Drive to Manchester High School.

Remarks:Average

Score

Total EN Funds

Anticipated: $720,000

Project

Number: 16073

Name: Spring Run Road Sidewalk

Sponsor: Chesterfield County

Applicant: Chesterfield County

Total Cost: $126,000

Current Request: $100,800

Description: Construction of a sidewalk on Spring Run Road from Brocket Drive to Spring Run Elementary School.

Remarks:Average

Score

Total EN Funds

Anticipated: $100,800

Project

Number: 16079

Name: Blackstone Sidewalk Improvements

Sponsor: Town of Blackstone

Applicant: Town of Blackstone

Total Cost: $983,238

Current Request: $786,590

Description: Sidewalk and access improvements to the Park and Blackstone Primary School.

Remarks:Average

Score

Total EN Funds

Anticipated: $786,590

17

2016 Transportation Alternatives Project Requests

01-Dec-15 District: Richmond

New Projects

Project

Number: 16085

Name: Petersburg SRTS

Sponsor: City of Petersburg

Applicant: City of Petersburg

Total Cost: $125,000

Current Request: $100,000

Description: Construction of sidewalk and crosswalk improvements at various school locations.

Remarks:Average

Score

Total EN Funds

Anticipated: $100,000

Cost : $6,771,242

Amount Requested : $5,381,618

Subtotal: Projects16

18

2016 Transportation Alternatives Project Requests

01-Dec-15 District: Hampton Roads

Existing Projects

Project

Number: 16001

Name: Cape Charles Community Trail

Sponsor: Town of Cape Charles

Applicant: Town of Cape Charles

Total Cost: $1,021,469

Current Request: $204,294

Description: Construction of Phase 2B trail section on the east end of Washington Avenue from Peach Street to Fig Street.

Remarks:Average

Score

Priority

Ranking0

Total EN Funds

Anticipated: $817,175

Project

Number: 16022

Name: Chesapeake Avenue Bike Trail

Sponsor: City of Chesapeake

Applicant: City of Chesapeake

Total Cost: $1,000,000

Current Request: $400,000

Description: Construction of a bike trail and separate pedestrian promenade walkway along the Chesapeake Avenue seawall.

Remarks:Average

Score

Priority

Ranking0

Total EN Funds

Anticipated: $800,000

Project

Number: 16057

Name: Hwy 301 North Sidewalk

Sponsor: Greensville County

Applicant: Greensville County

Total Cost: $564,100

Current Request: $132,108

Description: Construction of a sidewalk along US Hwy 301 North from Crescent Road to Greensville County Elementary School.

Remarks:Average

Score

Priority

Ranking0

Total EN Funds

Anticipated: $451,280

19

2016 Transportation Alternatives Project Requests

01-Dec-15 District: Hampton Roads

Existing Projects

Project

Number: 16065

Name: Pine Chapel Road Pedestrian/Bicycle Trail

Sponsor: City of Hampton

Applicant: City of Hampton

Total Cost: $2,254,377

Current Request: $509,072

Description: Construction of a pedestrian/bicycle trail along the north side of Pine Chapel Road from Coliseum Drive to Power Plant Parkway.

Remarks:Average

Score

Priority

Ranking0

Total EN Funds

Anticipated: $1,803,502

New Projects

Project

Number: 16021

Name: Washington Avenue Streetscape

Sponsor: City of Newport News

Applicant: City of Newport News

Total Cost: $500,000

Current Request: $400,000

Description: Construction of pedestrian accommodations on four city blocks of Washington Avenue.

Remarks:Average

Score

Total EN Funds

Anticipated: $400,000

Project

Number: 16026

Name: Independence Boulevard and Baxter Road Sidewalk

Sponsor: City of Virginia Beach

Applicant: City of Virginia Beach

Total Cost: $1,151,416

Current Request: $794,477

Description: Construction of a sidewalk along the west side of Independence Boulevard from the I-264 on-ramp to Baxter Road, and on the north side of Baxter Road from Independence Boulevard to Alicia Drive.

Remarks:Average

Score

Total EN Funds

Anticipated: $794,477

20

2016 Transportation Alternatives Project Requests

01-Dec-15 District: Hampton Roads

New Projects

Project

Number: 16027

Name: Providence Road Sidewalk

Sponsor: City of Virginia Beach

Applicant: City of Virginia Beach

Total Cost: $924,880

Current Request: $638,168

Description: Construction of a sidewalk along the south side of Providence Road from east of Kempsville Road to the intersection of Indian Lakes Boulevard and Churchill Drive.

Remarks:Average

Score

Total EN Funds

Anticipated: $638,168

Project

Number: 16028

Name: Salem Road Sidewalk

Sponsor: City of Virginia Beach

Applicant: City of Virginia Beach

Total Cost: $484,821

Current Request: $334,527

Description: Construction of a sidewalk along the east side of Salem Road from Salem Lakes Boulevard to Rock Lake Loop.

Remarks:Average

Score

Total EN Funds

Anticipated: $334,527

Project

Number: 16029

Name: West Great Neck Sidewalk

Sponsor: City of Virginia Beach

Applicant: City of Virginia Beach

Total Cost: $860,047

Current Request: $593,432

Description: Construction of a sidewalk along the west side of West Great Neck Road from Adam Keeling Road to the southern side of the bridge over Long Creek.

Remarks:Average

Score

Total EN Funds

Anticipated: $593,432

21

2016 Transportation Alternatives Project Requests

01-Dec-15 District: Hampton Roads

New Projects

Project

Number: 16037

Name: Complete Streets Initiative

Sponsor: City of Norfolk

Applicant: City of Norfok

Total Cost: $400,000

Current Request: $320,000

Description: Pedestrian safety improvements along the Tidewater Drive corridor.

Remarks:Average

Score

Total EN Funds

Anticipated: $320,000

Project

Number: 16049

Name: Granby Street Bike Lane

Sponsor: City of Norfolk

Applicant: City of Norfok

Total Cost: $710,000

Current Request: $568,000

Description: Construction of bicycle improvements along Granby Street from Willow Wood Drive to Admiral Taussig Boulevard.

Remarks:Average

Score

Total EN Funds

Anticipated: $568,000

Project

Number: 16050

Name: Elizabeth River Trail - Fort Norfolk Segment

Sponsor: City of Norfolk

Applicant: City of Norfok

Total Cost: $530,000

Current Request: $424,000

Description: Reconstruction of sidewalk from the Smith Creek Bridge to Front Street. Construction of a multi-modal path on Front Street from Second Street to Colley Avenue. Rehabilitation of the sidewalk on Colley Avenue from Front Street to Southampton Avenue.

Remarks:Average

Score

Total EN Funds

Anticipated: $424,000

22

2016 Transportation Alternatives Project Requests

01-Dec-15 District: Hampton Roads

New Projects

Project

Number: 16056

Name: Monticello Avenue Multi-Use Trail

Sponsor: City of Williamsburg

Applicant: City of Williamsburg

Total Cost: $1,250,000

Current Request: $1,000,000

Description: Construction of a trail along Monticello Avenue from Trayburn Drive to Ironbound Road.

Remarks:Average

Score

Total EN Funds

Anticipated: $1,000,000

Project

Number: 16066

Name: Suburban Pedestrian Connector

Sponsor: City of Suffolk

Applicant: City of Suffolk

Total Cost: $1,185,108

Current Request: $948,086

Description: Construction of a sidewalk from the Oakdale and Pierce Park communities to Portsmouth Boulevard.

Remarks:Average

Score

Total EN Funds

Anticipated: $948,086

Project

Number: 16086

Name: Bypass Road Sidewalk Rehabilitation

Sponsor: York County

Applicant: York County

Total Cost: $700,000

Current Request: $560,000

Description: Replacement of a pedestrian/bike path along Bypass Road from west of Waller Mill Road to the Williamsburg City Limits.

Remarks:Average

Score

Total EN Funds

Anticipated: $560,000

23

2016 Transportation Alternatives Project Requests

01-Dec-15 District: Hampton Roads

New Projects

Project

Number: 16091

Name: Low Ground Road Sidewalk

Sponsor: Greensville County

Applicant: Greensville County

Total Cost: $315,932

Current Request: $252,746

Description: Construction of a sidewalk from the Spring Hill Village Mobile Home Park to the Emporia City Limits.

Remarks:Average

Score

Total EN Funds

Anticipated: $252,746

Project

Number: 16093

Name: Lake Hampton Pedestrian/Bicycle Trail

Sponsor: City of Hampton

Applicant: City of Hampton

Total Cost: $1,870,000

Current Request: $1,000,000

Description: Construction of a trail from the Greenman property on Freeman Drive to the North Armistead Avenue intersection.

Remarks:Average

Score

Total EN Funds

Anticipated: $1,496,000

Cost : $15,722,150

Amount Requested : $9,078,910

Subtotal: Projects17

24

2016 Transportation Alternatives Project Requests

01-Dec-15 District: Fredericksburg

Existing Projects

Project

Number: 16059

Name: Mine Road Sidewalk

Sponsor: Stafford County

Applicant: Stafford County

Total Cost: $820,000

Current Request: $492,785

Description: Construction of a sidewalk along Mine Road from Cathedral Lane to Highpointe Boulevard.

Remarks:Average

Score

Priority

Ranking0

Total EN Funds

Anticipated: $656,000

New Projects

Project

Number: 16008

Name: Prince Street Sidewalks

Sponsor: Town of Tappahannock

Applicant: Town of Tappahannock

Total Cost: $361,330

Current Request: $266,130

Description: Reconstruction of sidewalks on Prince Street from Church Lane to the River.

Remarks:Average

Score

Total EN Funds

Anticipated: $266,130

Project

Number: 16025

Name: King William Courthouse Trail System

Sponsor: King William County

Applicant: King William County

Total Cost: $250,000

Current Request: $200,000

Description: Construction of pedestrian facilities that will facilitate access to the County's historic administrative/judical complex.

Remarks:Average

Score

Total EN Funds

Anticipated: $200,000

Cost : $1,431,330

Amount Requested : $958,915

Subtotal: Projects3

25

2016 Transportation Alternatives Project Requests

01-Dec-15 District: Culpeper

Existing Projects

Project

Number: 16002

Name: Marshall Streetscape

Sponsor: Fauquier County

Applicant: Fauquier County

Total Cost: $4,511,975

Current Request: $392,000

Description: Construction of sidewalks, crosswalks, landscaping, lighting and other improvements along the north and south sides of Main Street (Route 55) in the village of Marshall.

Remarks:Average

Score

Priority

Ranking0

Total EN Funds

Anticipated: $3,609,580

New Projects

Project

Number: 16036

Name: Water Street Shared Use Path

Sponsor: City of Charlottesville

Applicant: City of Charlottesville

Total Cost: $353,672

Current Request: $254,984

Description: Construction of a shared-use path along Water Street from the Coal Tower and Meade Avenue Trails to the downtown maill.

Remarks:Average

Score

Total EN Funds

Anticipated: $254,984

Project

Number: 16042

Name: Timber Fence Trail

Sponsor: Town of Warrenton

Applicant: Town of Warrenton

Total Cost: $918,756

Current Request: $735,005

Description: Construction of a trail connecting a park through adjacent neighborhoods to a high school.

Remarks:Average

Score

Total EN Funds

Anticipated: $735,005

26

2016 Transportation Alternatives Project Requests

01-Dec-15 District: Culpeper

New Projects

Project

Number: 16076

Name: 5th Street Node and Bicycle Connections

Sponsor: City of Charlottesville

Applicant: Thomas Jefferson Planning District Commission

Total Cost: $612,880

Current Request: $412,880

Description: Construction to include "nodes" for bicyclists at connecting points on the trail, trail construction from Bent Creek Road south along Moore's Creek, bridge construction over Biscuit Run, trail construction along Biscut Run and Moore's Creek.

Remarks:Average

Score

Total EN Funds

Anticipated: $412,880

Cost : $6,397,283

Amount Requested : $1,794,869

Subtotal: Projects4

27

2016 Transportation Alternatives Project Requests

01-Dec-15 District: Staunton

Existing Projects

Project

Number: 16009

Name: Strasburg Downtown Streetscaping

Sponsor: Town of Strasburg

Applicant: Town of Strasburg

Total Cost: $2,185,444

Current Request: $613,413

Description: Streetscaping improvements along King Street.

Remarks:Average

Score

Priority

Ranking0

Total EN Funds

Anticipated: $1,748,355

Project

Number: 16040

Name: Appalachian Trail Connector

Sponsor: Warren County

Applicant: Warren County

Total Cost: $1,299,137

Current Request: $340,941

Description: Construction of a path along Route 522 that will connect the Town of Front Royal with the Appalachian Trail.

Remarks:Average

Score

Priority

Ranking0

Total EN Funds

Anticipated: $1,039,309

Project

Number: 16064

Name: Sidewalk Improvements

Sponsor: Town of Mt Jackson

Applicant: Town of Mount Jackson

Total Cost: $450,120

Current Request: $360,096

Description: Construction of sidewalks along Main Street and Conicville Boulevard from Tripplett Tech School to Avondale Avenue.

Remarks:Average

Score

Priority

Ranking0

Total EN Funds

Anticipated: $360,096

28

2016 Transportation Alternatives Project Requests

01-Dec-15 District: Staunton

Existing Projects

Project

Number: 16067

Name: Lifecore Drive Shared-Use Path

Sponsor: Augusta County

Applicant: Augusta County

Total Cost: $1,067,100

Current Request: $580,640

Description: Construction of a shared-use path from west of the intersection of Tinkling Spring Road and Lifecore Road to the intersection of Village Creek Drive and Lifecore Drive.

Remarks:Average

Score

Priority

Ranking0

Total EN Funds

Anticipated: $853,680

New Projects

Project

Number: 16080

Name: Blue Ridge Road Shared-Use Path

Sponsor: Town of Glasgow

Applicant: Town of Glasgow

Total Cost: $294,400

Current Request: $235,520

Description: Construction of a shared-use path along Blue Ridge Road from Powhatan Street to Fitzlee Street.

Remarks:Average

Score

Total EN Funds

Anticipated: $235,520

Project

Number: 16081

Name: Bessie Weller Elementary School SRTS

Sponsor: City of Staunton

Applicant: City of Staunton

Total Cost: $378,798

Current Request: $278,798

Description: Construction of sidewalk, crosswalks, and lighting.

Remarks:Average

Score

Total EN Funds

Anticipated: $278,798

29

2016 Transportation Alternatives Project Requests

01-Dec-15 District: Staunton

New Projects

Project

Number: 16088

Name: Chessie Trail Bridge Connection

Sponsor: Town of Buena Vista

Applicant: City of Buena Vista

Total Cost: $231,619

Current Request: $176,031

Description: Construction of a walkway that will connect the existing Chessie trail to the City sidewalk along Route 60.

Remarks:Average

Score

Total EN Funds

Anticipated: $176,031

Project

Number: 16092

Name: Spotswood Elementary School SRTS

Sponsor: City of Harrisonburg

Applicant: City of Harrisonburg

Total Cost: $189,900

Current Request: $151,984

Description: Construction of a sidewalk, crossing location, and flashing zone lights on Reservoir Street between Hawkins Street and Kenmore Street.

Remarks:Average

Score

Total EN Funds

Anticipated: $151,984

Cost : $6,096,518

Amount Requested : $2,737,423

Subtotal: Projects8

30

2016 Transportation Alternatives Project Requests

01-Dec-15 District: Northern Virginia

Existing Projects

Project

Number: 16043

Name: Round Hill Pedestrian Improvements

Sponsor: Town of Round Hill

Applicant: Town of Round Hill

Total Cost: $2,419,565

Current Request: $1,175,162

Description: Construction of sidewalks along Main Street from Loudoun Street to just north of High Street.

Remarks:Average

Score

Priority

Ranking0

Total EN Funds

Anticipated: $1,935,652

Project

Number: 16047

Name: Colonial Highway Sidewalks

Sponsor: Town of Hamilton

Applicant: Town of Hamilton

Total Cost: $372,100

Current Request: $297,680

Description: Replacement, reconstruction, and upgrade of existing sidewalks in the Town of Hamilton.

Remarks:Average

Score

Priority

Ranking0

Total EN Funds

Anticipated: $297,680

Project

Number: 16054

Name: Van Buren Street Multi-Modal Improvements

Sponsor: Town of Herndon

Applicant: Town of Herndon

Total Cost: $636,383

Current Request: $509,106

Description: Construction of "complete street" design facilities on Van Buren Street from Herndon Parkway to Alabama Drive.

Remarks:Average

Score

Priority

Ranking0

Total EN Funds

Anticipated: $509,106

31

2016 Transportation Alternatives Project Requests

01-Dec-15 District: Northern Virginia

Existing Projects

Project

Number: 16061

Name: Cinder Bed Bikeway

Sponsor: Fairfax County

Applicant: Fairfax County

Total Cost: $4,000,000

Current Request: $400,000

Description: Construction of a bikeway from Fort Belvoir to Franconia-Springfield Metrorail Station.

Remarks:Average

Score

Priority

Ranking0

Total EN Funds

Anticipated: $2,000,000

Project

Number: 16087

Name: McKinley Road/North Ohio Street SRTS

Sponsor: Arlington County

Applicant: Arlington County

Total Cost: $1,109,280

Current Request: $400,000

Description: Construction of raised medians, pedestrian curb extensions, and buffered bike lanes on McKinley Road/North Ohio Street from Wilson Boulevard to 11th Street North.

Remarks:Average

Score

Priority

Ranking0

Total EN Funds

Anticipated: $840,000

New Projects

Project

Number: 16003

Name: Melody Lane Safe Routes to School Sidewalk

Sponsor: Town of Vienna

Applicant: Town of Vienna

Total Cost: $350,000

Current Request: $280,000

Description: Construction of a sidewalk on Melody Lane SW from DeSale Street to Lullaby Lane.

Remarks:Average

Score

Total EN Funds

Anticipated: $280,000

32

2016 Transportation Alternatives Project Requests

01-Dec-15 District: Northern Virginia

New Projects

Project

Number: 16032

Name: Horner Road Sidewalk

Sponsor: Prince William County

Applicant: Prince William County

Total Cost: $462,357

Current Request: $369,886

Description: Construction of a sidewalk along Horner Road from the intersection of Forest Glen Road to the Kilby Elementary School.

Remarks:Average

Score

Total EN Funds

Anticipated: $369,886

Project

Number: 16034

Name: Innovation Drive Asphalt Trail

Sponsor: Prince William County

Applicant: Prince William County

Total Cost: $1,067,000

Current Request: $853,600

Description: Construction of a trail on one side of Innovation Drive from George Mason Drive to the end of Innovation Drive.

Remarks:Average

Score

Total EN Funds

Anticipated: $853,600

Project

Number: 16038

Name: Opitz Boulevard Sidewalk

Sponsor: Prince William County

Applicant: Prince William County

Total Cost: $1,254,120

Current Request: $1,003,296

Description: Construction of a sidewalk along the south side of Opitz Boulevard from an existing sidewalk on Potomac Center Boulevard to an existing sidewalk on Opitz Boulevard at Potomac Library.

Remarks:Average

Score

Total EN Funds

Anticipated: $1,003,296

33

2016 Transportation Alternatives Project Requests

01-Dec-15 District: Northern Virginia

New Projects

Project

Number: 16039

Name: Dumfries Road Sidewalk

Sponsor: Prince William County

Applicant: Prince William County

Total Cost: $686,648

Current Request: $514,986

Description: Construction of sidewalk on the east side of Dumfries Road between Counselor Road and Tayloe Drive.

Remarks:Average

Score

Total EN Funds

Anticipated: $514,986

Project

Number: 16058

Name: Mount Vernon Trail Bridge Replacement

Sponsor: City of Alexandria

Applicant: National Park Service

Total Cost: $1,275,000

Current Request: $800,000

Description: Removal of an existing bridge and construction of a new bridge on the Mount Vernon Trail.

Remarks:Average

Score

Total EN Funds

Anticipated: $800,000

Project

Number: 16068

Name: Van Dorn Street Pedestrian and Bicycle Access Improvements

Sponsor: Fairfax County

Applicant: Fairfax County

Total Cost: $1,500,000

Current Request: $400,000

Description: Construction of a shared-use path from South Van Dorn Street/Oakwood Road Intersection to Fairfax County Line.

Remarks:Average

Score

Total EN Funds

Anticipated:$1,200,000

34

2016 Transportation Alternatives Project Requests

01-Dec-15 District: Northern Virginia

New Projects

Project

Number: 16069

Name: Reston Bike Share

Sponsor: Fairfax County

Applicant: Fairfax County

Total Cost: $766,000

Current Request: $400,000

Description: Purchase of bikeshare stations and bicycles to launch a bikeshare system in Reston, Va.

Remarks:Average

Score

Total EN Funds

Anticipated: $400,000

Project

Number: 16071

Name: W&OD Trail Plaza and Crossing Improvements

Sponsor: City of Falls Church

Applicant: City of Falls Church

Total Cost: $900,000

Current Request: $160,000

Description: Improvement of 6 at-grade crossings and construction of several trail plazas that will provide bicycle repair, access to restrooms, historical information, and wayfinding information.

Remarks:Average

Score

Total EN Funds

Anticipated: $720,000

Project

Number: 16072

Name: Park Avenue Great Streets

Sponsor: City of Falls Church

Applicant: City of Falls Church

Total Cost: $3,300,000

Current Request: $240,000

Description: Rehabilitate existing sidewwalks to comply with ADA standards and improve pedestrian access.

Remarks:Average

Score

Total EN Funds

Anticipated: $2,640,000

35

2016 Transportation Alternatives Project Requests

01-Dec-15 District: Northern Virginia

New Projects

Project

Number: 16098

Name: Historic Stone Bridge Rehabilitation

Sponsor: City of Manassas

Applicant: National Park Service

Total Cost: $575,000

Current Request: $460,000

Description: Preservation and rehabilitation of the historic Stone Bridge over Bull Run.

Remarks:Average

Score

Total EN Funds

Anticipated: $460,000

Cost : $20,673,453

Amount Requested : $8,263,716

Subtotal: Projects16

Cost : $78,112,423

Amount Requested : $41,309,834

Grand Total: Projects98