2
PRECINCT 3 3 1/4 Mile Rd. & N. Bentsen Palm Dr. $80,434 Regrade of roadside ditch and installation of driveway culverts along North Bentsen Palm Dr., approximately 3,500 ft. North of Buddy Owens Blvd (Mile 3). PRECINCT 3 3 3/4 Mile Rd. & Shuerbach Rd. $2,235,749 Construction of a drainage ditch and roadway culvert crossing extending from East N. Schuerbach Rd. to East Los Ebanos Rd. into Linda Vista drainage ditch. PRECINCT 3 4 1/2 Mile Rd. & N. Doffing Rd. $950,974 Construction of a drainage ditch with culvert crossings between N. Doffing Rd. and N. Minnesota Rd. running south to north from Mile 4 into West Main Drain III. PRECINCT 3 4 Mile Rd. & Minnesota Rd. $259,531 Regrade of roadside ditch and storm drainage system running North along Doffing Rd. and through proposed easements to outfall into a proposed drain ditch and ultimately into Linda Vista drain. PRECINCT 3 5 1/2 Mile Rd. & N. Bentsen Palm Dr. $80,434 Proposed construction of drainage swales, regrading of roadside ditches and installation of roadway culverts along N. Betsen Palm Dr. to accommodate excess runoff from low areas. PRECINCT 3 7 1/2 Mile Rd. & Glasscock Rd. $354,375 Proposed storm drainage system along existing roadway ROW connecting to a future TxDOT system. PRECINCT 3 7 1/2 Mile Rd. & Western Rd. $340,938 Construction of a drainage ditch, roadway culvert crossings and storm drainage system to increase additional detention volume to the existing J-08 drainage ditch. PRECINCT 1 Anaquitas $7,670,000 Channel and culvert improvements to the Anaquita Drain ditch from Business 83 south to the Arroyo. Channel and culvert improvements are also recommended upstream of this drain, starting at Baseline Road and South James Drive in Mercedes. PRECINCT 1 Delta Regional Reservoir $10,000,000 Construction of a 200+ acre off-line detention pond near Mile 17 North and Uncle Peters Road to mitigate flooding up and downstream of the Main Floodwater Channel Drain. PRECINCT 1 East Mercedes $6,495,192 Channel and culvert improvements to the drainage ditches located in the vicinity of FM 2556, extending from north of Expressway 83 south to the Arroyo. PRECINCT 4 Faysville Drain $6,902,445 Project consists of the extension of a drainage ditch that was created to provide an outfall for US 281/I-69C, the Community of Faysville and surrounding areas. Faysville Drain will ultimately outfall into the proposed Raymondville Drain. PRECINCT 1 FM 493 & Country Road $1,305,000 New storm drainage system for the neighborhoods located between South River Road and surrounding the Chaparral Drain. PRECINCT 2 Hidalgo Drain $1,500,000 Upgrade existing culvert structures, cleaning, regarding, and widening of the existing ditch to increase linear detention and positive flow to the outfall at the Mission Inlet. PRECINCT 1 Highway 281 & FM 88 $1,452,000 Proposed storm water pump station located near Ranchitos de Progreso subdivision at the intersection of FM88 & Highway 281. PRECINCT 4 J-08 Drain $7,032,968 The project consists of improving the existing J-08 drainage ditch by acquiring new right of way, regrading, widening and creating a maintenance bench. PRECINCT 2 Jackson Rd. Drain $3,618,750 Channel and culvert widening of the drainage system, including the addition of a culvert crossing. The project will also create gated structures and portable pump staging area that will provide continual discharge into the Mission Inlet to relieve area flooding. PRECINCT 2 Las Milpas $1,922,500 Drainage system and culvert improvements will include the widening of drain ditches leading up to the outfall points at the South Lateral Drain, which will relieve the area of flooding. PRECINCT 1 Malone Drive & Pomelo Road $609,000 New storm drainage system for the neighborhood northeast of Pomelo Road and Malone Drive. PRECINCT 1 Mid Valley Airport $7,615,920 Channel and culvert improvements to the drainage ditch network for the area. New storm drainage system and detention ponds for Joe Stephens Avenue and the neighborhood east of the airport to relieve area flooding. PRECINCT 1 Mile 10 N & Baseline Road $1,899,136 Channel and culvert improvements to the major drainage ditch south of the neighborhood area. New storm drainage system for the neighborhood and a detention pond on the south to relieve from area flooding. HIDALGO COUNTY DRAINAGE DISTRICT NO. 1 2018 DRAINAGE BOND PROGRAM The proposed countywide projects would positively affect more than 69,000 structures in Hidalgo County, helping to protect more than $5.5 billion in assessed property values. EARLY VOTING: OCTOBER 22 - NOVEMBER 2 • ELECTION DAY: TUESDAY, NOVEMBER 6 1 2 3 4 6 7 8 9 10 11 12 13 16 17 18 19 20 14 15 5

2018 DRAINAGE BOND PROGRAM - Progreso Texas · detention ponds for Las Brisas, Chapa subdivisions and Onyx Drive neighborhoods. PRECINCT 2 Mission-McAllen Rado Alternate $7,181,250

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 2018 DRAINAGE BOND PROGRAM - Progreso Texas · detention ponds for Las Brisas, Chapa subdivisions and Onyx Drive neighborhoods. PRECINCT 2 Mission-McAllen Rado Alternate $7,181,250

PRECINCT 3 3 1/4 Mile Rd. & N. Bentsen Palm Dr.$80,434 Regrade of roadside ditch and installation of driveway culverts along North Bentsen Palm Dr., approximately 3,500 ft. North of Buddy Owens Blvd (Mile 3).

PRECINCT 3 3 3/4 Mile Rd. & Shuerbach Rd.$2,235,749 Construction of a drainage ditch and roadway culvert crossing extending from East N. Schuerbach Rd. to East Los Ebanos Rd. into Linda Vista drainage ditch.

PRECINCT 3 4 1/2 Mile Rd. & N. Doffing Rd.$950,974 Construction of a drainage ditch with culvert crossings between N. Doffing Rd. and N. Minnesota Rd. running south to north from Mile 4 into West Main Drain III.

PRECINCT 3 4 Mile Rd. & Minnesota Rd.$259,531 Regrade of roadside ditch and storm drainage system running North along Doffing Rd. and through proposed easements to outfall into a proposed drain ditch and ultimately into Linda Vista drain.

PRECINCT 35 1/2 Mile Rd. & N. Bentsen Palm Dr.$80,434 Proposed construction of drainage swales, regrading of roadside ditches and installation of roadway culverts along N. Betsen Palm Dr. to accommodate excess runoff from low areas.

PRECINCT 37 1/2 Mile Rd. & Glasscock Rd.$354,375 Proposed storm drainage system along existing roadway ROW connecting to a future TxDOT system.

PRECINCT 3 7 1/2 Mile Rd. & Western Rd.$340,938 Construction of a drainage ditch, roadway culvert crossings and storm drainage system to increase additional detention volume to the existing J-08 drainage ditch.

PRECINCT 1Anaquitas$7,670,000 Channel and culvert improvements to the Anaquita Drain ditch from Business 83 south to the Arroyo. Channel and culvert improvements are also recommended upstream of this drain, starting at Baseline Road and South James Drive in Mercedes.

PRECINCT 1Delta Regional Reservoir$10,000,000 Construction of a 200+ acre off-line detention pond near Mile 17 North and Uncle Peters Road to mitigate flooding up and downstream of the Main Floodwater Channel Drain.

PRECINCT 1East Mercedes$6,495,192 Channel and culvert improvements to the drainage ditches located in the vicinity of FM 2556, extending from north of Expressway 83 south to the Arroyo.

PRECINCT 4Faysville Drain$6,902,445 Project consists of the extension of a drainage ditch that was created to provide an outfall for US 281/I-69C, the Community of Faysville and surrounding areas. Faysville Drain will ultimately outfall into the proposed Raymondville Drain.

PRECINCT 1FM 493 & Country Road$1,305,000 New storm drainage system for the neighborhoods located between South River Road and surrounding the Chaparral Drain.

PRECINCT 2Hidalgo Drain$1,500,000 Upgrade existing culvert structures, cleaning, regarding, and widening of the existing ditch to increase linear detention and positive flow to the outfall at the Mission Inlet.

PRECINCT 1Highway 281 & FM 88$1,452,000 Proposed storm water pump station located near Ranchitos de Progreso subdivision at the intersection of FM88 & Highway 281.

PRECINCT 4 J-08 Drain$7,032,968 The project consists of improving the existing J-08 drainage ditch by acquiring new right of way, regrading, widening and creating a maintenance bench.

PRECINCT 2 Jackson Rd. Drain$3,618,750Channel and culvert widening of the drainage system, including the addition of a culvert crossing. The project will also create gated structures and portable pump staging area that will provide continual discharge into the Mission Inlet to relieve area flooding.

PRECINCT 2 Las Milpas$1,922,500 Drainage system and culvert improvements will include the widening of drain ditches leading up to the outfall points at the South Lateral Drain, which will relieve the area of flooding.

PRECINCT 1 Malone Drive & Pomelo Road$609,000 New storm drainage system for the neighborhood northeast of Pomelo Road and Malone Drive.

PRECINCT 1 Mid Valley Airport$7,615,920 Channel and culvert improvements to the drainage ditch network for the area. New storm drainage system and detention ponds for Joe Stephens Avenue and the neighborhood east of the airport to relieve area flooding.

PRECINCT 1 Mile 10 N & Baseline Road$1,899,136Channel and culvert improvements to the major drainage ditch south of the neighborhood area. New storm drainage system for the neighborhood and a detention pond on the south to relieve from area flooding.

HIDALGO COUNTY DRAINAGE DISTRICT NO. 12018 DRAINAGE BOND PROGRAM

The proposed countywide projects would positively affect more than 69,000 structures in Hidalgo County, helping to protect more than $5.5 billion in assessed property values.

EARLY VOTING: OCTOBER 22 - NOVEMBER 2 • ELECTION DAY: TUESDAY, NOVEMBER 6

1

2

3

4

6

7

8

9

10

11

12

13

16

17

18

19

20

14

155

Page 2: 2018 DRAINAGE BOND PROGRAM - Progreso Texas · detention ponds for Las Brisas, Chapa subdivisions and Onyx Drive neighborhoods. PRECINCT 2 Mission-McAllen Rado Alternate $7,181,250

PRECINCT 1Mile 10 N & Mile 1 W$4,482,168 Channel and culvert improvements to the major drainage ditch for the area. New storm drainage system with associated detention ponds for two residential areas along Mile 11 N.

PRECINCT 1 Mile 11 N & FM 1015$14,722,192 Channel and culvert improvements to the drainage ditch network for the area. Four new regional detention ponds to relieve area from flooding.

PRECINCT 1 $10,628,888 Mile 11 N & Texas BoulevardChannel and culvert improvements to the drainage ditch network for the area. New storm drainage system along Beto Garcia, Tahiti and Samoa Drive and four detention ponds to relieve area flooding.

PRECINCT 1 Mile 9 N & FM 1015$10,645,208 Channel and culvert improvements to the drainage ditch network for the area, including the extension of an existing drainage ditch. New storm drainage system and associated detention ponds for Las Brisas, Chapa subdivisions and Onyx Drive neighborhoods.

PRECINCT 2Mission-McAllen Rado Alternate$7,181,250 Culvert and channel improvements will include a culvert along Colbath Ave and Taylor Rd Right-of-Way and a new outfall ditch at the Mission Inlet drain ditch.

PRECINCT 3 Mission Lateral$12,779,500 Proposed widening, culvert crossing and detention facilities to increase linear detention and functionality of existing Mission Lateral drainage ditch.

PRECINCT 3Monte Cristo Rd. & Conway Rd.$7,392,016 Addition of detention facilities, culvert crossings and cleaning improvements of existing drainage ditch.

PRECINCT 1 Old La Blanca & Mile 10 N$496,000 New storm drainage system along De Los Rios Avenue and Encino Drive.

PRECINCT 3 PD-Lateral$4,586,474 Construction of a drainage ditch with roadway crossings to outfall into existing Penitas drainage ditch.

PRECINCT 3Penitas Drain$5,393,595 Extension of Penitas Drain consisting of a construction of a drainage ditch with roadway crossings.

PRECINCT 2 Pharr-McAllen Drain$891,250 New storm drainage system and culvert improvements will include the addition of culverts at the Irrigation Canal and Ridge Rd crossings to increase capacity.

PRECINCT 4 Raymondville Drain$15,000,000 Project consists of a new drainage ditch connecting to existing channels. Existing channels will be improvements to the approximate 63-mile drainage system of in-line and off-line detention, reservoirs, and control structures that stretches from Edinburg Lake (Hidalgo Co.) to the Laguna Madre (Willacy Co.).

PRECINCT 2South “I” Road Detention$4,408,000 New detention facilities to mitigate flooding and store potentially damaging floodwaters temporarily until the channels can safely carry the water away.

PRECINCT 2 South Lateral Drain$13,350,000 Widening of the channel to expedite drain flow, and the addition of detention facilities at the upstream end connecting to the Main Floodway.

PRECINCT 1 Southwest Weslaco$10,504,952 Channel and culvert improvements to the drainage ditch network for the area. New regional storm drainage detention ponds and sump detention ponds with pumping stations at the Floodway.

PRECINCT 4 Sunflower Drain$1,132,727 Purchase additional right of way. Construct a proposed drain ditch. Upgrade existing connection to South Main Drain. Upgrade from existing culvert crossing underneath State Highway 107.

PRECINCT 3Western Rd & 9 Mile Line$80,434 Regrade of roadside ditch and installation of driveway culverts along North Abram Rd. to alleviate flooding issues.

DISTRICTWIDECapital Acquisition of In-House Machinery and Equipment$4,000,000Purchase of in-house machinery and equipment to be used for maintenance and operations

ST241

ST336

ST107

ST433

ST336

ST336

ST107

ST107

ST336

ST107 ST107

ST107

£¤83

£¤281

£¤83

£¤83

£¤281

£¤281

£¤281

£¤83

£¤281

£¤83

£¤281

£¤83

2D9A

J-01

-04

Mont

e Ch

risto

Elsa

-Edcouch DrainFM 6

81 O

utfa

ll

East L

a teral

Pueb

lo

de Palmas Drain

Z-00-0 0

J-09

J-08-00

Sout

hM

erce

des

L ate

r al

LJ

Goo

dwin

Drai

n

Palmview Lateral Extension

El Ro cio Drain

South Alamo Drain

Jack

son

Drai

n

Lateral 34

Weslaco Dra in

J-14-00

San

Juan

Late

ral

PSJA

South Drain

M onte CristoDrain

M ade r oLa

tera

l

LindaVis ta Drain

M ission Inlet Bypass

L-0 2-01

EdinburgStu b

Wes

tM a in Drain

II

Hida

lgo

Drai

n

Pharr-McAllen Lateral

South Main Drain II

Lull

Drai

n

J-0 2-00

Alam

oEx

pres

swayDr

ain

Pharr/McAllen Sout h Drain

Ra

do Alte

rnat

e Alam

o La

tera

l

J-09-00

PSJA

Lat

eral

Perezv i lleDrain Do

nna

North

Late

ral

Mission Lateral

NorthM

ain

Drain II

Nort hMain D rain I

SouthD

onnaD

r ain

Wes

laco

Nor

th L

ater

al

North

Ma

in Drain III

Mercedes Lateral

Wes

tMain Drain III

South Lateral Drain

Mission Inlet

South Mai

nDr

ain

I

Mai

n Fl

oodw

ater

Cha

nnel

SHAR

Y

23RD

TAYL

OR

MIL

E 2

RIO

BEE

F

STEW

ART

MIL

E 6

BUSINESS 83

WAR

E

BRYA

N

FRO

NTAG

E

MILE 10

FM 4

91

MO

N M

ACK

BENT

SEN

PALM

CESA

R CH

AVEZ

BENITO A RAMIREZ

MIL

E 1

COMA

JACK

SON

RICHARDSON

FRONTAGE

FM 4

93

FM 4

92

MILE 11

MONTE CRISTO

NOLANA

HIGHWAY107

MCC

OLL

SUG

AR

FM1015

VETE

RANS

MILE 17

MO

ORE

FIEL

D

LA H

OM

A

MILE 17 1/2

FM 8

8

CAGE

WAL

LACE

RAMSEYER

BENT

SEN

MID

WAY

FM88

6

BENT

SEN

GLAS

SCO

CK

IH 2

MAY

BERR

Y

FRONTAGE

ALAM

O

CLO

SNER

IH 2

SCHUNIOR

MARCEDONIO

SUNF

LOW

ER

CONW

AY

RAUL

LO

NGO

RIA

MILITARY

CONW

AY

LOS

EBAN

OS

BUSINESS HIGHWAY 83

MILE 4

GLA

SSCO

CK

MILE 2

TOW

ER

MAI

N

HUTT

O

STEW

ART

HIGHWAY 186

MILITARY

MILE 8

MILE 3

FM 8

8

MILITARY

VAL

VERD

E

HOLL

AND

IH 6

9C

FM 2812

MONTE CRISTO

CANTON

MILE 7

CHAPIN

KENY

ON

TRENTON

29TH

SIOUX

CURRYMAIN

TEXA

S

10TH

INGLE

PECANMAY

BERR

Y

WISCONSIN

MINNESOTA

FREDDY GONZALEZ

HIGHWAY 281

PALMA VISTA

MILE 16

SPRAGUE

CANT

U

MAI

N

ROOSEVELTMILE 12

HIGHWAY 107

29TH

VALL

EY V

IEW

MILE 4

UNIVERSITY

ROGERS MIL

E 3

IH 2

ELDORA

FM 8

8

GRIFFIN

ALBERTA

MILE 11

MILE 17 1/2

MILE 15

MILE 25

MILE 17

DAVIS

VETERANS

MIL

E 4

1/2

MIL

E 5

1/2

MILE 15 1/2

MILE 17

COL

ROW

E

TEXAS

STATE HIGHWAY 107

FM 1

015

CAGE

TOW

ER

MILE 3

FM 495

VETE

RANS

MIN

NESO

TA

MILE 8

MILE 9

MILE 5

ROGERS

MIL

E 4

23RD

MILE 12 1/2

MILE 7

HIGHWAY 83

MIL

E 6

1/2

INSP

IRAT

ION

LOOP 374

MILE 9

TRO

SPER

ELDORA

MIL

E 3

1/2

IOW

A

STEW

ART

FM 1921

MILE 5

RED I RANCH

MILE 19

HIGHWAY 281

MILE 13

FM 4

91WAR

E

MILE 4

BUSINESS 83

MIL

E 2

1/2

MIL

E 4

MILE 6

M

1ST

18TH

FM 494

BICE

NTEN

NIAL

FM 2812

FM 1

015

MILE 6

SIOUX

ALTO

N

MILE 14

VALD

EZCEM

ETER

Y

MIL

E 5

1/2

CESA

R CH

AVEZ

JUAN BALLI

FM 1422

MILE 13

SKIN

NER

MIL

E 1

IOWA

MILE 20

FM 490

FM14

25

MILE 9

ISRAEL CAVAZOS

CHAP

A

CURVE

MILE 14

FM 6

81

JARA

CHI

NAS

BRUS

HLIN

E

DOO

LITT

LE

FRONTAGE

MILE 13 1/2

MIL

E 2

HOLLYLUPINE

SHAR

Y

VALDEZ

DILL

ON

MILE 8

MILE 6

10TH

BUCY

EMMA ROSS

MAC

NORM

AN G

ROVE

VAL

VERD

E

MARINA

MILE 19

MILE 11

MILE 3

MILE 12

JESU

S FL

ORES

FM49

3

MILE 4

TOW

ER

MIL

E 2MILE 31/2

OLD MILITARY

MILE 21

MIL

E 1

1/2

UNCL

E PE

TERS

MILE 14

MILE 13

MILE 14

83RD

FM 4

91

INTE

RNAT

IONA

L

MIL

E 1

EXPR

ESSW

AY28

1

ROW

LAND

MILE 9

MILE 13

MILE 11

MILE 12

FM 2629

MILE 14 1/2

MILITARY

MILE 3

JASM

AN

NITTLER

6TH

MILE 9 1/2

MILE 22 1/2

12TH

TAM

EZVI

LLE

MDA

VILA

SR

SALA

ZAR

TROPPY

MILE 10

DURBIN

FM 8

8

MARS NURSERY

MIL

E 5

MARINA

MILE 20

DAVI

LA

ENG

ELM

AN G

ARDE

NS

GARCIA

MIL

E 3

1/2

SHAR

P

GUER

RA

HWY 281

MIL

E 1

1/2

LA MULA

MILE 10

A

LAM

O

ANDERSON

JARITAS

JAC

KSO

N

COO

LIDG

E

MILE 17

FM 2

058

11TH

COUNTY ROAD 3301

HOEH

N

MIL

E 7

LILAC

QUAIL

MILE 16

MILE 18

MILE 3

BRYA

N

BRYA

N

FM 490

FM 490

FM 490

28

18

24

12

21

1 23

6

22

19

54

27

37

25 31

20

17

29

30

7

11

14

35

23

16

9

34

15

8

Legend2018 Bond Projects

Detention Areas

Existing Drainage System

HCDD1 Boundary

Precinct 1

Precinct 2

Precinct 3

Precinct 4

32

36

µ

10

26

13

33

21

3622

25

34

32

35

33

37

38

26

30

31

27

28

29

23

24

Projects are listed in no particular order of priority and can be commenced simultane-ously depending upon readiness of project

as funding becomes available under this program. Project scope and location are estimates based on information currently

available and may be subject to reasonable change on the basis of new and refined

information up to the time of completion.