2018 FIVE-YEAR TRANSPORTATION
IMPROVEMENT & MAINTENANCE
PROGRAM 2017-2018 THROUGH 2021-2022
Recommended by the
Transportation Advisory Committee
February 27, 2018
Approved by the Board of Supervisors May 30, 2018
2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM
2017-2018 THROUGH 2021-2022
The Pinal County Board of Supervisors (Board) proudly presents the 2018 Five-Year Transportation Improvement and
Maintenance Program (TIMP) for Budget Years 2017-2018 through 2021-2022. The TIMP is Pinal County’s near-term transportation
plan that identifies potential funding and establishes a tentative schedule for planning, construction, and maintenance projects. It is
fiscally constrained and updated annually with new projects added to the fifth year.
The Transportation Advisory Committee (TAC) is the Board appointed, ten member panel representing each of Pinal County’s
five supervisor districts. The TAC is charged with prioritizing transportation projects for the TIMP and recommending the draft TIMP
to the Board. On February 27, 2018, the TAC met in an open public meeting and recommended approval of the 2018 TIMP for Budget
Years 2017-2018 through 2021-2022.
In recognition of their significant contributions, we would like to thank the TAC officers and members for their service to Pinal County.
First Row (L-R): Gordon Brown, District 2; Ted Hawkins, District 4; Chair Maxine Brown, District 5;
Anna Flores, District 1; Vice-Chair Kevin Louis, District 3
Second Row (L-R): Ron Vogler, District 4; William Beebe, District 5, Jim Fabris, District 2; David Garcia, District 1
2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM
2017-2018 THROUGH 2021-2022
The TAC conducts three public meetings during the months of September, November, and February in Florence and considers
public comments in developing recommendations to the Board. We encourage you to attend the meetings and offer comments on
the TIMP and future transportation projects.
Meetings are held on Tuesdays in the Ironwood Room (Northeast Multipurpose Room 101) of the Pinal County Administrative
Complex (1891 Historic Courthouse) and begin at 2:30 p.m. as follows:
Agendas and minutes are posted in compliance with Arizona’s Open Meeting Law and can be found on Pinal County’s website:
http://www.pinalcountyaz.gov/PublicWorks/TransportationPlanning/Pages/TACSchedule.aspx.
Funding for the TIMP is provided by revenues from the Pinal County Transportation Excise Tax, the half-cent sales tax, approved
by voters in 2005. The sole purpose of the tax is to fund construction, maintenance, and roadside development projects throughout
the county. Shopping and buying your gasoline locally ensure that quality transportation projects are planned and implemented
countywide. With your support, we can continue building and improving the county’s transportation system.
Pinal County Board of Supervisors
September 25, 2018 November 27, 2018 February 26, 2019
Vice-Chairman Pete Rios, District 1; Mike Goodman, District 2; Stephen Miller, District 3; Anthony Smith, District 4; Chairman Todd
House, District 5
2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM
2017-2018 THROUGH 2021-2022
GLOSSARY
Activity – Project work such as: pre-construction/construction/new construction/reconstruction, drainage, dust palliative,
pavement preservation or safety.
Construction – The building of roadway and/or related infrastructure improvements.
Drainage – The management of storm water to protect private and/or public infrastructure.
Dust Palliative – A surface treatment applied to unimproved roadways to control dust.
New Construction – The establishment of a roadway and/or related infrastructure improvements.
Pavement Preservation – A topical treatment that extends the service life of existing pavement surfaces.
Pre-Construction – The project work conducted prior to construction of roadway and/or related infrastructure
improvements such as: planning, environmental, design, and right-of-way acquisition.
Reconstruction – The rebuilding of roadway and/or related infrastructure improvements. Elements of new construction may
be incorporated into the project.
Safety – The project work that eliminates or reduces the severity of roadway hazards. Examples include intersection
realignment, guardrails, improved signage and/or pavement markings, traffic signals or related studies.
Status – The current state of the project such as: cancelled, closed, completed, pending, programmed, and underway
Cancelled – The project was terminated due to financial or other constraints such as unresolved right-of-way issues or
changing priority.
Closed – The project was combined with another project (including allocated funding) to streamline activities or allocated
funding for project was not used.
2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM
2017-2018 THROUGH 2021-2022
GLOSSARY (continued)
Completed – The project was successfully finished/constructed and closed out.
Pending – The project is about to start or awaiting the completion of another activity.
Programmed – The project was approved/authorized and scheduled for a future budget year.
Underway – The project is in progress.
Unfunded – Funding has not been identified/allocated.
Budget Year 2017-2018Transportation Improvement and Maintenance ProgramIMPROVEMENT
Project Location Activity PageDistrictStatus
PROJECT TYPE
Total CostProject Manager
Battaglia Drive Overfield Rd Intersection Construction/Reconstructi $350,000 14CompletedAngeline To a
Curry Road State Route 287-Storey Rd Construction $110,000 13CompletedLindsey Randall b
Germann Road Meridian Rd-Ironwood Dr Pre-Construction $244,124 22UnderwayCeleste Garza a
Henness Road Val Vista Rd-Waverly Dr New Construction $350,000 23CompletedLindsey Randall b
McCartney Road Interstate 10-Evans Rd Reconstruction $3,500,000 31, 3UnderwayLindsey Randall a
Mitchell Trail Heritage Rd-Arizona Farms Rd Pre-Construction $0 32CancelledLindsey Randall b
Safety Program Countywide Safety $500,000 47ProgrammedJohn Kraft a
Sunland Gin Road Battaglia Dr Intersection Safety $350,000 44UnderwayAngeline To b
Tweedy Road State Route 287-Storey Rd Construction $110,000 53CompletedLindsey Randall a
$5,514,124SUBTOTAL IMPROVEMENT
MAINTENANCEProject Location Activity PageDistrictStatus
PROJECT TYPE
Total CostProject Manager
Bronco Lane Valley View Dr south .1 mile Dust Palliative $30,000 55CompletedLindsey Randall b
Cactus Road Kaniksu St (north)-Frontier St Dust Palliative $20,000 65CompletedLindsey Randall a
Cattle Tank Road Davis Ranch Rd-Park Link Dr Pre-Construction $90,000 61, 4CompletedAngeline To b
Cattle Tank Road Davis Ranch Rd-Park Link Dr Dust Palliative $1,300,000 71, 4UnderwayAngeline To a
Dust Abatement Program Apache Junction area Dust Palliative $500,000 75PendingLindsey Randall b
Estancia Drive Davis Ranch Rd-Hedgehog Tr Dust Palliative $100,000 84CompletedAngeline To a
Harmon Road Toltec Hwy-Tweedy Rd Dust Palliative $360,000 81CompletedAngeline To b
Huisatch Road Garnet Rd-Amarillo Valley Rd Dust Palliative $175,000 94CompletedLindsey Randall a
La Palma Road State Route 287-.25 north of Kleck Rd Dust Palliative $150,000 91CompletedLindsey Randall b
Maverick Circle Mohican Rd west .1 mile Dust Palliative $30,000 105CompletedLindsey Randall a
McDavid Road Warren Rd-Hidden Valley Rd Dust Palliative $110,000 104CompletedLindsey Randall b
Muleshoe Road Roundup St-Shiprock St Dust Palliative $20,000 115CompletedLindsey Randall a
Pavement Preservation Program Countywide Pavement Preservation $500,000 117ProgrammedJoe Ortiz b
Redington Road Veterans Memorial Blvd-Pima County Line Dust Palliative $665,000 121CompletedAngeline To a
Sixshooter Road Jacob Waltz St north .1 mile Dust Palliative $30,000 125CompletedLindsey Randall b
Warren Road Farrell Rd-McDavid Rd Dust Palliative $220,000 134CompletedLindsey Randall a
$4,300,000SUBTOTAL MAINTENANCE
$9,814,124GRAND TOTAL 2017-2018
District 7 = Multiple districts or countywide
Budget Year 2018-2019Transportation Improvement and Maintenance ProgramIMPROVEMENT
Project Location Activity PageDistrictStatus
PROJECT TYPE
Total CostProject Manager
Arizona City Safety Study Multiple Intersections Pre-Construction $100,000 134ProgrammedAngeline To b
Baseline Avenue Mohican Rd-East 980 feet Construction $55,417 145PendingLindsey Randall a
Cactus Wren Street Mountain View Rd-Val Vista Rd New Construction $61,700 145PendingLindsey Randall b
Florence-Kelvin Highway Donnelly Wash-East 2 miles Construction $800,000 151PendingAngeline To a
Gantzel Road Chandler Heights Rd Construction $325,000 152, 5CompletedCeleste Garza b
Germann Road Meridian Rd-Ironwood Dr New Construction $1,728,756 162PendingCeleste Garza a
Hohokam Road Paisano Dr-Quartzite Dr Construction $286,300 161PendingLindsey Randall b
Lost Dutchman Road Sun Rd-Prospectors Rd Construction $156,000 175PendingLindsey Randall a
Safety Program Countywide Safety $500,000 177ProgrammedJohn Kraft b
$4,013,173SUBTOTAL IMPROVEMENT
MAINTENANCEProject Location Activity PageDistrictStatus
PROJECT TYPE
Total CostProject Manager
Arica Road Isom Rd-Trekell Rd Dust Palliative $120,000 184CompletedJohn Kraft a
Battaglia Drive Chuichu Rd-Del Rio Rd Pavement Preservation $200,000 183, 4ProgrammedAngeline To b
Carefree Place State Route 347-Pepper Pl Dust Palliative $500,000 194PendingJohn Kraft a
Chuichu Road Battaglia Dr-Interstate 8 Pavement Preservation $2,000,000 193PendingJohn Kraft b
Dust Abatement Program Countywide Dust Palliative $1,000,000 207ProgrammedJoe Ortiz a
Fulcar Road Hidden Valley Rd-Table Top Rd Dust Palliative $240,000 204CompletedJohn Kraft b
Mount Lemmon Road Campo Benito Rd-.5 miles south of AZ Zipline Dust Palliative $250,000 211PendingAngeline To a
Peters Road Santa Cruz Wash-Corrales Rd Dust Palliative $252,083 213PendingJohn Kraft b
Sage Street Barnes Rd-Miller Rd Dust Palliative $120,000 224CompletedJohn Kraft a
Sotol Road Warren Rd-Hidden Valley Rd Dust Palliative $150,000 224CompletedJohn Kraft b
Stagecoach Pass Avenue Schnepf Rd-Ghost Rider St Pre-Construction $0 235ClosedLindsey Randall a
$4,832,083SUBTOTAL MAINTENANCE
$8,845,256GRAND TOTAL 2018-2019
District 7 = Multiple districts or countywide
Budget Year 2019-2020Transportation Improvement and Maintenance ProgramIMPROVEMENT
Project Location Activity PageDistrictStatus
PROJECT TYPE
Total CostProject Manager
Florence-Kelvin Highway Gardenshire Rd-Apache Kid Rd Construction $700,000 231ProgrammedAngeline To b
Gantzel Road Queen Creek (Wash) Pre-Construction $50,000 242, 5ProgrammedLindsey Randall a
Hash Knife Draw Road Schnepf Rd-Sierra Vista Dr Construction $110,000 245PendingLindsey Randall b
Jackpot Street Skyline Dr-Rolling Ridge Rd Construction $82,500 255ProgrammedLindsey Randall a
Roberts Road Felix Rd-Joel Rd Construction $38,542 255ProgrammedLindsey Randall b
Rolling Ridge Road Schnepf Rd-Sierra Vista Dr Construction $110,000 265ProgrammedLindsey Randall a
Safety Program Countywide Safety $500,000 267ProgrammedJohn Kraft b
Sage Brush Avenue Schnepf Rd-Sierra Vista Dr Construction $110,000 275ProgrammedLindsey Randall a
Stagecoach Pass Avenue Ghost Rider St-Sierra Vista Dr Construction $0 275ClosedLindsey Randall b
Tombstone Street Skyline Dr-Rolling Ridge Rd Construction $82,500 285ProgrammedLindsey Randall a
Val Vista Road Warren Rd-Hidden Valley Rd Construction $520,000 284CompletedJohn Kraft b
$2,303,542SUBTOTAL IMPROVEMENT
MAINTENANCEProject Location Activity PageDistrictStatus
PROJECT TYPE
Total CostProject Manager
Ashmore Street Passmore Rd-Baldwin Av Dust Palliative $59,000 293, 4ProgrammedJohn Kraft a
Boyd Road Roosevelt St-End of road (Scenic St) Dust Palliative $11,000 295ProgrammedLindsey Randall b
Dolores Place-Shirley Road Olberg Rd-Avram Rd Dust Palliative $78,100 302PendingLindsey Randall a
Donnaloy Road Wilma Rd-Brenner Pass Rd Dust Palliative $84,700 302ProgrammedLindsey Randall b
Dust Abatement Program Countywide Dust Palliative $2,000,000 317ProgrammedJoe Ortiz a
Marlow Road Jacob Waltz St-End of road Dust Palliative $15,958 315ProgrammedLindsey Randall b
Olberg Road Arizona Farms Rd-Brenner Pass Rd Dust Palliative $102,083 322PendingLindsey Randall a
Pavement Preservation Program Countywide Pavement Preservation $700,000 327ProgrammedJoe Ortiz b
Plaza Drive Moon Vista St-Goldpoppy St Dust Palliative $6,667 335ProgrammedLindsey Randall a
Reed Road Bartlett Rd-At wash before Cactus Forest Rd Dust Palliative $91,667 331ProgrammedLindsey Randall b
Stagecoach Pass Avenue Schnepf Rd-Sierra Vista Dr Dust Palliative $250,000 345ProgrammedLindsey Randall a
Whirly Bird Road Amarillo Valley Rd-Ralston Rd Dust Palliative $300,000 344ProgrammedJohn Kraft b
$3,699,175SUBTOTAL MAINTENANCE
$6,002,717GRAND TOTAL 2019-2020
District 7 = Multiple districts or countywide
Budget Year 2020-2021Transportation Improvement and Maintenance ProgramIMPROVEMENT
Project Location Activity PageDistrictStatus
PROJECT TYPE
Total CostProject Manager
Bunkhouse Road Veteran's Memorial Blvd-San Manuel Lodge Reconstruction $50,000 351ProgrammedAngeline To a
Cordones Road Catalina Hills Rd-Biosphere Rd Pre-Construction $0 354CancelledAngeline To b
Hunt Highway (Old) Pioneer Path-Wildhorse Dr Construction $125,000 362ProgrammedLindsey Randall a
Judd Road-Tourmaline Drive Gantzel Rd-Copper Basin Development Construction $1,250,000 362ProgrammedCeleste Garza b
Kenworthy Road Germann Rd-Pima Rd Reconstruction $550,000 372ProgrammedLindsey Randall a
Magma Road Hunt Hwy-Gary Rd (Edwards Rd) Construction $1,250,000 372ProgrammedCeleste Garza b
Mountain View Road Broadway Av Intersection Construction $250,000 385ProgrammedLindsey Randall a
Ocotillo Road Meridian Rd-Ironwood Dr Construction $2,500,000 382ProgrammedLindsey Randall b
Red Rock Access Road Red Rock to Pinal Airpark Rd Pre-Construction $250,000 394ProgrammedAngeline To a
Safety Program Countywide Safety $500,000 397ProgrammedJohn Kraft b
$6,725,000SUBTOTAL IMPROVEMENT
MAINTENANCEProject Location Activity PageDistrictStatus
PROJECT TYPE
Total CostProject Manager
Bowlin Road Hidden Valley Rd-Stonebluff Rd Dust Palliative $100,000 404ProgrammedLindsey Randall a
Logan Boulevard Diffin Rd-Reed Rd Dust Palliative $125,000 401ProgrammedLindsey Randall b
Louis Johnson Drive Amarillo Valley Rd-State Route 347 Dust Palliative $250,000 414ProgrammedLindsey Randall a
Midway Road Beggs Rd-Marsh Rd Dust Palliative $230,000 413, 4ProgrammedLindsey Randall b
Rhea Road Brennar Pass Rd-Donnaloy Road Dust Palliative $30,000 422ProgrammedLindsey Randall a
River Road Redington Rd-Copper Creek Rd Dust Palliative $200,000 421ProgrammedAngeline To b
Rockcliffe Boulevard Oracle Ranch Rd (West)-Alice St Dust Palliative $30,000 431ProgrammedAngeline To a
Stonebluff Road Farrell Rd-Bowlin Rd Dust Palliative $100,000 434ProgrammedLindsey Randall b
Tweedy Road Storey Rd-Randolph Rd Dust Palliative $250,000 443ProgrammedLindsey Randall a
$1,315,000SUBTOTAL MAINTENANCE
$8,040,000GRAND TOTAL 2020-2021
District 7 = Multiple districts or countywide
Budget Year 2021-2022Transportation Improvement and Maintenance ProgramIMPROVEMENT
Project Location Activity PageDistrictStatus
PROJECT TYPE
Total CostProject Manager
Florence-Kelvin Highway Apache Kid Rd-Zellweger Rd Construction $250,000 441ProgrammedAngeline To b
Heather Drive Kashmir Rd-Lamb Rd Construction $125,000 454ProgrammedAngeline To a
Judd Road-Tourmaline Drive Gantzel Rd-Copper Basin Development Construction $1,250,000 452ProgrammedCeleste Garza b
Kenworthy Road Combs Rd-Chandler Heights Rd Construction $1,500,000 462, 5ProgrammedLindsey Randall a
Peart Road Interstate 8-Early Rd Reconstruction $2,520,000 463ProgrammedJohn Kraft b
Pinal Airpark Road Interstate 10-Trico Rd Construction $650,000 474ProgrammedAngeline To a
Safety Program Countywide Safety $500,000 477ProgrammedJohn Kraft b
Trekell Road S. Hanna Rd-Interstate 8 Reconstruction $540,000 483ProgrammedJohn Kraft a
$7,335,000SUBTOTAL IMPROVEMENT
MAINTENANCEProject Location Activity PageDistrictStatus
PROJECT TYPE
Total CostProject Manager
Camino Viejo Road Camino Viejo W-Enrada del Oro Dr Dust Palliative $940,000 485ProgrammedLindsey Randall b
Encanto Lane Cactus Forest Rd-840' North Dust Palliative $100,000 491ProgrammedLindsey Randall a
Orville Drive Diffin Rd-Quail Run Rd Dust Palliative $130,000 491ProgrammedLindsey Randall b
River Road Redington Rd-Copper Creek Rd Dust Palliative $200,000 501ProgrammedAngeline To a
Thunderbird Road Teel Rd-Mayer Rd Reconstruction $450,000 504ProgrammedJohn Kraft b
$1,820,000SUBTOTAL MAINTENANCE
$9,155,000GRAND TOTAL 2021-2022
District 7 = Multiple districts or countywide
Length in Miles
Battaglia Drive Overfield Rd Intersection
Construction/Reconstruction
$350,000
$0
$350,000
Activity
County Cost
Non County Cost
IMPROVEMENT
District 4Project Manager Angeline To E-mail [email protected]
Comments Activity: Culvert for intersection and pavement replacementBudget Year: From 2016-2017 to 2017-2018Status: From Programmed to Completed. Construction completed February 2018.
Status Completed
Maintenance Area Arizona City
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
0
1a
Length in Miles
Curry Road State Route 287-Storey Rd
Construction
$110,000
$0
$110,000
Activity
County Cost
Non County Cost
IMPROVEMENT
District 3Project Manager Lindsey Randall E-mail [email protected]
Comments Status: From Programmed to Completed. Construction completed October 2017.
Status Completed
Maintenance Area Casa Grande
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
1
1b
Budget Year 2017-2018 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
Length in Miles
Germann Road Meridian Rd-Ironwood Dr
Pre-Construction
$13,866
$230,258
$244,124
Activity
County Cost
Non County Cost
IMPROVEMENT
District 2Project Manager Celeste Garza E-mail [email protected]
Comments Activity: Right-of-way acquisition, environmental, design for construction of two-lane road, and plan review by the Arizona Department of TransportationCounty Cost: $13,866 reflects Pinal County's cost share matchBudget Year: 2016-2017 to 2017-2018Status: Design underway and is approximately 60% complete (Stage 3) with review/management by Arizona Department of Transportation. Project was awarded Surface Transportation Program (federal) funds through Maricopa Association of Governments. Construction scheduled Winter 2018.
Status Underway
Maintenance Area Apache Junction
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 6621139
1
2a
Length in Miles
Henness Road Val Vista Rd-Waverly Dr
New Construction
$350,000
$0
$350,000
Activity
County Cost
Non County Cost
IMPROVEMENT
District 3Project Manager Lindsey Randall E-mail [email protected]
Comments Budget Year: Carryover from 2016-2017 to 2017-2018Status: From Underway to Completed. Construction completed February 2018 with work on earth stabilization underway to complete Storm Water Quality General Permit.
Status Completed
Maintenance Area Casa Grande
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
1
2b
Budget Year 2017-2018 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
Length in Miles
McCartney Road Interstate 10-Evans Rd
Reconstruction
$3,500,000
$0
$3,500,000
Activity
County Cost
Non County Cost
IMPROVEMENT
District 1, 3Project Manager Lindsey Randall E-mail [email protected]
Comments Activity: Installation of culverts at dip crossings. Status: Construction Notice to Proceed issued 2/19/18 with completion expected August 2018.
Status Underway
Maintenance Area Casa Grande
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
3.1
3a
Length in Miles
Mitchell Trail Heritage Rd-Arizona Farms Rd
Pre-Construction
$0
$0
$0
Activity
County Cost
Non County Cost
IMPROVEMENT
District 2Project Manager Lindsey Randall E-mail [email protected]
Comments Activity: Right-of-way/design for new roadwayBudget Year: Carryover of $0 from 2016-2017 to 2017-2018Status: From Underway to Cancelled. Project cancelled due to stalled right-of-way acquisitions.
Status Cancelled
Maintenance Area San Tan
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
1
3b
Budget Year 2017-2018 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
Length in Miles
Safety Program Countywide
Safety
$500,000
$0
$500,000
Activity
County Cost
Non County Cost
IMPROVEMENT
District 7Project Manager John Kraft E-mail [email protected]
Comments Activity: Direct funding to the Safety Program (Target Funding: 10%)
Status Programmed
Maintenance Area Multiple
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
0
4a
Length in Miles
Sunland Gin Road Battaglia Dr Intersection
Safety
$350,000
$0
$350,000
Activity
County Cost
Non County Cost
IMPROVEMENT
District 4Project Manager Angeline To E-mail [email protected]
Comments Activity: Westbound Turn laneStatus: From Programmed to Underway. Design underway and construction scheduled Summer 2018.
Status Underway
Maintenance Area Arizona City
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 19118
0
4b
Budget Year 2017-2018 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
Length in Miles
Tweedy Road State Route 287-Storey Rd
Construction
$110,000
$0
$110,000
Activity
County Cost
Non County Cost
IMPROVEMENT
District 3Project Manager Lindsey Randall E-mail [email protected]
Comments Status: From Programmed to Completed. Construction completed October 2017.
Status Completed
Maintenance Area Casa Grande
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
1
5a
Length in Miles
Bronco Lane Valley View Dr south .1 mile
Dust Palliative
$30,000
$0
$30,000
Activity
County Cost
Non County Cost
MAINTENANCE
District 5Project Manager Lindsey Randall E-mail [email protected]
Comments Activity: Asphalt Rock Dust PalliativeStatus: From Pending to Completed. Asphalt rock dust palliative completed October 2017.Budget Year: From 2016-2017 to 2017-2018
Status Completed
Maintenance Area Apache Junction
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
0.1
5b
Budget Year 2017-2018 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
Length in Miles
Cactus Road Kaniksu St (north)-Frontier St
Dust Palliative
$20,000
$0
$20,000
Activity
County Cost
Non County Cost
MAINTENANCE
District 5Project Manager Lindsey Randall E-mail [email protected]
Comments Status: From Pending to Completed. Asphalt rock dust palliative completed 2015/2016.
Status Completed
Maintenance Area Apache Junction
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
0.1
6a
Length in Miles
Cattle Tank Road Davis Ranch Rd-Park Link Dr
Pre-Construction
$90,000
$0
$90,000
Activity
County Cost
Non County Cost
MAINTENANCE
District 1, 4Project Manager Angeline To E-mail [email protected]
Comments Activity: Environmental and right-of-way for Asphalt Rock Dust PalliativeBudget Year: From 2016-2018 to 2017-2018Status: From Underway to Completed. Pre-Construction completed September 2017. Construction underway and dust palliative expected Fall 2018Project Numbers: 6511213 (environmental clearance), 6511214 (right-of-way acquisition)
Status Completed
Maintenance Area Arizona City
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 6511213
5.5
6b
Budget Year 2017-2018 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
Length in Miles
Cattle Tank Road Davis Ranch Rd-Park Link Dr
Dust Palliative
$1,300,000
$0
$1,300,000
Activity
County Cost
Non County Cost
MAINTENANCE
District 1, 4Project Manager Angeline To E-mail [email protected]
Comments Activity: Asphalt rock dust palliativeCounty Cost: From $750,000 to $1,300,000 due to Bureau of Land Management requirementsBudget Year: From 2016-2017 to 2017-2018 Status: From Pending to Underway. Phased construction (Phase 2-Clearing and Grubbing) underway with chip seal expected Fall 2018.
Status Underway
Maintenance Area Arizona City
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
5.5
7a
Length in Miles
Dust Abatement Program Apache Junction area
Dust Palliative
$500,000
$0
$500,000
Activity
County Cost
Non County Cost
MAINTENANCE
District 5Project Manager Lindsey Randall E-mail [email protected]
Comments Activity: Area Engineer's discretionary project(s) to address fugitive dust (Particulate Matter 10) in Pinal County's Non-Attainment area (T1N, R8E)Status: 3.22 miles of Asphalt rock dust palliatives in the southeast Apache Junction area scheduled Summer 2018
Status Pending
Maintenance Area Apache Junction
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
0
7b
Budget Year 2017-2018 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
Length in Miles
Estancia Drive Davis Ranch Rd-Hedgehog Tr
Dust Palliative
$100,000
$0
$100,000
Activity
County Cost
Non County Cost
MAINTENANCE
District 4Project Manager Angeline To E-mail [email protected]
Comments Budget Year: From 2016-2017 to 2017-2018Status: From Pending to Completed. Asphalt rock dust palliative completed May 2017.
Status Completed
Maintenance Area Arizona City
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
1.1
8a
Length in Miles
Harmon Road Toltec Hwy-Tweedy Rd
Dust Palliative
$235,000
$125,000
$360,000
Activity
County Cost
Non County Cost
MAINTENANCE
District 1Project Manager Angeline To E-mail [email protected]
Comments Budget Year: From 2016-2017 to 2017-2018Status: From Pending to Completed. Construction completed September 2017.
Status Completed
Maintenance Area Arizona City
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
2
8b
Budget Year 2017-2018 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
Length in Miles
Huisatch Road Garnet Rd-Amarillo Valley Rd
Dust Palliative
$175,000
$0
$175,000
Activity
County Cost
Non County Cost
MAINTENANCE
District 4Project Manager Lindsey Randall E-mail [email protected]
Comments Budget Year: From 2016-2017 to 2017-2018Status: From Pending to Completed. Asphalt rock dust palliative completed August 2017.
Status Completed
Maintenance Area Hidden Valley
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
1
9a
Length in Miles
La Palma Road State Route 287-.25 north of Kleck Rd
Dust Palliative
$150,000
$0
$150,000
Activity
County Cost
Non County Cost
MAINTENANCE
District 1Project Manager Lindsey Randall E-mail [email protected]
Comments Status: From Pending to Completed. Asphalt rock dust palliative completed November 2017.Budget Year: From 2016-2017 to 2017-2018
Status Completed
Maintenance Area Casa Grande
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
2.25
9b
Budget Year 2017-2018 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
Length in Miles
Maverick Circle Mohican Rd west .1 mile
Dust Palliative
$30,000
$0
$30,000
Activity
County Cost
Non County Cost
MAINTENANCE
District 5Project Manager Lindsey Randall E-mail [email protected]
Comments Budget Year: From 2016-2017 to 2017-2018Status: From Pending to Completed. Asphalt rock dust palliative scheduled October 2017.
Status Completed
Maintenance Area Apache Junction
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
0.1
10a
Length in Miles
McDavid Road Warren Rd-Hidden Valley Rd
Dust Palliative
$110,000
$0
$110,000
Activity
County Cost
Non County Cost
MAINTENANCE
District 4Project Manager Lindsey Randall E-mail [email protected]
Comments Status: From Underway to Completed. Dust Palliative completed September 2017.
Status Completed
Maintenance Area Hidden Valley
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
1
10b
Budget Year 2017-2018 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
Length in Miles
Muleshoe Road Roundup St-Shiprock St
Dust Palliative
$20,000
$0
$20,000
Activity
County Cost
Non County Cost
MAINTENANCE
District 5Project Manager Lindsey Randall E-mail [email protected]
Comments Status: From Pending to Completed. Asphalt rock dust palliative completed October 2017.
Status Completed
Maintenance Area Apache Junction
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
0.1
11a
Length in Miles
Pavement Preservation Program Countywide
Pavement Preservation
$500,000
$0
$500,000
Activity
County Cost
Non County Cost
MAINTENANCE
District 7Project Manager Joe Ortiz E-mail [email protected]
Comments Activity: Direct funding to the Pavement Preservation Program (Target Funding: 10%)
Status Programmed
Maintenance Area Multiple
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
0
11b
Budget Year 2017-2018 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
Length in Miles
Redington Road Veterans Memorial Blvd-Pima County Line
Dust Palliative
$665,000
$0
$665,000
Activity
County Cost
Non County Cost
MAINTENANCE
District 1Project Manager Angeline To E-mail [email protected]
Comments Budget Year: From 2016-2017 to 2017-2018Status: From Underway to Completed. Dust palliative on Redington Road from Veterans Memorial Blvd to River Rd completed September 2015. Environmental study completed on Redington Road from River Rd to Pinal-Pima County boundary September 2016 with asphalt rock dust palliative completed March 2017. Wash crossing repairs completed March 2018.
Status Completed
Maintenance Area Oracle
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
8
12a
Length in Miles
Sixshooter Road Jacob Waltz St north .1 mile
Dust Palliative
$30,000
$0
$30,000
Activity
County Cost
Non County Cost
MAINTENANCE
District 5Project Manager Lindsey Randall E-mail [email protected]
Comments Budget Year: From 2016-2017 to 2017-2018Status: From Pending to Completed. Asphalt rock dust palliative completed October 2017.
Status Completed
Maintenance Area Apache Junction
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
0.1
12b
Budget Year 2017-2018 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
Length in Miles
Warren Road Farrell Rd-McDavid Rd
Dust Palliative
$220,000
$0
$220,000
Activity
County Cost
Non County Cost
MAINTENANCE
District 4Project Manager Lindsey Randall E-mail [email protected]
Comments Status: From Pending to Completed. Dust palliative completed September 2017.
Status Completed
Maintenance Area Hidden Valley
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
2
13a
Length in Miles
Arizona City Safety Study Multiple Intersections
Pre-Construction
$100,000
$0
$100,000
Activity
County Cost
Non County Cost
IMPROVEMENT
District 4Project Manager Angeline To E-mail [email protected]
Comments Location: Battaglia Drive from Sunland Gin Road to Overfield Road, Battaglia Drive from Chuichu Road to Del Rio Road, Lamb Road from Battaglia Drive to Milligan Road, Milligan Road from Sunland Gin Road Overfield Road, Overfield Road from Battaglia Drive to Milligan Road, and Sunland Gin Road from Battaglia Drive to Milligan Road
Status Programmed
Maintenance Area Arizona City
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
0
13b
Budget Year 2018-2019 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
Budget Year 2017-2018
Length in Miles
Baseline Avenue Mohican Rd-East 980 feet
Construction
$55,417
$0
$55,417
Activity
County Cost
Non County Cost
IMPROVEMENT
District 5Project Manager Lindsey Randall E-mail [email protected]
Comments Status: From Programmed to Pending. Construction expected after July 2018.Project Manager: From Celeste Garza to Lindsey RandallE-mail: From [email protected] to [email protected]
Status Pending
Maintenance Area Apache Junction
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
0.19
14a
Length in Miles
Cactus Wren Street Mountain View Rd-Val Vista Rd
New Construction
$61,700
$0
$61,700
Activity
County Cost
Non County Cost
IMPROVEMENT
District 5Project Manager Lindsey Randall E-mail [email protected]
Comments Status: From Programmed to Pending. Construction expected after July 2018.
Status Pending
Maintenance Area Apache Junction
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
0.22
14b
Budget Year 2018-2019 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
Length in Miles
Florence-Kelvin Highway Donnelly Wash-East 2 miles
Construction
$800,000
$0
$800,000
Activity
County Cost
Non County Cost
IMPROVEMENT
District 1Project Manager Angeline To E-mail [email protected]
Comments Status: From Programmed to Pending. Design expected July 2018 and construction expected Summer 2019.
Status Pending
Maintenance Area Riverside
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
2
15a
Length in Miles
Gantzel Road Chandler Heights Rd
Construction
$325,000
$0
$325,000
Activity
County Cost
Non County Cost
IMPROVEMENT
District 2, 5Project Manager Celeste Garza E-mail [email protected]
Comments Activity: Traffic SignalStatus: From Programmed to Completed. Traffic signal activitated July 2017.
Status Completed
Maintenance Area Apache Junction
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
0
15b
Budget Year 2018-2019 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
Length in Miles
Germann Road Meridian Rd-Ironwood Dr
New Construction
$98,696
$1,630,060
$1,728,756
Activity
County Cost
Non County Cost
IMPROVEMENT
District 2Project Manager Celeste Garza E-mail [email protected]
Comments Activity: Construction of two-lane roadBudget Year: Carryover from 2014-2015 to 2018-2019County Cost: $98,696 reflects Pinal County's cost share matchStatus: From Programmed to Pending. Design underway and construction expected Winter 2018. Project was awarded Surface Transportation Program (federal) funds through Maricopa Association of Governments.
Status Pending
Maintenance Area Apache Junction
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 6621139
1
16a
Length in Miles
Hohokam Road Paisano Dr-Quartzite Dr
Construction
$286,300
$0
$286,300
Activity
County Cost
Non County Cost
IMPROVEMENT
District 1Project Manager Lindsey Randall E-mail [email protected]
Comments Status: From Programmed to Pending. Construction expected Summer 2018.Project Manager: From Celeste Garza to Lindsey RandallE-mail: From [email protected] to [email protected]
Status Pending
Maintenance Area San Tan
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
0.33
16b
Budget Year 2018-2019 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
Length in Miles
Lost Dutchman Road Sun Rd-Prospectors Rd
Construction
$156,000
$0
$156,000
Activity
County Cost
Non County Cost
IMPROVEMENT
District 5Project Manager Lindsey Randall E-mail [email protected]
Comments Status: From Programmed to Pending. Construction scheduled Summer 2018.Project Manager: From Celeste Garza to Lindsey RandallE-mail: From [email protected] to [email protected]
Status Pending
Maintenance Area Apache Junction
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
0.6
17a
Length in Miles
Safety Program Countywide
Safety
$500,000
$0
$500,000
Activity
County Cost
Non County Cost
IMPROVEMENT
District 7Project Manager John Kraft E-mail [email protected]
Comments Activity: Direct funding to the Roadway Safety ProgramCounty Cost: Reduce from $1,000,000 to $500,000 and carryover $500,000 to Budget Year 2020-2021 to rebalance Safety Program funding.
Status Programmed
Maintenance Area Multiple
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
0
17b
Budget Year 2018-2019 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
Length in Miles
Arica Road Isom Rd-Trekell Rd
Dust Palliative
$120,000
$0
$120,000
Activity
County Cost
Non County Cost
MAINTENANCE
District 4Project Manager John Kraft E-mail [email protected]
Comments Status: From Programmed to Completed.
Status Completed
Maintenance Area Casa Grande
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
1
18a
Length in Miles
Battaglia Drive Chuichu Rd-Del Rio Rd
Pavement Preservation
$200,000
$0
$200,000
Activity
County Cost
Non County Cost
MAINTENANCE
District 3, 4Project Manager Angeline To E-mail [email protected]
Comments
Status Programmed
Maintenance Area Arizona City
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
4.5
18b
Budget Year 2018-2019 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
Length in Miles
Carefree Place State Route 347-Pepper Pl
Dust Palliative
$500,000
$0
$500,000
Activity
County Cost
Non County Cost
MAINTENANCE
District 4Project Manager John Kraft E-mail [email protected]
Comments Activity: Dust palliative includes 4.1 miles of the following roadways: Carefree Place, Reitz Ranch Road, Padilla Road, Clayton Road, and Lopez Road.Budget Year: Advance from 2019-2020 to 2018-2019 to combine with projects programmed under the State Implemention Plan for completion after July 2018.Status: From Programmed to Pending
Status Pending
Maintenance Area Hidden Valley
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 27124
4.1
19a
Length in Miles
Chuichu Road Battaglia Dr-Interstate 8
Pavement Preservation
$2,000,000
$0
$2,000,000
Activity
County Cost
Non County Cost
MAINTENANCE
District 3Project Manager John Kraft E-mail [email protected]
Comments Status: From Programmed to Pending. Planning to contract Pavement Preservation after July 2018.
Status Pending
Maintenance Area Arizona City
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
4.3
19b
Budget Year 2018-2019 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
Length in Miles
Dust Abatement Program Countywide
Dust Palliative
$1,000,000
$0
$1,000,000
Activity
County Cost
Non County Cost
MAINTENANCE
District 7Project Manager Joe Ortiz E-mail [email protected]
Comments Activity: Area Engineers' discretionary project(s) to address fugitive dust (Particulate Matter 2.5 and 10) in Pinal County's Non-Attainment areas
Status Programmed
Maintenance Area Multiple
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
0
20a
Length in Miles
Fulcar Road Hidden Valley Rd-Table Top Rd
Dust Palliative
$240,000
$0
$240,000
Activity
County Cost
Non County Cost
MAINTENANCE
District 4Project Manager John Kraft E-mail [email protected]
Comments Status: From Programmed to Completed. Completed in 2016 as part of the State Implementation Plan.
Status Completed
Maintenance Area Hidden Valley
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
2
20b
Budget Year 2018-2019 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
Length in Miles
Mount Lemmon Road Campo Benito Rd-.5 miles south of AZ Zipline
Dust Palliative
$250,000
$0
$250,000
Activity
County Cost
Non County Cost
MAINTENANCE
District 1Project Manager Angeline To E-mail [email protected]
Comments Activity: Continuation of asphalt rock dust palliative and cutoff walls at wash crossingBudget Year: From 2020-2021 to 2018-2019Status: From Programmed to Pending. Asphalt rock dust palliative is expected Summer 2018.
Status Pending
Maintenance Area Oracle
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 141
2
21a
Length in Miles
Peters Road Santa Cruz Wash-Corrales Rd
Dust Palliative
$252,083
$0
$252,083
Activity
County Cost
Non County Cost
MAINTENANCE
District 3Project Manager John Kraft E-mail [email protected]
Comments Budget Year: From 2017-2018 to 2018-2019Status: From Programmed to Pending. Construction scheduled after July 2018.Project Manager: From Lindsey Randall to John KraftE-mail: From [email protected] to [email protected]
Status Pending
Maintenance Area Casa Grande
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
1.6
21b
Budget Year 2018-2019 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
Length in Miles
Sage Street Barnes Rd-Miller Rd
Dust Palliative
$120,000
$0
$120,000
Activity
County Cost
Non County Cost
MAINTENANCE
District 4Project Manager John Kraft E-mail [email protected]
Comments Status: From Programmed to Completed. Construction completed August 2017.
Status Completed
Maintenance Area Hidden Valley
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
22a
Length in Miles
Sotol Road Warren Rd-Hidden Valley Rd
Dust Palliative
$150,000
$0
$150,000
Activity
County Cost
Non County Cost
MAINTENANCE
District 4Project Manager John Kraft E-mail [email protected]
Comments Status: From Programmed to Completed. Completed April 2017.
Status Completed
Maintenance Area Hidden Valley
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
1
22b
Budget Year 2018-2019 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
Length in Miles
Stagecoach Pass Avenue Schnepf Rd-Ghost Rider St
Pre-Construction
$0
$0
$0
Activity
County Cost
Non County Cost
MAINTENANCE
District 5Project Manager Lindsey Randall E-mail [email protected]
Comments Status: From Underway to Closed. Funding and project is combined with Stagecoach Pass Avenue project programmed in Budget Year 2019-2020.County Cost: From $50,000 to $0.Activity: In-house design and right-of-way design. Project Manager: From Celeste Garza to Lindsey RandallE-mail: From [email protected] to [email protected]
Status Closed
Maintenance Area Apache Junction
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
0.8
23a
Length in Miles
Florence-Kelvin Highway Gardenshire Rd-Apache Kid Rd
Construction
$700,000
$0
$700,000
Activity
County Cost
Non County Cost
IMPROVEMENT
District 1Project Manager Angeline To E-mail [email protected]
Comments
Status Programmed
Maintenance Area Riverside
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 3030
3
23b
Budget Year 2019-2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
Budget Year 2018-2019
Length in Miles
Gantzel Road Queen Creek (Wash)
Pre-Construction
$50,000
$0
$50,000
Activity
County Cost
Non County Cost
IMPROVEMENT
District 2, 5Project Manager Lindsey Randall E-mail [email protected]
Comments Project Manager: From Celeste Garza to Lindsey RandallE-mail: From [email protected] to [email protected]
Status Programmed
Maintenance Area Apache Junction
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 4010
0.07
24a
Length in Miles
Hash Knife Draw Road Schnepf Rd-Sierra Vista Dr
Construction
$110,000
$0
$110,000
Activity
County Cost
Non County Cost
IMPROVEMENT
District 5Project Manager Lindsey Randall E-mail [email protected]
Comments Status: From Programmed to Pending. Construction expected Summer 2018 as part of the State Implementation Plan.Project Manager: From Celeste Garza to Lindsey RandallE-mail: From [email protected] to [email protected]
Status Pending
Maintenance Area Multiple
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 8125
1
24b
Budget Year 2019-2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
Length in Miles
Jackpot Street Skyline Dr-Rolling Ridge Rd
Construction
$82,500
$0
$82,500
Activity
County Cost
Non County Cost
IMPROVEMENT
District 5Project Manager Lindsey Randall E-mail [email protected]
Comments Project Manager: From Celeste Garza to Lindsey RandallE-mail: From [email protected] to [email protected]
Status Programmed
Maintenance Area San Tan
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 10116
0.75
25a
Length in Miles
Roberts Road Felix Rd-Joel Rd
Construction
$38,542
$0
$38,542
Activity
County Cost
Non County Cost
IMPROVEMENT
District 5Project Manager Lindsey Randall E-mail [email protected]
Comments Project Manager: From Celeste Garza to Lindsey RandallE-mail: From [email protected] to [email protected]
Status Programmed
Maintenance Area San Tan
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 15035
0.35
25b
Budget Year 2019-2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
Length in Miles
Rolling Ridge Road Schnepf Rd-Sierra Vista Dr
Construction
$110,000
$0
$110,000
Activity
County Cost
Non County Cost
IMPROVEMENT
District 5Project Manager Lindsey Randall E-mail [email protected]
Comments Project Manager: From Celeste Garza to Lindsey RandallE-mail: From [email protected] to [email protected]
Status Programmed
Maintenance Area San Tan
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 16114
1
26a
Length in Miles
Safety Program Countywide
Safety
$500,000
$0
$500,000
Activity
County Cost
Non County Cost
IMPROVEMENT
District 7Project Manager John Kraft E-mail [email protected]
Comments Activity: Direct funding to the Roadway Safety ProgramCounty Cost: Reduce from $1,000,000 to $500,000 and carryover $500,000 to Budget Year 2021-2022 to rebalance Safety Program funding.
Status Programmed
Maintenance Area Multiple
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
0
26b
Budget Year 2019-2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
Length in Miles
Sage Brush Avenue Schnepf Rd-Sierra Vista Dr
Construction
$110,000
$0
$110,000
Activity
County Cost
Non County Cost
IMPROVEMENT
District 5Project Manager Lindsey Randall E-mail [email protected]
Comments Project Manager: From Celeste Garza to Lindsey RandallE-mail: From [email protected] to [email protected]
Status Programmed
Maintenance Area Apache Junction
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 17126
1
27a
Length in Miles
Stagecoach Pass Avenue Ghost Rider St-Sierra Vista Dr
Construction
$0
$0
$0
Activity
County Cost
Non County Cost
IMPROVEMENT
District 5Project Manager Lindsey Randall E-mail [email protected]
Comments Status: From Programmed to Closed. Funding and project is combined with Stagecoach Pass Avenue project programmed in Budget Year 2019-2020.County Cost: $28,333.00 to $0.Project Manager: From Celeste Garza to Lindsey RandallE-mail: From [email protected] to [email protected]
Status Closed
Maintenance Area Apache Junction
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 18127
1
27b
Budget Year 2019-2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
Length in Miles
Tombstone Street Skyline Dr-Rolling Ridge Rd
Construction
$82,500
$0
$82,500
Activity
County Cost
Non County Cost
IMPROVEMENT
District 5Project Manager Lindsey Randall E-mail [email protected]
Comments Project Manager: From Celeste Garza to Lindsey RandallE-mail: From [email protected] to [email protected]
Status Programmed
Maintenance Area San Tan
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 20115
0.75
28a
Length in Miles
Val Vista Road Warren Rd-Hidden Valley Rd
Construction
$520,000
$0
$520,000
Activity
County Cost
Non County Cost
IMPROVEMENT
District 4Project Manager John Kraft E-mail [email protected]
Comments Status: From Programmed to Completed. Completed August 2017 as part of the State Implementation Plan.
Status Completed
Maintenance Area Hidden Valley
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 22036
1
28b
Budget Year 2019-2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
Length in Miles
Ashmore Street Passmore Rd-Baldwin Av
Dust Palliative
$59,000
$0
$59,000
Activity
County Cost
Non County Cost
MAINTENANCE
District 3, 4Project Manager John Kraft E-mail [email protected]
Comments
Status Programmed
Maintenance Area Casa Grande
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 23022
0.5
29a
Length in Miles
Boyd Road Roosevelt St-End of road (Scenic St)
Dust Palliative
$11,000
$0
$11,000
Activity
County Cost
Non County Cost
MAINTENANCE
District 5Project Manager Lindsey Randall E-mail [email protected]
Comments Project Manager: From Celeste Garza to Lindsey RandallE-mail: From [email protected] to [email protected]
Status Programmed
Maintenance Area Apache Junction
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 25015
0.1
29b
Budget Year 2019-2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
Length in Miles
Dolores Place-Shirley Road Olberg Rd-Avram Rd
Dust Palliative
$78,100
$0
$78,100
Activity
County Cost
Non County Cost
MAINTENANCE
District 2Project Manager Lindsey Randall E-mail [email protected]
Comments Status: From Programmed to Pending. Construction expected Summer 2018 as part of the State Implementation Plan.Project Manager: From Celeste Garza to Lindsey RandallE-mail: From [email protected] to [email protected]
Status Pending
Maintenance Area San Tan
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 28121
0.71
30a
Length in Miles
Donnaloy Road Wilma Rd-Brenner Pass Rd
Dust Palliative
$84,700
$0
$84,700
Activity
County Cost
Non County Cost
MAINTENANCE
District 2Project Manager Lindsey Randall E-mail [email protected]
Comments Status: From Programmed to Pending. Construction expected Summer 2018 as part of the State Implementation Plan.Project Manager: From Celeste Garza to Lindsey RandallE-mail: From [email protected] to [email protected]
Status Programmed
Maintenance Area San Tan
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 29120
0.77
30b
Budget Year 2019-2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
Length in Miles
Dust Abatement Program Countywide
Dust Palliative
$2,000,000
$0
$2,000,000
Activity
County Cost
Non County Cost
MAINTENANCE
District 7Project Manager Joe Ortiz E-mail [email protected]
Comments Activity: Area Engineers' discretionary project(s) to address fugitive dust (Particulate Matter 2.5 and 10) in Pinal County's Non-Attainment areas
Status Programmed
Maintenance Area Multiple
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
31a
Length in Miles
Marlow Road Jacob Waltz St-End of road
Dust Palliative
$15,958
$0
$15,958
Activity
County Cost
Non County Cost
MAINTENANCE
District 5Project Manager Lindsey Randall E-mail [email protected]
Comments Project Manager: From Celeste Garza to Lindsey RandallE-mail: From [email protected] to [email protected]
Status Programmed
Maintenance Area Apache Junction
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 30012
0.15
31b
Budget Year 2019-2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
Length in Miles
Olberg Road Arizona Farms Rd-Brenner Pass Rd
Dust Palliative
$102,083
$0
$102,083
Activity
County Cost
Non County Cost
MAINTENANCE
District 2Project Manager Lindsey Randall E-mail [email protected]
Comments Status: From Programmed to Pending. Construction expected Summer 2018 as part of the State Implementation Plan.Project Manager: From Celeste Garza to Lindsey RandallE-mail: From [email protected] to [email protected]
Status Pending
Maintenance Area San Tan
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 31119
0.93
32a
Length in Miles
Pavement Preservation Program Countywide
Pavement Preservation
$700,000
$0
$700,000
Activity
County Cost
Non County Cost
MAINTENANCE
District 7Project Manager Joe Ortiz E-mail [email protected]
Comments Activity: Direct funding to the Pavement Preservation Program
Status Programmed
Maintenance Area Multiple
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
0
32b
Budget Year 2019-2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
Length in Miles
Plaza Drive Moon Vista St-Goldpoppy St
Dust Palliative
$6,667
$0
$6,667
Activity
County Cost
Non County Cost
MAINTENANCE
District 5Project Manager Lindsey Randall E-mail [email protected]
Comments Project Manager: From Celeste Garza to Lindsey RandallE-mail: From [email protected] to [email protected]
Status Programmed
Maintenance Area Apache Junction
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 32016
0.06
33a
Length in Miles
Reed Road Bartlett Rd-At wash before Cactus Forest Rd
Dust Palliative
$91,667
$0
$91,667
Activity
County Cost
Non County Cost
MAINTENANCE
District 1Project Manager Lindsey Randall E-mail [email protected]
Comments Project Manager: From Celeste Garza to Lindsey RandallE-mail: From [email protected] to [email protected]
Status Programmed
Maintenance Area San Tan
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 35029
0.74
33b
Budget Year 2019-2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
Length in Miles
Stagecoach Pass Avenue Schnepf Rd-Sierra Vista Dr
Dust Palliative
$250,000
$0
$250,000
Activity
County Cost
Non County Cost
MAINTENANCE
District 5Project Manager Lindsey Randall E-mail [email protected]
Comments Location: From Schnepf Rd-Sierra Ghost Rider St to Schnepf Rd-Sierra Vista DrStatus: Funding and projects 2 Stagecoach Pass Avenue projects from Budget Year 2018-2019 and 2019-2020 into one Stagecoach Pass Avenue project from Schnepf Rd-Sierra Vista Dr. Development north of area will improve roadway and county will chip seal roadway once improvements are made.County Cost: from $250,000 to $328,333.Project Manager: From Celeste Garza to Lindsey RandallE-mail: From [email protected] to [email protected]
Status Programmed
Maintenance Area Apache Junction
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
0.75
34a
Length in Miles
Whirly Bird Road Amarillo Valley Rd-Ralston Rd
Dust Palliative
$300,000
$0
$300,000
Activity
County Cost
Non County Cost
MAINTENANCE
District 4Project Manager John Kraft E-mail [email protected]
Comments Activity: Dust palliative includes Whirly Bird Road from Amarillo Valley Rd to Ralston Rd and Garnet Road from Whirly Bird Rd to Century Rd
Status Programmed
Maintenance Area Hidden Valley
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 36008
3
34b
Budget Year 2019-2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
Length in Miles
Bunkhouse Road Veteran's Memorial Blvd-San Manuel Lodge
Reconstruction
$50,000
$0
$50,000
Activity
County Cost
Non County Cost
IMPROVEMENT
District 1Project Manager Angeline To E-mail [email protected]
Comments Activity: Resize culvert to driveway and reconstruct roadway for proper drainage
Status Programmed
Maintenance Area Oracle
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 134
0.2
35a
Length in Miles
Cordones Road Catalina Hills Rd-Biosphere Rd
Pre-Construction
$0
$0
$0
Activity
County Cost
Non County Cost
IMPROVEMENT
District 4Project Manager Angeline To E-mail [email protected]
Comments Activity: Design Concept Report for new roadwayCounty Cost: From $250,000 to $0.00Status: From Programmed to Cancelled. Project is now funded by the Pinal Regional Transportation Authority.
Status Cancelled
Maintenance Area Oracle
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 156
3.5
35b
Budget Year 2020-2021 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
Length in Miles
Hunt Highway (Old) Pioneer Path-Wildhorse Dr
Construction
$125,000
$0
$125,000
Activity
County Cost
Non County Cost
IMPROVEMENT
District 2Project Manager Lindsey Randall E-mail [email protected]
Comments Activity: Concrete ford crossingProject Manager: From Celeste Garza to Lindsey RandallE-mail: From [email protected] to [email protected]
Status Programmed
Maintenance Area San Tan
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 181
0
36a
Length in Miles
Judd Road-Tourmaline Drive Gantzel Rd-Copper Basin Development
Construction
$1,250,000
$0
$1,250,000
Activity
County Cost
Non County Cost
IMPROVEMENT
District 2Project Manager Celeste Garza E-mail [email protected]
Comments Activity: Construction of new road on Judd Road alignmentCounty Cost: $1,250,000 will be programmed annually for 4 years (Year 1).
Status Programmed
Maintenance Area San Tan
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 176
1.5
36b
Budget Year 2020-2021 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
Length in Miles
Kenworthy Road Germann Rd-Pima Rd
Reconstruction
$550,000
$0
$550,000
Activity
County Cost
Non County Cost
IMPROVEMENT
District 2Project Manager Lindsey Randall E-mail [email protected]
Comments Activity: RehabilitationProject Manager: From Celeste Garza to Lindsey RandallE-mail: From [email protected] to [email protected]
Status Programmed
Maintenance Area Apache Junction
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 178
1
37a
Length in Miles
Magma Road Hunt Hwy-Gary Rd (Edwards Rd)
Construction
$1,250,000
$0
$1,250,000
Activity
County Cost
Non County Cost
IMPROVEMENT
District 2Project Manager Celeste Garza E-mail [email protected]
Comments Activity: Continuation of improvements on alignmentStatus: Project is a high priority for Transportation Advisory Committee and Staff. Staff is exploring other funding opportunities to advance the project schedule.
Status Programmed
Maintenance Area San Tan
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 1420144
1
37b
Budget Year 2020-2021 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
Length in Miles
Mountain View Road Broadway Av Intersection
Construction
$250,000
$0
$250,000
Activity
County Cost
Non County Cost
IMPROVEMENT
District 5Project Manager Lindsey Randall E-mail [email protected]
Comments Activity: Intersection reconstruction and culvert installationProject Manager: From Celeste Garza to Lindsey RandallE-mail: From [email protected] to [email protected]
Status Programmed
Maintenance Area Apache Junction
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 179
0
38a
Length in Miles
Ocotillo Road Meridian Rd-Ironwood Dr
Construction
$2,500,000
$0
$2,500,000
Activity
County Cost
Non County Cost
IMPROVEMENT
District 2Project Manager Lindsey Randall E-mail [email protected]
Comments Activity: Roadway widening
Status Programmed
Maintenance Area Apache Junction
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 177
1
38b
Budget Year 2020-2021 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
Length in Miles
Red Rock Access Road Red Rock to Pinal Airpark Rd
$250,000
$0
$250,000
Activity
County Cost
Non County Cost
IMPROVEMENT
District 4Project Manager Angeline To E-mail [email protected]
Comments Activity: Environmental Clearnace/Right-of-Way Acquisition. Replacement project for Cordones Road. Red Rock Access Road was programmed on the Transportation Improvement and Maintenance Program but was cancelled in 2015. Pre-Construction funding is necessary to evaluate a secondary access to Pinal Airpark.
Status
3
Pre-Construction Programmed
Maintenance Area Arizona City
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
39a
Length in Miles
Safety Program Countywide
Safety
$500,000
$0
$500,000
Activity
County Cost
Non County Cost
IMPROVEMENT
District 7Project Manager John Kraft E-mail [email protected]
Comments Activity: Direct funding to the Roadway Safety ProgramCounty Cost: Add $500,000 to Budget Year 2020-2021 to rebalance Safety Program funding.
Status Programmed
Maintenance Area Multiple
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
0
39b
Budget Year 2020-2021 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
Length in Miles
Bowlin Road Hidden Valley Rd-Stonebluff Rd
Dust Palliative
$100,000
$0
$100,000
Activity
County Cost
Non County Cost
MAINTENANCE
District 4Project Manager Lindsey Randall E-mail [email protected]
Comments
Status Programmed
Maintenance Area Hidden Valley
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
0.6
40a
Length in Miles
Logan Boulevard Diffin Rd-Reed Rd
Dust Palliative
$125,000
$0
$125,000
Activity
County Cost
Non County Cost
MAINTENANCE
District 1Project Manager Lindsey Randall E-mail [email protected]
Comments Activity: Dust palliative is contingent on receiving right-of-way donationsProject Manager: From Celeste Garza to Lindsey RandallE-mail: From [email protected] to [email protected]
Status Programmed
Maintenance Area San Tan
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 147
1
40b
Budget Year 2020-2021 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
Length in Miles
Louis Johnson Drive Amarillo Valley Rd-State Route 347
Dust Palliative
$250,000
$0
$250,000
Activity
County Cost
Non County Cost
MAINTENANCE
District 4Project Manager Lindsey Randall E-mail [email protected]
Comments
Status Programmed
Maintenance Area Hidden Valley
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 137
2
41a
Length in Miles
Midway Road Beggs Rd-Marsh Rd
Dust Palliative
$230,000
$0
$230,000
Activity
County Cost
Non County Cost
MAINTENANCE
District 3, 4Project Manager Lindsey Randall E-mail [email protected]
Comments
Status Programmed
Maintenance Area Casa Grande
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 130
2
41b
Budget Year 2020-2021 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
Length in Miles
Rhea Road Brennar Pass Rd-Donnaloy Road
Dust Palliative
$30,000
$0
$30,000
Activity
County Cost
Non County Cost
MAINTENANCE
District 2Project Manager Lindsey Randall E-mail [email protected]
Comments Status: Dust palliative may be completed in conjunction with the Donnaloy Road project that is programmed in Budget Year 2019-2020.Project Manager: From Celeste Garza to Lindsey RandallE-mail: From [email protected] to [email protected]
Status Programmed
Maintenance Area San Tan
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
0.3
42a
Length in Miles
River Road Redington Rd-Copper Creek Rd
Dust Palliative
$200,000
$0
$200,000
Activity
County Cost
Non County Cost
MAINTENANCE
District 1Project Manager Angeline To E-mail [email protected]
Comments Status: Dust palliative is contigent on receiving right-of-way donations.Length: Dust palliative will extend to existing 5 miles of paved roadway.County Cost: $200,000 will be programmed annually for 4 years (Year 1).
Status Programmed
Maintenance Area Oracle
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 191
8
42b
Budget Year 2020-2021 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
Length in Miles
Rockcliffe Boulevard Oracle Ranch Rd (West)-Alice St
Dust Palliative
$30,000
$0
$30,000
Activity
County Cost
Non County Cost
MAINTENANCE
District 1Project Manager Angeline To E-mail [email protected]
Comments Comments: Dust palliative is contigent on receiving right-of-way donations
Status Programmed
Maintenance Area Oracle
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 132
0.25
43a
Length in Miles
Stonebluff Road Farrell Rd-Bowlin Rd
Dust Palliative
$100,000
$0
$100,000
Activity
County Cost
Non County Cost
MAINTENANCE
District 4Project Manager Lindsey Randall E-mail [email protected]
Comments
Status Programmed
Maintenance Area Hidden Valley
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 149
1
43b
Budget Year 2020-2021 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
Length in Miles
Tweedy Road Storey Rd-Randolph Rd
Dust Palliative
$250,000
$0
$250,000
Activity
County Cost
Non County Cost
MAINTENANCE
District 3Project Manager Lindsey Randall E-mail [email protected]
Comments Comments: Carmichael Road to Randolph Road is located within the City of Coolidge
Status Programmed
Maintenance Area Casa Grande
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 1400188
2
44a
Length in Miles
Florence-Kelvin Highway Apache Kid Rd-Zellweger Rd
Construction
$250,000
$0
$250,000
Activity
County Cost
Non County Cost
IMPROVEMENT
District 1Project Manager Angeline To E-mail [email protected]
Comments Activity: L-2 Standard - 6 inch Aggregate Base over Double Chip Seal
Status Programmed
Maintenance Area Riverside
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 253
0.75
44b
Budget Year 2021-2022 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
Budget Year 2020-2021
Length in Miles
Heather Drive Kashmir Rd-Lamb Rd
Construction
$125,000
$0
$125,000
Activity
County Cost
Non County Cost
IMPROVEMENT
District 4Project Manager Angeline To E-mail [email protected]
Comments Activity: Roadway construction with Aggregate Base and Aphalt ConcreteLength: 900'
Status Programmed
Maintenance Area Arizona City
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 249
900
45a
Length in Miles
Judd Road-Tourmaline Drive Gantzel Rd-Copper Basin Development
Construction
$1,250,000
$0
$1,250,000
Activity
County Cost
Non County Cost
IMPROVEMENT
District 2Project Manager Celeste Garza E-mail [email protected]
Comments Activity: Construction on new road on Judd alignmentCounty Cost: $1,250,000 will be programmed annually for 4 years (Year 2)
Status Programmed
Maintenance Area San Tan
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 176
1.5
45b
Budget Year 2021-2022 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
Length in Miles
Kenworthy Road Combs Rd-Chandler Heights Rd
Construction
$1,500,000
$0
$1,500,000
Activity
County Cost
Non County Cost
IMPROVEMENT
District 2, 5Project Manager Lindsey Randall E-mail [email protected]
Comments Activity: Construction of an L-2 Standard roadway. This project in contingent on funding availability (project is partially funded at this time).
Status Programmed
Maintenance Area Apache Junction
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 207
1.15
46a
Length in Miles
Peart Road Interstate 8-Early Rd
$2,520,000
$0
$2,520,000
Activity
County Cost
Non County Cost
IMPROVEMENT
District 3Project Manager John Kraft E-mail [email protected]
Comments Activity: Remove existing pavement and replace with L-2 Modified Standard.
Status
Reconstruction Programmed
Maintenance Area Casa Grande
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 269
2
46b
Budget Year 2021-2022 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
Length in Miles
Pinal Airpark Road Interstate 10-Trico Rd
Construction
$650,000
$0
$650,000
Activity
County Cost
Non County Cost
IMPROVEMENT
District 4Project Manager Angeline To E-mail [email protected]
Comments Activity: Driveways, possible left turn acceleration/merge lane, and possible roadway mill and replace.
Status Programmed
Maintenance Area Arizona City
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 251252
2
47a
Length in Miles
Safety Program Countywide
Safety
$500,000
$0
$500,000
Activity
County Cost
Non County Cost
IMPROVEMENT
District 7Project Manager John Kraft E-mail [email protected]
Comments Activity: Direct funding to the Roadway Safety ProgramCounty Cost: Add $500,000 to Budget Year 2021-2022 to rebalance Safety Program funding.
Status Programmed
Maintenance Area Multiple
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
0
47b
Budget Year 2021-2022 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
Length in Miles
Trekell Road S. Hanna Rd-Interstate 8
$540,000
$0
$540,000
Activity
County Cost
Non County Cost
IMPROVEMENT
District 3Project Manager John Kraft E-mail [email protected]
Comments Activity: Remove existing pavement and replace with L-2 Modified Standard.
Status
Reconstruction Programmed
Maintenance Area Casa Grande
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 271
0.4
48a
Length in Miles
Camino Viejo Road Camino Viejo W-Enrada del Oro Dr
Dust Palliative
$940,000
$0
$940,000
Activity
County Cost
Non County Cost
MAINTENANCE
District 5Project Manager Lindsey Randall E-mail [email protected]
Comments Activity: State Land right-of-way is needed to complete the dust palliative
Status Programmed
Maintenance Area Apache Junction
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 212
2.4
48b
Budget Year 2021-2022 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
Length in Miles
Encanto Lane Cactus Forest Rd-840' North
Dust Palliative
$100,000
$0
$100,000
Activity
County Cost
Non County Cost
MAINTENANCE
District 1Project Manager Lindsey Randall E-mail [email protected]
Comments Activity: Dust Palliative will include Indigo Road, the unpaved segment of Leisure Lane, and Page Road for a total of 1 mile.
Status Programmed
Maintenance Area San Tan
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 193
1
49a
Length in Miles
Orville Drive Diffin Rd-Quail Run Rd
Dust Palliative
$130,000
$0
$130,000
Activity
County Cost
Non County Cost
MAINTENANCE
District 1Project Manager Lindsey Randall E-mail [email protected]
Comments
Status Programmed
Maintenance Area San Tan
Transporation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 217
1.13
49b
Budget Year 2021-2022 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
Length in Miles
River Road Redington Rd-Copper Creek Rd
Dust Palliative
$200,000
$0
$200,000
Activity
County Cost
Non County Cost
MAINTENANCE
District 1Project Manager Angeline To E-mail [email protected]
Comments Status: Dust palliative is contigent on receiving right-of-way donations.Length: Dust palliative will extend to existing 5 miles of paved roadway.County Cost: $200,000 will be programmed annually for 4 years (Year 2).
Status Programmed
Maintenance Area Oracle
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 191
8
50a
Length in Miles
Thunderbird Road Teel Rd-Mayer Rd
$450,000
$0
$450,000
Activity
County Cost
Non County Cost
MAINTENANCE
District 4Project Manager John Kraft E-mail [email protected]
Comments Activity: Roadway Widening
Status
Reconstruction Programmed
Maintenance Area Hidden Valley
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 216
1.5
50b
Budget Year 2021-2022 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520-866-6411 (telephone)520-866-6511 (fax)
45b
2a & 16a
5b10a
12b6a
11a
12a6b & 7a
1a
8a
8b
21b
15b
14b
14a
16b
17a
23a &34a
9b
2b3a
9a
10b13a
1b44a
15a
23b
4b
MesaTempe
Chandler
Gilbert
Queen Creek27b
Tonto National Forest
San Carlos Apache Tribe
33a 31b
29b
37a38b
24a 27a24b26a
25a 28a36a
37b
25b
30b
32a
30a
42a
33b
40b
13b & 18b 13b 50a
43a
21a35b
35a
20b
28b22a
22b
41b19b
29a
18a
41a
34b
19a
43b
40a
5a
3b
38a
44b
45a
47a
48a
50b
46a
36b
46b
48b
49a
49b
39a
District 3;
District 4;
;District 2
;District 5
District 1;
WINKELMANHAYDEN
SUPERIOR
KEARNY
APACHE JUNCTION
MAMMOTH
COOLIDGEMARICOPA
FLORENCE
CASA GRANDE
ELOY
HUNT HWY
§̈¦10rx187
£¤60
rx287
rx88
rx587
rx387
rx238
rx287rx84
rx347
rx87
rx177
rx79
rx77§̈¦8
§̈¦10
MARICOPA-CASA GRANDE HWY
PARK LINK DR
Ak-Chin Indian Res.
Gila River Indian Res.
Tohono Indian Res.
FLOREN CE-KELV
INHW
Y
rx347
rx87
£¤60
rx79
PINAL COUNTYPIMA COUNTY
PINAL
COUN
TYGR
AHAM
COUN
TY
GILA COUNTY
PINAL COUNTY
MARICOPA COUNTYPINAL COUNTY
PINAL COUNTYMARICOPA COUNTY
PINAL
COUN
TYMA
RICO
PA CO
UNTY
Coconino
Pima
Mohave
Gila
Pinal
Yavapai
Maricopa
Yuma
Cochise
La Paz
Graham
ApacheNavajo
Greenlee
Santa Cruz
LegendArea 1 Projects
Area 2 Projects
Area 3 Projects
µ
Project Time Frame : 2017-2022Pinal County Public Works Incorporated Cities Tribal Communities Tonto National Forest Supervisor DistrictsFive Year Transportation Improvement & Maintenance Project Map