Page 1: 2020 Construction Program · and replace the bridge decks on the I-480 bridge (Valley View Bridge) over the Cuyahoga River Valley in Village of Valley View and city of Independence

SERVING CUYAHOGA, GEAUGA AND LAKE COUNTIES

Mike DeWine, Ohio Governor | Jack Marchbanks, Ph. D., ODOT Director | John Picuri P.E., District Deputy Director

ODOT District 122020 Construction Program

Cuyahoga

GeaugaLake

GARFIELD HTS.12

Page 2: 2020 Construction Program · and replace the bridge decks on the I-480 bridge (Valley View Bridge) over the Cuyahoga River Valley in Village of Valley View and city of Independence

Table of Contents

Overview..................................................................... Page 2

Cuyahoga County....................................................... Pages 3-23 Geauga County........................................................... Pages 24-27 Lake County................................................................ Pages 28-31 Regional Projects....................................................... Pages 32-33 Local-Let Projects........................................................ Page 34-35

ODOT DISTRICT 12 | 2018 CONSTRUCTION GUIDEODOT District 12 2020 Construction ProgramODOT District 12 2020 Construction Program

LOCAL LET PROJECTS 1

Page 3: 2020 Construction Program · and replace the bridge decks on the I-480 bridge (Valley View Bridge) over the Cuyahoga River Valley in Village of Valley View and city of Independence

The Ohio Department of Transportation District 12, is responsible for the maintenance and construction on all Interstates, U.S. and State Routes in unincorporated municipalities in Cuyahoga, Geauga and Lake counties. Each spring, we shift our focus from snow and ice removal to the construction and maintenance of our roadways.

The 2020 Construction Program includes information about major construction projects in the District 12 tri-county area. This includes projects that are administered by ODOT and those that ODOT has contributed money to that are being administered by local agencies.

For the latest on District 12’s major Cleveland Urban Core Projects, and to sign up to recieve project-related emails, motorists are encouraged to log on to the following websites:

• Cleveland Innerbelt Corridor: www.Innerbelt.org• Opportunity Corridor: www.OpportunityCorridor.transportation.ohio.gov

As in every construction season, we ask motorists to use caution when traveling through work zones. By obeying posted speed limits and exercising caution, motorists can do their part to keep both our construction employees and fellow motorists safe. Questions regarding District 12 construction projects can be directed to the Public Information Office at [email protected], 216-584-2006 or 216-584-2007.

ODOT DISTRICT 12 | 2018 CONSTRUCTION GUIDEODOT District 12 2020 Construction ProgramODOT District 12 2020 Construction Program

LOCAL LET PROJECTSOverview 2

Page 4: 2020 Construction Program · and replace the bridge decks on the I-480 bridge (Valley View Bridge) over the Cuyahoga River Valley in Village of Valley View and city of Independence

ODOT DISTRICT 12 | 2018 CONSTRUCTION GUIDEODOT District 12 2020 Construction ProgramODOT District 12 2020 Construction Program

LOCAL LET PROJECTSCuyahoga County 3

Page 5: 2020 Construction Program · and replace the bridge decks on the I-480 bridge (Valley View Bridge) over the Cuyahoga River Valley in Village of Valley View and city of Independence

U.S. Route 6, East Cleveland PROJECT ID: 95404 - BID AMOUNT: $2,817,320Upgrade and coordinate the traffic signals along U.S. 6 (Euclid Ave.) between Superior Ave. and Ivanhoe Rd. in the city of East Cleveland. Minor impacts to traffic. Start date: April 2019. Estimated completion: July 2020.

Interstate 90 and Interstate 480, Cuyahoga CountyPROJECT ID: 103165 - BID AMOUNT: $1,426,790Upgrade the overhead lighting at various interchanges on I-90 and I-480 in Cuyahoga County. Minimal impacts to traffic. Estimated start date: May 2020. Estimated completion: May 2021. Main Ave., ClevelandPROJECT ID: 111396 - ESTIMATED COST: $402,130Pedestrian and bicycle improvements on Main Ave. between Old River Rd. and W. 9th St. in the City of Cleveland. Minimal impacts to traffic. Estimated start date: July 2020. Estimated completion: October 2020. Euclid Safe Routes to School, EuclidPROJECT ID: 103707 - ESTIMATED COST: $145,000Sidewalk, crosswalk marking, visibility and accessibility improvements in the Euclid city schools. Minimal impacts to traffic. Estimated start date: July 2020. Estimated completion: October 2020.

Cleveland Heights / University Heights Safe Routes to School, Cleveland Heights / University HeightsPROJECT ID: 103700 - ESTIMATED COST: $245,300Sidewalks, signals, and crossing improvements at five locations in the cities of Cleveland Heights/ University Heights. Minimal impacts to traffic. Estimated start date: June 2020. Estimated completion: October 2020. Cleveland Safe Routes to School, ClevelandPROJECT ID: 106352 - BID AMOUNT: $495,928ADA ramps, sidewalk, curb, pedestrian signals, and pavement markings in the city of Cleveland. Minimal impacts to traffic. Estimated start date: May 2020. Estimated completion: September 2020.

Interstate 271, Interstate 77, Interstate 480, Cleveland, Beachwood and Independence PROJECT ID: 108655 - BID AMOUNT: $1,365,315Construct a noise barrier along I-271 just south of Cedar Rd. in the city of Beachwood. In addition the project will make repairs to the noise barrier on I-77 near E. Sprague Rd. in the city of Independence and I-480 just west of SR 176 in the city of Cleveland. Minimal impacts to traffic. Estimated start date: May 2020. Estimated completion: September 2021.

PROJECTS WITH MINIMAL IMPACT ON TRAFFICPROJECTS WITH MINIMAL IMPACT ON TRAFFIC

ODOT DISTRICT 12 | 2018 CONSTRUCTION GUIDEODOT District 12 2020 Construction ProgramODOT District 12 2020 Construction Program

LOCAL LET PROJECTSCuyahoga County 4

Page 6: 2020 Construction Program · and replace the bridge decks on the I-480 bridge (Valley View Bridge) over the Cuyahoga River Valley in Village of Valley View and city of Independence

LOCATION: Interstate 71 southbound exit to State Route 176 in Cleveland.

ESTIMATED START DATE: April 2020

PROJECT ID: 98063BID AMOUNT: $4,345,684

ESTIMATED COMPLETION DATE:June 2021

DESCRIPTION: New deceleration lane on I-71 southbound exit to SR 176.

IMPACT: During off peak hours there will be various lane restrictions. Traffic will be shifted throughout the construction zone. I-71 southbound exit to SR 176 southbound will have various weekend closures. The detour will be I-71 southbound to US 42 (W. 25th St./Pearl Road) southbound to SR 94 (State Rd.) southbound to I-480 eastbound to SR 176 northbound.

LOCATION: Interstate 77 over Interstate 490 in Cleveland.

START DATE: October 2017

PROJECT ID: 13567BID AMOUNT: $25,628,718

ESTIMATED COMPLETION DATE: July 2020

DESCRIPTION: Replace and widen the I-77 bridge over I-490 in the city of Cleveland to three lanes in each direction. (CCG6A) Work to be completed in 2020 includes the concrete overlay of the northbound bridge, surface course of pavement over the entire project, and median barrier construction.

IMPACT: Traffic will be maintained utilizing traffic shifts. Intermittent ramp closures at the I-77/I-490 interchange. Detours will be posted.

MAP 1MAP 1 MAP 2MAP 2

ODOT DISTRICT 12 | 2018 CONSTRUCTION GUIDEODOT District 12 2020 Construction ProgramODOT District 12 2020 Construction Program

LOCAL LET PROJECTSCuyahoga County 5

Page 7: 2020 Construction Program · and replace the bridge decks on the I-480 bridge (Valley View Bridge) over the Cuyahoga River Valley in Village of Valley View and city of Independence

LOCATION: Interstate 77 in Brecksville and Cleveland.

START DATE: June 2019

PROJECT ID: 106350BID AMOUNT: $3,050,000

ESTIMATED COMPLETION DATE: October 2020

DESCRIPTION: Construct a noise barrier along I-77 north and southbound between Miller Road and Valley Parkway in the city of Brecksville and between Pershing Avenue and Czar Avenue in the city of Cleveland. Work to be completed in 2020 includes the construction of the noise barrier.

IMPACT: Minor impacts to traffic.

LOCATION: Interstate 90 in Cleveland.

START DATE: April 2018

PROJECT ID: 87628

BID AMOUNT: $14,822,785

ESTIMATED COMPLETION DATE:July 2020

DESCRIPTION: Bridge deck replacement and structural steel painting on I-90 over East 185th St., Neff Rd., and East 200th St. in the city of Cleveland. Work to be completed in 2020 includes utility relocation, the final striping of the project, and bridge painting.

IMPACT: In 2020 two lanes of traffic will be maintained in both directions of I-90. Temporary lane and ramp closures will take place during work. Detours will be posted.

MAP 3MAP 3 MAP 4MAP 4

ODOT DISTRICT 12 | 2018 CONSTRUCTION GUIDEODOT District 12 2020 Construction ProgramODOT District 12 2020 Construction Program

LOCAL LET PROJECTSCuyahoga County 6

Page 8: 2020 Construction Program · and replace the bridge decks on the I-480 bridge (Valley View Bridge) over the Cuyahoga River Valley in Village of Valley View and city of Independence

LOCATION: Interstate 90 in Cleveland.

START DATE: April 2019

PROJECT ID: 103821BID AMOUNT: $2,427,335

ESTIMATED COMPLETION DATE: May 2020

DESCRIPTION: Improve traffic flow on Martin Luther King Jr. Dr. at the I-90 interchange and modify the I-90 east and westbound exit ramps to Martin Luther King Jr. Dr. in the city of Cleveland. Work to be completed in 2020 includes traffic signal installation at three locations and pavement work at various locations.

IMPACT: Traffic will be maintained. Off-peak lane and ramp closures as necessary. Detours will be posted.

LOCATION: Interstate 90 in Cleveland.

ESTIMATED START DATE: April 2020

PROJECT ID: 96673

BID AMOUNT: $2,782,494ESTIMATED COMPLETION DATE: October 2020

DESCRIPTION: Bridge painting on two bridges on I-90 over Joslyn Rd. and over the GCRTA Triskett Rapid Station Park and Ride.

IMPACT: Traffic will be maintained on I-90. Joslyn Rd. over I-90 will have various lane restrictions.

MAP 5MAP 5 MAP 6MAP 6

ODOT DISTRICT 12 | 2018 CONSTRUCTION GUIDEODOT District 12 2020 Construction ProgramODOT District 12 2020 Construction Program

LOCAL LET PROJECTSCuyahoga County 7

Page 9: 2020 Construction Program · and replace the bridge decks on the I-480 bridge (Valley View Bridge) over the Cuyahoga River Valley in Village of Valley View and city of Independence

LOCATION: Interstate 90 in the city of Cleveland.

ESTIMATED START DATE: March 2020

PROJECT ID: 88348BID AMOUNT: $16,688,245

ESTIMATED COMPLETION DATE:September 2021

DESCRIPTION: Bridge deck replacement and bridge painting on I-90 over E. 140th St. and E. 152nd St.IMPACT: Traffic will be maintained on I-90. The following ramps will be closed during various phases of construction: E.140th entrance ramp to I-90 eastbound, E.152nd entrance ramp to I-90 westbound, E. 156th entrance ramp to I-90 westbound, I-90 eastbound exit to E. 152nd, I-90 westbound exit to E. 152/E. 140th streets.

LOCATION: Interstate 90 in Cleveland and Euclid.

ESTIMATED START DATE: March 2020

PROJECT ID: 76786

BID AMOUNT: $5,084,888

ESTIMATED COMPLETION DATE: September 2020

DESCRIPTION: Resurfacing on I-90 between just east of E. 152nd St. and SR 2 (Cleveland Memorial Shoreway) and on SR 2 (Cleveland Memorial Shoreway) between I-90 and Lake County line.

IMPACT: Various nightly lane restrictions

MAP 7MAP 7 MAP 8MAP 8

ODOT DISTRICT 12 | 2018 CONSTRUCTION GUIDEODOT District 12 2020 Construction ProgramODOT District 12 2020 Construction Program

LOCAL LET PROJECTSCuyahoga County 8

Page 10: 2020 Construction Program · and replace the bridge decks on the I-480 bridge (Valley View Bridge) over the Cuyahoga River Valley in Village of Valley View and city of Independence

LOCATION: Interstate 90 in Cleveland. ESTIMATED START DATE: June 2020

PROJECT ID: 88400

BID AMOUNT: $1,893,619ESTIMATED COMPLETION DATE:October 2020

DESCRIPTION: Paint nine bridges on I-90 between Berea Rd. and W. 65th St. in the city of Cleveland. Two bridges on I-90 and Berea Rd., two bridges on I-90 and West Blvd., two bridges on I-90 and W. 100th St., and two bridges on I-90 and W. 98th St., and one on I-90 and W. 65th St.

IMPACT: W. 100th St. will be restricted to one lane in each direction. One lane in each direction will be maintained on the following roads: Berea Rd., W. 65th St., W. 98th St., and West Blvd.

LOCATION: West 44th St. bridge over Interstate 90 in Cleveland.

ESTIMATED START DATE: May 2020

PROJECT ID: 105792

ESTIMATED COST: $4,251,258

ESTIMATED COMPLETION DATE:October 2020

DESCRIPTION: Major bridge repairs on the W. 44th St. bridge over I-90 in the city of Cleveland.IMPACT: W. 44th St. will be closed between N. Marginal Rd. and S. Marginal Rd. for 150 days. The detour will be I-90 westbound to W. 85th St. southbound to I-90 eastbound to W. 44th St.

MAP 9MAP 9 MAP 10MAP 10

ODOT DISTRICT 12 | 2018 CONSTRUCTION GUIDEODOT District 12 2020 Construction ProgramODOT District 12 2020 Construction Program

LOCAL LET PROJECTSCuyahoga County 9

Page 11: 2020 Construction Program · and replace the bridge decks on the I-480 bridge (Valley View Bridge) over the Cuyahoga River Valley in Village of Valley View and city of Independence

LOCATION: Interstate 271 in Oakwood, Bedford, Bedford Heights and Warrensville Heights.

START DATE: August 2016

PROJECT ID: 80418BID AMOUNT: $119,988,187

ESTIMATED COMPLETION DATE:June 2020

DESCRIPTION: Widen I-271 between the Summit County Line and Miles Rd. in the cities of Oakwood, Bedford, Bedford Heights and Warrensville Heights. Work to be completed in 2020 includes pavement markings, noise walls construction and pavement work.

IMPACT: Various lane shifts and restrictions.

LOCATION: Interstate 271 in Beachwood, Lyndhurst and Mayfield Heights.

ESTIMATED START DATE: April 2020

PROJECT ID: 102451BID AMOUNT $4,975,950

ESTIMATED COMPLETION DATE:October 2020

DESCRIPTION: Bridge painting on six bridges on I-271 in the cities of Bachwood, Lydhurst, and Mayfield. I-271 and Chagrin Blvd., two bridges on I-271 and Fairmount Blvd., I-271 and Cedar Rd., I-271 and Brainard Rd., and I-271 and Lander Rd.

IMPACT: Various lane restrictions and short duration closures on I-271.

MAP 11MAP 11 MAP 12MAP 12

ODOT DISTRICT 12 | 2018 CONSTRUCTION GUIDEODOT District 12 2020 Construction ProgramODOT District 12 2020 Construction Program

LOCAL LET PROJECTSCuyahoga County 10

Page 12: 2020 Construction Program · and replace the bridge decks on the I-480 bridge (Valley View Bridge) over the Cuyahoga River Valley in Village of Valley View and city of Independence

LOCATION: Interstate 480 bridge (Valley View Bridge)in Village of Valley View and city of Independence.

START DATE: December 2017

PROJECT ID: 90591 BID AMOUNT: $227,774,081

ESTIMATED COMPLETION DATE: June 2024

DESCRIPTION: Construct a four-lane bridge between the two existing bridges and replace the bridge decks on the I-480 bridge (Valley View Bridge) over the Cuyahoga River Valley in Village of Valley View and city of Independence. Work to be completed in 2020 includes the completion of the new bridge by the fall of 2020 and the beginning of the bridge deck replacement on the existing eastbound bridge.

IMPACT: Traffic will be maintained utilizing lane shifts. Off-peak lane closures. I-480 eastbound traffic will be shifted onto the new bridge in late fall.

LOCATION: Interstate 480 in Cleveland.

ESTIMATED START DATE: March 2020

PROJECT ID: 108480BID AMOUNT: $ 1,228,244

ESTIMATED COMPLETION DATE: October 2020

DESCRIPTION: Add a new lane on I-480 westbound from SR 176 southbound to the SR 94 (State Rd.) interchange.

IMPACT: Various nightly lane restrictions.

MAP 13MAP 13 MAP 14MAP 14

ODOT DISTRICT 12 | 2018 CONSTRUCTION GUIDEODOT District 12 2020 Construction ProgramODOT District 12 2020 Construction Program

LOCAL LET PROJECTSCuyahoga County 11

Page 13: 2020 Construction Program · and replace the bridge decks on the I-480 bridge (Valley View Bridge) over the Cuyahoga River Valley in Village of Valley View and city of Independence

LOCATION: Interstate 480 in North Olmsted and Fairview Park.

ESTIMATED START DATE: June 2020

PROJECT ID: 77526BID AMOUNT $5,920,039

ESTIMATED COMPLETION DATE: October 2020

DESCRIPTION: Resurfacing on I-480 between the Lorain County line and Rocky River bridge.

IMPACT: Various daily and nightly lane closures. The project also includes various ramp closures. All detours will be posted.

LOCATION: Interstate 480 in Cleveland.

ESTIMATED START DATE: April 2020

PROJECT ID: 22131BID AMOUNT: $18,925,536

ESTIMATED COMPLETION DATE: June 2022

DESCRIPTION: Bridge painting on I-480 over the Rocky River and SR 10 (Lorain Ave.) over the Rocky River.

IMPACT: Various shoulder closures on I-480 and SR 10 (Lorain Ave.).

MAP 15MAP 15 MAP 16MAP 16

ODOT DISTRICT 12 | 2018 CONSTRUCTION GUIDEODOT District 12 2020 Construction ProgramODOT District 12 2020 Construction Program

LOCAL LET PROJECTSCuyahoga County 12

Page 14: 2020 Construction Program · and replace the bridge decks on the I-480 bridge (Valley View Bridge) over the Cuyahoga River Valley in Village of Valley View and city of Independence

LOCATION: Interstate 480 in Warrensville Heights, Maple Heights, Bedford Heights, and North Randall.

ESTIMATED START DATE: June 2020

PROJECT ID: 107418ESTIMATED COST: $1,070,240

ESTIMATED COMPLETION DATE:October 2020

DESCRIPTION: Concrete median wall replacement on I-480 between Warrensville Center Rd. and Green Rd. in the cities of Warrensville Heights, Maple Heights, Bedford Heights, and North Randall.IMPACT: Traffic will be maintained utilizing lane shifts.

LOCATION: U.S. Route 6 (Detroit-Superior) in Cleveland.

ESTIMATED START DATE: June 2019

PROJECT ID: 99972BID AMOUNT $9,879,989

ESTIMATED COMPLETION DATE:September 2020

DESCRIPTION: Place a new driving surface and other miscellaneous repairs on the U.S. 6 (Detroit-Superior) Bridge over the Cuyahoga River in the city of Cleveland. Work in 2020 includes sidewalk repairs, and various work to the bridge driving surface. The majority of the work will be under the bridge and not affect trafficIMPACT: U.S. 6 (Detroit-Superior) Bridge will have various lane restrictions. Pedestrian access will be maintained at all times. There will be various parking lot closures around the bridge.

MAP 17MAP 17 MAP 18MAP 18

ODOT DISTRICT 12 | 2018 CONSTRUCTION GUIDEODOT District 12 2020 Construction ProgramODOT District 12 2020 Construction Program

LOCAL LET PROJECTSCuyahoga County 13

Page 15: 2020 Construction Program · and replace the bridge decks on the I-480 bridge (Valley View Bridge) over the Cuyahoga River Valley in Village of Valley View and city of Independence

LOCATION: U.S. Route 6 (Superior Ave.) in East Cleveland.

ESTIMATED START DATE: June 2020

PROJECT ID: 105998BID AMOUNT: $3,441,122

ESTIMATED COMPLETION DATE:August 2021

DESCRIPTION: Resurfacing on U.S. Route 6 (Superior Ave.) between just west of E. 125th St. and U.S. Route 20 (Euclid Ave.) and on U.S. Route 20 (Euclid Ave.) between E.125th St. and W. Belvoir Blvd. in the city of East Cleveland.

IMPACT: Various lane closures.

LOCATION: U.S. Route 42 (West 25th Street), in Cleveland.

START DATE: May 2019

PROJECT ID: 23414BID AMOUNT: $4,463,577

ESTIMATED COMPLETION DATE:October 2020

DESCRIPTION: Replace the bridge deck on the U.S. 42 (W. 25th St.) bridge over I-90 in the city of Cleveland.

IMPACT: One lane of traffic will be maintained in each direction on U.S. 42 (W. 25th St.) bridge over I-90. Truck traffic destined for U.S. 42 (W. 25th St.) northbound will be detoured via I-90 east to Orange/Ontario avenues to Carnegie Avenue to W. 25th Street. Off-peak lane closures on I-90.

MAP 19MAP 19 MAP 20MAP 20

ODOT DISTRICT 12 | 2018 CONSTRUCTION GUIDEODOT District 12 2020 Construction ProgramODOT District 12 2020 Construction Program

LOCAL LET PROJECTSCuyahoga County 14

Page 16: 2020 Construction Program · and replace the bridge decks on the I-480 bridge (Valley View Bridge) over the Cuyahoga River Valley in Village of Valley View and city of Independence

LOCATION: State Route 2 in Cleveland.

ESTIMATED START DATE: June 2020

PROJECT ID: 87800BID AMOUNT: $2,397,172

ESTIMATED COMPLETION DATE: August 2020

DESCRIPTION: Resurface SR 2 (Cleveland Memorial Shoreway) between just west of W. 9th St. and I-90 in the city of Cleveland.IMPACT: Various lane closures and ramp closures.

LOCATION: U.S. Route 42 (Pearl Road), in Strongsville, Middleburg Heights, Parma Heights, and Parma.

START DATE: August 2019

PROJECT ID: 105726BID AMOUNT: $10,951,210

ESTIMATED COMPLETION DATE:October 2020

DESCRIPTION: Resurface U.S. 42 (Pearl Rd.) between Valley Pkwy. and Snow Rd. in the cities of Strongsville, Middleburg Heights, Parma Heights, and Parma.IMPACT: One lane will be maintained in each direction.

MAP 21MAP 21 MAP 22MAP 22

ODOT DISTRICT 12 | 2018 CONSTRUCTION GUIDEODOT District 12 2020 Construction ProgramODOT District 12 2020 Construction Program

LOCAL LET PROJECTS XCuyahoga County 15

Page 17: 2020 Construction Program · and replace the bridge decks on the I-480 bridge (Valley View Bridge) over the Cuyahoga River Valley in Village of Valley View and city of Independence

LOCATION: State Route 3(Ridge Rd.), in Parma.

ESTIMATED START DATE: April 2020

PROJECT ID: 105907

BID AMOUNT: $4,254,102

ESTIMATED COMPLETION DATE: September 2020

DESCRIPTION: Pavement repairs on SR 3 (Ridge Rd.) between Pleaseant Valley Rd. and Ridgewood Rd., and resurfacing on SR 3 (Ridge Rd.) between Ridgewood Rd. and U.S. 42 (Pearl Rd.) in the city of Parma.

IMPACT: Traffic will be maintained.

LOCATION: State Route 10, in Cleveland. START DATE: August 2018PROJECT ID: 96833

BID AMOUNT: $150,858,250ESTIMATED COMPLETION DATE:June 2022

DESCRIPTION: Build a new roadway – to be known as SR 10 – between E. 55th St/I-490 and East 93rd St. in the city of Cleveland. (Opportunity Corridor Section 3) Worked to be completed in 2020 includes work on various bridges and the completion of the 55th St. bridge in the fall. Work will also begin at the intersections of E. 75th St., E. 79th St. and Buckeye Rd. and the Opportunity Corridor Blvd.

IMPACT: I-490 is closed between I-77 and E. 55th Street through the spring of 2021. Visit www.opportunitycorridor.transportation.ohio.gov for more information. Short term lane and road closures on various side streets will also be necessary. Various lane restrictions on E. 75th St., E. 79th St. and Buckeye Rd. at the intersection of the Opportunity Corridor Blvd.

MAP 23MAP 23 MAP 24MAP 24

ODOT DISTRICT 12 | 2018 CONSTRUCTION GUIDEODOT District 12 2020 Construction ProgramODOT District 12 2020 Construction Program

LOCAL LET PROJECTSCuyahoga County 16

Page 18: 2020 Construction Program · and replace the bridge decks on the I-480 bridge (Valley View Bridge) over the Cuyahoga River Valley in Village of Valley View and city of Independence

LOCATION: State Route 10 (Hope Memorial Bridge) in Cleveland.

START DATE: April 2019

PROJECT ID: 96986

BID AMOUNT: $14,394,851

ESTIMATED COMPLETION DATE: October 2020

DESCRIPTION: Miscellaneous steel repairs on the SR 10 (Hope Memorial Bridge) over the Cuyahoga River in the city of Cleveland. Work in 2020 includes the replacement of the bridge driving surface and work underneath the bridge.

IMPACT: One lane of traffic will be maintained in each direction on SR 10 (Hope Memorial Bridge). The multi-use path on the north side of the bridge will be maintained and the sidewalk on the south side of the will be closed.

LOCATION: State Route 10 (Lorain Rd.) in Fairview Park.

ESTIMATED START DATE: Spring 2020

PROJECT ID: 102803ESTIMATED COST $485,778

ESTIMATED COMPLETION DATE: September 2020

DESCRIPTION: Slope repair and roadway stabilization on SR 10 (Lorain Rd.) just east of W. 192 St.

IMPACT: One lane of traffic will be maintained in each direction on SR 10 (Lorain Rd.) throughout construction. Pedestrian traffic on the south side of Lorain Rd. will be closed.

MAP 25MAP 25 MAP 26MAP 26

ODOT DISTRICT 12 | 2018 CONSTRUCTION GUIDEODOT District 12 2020 Construction ProgramODOT District 12 2020 Construction Program

LOCAL LET PROJECTSCuyahoga County 17

Page 19: 2020 Construction Program · and replace the bridge decks on the I-480 bridge (Valley View Bridge) over the Cuyahoga River Valley in Village of Valley View and city of Independence

LOCATION: State Route 14 (Broadway Ave.), in Garfield Heights. ESTIMATED START DATE: April 2020PROJECT ID: 13182BID AMOUNT: $2,011,188

ESTIMATED COMPLETION DATE: October 2020

DESCRIPTION: Repairs to two bridges on SR 14 (Broadway Ave.) over Mill Creek in city of Garfield Heights.

IMPACT: SR 14 (Broadway Ave.) will be closed for 30 days. All detours will be posted.

LOCATION: State Route 17 (Brookpark Rd.), State Route 252 (Columbia Rd.) and Butternut Ridge Rd., in North Olmsted.

ESTIMATED START DATE: March 2020

PROJECT ID: 95109ESTIMATED COST: $3,871,950

ESTIMATED COMPLETION DATE: July 2021

DESCRIPTION: Traffic signal upgrade along State Route 17 (Brookpark Rd.), State Route 252 (Great Northern Blvd.) and Butternut Ridge Rd. within the city of North Olmsted.IMPACT: Various lane restrictions and flagging operations during off-peak hours.

MAP 27MAP 27 MAP 28MAP 28

ODOT DISTRICT 12 | 2018 CONSTRUCTION GUIDEODOT District 12 2020 Construction ProgramODOT District 12 2020 Construction Program

LOCAL LET PROJECTSCuyahoga County 18

Page 20: 2020 Construction Program · and replace the bridge decks on the I-480 bridge (Valley View Bridge) over the Cuyahoga River Valley in Village of Valley View and city of Independence

LOCATION: State Route 43 (Miles Road) in Cleveland.

ESTIMATED START DATE: April 2020

PROJECT ID: 85360

ESTIMATED COST: $7,314,918

ESTIMATED COMPLETION DATE:October 2020

DESCRIPTION: Resurface SR 43 (Miles Rd.) between the just west of Ingleside Rd. and SR 14 (Broadway Ave.) The project also includes the addition of two way left turn lane and bike lanes.

IMPACT: SR 43 (Miles Rd.) between Lee Rd. and E. 131 St. will be closed. The detour will be Lee Rd. north to Harvard Rd. west to E.131 St. south. Traffic will be maintained at all other times.

LOCATION: State Route 17 (Brookpark Road) and State Route 94 (State Road) in Cleveland and Parma.

START DATE: April 2019

PROJECT ID: 102054

BID AMOUNT: $2,056,870

ESTIMATED COMPLETION DATE:July 2020

DESCRIPTION: Add a right- turn only lane on westbound Brookpark Rd. at State Rd., lengthen the turn-slot on the I-480 westbound exit ramp to State Rd. and reconfigure travel lanes on State Rd. between Brookpark Rd. and Ralph and Burger avenues in the cities of Cleveland and Parma.

IMPACT: SR 94 (State Rd.) northbound will be restricted to two lanes – except for the bridge over I-480. Traffic shifts on I-480 east and westbound exit ramps to State Rd. and off-peak lane closures on State and Brookpark roads.

MAP 29MAP 29 MAP 30MAP 30

ODOT DISTRICT 12 | 2018 CONSTRUCTION GUIDEODOT District 12 2020 Construction ProgramODOT District 12 2020 Construction Program

LOCAL LET PROJECTSCuyahoga County 19

Page 21: 2020 Construction Program · and replace the bridge decks on the I-480 bridge (Valley View Bridge) over the Cuyahoga River Valley in Village of Valley View and city of Independence

LOCATION: State Route 87 (South Woodland Road) in Moreland Hills.

START DATE: August 2019

PROJECT ID: 108127BID AMOUNT: $881,000

ESTIMATED COMPLETION DATE: May 2020

DESCRIPTION: Slope stabilization on SR 87 (South Woodland Rd.) between Chagrin River Rd. and Farwood Dr. in the village of Moreland Hills.

IMPACT: SR 87 (South Woodland Road) is closed between Chagrin River Rd. and Farwood Dr. for the duration of the project. The detour is SR 91(SOM Center Rd.) to US 422 to SR 306 (Chillicothe Rd.).

LOCATION: East 55th St. in Cleveland. ESTIMATED START DATE: March 2020PROJECT ID: 105930

BID AMOUNT: $1,471,986ESTIMATED COMPLETION DATE: September 2020

DESCRIPTION: Pavement repairs and resurfacing on E. 55th St. between Harvard Ave. and Broadway Ave. in the city of Cleveland.IMPACT: Traffic will be maintained.

MAP 31MAP 31 MAP 32MAP 32

ODOT DISTRICT 12 | 2018 CONSTRUCTION GUIDEODOT District 12 2020 Construction ProgramODOT District 12 2020 Construction Program

LOCAL LET PROJECTSCuyahoga County 20

Page 22: 2020 Construction Program · and replace the bridge decks on the I-480 bridge (Valley View Bridge) over the Cuyahoga River Valley in Village of Valley View and city of Independence

LOCATION: Harvard Ave. / East 116th St., Cleveland.

ESTIMATED START DATE: March 2020

PROJECT ID: 106732

ESTIMATED COST: $204,877

ESTIMATED COMPLETION DATE: September 2020

DESCRIPTION: Traffic signal upgrade at the Harvard Ave./ East 116th St. intersection in the city of Cleveland. IMPACT: Various lane restrictions during off-peak hours.

LOCATION: Clark Avenue, in Cleveland.

START DATE: May 2019

PROJECT ID: 104932

BID AMOUNT: $7,346,248

ESTIMATED COMPLETION DATE:October 2020

DESCRIPTION: Resurface and streetscape improvements on Clark Ave. between W. 41st St. and Quigley Ave. in the city of Cleveland. Work in 2020 includes waterline work, streetscape improvements, pavement repairs, and resurfacing.IMPACT: In 2020 Clark Ave. between W. 25th St. and W. 41st St. will close to westbound traffic. Westbound motorists will be detoured W. 25th St. to the I-71 southbound ramp to Fulton Rd. to W. 41st St. and Clark Ave. Eastbound traffic will be maintained. All other times flaggers will maintain traffic.

MAP 33 MAP 34 MAP 33 MAP 34

ODOT DISTRICT 12 | 2018 CONSTRUCTION GUIDEODOT District 12 2020 Construction ProgramODOT District 12 2020 Construction Program

LOCAL LET PROJECTSCuyahoga County 21

Page 23: 2020 Construction Program · and replace the bridge decks on the I-480 bridge (Valley View Bridge) over the Cuyahoga River Valley in Village of Valley View and city of Independence

LOCATION: Huron Road, Prospect Avenue, West 6th Street, West 3rd Street and West 2nd Street in Cleveland.

START DATE: July 2018

PROJECT ID: 95557BID AMOUNT: $13,990,873

ESTIMATED COMPLETION DATE:November 2020

DESCRIPTION: : Repairs to Huron Road, Prospect Ave., West 6th St., West 3rd St. and West 2nd St. bridges over GCRTA station in the city of Cleveland. Work in 2020 includes repairs to Prospect Ave.IMPACT: Prospect Ave. between Superior Ave. and Ontario St. will be restricted to eastbound traffic only. The westbound detour is Huron Rd.

LOCATION: North Coast Harbor in Cleveland.

START DATE: May 2019

PROJECT ID: 80966

BID AMOUNT: $12,299,138

ESTIMATED COMPLETION DATE:October 2020

DESCRIPTION: Construct a pedestrian bridge (North Coast Harbor) from east of Dock 32 to Voinovich Park in the city of Cleveland.

IMPACT: Minor impacts to area near Voinovich Park and boat traffic to the inner harbor marina.

MAP 35MAP 35 MAP 36MAP 36

ODOT DISTRICT 12 | 2018 CONSTRUCTION GUIDEODOT District 12 2020 Construction ProgramODOT District 12 2020 Construction Program

LOCAL LET PROJECTSCuyahoga County 22

Page 24: 2020 Construction Program · and replace the bridge decks on the I-480 bridge (Valley View Bridge) over the Cuyahoga River Valley in Village of Valley View and city of Independence

LOCATION: Interstate 71, Interstate 90, State Route 283 and State Route 237, Cleveland and Village of Bratenahl

ESTIMATED START DATE: June 2020

PROJECT ID: 109249BID AMOUNT: $926,885

ESTIMATED COMPLETION DATE: October 2020

DESCRIPTION: Bridge deck overlays at the following locations: Denison Rd. over I-71 southbound, SR 237 over SR 17 (Brookpark Rd.), Interstate 90 eastbound ramp to SR 283 (E. 55th St.), and U.S. 6 (Superior Ave.) over I-90 in the city of Cleveland and village of Bratenahl.IMPACT: I-71 northbound ramp to Denison Rd. will have various lane restrictions. SR 237 over SR 17 (Brookpark Rd.) will have one lane of traffic maintained in each direction. I-90 eastbound ramp to SR 283 (E. 55th St.) will be closed for 14 days. The detour will be E. 140th St. to SR 283 (E. 55th St.). U.S. 6 (Superior Ave.) over I-90 will have various lane closures.

MAP 37MAP 37

ODOT DISTRICT 12 | 2018 CONSTRUCTION GUIDEODOT District 12 2020 Construction ProgramODOT District 12 2020 Construction Program

LOCAL LET PROJECTSCuyahoga County 23

Page 25: 2020 Construction Program · and replace the bridge decks on the I-480 bridge (Valley View Bridge) over the Cuyahoga River Valley in Village of Valley View and city of Independence

4

5

ODOT DISTRICT 12 | 2018 CONSTRUCTION GUIDEODOT District 12 2020 Construction ProgramODOT District 12 2020 Construction Program

LOCAL LET PROJECTSGeauga County 24

Page 26: 2020 Construction Program · and replace the bridge decks on the I-480 bridge (Valley View Bridge) over the Cuyahoga River Valley in Village of Valley View and city of Independence

LOCATION: State Route 168 (Tavern Rd.) in Troy Township.

ESTIMATED START DATE: June 2020

PROJECT ID: 105003

ESTIMATED COST: $211,901

ESTIMATED COMPLETION DATE:September 2020

DESCRIPTION: Culvert replacement on SR 168 (Tavern Rd.) between Patch Rd. and Mumford Rd. in Troy Township. The project also includes minor widening.

IMPACT: SR 168 (Tavern Rd.) will be closed for 20 days. A detour will be posted.

LOCATION: State Route 608 in Middlefield, Claridon, and Huntsburg townships.

ESTIMATED START DATE: February 2020

PROJECT ID: 99640BID AMOUNT: $283,868

ESTIMATED COMPLETION DATE:October 2020

DESCRIPTION: Resurfacing on SR 608 between just north of Button St. to the Cuyahoga River in Middlefield, Claridon, and Huntsburg townships.

IMPACT: Flaggers will maintain traffic.

MAP 1MAP 1 MAP 2MAP 2

ODOT DISTRICT 12 | 2018 CONSTRUCTION GUIDEODOT District 12 2020 Construction ProgramODOT District 12 2020 Construction Program

LOCAL LET PROJECTSGeauga County 25

Page 27: 2020 Construction Program · and replace the bridge decks on the I-480 bridge (Valley View Bridge) over the Cuyahoga River Valley in Village of Valley View and city of Independence

LOCATION: State Route 306 (Chillicothe Rd.) in Chester and Russell townships.

ESTIMATED START DATE: May 2020

PROJECT ID: 104327

BID AMOUNT: $781,888

ESTIMATED COMPLETION DATE:September 2020

DESCRIPTION: Resurfacing SR 306 (Chillicothe Rd.) between SR 87 (Kinsman Rd.) to U.S. 322 (Mayfield Rd.) in Chester and Russell townships.

IMPACT: Flaggers will maintain traffic.

LOCATION: State Route 306 (Chillicothe Rd.) in Chester Township

ESTIMATED START DATE: May 2020

PROJECT ID: 99678

BID AMOUNT: $799,866

ESTIMATED COMPLETION DATE:October 2020

DESCRIPTION: Resurfacing SR 306 (Chillicothe Rd.) between U.S. 322 (Mayfield Rd.) to just north of Sharp Ln in Chester Townships.

IMPACT: Flaggers will maintain traffic.

MAP 3MAP 3 MAP 4MAP 4

ODOT DISTRICT 12 | 2018 CONSTRUCTION GUIDEODOT District 12 2020 Construction ProgramODOT District 12 2020 Construction Program

LOCAL LET PROJECTSGeauga County 26

Page 28: 2020 Construction Program · and replace the bridge decks on the I-480 bridge (Valley View Bridge) over the Cuyahoga River Valley in Village of Valley View and city of Independence

LOCATION: State Route 700 (Claridon-Troy Rd.), Troy Township.

ESTIMATED START DATE: April 2020

PROJECT ID: 85605

BID AMOUNT: $737,652

ESTIMATED COMPLETION DATE:September 2020

DESCRIPTION: Resurfacing SR 700 (Claridon-Troy Rd.) between the Portage County line and US 422 in Troy Township.

IMPACT: Flaggers will maintain traffic.

LOCAL LET PROJECTSGeauga County 27

MAP 5MAP 5

ODOT DISTRICT 12 | 2018 CONSTRUCTION GUIDEODOT District 12 2020 Construction ProgramODOT District 12 2020 Construction Program

Page 29: 2020 Construction Program · and replace the bridge decks on the I-480 bridge (Valley View Bridge) over the Cuyahoga River Valley in Village of Valley View and city of Independence

ODOT DISTRICT 12 | 2018 CONSTRUCTION GUIDEODOT District 12 2020 Construction ProgramODOT District 12 2020 Construction Program

Lake County 28

Page 30: 2020 Construction Program · and replace the bridge decks on the I-480 bridge (Valley View Bridge) over the Cuyahoga River Valley in Village of Valley View and city of Independence

LOCATION: Interstate 271 in Willoughby Hills.

ESTIMATED START DATE: Spring 2020

PROJECT ID: 99788

BID AMOUNT: $11,910,717

ESTIMATED COMPLETION DATE: September 2021

DESCRIPTION: Replace the ramp from I-271 northbound to I-90 westbound and replace two bridges on I-271 between Eddy Rd. and I-90 in Willoughby Hills.IMPACT: The I-271 northbound express lanes just north of Highland Rd.will be closed during off peak times. The ramp from I-271 northbound to I-90 westbound will be closed for multiple weekends. Detours will be posted. I-271 between Eddy Rd. and I-90 will have various lane restrictions.

LOCATION: Vrooman Road in LeRoy and Perry Townships.

START DATE: August 2018

PROJECT ID: 105029BID AMOUNT: $22,381,228

ESTIMATED COMPLETION DATE: October 2020

DESCRIPTION: Construct a new bridge on Vrooman Rd. over the Grand River; realign the intersection of Vrooman Rd. and SR 84 (S. Ridge Rd.); and the resurfacing of Vrooman Rd. between I-90 and the Grand River in LeRoy and Perry Twps. Work in 2020 will include the bridge driving surface construction and the reconstruction of Vrooman Rd. between I-90 and south of the new bridge.

IMPACT: Vrooman Rd. will be closed between Seeley Rd. and SR 84 (S Ridge Rd.) during the construction of the new bridge. Motorists are detoured via I-90, SR 44 and SR 84. Through October 2020, the intersection of Seeley Rd. and Vrooman Rd. is closed. Seeley Rd. will remain accessible via Paine Rd.

MAP 2MAP 2MAP 1MAP 1

ODOT DISTRICT 12 | 2018 CONSTRUCTION GUIDEODOT District 12 2020 Construction ProgramODOT District 12 2020 Construction Program

LOCAL LET PROJECTSLake County 29

Page 31: 2020 Construction Program · and replace the bridge decks on the I-480 bridge (Valley View Bridge) over the Cuyahoga River Valley in Village of Valley View and city of Independence

LOCATION: State Route 535 in Fairport Harbor and Painesville townships.

ESTIMATED START DATE: March 2020

PROJECT ID: 99657BID AMOUNT: $819,363

ESTIMATED COMPLETION DATE:October 2020

DESCRIPTION: Resurfacing on SR 535 between just north of Windjammer Ct. to U.S. 20 in Fairport Harbor and Painesville townships.

IMPACT: Flaggers will maintain traffic.

LOCATION: State Route 307 in Madison Township.

ESTIMATED START DATE: June 2020

PROJECT ID: 99637

BID AMOUNT: $165,302

ESTIMATED COMPLETION DATE:October 2020

DESCRIPTION: Chip seal SR 307 between SR 528 and Ashtabula County line in Madison Township.

IMPACT: Flaggers will maintain traffic.

MAP 3MAP 3 MAP 4MAP 4

ODOT DISTRICT 12 | 2018 CONSTRUCTION GUIDEODOT District 12 2020 Construction ProgramODOT District 12 2020 Construction Program

LOCAL LET PROJECTSLake County 30

Page 32: 2020 Construction Program · and replace the bridge decks on the I-480 bridge (Valley View Bridge) over the Cuyahoga River Valley in Village of Valley View and city of Independence

Various Routes, Lake County PROJECT I.D.: 98837 – ESTIMATED COST: $410,725Upgrade traffic signals at various locations in Lake county. Traffic will be maintained. Lane closures expected during off-peak hours. Start Date: May 2019/Estimated Completion: May 2020

LOCATION: Stevens Boulevard in Eastlake.

ESTIMATED START DATE: April 2020

PROJECT ID: 105937

BID AMOUNT: $3,066,647

ESTIMATED COMPLETION DATE:October 2020

DESCRIPTION: Resurfacing on Stevens Blvd. from E. 354th St. to SR 91 in the city of Eastlake.

IMPACT: Traffic will be maintained.

LAKE COUNTY MINIMAL IMPACTSLAKE COUNTY MINIMAL IMPACTSMAP 5MAP 5

ODOT DISTRICT 12 | 2018 CONSTRUCTION GUIDEODOT District 12 2020 Construction ProgramODOT District 12 2020 Construction Program

LOCAL LET PROJECTSLake County 31

Page 33: 2020 Construction Program · and replace the bridge decks on the I-480 bridge (Valley View Bridge) over the Cuyahoga River Valley in Village of Valley View and city of Independence

Various Routes, Cuyahoga, Geauga, and Lake Counties - PROJECT I.D.: 111157 – BID AMOUNT: $956,800Guardrail upgrades and replacement on various routes in Cuyahoga, Geauga, and Lake counties. Traffic will be maintained. Lane closures expected during off-peak hours. Start Date: June 2019/ Estimated Complete: June 2020

Various Routes, Cuyahoga, Geauga, and Lake Counties - PROJECT I.D.: 103166 – ESTIMATED COST: $3,946,543Upgrade pavement markings at various locations in Cuyahoga, Lake, and Geauga counties. Traffic will be maintained. Lane closures expected during off-peak hours. Start Date: June 2020/ Estimated Complete: November 2020

Various Routes, Cuyahoga, Geauga, and Lake Counties - PROJECT I.D.: 105690 – BID AMOUNT: $1,200,000Bridge cleaning on 78 structures at various locations in Cuyahoga, Lake, and Geauga counties. Various lane closures during off-peak hours. Estimated Start: June 2020/ Estimated Complete: October 2020

Various Routes, Cuyahoga, Geauga, and Lake Counties - PROJECT I.D.: 103167 – ESTIMATED COST: $355,000Upgrade highway signs at various locations in Cuyahoga, Lake, and Geauga counties. Traffic will be maintained. Lane closures expected during off-peak hours. Estimated Start: May 2020/ Estimated Complete: May 2021

Various Routes, Cuyahoga, Geauga, and Lake Counties - PROJECT I.D.: 103193 – BID AMOUNT: $168,406Traffic signal upgrades at 74 locations in Cuyahoga, Lake, and Geauga counties. Lane closures expected during off-peak hours. Estimated Start: April 2020 / Estimated Complete: August 2020

Various Routes, Cuyahoga and, Geauga Counties - PROJECT I.D.:103164 – BID AMOUNT: $1,400,000Guardrail repair on various routes in Cuyahoga, and Geauga Counties. Traffic will be maintained. Lane closures expected during off-peak hours. Start Date: July 2018/ Estimated Complete: June 2021

Various Routes, Cuyahoga, Geauga, and Lake Counties - PROJECT I.D.: 109530 – BID AMOUNT: $425,989Brush and tree clearing on various corridors in Cuyahoga, Geauga, and Lake, counties. Traffic will be maintained. Lane closures expected during off-peak hours. Start Date: December 2019/ Estimated Complete: April 2020

Various Routes, Cuyahoga, Geauga, and Lake Counties - PROJECT I.D.: 98832 – BID AMOUNT: $1,860,000Guardrail upgrades and replacement on various routes in Cuyahoga, Geauga, and Lake, counties. Traffic will be maintained. Lane closures expected during off-peak hours. Start Date: June 2019/ Estimated Complete: June 2020

LOCAL LET PROJECTSRegional Projects 32

DISTRICT 12 REGIONAL PROJECTSDISTRICT 12 REGIONAL PROJECTS

ODOT DISTRICT 12 | 2018 CONSTRUCTION GUIDEODOT District 12 2020Construction ProgramODOT District 12 2020Construction Program

Page 34: 2020 Construction Program · and replace the bridge decks on the I-480 bridge (Valley View Bridge) over the Cuyahoga River Valley in Village of Valley View and city of Independence

Various Routes, Cuyahoga and Lake Counties - PROJECT I.D.: 98836 – BID AMOUNT: $470,000Upgrade highway signs at various locations in Cuyahoga and Lake counties. Traffic will be maintained. Lane closures expected during off-peak hours. Start Date: June 2019/ Estimated Complete: May 2020

Various Routes, Cuyahoga, Geauga, and Lake Counties - PROJECT I.D.: 103289 – BID AMOUNT: $1,256,452Pavement repairs at various locations in Cuyahoga, Lake, and Geauga counties. Traffic will be maintained. Lane closures expected during off-peak hours. Estimated Start: April 2020/ Estimated Complete: October 2020

Various Routes, Cuyahoga, and Geauga Counties - PROJECT I.D.: 98833 – BID AMOUNT: $1,320,000Upgrade highway lighting at various locations in Cuyahoga and Geauga counties. Traffic will be maintained. Lane closures expected during off-peak hours. Start Date: June 2019/ Estimated Complete: May 2020

Various Routes, Cuyahoga, and Lake Counties - PROJECT I.D.: 99996 – BID AMOUNT: $1,571,340Bridge deck sealing at various locations in Cuyahoga and Lake counties. Traffic will be maintained. Lane closures expected during off-peak hours. Start Date: July 2019/ Estimated Complete: June 2020

Various Routes, Cuyahoga, and Lake Counties - PROJECT I.D.: 99997 – ESTIMATED COST: $2,150,000Bridge deck sealing at various locations in Cuyahoga and Lake counties. Traffic will be maintained. Lane closures expected during off-peak hours. Estimated Start: June 2020/ Estimated Complete: August 2021

Various Routes, Cuyahoga, and Lake Counties - PROJECT I.D.: 111350 – ESTIMATED COST: $300,000Drainage repairs at three locations I-271 and Wilson Millson Rd., SR 2 just east of E. 260th St., and SR 87 at Hemlock Pt. Rd. There will be various lane restrictions. Estimated Start: May 2020/ Estimated Complete: October 2020

DISTRICT 12 REGIONAL PROJECTSDISTRICT 12 REGIONAL PROJECTS

ODOT DISTRICT 12 | 2018 CONSTRUCTION GUIDEODOT District 12 2020 Construction ProgramODOT District 12 2020 Construction Program

LOCAL LET PROJECTSRegional Projects 33

Page 35: 2020 Construction Program · and replace the bridge decks on the I-480 bridge (Valley View Bridge) over the Cuyahoga River Valley in Village of Valley View and city of Independence

ODOT DISTRICT 12 | 2018 CONSTRUCTION GUIDEODOT District 12 2020 Construction ProgramODOT District 12 2020 Construction Program

Project ID Managing Agency Description Projected Cost

89039 County Engineer Repair Highland Rd. bridges over Euclid Creek in the city of Euclid. $14,891,604

80961 County Engineer Reconstruct and widen Royalton Rd. (SR 82) between W. 130th St. and York Rd. in the city of North Royalton. $14,658,156

103631 City of Euclid Pedestrian and landscaping improvements at the intersection of Euclid Ave. (US 20) and W. 260th St. in the city of Euclid. $136,856

100251 County Engineer Resurface Cedar Rd. between Green Rd. and I-271 in the cities of University Heights, South Euclid, Beachwood and Lyndhurst. $4,499,104

87075 County Engineer Construct the Cleveland Towpath Trail between Tremont/Literary Trailhead to Canal Basin Park in the city of Cleveland. $12,000,000

105722 County Engineer Resurface Warrensville Center Road between Broadway Ave. and I-480 in the cities of Bedford and Maple Heights. $3,074,226

105717 County Engineer Resurface Ridge Rd. between Memphis Ave. and Denison Ave. in the cities of Brooklyn and Cleveland. $2,206,780

108258 City of Rocky River Upgrade signals and pavement marking at 13 intersections on Center Ridge Rd. (U.S. 20) in the city of Rocky River. $707,251

105715 County Engineer Resurface Brainard Rd. from Cedar Rd. to Wilson Mills Rd. in the cities of Lyndhurst and Highland Heights. $3,688,332

110487 City of Broadview Heights Install a traffic signal at the intersection of Broadview Rd. (SR 176) and Valley Parkway Dr. in the city of Broadview Heights. $275,000

104509 County Engineer Replace the Memphis Rd. bridge over the CSX Railroad in the city of Brooklyn. $5,475,190

99753 Village of Cuyahoga Heights Construct the third phase of the multi purpose trail between just north of Canal Rd. to just east of E. 71 St. in the village of Cuyahoga Heights. $890,000

105935 City of Shaker Heights Streetscape on Warrensville Center Rd. - which includes constructing a multipurpose path - between Norwood Rd. and Thornton Park in the city of Shaker Heights. $3,000,000

97602 City of Strongsville Signal upgrade along U.S. 42 and SR 82 in the city of Strongsville. $5,651,350

103714 City of Rocky River Safe Routes to School project to improve crossings by adding pedestrian signals and sidewalks in the city of Rocky River. $54,925

Cuyahoga County Local Let ProjectsCuyahoga County Local Let Projects

LOCAL LET PROJECTSLocal Let Projects 34

Page 36: 2020 Construction Program · and replace the bridge decks on the I-480 bridge (Valley View Bridge) over the Cuyahoga River Valley in Village of Valley View and city of Independence

Project ID Managing Agency Description Projected Cost110755 County Engineer Resurface Aquilla Rd. from U.S. 322 (Mayfield Rd.) to Chardon City Limits in Claridon Township. $625,000

109421 County Engineer Guardrail upgrade at various locations in Geauga County. $728,000

109426 County Engineer Pavement marking upgrades at various locations in Geauga County. $242,000

Project ID Managing Agency Description Projected Cost

96947 City of Broadview Heights Widen SR 82 (Royalton Rd.) between SR 176 (Broadview Rd.) and Treeworth Blvd. in the city of Broadview Heights. $9,668,574

96956 County Engineer Rehabilitate the North Main Street Bridge over the Chagrin River in the village of Chagrin Falls. $3,600,000

106826 City of Broadview Heights Add a left turn lane to SR 176 (Broadview Rd.) at the Oakes Rd. intersection in the city of Broadview Heights. $450,000

105720 County Engineer Resurface West 130th St. between Bagley Rd. and Snow Rd. in the cities of Brook Park, Middleburg Heights, Parma and Parma Heights. $6,993,700

80986 Cleveland-Cuyahoga County Port Authority

Reconstruction of the general cargo facility main gate and construction access road improvements at the Cleveland-Cuyahoga County Port Authority in the city of Cleveland. $2,047,500

Project ID Managing Agency Description Projected Cost91829 Lake County Port Authority Erosion protection at Stanton Park along the Lake Erie shoreline in Madison Township. $464,545

101587 County Engineer Replace the Waite Hill Rd. bridge over the Chagrin River in the village of Waite Hill. $2,029,000

105938 City of Mentor Resurface Tyler Blvd. between SR 615 and Heisley Rd. in the city of Mentor. $1,195,355

109310 City of Willoughby Reconstruct Erie St. between the Norfolk Southern RR and CSX RR. The project also includes sidewalk and curb work in the city of Willoughby. $587,372

110399 City of Mentor Build bicycle lanes on Headlands Rd. between Jordan Rd. east to existing bike lanes in the city of Mentor. $221,000

105936 County Engineer Rehabilitate and widen Bennett Rd. between U.S. 20 (N. Ridge Rd.) and Lake Rd. in Madison Township. $1,718,413

Cuyahoga County Local Let ProjectsCuyahoga County Local Let Projects

Lake County Local Let ProjectsLake County Local Let Projects

Geauga County Local Let ProjectsGeauga County Local Let Projects

ODOT DISTRICT 12 | 2018 CONSTRUCTION GUIDEODOT District 12 2020 Construction ProgramODOT District 12 2020 Construction Program

LOCAL LET PROJECTSLocal Let Projects 35

Page 37: 2020 Construction Program · and replace the bridge decks on the I-480 bridge (Valley View Bridge) over the Cuyahoga River Valley in Village of Valley View and city of Independence

For more information please contact:Brent Kovacs, Public Information Officer, (216) 584-2006

[email protected]

Like us on Facebook: Follow us on Twitter: Statewide Traffic Information: www.facebook.com/District12Cleveland www.twitter.com/ODOT_Cleveland www.OHGO.com

For general information, call (216) 581-2100 or visit District 12’s website at: www.transportation.ohio.gov/dist12

Page 38: 2020 Construction Program · and replace the bridge decks on the I-480 bridge (Valley View Bridge) over the Cuyahoga River Valley in Village of Valley View and city of Independence

Printed January 2020