2
LNG Carrier:Visiting LNG carriers will berth
along side on the starboard side.
Crib Point Jetty: Berth 2
Crib Point Jetty: Berth 2
3
Berth 2:AGL LNG Import
FSRU
The Gas Import Jetty Works would comprise of:
1. Continuous mooring of an FSRU at Berth 2 of the existing Crib Point Jetty to store LNG and regasify LNG into natural gas using the onboard regasification unit.PoHDA will remediate and upgrade the jetty facilties
The Esplanade
1
Pierhead and Jetty works:
PoHDA
Crib Point Jetty
Service Platform
Mooring Dolphins
Former Refinery Site
4
2. Jetty Infrastructure on the Crib Point Jetty including marine loading arms (MLAs) that would connect to the FSRU and gas piping installed on the Crib Point Jetty, to transfer the gas from the FSRU to the Crib Point Receiving Facility
Gas Piping 2
Gas Piping
MLA (Mounted on
Pierhead)
The Esplanade
2
Former Refinery Site
5
The Gas Import Jetty Works would comprise of:
3. Crib Point Receiving Facility, including gas metering, odorant injection and nitrogen injection– the Crib Point Receiving Facility would be located on land adjacent to the Crib Point Jetty.
AGLCrib Point
Receiving Facility
3
The Esplanade
Former Refinery Site
6
The Project would cohabitate with existing users of the Port Facilities.
United Petroleum utilises Berth 1 for petrol and diesel import.
Offshore pipeline installers occasionally weld pipeline sections on the refinery site before winding on to vessels berthed at Berth 3.
United PetroleumOnshore facilities
Berth 1:United Petroleum
Berth 3:3rd party
users
Berth 3Pipe-load easement
The Esplanade
Former Refinery Site
Regasification Unit
In Open Loop mode, continuous
seawater flow is used as a heat
source to regasify the liquefied
natural gas (LNG) stored onboard
the FSRU. When the LNG is in its
gaseous state, it is transported from
the regasification unit to the MLAs
and flows through the jetty gas
piping to the Crib Point onshore
receiving facility where odorant and
nitrogen (if required) are injected,
and the gas is metered.
7
Pierhead &
Regasification UnitRegasification Unit
Pierhead
Associated infrastructure that will
be installed on the deck
pierhead, include:
− hydraulic gangway tower to
access the FSRU
− Fire system, which can be
remotely operated
− contaminated spill
containment equipment
− lighting and CCTV security
system.
8
Pierhead
Fire Fighting System
Hydraulic System for MLA Actuation
Pierhead &
Regasification Unit
Gangway location
Marine Loading Arms
MLAs would be installed from
the water side using a floating
barge with a crane.
The MLAs would be fixed to the
pierhead deck.
The MLAs would be connected to
gas piping which would be lifted
into place from the barge and
installed.
9
Piping to onshore Receiving Facility
Marine Loading Arms (MLAs)
Pierhead &
Regasification Unit
10
Gas Pipeline from Jetty
(underground)
Gas Pipeline from Jetty
Crib Point Receiving Facility
No. Equipment
1 Gas Piping from Jetty and Culvert
2
3
4
5
6
7
8
9
10
11
12
1
11
Crib Point Receiving Facility
No. Equipment
1 Gas Piping from Jetty and Culvert
2 Nitrogen Offloading bay
3 Nitrogen Tank and Pumps
4 Nitrogen Vaporisers
5
6
7
8
9
10
11
12
2
3
4
1
12
Crib Point Receiving Facility
No. Equipment
1 Gas Piping from Jetty and Culvert
2 Nitrogen Offloading bay
3 Nitrogen Tank and Pumps
4 Nitrogen Vaporisers
5 Surface Water Treatment
6 Switchgear and Utilities
7 Odourant Offloading and Storage
8 Odourisation and HP Gas Meter
9
10
11
12
2
3
45
6
78
1
13
Crib Point Receiving Facility
No. Equipment
1 Gas Piping from Jetty and Culvert
2 Nitrogen Offloading bay
3 Nitrogen Tank and Pumps
4 Nitrogen Vaporisers
5 Surface Water Treatment
6 Switchgear and Utilities
7 Odourant Offloading and Storage
8 Odourisation and HP Gas Meter
9 Firewater Tank and pumps
10 Workshop
11 Gas Chromatograph
12 APA PIG Launcher and dayroom
2
3
4
5
67
9
11
10
12
8
1
Vessel and Regasification Systems
• FSRU designed and operated to stringent international standards
• Site specific Safety Studies• FSRU has Safety Management • Class Notation for the vessel and
regasification unit issued by a globally recognised classification society (DNV GL)
• A Safety Case would be developed consistent with the requirements of a Major Hazard Facility
• Regulatory oversight would be provided by AMSA and WorkSafe Victoria 14
FSRU – Safety DemonstrationFSRU & LNGC in Port Area
Regulatory Body Key Compliance Requirements
Australian Maritime Safety Authority (AMSA)
Aviation and Maritime Security (AMS)
PoHDA
WorkSafe Victoria
ESV
Key Compliance RequirementsRegulatory Body
Jetty Infrastructure & Crib Point Receiving Facility
• Gas Safety Act 1997• Gas Industry Act 2001• Gas Safety (Safety Case) Regulations 2018• Occupational Health and Safety Act 2004• Occupational Health and Safety Regulations 2017• Port of Hastings Operating Handbook• Port Management Act 1995
PoHDA and Port of Hastings Harbour Master
Victorian Regional Channels Authority
WorkSafe Victoria
• Navigation Act 2012• Marine Orders 17, 32, 41 & 58• Marine Safety (DCV) National Law Act 2012• Marine Transport and Offshore Facilities Security Act 2003• Occupational Health and Safety (Maritime Industry) Act 1993• Maritime Transport and Offshore Facilities Security Act 2003• Port Management Act 1995• Marine Safety Act 2010• Harbour Master’s Directions• Port of Hastings Port Operating Handbook• Safety Case consistent with Major Hazard Facilities requirements under
the Occupational Health and Safety Regulations 2017
15
CPRF – Safety Demonstration
Jetty Infrastructure and Crib Point
Receiving Facility
• Designed and operated to Australian and International standards
• Safety, hazard and risk studies conducted• A Safety case would be developed for
approval• Regulatory oversight would be provided by
Energy Safe Victoria