0 U.S. Department of Transportation

Federal Transit Administration

2021 Virtual Transit Asset Management

Roundtable Day 3: TAM & Technology

June 24, 2021

Page 2: 2021 Vritual Transit Asset Management Roundtable

Teams Logistics

• There is no private chat pod.• Keep yourself muted unless you’re speaking.• Use the “raise hand” feature to speak during

the Q&A.

2

If anyone is in attendance but hasn’t registered, email [email protected]

with your name, title, and agency.

Page 3: 2021 Vritual Transit Asset Management Roundtable

0 U.S. Department of Transportation

Federal Transit Administration

Technology Advancements in Transit Asset Management (TAM)

June 24, 2021

Mohammed Yousuf Director, Office of Infrastructure, Safety & Asset Innovation/TRI.

Page 4: 2021 Vritual Transit Asset Management Roundtable

Courtesy: Traffic Technology Today

Transit Asset Management (TAM)Improves

Asset inventory & condition assessment

Reporting performance targets

Life cycle costs,maintenance and operations

4

Page 5: 2021 Vritual Transit Asset Management Roundtable

Real-Time Transit Infrastructure and Rolling Stock Condition Assessment

Program

• Explore advanced technologies for real-time condition assessment of transit capital and facilities.

• Assess, detect, monitor and track deficiencies and defects of rail systems in real-time.

• Evaluate the cost-effectiveness and practicality of proposed solutions.

Research Program

Goals:

5

Page 6: 2021 Vritual Transit Asset Management Roundtable

6

Reimagining TAM through Advanced Technologies

Artificial Intelligence

– smart sensors to track the

health of rail tracks

Advanced scanning technologies - light detection and ranging technologies, optical

imaging, and overhead catenary automated scanning to assess track conditions in

real-time

Digital Twins Simulation and Modeling – real-time infrastructure

maintenance through virtual representation

of assets and predictive modeling

6

Page 7: 2021 Vritual Transit Asset Management Roundtable

Projects Selected Applicants Project Title Proposed Scalable

Funding

Board of Trustees of the University of Illinois

Real Time Track and Vehicle Health Monitoring through Rail-mounted Load Quantification Smart Sensors

$395,000

Maryland MTA Mobile LiDAR: Modernizing Condition Assessments An innovative approach to data acquisition

$150,000

Regional Transportation Commission of Southern Nevada

The Digital Twin Paradigm for Real-Time Transit Infrastructure Maintenance

$131,661

Dallas Area Rapid Transit Authority

DART Real-time Infrastructure and Asset Digital Condition Assessment Project

$184,000

Southeastern Pennsylvania Transportation Authority SEPTA Regional Rail Automated Wire Scan

$170,000

Utah Transit Authority Polarized Infrared and Optical Imaging System for Transit Infrastructure Condition Assessment

$338,155

Total Funding Amount $1,368,816

7

Page 8: 2021 Vritual Transit Asset Management Roundtable

Contact Information

Samuel Yimer Mohammed Yousuf General Engineer, Office of Director, Office of Infrastructure, Infrastructure, Safety and Asset Safety and Asset Innovation Innovation FTA Research, Demonstration and FTA Research, Demonstration Innovation and Innovation Phone: 202-366-6140 Phone:-202-366-1321 Email: [email protected] Email: [email protected]

8

Page 9: 2021 Vritual Transit Asset Management Roundtable

UTA METRO

~ King County

METRO

Dan Hofer and Susan Mwangi Hal Johnson and Jeff Hiott Utah Transit Authority Capital Metro

Danny Ilioiui King County Metro

9

Page 10: 2021 Vritual Transit Asset Management Roundtable

Real-Time Transit Infrastructure and Rolling Stock Condition Assessment Demonstration Program. Infrared scanning or rail

Dan Hofer and Hal Johnson June 2021

Page 11: 2021 Vritual Transit Asset Management Roundtable

About UTA

• Population – approx. 2.3million

• Linear Geographic Area –108 miles long by 50 mileswide

• Currently Employs -approx. 2400

• Operate – 700+ Buses, 450+Vans, approx. 120 LRVs, andapprox. 70 Commuter RailVehicles

Page 12: 2021 Vritual Transit Asset Management Roundtable

UTA :@: RAIL

! allllllllilD TRAXIJJtl.ftlOI «i> WIMlrrf'rq allllllllllD TRAl(ll11Hi'II~ Q 0.,,P•~

allllllllllD TRAXr-.tN"IOl

N " 0,,. -

'"""-"' allllllllllD ~?50

!IOl-74J-l8&!(Rll)E-ur,1,1-.,,,,, O D GJ -

Q famq:tm

" """""' Arena T~Squa-!

West Valley City

Q FMOnPIDWest

WestJord.,

....

UTA Rail System

• 90 miles of commuter rail

• 50 miles of light rail

• System built between 1999 and 2013

Page 13: 2021 Vritual Transit Asset Management Roundtable

P<>rfnrniance Measurements

,ration Forecasting

RM ::>ecdy Curves

Cond1t1nn R~ting Appl1cat1o'l

PM Pr0or~mc:

lnventorv

TAM at UTA

Budget Projections

Condition Rating Application

Deterioration Forecasting •Tied to TERM Decay Curves

Performance Measurements

Risk Evaluation

PM Programs

Inventory

• Condition Rating Application and Deterioration Forecasting are most difficult

• Time-consuming • Often difficult to justify on

a large scale

Page 14: 2021 Vritual Transit Asset Management Roundtable

__ ,_l1illf!D,so 3959 11illffg,~

Benefits of this Project

Provides key benefits: • Third-party verification • Severity of defects

• internal • Advanced detection • Precise location id • Quick data processing &

turnaround time

Field Verification Location ID Defect ID Data

Collection

Page 15: 2021 Vritual Transit Asset Management Roundtable

Polarized Infrared & Optical Imaging System for Transit Infrastructure Condition

Assessment: WHAT The project is a collaboration/public private partnership between UTA, the University of Utah and Autofill

• The project will develop and demonstrate a system that can identify, quantify, and monitor both the internal and external defects of rail track and tie structures with the potential for high-speed full track section inspection.

Page 16: 2021 Vritual Transit Asset Management Roundtable

·~-;~~ ~

Polarized Infrared & Optical Imaging System for Transit Infrastructure Condition

Assessment: HOW • The system will employ a polarized

infrared camera and a polarized optical camera.

• The cameras are envisioned to be mounted on an inspection vehicles or revenue service train and provide early warning and long-term monitoring of track and tie conditions.

Page 17: 2021 Vritual Transit Asset Management Roundtable

H,e~ -ng S01urci _1

~ - Qlft

. it:'"0 11

- . - . -.

T ~Ir~ I 110[1

Infrared scanning

• Infrared scanning can see hiddenflaws by detecting uneven heating

Page 18: 2021 Vritual Transit Asset Management Roundtable

flaw detection with IR & o tical images

. Solar irradiance ·ww

induced daily rail : 1

temperature variation ----- -------·--- ------.. .. Field rail temperature data

Ambient IR & optical noises

~

Field of view for rail track & tie inspection

Figure 1- Concept of fully developed system for in-motion rail track and tie inspection

How it works

Page 19: 2021 Vritual Transit Asset Management Roundtable

Project Benefits

Improved safety for UTA’s rail system to avoid catastrophic failures.Current detection practices require visual or sounding methods which can take days. The proposed system may be able to scan the whole system at operating speed.The system will employ a polarized infrared camera and a polarized optical camera which can detect both internal and external defects.The cameras are envisioned to be mounted on an inspection vehicles or revenue service train and provide early warning and long-term monitoring of track and tie conditions.National applicability.

Page 20: 2021 Vritual Transit Asset Management Roundtable

Additional Notes

2.

Both the University of Utah and Autofill are providing financial match for the project.The University of Utah team is led by Xuan (Peter)Zhu, Ph.D., who is an assistant professor in Civil Engineering. Dr. Zhu serves as the lead on the project.Autofill are a private company based in the Netherlands. They are highly experienced in: 1. ComputerVision,

Artificial Intelligence 3. Convolutional Neural Networks and 4. Edge computing.The CEO and CTO have extensive experience and have worked with Homeland Security, The London Underground and major telecom companies.

Page 21: 2021 Vritual Transit Asset Management Roundtable

TAM & TECHNOLOGY

Susan Mwangi Manager, Transit Asset Management & Inventory

Jeff Hiott VP, Imagination, Research & Industry Benchmarking

21

Page 22: 2021 Vritual Transit Asset Management Roundtable

I AMETRO

CapMetro Overview

• Austin, Texas metro region (544 sq. mile service area)

• Population served: 1,300,000+

• 83 bus routes, 14 high-frequency routes, 1 regional rail line

• 368 MetroBuses, 12 Battery Electric Buses (BEBs), 55 MetroRapid vehicles, 10 diesel electric trains, 257 van pool vehicles, 213 paratransit/On-Demand Microtransit vehicles

• 2,300 bus stops, 17 Park & Rides/transit centers, 9 commuter rail stations, 162 miles of commuter and freight rail

• MetroBike bikeshare with E-bike expansion* 22

Page 23: 2021 Vritual Transit Asset Management Roundtable

I AMETRO

Sustainability and Climate Initiatives

Agency Strategic Goal: Sustainability

Sustainability Vision Plan & Climate Action Plan (in development) • Plan focuses on clear, integrated and actionable steps towards

the goal of becoming the one of the first carbon-neutral transit agency in the country

Focusing on Renewables • All facilities currently powered by 100% renewable energy

sources • More than 270 public facility amenities are solar powered

(shelter lights, security cameras, electronic signs, displays)

23

Page 24: 2021 Vritual Transit Asset Management Roundtable

I AMETRO

Zero Emission Bus Fleet Transition

Highlighted Strategies • Fleet Electrification:

• Zero Emission Vehicle Transition Plan(underway)

• 200 battery electric buses by 2025 (12 inservice)launched with LoNo funding 2019/2020

• 100% zero emission fleet by 2035• North Ops Electric Bus Depot is “E-ready” for

200 buses (Opened Sept. 2020)• Zero emission rail and paratransit fleets

integrated into Project Connect systemexpansion

24

Page 25: 2021 Vritual Transit Asset Management Roundtable

I AMETRO

Proterra (6) 40’ buses with Proterra chargers

Chargers

Dispensers

25

Page 26: 2021 Vritual Transit Asset Management Roundtable

I AMETRO

New Flyer 40’ (4) & 60’ (2) with Siemens Chargers

Charger Dispenser

26

Page 27: 2021 Vritual Transit Asset Management Roundtable

I AMETRO

Future On Route Charging for MetroRapid BRT lines

• End of Line (EOL) for revenue service

• 4 fast chargers • Buses with pantograph

down & plug in

27

Page 28: 2021 Vritual Transit Asset Management Roundtable

I AMETRO

Project Connect

• Orange Line Light Rail • 21 miles • 22 stations

• Blue Line Light Rail • 15 miles • 20 stations

• Green Line Regional Rail • 27 miles • 6 stations

• BRT (all lines) • 74 miles • 193 stations • Approximately 65 new zero emission buses

28

Page 29: 2021 Vritual Transit Asset Management Roundtable

I AMETRO

Lifecycle Planning

• Range: Battery Electric bus vs Diesel bus • Replacement schedule ratio

• CapMetro Useful Life (as part of our LRFP) • Diesel buses - 14 years • BEB - 12 years • Chargers - 20 years

• Consultant • Data support and analyses to help inform decisions • Planning, operations, and maintenance • Charging strategies – on-route vs depot or both

29

Page 30: 2021 Vritual Transit Asset Management Roundtable

I AMETRO

Facility Modifications for New Fleet

• Modernize and expanded existing garage with electric infrastructure • Designed for future expansion without clear answers to the unknowns: When? How many? What kind of electric buses to buy

plug in, overhead, wireless ??

30

Page 31: 2021 Vritual Transit Asset Management Roundtable

I AMETRO

North Operations Bus Garage Expansion Project

Bus Yard Expansion Project

Phase I: Serta Building Demolition

Phase II: Build Bus Yard Expansion

Phase III: Electric Infrastructure for First 12 Battery Electric Buses

Future Phases: Add Electric Infrastructure in Phases as Additional Buses are Delivered

Serta Mattress Factory Building

31

Page 32: 2021 Vritual Transit Asset Management Roundtable

I AMETRO

Current Buses and Chargers

• 12 electric buses (BEBs)

• 9 plug in chargers

• 3 duplex chargers (cascade)

32

Page 33: 2021 Vritual Transit Asset Management Roundtable

I AMETRO

~ ----c

I ~ -----.:::: ~

. ~ --..,; 1 . ~ .

. __ , _ _,- I ~ ~~:.,,-

~/

/ /

N. Ops Yard

• Conduit for future wiring

• All underground for flexibility

• 8 arrays & charger spines

Austin Energy equipment & access road

Diesel yard

Electric yard

33

Page 34: 2021 Vritual Transit Asset Management Roundtable

I AMETRO

Power Equipment

• 2 AE service drops

• 8 AE transformer

• 8 AE meter

• 2 AE switchgear

• 8 CapMetro switchboard

• Second feed at 50%, adds resiliency

34

Page 35: 2021 Vritual Transit Asset Management Roundtable

t \ \ v:..,

J

i I'

\ i i

'--

N. Ops Yard

• ~175 electric

• Space constraints to expand

35

Page 36: 2021 Vritual Transit Asset Management Roundtable

I AMETRO

Future: Solar Canopy with Pantographs

• Shade & solar panels

• Connect to AE grid

• Connect to admin building

• Flatten peak demand curve

• Solar on buildings?

• Battery storage?

36

Page 37: 2021 Vritual Transit Asset Management Roundtable

I AMETRO

Next Steps/Challenges

• Complete a Facility Master Plan (underway) • Manage TAMP to maintain current assets in an SGR while rapidly expanding the

system with new assets to add to our inventory • Update procurement process with asset management integration • Remain committed to innovation • Train staff to manage and maintain assets, especially new technologies

37

Page 38: 2021 Vritual Transit Asset Management Roundtable

THANK YOU!

Page 39: 2021 Vritual Transit Asset Management Roundtable

King County

M'ETRO Moving forw,ird together

King County Metro Battery Electric Bus

Program

Danny ILIOIU Zero-Emissions Fleet / Program Manager

Page 40: 2021 Vritual Transit Asset Management Roundtable

l•fl n King County

M'ETIRO Moving forward together

King County Metro

1600 Buses Total (100% of the fleet is Diesel-Electric Hybrid, ETB or BEB), in addition we operate Ferry, Light Rail. Streetcar, Access, Van Pool…

• 185 Zero-Emissions Buses

o 174 Electric Trolley Buses (ETBs or Trolleys)

o 11 Fast Charge 40’ Battery Electric Buses (BEBs)

• 10 Extended-Range 40’ & 60’ Battery Electric Buses (2018-2020) – Leased/Test Completed/Buses returned

o 40 Extended-Range BEBs (2021-2022)

o 260 BEBs (2024-2027)

o 30 ETBs (2027)

Page 41: 2021 Vritual Transit Asset Management Roundtable

l•fl n King County

M'ETIRO Moving forward together

Zero-Emissions by 2040 (or 2035) ?

► Eight to Ten Bases ► Layover Chargers ► Align with ESJ plan ► Eliminate local emissions ► 70% of work blocks can be satisfied by

current BEB technology ► Mix of Trolley and BEB to reach zero-

emissions goals ► Expand trolley system where the TCO

supports

Page 42: 2021 Vritual Transit Asset Management Roundtable

1040 Hectrific;i tlon Vs Capacity

, ...

"'

~ krt:• r1m BIHi! Elactrlf»d ;;!Ol3(1'M)l•t>As.Ext•nuon 06 5,ou.tbe.i~ :§OijtJl IA:iE'YilT-tl Cif)~cy~e~Jon Due-To lflmlm. ActJtc ,l.>~tt!fl~n 5a!,rth Anne.:-: l!ia51!" El11ct,ifk)d Far 15lo1;1U'a,p1; :i:on L06C ,etlecu IN! fluiml:lil!for tnsrt1n1 smioM INCI.U0(5 SOUNDTllAi!iSITfllIT @ ZOJS Con~ TO Dectdi:.80 IIMR,;J

- • LOIC

I J -,,,

x,~1 ID1II »J1 .r. »a .,.... zns lO ""

l•fl n King County

M'ETIRO Moving forward together

l ! i

/ / .,

""

,,

""'

,, ,,

""

....

...

l 035 rlr>ernficatlan Vs Capacity -lnl~tm Bise l1ertllfied 20~:i fr11rlf1) As. Eruns,an Of ~ulh &ne Sou h Ball!! V■rd C■p■rlty l!;fttoctlorr De ti> lntenm ~t.,g lt.!l ~enslan. South-N1nu~El111cntf11dcFor l!iS 81.W1$J0}7

LOSCn&:ls 1he~t 1Kofch~rMstaliol'I, INt'l liOU MlilJHD J ftAll511 run 8 :lots CCt(lff1:witri lo 81:«.it t.aO ..... I

- ----

/

◄ ,. ,,,

., ,,,

1

1

I )_ -----I .,, .,,

Zero-Emissions by 2040 (or 2035) ?

Page 43: 2021 Vritual Transit Asset Management Roundtable

l•fl n King County

M'ETIRO Moving forward together

Eastgate Park & Ride

Page 44: 2021 Vritual Transit Asset Management Roundtable

ti King County

M'ETIRO Mo . ·lling forward · · together

South Base Test Facility

Page 45: 2021 Vritual Transit Asset Management Roundtable

I

--=~~(--: ~ -----

I

l•fl n King County

M·ETIRO Moving forward together

~ r: ; :;, ~/ I: / /i : ~ I , t

)11111 ..... '/ / r, .1! -- ---u ,:

- ... --~ ;: I ;r I - " ,: ,,

I - '! ,, ,,

I - r - I -- - ti ,, t

' E I I ~ -;J E::+ I I ~ ,, , ,

I I _-,;:- . _j_ I u; .J

_J 11

I

Interim Base

Page 46: 2021 Vritual Transit Asset Management Roundtable

l•fl n King County

M'ETIRO 60% SUBMITTAL

SCNS

Moving forward together

Layover Charging (En-Route)

Page 47: 2021 Vritual Transit Asset Management Roundtable

l•fl n King County

M'ETIRO Moving forward together

Programmatic Considerations

• Design/Bid/Build vs. Progressive Design Build – alternative Construction delivery methods

• Charger and Bus work with each other? Commissioning • J3105-1, 1772, OCPP, Open ADR compliant?

• On Base and Layover (aka on route) charging Charging • Smart Charging

• Clean Energy/Green Power Electricity - Utility • Rate structure – Seattle City Light pilot tariff

Operations • Employee Training

Page 48: 2021 Vritual Transit Asset Management Roundtable

Costs -varying estimates

Permitting timing

Commissioning- Anticipated

Manufacturer readiness

Space constraints

Operational Reliability and Support

l•fl n King County

M'ETIRO Moving forward together

Some Challenges

Page 49: 2021 Vritual Transit Asset Management Roundtable

l•fl n King County

M'ETIRO Moving forward together

Agency Culture - groups to involve, when and how

Project Delivery Methods

Utility Partnerships- SCL and PSE

Training - Infrastructure Maintenance, Bus Operations, Service Planning

Manufacturer readiness

South Base Campus (Interim, Annex) and Strategy for future locations

Lessons Learned

Page 50: 2021 Vritual Transit Asset Management Roundtable

l•fl n King County

M'ETIRO Moving forward together

King County Metro

Questions?