Upload
th-nattapong
View
133
Download
5
Tags:
Embed Size (px)
DESCRIPTION
20376044_EN_DE_130328
Citation preview
280313 enGB 203 760 44 714 IS 813
43456644.eps
Technical dataDemag DR-Pro rope hoistDouble-rail crab with EZ2DR 20 twin hoist
2 2037
6044
_enG
B.in
dd/2
8031
3
© D
emag
Cra
nes
& C
ompo
nent
s G
mbH
Design overview 3
Selection criteria 4
Selection table 5Hook paths [m] 5Information on the control system of EZ2DR 20 twin hoist crabs 5
Pole-changing hoist drives 6DR 20 motor data 6
Inverter operation 7DR 20 motor data 8Motor key data for inverter-controlled cross-travel drives and wheel diameter 9
EZ2DR 20 twin hoist double-rail crab - H20 - 6/2 10Dimension drawing 10
EZ2DR 20 twin hoist double-rail crab - 6/2 12Dimensions 12Wheel loads 13
EZ2DR 20 twin hoist double-rail crab - 8/2 14Dimensions 14Wheel loads 15
EZ2DR 20 twin hoist double-rail crab - 10/2 16Dimensions 16Wheel loads 17
Contents
Manufacturer Demag Cranes & Components GmbHPO Box 67 · 58286 Wetter (Germany)Telephone +49 (0)2335 92-0 · Telefax +49 (0)2335 92-7676www.demagcranes.com
32037
6044
_enG
B.in
dd/2
8031
3
© D
emag
Cra
nes
& C
ompo
nent
s G
mbH
43456644.eps
Bottom block
Crab frame
Hoist motor
Wheel block
Design overview
Explanation of size designations/type assignment
1) Code 00 Prepared for electric equipment provided by the customer. Code 01 EZDR with internal electric equipment for operation on a crane. Crane bridge enclosure and DSE-10R control pendant with control cable
included. Code 03 As for code 01 but control via a DRC radio control system.
E Z 2DR- 20 - 10 8/2 10,9 Z - 0,5 - 5 (7) 400 - 01 - 50 - 25 2240 55
Rail head width in [mm]
Track gauge in [mm]
Max. cross-travel speed in [m/min]
Frequency [Hz]
Electric equipment code 1)
Operating voltage [V]
Lifting speed in [m/min]
Motor type: Z = Cylindrical rotor
Hook path in [m]
Reeving
Load capacity in [t]
Range 20
Demag rope hoist
F = StationaryZ = Double-rail crab
E = Electric travel trolley
Hoist motor
Inverter
Inverter
Crab control systemHoist gearbox Travel motor
4 2037
6044
_enG
B.in
dd/2
8031
3
© D
emag
Cra
nes
& C
ompo
nent
s G
mbH
Example SWL 40 tLoad spectrum ‘Medium’ from tableLifting speed 6 m/minCreep lifting speed 1 m/minReeving 8/2Average hook path 3 mNumber of cycles/hour 20Working time/day 8 hoursThe average operating time per working day is estimated or calculated as follows:
The size of the hoist is determined by the load spectrum, average operating time per working day, load capacity and reeving.
SW
L
Operating time
SW
L
Operating time
SW
L
Operating time
Operating time
Very heavy dead load
Small partial loadSmall dead load
Heavy partial loadMedium partial loadMedium dead load
Heavy dead load
SW
L
4 Very heavyHoist units which are usually subject to maximum and almost maximum loads.
3 HeavyHoist units which are usually subject to medium loads but frequently to maximum loads.
2 MediumHoist units which are usually subject to small loads but rather often to maximum loads.
The load spectrum(in most cases estimated) can be evaluated according to the definitions below:
1 LightHoist units which are usually subject to very small loads and in exceptional cases only to maximum loads.
Selection criteria
1. What are the operating conditions?2. What is the specified safe working load?3. To what height must the load be lifted?4. What is the required lifting speed?
5. Do the loads need to be lifted and lowered with great accuracy?
6. Is horizontal load travel necessary?7. How is the hoist to be controlled?
For the medium load spectrum and an average daily operating time of 2,7 hours, the table shows group 2 m. For a load capacity of 40 t and 8/2 rope reeving, the table indicates hoist size DR 20 - 40.
The group is determined by the load spectrum and operating time.
Load spectrum Average operating time per working day in hours
1 Light 2–4 4–8 8–16 over 16
2 Medium 1–2 2–4 4–8 8-16
3 Heavy 0,5–1 1–2 2–4 4-8
4 Very heavy 0,25–0,5 0,5–1 1–2 2-4
Group of mechanisms to FEM 1Am 2m 3m 4m
ISO M4 M5 M6 M7
Group of mechanisms to FEM/ISO 1Am/M4 2m/M5 3m/M6 4m/M7
Reeving arrangement Load capacity in t
6/2 40 32 25 20
8/2 50 40 32 25
10/2 63 50 40 —
Operating time/day =
2 · average hook path · no. of cycles/hour · working time/day =
60 · lifting speed
Operating time/day =
2 · 3 · 20 · 8= 2,7 hours
60 · 6
The warm air rising from the hoist inverter braking resistors must be considered for project-engineering.If a hoist inverter is used, a minimum distance of 100 mm must be maintained from the top edge of the hoist unit.
52037
6044
_enG
B.in
dd/2
8031
3
© D
emag
Cra
nes
& C
ompo
nent
s G
mbH
Selection table
1) Vmax / Vmin 2) Vmin - Vmax (Vpartial) (Vpartial) in partial load range
Drum lengthReeving
6/2 8/2 10/2
H22 14,5 10,9 —
H34 23,1 17,3 13,8
H52 — 26 20,8
Hook paths [m]
Range Group of mechanisms
FEM / ISO
Load capacity[ t ]
Lifting speed [m/min]
DR 20
6/2 reeving
Pole-changing motor 1) Frequency-controlled motor 2)
2/12 2/12 2/12 / 4+FI 4+FI1Am / M4 40
4/0,7 8/1,3 0,7–6,7 (10) 0,7–10,7 (14,7)2m / M5 32
3m / M6 25
4m / M7 208/2 reeving
1Am / M4 50
3/0,5 6/1 0,5–5 (7) 0,5–8 (11)2m / M5 403m / M6 324m / M7 25
10/2 reeving1Am / M4 63
2,4/0,4 4,8/0,8 0,4–4 (5,6) 0,4–6,4 (8,8)2m / M5 503m / M6 40
For controlling a twin hoist crab, a standard processor control system with CAN bus signal transfer is used.
In this case, the control system uses the parameter sets for ‘two-crab mode’, i.e. all safety and monitoring functions are active and the results are safely exchanged via the CAN bus connection.
Two drive variants are provided for the hoist units: stepped hoist drives (pole-changing hoist motors) stepless hoist drives (inverter operation)
The motors are switched on at the same time and operated together. Owing to the motor tolerances, slightly uneven unwinding of the lifting rope from the drum is possible. However, this will be corrected when moving in the opposite direction and also can be deliberately compensated by approaching the upper limit position.Unwanted operating statuses and hazards by overloading are prevented by the following equipment: Limit switches Speed monitoring Overload protection by means of a load measuring pin in the top block
Any other control variants must be designed for individual cases. This also applies to crabs with an auxiliary hoist unit or with a platform.
Please contact our engineering department for these solutions.
Information on the control system of EZ2DR 20 twin hoist crabs
6 2037
6044
_enG
B.in
dd/2
8031
3
© D
emag
Cra
nes
& C
ompo
nent
s G
mbH
Pole-changing hoist drivesMain/creep lifting F6
Motor selection depending on reeving arrangement and SWL
Type Reeving
Group of mechanisms
FEM / ISO
SWL
[t]
Lifting speed2/12-pole 2/12-pole
[m/min] [m/min]
EZ2
DR
20
twin
hoi
st
6/2
1Am / M4 40 4 / 0,7 ZBR 180 A12/2 (40 %) 8 / 1,3 ZBR 200 B12/2 (40 %)
2m / M5 32 4 / 0,7 ZBR 180 A12/2 (40 %) 8 / 1,3 ZBR 200 B12/2 (60 %)
3m / M6 25 4 / 0,7 ZBR 132 A12/2 (60 %) 8 / 1,3 ZBR 200 B12/2 (60 %)
4m / M7 20 4 / 0,7 ZBR 132 A12/2 (60 %) 8 / 1,3 ZBR 200 B12/2 (60 %)
8/2
1Am / M4 50 3 / 0,5 ZBR 180 A12/2 (40 %) 6 / 1 ZBR 200 B12/2 (40 %)
2m / M5 40 3 / 0,5 ZBR 180 A12/2 (40 %) 6 / 1 ZBR 200 B12/2 (60 %)
3m / M6 32 3 / 0,5 ZBR 132 A12/2 (60 %) 6 / 1 ZBR 200 B12/2 (60 %)
4m / M7 25 3 / 0,5 ZBR 132 A12/2 (60 %) 6 / 1 ZBR 200 B12/2 (60 %)
10/2
1Am / M4 63 2,4 / 0,4 ZBR 180 A12/2 (40 %) 4,8 / 0,8 ZBR 200 B12/2 (40 %)
2m / M5 50 2,4 / 0,4 ZBR 180 A12/2 (40 %) 4,8 / 0,8 ZBR 200 B12/2 (60 %)
3m / M6 40 2,4 / 0,4 ZBR 132 A12/2 (60 %) 4,8 / 0,8 ZBR 200 B12/2 (60 %)
DR 20 motor dataDesign is in accordance with the VDE regulations and the design rules of the FEM, to meet the high demands made on electric hoists.
Required supply cable conductor cross-sections and fuse links per crab
DR 20 rangeMains connection delay fuse 1) for
50 Hz Supply lines 2) for 5 % voltage drop ∆U and start-up current IA for 50 Hz
400 V 400 V (∆U 20 V)
Motor size A mm² m
ZBR 132 D 12/2 50 2,5 15
ZBR 180 A 12/2 63 10 45
ZBR 200 B 12/2 125 16 30
Motor key data
Type Number of poles
PN[kW]
CDF%
n [rpm] Starts/h IN
[A]IA
[A]cos φN cos φA
ZBR 132 D 12/2 B14020/40 % CDF
122
1,48,9
2040
4002870
240120
9,618,0
15,0120,0
0,540,89
0,680,85
ZBR 180 A 12/2 B14015/25 % CDF
122
2,213,8
1525
4602905
16080
12,729,0
27,0199,0
0,420,90
0,480,63
ZBR 200 B 12/2 B28015/25 % CDF
122
4,327,2
1525
4602890
16080
24,053,0
48,0310,0
0,400,91
0,460,53
ZBR 200 B 12/2 B28020/40 % CDF
122
3,421,7
2040
4702915
240120
22,043,0
48,0310,0
0,360,90
0,460,53
72037
6044
_enG
B.in
dd/2
8031
3
© D
emag
Cra
nes
& C
ompo
nent
s G
mbH
Motor selection depending on reeving arrangement and SWL
Type Reeving
Group of mechanisms
FEM / ISO
SWL
[t]
Lifting speed2/12 / 4+FI 4+FI
[m/min] [m/min]
EZ2
DR
20
twin
hoi
st
6/2
1Am / M4 400,7 - 6,7 (10)
ZBR 132 C4 (50 %)DIC-4-060
0,7 - 10,7 (14,7)ZBR 180 A4 (60 %)
DIC-4-090
2m / M5 320,7 - 6,7 (10)
ZBR 132 C4 (50 %)DIC-4-045
0,7 - 10,7 (14,7)ZBR 180 A4 (60 %)
DIC-4-075
3m / M6 250,7 - 6,7 (10)
ZBR 132 C4 (60 %)DIC-4-045
0,7 - 10,7 (14,7)ZBR 132 C4 (50 %)
DIC-4-060
4m / M7 200,7 - 6,7 (10)
ZBR 132 C4 (60 %)DIC-4-045
0,7 - 10,7 (14,7)ZBR 132 C4 (60 %)
DIC-4-045
8/2
1Am / M4 500,5 - 5 (7)
ZBR 132 C4 (50 %)DIC-4-060
0,5 - 8 (11)ZBR 180 A4 (60 %)
DIC-4-090
2m / M5 400,5 - 5 (7)
ZBR 132 C4 (50 %)DIC-4-045
0,5 - 8 (11)ZBR 180 A4 (60 %)
DIC-4-075
3m / M6 320,5 - 5 (7)
ZBR 132 C4 (60 %)DIC-4-045
0,5 - 8 (11)ZBR 132 C4 (50 %)
DIC-4-060
4m / M7 250,5 - 5 (7)
ZBR 132 C4 (60 %)DIC-4-045
0,5 - 8 (11)ZBR 132 C4 (60 %)
DIC-4-045
10/2
1Am / M4 630,4 - 4 (5,6)
ZBR 132 C4 (50 %)DIC-4-060
0,4 - 6,4 (8,8)ZBR 180 A4 (60 %)
DIC-4-090
2m / M5 500,4 - 4 (5,6)
ZBR 132 C4 (50 %)DIC-4-045
0,4 - 6,4 (8,8)ZBR 180 A4 (60 %)
DIC-4-075
3m / M6 400,4 - 4 (5,6)
ZBR 132 C4 (60 %)DIC-4-045
0,4 - 6,4 (8,8)ZBR 132 C4 (50 %)
DIC-4-060
Inverter operation
8 2037
6044
_enG
B.in
dd/2
8031
3
© D
emag
Cra
nes
& C
ompo
nent
s G
mbH
1) Fuse links do not apply in conjunction with a cross travel motor.2) The lengths of the supply lines are calculated on the basis of an earth-loop impedance of 200 mΩ.
DR 20 motor dataDesign is in accordance with the VDE regulations and the design rules of the FEM, to meet the high demands made on electric hoists.
Inverter-fed hoist motor acceleration current = 1,2 x rated current I(A).Inverter-fed hoist motor rated cos phi = 1,0
Reeving Group of mechanisms
FEM / ISO
Motor key data Hoist capacity Inverter
Type Brake Number of poles
CDF n for 87 Hz [rpm]
Phoist [kW]
Type Rated current at 2 kHz [A]
6/2
1Am / M4ZBR 180 A4 B280 4 60 % 2545
36,7 DIC-4-090 90
2m / M5 29,7 DIC-4-075 75
3m / M6ZBR 132 C4 B140 4
50 % 2520 23,8 DIC-4-060 60
4m / M7 60 % 2530 19,1 DIC-4-045 45
8/2
1Am / M4
ZBR 132 C4 B140 4
50 % 252022,4 DIC-4-060 60
2m / M5 18,0 DIC-4-045 45
3m / M660 % 2530
14,5DIC-4-045 45
4m / M7 11,5
1Am / M4ZBR 180 A4 B280 4 60 % 2545
36,0 DIC-4-090 90
2m / M5 28,9 DIC-4-075 75
3m / M6ZBR 132 C4 B140 4
50 % 2520 23,1 DIC-4-060 60
4m / M7 60 % 2530 18,2 DIC-4-045 45
10/2
1Am / M4
ZBR 132 C4 B140 4
50 % 252023,7 DIC-4-060 60
2m / M5 19,0 DIC-4-045 45
3m / M660 % 2530
15,0DIC-4-045 45
4m / M7 12,0
1Am / M4ZBR 180 A4 B280 4 60 % 2545
38,1 DIC-4-090 90
2m / M5 30,6 DIC-4-075 75
3m / M6ZBR 132 C4 B140 4
50 % 2520 23,8 DIC-4-060 60
4m / M7 60 % 2530 19,2 DIC-4-045 45
DR 20 range Mains connection delay fuse 1) for 50 Hz 400 V
Supply lines 2) for 5 % voltage drop ∆U 400 V (∆U 20 V)
Inverter type A mm² m
DIC-4-045 63 10 90
DIC-4-060 80 16 90
DIC-4-075 100 25 90
DIC-4-090 125 32 (2 x 16 mm2) 65
Required supply cable conductor cross-sections and fuse links per crab
92037
6044
_enG
B.in
dd/2
8031
3
© D
emag
Cra
nes
& C
ompo
nent
s G
mbH
Motor key data for inverter-controlled cross-travel drives and wheel diameterDR 20 cross-travel drives, 6/2, 8/2, 10/2 reeving
6/2 reeving
Drum length Drum lengthH22 H34 H52 H22 H34 H52
Track gauge Track gauge2240 2800 2800 3550 2240 2800 2800 3550
Group of mechanisms
FEM / ISOSWL (t) Wheel diameter Drive unit (motor - gearbox -
inverter)
1Am / M4 40250
12m / M5 32 23m / M6 25
200 34m / M7 20
8/2 reeving
Drum length Drum lengthH22 H34 H52 H22 H34 H52
Track gauge Track gauge2240 2800 2800 3550 2240 2800 2800 3550
Group of mechanisms
FEM / ISOSWL (t) Wheel diameter Drive unit (motor - gearbox -
inverter)
1Am / M4 50 315 4 52m / M5 40
2501
63m / M6 322
4m / M7 25
10/2 reeving
Drum length Drum lengthH22 H34 H52 H22 H34 H52
Track gauge Track gauge2240 2800 2800 3550 2240 2800 2800 3550
Group of mechanisms
FEM / ISOSWL (t) Wheel diameter Drive unit (motor - gearbox -
inverter)
1Am / M4 63315 4
72m / M5 50 83m / M6 40 250 1 6
DR 20 range Mains connection delay fuse 1) for 50 Hz 400 V
Inverter type A
DIC-4-014 18
DIC-4-025 32
Required fuse links
1) Fuse links also apply in conjunction with a cross-travel motor.
1 1 x ZBA 100 B 4 / B020 Mn = 20 / ADK 60 TD / i = 89,9 Dedrive Compact DIC-4-025
2 1 x ZBA 100 AL 4 / B020 Mn = 16 / ADK 60 TD / i = 89,9 Dedrive Compact DIC-4-014
3 1 x ZBA 100 AL 4 / B020 Mn = 16 / ADK 50 DD / i = 71,6 Dedrive Compact DIC-4-014
4 1 x ZBA 100 B 4 / B020 Mn = 20 / ADK 70 TD / i = 115 Dedrive Compact DIC-4-025
5 2 x ZBA 90 B 4 / B020 Mn = 16 / ADE 60 TD / i = 107 Dedrive Compact DIC-4-025
6 2 x ZBA 90 A 4 / B020 Mn = 10 / ADE 50 TD / i = 87,4 Dedrive Compact DIC-4-014
7 2 x ZBA 100 AL 4 / B020 Mn = 20 / ADE 60 TD / i = 107 Dedrive Compact DIC-4-025
8 2 x ZBA 90 B 4 / B020 Mn = 20 / ADE 60 TD / i = 107 Dedrive Compact DIC-4-025
10 2037
6044
_enG
B.in
dd/2
8031
3
© D
emag
Cra
nes
& C
ompo
nent
s G
mbH
= =
70133
H
h1 D
45
EZ2DR 20 twin hoist double-rail crab - H20 - 6/2Dimension drawing
min
.
max.
Track gauge 2240 mm
max. 70
min
. 45
Please note the technical data of DRS wheel blocks 203 352 44. Wheel diameter see table, page 9.
42709344.eps
43464344.eps
43464544.eps
e1
C
eka
112037
6044
_enG
B.in
dd/2
8031
3
© D
emag
Cra
nes
& C
ompo
nent
s G
mbH
EZ2DR 20 twin hoist with inverterTrack gauge Lka 2240 and 2800 mm Track gauge Lka 3550 mm
Track gauge Lka 3550 mmEZ2DR 20 twin hoist with pole-changing motorsTrack gauge Lka 2240 and 2800 mm
max
.
43464644.eps 43464744.eps
43464844.eps 43464944.eps
437
e3
437 B2L2L1F1
113
250
481
1237
1334
e5e2
e4481
250
1237
F2 F1L B1
R11
R22
R21
R12
1000
1000Lka
1300
Lka
R11
R22
R21
R12
1300Lka
R11
R22
R21
R12
12 2037
6044
_enG
B.in
dd/2
8031
3
© D
emag
Cra
nes
& C
ompo
nent
s G
mbH
Dimensions in mm
1) Drum brake possible for F1 ≥ 179 mm, with drum brake F1-84 mm
Table B
EZ2DR 20 twin hoist double-rail crab - 6/2Dimensions
Rope reeving 6/2
Drum length H22 H34
Group of mechanisms FEM / ISO1Am + 2m /
M4 + M53m + 4m / M6 + M7
1Am + 2m / M4 + M5
3m + 4m / M6 + M7
eKA 1900
e1 780
e2 293 270 293 270
e3 see table A
e4 see table A
e5 see table B
H 865 840 865 840
h1 281 238 281 238
D 250 200 250 200
B1 260
B2 116,5
L1 110
L2 133
C 1016 1041 1016 1041
Track gauge LKa 2240
L 597 —
F1 1) 650,5 —
F2 373 —
Track gauge LKa 2800
L 597 946
F 1) 930,5 930,5
F2 653 304
Cross-travel speed m/min 2,14 to 25 with frequency inverter
Hoist motor e3 e4
ZBR 132 A12/2 157 183
ZBR 180 A12/2 227 113
ZBR 200 B12/2 268 72
ZBR 132 C4 142 198
ZBR 180 A4 227 113
Table A
Cross-travel drives e5
ADK 50 DD/ZBA 90 A4 /100 AL 4 330
ADK 60 TD/ZBA 90 B4/100 AL4 /100 B4 370
ADK 70 TD/ZBA 100 B4 424
132037
6044
_enG
B.in
dd/2
8031
3
© D
emag
Cra
nes
& C
ompo
nent
s G
mbH
Wheel loads from deadweight in kg
Reeving 6/2Group of mechanisms FEM / ISO 1Am + 2m / M4 + M5 3m + 4m / M6 + M7Drum length H22 H34 H22 H34
Wheel no. Wheel load [kg] Wheel load [kg]
Deadweight of crab 4521 — 4253 —
Track gauge LKa 2240
R11 991
—
934
—R12 1282 1225R21 1041 944R22 1207 1150
Deadweight of crab 4603 4867 4335 4599
Track gauge LKa 2800
R11 1011 1065 954 1008R12 1303 1381 1246 1324R21 1061 1115 964 1018R22 1228 1306 1171 1249
Wheel loads from hook load in kg
Reeving 6/2
Group of mechanisms FEM / ISO 1Am / M4 2m / M5 3m / M6 4m / M7 1Am / M4 2m / M5 3m / M6 4m / M7
Drum length H22 H34
SWL 40000 32000 25000 20000 40000 32000 25000 20000
Track gauge LKa Load position Wheel no. Wheel load [kg] Wheel load [kg]
2240 top/bottom
R11 8211 6568 5132 4105
— — — —
R12 11789 9432 7368 5895
R21 8211 6568 5132 4105
R22 11789 9432 7368 5895
Rmax 11789 9432 7368 5895
Track gauge LKa Load position Wheel no. Wheel load [kg] Wheel load [kg]
2800 top/bottom
R11 8211 6568 5132 4105 8211 6568 5132 4105
R12 11789 9432 7368 5895 11789 9432 7368 5895
R21 8211 6568 5132 4105 8211 6568 5132 4105
R22 11789 9432 7368 5895 11789 9432 7368 5895
Rmax 11789 9432 7368 5895 11789 9432 7368 5895
EZ2DR 20 twin hoist double-rail crab - 6/2Wheel loads
14 2037
6044
_enG
B.in
dd/2
8031
3
© D
emag
Cra
nes
& C
ompo
nent
s G
mbH
EZ2DR 20 twin hoist double-rail crab - 8/2Dimensions
Dimensions in mm
1) Drum brake possible for F1 ≥ 179 mm, with drum brake F1-84 mm
Rope reeving 8/2
Drum length H22 H34 H52
Group of mechanisms FEM / ISO 1Am / M4 2m + 3m + 4m / M5 + M6 + M7 1Am / M4 2m + 3m + 4m /
M5 + M6 + M7 1Am / M4 2m + 3m + 4m / M5 + M6 + M7
eKA 1900
e1 780
e2 335 293 335 293 335 293
e3 see table A
e4 see table A
e5 see table B
H898 (Lka=2240)918 (Lka=2800)
865 (Lka=2240)885 (Lka=2800)
918 885 1010 977
h1 349,5 281 349,5 281 349,5 281
D 315 250 315 250 315 250
B1 260
B2 116,5
L1 110
L2 133
C 1045 1078 1045 1078 1045 1078
Track gauge LKa 2240
L 597 — —
F1 1) 663,5 — —
F2 360 — —
Track gauge LKa 2800
L 597 946 —
F 1) 943,5 943,5 —
F2 640 291 —
Track gauge LKa 3550
L — — 1420
F 1) — — 1318,5
F2 — — 192
Cross-travel speed m/min 2,14 to 25 with frequency inverter
Table B
Hoist motor e3 e4
ZBR 132 A12/2 157 183
ZBR 180 A12/2 227 113
ZBR 200 B12/2 268 72
ZBR 132 C4 142 198
ZBR 180 A4 227 113
Table A
Cross-travel drives e5
ADK 50 DD/ZBA 90 A4 /100 AL 4 330
ADK 60 TD/ZBA 90 B4/100 AL4 /100 B4 370
ADK 70 TD/ZBA 100 B4 424
152037
6044
_enG
B.in
dd/2
8031
3
© D
emag
Cra
nes
& C
ompo
nent
s G
mbH
EZ2DR 20 twin hoist double-rail crab - 8/2Wheel loads
Wheel loads from deadweight in kg
Rope reeving 8/2Group of mechanisms FEM / ISO 1Am / M4 2m + 3m + 4m / M5 + M6 + M7Drum length H22 H34 H52 H22 H34 H52
Wheel no. Wheel load [kg]
Deadweight of crab 5001 — — 4621 — —
Track gauge LKa 2240
R11 1094
— —
1012
— —R12 1394 1311R21 1194 1062R22 1319 1236
Deadweight of crab 5099 5361 — 4717 4983 —
Track gauge LKa 2800
R11 1117 1171
—
1034 1089
—R12 1420 1497 1337 1415R21 1217 1271 1084 1139R22 1345 1422 1262 1340
Deadweight of crab — — 5955 — — 5626
Track gauge LKa 3550
R11
— —
1272
— —
1189R12 1781 1699R21 1301 1219R22 1601 1519
Wheel loads from hook load in kg
Rope reeving 8/2
Group of mechanisms FEM / ISO 1Am / M4
2m / M5
3m / M6
4m / M7
1Am / M4
2m / M5
3m / M6 4m / M7 1Am /
M42m / M5
3m / M6
4m / M7
Drum length H22 H34 H52
SWL in kg 50000 40000 32000 25000 50000 40000 32000 25000 50000 40000 32000 25000
Track gauge LKaLoad
positionWheel
no. Wheel load [kg]
2240 top/bottom
R11 10263 8211 6568 5132
— — — — — — — —
R12 14737 11789 9432 7368
R21 10263 8211 6568 5132
R22 14737 11789 9432 7368
Rmax 14737 11789 9432 7368
Track gauge LKaLoad
positionWheel
no. Wheel load [kg]
2800 top/bottom
R11 10263 8211 6568 5132 10263 8211 6568 5132
— — — —
R12 14737 11789 9432 7368 14737 11789 9432 7368
R21 10263 8211 6568 5132 10263 8211 6568 5132
R22 14737 11789 9432 7368 14737 11789 9432 7368
Rmax 14737 11789 9432 7368 14737 11789 9432 7368
Track gauge LKaLoad
positionWheel
no. Wheel load [kg]
3550 top/bottom
R11
— — — — — — — —
10263 8211 6568 5132
R12 14737 11789 9432 7368
R21 10263 8211 6568 5132
R22 14737 11789 9432 7368
Rmax 14737 11789 9432 7368
16 2037
6044
_enG
B.in
dd/2
8031
3
© D
emag
Cra
nes
& C
ompo
nent
s G
mbH
EZ2DR 20 twin hoist double-rail crab - 10/2Dimensions
Dimensions in mm
1) Drum brake possible for F1 ≥ 179 mm, with drum brake F1-84 mm
Rope reeving 10/2
Drum length H34 H52
Group of mechanisms FEM / ISO 1Am + 2m / M4 + M5 3m / M6 1Am + 2m / M4 + M5 3m / M6
eKA 1900
e1 780
e2 335 293 335 293
e3 see table A
e4 see table A
e5 see table B
H 992 957 1010 977
h1 349,5 281 349,5 281
D 315 250 315 250
B1 260
B2 116,5
L1 110
L2 133
C 1278 1310 1278 1310
Track gauge LKa 2800
L 946 — —
F1 1) 830 — —
F2 404,5 — —
Track gauge LKa 3550
L — — 1420
F 1) — — 1205
F2 — — 305,5
Cross-travel speed m/min 2,14 to 25 with frequency inverter
Table B
Hoist motor e3 e4
ZBR 132 A12/2 157 183
ZBR 180 A12/2 227 113
ZBR 200 B12/2 268 72
ZBR 132 C4 142 198
ZBR 180 A4 227 113
Table A
Cross-travel drives e5
ADK 50 DD/ZBA 90 A4 /100 AL 4 330
ADK 60 TD/ZBA 90 B4/100 AL4 /100 B4 370
ADK 70 TD/ZBA 100 B4 424
172037
6044
_enG
B.in
dd/2
8031
3
© D
emag
Cra
nes
& C
ompo
nent
s G
mbH
Wheel loads from deadweight in kg
Rope reeving 10/2Group of mechanisms FEM / ISO 1Am + 2m / M4 + M5 3m / M6Drum length H34 H52 H34 H52
Wheel no. Wheel load [kg] Wheel load [kg]Deadweight of crab 5577 — 5197 —
Track gauge LKa 2800
R11 1215
—
1133
—R12 1561 1478R21 1315 1183R22 1486 1403
Deadweight of crab — 6285 — 5924
Track gauge LKa 3550
R11
—
1333
—
1251R12 1884 1786R21 1378 1280R22 1690 1607
Wheel loads from hook load in kg
Rope reeving 10/2
Group of mechanisms FEM / ISO 1Am / M4 2m / M5 3m / M6 4m / M7 1Am / M4 2m / M5 3m / M6 4m / M7
Drum length H34 H52
SWL in kg 63000 50000 40000 — 63000 50000 40000 —
Track gauge LKaLoad
position Wheel no. Wheel load [kg] Wheel load [kg]
2800 top/bottom
R11 12932 10263 8211
— — — — —
R12 18568 14737 11789
R21 12932 10263 8211
R22 18568 14737 11789
Rmax 18568 14737 11789
Track gauge LKa Load
position Wheel no. Wheel load [kg] Wheel load [kg]
3550 top/bottom
R11
— — — —
12932 10263 8211
—
R12 18568 14737 11789
R21 12932 10263 8211
R22 18568 14737 11789
Rmax 18568 14737 11789
EZ2DR 20 twin hoist double-rail crab - 10/2Wheel loads
18 2037
6044
_enG
B.in
dd/2
8031
3
© D
emag
Cra
nes
& C
ompo
nent
s G
mbH
Notes
192037
6044
_enG
B.in
dd/2
8031
3
© D
emag
Cra
nes
& C
ompo
nent
s G
mbH
Notes
The current addresses of our sales offices, subsidiaries and agencies worldwide can be found on the Demag Cranes & Components GmbH homepage atwww.demagcranes.com/Contact
Prin
ted
in G
erm
any
Reproduction in whole or in part only with prior consent of Demag Cranes & Components GmbH, 58286 Wetter (Germany) Subject to change. Not liable for errors or omissions.
Demag Cranes & Components GmbHPO Box 67 · 58286 Wetter (Germany)Phone +49 (0 )2335 92-0Fax +49 (0 )2335 92-7676www.demagcranes.com