Otter Tail County2040 Transportat ion Plan
Better roads for a better Otter Tail… our values, our priorities
OTTER TAIL COUNTY 2040 TRANSPORTATION PLAN
ACKNOWLEDGEMENTS
PROJECT STEERING COMMITTEE
Andrew Klinnert Fred Sailer Lee Rogness
Bob Lahman Jean Bowman Myron Lueders
Craig W. Johnson Jim Beckstrom Nick Leonard
Chuck Grotte John Christensen Rick West
Curt Beckler John Haarstad Russ Dewey
Dan Bradow Kelcey Klemm Stanley Overgaard
Dan Edwards Kim Schroeder Wayne Johnson
Dick Trana Larry Bucholz
Don Solga Larry Huwe
Ed Roberts Lee Mindemann
PROJECT MANAGEMENT TEAM
Rick West, Public Works Division Director/ County Engineer
Chuck Grotte, Assistant County Engineer
Kevin Fellbaum, County Ditch Inspector / Engineer Technician
Lee Rogness, Otter Tail County Commissioners
Wayne Johnson, Otter Tail County Commissioners
PROJECT CONSULTANT TEAM
Brian Shorten, SRF Consulting Group Inc.
Craig Vaughn, SRF Consulting Group Inc.
BrieAnna Simon, SRF Consulting Group Inc.
Amy Grothaus, Braun Intertec
Adoption of the Otter Tail County Transportation Plan (2040) | Otter Tail County Resolution No. 2015-52
Upon motion by______________, seconded by_____________ and unanimously carried, the following resolution was adopted:
WHEREAS: the Otter Tail County Board of Commissioners is the duly elected governing body for Otter Tail County and is responsible for the planning, development, and preservation of a safe and functional transportation system; and
WHEREAS: Otter Tail County has undertaken the task of preparing a long range comprehensive County Transportation Plan to ensure the continued performance of the County’s transportation network; and
WHEREAS: the transportation planning process was guided by an Advisory Committee, composed of a cross-section of multi-jurisdictional technical experts and citizens; and
WHEREAS: the public was invited, encouraged and involved in the Plan’s preparation; and
WHEREAS: the Otter Tail County Transportation Plan (2040) includes the following key elements: existing conditions, goals, objectives and performance measures, future traffic forecasts, future multi-model analysis, system preservation strategies and an implementation plan with alternative funding scenarios; and
WHEREAS: this County Transportation Plan will assist County and local officials to cooperatively preserve and improve the County’s transportation system.
NOW, THEREFORE, BE IT RESOLVED, THAT: the Otter Tail County Board of Commissioners does hereby adopt the Otter Tail County Transportation Plan (2040), and agrees to use it as a guide for future transportation system decisions.
Adopted at Fergus Falls, Minnesota, this______ day of_______ 2015.
ATTEST
CERTIFICATIONSTATE OF MINNESOTA, COUNTY OF OTTER TAIL
I hereby certify that the foregoing Resolution is a true and correct copy of the Resolution presented to and adopted by the County of Otter Tail at a duly authorized meeting thereof held on this_____ day of _______, 2015, as shown in the minutes of said meeting in my possession.
SEAL
I:\HWYSHARE\Otter Tail County Transportation Plan - 2014\Adoption of OTC Transportation Plan (2040) 7-21-15.doc
OTTER TAIL COUNTY RESOLUTION OF ADOPTION
OTTER TAIL COUNTY 2040 TRANSPORTATION PLAN
TABLE OF CONTENTS
INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . CHAPTER 1
EXISTING CONDITIONS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . CHAPTER 2
GOALS, OBJECTIVES & PERFORMANCE MEASURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . CHAPTER 3
TRAFFIC FORECASTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . CHAPTER 4
FUTURE MULTIMODAL SYSTEM ANALYSIS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . CHAPTER 5
IMPLEMENTATION PLAN. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . CHAPTER 6