ABB Modular Systems

PPMV, South Africa, Manie Jooste, 22 May 2014.

Page 2: 22 May 2014. ABB Modular Systems · Compact Substations (CSS) ... An Efficient Power Presentation | 18 Sep 2013 ... Execution Step 2 – E-House preparation

Chart 2

ABB South Africa Agenda

Introduction

Product Overview

E-Houses

Mobile substations

Compact Substations

Non System Product Packaging

Execution in 7 steps

Summary

Page 3: 22 May 2014. ABB Modular Systems · Compact Substations (CSS) ... An Efficient Power Presentation | 18 Sep 2013 ... Execution Step 2 – E-House preparation

Chart 3

ABB South Africa Modular Systems - Introduction ABB recognized the preference of key customer expressing an increased

interest in packaged solutions with one central interface point.

• The drivers for these changes:

Package multiple MV products

Reduce on site cost and risk exposure on site

Reduce coordination & product integration issue

Reduce procurement cost Project Engineering & Management resources

Optimize installation and commissioning time

Page 4: 22 May 2014. ABB Modular Systems · Compact Substations (CSS) ... An Efficient Power Presentation | 18 Sep 2013 ... Execution Step 2 – E-House preparation

Chart 4

ABB South Africa Modular Systems – Product Overview. E-House

• Electrical House (E-Houses) Substation

• Containerized substations

Mobile substations

• Skid / trailer mounted

Compact Substations (CSS)

• Bulk metering units

Non System Product Packaging (NSPP)

• Medium Voltage products as loose components.

Page 5: 22 May 2014. ABB Modular Systems · Compact Substations (CSS) ... An Efficient Power Presentation | 18 Sep 2013 ... Execution Step 2 – E-House preparation

Chart 5

© ABB Group

May 27, 2014 | Slide 5

Electrical House Electrical House (E-House) is a

prefabricated modular building to house any Medium and / or Low voltage switchgear as well as electrical auxiliary equipment.

Customized substation made to customer specific requirements.

Factory engineering & assembly done at manufacturers works.

Pre-wired, Pre-tested, FAT and Cold Commissioning

Higher level Safety & Security

Minimum site work required.

ABB South Africa E-House.

Page 6: 22 May 2014. ABB Modular Systems · Compact Substations (CSS) ... An Efficient Power Presentation | 18 Sep 2013 ... Execution Step 2 – E-House preparation

Chart 6

© ABB Group

May 27, 2014 | Slide 6

Containerized Substations Containerized Substations with one time used

or new shipping containers to house any medium or low voltage switchgear as well as auxiliary equipment.

Optional installation of bus-ducting, arc venting and remote operation panels.

ABB South Africa E-House.

Page 7: 22 May 2014. ABB Modular Systems · Compact Substations (CSS) ... An Efficient Power Presentation | 18 Sep 2013 ... Execution Step 2 – E-House preparation

Chart 7

© ABB Group

May 27, 2014 | Slide 7

Skid / Trailer Substations The skid is a mobile prefabricated support

frame to mount equipment on for the Industry and Distribution market

The mobile base can house indoor and outdoor equipment on the same platform.

Emergency electricity supply during maintenance ,breakdown or refurbishment.

ABB South Africa Mobile substations.

Page 8: 22 May 2014. ABB Modular Systems · Compact Substations (CSS) ... An Efficient Power Presentation | 18 Sep 2013 ... Execution Step 2 – E-House preparation

Chart 8

© ABB Group

May 27, 2014 | Slide 8

Bulk metering unit. Designs available for indoor and

outdoor applications

Screened voltage transformers and connections

Meter reading without entering MV compartments.

ABB South Africa Compact Substation.

Page 9: 22 May 2014. ABB Modular Systems · Compact Substations (CSS) ... An Efficient Power Presentation | 18 Sep 2013 ... Execution Step 2 – E-House preparation

© ABB Group

May 27, 2014 | Slide 9 © ABB Group May 27, 2014 | Slide 9

Customers

Package Solution

ABB South Africa NSPP.

Coordinated delivery schedules avoid delays and increase value for the end users Early visibility of problems and predictability in project execution Project management from the beginning to the end: Order entry, Issue PO’s to ABB and Third party products, Change-orders, Scheduling, Document control, Invoicing, Logistics.

Page 10: 22 May 2014. ABB Modular Systems · Compact Substations (CSS) ... An Efficient Power Presentation | 18 Sep 2013 ... Execution Step 2 – E-House preparation

Substation layouts- Focus on up front Detailed engineering & design

10 | An Efficient Power Presentation | 18th Sep 2013

ABB South Africa Execution Step 1 – Detail Engineering.

Page 11: 22 May 2014. ABB Modular Systems · Compact Substations (CSS) ... An Efficient Power Presentation | 18 Sep 2013 ... Execution Step 2 – E-House preparation

11 | An Efficient Power Presentation | 18th Sep 2013

ABB South Africa Execution Step 2 – E-House preparation.

Floor Preparation

Side walls and frames

Final finishing

Page 12: 22 May 2014. ABB Modular Systems · Compact Substations (CSS) ... An Efficient Power Presentation | 18 Sep 2013 ... Execution Step 2 – E-House preparation

12 | An Efficient Power Presentation | 18th Sep 2013

ABB South Africa Execution Step 2 – Container preparation. Sides, doors and floor modifications

Interior cladding and fitment of safety systems

Final finishing

Page 13: 22 May 2014. ABB Modular Systems · Compact Substations (CSS) ... An Efficient Power Presentation | 18 Sep 2013 ... Execution Step 2 – E-House preparation

13 | An Efficient Power Presentation | 18th Sep 2013

ABB South Africa Execution Step 3 – Installation / fitment .

MV PLC C&I

MCC

Page 14: 22 May 2014. ABB Modular Systems · Compact Substations (CSS) ... An Efficient Power Presentation | 18 Sep 2013 ... Execution Step 2 – E-House preparation

14 | An Efficient Power Presentation | 18th Sep 2013

ABB South Africa Execution Step 3 – Installation / fitment .

Page 15: 22 May 2014. ABB Modular Systems · Compact Substations (CSS) ... An Efficient Power Presentation | 18 Sep 2013 ... Execution Step 2 – E-House preparation

15 | An Efficient Power Presentation | 18th Sep 2013

ABB South Africa Execution Step 3 – Installation / fitment .

BTU’s Remote control panels and indication

Page 17: 22 May 2014. ABB Modular Systems · Compact Substations (CSS) ... An Efficient Power Presentation | 18 Sep 2013 ... Execution Step 2 – E-House preparation

17 | An Efficient Power Presentation | 18th Sep 2013

ABB South Africa Execution Step 5 – Rigging / Loading.

Page 18: 22 May 2014. ABB Modular Systems · Compact Substations (CSS) ... An Efficient Power Presentation | 18 Sep 2013 ... Execution Step 2 – E-House preparation

18 | An Efficient Power Presentation | 18th Sep 2013

ABB South Africa Execution Step 6 – Delivery to site.

Page 19: 22 May 2014. ABB Modular Systems · Compact Substations (CSS) ... An Efficient Power Presentation | 18 Sep 2013 ... Execution Step 2 – E-House preparation

19 | An Efficient Power Presentation | 18th Sep 2013

ABB South Africa Execution Step 7 – SAT & Handover.

Page 20: 22 May 2014. ABB Modular Systems · Compact Substations (CSS) ... An Efficient Power Presentation | 18 Sep 2013 ... Execution Step 2 – E-House preparation

© ABB Group

May 27, 2014 | Slide 20 © ABB Group May 27, 2014 | Slide 20

Benefits of Modular Systems 1) Complete ABB portfolio of medium and low voltage

products

2) Technical analysis of the request by the Modular systems quotation team

3) Project Management: from design to delivery - single point of contact for all equipment.

4) Engineered Building to meet customer and site requirements

5) Management of ABB and third party equipment

6) Global leader with huge installed base, global service coverage and high level of engineering capabilities

ABB South Africa Summary.

Page 21: 22 May 2014. ABB Modular Systems · Compact Substations (CSS) ... An Efficient Power Presentation | 18 Sep 2013 ... Execution Step 2 – E-House preparation

© ABB Group May 27, 2014 | Slide 21