4
Ludgate Loft 132.3m Sta 40 98 39 37 33 108 Sub 36 84 89 Towing Path 86 32 38 60 3 120.7m 106 94 67 95 96 17 53 El Nurses 21 Cornwall PH 42 91 31 100 Home 55 104 MP 33 119.8m House 57 31 Apartments 101 LB 18 83 107 121.3m 85 1 to 12 141 TCB 40 87 19 9 55 15 161 to 169 54 125.3m 133 to 137 11 58 to 61 52 Car Park LB Lock Multistorey 55 PH 42a 56 4 124.7m 126.5m Works 45 Lock 53 127.1m 2 El Sub Sta FB 12 to 18 110 61 61b 61a 32 12 to 16 17 to 21 22 to 34 1 to 11 58 1 80 6 to 7 144 176 to 178 57 59 57 34 to 35 Overflow o 22 Lock 28 156 to 170 2 Shelter Shelter Sls Sl Sls Sluice Sl TCB TCB Tow Path Car Park Hotel Ludgate Loft 132.3m Sta 40 98 39 37 33 108 Sub 36 84 89 Towing Path 86 32 38 60 3 120.7m 106 94 67 95 96 17 53 El Nurses 21 Cornwall PH 42 91 31 100 Home 55 104 MP 33 119.8m House 57 31 Apartments 101 LB 18 83 107 121.3m 85 1 to 12 141 TCB 40 87 19 9 55 15 161 to 169 54 125.3m 133 to 137 11 58 to 61 52 Car Park LB Lock Multistorey 55 PH 42a 56 4 124.7m 126.5m Works 45 Lock 53 127.1m 2 El Sub Sta FB 12 to 18 110 61 61b 61a 32 12 to 16 17 to 21 22 to 34 1 to 11 58 1 80 6 to 7 144 176 to 178 57 59 57 34 to 35 Overflow o 22 Lock 28 156 to 170 2 Shelter Shelter Sls Sl Sls Sluice Sl TCB TCB Tow Path Car Park Hotel NEWHALL STREET GREAT CHARLES STREET QUEENSWAY CHARLOTTE STREET CHARLOTTE STREET FLEET STREET NEWHALL STREET LIONEL STREET LIONEL STREET CHARLOTTE STREET BROOK STREET JAMES STREET TC-05a-01 TC-05a-02 50m 1 : 500 30 5 10 20 0 40 This drawing includes map data licensed from Ordnance Survey with the permission of the controller of Her Majesty's Stationery Office. ã Crown copyright licence number 100019543 (2020) KEY EXISTING ROAD MARKINGS PROPOSED WHITE ROAD MARKINGS PROPOSED KERB TRAFFIC CONE BARRIERS TEMPORARY TRAFFIC SIGN A-FRAME LOCATION PLAN NOTES 1. ALL DIMENSIONS IN METRES UNLESS OTHERWISE STATED. 2. NOTES PLACED DIRECTLY ON THE LAYOUT DRAWING SUPERSEDE THOSE DETAILED IN KEYS. 3. ALL DIAGRAMS ARE TO THE TRAFFIC SIGNS REGULATIONS AND GENERAL DIRECTIONS 2016 (TSRGD). 4. ALL DESIGNS ARE BASED ON ORDNANCE SURVEY MAPPING. 5. WHERE NO CHANGE IS SHOWN, EXISTING RESTRICTIONS APPLY. 6. WHERE CYCLES ARE PERMITTED THROUGH ROAD CLOSURES, A MINIMUM OF 1.5m GAP SHOULD BE PROVIDED BETWEEN THE KERB AND TEMPORARY BARRIER. FOR INFORMATION 100 BROAD STREET BIRMINGHAM B15 1AE Telephone +44 (0)121 456 1616 Email: [email protected] www.pellfrischmann.com P02 104130-PF-100-C1-DR-TR-005a Sheet 5 Concept Design Tranche 1 Birmingham Traffic Cells Transport Plan Emergency Birmingham

23 21 19 36 18 37 3938 JAMES STREET 53 17 42 · 7/8/2020  · PH Club Works 42 Works El Sub Sta Works 85 Warehouse 37 71 Works 49 Works Works 16 19 101 45 20 Works 38 Chy 33 Works

  • Upload
    others

  • View
    8

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 23 21 19 36 18 37 3938 JAMES STREET 53 17 42 · 7/8/2020  · PH Club Works 42 Works El Sub Sta Works 85 Warehouse 37 71 Works 49 Works Works 16 19 101 45 20 Works 38 Chy 33 Works

L

u

d

g

a

te

L

o

ft

1

3

2

.3

m

S

ta

4

0

9

8

3

9

3

7

3

3

1

0

8

S

u

b

3

6

8

4

8

9

T

o

w

i

n

g

P

a

t

h

8

6

3

2

3

8

6

0

2

3

1

2

0

.7

m

1

0

6

9

4

6

7

9

5

9

6

1

7

5

3

E

l

N

u

r

s

e

s

2

1

C

o

r

n

w

a

l

l

P

H

4

2

9

1

3

1

1

0

0

H

o

m

e

5

5

1

0

4

M

P

3

3

1

1

9

.8

m

H

o

u

s

e

5

7

3

1

A

p

a

r

tm

e

n

ts

1

0

1

L

B

1

8

8

3

1

0

7

1

2

1

.3

m

8

5

1

t

o

1

2

1

4

1

T

C

B

4

0

8

7

1

9

1

9

9

5

5

1

5

1

6

1

t

o

1

6

9

5

4

1

2

5

.3

m

1

3

3

t

o

1

3

7

1

1

5

8

t

o

6

1

5

2

C

a

r

P

a

r

k

L

B

L

o

c

k

M

u

ltis

to

r

e

y

5

5

P

H

4

2

a

5

6

4

1

2

4

.7

m

1

2

6

.5

m

W

o

r

k

s

4

5

L

o

c

k

5

3

1

2

7

.1

m

2

7

E

l S

u

b

S

ta

F

B

1

2

t

o

1

8

1

1

0

6

1

6

1

b

6

1

a

3

2

1

2

t

o

1

6

1

7

t

o

2

1

2

2

t

o

3

4

1

t

o

1

1

5

8

1

8

0

6

t

o

7

1

4

4

1

7

6

t

o

1

7

8

5

7

5

9

5

7

3

4

t

o

3

5

O

v

e

r

f

l

o

w

1

4

t

o

2

2

L

o

c

k

2

8

1

5

6

t

o

1

7

0

2

S

h

e

lte

r

S

h

e

lte

r

S

ls

S

l

S

ls

S

lu

ic

e

S

l

T

C

B

T

C

B

T

o

w

P

a

t

h

C

a

r

P

a

r

k

H

o

te

l

L

u

d

g

a

te

L

o

ft

1

3

2

.3

m

S

ta

4

0

9

8

3

9

3

7

3

3

1

0

8

S

u

b

3

6

8

4

8

9

T

o

w

i

n

g

P

a

t

h

8

6

3

2

3

8

6

0

2

3

1

2

0

.7

m

1

0

6

9

4

6

7

9

5

9

6

1

7

5

3

E

l

N

u

r

s

e

s

2

1

C

o

r

n

w

a

l

l

P

H

4

2

9

1

3

1

1

0

0

H

o

m

e

5

5

1

0

4

M

P

3

3

1

1

9

.8

m

H

o

u

s

e

5

7

3

1

A

p

a

r

tm

e

n

ts

1

0

1

L

B

1

8

8

3

1

0

7

1

2

1

.3

m

8

5

1

t

o

1

2

1

4

1

T

C

B

4

0

8

7

1

9

1

9

9

5

5

1

5

1

6

1

t

o

1

6

9

5

4

1

2

5

.3

m

1

3

3

t

o

1

3

7

1

1

5

8

t

o

6

1

5

2

C

a

r

P

a

r

k

L

B

L

o

c

k

M

u

ltis

to

r

e

y

5

5

P

H

4

2

a

5

6

4

1

2

4

.7

m

1

2

6

.5

m

W

o

r

k

s

4

5

L

o

c

k

5

3

1

2

7

.1

m

2

7

E

l S

u

b

S

ta

F

B

1

2

t

o

1

8

1

1

0

6

1

6

1

b

6

1

a

3

2

1

2

t

o

1

6

1

7

t

o

2

1

2

2

t

o

3

4

1

t

o

1

1

5

8

1

8

0

6

t

o

7

1

4

4

1

7

6

t

o

1

7

8

5

7

5

9

5

7

3

4

t

o

3

5

O

v

e

r

f

l

o

w

1

4

t

o

2

2

L

o

c

k

2

8

1

5

6

t

o

1

7

0

2

S

h

e

lte

r

S

h

e

lte

r

S

ls

S

l

S

ls

S

lu

ic

e

S

l

T

C

B

T

C

B

T

o

w

P

a

t

h

C

a

r

P

a

r

k

H

o

te

l

N

E

W

H

A

L

L

S

T

R

E

E

T

G

R

E

A

T

C

H

A

R

L

E

S

S

T

R

E

E

T

Q

U

E

E

N

S

W

A

Y

C

H

A

R

L

O

T

T

E

S

T

R

E

E

T

C

H

A

R

L

O

T

T

E

S

T

R

E

E

T

F

L

E

E

T

S

T

R

E

E

T

N

E

W

H

A

L

L

S

T

R

E

E

T

L

I

O

N

E

L

S

T

R

E

E

T

L

I

O

N

E

L

S

T

R

E

E

T

C

H

A

R

L

O

T

T

E

S

T

R

E

E

T

B

R

O

O

K

S

T

R

E

E

T

J

A

M

E

S

S

T

R

E

E

T

TC-05a-01

TC-05a-02

50m

1 : 500

305 10 200 40

This drawing includes map data licensed from Ordnance Survey with the permission

of the controller of Her Majesty's Stationery Office.

ã Crown copyright licence number 100019543 (2020)

KEY

EXISTING ROAD MARKINGS

PROPOSED WHITE ROAD MARKINGS

PROPOSED KERB

TRAFFIC CONE

BARRIERS

TEMPORARY TRAFFIC SIGN A-FRAME

LOCATION PLAN

NOTES

1. ALL DIMENSIONS IN METRES UNLESS OTHERWISE STATED.

2. NOTES PLACED DIRECTLY ON THE LAYOUT DRAWING

SUPERSEDE THOSE DETAILED IN KEYS.

3. ALL DIAGRAMS ARE TO THE TRAFFIC SIGNS REGULATIONS

AND GENERAL DIRECTIONS 2016 (TSRGD).

4. ALL DESIGNS ARE BASED ON ORDNANCE SURVEY MAPPING.

5. WHERE NO CHANGE IS SHOWN, EXISTING RESTRICTIONS

APPLY.

6. WHERE CYCLES ARE PERMITTED THROUGH ROAD

CLOSURES, A MINIMUM OF 1.5m GAP SHOULD BE PROVIDED

BETWEEN THE KERB AND TEMPORARY BARRIER.

FOR INFORMATION

100 BROAD STREET BIRMINGHAM B15 1AE

Telephone +44 (0)121 456 1616Email: [email protected]

www.pellfrischmann.com

P02

104130-PF-100-C1-DR-TR-005a

Sheet 5

Concept Design

Tranche 1

Birmingham Traffic Cells

Transport Plan

Emergency Birmingham

AutoCAD SHX Text
P01
AutoCAD SHX Text
DH
AutoCAD SHX Text
NY
AutoCAD SHX Text
03-08-20
AutoCAD SHX Text
NY
AutoCAD SHX Text
CONCEPT DESIGN
AutoCAD SHX Text
Drawing Status
AutoCAD SHX Text
Drawing No.
AutoCAD SHX Text
Name
AutoCAD SHX Text
Date
AutoCAD SHX Text
File No.
AutoCAD SHX Text
Scale
AutoCAD SHX Text
Drawing Title
AutoCAD SHX Text
Project
AutoCAD SHX Text
Revision
AutoCAD SHX Text
REV
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DRN
AutoCAD SHX Text
CHK
AutoCAD SHX Text
APP
AutoCAD SHX Text
DATE
AutoCAD SHX Text
Approved
AutoCAD SHX Text
Drawn
AutoCAD SHX Text
Checked
AutoCAD SHX Text
Designed
AutoCAD SHX Text
CONCEPT DESIGN
AutoCAD SHX Text
Pell Frischmann
AutoCAD SHX Text
c
AutoCAD SHX Text
26-06-20
AutoCAD SHX Text
NY
AutoCAD SHX Text
26-06-20
AutoCAD SHX Text
NY
AutoCAD SHX Text
26-06-20
AutoCAD SHX Text
DH
AutoCAD SHX Text
26-06-20
AutoCAD SHX Text
DH
AutoCAD SHX Text
1:500 @ A1
AutoCAD SHX Text
Architect/Client/Contractor
AutoCAD SHX Text
104130-PF-100-C1-DR-TR
AutoCAD SHX Text
UPDATED FOLLOWING CLIENT FEEDBACK
AutoCAD SHX Text
NY
AutoCAD SHX Text
07-08-20
AutoCAD SHX Text
NY
AutoCAD SHX Text
DH
AutoCAD SHX Text
P02
Page 2: 23 21 19 36 18 37 3938 JAMES STREET 53 17 42 · 7/8/2020  · PH Club Works 42 Works El Sub Sta Works 85 Warehouse 37 71 Works 49 Works Works 16 19 101 45 20 Works 38 Chy 33 Works

W

a

r

e

h

o

u

s

e

86

1

2

0

.1

m

7

1

3

88

1

9

2

to

4

P

H

3

3

8

6

1

1

8

.

3

m

2

5

2

1

87

W

a

r

e

h

o

u

s

e

3

7

1

6

4

3

9

1

0

to

1

6

C

L

IV

E

P

A

S

S

A

G

E

8

1

t

o

8

5

8

1

9

3

2

3

86b

86a

T

C

B

1

115.2m

2

9

4

9

H

o

s

t

e

l

89

4

1

1 to 7

6

3

3

2

3

9

6

1

1

7

.

7

m

2

1

6

3

W

a

re

h

o

u

se

W

o

r

k

s

3

2

t

o

5

4

E

l

1

Lock

S

u

b

S

t

a

5

1

1

2

2

.

8

m

8

11

2

7

1

6

3

L

B

W

a

rd

B

d

yC

R

D

e

f

5

8

5

6

3

9

4

3

9

3

1

8

to

2

6

5

S

h

e

l

t

e

r

S

h

e

l

t

e

r

E

S

S

C

a

r

P

a

r

k

S

h

e

l

t

e

r

s

Tow

P

ath

W

a

r

e

h

o

u

s

e

86

1

2

0

.1

m

7

1

3

88

1

9

2

to

4

P

H

3

3

8

6

1

1

8

.

3

m

2

5

2

1

87

W

a

r

e

h

o

u

s

e

3

7

1

6

4

3

9

1

0

to

1

6

C

L

IV

E

P

A

S

S

A

G

E

8

1

t

o

8

5

8

1

9

3

2

3

86b

86a

T

C

B

1

115.2m

2

9

4

9

H

o

s

t

e

l

89

4

1

1 to 7

6

3

3

2

3

9

6

1

1

7

.

7

m

2

1

6

3

W

a

re

h

o

u

se

W

o

r

k

s

3

2

t

o

5

4

E

l

1

Lock

S

u

b

S

t

a

5

1

1

2

2

.

8

m

8

11

2

7

1

6

3

L

B

W

a

rd

B

d

yC

R

D

e

f

5

8

5

6

3

9

4

3

9

3

1

8

to

2

6

5

S

h

e

l

t

e

r

S

h

e

l

t

e

r

E

S

S

C

a

r

P

a

r

k

S

h

e

l

t

e

r

s

Tow

P

ath

S

T

C

H

A

D

'S

C

I

R

C

U

S

Q

U

E

E

N

S

W

A

Y

W

IL

L

IA

M

B

O

O

T

H

L

A

N

E

OLD SNOW HILL

C

O

N

S

T

I

T

U

T

I

O

N

H

I

L

L

H

E

N

R

IE

T

T

A

S

T

R

E

E

T

H

A

M

P

T

O

N

S

T

R

E

E

T

S

U

M

M

E

R

L

A

N

E

W

A

T

E

R

S

T

R

E

E

T

M

A

R

Y

A

N

N

S

T

R

E

E

T

SH

AD

WE

LL S

TR

EE

T

COLROW

AHEADONLY

AHEADONLY

KEEPCLEAR

KEEPCLEAR

RE

FE

R T

O S

EC

TIO

N S

1-0

6

TURNLEFT

TURNLEFT

50m

1 : 500

305 10 200 40

This drawing includes map data licensed from Ordnance Survey with the permission

of the controller of Her Majesty's Stationery Office.

ã Crown copyright licence number 100019543 (2020)

KEY

EXISTING ROAD MARKINGS

PROPOSED WHITE ROAD MARKINGS

PROPOSED KERB

TRAFFIC CONE

BARRIERS

TEMPORARY TRAFFIC SIGN A-FRAME

LOCATION PLAN

NOTES

1. ALL DIMENSIONS IN METRES UNLESS OTHERWISE STATED.

2. NOTES PLACED DIRECTLY ON THE LAYOUT DRAWING

SUPERSEDE THOSE DETAILED IN KEYS.

3. ALL DIAGRAMS ARE TO THE TRAFFIC SIGNS REGULATIONS

AND GENERAL DIRECTIONS 2016 (TSRGD).

4. ALL DESIGNS ARE BASED ON ORDNANCE SURVEY MAPPING.

5. WHERE NO CHANGE IS SHOWN, EXISTING RESTRICTIONS

APPLY.

6. WHERE CYCLES ARE PERMITTED THROUGH ROAD

CLOSURES, A MINIMUM OF 1.5m GAP SHOULD BE PROVIDED

BETWEEN THE KERB AND TEMPORARY BARRIER.

FOR INFORMATION

NO WORKS PROPOSED

100 BROAD STREET BIRMINGHAM B15 1AE

Telephone +44 (0)121 456 1616Email: [email protected]

www.pellfrischmann.com

P04

104130-PF-100-C1-DR-TR-005

Sheet 6

Concept Design

Tranche 1

Birmingham Traffic Cells

Transport Plan

Emergency Birmingham

AutoCAD SHX Text
P01
AutoCAD SHX Text
DH
AutoCAD SHX Text
NY
AutoCAD SHX Text
26-06-20
AutoCAD SHX Text
NY
AutoCAD SHX Text
CONCEPT DESIGN
AutoCAD SHX Text
UPDATED FOLLOWING CLIENT & STAKEHOLDER FEEDBACK
AutoCAD SHX Text
NY
AutoCAD SHX Text
27-07-20
AutoCAD SHX Text
NY
AutoCAD SHX Text
DH
AutoCAD SHX Text
P02
AutoCAD SHX Text
P03
AutoCAD SHX Text
DH
AutoCAD SHX Text
NY
AutoCAD SHX Text
03-08-20
AutoCAD SHX Text
NY
AutoCAD SHX Text
UPDATED FOLLOWING CLIENT FEEDBACK
AutoCAD SHX Text
Drawing Status
AutoCAD SHX Text
Drawing No.
AutoCAD SHX Text
Name
AutoCAD SHX Text
Date
AutoCAD SHX Text
File No.
AutoCAD SHX Text
Scale
AutoCAD SHX Text
Drawing Title
AutoCAD SHX Text
Project
AutoCAD SHX Text
Revision
AutoCAD SHX Text
REV
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DRN
AutoCAD SHX Text
CHK
AutoCAD SHX Text
APP
AutoCAD SHX Text
DATE
AutoCAD SHX Text
Approved
AutoCAD SHX Text
Drawn
AutoCAD SHX Text
Checked
AutoCAD SHX Text
Designed
AutoCAD SHX Text
CONCEPT DESIGN
AutoCAD SHX Text
Pell Frischmann
AutoCAD SHX Text
c
AutoCAD SHX Text
26-06-20
AutoCAD SHX Text
NY
AutoCAD SHX Text
26-06-20
AutoCAD SHX Text
NY
AutoCAD SHX Text
26-06-20
AutoCAD SHX Text
DH
AutoCAD SHX Text
26-06-20
AutoCAD SHX Text
DH
AutoCAD SHX Text
1:500 @ A1
AutoCAD SHX Text
Architect/Client/Contractor
AutoCAD SHX Text
104130-PF-100-C1-DR-TR
AutoCAD SHX Text
UPDATED FOLLOWING CLIENT FEEDBACK
AutoCAD SHX Text
NY
AutoCAD SHX Text
07-08-20
AutoCAD SHX Text
NY
AutoCAD SHX Text
DH
AutoCAD SHX Text
P04
Page 3: 23 21 19 36 18 37 3938 JAMES STREET 53 17 42 · 7/8/2020  · PH Club Works 42 Works El Sub Sta Works 85 Warehouse 37 71 Works 49 Works Works 16 19 101 45 20 Works 38 Chy 33 Works

P

H

C

l

i

n

i

c

22

24

1

2

8

.

0

m

F

n

1

3

0

.

8

m

10

1

3

7

M

u

l

t

i

s

t

o

r

e

y

1

2

9

.

5

m

1 to 11

20 to 39

1

C

a

r

P

a

r

k

1

2

1

3

L

B

T

C

B

M

u

l

t

i

C

a

r

P

k

Shelters

Ward Bdy

Def

T

u

n

n

e

l

15 to

19

2

S

h

e

l

t

e

r

s

T

C

B

T

C

B

T

C

B

20

L

C

C

a

r

P

a

r

k

P

H

C

l

i

n

i

c

22

24

1

2

8

.

0

m

F

n

1

3

0

.

8

m

10

1

3

7

M

u

l

t

i

s

t

o

r

e

y

1

2

9

.

5

m

1 to 11

20 to 39

1

C

a

r

P

a

r

k

1

2

1

3

L

B

T

C

B

M

u

l

t

i

C

a

r

P

k

Shelters

Ward Bdy

Def

T

u

n

n

e

l

15 to

19

2

S

h

e

l

t

e

r

s

T

C

B

T

C

B

T

C

B

20

L

C

C

a

r

P

a

r

k

S

N

O

W

H

IL

L

S

T

C

H

A

D

'S

C

I

R

C

U

S

Q

U

E

E

N

S

W

A

Y

COLMORE CIRCUS QUEENSWAY

COLMORE CIRCUS QUEENSWAY

WEAMAN STREET

QU

EE

NS

WA

Y

WH

ITTA

LL STR

EE

T

COLROW

COLROW

(A34) A38

AHEAD

ONLY

A41A41

A41A41

AHEADONLY

BUSSTAND BUSSTAND

BUSGATE

BUSGATE

BUSGATE

RE

FE

R T

O S

EC

TIO

N S

1-0

5

KEEP

CLEAR

BUS STOP

BUS STOPBUS STAN

DBUS STAND

BUSSTOP

COLROW

TRAFFIC SIGN NOT PRESCRIBED IN TSRGD.

REQUIRES SECRETARY OF STATE APPROVAL

BLANK OUT AREA SHOWN ON SIGN

REMOVE SIGN PLATE TO TIP

REMOVE SIGN PLATE TO TIP

TC-07-01

TC-07-02

TC-07-03

TC-07-04

TC-07-05 & 06

TC-07-13

TC-07-14

TC-07-15

TC-07-16

TC-07-17TC-07-18

TC-07-19 & 20

TC-07-21

TC-07-22

TC-07-08

TC-07-09 & 10

TC-07-11

TC-07-12

TC-07-07

50m

1 : 500

305 10 200 40

This drawing includes map data licensed from Ordnance Survey with the permission

of the controller of Her Majesty's Stationery Office.

ã Crown copyright licence number 100019543 (2020)

KEY

EXISTING ROAD MARKINGS

PROPOSED WHITE ROAD MARKINGS

PROPOSED KERB

TRAFFIC CONE

BARRIERS

TEMPORARY TRAFFIC SIGN A-FRAME

LOCATION PLAN

NOTES

1. ALL DIMENSIONS IN METRES UNLESS OTHERWISE STATED.

2. NOTES PLACED DIRECTLY ON THE LAYOUT DRAWING

SUPERSEDE THOSE DETAILED IN KEYS.

3. ALL DIAGRAMS ARE TO THE TRAFFIC SIGNS REGULATIONS

AND GENERAL DIRECTIONS 2016 (TSRGD).

4. ALL DESIGNS ARE BASED ON ORDNANCE SURVEY MAPPING.

5. WHERE NO CHANGE IS SHOWN, EXISTING RESTRICTIONS

APPLY.

6. WHERE CYCLES ARE PERMITTED THROUGH ROAD

CLOSURES, A MINIMUM OF 1.5m GAP SHOULD BE PROVIDED

BETWEEN THE KERB AND TEMPORARY BARRIER.

FOR INFORMATION

100 BROAD STREET BIRMINGHAM B15 1AE

Telephone +44 (0)121 456 1616Email: [email protected]

www.pellfrischmann.com

P04

104130-PF-100-C1-DR-TR-006

Sheet 7

Concept Design

Tranche 1

Birmingham Traffic Cells

Transport Plan

Emergency Birmingham

AutoCAD SHX Text
P01
AutoCAD SHX Text
DH
AutoCAD SHX Text
NY
AutoCAD SHX Text
26-06-20
AutoCAD SHX Text
NY
AutoCAD SHX Text
CONCEPT DESIGN
AutoCAD SHX Text
UPDATED FOLLOWING CLIENT & STAKEHOLDER FEEDBACK
AutoCAD SHX Text
NY
AutoCAD SHX Text
27-07-20
AutoCAD SHX Text
NY
AutoCAD SHX Text
DH
AutoCAD SHX Text
P02
AutoCAD SHX Text
P03
AutoCAD SHX Text
DH
AutoCAD SHX Text
NY
AutoCAD SHX Text
03-08-20
AutoCAD SHX Text
NY
AutoCAD SHX Text
UPDATED FOLLOWING CLIENT FEEDBACK
AutoCAD SHX Text
Drawing Status
AutoCAD SHX Text
Drawing No.
AutoCAD SHX Text
Name
AutoCAD SHX Text
Date
AutoCAD SHX Text
File No.
AutoCAD SHX Text
Scale
AutoCAD SHX Text
Drawing Title
AutoCAD SHX Text
Project
AutoCAD SHX Text
Revision
AutoCAD SHX Text
REV
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DRN
AutoCAD SHX Text
CHK
AutoCAD SHX Text
APP
AutoCAD SHX Text
DATE
AutoCAD SHX Text
Approved
AutoCAD SHX Text
Drawn
AutoCAD SHX Text
Checked
AutoCAD SHX Text
Designed
AutoCAD SHX Text
CONCEPT DESIGN
AutoCAD SHX Text
Pell Frischmann
AutoCAD SHX Text
c
AutoCAD SHX Text
26-06-20
AutoCAD SHX Text
NY
AutoCAD SHX Text
26-06-20
AutoCAD SHX Text
NY
AutoCAD SHX Text
26-06-20
AutoCAD SHX Text
DH
AutoCAD SHX Text
26-06-20
AutoCAD SHX Text
DH
AutoCAD SHX Text
1:500 @ A1
AutoCAD SHX Text
Architect/Client/Contractor
AutoCAD SHX Text
104130-PF-100-C1-DR-TR
AutoCAD SHX Text
UPDATED FOLLOWING CLIENT FEEDBACK
AutoCAD SHX Text
NY
AutoCAD SHX Text
07-08-20
AutoCAD SHX Text
NY
AutoCAD SHX Text
DH
AutoCAD SHX Text
P04
Page 4: 23 21 19 36 18 37 3938 JAMES STREET 53 17 42 · 7/8/2020  · PH Club Works 42 Works El Sub Sta Works 85 Warehouse 37 71 Works 49 Works Works 16 19 101 45 20 Works 38 Chy 33 Works

2

3

t

o

2

5

G

a

r

a

g

e

W

a

r

e

h

o

u

s

e

G

a

r

a

g

e

W

o

r

k

s

3

7

2

1

9

t

o

2

1

2

7

t

o

3

0

1

1

8

.

0

m

3

7

1

S

u

b

w

a

y

W

a

r

e

h

o

u

s

e

D

e

p

o

t

C

a

r

P

a

r

k

3

7

0

W

arehouse

W

o

r

k

s

4

0

B

a

t

h

S

t

S

u

b

w

a

y

W

o

r

k

s

W

o

r

k

s

W

a

r

e

h

o

u

s

e

W

o

r

k

s

W

o

r

k

s

3

6

3

to

6

8

2

3

6

1

P

H

C

l

u

b

W

o

r

k

s

4

2

W

o

r

k

s

El S

ub S

ta

W

o

r

k

s

8

5

W

a

r

e

h

o

u

s

e

3

7

7

1

W

o

r

k

s

49

W

o

r

k

s

W

o

r

k

s

16

1

9

101

45

2

0

W

o

r

k

s

3

8

C

h

y

3

3

W

o

r

k

s

1

6

to

1

8

1

1

3

.7

m

22

6

2

2

4

5

92

1

1

4

.0

m

93

23 to 34

C

a

r

P

a

r

k

1

2

2

.

5

m

W

arehouse

4

8

1

1

7

.

3

m

1

1

4

.0

m

54 to 67

32

2

W

a

r

e

h

o

u

s

e

T

o

w

P

a

th

W

o

r

k

s

C

a

r

P

a

r

k

4

7

100

Partr

idge C

ourt

7

5

50

W

o

r

k

s

Ware

house

3

3

to

3

5

W

o

r

k

s

4

1

1

4

.

6

m

1

1

2

.

8

m

1

1

6

.

1

m

Factory

43

5

0

6

0

5

6

T

o

6

0

C

a

r

P

a

r

k

68 to 69

3

0

3

1

2

9

a

1 to 19

97

98

95

96

94

2

9

21 to 24

1 to 6

2

5

to

2

7

2

9

to

3

1

3

6

9

S

h

e

l

t

e

r

E

S

S

C

a

r

P

a

r

k

C

a

r

P

a

r

k

C

a

r

P

a

r

k

C

a

r

P

a

r

k

4

2

G

a

n

t

r

y

L

B

T

C

B

2

3

t

o

2

5

G

a

r

a

g

e

W

a

r

e

h

o

u

s

e

G

a

r

a

g

e

W

o

r

k

s

3

7

2

1

9

t

o

2

1

2

7

t

o

3

0

1

1

8

.

0

m

3

7

1

S

u

b

w

a

y

W

a

r

e

h

o

u

s

e

D

e

p

o

t

C

a

r

P

a

r

k

3

7

0

W

arehouse

W

o

r

k

s

4

0

B

a

t

h

S

t

S

u

b

w

a

y

W

o

r

k

s

W

o

r

k

s

W

a

r

e

h

o

u

s

e

W

o

r

k

s

W

o

r

k

s

3

6

3

to

6

8

2

3

6

1

P

H

C

l

u

b

W

o

r

k

s

4

2

W

o

r

k

s

El S

ub S

ta

W

o

r

k

s

8

5

W

a

r

e

h

o

u

s

e

3

7

7

1

W

o

r

k

s

49

W

o

r

k

s

W

o

r

k

s

16

1

9

101

45

2

0

W

o

r

k

s

3

8

C

h

y

3

3

W

o

r

k

s

1

6

to

1

8

1

1

3

.7

m

22

6

2

2

4

5

92

1

1

4

.0

m

93

23 to 34

C

a

r

P

a

r

k

1

2

2

.

5

m

W

arehouse

4

8

1

1

7

.

3

m

1

1

4

.0

m

54 to 67

32

2

W

a

r

e

h

o

u

s

e

T

o

w

P

a

th

W

o

r

k

s

C

a

r

P

a

r

k

4

7

100

Partr

idge C

ourt

7

5

50

W

o

r

k

s

Ware

house

3

3

to

3

5

W

o

r

k

s

4

1

1

4

.

6

m

1

1

2

.

8

m

1

1

6

.

1

m

Factory

43

5

0

6

0

5

6

T

o

6

0

C

a

r

P

a

r

k

68 to 69

3

0

3

1

2

9

a

1 to 19

97

98

95

96

94

2

9

21 to 24

1 to 6

2

5

to

2

7

2

9

to

3

1

3

6

9

S

h

e

l

t

e

r

E

S

S

C

a

r

P

a

r

k

C

a

r

P

a

r

k

C

a

r

P

a

r

k

C

a

r

P

a

r

k

4

2

G

a

n

t

r

y

L

B

T

C

B

L

O

W

E

R

L

O

V

E

D

A

Y

S

T

R

E

E

T

LO

WE

R L

OV

ED

AY

ST

RE

ET

CL

IV

EL

AN

D S

TR

EE

T

H

A

N

L

E

Y

S

T

R

E

E

T

C

E

C

IL

S

T

R

E

E

T

P

R

IN

C

IP

S

T

R

E

E

T

S

H

A

D

W

E

L

L

S

T

R

E

E

T

LIT

TLE

SH

AD

WE

LL S

TR

EE

T

BA

TH

S

TR

EE

T

LO

VE

DA

Y S

TR

EE

T

TC-08-01

TC-08-04 & 05

TC-08-06

TC-08-03

TC-08-02

TC-08-08

TC-08-07

50m

1 : 500

305 10 200 40

This drawing includes map data licensed from Ordnance Survey with the permission

of the controller of Her Majesty's Stationery Office.

ã Crown copyright licence number 100019543 (2020)

KEY

EXISTING ROAD MARKINGS

PROPOSED WHITE ROAD MARKINGS

PROPOSED KERB

TRAFFIC CONE

BARRIERS

TEMPORARY TRAFFIC SIGN A-FRAME

LOCATION PLAN

NOTES

1. ALL DIMENSIONS IN METRES UNLESS OTHERWISE STATED.

2. NOTES PLACED DIRECTLY ON THE LAYOUT DRAWING

SUPERSEDE THOSE DETAILED IN KEYS.

3. ALL DIAGRAMS ARE TO THE TRAFFIC SIGNS REGULATIONS

AND GENERAL DIRECTIONS 2016 (TSRGD).

4. ALL DESIGNS ARE BASED ON ORDNANCE SURVEY MAPPING.

5. WHERE NO CHANGE IS SHOWN, EXISTING RESTRICTIONS

APPLY.

6. WHERE CYCLES ARE PERMITTED THROUGH ROAD

CLOSURES, A MINIMUM OF 1.5m GAP SHOULD BE PROVIDED

BETWEEN THE KERB AND TEMPORARY BARRIER.

FOR INFORMATION

100 BROAD STREET BIRMINGHAM B15 1AE

Telephone +44 (0)121 456 1616Email: [email protected]

www.pellfrischmann.com

P04

104130-PF-100-C1-DR-TR-007

Sheet 8

Concept Design

Tranche 1

Birmingham Traffic Cells

Transport Plan

Emergency Birmingham

AutoCAD SHX Text
P01
AutoCAD SHX Text
DH
AutoCAD SHX Text
NY
AutoCAD SHX Text
26-06-20
AutoCAD SHX Text
NY
AutoCAD SHX Text
CONCEPT DESIGN
AutoCAD SHX Text
UPDATED FOLLOWING CLIENT & STAKEHOLDER FEEDBACK
AutoCAD SHX Text
NY
AutoCAD SHX Text
27-07-20
AutoCAD SHX Text
NY
AutoCAD SHX Text
DH
AutoCAD SHX Text
P02
AutoCAD SHX Text
P03
AutoCAD SHX Text
DH
AutoCAD SHX Text
NY
AutoCAD SHX Text
03-08-20
AutoCAD SHX Text
NY
AutoCAD SHX Text
UPDATED FOLLOWING CLIENT FEEDBACK
AutoCAD SHX Text
Drawing Status
AutoCAD SHX Text
Drawing No.
AutoCAD SHX Text
Name
AutoCAD SHX Text
Date
AutoCAD SHX Text
File No.
AutoCAD SHX Text
Scale
AutoCAD SHX Text
Drawing Title
AutoCAD SHX Text
Project
AutoCAD SHX Text
Revision
AutoCAD SHX Text
REV
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DRN
AutoCAD SHX Text
CHK
AutoCAD SHX Text
APP
AutoCAD SHX Text
DATE
AutoCAD SHX Text
Approved
AutoCAD SHX Text
Drawn
AutoCAD SHX Text
Checked
AutoCAD SHX Text
Designed
AutoCAD SHX Text
CONCEPT DESIGN
AutoCAD SHX Text
Pell Frischmann
AutoCAD SHX Text
c
AutoCAD SHX Text
26-06-20
AutoCAD SHX Text
NY
AutoCAD SHX Text
26-06-20
AutoCAD SHX Text
NY
AutoCAD SHX Text
26-06-20
AutoCAD SHX Text
DH
AutoCAD SHX Text
26-06-20
AutoCAD SHX Text
DH
AutoCAD SHX Text
1:500 @ A1
AutoCAD SHX Text
Architect/Client/Contractor
AutoCAD SHX Text
104130-PF-100-C1-DR-TR
AutoCAD SHX Text
UPDATED FOLLOWING CLIENT FEEDBACK
AutoCAD SHX Text
NY
AutoCAD SHX Text
07-08-20
AutoCAD SHX Text
NY
AutoCAD SHX Text
DH
AutoCAD SHX Text
P04