24a - 1NASA’s Goddard Space Flight Center
Mission Assurance
Ron KoleckiSenior Systems Assurance Manager
August 16-17, 2005
24a - 2NASA’s Goddard Space Flight Center
Mission Assurance Requirement Summary
GSFC Responsible
GSFC PI
Russia Responsible
UoMD PI
MIT Responsible
Boston U PI
GSFC Responsible
Mission Assurance Requirements are consistent across project with independent oversight of each
element
Mission Assurance Requirements are consistent across project with independent oversight of each
element
LRO Level 1Requirements
ESMD-RLEP-0010
LRO Level 1Requirements
ESMD-RLEP-0010
RLEP Mission AssuranceRequirements
430-RQMT-000006
RLEP Mission AssuranceRequirements
430-RQMT-000006
Mission Assurance Guidelines
300-PG-7120.2.2
Mission Assurance Guidelines
300-PG-7120.2.2
LRO Spacecraft
PAIP
LRO Spacecraft
PAIP
LOLA Instrument
PAIP
LOLA Instrument
PAIP
LEND Instrument
PAIP
LEND Instrument
PAIP
LAMPInstrument
PAIP
LAMPInstrument
PAIP
CRaTERInstrument
PAIP
CRaTERInstrument
PAIP
Diviner Instrument
PAIP
Diviner Instrument
PAIPMini RF
Tech Demo
Mini RFTech Demo
DoD Responsible
LROC Instrument
PAIP
LROC Instrument
PAIP
MSSS Responsible
Northwestern Univ PI
SwRI Responsible
NW PI
JPL Responsible
UCLA PI
24a - 3NASA’s Goddard Space Flight Center
Mission Assurance Organization
LRO Experienced Personnel provide oversight and technical support across all
elements of LRO Project
LRO Experienced Personnel provide oversight and technical support across all
elements of LRO Project
EEE PartsRich Williams
EEE PartsRich Williams
MaterialsPilar Joy
MaterialsPilar Joy
ReliabilityNinoIngegne
Lydia Lee
ReliabilityNinoIngegne
Lydia Lee
Hardware QAWillie JonesAlton Lacks
Hardware QAWillie JonesAlton Lacks
Software QACindy Taylor
Software QACindy Taylor
ManufacturingNick Virmani
ManufacturingNick Virmani
Systems Assurance Manager Ron Kolecki
Safety ManagerDave Bogart
Systems Assurance Manager Ron Kolecki
Safety ManagerDave Bogart
Office of System Safety and Mission Assurance
Director
Office of System Safety and Mission Assurance
Director
LRO Project ManagerCraig Tooley
LRO Project ManagerCraig Tooley
24a - 4NASA’s Goddard Space Flight Center
Requirements Applicable to all Mission Concepts
• QMS: ISO 9001:2000
• Nonconformance Control (NCR or PFR)
• MRB/FRB Requirements
• Hardware, S/W or Design Reuse
• Configuration Mgt.
• Reqts. Flowdown
• Contractor Surveillance
• Safety Program per NPD 8700.1
• System Safety Plan
• Hazard Analyses
• MSPSP
• Ground & Hazardous Ops.
• Orbital Debris
• Launch Site Support
• Mishap Reporting
• Probabilistic Risk Assessment
• FMEA / FTA
• Part Stress & WCA
• Trend Analysis
• Limited Life
• Risk List
• Documented Program (PAIP)
• Software Safety per NASA-STD-8719.13
• Verification & Validation, IV&V
• Configuration Mgt.
• Formal Reviews
• Problem Reporting/ Corrective Action
• Surveillance
• Independent Design Reviews
• Verification Plans/ Specs (GEVS-SE)
• Test Matrix/ Verification Reports
• Component/ Subsystem Reviews
• Verification Reports
RLEP MAR
430-RQMT-000006
300-PG-7120.2.2
(MAG)
LRO Spacecraft/
Orbiter PAIP
431-PLAN-000131
LOLA PAIPLOLA-PLAN-
0003LEND PAIP LROC PAIP CRaTER PAIP
DWG 32-01204Diviner PAIP LAMP PAIP
PAIP-05-15-11239
Quality System / Configuration Control System Safety Reliability/Risk Software Assurance Design Verification/
Technical Reviews
24a - 5NASA’s Goddard Space Flight Center
Requirements Applicable to all Mission Phases
RLEP MAR
430-RQMT-000006
300-PG-7120.2.2
(MAG)
• NASA-STD-8739 Series
• PWB Design per IPC 2221-2223, D-275
• PWB Mfg. Per ICP A600-6018 W/ GSFC Supplement
• PWB Coupons
• Training / Certification
• ESD – ANSI/ESD S20-20
•Level 2 parts per EEE-INST-002
•Parts Control Board
•Derating
•Radiation Effects– TID, ELDR, SEE
•Value Added Tests (PIND, etc.)
•Alerts
•Test Data & EIDP
•Photos
• Compliant Materials & MSFC-STD-3029
• Outgassing Limits (TML/CVCM)
• Shelf Life Controls
• Materials & Process Lists for LRO MAE Review & Approval
• Fastener Integrity (541-PG-8072.1.2)
• Raw Material Certs.
• Contamination Verification Process
• Contamination Control Plan
• Outgassing
• T/V Bakeouts of all Hardware
• Hardware Handling & Cleanroom Standards.
• Respond to GIDEP and NASA Advisories (GPG 5340.3)
LRO PAIP
431-PLAN-000131
Workmanship/Design/ESD
RequirementsEEE Parts Materials & Processes Contamination Control GIDEP Alerts &
Problem Advisories
24a - 6NASA’s Goddard Space Flight Center
RLEP/LRO MAR – PAIP Relationship
• The RLEP Mission Assurance Requirements (MAR) document was written to define the overall mission requirements for hardware, software and related critical ground support equipment.
• The Spacecraft/Orbiter and Instrument teams responded with their Performance Assurance Implementation Plans (PAIP) which outline how the individual institutions and their contractors would meet the requirements called out as CDRLs in the MAR.
• After the project has reviewed the initial PAIPs and commented back to the teams, revisions in the PAIPs may be required.
• Those requirements which the developers cannot meet will be documented on a waiver request.
24a - 7NASA’s Goddard Space Flight Center
Problem Failure Reporting
• Both the spacecraft/orbiter and instrument teams are required to document failures (at the first application of power at the start of end item acceptance testing or the first operation of a mechanism) or nonconformances with received product.
• The LRO project office must be notified of problem/failures within 24 hours of occurrence. A failure review board may be required to disposition the actions related to the issue.
• A closed loop nonconformance system is also required by the MAR. It shall include ensuring the corrective action is implemented to prevent recurrence.
• A Material Review Board is required to disposition other than preliminary reviews. The teams QA lead shall be a member of the MRB.
• The MRB chairperson shall notify the LRO project of all MRB actions and recommendations.
24a - 8NASA’s Goddard Space Flight Center
Surveillance and Audits
• The LRO Project has a surveillance plan (430-PLAN-0003) which defines how the project will monitor hardware and software development activities from all the contractors.
• Assurance reviews and audits provide an insight into how the contractors are functioning.
• Participation by SMA in boards such as CCB, PCB, MRB, FRB and others provides insight into various phases of the design and workmanship.
• The LRO SMA team will use two methods of product verification.– Direct examination: inspection of hardware and associated documentation
– Indirect examination: similar hardware fabricated by the same personnel and equipment, lot acceptance samples and material examinations that may take place at GSFC.
24a - 9NASA’s Goddard Space Flight Center
Mission Assurance Summary
• Mission Assurance Requirements are well defined and comprehensive.
• These are traditional requirements for GSFC Missions and they are understood.
• Systems with experienced personnel are in place and operating.
The Lunar Reconnaissance Orbiter Mission Assurance team is ready to support PDR
The Lunar Reconnaissance Orbiter Mission Assurance team is ready to support PDR