    NRC Presentation, Shelter Meeting 11b,

    Geneva, November 2011

    Title: Urban Assistance in Baghdad

    Objective: Initiate participation in developmentof Strategies for Urban Shelter

    Assistance

    Presented by: yvind Nordlie , Shelter Advisor , NRC

  • 8/13/2019 27 - Urban Assistance in Baghdad - Nrc - o Nordlie

    2/13

    Urban Shelter Guidelines

    Traditionally, morefocus on Displacedand Non-displaced,but not on AffectedPopulation

    Difficulties ofdefining IDPs due tovarious reasons forchange in location(econ, social..)

    Unclear how tosupport urbanpopulations withexisting AssistanceMethods(understand urbanneeds)

  • 8/13/2019 27 - Urban Assistance in Baghdad - Nrc - o Nordlie

    3/13

    NRC Pilot Project

    Baghdad:

    126 Settlements, IDP population 215.000

    NRC involved in 60 settlements

  • 8/13/2019 27 - Urban Assistance in Baghdad - Nrc - o Nordlie

    4/13

    NRC Pilot Project

    IDP camps transform

    into regular cityslums

  • 8/13/2019 27 - Urban Assistance in Baghdad - Nrc - o Nordlie

    5/13

    UNHABITATInitiative:

    Strategy for

    durable

    solutions

    NRC Pilot Project

    Amman

    conference

    March 2011

  • 8/13/2019 27 - Urban Assistance in Baghdad - Nrc - o Nordlie

    6/13

    NRC Pilot Project

    Challenge:

    Selective

    assistance;

    post 2006

    IDPs

    NRC Pil t P j t

  • 8/13/2019 27 - Urban Assistance in Baghdad - Nrc - o Nordlie

    7/13

    NRC Pilot Project

    Working with

    all groups in

    communities

    All durable

    solutions

  • 8/13/2019 27 - Urban Assistance in Baghdad - Nrc - o Nordlie

    8/13

    o ro ec

    3a. Forming

    of

    community

    steeringgroup and

    saving &

    loan group

    7a. Begin

    physical

    construction

    3c. Establish

    Housing

    facilitation

    Unit

    6. Master

    planning

    1. Agreementof non-

    eviction for

    current

    occupiers

    2. Addressallocated for

    current

    occupiers-Registered IDPs

    -Non registered IDPs

    5. Regularization 5. Individuallease

    granted on

    regularized

    plots

    5. Option tobuy land title

    @ market

    value

    7b. Housing

    finance

    7c.

    Infrastructur

    e financing

    7b.Construction

    Modality

    Self build,

    contractor

    build,

    Longer term shelter process

    INTEGRATION

    INFORMAL SETTLEMENT

    UPGRADE incremental

    process (staying in the

    community.)

    LOCAL INTEGRATION

    3b. Form

    decision

    making

    committee ,

    4. Plan and

    agree to

    extend basic

    core services

    Temp phase

    Permanent

    Phase

    5. Communal

    lease

    agreement

    conditionsBased on

    communal

    model

    Rental support

    Long term involvement -

    Complex processes

    NRC Pil t P j t

  • 8/13/2019 27 - Urban Assistance in Baghdad - Nrc - o Nordlie

    9/13

    NRC Pilot Project

    Integration:Socio

    economic

    structures

  • 8/13/2019 27 - Urban Assistance in Baghdad - Nrc - o Nordlie

    10/13

  • 8/13/2019 27 - Urban Assistance in Baghdad - Nrc - o Nordlie

    11/13

  • 8/13/2019 27 - Urban Assistance in Baghdad - Nrc - o Nordlie

    12/13

    NRC Pilot Project

    A variety of approaches and tools needed

  • 8/13/2019 27 - Urban Assistance in Baghdad - Nrc - o Nordlie

    13/13

    Participation

    Phase II

    Share existing developments (coordinate with

    UNHABITAT)

    Best practices Working group

    Reference group