Respo nsibi litie METROSIL SITE TEST REPORT Name of Substation: Al-Khurmah 110/13.8kV S/S Contract No. : 4400002558 Customer Name: National Grid-SA-WOA Sheet :- Page 1 of 2 Panel/Bay No.: Equip. No.: Dwg. Ref.: Record No.: 1. GENERAL DATA AND INFORMATION. Panel No: Model No: Make Rating Serial No: 2. MECHANICAL CHECKS AND VISUAL INSPECTION : 3. Function Check: Voltage Applied in Volts Measured Current in mA (R ph) Measured Current in mA (Y ph) Measured Current in mA (B ph) DATE: TESTING ENGINEER - JAL MAIN CONTRACTOR – ETA STAR CSD- ENGINEER Signature: ________________ Name : ________________ Signature: ________________ Name : ________________ Signature: ________________ Name : ________________ Respo nsibi litie

27.Metrosil Test Format

Embed Size (px)

DESCRIPTION

Metrosil Test Format

Citation preview

Page 1: 27.Metrosil Test Format

Responsibilities LegendCSD

Responsibilities LegendCSD

Responsibilities LegendCSD

METROSILSITE TEST REPORT

Name of Substation: Al-Khurmah 110/13.8kV S/SContract No. : 4400002558

Customer Name: National Grid-SA-WOA Sheet :- Page 1 of 1

Panel/Bay No.: Equip. No.: Dwg. Ref.: Record No.:

1. GENERAL DATA AND INFORMATION.Panel No: Model No:Make RatingSerial No:

2. MECHANICAL CHECKS AND VISUAL INSPECTION:

3. Function Check:

Voltage Applied in Volts

Measured Current in mA (R ph)

Measured Current in mA (Y ph)

Measured Current in mA (B ph)

DATE:

TESTING ENGINEER - JAL MAIN CONTRACTOR – ETA STAR

CSD- ENGINEER

Signature: ________________

Name : ________________

Signature: ________________

Name : ________________

Signature: ________________

Name : ________________

Responsibilities LegendCSD