63
29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530-6901 Shaheen Safiullah Compliance Assistance Specialist

29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance

Embed Size (px)

Citation preview

Page 1: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance

29 CFR1910.1025 Lead in General Industry

1926.62 Lead in Construction

ile, Compliance OfficerUtah OSHA – (801)530-

6901

Shaheen Safiullah

Compliance Assistance Specialist

Page 2: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance

Health Effects

• Routes of Entry

• Inhalation (breathing)

• Ingestion (swallowing)

Page 3: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance

Health Effects

• Acute effects– Abdominal pain

– Constipation

– Limb pain

– Hypertension

– Vomiting

– Coma

– Respiratory arrest

– Death

Page 4: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance

Health Effects (contd)

• Chronic effects– Fatigue– Weight loss– Insomnia– Shaking of arms– Foot drop, wrist drop– Blue line on gums

Page 5: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance

Organs and systems affected

• Blood System (heme-synthesis inhibition)

• Nervous System

• Kidneys and Liver

• Reproductive System

* Children and Lead

Page 6: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance

Medical Expenses

• Higher workers compensation premium– Liability Lawsuits– Loss of Productivity– Loss in earning power– Lost time by supervision– Lost time by fellow workers– Cost of training new personnel– Economic loss to injured worker’s family

Page 7: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance

Exposure Limits

• PEL (permissible exposure limit)– 50g/m3 (8-hour time weighted average)– OR, Allowable employee exposure in g/m3) =

400 divided by the number of hours worked in the day

• AL (Action Level)– 30g/m3 (8 hour time weighted average)

• Blood Lead Level (BLL)– 50 g/dl

Page 8: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance

Exposure Assessment

• Employers shall initially determine if any employee may be exposed to lead at or above the action level. Do not use the protection factor of respirators during exposure assessment.– Collect personal samples representative of a full shift

• At least one sample for each job classification in each work area with the highest exposure

– Exception: Any data obtained within the past 12 months under closely resembling work conditions such as processes, type of material, control methods, work practices, environmental conditions, is acceptable in place of personal air samples in the current workplace.

Page 9: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance

Construction: Provide Protection During Exposure Assessment

• Appropriate respiratory protection• Protective work clothing & equipment• Change areas• Handwashing facilities• Training• Initial medical surveillance: BLL &

ZPP

Page 10: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance

Construction: Assumed Exposures >PEL but < 10X PEL

• Manual scraping/sanding• Heat gun applications• General clean up• Power tool cleaning w/dust

collection systems• Spray painting with lead-based

paint

Page 11: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance

Construction: Assumed Exposures

>10X PEL but <50X PEL • Lead-containing mortar; lead burning• Rivet busting• Power tool cleaning w/out dust

collection systems• Clean up of dry expendable abrasives• Abrasive blasting enclosure movement

and removal

Page 12: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance

Construction: Assumed Exposures>50X PEL

• Abrasive blasting

• Welding

• Cutting

• Torch burning

Page 13: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance

Basis of initial determination

• Employer shall conduct initial monitoring based on the following observations:– Employee exposure monitoring results– Any information, observations or calculations

which would indicate lead exposure– Previous monitoring– Employee complaints of symptoms related to

lead exposure

Page 14: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance

Initial determination exception• Objective data showing that a particular product containing

lead or a process, operation or activity involving lead cannot result in employee exposure to lead at or above the action level during processing, use or handling, the employer may rely upon such data instead of implementing initial monitoring. – Maintain an accurate record documenting the nature and relevancy

of objective data. This record must be maintained for 30 years.

• Any data obtained within the past 12 months under closely resembling conditions.

• Objective data cannot be used for exposure assessment during interim protection.

Page 15: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance

Positive initial determination

• If there is possibility of exposure above the action level then representative monitoring must be conducted.– If above the AL but below the PEL monitoring

shall be done every 6 months– If above the PEL then every 3 months

Page 16: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance

Additional Exposure Assessments Required When

• Changes that may result in increased exposure:–Equipment–Process/new task–Control–Personnel

Page 17: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance

(e) Methods of compliance

Page 18: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance

Hierarchy of Controls

• Goal: reduce exposures to PEL• Must institute engineering and

work practice controls• May use administrative controls• May supplement with respiratory

protection after achieving lowest feasible level

Page 19: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance

Compliance Program

• Required if PEL

• Revised/updated every 6 months

Page 20: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance

Compliance Program Components

• Description of lead-emitting processes– Equipment, material, controls, crew size,

job description, SOPs, maintenance procedures

• How compliance will be achieved• Technology considered to achieve PEL• Air monitoring data documenting lead

emission source• Schedule for implementation

Page 21: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance

Compliance Program Components (cont’d)

• Work practice program– Protective clothing

– Housekeeping

– Hygiene facilities

– Work practices as described in App B where relevant

Page 22: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance

Compliance Program Components (cont’d)

• Administrative controls– Implement a job rotation schedule:

• ID of employee

• Duration and exposure levels of each job

• Any other information useful in assessing reliability of administrative controls

Page 23: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance

Compliance Program Components (cont’d)

• Arrangements made among contractors on multi-contractor sites (1926.16)

• Provisions for frequent and regular inspections of job sites, materials and equipment by a competent person

• Revise the program at least every six months

Page 24: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance

No Apparent Controls for Lead Exposure

Page 25: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance

Engineering ControlIsolation / Containment

Page 26: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance

Engineering ControlsShrouded Tools w/HEPA

vacuum

Page 27: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance

Other Engineering & Work Practice Controls

• Substitution

• Ventilation

• Processes than minimize dust generation– Chemical paint strippers

– Wet methods

Page 28: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance

Chemical Paint Removers

Page 29: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance

(f) Respiratory Protection

Implement a written respiratory protection program

(29 CFR 1910.134)

Page 30: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance

Air-Purifying Respirator (APR)Cleanses the contaminated atmosphere

Can’t be worn: in unknown/IDLH atmospheres where prohibited

Page 31: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance

Powered Air-Purifying Respirator (PAPR)

An air-purifying respirator that uses a blower to force the ambient air through air-purifying elements to the inlet covering.

Page 32: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance

Atmosphere-Supplying Respirators

• Supplies breathing air

• Includes:– Supplied air

respirators– SCBA– Combination SAR /

SCBA units

Page 33: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance

Two Basic Classes of Contaminants

• Aerosols/particulates–Airborne solid or liquid particles

–Dusts, fumes, mists, fog, smoke, fibers

• Gases/Vapors

Page 34: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance

High Efficiency Particulate Air Filter (HEPA)

Filter that is at least 99.97% efficient in removing monodisperse particles of 0.3 micrometers in diameter.

Equivalent NIOSH 42 CFR 84 particulate filters are the N100, R100, and P100 filters.

Page 35: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance

Medical Evaluations

• Before fit testing and use

• Performed by PLHCP –medical questionnaire - 1910.134

Appendix C

–an initial medical examination

Page 36: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance

Fit Testing

Assess respirator fit prior to use

Page 37: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance

Use of RespiratorsFacepiece Seal Protection

• No facial hair or any condition that interferes with the face-to-facepiece seal or valve function

• Corrective glasses or goggles or other PPE must be worn in a manner that does not interfere with the face-to-facepiece seal

• User seal check each time

Page 38: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance

User Seal Check

An action conducted by the respirator user to determine if the respirator is properly seated to the face.

Positive Pressure Positive Pressure CheckCheck

Negative Pressure Negative Pressure CheckCheck

Page 39: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance

Maintenance and Care

• Clean and disinfect• Storage

– Cartridges/filtersseparately– Plastic bags orcoffee cans

Page 40: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance

Respirator Selection

• Based on exposure level

• Select using Table 1

• PAPRs must be provided if–Employee chooses and

–Provides adequate protection

Page 41: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance

(g) Protective Work Clothing and Equipment

Page 42: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance

Provision and Use

• Prevent employee contamination• Provide and maintain at no cost

when– > PEL– Skin/eye irritation– Interim protection

• Ensure use

Page 43: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance

Cleaning & Replacement

• Clean at least weekly; daily if >200g/m3

• Remove PPE in change areas only• Put into closed, labeled containers• Inform cleaning personnel in writing• No blowing, shaking, or otherwise

dispersing in air

Page 44: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance

(h) Housekeeping – for all exposures!

• Keep all surfaces free from lead• Use HEPA filter when vacuuming • Shoveling, dry or wet sweeping used only

where vacuuming or an equal method is not effective

• Compressed air not allowed unless used with exhaust ventilation system

Page 45: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance

(i) Hygiene Facilities & Practices

Page 46: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance

Lead on Hands & Blood Lead Levels

• Positive correlation between lead on hand tested and blood lead levels

Page 47: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance

Hygiene Facilities & Practices

• Required when exposure > PEL

• No food, drinks, cigs, cosmetics – Wash hands/face prior

• Eating facilities/areas: provide– Free from lead– Enter after removing surface Pb dust

Page 48: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance

Signs Required in Areas >PEL

Page 49: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance

Hygiene Facilities & Practices - cont

• Provide clean change rooms– Separate work and street clothes– Ensure workers don’t wear PPE

home

• Showers: provide and ensure use when > PEL– If unfeasible, handwashing facilities– Provide cleansing agents and towels

Page 50: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance

Hygiene Facilities & Practices - cont

Page 51: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance

D-Lead Cleaning Products

Page 52: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance

Lead Check Swabs

Page 53: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance

D-Lead Lead Test Kits

Spray Solution 1, then Solution 2

Yellow means lead is present

Page 54: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance

(j) Medical Surveillance

Page 55: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance

Medical Surveillance

• Biological Monitoring when = or >AL–Blood lead levels (BLL)–Zinc Protoporphyrin (ZPP)

• Medical Examinations by licensed physician

Page 56: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance

Medical Surveillance – cont

• When =/ > AL for more than 30 days in any consecutive 12 months

• No cost to employees, reasonable time and place

• Requirements vary according to– Workplace type– Exposure level– BLL level

Page 57: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance

(k) Medical Removal Protection(MRP)

50 g/dl whole blood

Page 58: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance

Temporary Removals

• Final medical determination: Any medical finding that the employee has a medical condition increasing risk of material impairment to health from exposure to lead

Page 59: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance

Temporary Removals - cont

• Remove from Pb exposures 50 g/dl

• Return when two consecutive BLL tests are 40 g/dl whole blood

Page 60: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance

MRP Benefits

• Maintain–Normal earnings–Seniority–Other rights and benefits

• Benefits continue for up to 18 mos on each occasion

Page 61: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance

(l) Training Requirements

• Prior to start of job

• At least annually

• Extent of training depends on exposure

Page 62: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance

(m) Recordkeeping

• Keep for at least 40 years or duration of employment + 20 years (30 yrs construction)– Exposure assessment data

– Objective data for monitoring exemption

– Medical surveillance ( duration of employment + 30 years, construction)

Page 63: 29 CFR 1910.1025 Lead in General Industry 1926.62 Lead in Construction ile, Compliance Officer Utah OSHA – (801)530- 6901 Shaheen Safiullah Compliance

OSHA website

• Federal OSHA: Www.osha.gov– Click on “Technical Links” under

the outreach section

• Utah OSHA: www.uosh.utah.gov

• NIOSH: www.cdc.gov/niosh