1 RFP 2016002D Due Date: August 21, 2015 JOC Mechanical, Plumbing/HVAC Scope of Work and Specifications RFP 2016002D RFP SCOPE OF WORK AND SPECIFICATIONS FOR MECHANICAL, PLUMBING/HVAC A. INTRODUCTION: The product specified or work performed under this solicitation will be set forth in each individual project’s detailed Specifications or Scope of Work based on the product, services, or deliverables acquired through this solicitation. In addition to the General Terms and Conditions, CES is providing Categorical Terms and Conditions to this RFP. In case of conflict between the General Terms and Conditions and Categorical Terms and Conditions, the latter shall apply. B. QUOTES AND PROPOSALS 1. All proposals submitted to a CES Eligible Agency under this RFP will be based on the pricing methodology described and stipulated within each Lot of this RFP specific to the Contractor’s response and awarded contract. 2. Lot 1 The Gordian Group a. All proposals submitted to a CES Eligible Agency under this pricing methodology will be based upon tasks and unit prices obtained from Gordian’s June 2015 Technical Specification Book (Exhibit 2) and the Construction Task Catalog® (Exhibit 3). All work performed must be quoted per the Technical Specification Book and the Construction Task Catalog® by the prime Contractor, even if subcontractors are used. Subcontractor’s invoices must tie to the price quotes submitted for the project. b. A unit price spreadsheet must be submitted to substantiate the quote given to the CES Eligible Agency. c. Bonding cost and New Mexico Gross Receipt Tax (NMGRT) must be shown as separate line items at the bottom of the cost spreadsheet. This information can be handwritten or typed on the spreadsheet or can be entered and printed off of the JOC webbased application. The information submitted must clearly identify and contain all of the required detail for each of the items that make up each individual construction project. d. All change orders must be supported and submitted in accordance with the Technical Specification and Unit Price books. 3. Lot 2 R.S. Means a. If this pricing methodology is utilized to price a project, Contractor must use the current year and standard cost data. Only the following cost data titles will be accepted: RS Means Mechanical Cost Data 2015 Book RS Means Plumbing Cost Data 2015 Book b. All work performed must be quoted per R.S. Means by the prime Contractor, even if subcontractors are used. Subcontractor’s invoices must tie to the R.S. Means spreadsheet. c. An R.S. Means spreadsheet must be submitted to substantiate the quote given to the CES Eligible Agency. The spreadsheet columns must reveal the full R.S. Means number and a sufficient amount of the description. This also applies to any change orders. d. Pricing must be done by Location Codes. National Average will not be allowed. In order to choose the “closest” location code, the first three (3) numbers of the zip code will be used to determine the city location index in New Mexico. As an example, if the project is in Hobbs, which has a zip code of 88240, the city index to be used is Roswell, which has a zip code of 88201.

3-2016-002D Scope of Work and Specifications for

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 3-2016-002D Scope of Work and Specifications for

1                             RFP 2016‐002D                                                                                                                                           Due Date: August 21, 2015 JOC Mechanical, Plumbing/HVAC                                                                                               Scope of Work and Specifications 

RFP 2016‐002D  RFP SCOPE OF WORK AND SPECIFICATIONS FOR MECHANICAL, PLUMBING/HVAC   A. INTRODUCTION: The product specified or work performed under this solicitation will be set forth in each individual project’s detailed Specifications or Scope of Work based on  the product, services, or deliverables acquired  through this  solicitation.  In addition  to  the General Terms and Conditions, CES  is providing Categorical Terms and Conditions to this RFP. In case of conflict between the General Terms and Conditions and Categorical Terms and Conditions, the latter shall apply.   B. QUOTES AND PROPOSALS 

1. All  proposals  submitted  to  a  CES  Eligible  Agency  under  this  RFP  will  be  based  on  the  pricing methodology  described  and  stipulated  within  each  Lot  of  this  RFP  specific  to  the  Contractor’s response and awarded contract.  

2. Lot 1 ‐ The Gordian Group a. All proposals submitted  to a CES Eligible Agency under  this pricing methodology will be based 

upon  tasks  and  unit  prices  obtained  from  Gordian’s  June  2015  Technical  Specification  Book (Exhibit 2) and the Construction Task Catalog® (Exhibit 3).  All work performed must be quoted per  the  Technical  Specification  Book  and  the  Construction  Task  Catalog®  by  the  prime Contractor,  even  if  subcontractors  are  used.    Subcontractor’s  invoices must  tie  to  the  price quotes submitted for the project. 

b. A unit price spreadsheet must be submitted to substantiate the quote given to the CES Eligible Agency. 

c. Bonding cost and New Mexico Gross Receipt Tax (NMGRT) must be shown as separate line items at  the bottom of  the cost spreadsheet.   This  information can be handwritten or  typed on  the spreadsheet  or  can  be  entered  and  printed  off  of  the  JOC  web‐based  application.    The information submitted must clearly identify and contain all of the required detail for each of the items that make up each individual construction project. 

d. All  change  orders  must  be  supported  and  submitted  in  accordance  with  the  Technical Specification and Unit Price books.  

3. Lot 2 ‐ R.S. Means a. If  this pricing methodology  is utilized  to price a project, Contractor must use  the current year 

and standard cost data.  Only the following cost data titles will be accepted:    RS Means Mechanical Cost Data 2015 Book   RS Means Plumbing Cost Data 2015 Book  

b. All  work  performed  must  be  quoted  per  R.S.  Means  by  the  prime  Contractor,  even  if subcontractors are used.  Subcontractor’s invoices must tie to the R.S. Means spreadsheet. 

c. An  R.S. Means  spreadsheet must  be  submitted  to  substantiate  the  quote  given  to  the  CES Eligible  Agency.    The  spreadsheet  columns  must  reveal  the  full  R.S. Means  number  and  a sufficient amount of the description. This also applies to any change orders. 

d. Pricing must be done by  Location Codes.   National Average will not be  allowed.    In order  to choose the “closest”  location code, the  first three  (3) numbers of the zip code will be used to determine  the  city  location  index  in New Mexico.   As an example,  if  the project  is  in Hobbs, which has a  zip  code of 88240,  the  city  index  to be used  is Roswell, which has a  zip  code of 88201. 

Page 2: 3-2016-002D Scope of Work and Specifications for

2                             RFP 2016‐002D                                                                                                                                           Due Date: August 21, 2015 JOC Mechanical, Plumbing/HVAC                                                                                               Scope of Work and Specifications 

e. The Contractor’s factor and the associated amount, bonding cost and New Mexico Gross Receipt Tax  (NMGRT)  must  be  shown  as  separate  line  items  at  the  bottom  of  the  R.S.  Means spreadsheet.  This information can be handwritten or typed on the spreadsheet or can be shown on a separate summary sheet.  The summary sheet must start with the R.S. Means spreadsheet total and show the detail for each of the items stated above. 

f. The Offeror’s submitted factor represents the percentage of the R.S. Means total cost (including overhead and profit) that will be charged to the CES Eligible Agency for construction costs.  A bid cost  of  92%  indicates  that  the  Contractor  will  charge  the  R.S.  Means  Total  Cost  for  each assembly item times .92 as the billable amount; a bid cost of 102% indicates that the Contractor will charge the R. S. Means Total Cost for each assembly item times 1.02 as the billable amount. Factors affecting cost include the quality of materials, productivity of labor force, size of project, environmental and site conditions.  Therefore, note the following:  i. The individual item cost will not include New Mexico Gross Receipt Tax (NMGRT), which will 

be listed as a separate line item. ii. Bonding costs will be listed as a separate line item.  iii. Travel and per diem  costs will be  included as part of  the Offeror’s  factor and will not be 

allowed as a separate line item for projects one hundred fifty (150) map miles or less from the home location of the Contractor or subcontractor (round‐trip). 

iv. In preparing  a proposal  for  a project more one hundred  fifty  (150) map miles  round‐trip from  the  home  location  of  the  Contractor  or  subcontractors  providing  the  products  and services, the Offeror will propose an additional  factor to be added to normal hours, other than normal hours and federal funded project factors to cover these projects.  

v. Within  R.S.  Means  there  are  modifiers  that  can  be  applied  due  to  circumstances  and conditions  such  as  season  of  the  year, weather  conditions,  building  code  requirements, safety and environmental concerns, etc.    If a project’s cost proposal requires any of  these modifiers, they must be identified and presented to the CES Eligible Agency for its approval prior to them being utilized to calculate a project’s cost. 

vi. For  goods  and  services  required where  there  is  not  an  applicable  R.S. Means  Listing  to properly price  the  item,  the Alternative Pricing Method or Discount  from Published Prices Lists shall be allowed.    

4. For Gordian and RS Means, the Contractor’s factor applied to arrive at the CES price must include all costs relating to the following, and the listed items are provided as examples only: a. Contractor’s  and  Subcontractor’s  general  cost  such  as  home  office  overhead;  all  types  of 

insurance,  fringe  benefits,  payroll  taxes,  worker’s  compensation,  etc.;  site  visits;  project meetings  and  owner  support  services;  project  development;  project  office  staff,  supplies, equipment  and  paperwork;  inspection  and  testing  fees;  training;  supervision;  project mobilization and close‐out; and other related costs. 

b. Construction‐related  cost  such  as,  preparing  and  submitting  paperwork  relating  to  project proposals,  drawings,  and  associated  documents;  safety  and  protection  equipment,  supplies, materials and signage; vehicles such as pickup  trucks, vans, utility  trucks, service  trucks, office trailers  and  portable  toilets,  for  Contractor’s  use;  tools,  equipment  and  materials,  and temporary utilities. 

c. Other project costs such as transporting of workers to and  from the  job site; housing workers while on the project; transporting supplies, materials and equipment to and from the  job site; and differences in project size, complexity, location; etc. 

d. If, due to unusual or special circumstances or project needs, the use of general condition items are necessary in a R.S. Means proposal, a separate R.S. Means cost proposal listing these items must be submitted with  justification and other backup documentation  to CES staff  for  its  review and 

Page 3: 3-2016-002D Scope of Work and Specifications for

3                             RFP 2016‐002D                                                                                                                                           Due Date: August 21, 2015 JOC Mechanical, Plumbing/HVAC                                                                                               Scope of Work and Specifications 

approval prior to their being included as part of a total project’s cost proposal.   CES reserves the right to approve or disapprove such requests and, if the Contractor feels CES’ decision is in error, the  Contractor may  request  third  party  review.    The  findings  of  the  third  party’s  review will determine whether the Contractor or CES pays for the review.  Items that fall within this area may include, but are not limited to: i. Architectural and engineering services, if required. ii. Pre‐construction site investigation to ascertain and discover conditions that may effect, impact 

and/or  change  the  project’s  detailed  scope  of  work.    It  is  understood  that  unforeseen conditions  and/or  circumstances may  arise  and/or be encountered during  the  construction process that may need to be addressed in a change order. 

iii. Special requests made by the Owner that is outside the normal and customary process.  e. For  county’s within  a  CES  Region  that  stipulate  a  subsistence  or  incentive  rate  for  classes  of 

employees, the subsistence or incentive rate is not built into the Region’s factor, rather, it will be treated as a pass through.  

5. Discounts from Published Prices Lists a. Quotes and cost proposals submitted based on a discount of a manufacturer’s, a distributor’s, or 

a  supplier’s  printed  retail  price  lists  (MSRP) must  be  presented  by  line  items  indicating  the catalog/product number, description, quantity, unit of measure, retail unit price, CES discount, CES unit price and CES extended price. 

b. Bonding cost and New Mexico Gross Receipt Tax (NMGRT) must be shown as separate line items at the bottom of the quote/cost proposal. 

c. Published price list utilized must be submitted in advance and approved by CES prior to utilizing it to develop any quotes or cost proposal.   

6. Alternative pricing methodology is utilized when goods and services required by a project cannot be priced by utilizing the R.S. Means or the Gordian Group or Discounts from Published Price Lists. a. The alternative pricing method involves obtaining written quotes from a least three (3) qualified 

suppliers,  distributors,  or  subcontractors  and  utilizes  the  quote  that  meets  the  project’s requirements and is the most cost effective solution. 

b. All quotes  received with a summary and  recommendation will be provided  to  the CES Eligible Agency in advance and approved by that Agency prior to being included into any final project’s cost proposal. 

c. CES and its Eligible Agencies reserve the right to accept or reject any quote or proposal including such items and may obtain these items through other procurement means. 

d. The  CES  price  will  be  determined  by  taking  the  supplier’s,  the  distributor’s,  or  the subcontractor’s  invoice  and  adding  the  Contractor’s  established  normal  and  customary overhead and profit and applying the established CES discount to arrive at the CES price.     

7. Any goods or services acquired as a sole source must be  justified and documented  in compliance and accordance with the sole source provision of the New Mexico Procurement Code (13‐1‐126 and 13‐1‐126.1 NMSA 1978).  

8. Cost evaluation of individual cost items selected and appear in the cost exhibit for the Category and or Lot and will be based on a point system, with points being awarded for being low to high bidder for each cost evaluation item, such as, mileage charge, per diem rate, travel time, labor rates, etc.  If an  Offeror  does  not  provide  a  value, marks  non‐applicable  (N/A)  or  leaves  out  an  item  that  is required, CES will allot zero (0) points to that  item, and  if awarded a contract, that  item cannot be 

Page 4: 3-2016-002D Scope of Work and Specifications for

4                             RFP 2016‐002D                                                                                                                                           Due Date: August 21, 2015 JOC Mechanical, Plumbing/HVAC                                                                                               Scope of Work and Specifications 

used in providing products or services. The low bidder will receive the full point value and all other Bidders providing a cost will receive points calculated as follows:  

(Lowest Bid / Offeror Bid) x point value    In the case of one or more Bidders providing an item at no cost, the bidder(s) providing the item at no cost will receive full point value. For the other bidder(s) who provide a cost, their score will be calculated as follows:  

(Lowest Bid / Offeror Bid) x point value x .70                                        

Page 5: 3-2016-002D Scope of Work and Specifications for

5                             RFP 2016‐002D                                                                                                                                           Due Date: August 21, 2015 JOC Mechanical, Plumbing/HVAC                                                                                               Scope of Work and Specifications 

RFP 2016‐002D   General Scope of Work   A  job  order  contract  is  an  indefinite  quantity  contract  to  which  the  awarded  contractor  provides  and  performs general construction products and services as individual projects at different locations throughout the State and  for  individual CES Members and Participating Entities on an as‐needed basis.   The CES  JOC program is based on two nationally‐accepted pricing methodologies (pricing/quoting systems), The Gordian Group and R.S. Means, which contains various construction products and services with pre‐set unit pricing based on local labor, material and equipment prices.   JOC contractors provide any/all  project management, supervision, documentation,  supplies, materials,  labor and equipment  required  to perform and  complete the individual CES Members’/Participating Entities’ defined construction project’s scope of work.  The product specified or work performed under this solicitation will be set forth in each individual project’s detailed Specifications or Scope of Work based on  the product, services, or deliverables acquired  through this  solicitation.  In addition  to  the General Terms and Conditions, CES  is providing Categorical Terms and Conditions to this RFP. In case of conflict between the General Terms and Conditions and Categorical Terms and Conditions, the latter shall apply.  

Cooperative Educational Services’  (CES’) cooperative purchasing program  re‐solicits construction contracts every  two  years  in  order  to  award  contracts  to  provide  construction  products  and  services  relating  to construction projects specific to any of the various public educational institutions and other public agencies located throughout New Mexico.  CES is seeking Contractors that hold the appropriate construction licenses for  the  proposed  services  and  who  possess  the  qualifications,  experience  and  resources  to  provide construction products and services on an as‐needed basis as requested under all Categories and Lots of this solicitation. The products and  services provided may  include, but are not  limited  to  the  following  Lots  in each Category:  Mechanical, Plumbing/HVAC: Qualified and experienced Contractors  that possess  the expertise,  capacity and  resources  to  provide  Plumbing  and HVAC  products  and  services  for  CES  Eligible Agencies  on  an  as‐needed basis, including, but are not limited to: 1. Inspecting, assessing, and evaluating existing plumbing and mechanical systems, such as: 

a. Water wells, distribution, filtering, purification systems and related equipment; b. Sewer infrastructure, treatment facilities and related equipment; c. Natural and LP gas distribution systems and related equipment; d. Heating, ventilation and air conditioning equipment (HVAC), distribution and return systems; and e. Miscellaneous mechanical equipment and systems.  

2. Services relating to installing, maintaining and repairing those systems listed in item 1 above. 3. Assisting  CES  Eligible  Agencies  in  developing,  implementing  and  conducting  preventive maintenance 

programs to maintain their mechanical systems in good working order.   4. Providing  complete  and  comprehensive  product  line(s)  from  a  variety  of  nationally  recognized 

manufacturers of energy efficient and cost effective heating, cooling, and ventilation. 5. Providing plumbing and HVAC supplies, materials, parts and equipment  to allow CES Eligible Agency’s 

maintenance staff to maintain and repair the existing plumbing and HVAC systems. 6. Technical support and training for CES Eligible Agency’s in‐house maintenance staff. 

 Offeror shall  list and provide copies of all New Mexico Contractor  licenses they hold as this supports their background,  knowledge  and  expertise. Because  all work under  this  solicitation  is on  a project‐by‐project basis, exact project specifications are not available. Firms awarded contracts as a result of this RFP may be used to develop the specifications for any work to be performed for  individual projects. CES currently has contracts  for  the  products  and  services  solicited  herein.    However,  the  current  volume  for  these 

Page 6: 3-2016-002D Scope of Work and Specifications for

6                             RFP 2016‐002D                                                                                                                                           Due Date: August 21, 2015 JOC Mechanical, Plumbing/HVAC                                                                                               Scope of Work and Specifications 

construction products and services is not to be considered a guarantee or estimate of volume that will result from this solicitation.  The Terms and Conditions  listed below apply to all Lots of this RFP.  If  there  is a conflict between General Terms, Conditions and the Categorical/Lot terms and conditions, the Categorical/Lot terms and conditions will take precedence.    Special Solicitation Security  CES has determined that it will require a mandatory security, bid bond or other acceptable bid security in the amount of  Twenty‐Five  Thousand Dollars  ($25,000)  in  response  to  this RFP.    The bid  security must accompany  the  Contractor’s RFP  response when  submitted  and  be  placed  behind  Tab  1. Acceptable  bid security will be an amount equal to that specified above, or an annual or one‐time bid bond underwritten by a surety company  licensed  to  issue bid bonds  in New Mexico.   Bid security can be provided using a  form similar  to  the New Mexico State Procurement Department, with  the principal being  the prime Contractor and  CES  being  the  Agency  of  Record.  The  security  company’s  standard  form  is  acceptable  as  long  as  it complies with the minimum requirements of the New Mexico State Procurement Department.  Category 1 Definitions  ADAAG:  Americans with Disabilities Act Architectural Guidelines, http://www.access‐board.gov/adaag /html/adaag.htm ADA:  Americans with Disabilities Act, http://www.ada.gov Adjustment  Factor:    The  competitively  bid  adjustment  to  be  applied  to  the  unit  prices  listed  in  the Construction Task Catalog® utilized by the Gordian pricing methodology. A/E:  Architectural and Engineering Builders  Work:     Work  done  in  conjunction  with  and  subsidiary  to  work  performed  by  mechanical, electrical, or other trades such as installations requiring cutting and patching of others work. CCI:  Construction Cost Index CFR:  Code of Federal Regulations, www.gpoaccess.gov/cfr/index.html Change Order Document:  Issued by the Owner to the contractor to make a specific change in the work that may result in a change in the scope of the contract's work, the contract sum, or the contract time. CID:  Construction Industries Division Construction Task Catalog®:   Comprehensive  listing of specific construction‐related  tasks,  together with a specific unit of measurement and a unit price (also referred to as the “Unit Price Book” or “UPB”) utilized by the Gordian pricing methodology.  Consumables:  Items used, worn, or consumed such as fuel and lubricants, and parts of tools such as saw blades. Detailed  Scope  of Work:    A  written  description  setting  forth  the  work  the  Contractor  is  obligated  to complete for a particular Job Order/project. Factory‐Built Building:   A residential or nonresidential building  including a dwelling unit or habitable room thereof which is either wholly or in substantial part manufactured at an off‐site location to be assembled on‐site. Federal Regulations and Codes – Title 29:  Hazardous materials handling, removal and disposal; respiratory protection  and monitoring;  employee  exposure  to  hazardous materials;  employee  exposure  and medical records; construction involving hazardous materials and hazardous communications. 

Page 7: 3-2016-002D Scope of Work and Specifications for

7                             RFP 2016‐002D                                                                                                                                           Due Date: August 21, 2015 JOC Mechanical, Plumbing/HVAC                                                                                               Scope of Work and Specifications 

Federal  Regulations  and  Codes  –  Title  40:    National  emission  standards  for  hazardous  materials  and asbestos abatement projects, worker protection, asbestos‐containing materials in schools. HVAC System:  An EPA approved vacuum system. HVAC is the abbreviation for heating, ventilation, and air conditioning systems, used in building design and construction.  ISO:  International Standards Organization, www.iso.ch ISO 9000/9001:  International Standards Organization Quality Standards Job Order:  A written order requiring the Contractor to complete the detailed scope of work in the job order completion time for the job order amount.  The CES Member will be responsible for the development of the job order, as well as  the  supervision and acceptance of  the work  contained  in  the  job order description.    Each  job  order  will  include  a  detailed  scope  of  work,  a  lump  sum,  firm  fixed  price  proposal  from  the Contractor, with New Mexico Gross Receipts Tax (NMGRT) shown as a separate line item, time duration for the completion of the work and any special conditions that might apply to that specific job order. Job Order Amount:  The amount the Contractor will be paid for completing a job order. Job Order Contract (JOC):  A job order contract is an indefinite quantity contract in which the Contractor will perform an ongoing series of individual small to medium, multi‐traded maintenance, repair and minor new construction projects at different locations throughout the identified CES regions. Job Order Price Proposal:   A price proposal prepared by the Contractor that  includes the pre‐priced tasks, non pre‐priced tasks, quantities and appropriate adjustment factors required to complete the detailed scope of work in accordance with the Gordian pricing methodology. Joint Scope Meeting:  A site meeting to discuss the work before the detailed scope of work is finalized. Modular/Pre‐Engineered Building:  A factory‐built building where the different components are constructed at the manufacturer’s facilities and then transported to the project site where they are assembled, erected or constructed to make a complete building.  Additional construction services may be needed to finish and install other components. NEC:  NFPA 70: National Electrical Code,   http://www.nfpa.org/aboutthecodes/AboutTheCodes.asp ?DocNum=70 NFPA  54:    Liquid  Petroleum Gas  Code  for  installation  of  piping  and  appliances  for  both  residential  and commercial applications. NFPA 58:  Liquid Petroleum Gas Code, for gas piping materials and components, gas piping installations, and inspection, testing, and purging of gas piping systems. NMAC 14.7.2:  2009 New Mexico Commercial Building Code NMPSFA:  New Mexico Public School Facilities Authority, www.nmschoolbuilding.org Non Pre‐Priced Tasks:   An  item of work  required by  the detailed  scope of work, but not  included  in  the Construction Task Catalog®.  Architectural and engineering services may be required periodically during the life of this contract.  If architectural and engineering services are required, they will be priced as a non pre‐priced  task.   Any  architectural  and  engineering  fees will  be  negotiated with  the  Contractor.    Such work requirements will be  incorporated  into and made a part of  this  contract  for  the  job order  to which  they pertain, and can be incorporated into the Construction Task Catalog®, if determined appropriate by CES, at the base price determined in this contract.  Non pre‐priced tasks will be separately identified and submitted in the job order proposal; utilized by the Gordian pricing methodology. Owner’s Representative:  A CES Member’s employee or contracted consultant who has been designated by the Member  to coordinate,  supervise, manage, make decisions and act on  the Member’s behalf during a procurement transaction or construction project. Portable/Relocateable  Building:    A  factory‐built  building  which  is  completely  constructed  at  the manufacturer’s facilities and then is transported to the designated project site.  The only services performed on the project site relates to setting the building in place and connecting the utilities. Pre‐Priced Task:  An item of work included in the Construction Task Catalog® for which a unit price is given; utilized by the Gordian pricing methodology. Subassembly:  A prefabricated wall, floor, ceiling, roof or similar combination of components. 

Page 8: 3-2016-002D Scope of Work and Specifications for

8                             RFP 2016‐002D                                                                                                                                           Due Date: August 21, 2015 JOC Mechanical, Plumbing/HVAC                                                                                               Scope of Work and Specifications 

Third Party Contractor:  A Contractor selected and named by the Owner in specifications or in a designer's instructions  to  the  Contractor  who  is  not  a  party  to  the  contract  in  question,  but  who  also  has  a construction contract with the same Owner for providing the specialized,  individual building component or system the Owner has chosen to incorporate into the project, therefore, creating a need for coordination and cooperation  among  the Owner's  engaged  Contractors  on  the  same  project,  provided  neither  Contractor raises no reasonable objections. Unit  Price:    The  price  published  in  the  Gordian  Construction  Task  Catalog®/R.S.  Means  for  a  specific construction or construction‐related task. Each unit price is comprised of the labor, equipment and material costs to accomplish that specific task. Unit price  is also the price for a single unit of measure, such as the price for a product in a catalog or on a retail price list.  RFP 2016‐002D    General Specifications and Exhibits  A. The documents  listed below and provided as exhibits are to be considered part of RFP 2016‐002D and 

may be  included as part of any contract awarded as a  result of  this solicitation depending on  the Lot awarded. 1.  State of NM Wage Rates ‐ June, 2015 (Exhibit 1).        And Federal David Bacon Wage Rates ‐ June, 2015 (Exhibit 1A). 2. Technical Specification Book dated June, 2015 Mechanical and Electrical (Exhibit 2). 3. Construction Task Catalog® dated June, 2015 Mechanical and Electrical (Exhibit 3).  4. RS Means Mechanical Cost Data 2015 Book (not included) 5. RS Means Plumbing Cost Data 2015 Book (not included) 6. Three Party Contract (Contract Between the Owner, Buyer and Contractor) (Exhibit 4).  

Sample document is subject to modification depending on the CES Eligible Agency utilizing it.  

B. Due to the nature of this Request for Proposals and the variety and  level of construction products and services requested and the standard of quality and performance required in the specifications and scope of work of  individual projects, the minimum acceptable product and performance standards are those established by construction trade industry organizations, federal, state and local governmental agencies; or  those of  the product manufacturers  specified  in  specific  job orders, unless otherwise stated  in  the project’s  final  detailed  scope  of  work,  specifications,  addendums,  drawings,  manufacturer  industry standards or CES three‐party agreement.   

 C. Contractor will pay  for  any  failure  to  conform or  for  any defect.    In  addition, Contractor will  fix  any 

damage to CES Eligible Agency’s controlled, real or personal property when that damage is the result of Contractor’s  failure  to  conform  to  contract  requirements;  any  defect  in  equipment,  material, workmanship, or design furnished; or in failure to comply with federal, state and local laws, codes, and regulations.    Contractor’s  warranty  with  respect  to  work  done,  repaired  or  replaced  under  these conditions will run for one (1) year from the date of repair or replacement or completion. 

   D. If Contractor  fails  to  remedy  any  failure, defect or damage within  a  reasonable  time  after  receipt of 

notice, the CES Eligible Agency will have the right to replace or otherwise remedy the failure, defect or damage at the Contractor’s expense in accordance with New Mexico state law. 

  

Page 9: 3-2016-002D Scope of Work and Specifications for

9                             RFP 2016‐002D                                                                                                                                           Due Date: August 21, 2015 JOC Mechanical, Plumbing/HVAC                                                                                               Scope of Work and Specifications 

 Lot 1          Gordian Based Job Order Contract (JOC) for Mechanical, Plumbing/HVAC and Other                     Related Products and Services  Lot 1 Scope of Work  CES  is seeking a qualified Contractor(s) who  is  licensed  in the State of New Mexico to provide a variety of paving, site work, earthwork, concrete and related products and services for a firm, fixed price based on the Technical Specifications Book  (Exhibit 2) and the Construction Task Catalog® (Exhibit 3) of this solicitation.  The scope of work may include, but is not limited to, that defined in the Categorical Scope of Work.   Lot 1 Term and Conditions  The following are Terms and Conditions under this Lot. They are in addition to the Listing of General Terms and Conditions specified in the RFP.    1. Unless otherwise specified, the Contractor shall supply all labor, services, tools and equipment necessary 

to complete specific  job order  tasks according to proper construction standards and practices; and shall complete  projects  as  implied  either  from  the  project  drawings  or  specifications.    Architectural  and engineering  services may be  required periodically.    If  so,  the architectural and engineering  fees will be addressed as a non pre‐priced item.  

2. At  the  issuance  of  each  job  order  under  this  contract,  the  CES  Eligible  Agency  and  Contractor  shall discuss the  issues of access and special requirements that are  to be observed during  the execution of the work.  

3. The Contractor shall perform its job order construction work in accordance with this contract, including provisions  of  all  pricing,  management,  drawings,  documents,  labor,  materials,  supplies,  parts, transportation, facilities, supervision, and equipment needed to complete each job order. 

 4. Contractor shall maintain accurate and complete records, files and documents to include state and local 

laws,  ordinances,  rules,  regulations,  manufacturers’  instructions  and  recommendations  which  are necessary and related to the work to be performed. 

 5. The Contractor will clearly  identify each  individual product and service and  its cost  in accordance with 

the pricing methodology as allowed under this Lot. A detailed price and cost submittal with all options that need to be considered will be submitted to the CES Eligible Agency  in the format required by this RFP.   

6. The Contractor shall prepare and submit required reports, maintain current record drawings, and submit required  information to the CES Eligible Agency.   The Contractor will provide materials  lists to  include model, trade names and brand names and ratings (if applicable) for all materials necessary to complete the  job.   If CES or the CES Eligible Agency requests any  information, the records and files will be made available to them.  

7. The Contractor may be required to provide minor architectural, structural, mechanical, electrical, civil, or  other  engineering  services  for  small  performance‐based  scopes  of work  as  requested  by  the  CES Eligible Agency  or  as  required  for  filings  or  permits.    The  services  shall  be  provided  by  architects  or engineers registered and  insured  in  the State of New Mexico to practice  in  the particular professional 

Page 10: 3-2016-002D Scope of Work and Specifications for

10                             RFP 2016‐002D                                                                                                                                           Due Date: August 21, 2015 JOC Mechanical, Plumbing/HVAC                                                                                               Scope of Work and Specifications 

field  involved.  Professional  liability  coverage  shall  be  at  least  $500,000.   All  documents  prepared  by architects, consultants and engineers for the Contractor under this contract are subject to review by the CES Eligible Agencies and NMPSFA, when applicable. 

 8. The procedure for initiating a specific job order under the CES Gordian JOC program is as follows: 

A. The CES Eligible Agency may award an individual Job Order to any selected Contractor. Selection of the Contractor and award of the Job Order will be based on one or more of the following criteria: 1) Evaluation of past and current performance on Job Orders of a similar nature and type of work, 

project size, construction management challenges, schedule performance, etc.  2) Balancing of work load (Job Order dollar volume and construction backlog) among Contractors. 3) Management of Job Order dollar volume within bonding limitations of the Contractor.  4) Price, as it relates to the CES Eligible Agency’s independent cost estimate or to an offer from any 

other contractor. 5) Contractor’s responsiveness to the CES Eligible Agency on Job Orders. 6) Other appropriate criteria as deemed in the best interest of the CES Eligible Agency. 

B. The CES Eligible Agency will notify the Gordian Group’s designated representative and the selected Contractor of a project.   The CES Eligible Agency and the Contractor will schedule a site visit (Joint Scope Meeting)  to discuss and develop a  scope of work, determine  the project  requirement and compile all pertinent documents.   From this meeting, the Contractor and CES Eligible Agency shall come away, at a minimum, with the following: 1) Job order number and title. 2) The general scope of work. 3) Existing site conditions. 4) Definition and refinement of requirements. 5) Detailed scope of work. 6) Establishing  requirements  for  design  drawings,  sketches,  submittals,  catalogue  cuts,  samples, 

shop drawings, etc. 7) Tentative construction schedule (bar chart or critical path method [CPM] schedule). 8) Preliminary quantity estimates. 9) Proposal due date. 10) Methods and alternatives for accomplishing work. 11) Access to the site and protocol for admission. 12) Staging area. 13) Presence of hazardous materials. 14) Liquidated damages. 

C. Upon completion of the  joint scope process, the Contractor will prepare and submit a draft of the detailed scope of work, referencing any attachments required to accurately document the work to be accomplished for the CES Eligible Agency to review and approve, amend or reject.  The detailed scope of work, unless modified and agreed to by both the Contractor and the CES Eligible Agency, will be the basis on which the Contractor will develop its Job Order Price proposal and submit it to the CES Eligible Agency for its final acceptance or rejection.  The Contractor does not have the right to refuse to perform any task or any work in connection with a particular project. 

D. Preparation of the Job Order Price Proposal 1) The  value  of  the  Job  Order  Price  Proposal  shall  be  calculated  by  summing  the  total  of  the 

calculations for each Pre‐priced Tasks (Unit Price x quantity x Adjustment Factor) plus the value of all Non Pre‐priced Tasks. 

2) The Job Order Amount shall be the value of the approved Job Order Price Proposal. 3) The Contractor's Job Order Price Proposal shall also include the following: 

(a) Required drawings or sketches; 

Page 11: 3-2016-002D Scope of Work and Specifications for

11                             RFP 2016‐002D                                                                                                                                           Due Date: August 21, 2015 JOC Mechanical, Plumbing/HVAC                                                                                               Scope of Work and Specifications 

(b) List of anticipated Subcontractors; (c) Construction schedule; (d) Calculations; (e) Special insurance, if required; (f) For special equipment, a copy of the warranty document, if required; (g) Other requested documents. 

4) The Contractor will prepare its Job Order Price Proposal in accordance with the following: (a) Pre‐priced  task:  A  task  described  in,  and  for  which  a  Unit  Price  is  set  forth  in,  the 

Construction Task Catalog®. (b) Non Pre‐priced Task: A task that is not set forth in the Construction Task Catalog®. (c) Information submitted  in support of Non Pre‐priced Tasks shall  include, but not be  limited 

to, the following: (i) Catalog cuts, specifications,  technical data, drawings, or other  information as required 

to evaluate the task. (ii) If  the  Contractor  will  perform  the  work  with  its  own  forces,  it  shall  submit  three 

independent quotes for all material to be installed and shall, to the extent possible, use Pre‐priced Tasks  for  labor and equipment  from  the Construction Task Catalog®.  If  the work  is  to  be  subcontracted,  the  Contractor must  submit  three  independent  quotes from subcontractors. The Contractor shall not submit a quote or bid from any supplier or  subcontractor  that  the Contractor  is not prepared  to use. CES Eligible Agency may require additional quotes and bids if the suppliers or subcontractors are not acceptable or if the prices are not reasonable. 

The final price submitted for Non Pre‐priced Tasks shall be according to the following formula: For Non Pre‐priced Tasks Performed with Contractor's Own Forces: A = The hourly rate for each trade classification not in the Construction Task Catalog® multiplied by the quantity; B  =  The  rate  for  each  piece  of  Equipment  not  in  the  Construction  Task Catalog® multiplied by the quantity; C = Lowest of three independent quotes for all materials. Total for a Non Pre‐priced Tasks performed with Contractor’s Own Forces = (A+B+C) x Non Pre‐priced Task Adjustment Factor For Non Pre‐priced Tasks Performed by Subcontractors:   If  the  Non  Pre‐priced  Task  is  to  be  subcontracted,  the  Contractor  must submit three independent quotes for the work. D = Lowest of three Subcontractor Quotes Total Cost for Non Pre‐priced Tasks performed by Subcontractors = D x Non Pre‐Priced Task Adjustment Factor 

(d) After a Non Pre‐priced Task  is used on  three separate  Job Orders,  the Unit Price  for such task  will  be  established,  following  approval  by  the  CES  Eligible  Agency,  and  fixed  as  a permanent Non Pre‐priced Task which will no longer require price justification. 

(e) The CES Eligible Agency’s determination as to whether a task  is a Pre‐priced Task or a Non Pre‐priced Task shall be final, binding and conclusive as to the Contractor. 

E. Contractor shall make the necessary arrangements for and obtain all filings and permits required for the Work, including the preparation of all drawings, sketches, calculations and other documents and information that may be required therefor. If the Contractor is required to pay an application fee for filing a project, a fee to obtain a building permit, or any other permit fee to the City, State or some other governmental or regulatory agency, then the amount of such fee paid by the Contractor for 

Page 12: 3-2016-002D Scope of Work and Specifications for

12                             RFP 2016‐002D                                                                                                                                           Due Date: August 21, 2015 JOC Mechanical, Plumbing/HVAC                                                                                               Scope of Work and Specifications 

which a receipt is obtained shall be treated as a Reimbursable Task to be paid without mark‐up. The cost of expediting services or equipment use fees are not reimbursable. 

F. The Contractor shall provide incidental engineering and architectural services required in connection with a particular Job Order including drawings and information required for filing. 

G. The  Contractor's  Job Order  Price  Proposal  shall  be  submitted  by  the  date  indicated  at  the  Joint Scope meeting. All  incomplete  Job Order Price Proposals  shall be  rejected.  The  time  allowed  for preparation of the Contractor's Job Order Price Proposal will depend on the complexity and urgency of  the  Job Order but  should average between  seven and  fourteen days. On  complex  Job Orders, such  as  Job  Orders  requiring  incidental  engineering/architectural  drawings  and  approvals  and permits,  allowance will  be made  to  provide  adequate  time  for  preparation  and  submittal  of  the necessary documents. 

H. In  emergency  situations  and  minor  maintenance  and  repair  Job  Orders  requiring  immediate completion,  the  Job Order  Price  Proposal may  be  required  quickly  and  the  due  date will  be  so indicated on  the Request  for Proposal or, as described below,  the Contractor may be directed  to begin work immediately with the paperwork to follow. 

I. By  submitting  a  Job  Order  Price  Proposal  to  the  CES  Eligible  Agency,  the  Contractor  agrees  to accomplish  the Detailed Scope of Work  in accordance with  the Request  for Proposal at  the price submitted.  It  is  the Contractor's responsibility  to  include  the necessary  tasks and quantities  in  the Job Order  Price  Proposal  and  apply  the  appropriate Adjustment  Factor(s)  and  Construction  Task Catalog® prior to delivering it to the CES Eligible Agency. 

J. If  the  Contractor  requires  clarifications  or  additional  information  regarding  the  scope  of work  in order to prepare the Job Order Price Proposal, the request must be submitted so that the submittal of the Job Order Price Proposal is not delayed.  

9. Review of the Proposal and Issuance of Job Order and CES Purchase Order. A. The  CES  Eligible  Agencies  representative  will  evaluate  the  Contractor’s  proposal,  and  proposed 

tasks, and compare  these with  the  cost estimate of  the detailed  scope of work  to determine  the reasonableness of approach, including the nature and quantity of tasks proposed. 

B. The  Contractor may  choose  the means  and methods  of  construction;  subject  however,  to  CES Eligible Agency's right to reject any means and methods proposed by the Contractor that: 1) Will constitute or create a hazard to the work, or to persons or property; or 2) Will not produce finished Work in accordance with the terms of the Contract; or 3) Unnecessarily  increases  the price of  the  Job Order when alternative means and methods are 

available. C. The CES Eligible Agency reserves the right to reject a Job Order Price Proposal or cancel a Project for 

any reason. CES Eligible Agency also reserves the right not to issue a Job Order if it is determined to be in the best interests of CES Eligible Agency. CES Eligible Agency may perform such Work by other means. The Contractor shall not recover any costs arising out of or related to the development of the Job Order  including but not  limited to the costs to attend the Joint Scope Meeting, review the Detailed Scope of Work, prepare a Job Order Price Proposal (including  incidental architectural and engineering services), subcontractor costs, and the costs to review the Job Order Price Proposal with CES Eligible Agency. 

D. Each Job Order provided to the Contractor shall reference the Detailed Scope of Work and set forth the  Job  Order  Price  and  the  Job  Order  Completion  Time.  All  clauses  of  this  Contract  shall  be applicable  to each  Job Order. The  Job Order, delivered  to  the Contractor  constitutes CES Eligible Agency's acceptance of the Contractor's  Job Order Price Proposal. A copy of the  Job Order will be provided to the Contractor. 

E. CES will review all information submitted and, if CES finds the job order to be in compliance with the terms, conditions and  specifications, CES will  issue  the Contractor a CES purchase order, which  is 

Page 13: 3-2016-002D Scope of Work and Specifications for

13                             RFP 2016‐002D                                                                                                                                           Due Date: August 21, 2015 JOC Mechanical, Plumbing/HVAC                                                                                               Scope of Work and Specifications 

considered Contractor’s notice  to proceed.  Job orders  shall  include all documents  relating  to  the identified project. The CES purchase order, signed by and delivered  to  the Contractor, constitutes CES and its Agency’s acceptance of the Contractor’s proposal.  A signed copy will be provided to the Contractor, together with the Notice to Proceed.  

10. In the event that immediate emergency response is necessary, the Contractor shall be required to follow alternative procedures as established by CES.   The Contractor will begin work as directed by  the CES Eligible Agency  and  approved by CES,  notwithstanding  the  absence of  a  fully developed Request  for Proposal, Detailed Scope of Work or Job Order.  The Contractor shall be compensated as if the work had been ordered under the standard procedures.  

11. The Contractor will prepare and submit with each proposal a bar chart or CPM schedule setting forth the manner and sequence of the work. The Contractor shall schedule the work in accordance with the time duration set forth in the Request for Job Order Proposal. 

 12. Changes  in  the work  requested  in  a  job  order  shall  be  dealt with  by  a  change  order.    Additions  or 

deletions  are  calculated  by  using  the  appropriate  item  in  the  Construction  Task  Catalog®,  times  the quantity to be added or deleted, times the appropriate adjustment factor.   Time will be negotiated as appropriate for the scope of work.  

13. Notice to Proceed:  The Contractor will not begin work on a job order until CES’ purchase order is issued and all documents relating to that job order are signed by CES, its Eligible Agency and the Contractor and Notice to Proceed has been issued to the Contractor. 

 14. The Gordian Group’s Job Order Contracting Software License 

A. CES  selected The Gordian Group’s  (Gordian)  Job Order Contracting  (“JOC”) Solution  (Gordian  JOC Solution) for their JOC program. The Gordian JOC Solution includes Gordian’s proprietary eGordian® JOC applications (JOC Applications) and construction cost data (Construction Task Catalog®), which shall be used by the Contractor to prepare and submit Job Order Price Proposals, subcontractor lists, and other requirements specified by CES. The Contractor shall be required to execute Gordian’s JOC System License to obtain access to Gordian’s JOC Solution. The Contractor’s use, in whole or in part, of Gordian’s JOC Applications, Construction Task Catalog® and other proprietary materials provided by  Gordian  for  any  purpose  other  than  to  execute  work  under  this  Contract  for  CES  is  strictly prohibited unless otherwise approved in writing by Gordian. The Contractor hereby agrees to abide by the terms of the following JOC System License. 

B. Gordian hereby grants to the Contractor, and the Contractor hereby accepts from Gordian  for the term of  this Contract or Gordian’s Contract with CES, whichever  is  shorter, a non‐exclusive  right, privilege,  and  license  to  Gordian’s  proprietary  JOC  System  and  related  proprietary  materials (collectively referred to as “Proprietary  Information”) to be used for the sole purpose of executing Contractor’s  responsibilities  to  CES  under  this  Contract.  The  Contractor  hereby  agrees  that Proprietary Information shall  include, but  is not  limited to, Gordian‘s JOC Applications and support documentation,  Construction  Task  Catalog®,  training  materials  and  other  Gordian  provided proprietary  materials.  In  the  event  this  Contract  expires  or  terminates  as  provided  herein,  or Gordian’s Contract with CES expires or terminates, this JOC System License shall terminate and the Contractor shall return all Proprietary Information in its possession to Gordian. 

C. Gordian may terminate this License Agreement in the event of: (1) any breach of a material term of this Agreement by the Contractor which is not remedied within ten (10) days after written notice to the breaching party; or (2) the other party’s making an assignment for the benefit of its creditors, or 

Page 14: 3-2016-002D Scope of Work and Specifications for

14                             RFP 2016‐002D                                                                                                                                           Due Date: August 21, 2015 JOC Mechanical, Plumbing/HVAC                                                                                               Scope of Work and Specifications 

the filing by or against such party of a petition under any bankruptcy or insolvency law, which is not discharged within thirty (30) days of such filing. 

D. The Contractor  acknowledges  that  disclosure of  Proprietary  Information will  result  in  irreparable harm to Gordian for which monetary damages would be an inadequate remedy and agrees that no such disclosure shall be made to anyone without first receiving the written consent of Gordian. The Contractor further acknowledges and agrees to respect the copyrights, registrations, trade secrets, and other proprietary rights of Gordian in the Proprietary Information during and after the term of this Contract and shall at all times maintain complete confidentiality with regard to the Proprietary Information provided to the Contractor. 

E. In  the event of a conflict  in  terms and conditions between  this  JOC System License and any other terms  and  conditions  of  this  Contract  or  any  Job  Order,  Purchase  Order  or  similar  purchasing document issued to the Contractor by CES, this JOC System License shall take precedence. 

 Lot 1 Required Response  The Offeror,  through written narratives and documentation, must provide responses  to all  items  found  in Tab 4  ‐ Offeror’s Qualifications and Tab 5 Forms  including Form H – Manufacturer’s Representative Form. Failure to provide the information requested may result in the Offeror’s response being non‐responsive.   Lot 1 Price and Cost Submittal  1. When  preparing  a  project  proposal  for  this  Lot,  the  Contractor  shall  utilize  the  following  pricing 

methodologies to prepare their cost proposal for individual job order projects.  2. Gordian 

A. Adjustment  Factor:    The  Contractor’s  competitively  bid  price  adjustment  to  the  unit  prices  as published  in  the Construction Task Catalog®.   Contractors must bid nine  (9) adjustment  factors as follows: 1) Normal Working Hours  (Defined  as  7:00  a.m.  to  5:00  p.m. Monday‐Friday)  (Outside  Tribal 

Lands).  (a) One for work in normal hours when the total project cost (job order) is in excess of $60,000, 

requiring state wage rates. (b) One for work in normal hours when the total project cost (job order) is less than $60,000 

and does not require state wage rates. 2) Other Than Normal Working Hours (Defined as all hours not defined as normal hours above) 

(Outside Tribal Lands). (a) One for work in other than normal working hours when the total project cost (job order) is 

in excess of $60,000, requiring state wage rates. (b) One for work in other than normal working hours when the total project cost (job order) is 

less than $60,000 and does not require state wage rates. 3) Project Funded by Federal Funds or on Tribal Lands Performed During Normal Working Hours 

(Defined as 7:00 a.m. to 5:00 p.m. Monday‐Friday)  (a) One for work in normal working hours when the total project cost (job order) is in excess of 

$2,000, requiring federal wage rates. (b) One  for work  in normal working hours when  the  total project cost  (job order)  is  less  than 

$2,000 and does not require federal wage rates. 4) Project Funded by Federal Funds or on Tribal Lands Performed Outside Normal Working Hours 

(Defined as all hours not defined as normal hours above)  (a) One for work in other than normal working hours when the total project cost (job order) is 

in excess of $2,000, requiring federal wage rates. 

Page 15: 3-2016-002D Scope of Work and Specifications for

15                             RFP 2016‐002D                                                                                                                                           Due Date: August 21, 2015 JOC Mechanical, Plumbing/HVAC                                                                                               Scope of Work and Specifications 

(b) One for work in other than normal working hours when the total project cost (job order) is less than $2,000 and does not require federal wage rates. 

(c) Note: Factors (c) and (d) are utilized for projects funded by federal funds and require Davis Bacon Wage Rates or for projects located on tribal lands. 

5) Non Pre‐Priced Tasks B. All adjustment factors are expressed as an increase or decrease from the published prices. C. When offering an adjustment factor, the Offeror must include in its factor: 

1) All general cost (General Conditions) such as home office overhead; all types of insurance, fringe benefits,  payroll  taxes,  worker’s  compensation  etc.;  site  visits;  project meetings  and  owner support services; project development; project office staff, supplies, equipment and paperwork; inspection and testing fees; training; supervision; project mobilization and close‐out and other related costs. 

2) Plan Checking and Permit Fees:  Include as part of the response any plan checking fee as charged by any municipality, county or state government (or any other applicable entity or agency with jurisdiction  over  the  project)  for  checking  contract  documents  prior  to  obtaining  a  building permit.  Include in your response all costs incurred for permits relating to this requirement. 

1.1 Note:   Offerors and Subcontractors whose home  location  is  in one region and  the project  is  in  another  must  build  into  their  adjustment  factor  the  above  costs associated for doing projects in other regions.  No general conditions relating to the above  items  will  be  allowed  in  a  project’s  proposal  unless  it  is  submitted  and approved in advance by The Gordian Group and CES.      

D. Economic Price Adjustment:   The Adjustment Factors may be updated on each anniversary of  the award  date  to  account  for  changes  in  construction  costs,  provided,  the  Contractor  requests  in writing, approximately fourteen to thirty days prior to the anniversary of the award date, that the Adjustment Factors be updated. Such request shall be delivered to CES and to Gordian. In the event the Contractor  fails to deliver the request timely, then CES shall determine the date on which the Adjustment Factors will be updated, but in no event will such date be later than thirty days after the written request  to update  the Adjustment Factors  is received by CES. Thereafter,  the Contractor’s Adjustment Factors will be adjusted according to the following: 1) The  Contractor’s Normal Working Hours  and Other  than Normal Working Hours  Adjustment 

Factors will be adjusted according to the following: (a) A Base Year Index shall be calculated by averaging the 12 month Construction Cost Indices 

(CCI) for [Insert ENR City] published in the Engineering News Record (ENR) for the 12 months immediately prior to the month of the bid due date (e.g. April bid date, Base Year  Index  is April of the prior year to March of the bid date year). 

(b) A  Current  Year  Index  shall  be  calculated  by  averaging  the  12 month  Construction  Cost Indices  (CCI)  for  [ENR  City]  published  in  the  Engineering  News  Record  (ENR)  for  the  12 months beginning with  the month of anniversary of  the bid due date  (e.g. April bid date, Current Year Index is April of the prior year to March of the current year). 

(c) The Economic Price Adjustment shall be calculated by dividing the Current Year Index by the Base Year Index. 

(d) The  Contractor’s  original  Adjustment  Factors  shall  be multiplied  by  the  Economic  Price Adjustment  to  obtain  the  Contractor’s  new Adjustment  Factors  effective  for  the  next  12 months. 

(e) Averages shall be obtained by summing the 12 month indices and dividing by 12. (f) All calculations  in this article shall be carried to the fifth decimal place and rounded to the 

fourth decimal place. The following rules shall be used for rounding: (g) The  fourth decimal place  shall be  rounded up when  the  fifth decimal place  is  five  (5) or 

greater. 

Page 16: 3-2016-002D Scope of Work and Specifications for

16                             RFP 2016‐002D                                                                                                                                           Due Date: August 21, 2015 JOC Mechanical, Plumbing/HVAC                                                                                               Scope of Work and Specifications 

(h) The fourth decimal place shall remain unchanged when the fifth decimal place  is  less than five (5). 

2) ENR  occasionally  revises  indices.  ENR  CCIs  used  in  the  calculations  described  above  shall  be those currently published at the time the Economic Price Adjustment calculation  is performed. No retroactive adjustments will be made as a result of an ENR revision. Revised CCI  indices,  if any, shall be used in subsequent calculations. 

3) Under  all  circumstances,  should  the  Contractor  submit  a  Job  Order  Price  Proposal  with inaccurate Adjustment Factors, the act of submission by the Contractor  is a waiver of all rights to  any  further  compensation  above  the  Job Order Amount  submitted  in  the  Job Order  Price Proposal. 

4) The Contractor cannot delay  submission of  the  Job Order Proposal past  the due date  to  take advantage of a scheduled update of the Adjustment Factors. In that event, the Contractor shall use the Adjustment Factors that would have been in effect without the delay. 

5) The Adjustment  Factor  for Non Pre‐priced Tasks will  remain  constant  for  the duration of  the Contract. 

 Lot 1 Cost Evaluation Information 

 The  following  cost  items need be  submitted electronically  in  the Microsoft Excel Price Sheet Form,  Lot 1 Gordian, and uploaded into Tab 6 of your response.  1. Offeror’s Gordian Costing of Products and Services Factor relating to construction projects. 2. Offeror’s Support for CES Pricing – Same as indicated on From F. 

3. Performance and Payment Bond Costs:  This represents the cost the vendor incurs to provide a performance and payment bond to the Member for an individual project when it is required. The Offeror is to indicate the percentage rate charged on the total cost of an individual project to obtain a bond, and the documentation to substantiate the rate, that is, two percent (2%).

Page 17: 3-2016-002D Scope of Work and Specifications for

17                             RFP 2016‐002D                                                                                                                                           Due Date: August 21, 2015 JOC Mechanical, Plumbing/HVAC                                                                                               Scope of Work and Specifications 

Lot 2   Job Order Contract (JOC) for Mechanical, Plumbing/HVAC Utilizing Published Price Lists, R.S Means and Alternative Pricing Methodologies 

      Category 2 Scope of Work  CES  is seeking a qualified Contractor(s) who  is  licensed  in  the State of New Mexico  to provide a variety of construction products and  services  for a  firm,  fixed price based on R.S. Means RS Means Mechanical Cost Data  2015  Book  and  the  RS  Means  Plumbing  Cost  Data  2015  Book,  and  other  pricing  methodologies identified in this solicitation.  The scope of work may include, but is not limited to, construction services relating to the repair, alteration, maintenance, renovation, modernization, rehabilitation, and related services specific to the awarded Lot or Lots.  The  JOC  Contractor  will  furnish  all  management,  documentation,  labor,  materials  and  equipment needed to perform and complete the scope of work stated for each  individual project requested under this Category for the Lots that they are awarded.   Category 2 Terms and Conditions  The following are Terms and Conditions under this Lot. They are  in addition to the Listing of General Terms and Conditions specified in the RFP.    A. Upon request by a CES Eligible Agency and at no cost to CES or the CES Eligible Agency, the Contractor 

will arrange a meeting with the Agency to review the scope of construction products and services to be provided, project’s  location, conditions and timelines, the CES Agency’s requirements and expectations to gather the information required to prepare the necessary paperwork and cost proposal to enable the Agency to make a decision on whether or not to proceed with the proposed project.    

B. As part of  the  joint  scope of work meeting,  the Contractor will perform a preliminary  investigation  to develop  the  project’s  detailed  scope  of work.    The  Contractor  shall  determine  if  the  project  is  being funded in part or in whole by the CES Agency, the Federal Government or NMPSFA.  The Contractor shall communicate with all parties that have been identified as co‐owner’s representatives. 

 C. Based on the information obtained from the owner’s designated representative(s), and the Contractor’s 

evaluation and  review of  the project’s documentation and detailed  scope of work,  the Contractor will prepare  a detailed  cost proposal  covering  the  services, materials,  equipment  and other  related  items needed to initiate and complete the proposed project’s detailed scope of work.  This will include, but is not limited to, the estimated timelines, terms, conditions and specifications of performance, warranties, etc., with their associated costs. 

 D. The Contractor will clearly identify each individual product and service and its cost in accordance with the 

R.S. Means or other pricing methodology as allowed under this Lot. A detailed price and cost submittal with all options  that need  to be considered will be submitted  to  the CES Eligible Agency  in  the  format required by this RFP.  

E. The Contractor will clearly  identify which of the proposed products and services will be provided by  its employees  and  which  items  it  intends  to  subcontract.  The  Contractor  will  provide  a  list  of  all subcontractors with their contact information, NMCID license information, type of products and services provided and dollar value of work  to be performed.    If applicable,  include  the subcontractors NMDWS registration number. 

Page 18: 3-2016-002D Scope of Work and Specifications for

18                             RFP 2016‐002D                                                                                                                                           Due Date: August 21, 2015 JOC Mechanical, Plumbing/HVAC                                                                                               Scope of Work and Specifications 

 F. The  CES  Eligible  Agency  reserves  the  right  to  accept  or  reject  any  project  proposal  submitted  by 

Contractor.  

G. The Contractor may be asked by  the CES Eligible Agency  to work with  them  to modify  the proposal  to meet  their needs or available resources. Any changes should be clearly  identified  in writing so the CES Eligible Agency clearly understands the impact such changes may have on the project outcome or overall quality of the project. 

 H. On the acceptance of the project proposal, the Contractor and the CES Eligible Agency will need to create 

and file all required documents with CES, with all appropriate state and local governing authorities, and acquire  permits  and  authorization.    If  required,  the  Contractor  will  complete  and  sign  a  CES  or CES/NMPSFA third‐party agreement between the Buyer, Contractor and Owner.  If an additional contract is completed between the Contractor and CES Eligible Agency, the Contractor will submit a copy of the signed  contract  along with  its  project  and  cost  proposal  to  CES.    CES will  verify  the  pricing  to  be  in accordance with the RFP pricing and will issue a CES purchase order to the Contractor. 

 I. The Contractor must provide  the owner a complete scope of work which  includes a description of  the 

work  to be performed by  the Contractor,  the  subcontractor and  the owner prior  to  the  issuance of a purchase order.  

 J. In any contract between the Contractor and an owner based on this RFP, the Terms and Conditions of the 

RFP will prevail.  

K. The Contractor, upon receipt of the CES purchase order, will provide CES with a copy of any applicable performance and payment bonds for the Contractor and any subcontractors, finalized project timelines, schedules of values, the NMDWS paperwork and additional required documents.  

L. Any change orders or modifications to the project will occur only with written approval of CES, the CES Eligible Agency and the Contractor. 

  Lot 2 Required Response   The Offeror must identify the Lot or Lots that are being proposed on all applicable forms.  The Offeror, through written narratives and documentation, must provide responses to all items found in Tab 4 ‐ Offeror’s Qualifications and all Tab 5 Forms included Form H – Manufacturer’s Representative List.  Failure to  provide  the  information  requested may  result  in  the  Offeror’s  response  being  non‐responsive.  If  the Offeror  is submitting a response  for more than one Lot,  information specific to the submitted Lot must be provided. 

  

Lot 2   RS Means Price and Cost Submittal  A. When  preparing  a  project  proposal  for  this  Lot,  the  Contractor  shall  utilize  the  following  pricing 

methodologies to prepare their cost proposal for individual job order projects.    

Page 19: 3-2016-002D Scope of Work and Specifications for

19                             RFP 2016‐002D                                                                                                                                           Due Date: August 21, 2015 JOC Mechanical, Plumbing/HVAC                                                                                               Scope of Work and Specifications 

 B. R.S. Means Pricing Methodology.  

 1. The Offeror responding to this Lot will acquire the current version of the R.S. Means CD/Software or 

copies of the bound books that are required in order to prepare a cost proposal covered by this Lot. 2. The R.S. Means pricing method  is  to be the primary method  for pricing projects covered by  this Lot, 

unless  it cannot clearly and accurately  reflect  the  line‐item costs of  the project.    In  these cases,  the project may require the use of multiple pricing methodologies defined herein.   

3. When utilizing the R.S. Means pricing methodology, there are options that can be established that will govern how individual construction cost items within the R.S. Means software or cost‐books can effect and modify the individual item’s costs as a global setting and will determine the actual item’s cost that appears  on  the  project’s  price  proposal.   All  such  options must  be  disclosed  and  noted within  the Offeror’s cost submittal response.  

4. The  individual  item’s  cost  shown  in  the R.S. Means’  cost‐listing  indicates  the materials,  equipment, labor, overhead and profit that will be charged the Owner for the construction item.  

5. R.S. Means cost proposals are to be the primary method utilized for projects covered by this Lot. a. All products and services required to complete the project’s detailed scope of work provided must 

be listed. b. The Contractor must, for each individual cost item shown on their cost proposal, identify any of the 

R.S. Means special factors that are applicable. c. A  current  edition of R.S. Means  shall  be  utilized  for  the  response  to  the RFP. A new  edition  is 

published  January  1st  of  each  year,  adjustments  and  updates  to  reflect  current material  costs, equipment costs, labor rates, market conditions, etc., are included in the new addition and will limit the need for item prices to be adjusted.  If a price increase occurs during the year that significantly affects the industry, the Contractor may request CES’ approval for an adjustment. 

d. The quantity or unit of measure, of a product or service, must accurately represent the required need. 

e. A  subtotal  of  all  of  the  items  selected will  be  presented  and  the  Contractor’s multiplier/factor awarded for the region will be applied to arrive at the R.S. Means project cost. 

f. Contractor’s R.S. Means factor i. As part of the Offeror’s response to this Lot, it will propose a factor that will be applied to the 

R.S. Means’ construction cost proposal to reflect the additional Contractor’s costs to prepare for, mobilize,  take  possession  of,  secure  and  take  control  of  the  construction  site,  and  to manage, supervise and complete all activities required by the project and the CES one percent (1%) administrative fee. 

ii. The Offeror’s  factor must  include all general  condition  items and  the CES one percent  (1%) administrative fee. 

iii. Since  all mobilizations,  transportation  and  travel  costs  for  both  its  and  its  subcontractor’s personnel  are  to  be  included  in  the  Offeror’s  factor,  if  the  Offeror  intends  to  service  CES procurement  regions other  than  the region  in which Offeror  is  located and  intends  to utilize subcontractor’s  that  are  not  located  in  the  CES  procurement  region  where  the  project  is located, the Offeror must take into consideration all of these variables and appropriately allow for them in its factor for each region it intends to serve. 

iv. The Offeror will propose a factor for each of the CES procurement regions it intends to serve.  This factor will be expressed as a whole number plus three (3) decimals places.  For example, if the Offeror proposes (0.925) and the project’s construction quote/cost proposal subtotal is ten 

Page 20: 3-2016-002D Scope of Work and Specifications for

20                             RFP 2016‐002D                                                                                                                                           Due Date: August 21, 2015 JOC Mechanical, Plumbing/HVAC                                                                                               Scope of Work and Specifications 

thousand ($10,000) dollars, then the calculation would be ($10,000 multiplied by 0.925 equals $9,250) total construction costs. If the Offeror proposes (1.125) and the project’s construction quote/cost proposal subtotal is ten thousand ($10,000) dollars, then the calculation would be ($10,000 multiplied by 1.125 equals $11,250) for total construction costs.  

v. The Offeror will propose the following factors for each CES procurement regions  it  intends to service. The Offeror may propose factors that are the same for all regions or may vary between regions.  1) Normal Working Hours (Defined as 7:00 a.m. to 5:00 p.m. Monday‐Friday) (Outside Tribal 

Lands). a) One  for work  in normal hours when  the  total project cost  (job order)  is  in excess of 

$60,000, requiring state wage rates. b) One  for work  in  normal  hours when  the  total  project  cost  (job  order)  is  less  than 

$60,000 and does not require state wage rates. 2) Other Than Normal Working Hours  (Defined as all hours not defined as normal hours 

above) (Outside Tribal Lands). a) One  for work  in other  than normal working hours when  the  total project  cost  (job 

order) is in excess of $60,000, requiring state wage rates. b) One  for work  in other  than normal working hours when  the  total project  cost  (job 

order) is less than $60,000 and does not require state wage rates. 3) Project funded by Federal Funds or on Tribal Lands and performed during working hours 

(Defined as 7:00 a.m. to 5:00 p.m. Monday‐Friday).   a) One for work performed during normal hours when the total project cost (job order) is 

in excess of $2,000, requiring federal wage rates. b) One for work performed during normal hours when the total project cost (job order) is 

less than $2,000 and does not require federal wage rates. 4) Project  funded  by  Federal  Funds  or  on  Tribal  Lands  and  performed  outside  normal 

working hours (Defined as all hours not defined as normal hours above).    a) One  for work  performed  outside  of  normal  hours when  the  total  project  cost  (job 

order) is in excess of $2,000, requiring federal wage rates. b) One  for work  performed  outside  of  normal  hours when  the  total  project  cost  (job 

order) is less than $2,000 and does not require federal wage rates. Note: Factors c) and d) are utilized for projects funded by federal funds and require Davis Bacon Wage Rates or for projects located on tribal lands. 

5) An Add‐on factor for projects  located 150 (round‐trip) map miles from the Contractor’s and/or subcontractor’s home locations.  a) Propose a  factor  to be added  to  the normal hours, other  than normal hours or  the 

federal  funded  factor  for  projects  located  150  map  miles  (round‐trip)  from  the contractor’s and/or subcontractors home location.   

g. The Offeror’s awarded  factor may be adjusted on the Offeror’s CES contract anniversary date by applying the escalation or de‐escalation measured by the Construction Cost Index (CCI) published in the ENR, Engineering News‐Record. 

h. Cost of permits, performance and payment bond costs, tribal taxes and New Mexico Gross Receipt Taxes are shown as separate line items on the cost proposal.  

C. Alternative Pricing Methodology  1. If  there  are  R.S. Means’  cost  products  or  services  that  cannot  accurately  describe  the  construction 

product  or  services  required  by  the  project’s  detail  scope  of work,  the  cost  of  these  items will  be calculated by utilizing these components of the alternative pricing methodology. 

Page 21: 3-2016-002D Scope of Work and Specifications for

21                             RFP 2016‐002D                                                                                                                                           Due Date: August 21, 2015 JOC Mechanical, Plumbing/HVAC                                                                                               Scope of Work and Specifications 

a. The Offeror will propose a percentage that  includes the Offeror’s overhead, markup and profit to determine the normal and customary price.   

b. The Offeror will also propose a percentage that reflects the amount of discount offered to CES and CES Eligible Agencies that will be used to determine the CES price.   

2. Once  a  quote  is  approved  by  the  CES  Eligible  Agency,  the  Contractor  will  apply  their  proposed percentage  to establish  the normal and customary  retail price.   For example,  if  the  total cost of  the quote is ten thousand ($10,000) dollars and the Contractor’s awarded percentage is eighteen percent (18%), the retail price would be determined by multiplying $10,000 by 1.18, establishing $11,800 as the alternative  price.  In  developing  this  percentage,  the  Offeror  must  take  into  account  any  non‐construction general conditions and include them as part of its percentage.    

3. The CES price  is  calculated by  taking  the  alternative price of $11,800  and multiplying  it by  the CES discount  off  of  the  alternative  price  that  was  proposed  and  subtracting  that  amount  from  the alternative price. For example, given  the alternative price of $11,800 and a  five  (5) percent discount from  the  alternative  price,  the  calculation would  be  ($11,800*.05)  =  $590;  then  $11,800  ‐  $590  = $11,210. The CES price of $11,210 would be made a part of the project’s cost proposal.  

4. The Contractor must provide CES all of the quotes and documents associated with its final project cost proposal when the alternative pricing methodology is utilized.  

5. \Cost of permits, performance and payment bond costs,  tribal  taxes and New Mexico Gross Receipt Taxes are shown as separate line items on the cost proposal.  

D. Published/Retail Price Lists:  For products and services not covered by R.S. Means, the Offeror may prepare and  submit  a  supplier’s,  a  distributor’s  or  manufacturer’s  published  price  list  as  another  pricing methodology.  The line‐item cost of these items will be determined and calculated by taking the published price list and applying a CES discount to obtain the price paid by the CES Eligible Agency. 

  Lot 2 RS Means Cost Evaluation Information  The following cost  items need be submitted electronically  in the Microsoft Excel price sheet Form, Lot 2 RS Means, and uploaded into Tab 6 of your response.  A. Offeror’s R.S. Means Factor for Costing of Products and Services relating to construction projects.  

 B. Performance  and  Payment  Bond  Costs:    This  represents  the  cost  the  vendor  incurs  to  provide  a 

performance and payment bond to the Member for an individual project when it is required. The Offeror is to indicate the percentage rate charged on the total cost of an individual project to obtain a bond, and the documentation to substantiate the rate, that is, two percent (2%). 

 C. Alternative Methods of Costing:  Used for those items that cannot be priced using the R.S. Means pricing 

method,  including  sole  source  items. Offeror  is  to  indicate  the percent of overhead, or markup,  to be added to these costs to obtain the standard cost on which the CES discount can be taken to achieve the CES price.   

 D. CES Discount off Alternative Method of Costing to obtain CES prices:  Used for those items that cannot be 

priced using the R.S. Means pricing method. This represents the percent of discount that is taken off the 

Page 22: 3-2016-002D Scope of Work and Specifications for

22                             RFP 2016‐002D                                                                                                                                           Due Date: August 21, 2015 JOC Mechanical, Plumbing/HVAC                                                                                               Scope of Work and Specifications 

standard cost to obtain the CES price. Example:  item cost $1,000, percent of profit and overhead of 20% equals standard price of $1,200, less the CES discount of 10% or $120 equals the CES price of $1,080. 

 E. Discounts Provided on Price Lists and Catalogs:   This  represents  the average discount provided by  the 

Offeror on stated prices.  

F. Offeror’s Support for CES Pricing:  Same as indicated on Form F.