5

(3) Overall project scheduled1vmz9r13e2j4x.cloudfront.net/NET/misc/Bluestem... · to house the turbines/generators, maintenance shop space,office space, spare parts inventory, and

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: (3) Overall project scheduled1vmz9r13e2j4x.cloudfront.net/NET/misc/Bluestem... · to house the turbines/generators, maintenance shop space,office space, spare parts inventory, and
Page 2: (3) Overall project scheduled1vmz9r13e2j4x.cloudfront.net/NET/misc/Bluestem... · to house the turbines/generators, maintenance shop space,office space, spare parts inventory, and

DOCS/1728607.2 2

(3) Overall project schedule:A. Estimated completion date of all engineering studies: July 1, 2018B. Estimated date of commencement of construction: August 1, 2018

(4) Total Estimated Cost:A. Total cost of generation station: $37,000,000B. Total cost of substations and switch yards or any other related facilities, not including transmission lines: $1,500,000C. Total estimated cost: $38,500,000D. How is the proposed facility to be financed: A combination of equity and debt financing.

(5) Description of related facilities: Related facilities include climate controlled building to house the turbines/generators, maintenance shop space, office space, spare parts inventory, and natural gas line.

(6) The owners of electric generation facilities, electric transmission lines, and/or related facilities, and any other persons or organizations known to the applicant whom the applicant believes to be interested in this application are: The City of Beatrice, Nebraska for who the capacity power purchase agreement will be with and the Nebraska Public Power District the interconnecting utility.

(7) Waivers and consents from the following are attached:

(8) Public convenience and necessity: The proposed electric generation facilities and/or related facilities will serve the public convenience and necessity, and the applicant can most economically and feasibly supply the electric service resulting from the proposed constructing or acquisition without unnecessary conflict and duplication.

Dated this 1st day of September, 2016.

_______________________________________________________

Signature

By: Mr. David C. LevyTitle: Counsel for Bluestem Energy Solutions, LLCAddress: Baird Holm LLP 1700 Farnam Street Suite 1500 Omaha, Nebraska 68102-2068

Page 3: (3) Overall project scheduled1vmz9r13e2j4x.cloudfront.net/NET/misc/Bluestem... · to house the turbines/generators, maintenance shop space,office space, spare parts inventory, and

Exhibit A

(Page 1 of 1)

DO

CS

/1728607.2

EXHIBIT A

Location of Proposed Generation Facilities

sara.birkett
Typewritten Text
PRB-3835-G
Page 4: (3) Overall project scheduled1vmz9r13e2j4x.cloudfront.net/NET/misc/Bluestem... · to house the turbines/generators, maintenance shop space,office space, spare parts inventory, and

Exhibit B

(Page 1 of 2)

DO

CS

/1728607.2

EXHIBIT B

Recorded Plat

sara.birkett
Typewritten Text
PRB-3835-G
sara.birkett
Typewritten Text
sara.birkett
Typewritten Text
Page 5: (3) Overall project scheduled1vmz9r13e2j4x.cloudfront.net/NET/misc/Bluestem... · to house the turbines/generators, maintenance shop space,office space, spare parts inventory, and

Exhibit B (Page 2 of 2)DOCS/1728607.2