3rd Libera Users Meeting – June 2009

Preparation work for ALBA’s Closed-Orbit BPMs 1/33

Preparation work for ALBA’s Closed-Orbit BPMs

3rd Libera Users Meeting – June 2009

Angel Olmos

Page 2: 3 rd Libera Users Meeting – June 2009 Preparation work for ALBA’s Closed-Orbit BPMs 1/33 Preparation work for ALBA’s Closed-Orbit BPMs 3rd Libera Users

3rd Libera Users Meeting – June 2009

Preparation work for ALBA’s Closed-Orbit BPMs 2/33

OUTLINE

• ALBA OVERVIEW

• LIBERAS, SINCE 2nd USERS

MEETING

• ALBA FAST ORBIT FEEDBACK

BEAM POSITION MONITORS

RF CABLES

LIBERA ELECTRONICS

FOFB NETWORK

CORRECTION CALCULATION

POWER CONVERTERS

CORRECTOR MAGNETS

Page 3: 3 rd Libera Users Meeting – June 2009 Preparation work for ALBA’s Closed-Orbit BPMs 1/33 Preparation work for ALBA’s Closed-Orbit BPMs 3rd Libera Users

3rd Libera Users Meeting – June 2009

Preparation work for ALBA’s Closed-Orbit BPMs 3/33

ALBA OVERVIEW

SLS type Booster and SR share the same tunnel

100MeV Thales LINAC

7 out of 32 beamlines on day one 1 Bending 1 Wiggler 1 SC-Wiggler 2 IV-Undulators 2 Apple II Undulators

Full energy 3GeVBooster

Page 4: 3 rd Libera Users Meeting – June 2009 Preparation work for ALBA’s Closed-Orbit BPMs 1/33 Preparation work for ALBA’s Closed-Orbit BPMs 3rd Libera Users

3rd Libera Users Meeting – June 2009

Preparation work for ALBA’s Closed-Orbit BPMs 4/33

Schedule on August-06Jun-08 Building finishedNov-08 Booster commissioningMar-09 SR commissioning during 8 monthsOct-09 Beamlines commissioning

ALBA OVERVIEW

Schedule on April-09? Building not yet finished 12months delayJul-09 Cooling available 13 months delayOct-09 Booster commissioning 11 months delayMay-10 SR commissioning during 2 months 14 months delaySep-10 Beamlines commissioning 13 months delay

Beam for users, January 2011

Page 5: 3 rd Libera Users Meeting – June 2009 Preparation work for ALBA’s Closed-Orbit BPMs 1/33 Preparation work for ALBA’s Closed-Orbit BPMs 3rd Libera Users

3rd Libera Users Meeting – June 2009

Preparation work for ALBA’s Closed-Orbit BPMs 5/33

Moving from University to ALBA site on April-09

ALBA OVERVIEWWhere are we now?

Page 6: 3 rd Libera Users Meeting – June 2009 Preparation work for ALBA’s Closed-Orbit BPMs 1/33 Preparation work for ALBA’s Closed-Orbit BPMs 3rd Libera Users

3rd Libera Users Meeting – June 2009

Preparation work for ALBA’s Closed-Orbit BPMs 6/33

ALBA OVERVIEWWhere are we now?

LINAC pre-commissioning done on Summer-08

Turn-key system from Thales LTB and LiDia CELLSresponsability

Temporally electricity and cooling

Full commissioning TBD by fall-09

Page 7: 3 rd Libera Users Meeting – June 2009 Preparation work for ALBA’s Closed-Orbit BPMs 1/33 Preparation work for ALBA’s Closed-Orbit BPMs 3rd Libera Users

3rd Libera Users Meeting – June 2009

Preparation work for ALBA’s Closed-Orbit BPMs 7/33

Service Area (electronic racks) and Experimental Hall finished

ALBA OVERVIEWWhere are we now?

Cooling and Air conditioning pending

Booster mechanical installation finished

SR 8 out of 16 sectors installed

Hutches and beamlines on the way

Cabling campaign has started

Page 8: 3 rd Libera Users Meeting – June 2009 Preparation work for ALBA’s Closed-Orbit BPMs 1/33 Preparation work for ALBA’s Closed-Orbit BPMs 3rd Libera Users

3rd Libera Users Meeting – June 2009

Preparation work for ALBA’s Closed-Orbit BPMs 8/33

OUTLINE

• ALBA OVERVIEW

• LIBERAS, SINCE 2nd USERS

MEETING

• ALBA FAST ORBIT FEEDBACK

BEAM POSITION MONITORS

RF CABLES

LIBERA ELECTRONICS

FOFB NETWORK

CORRECTION CALCULATION

POWER CONVERTERS

CORRECTOR MAGNETS

Page 9: 3 rd Libera Users Meeting – June 2009 Preparation work for ALBA’s Closed-Orbit BPMs 1/33 Preparation work for ALBA’s Closed-Orbit BPMs 3rd Libera Users

3rd Libera Users Meeting – June 2009

Preparation work for ALBA’s Closed-Orbit BPMs 9/33

LIBERAS, SINCE 2nd USERS MEETING

- Not much ... that’s why I’m showing you other stuff - Two units (not really used) during LINAC pre-commissioning (release 1.8)

LINAC synchronization problem

Peak detector on Device Server for position calculation

Page 10: 3 rd Libera Users Meeting – June 2009 Preparation work for ALBA’s Closed-Orbit BPMs 1/33 Preparation work for ALBA’s Closed-Orbit BPMs 3rd Libera Users

3rd Libera Users Meeting – June 2009

Preparation work for ALBA’s Closed-Orbit BPMs 10/33

- Development of a generic Matlab GUI for 2.0

Used for Lab testing of new SW releases

LIBERAS, SINCE 2nd USERS MEETING

Page 11: 3 rd Libera Users Meeting – June 2009 Preparation work for ALBA’s Closed-Orbit BPMs 1/33 Preparation work for ALBA’s Closed-Orbit BPMs 3rd Libera Users

3rd Libera Users Meeting – June 2009

Preparation work for ALBA’s Closed-Orbit BPMs 11/33

OUTLINE

• ALBA OVERVIEW

• LIBERAS, SINCE 2nd USERS

MEETING

• ALBA FAST ORBIT FEEDBACK

BEAM POSITION MONITORS

RF CABLES

LIBERA ELECTRONICS

FOFB NETWORK

CORRECTION CALCULATION

POWER CONVERTERS

CORRECTOR MAGNETS

Page 12: 3 rd Libera Users Meeting – June 2009 Preparation work for ALBA’s Closed-Orbit BPMs 1/33 Preparation work for ALBA’s Closed-Orbit BPMs 3rd Libera Users

3rd Libera Users Meeting – June 2009

Preparation work for ALBA’s Closed-Orbit BPMs 12/33

ALBA FAST ORBIT FEEDBACK

Beam Position Monitors BPM readout electronics

FOFB network

Correctors Power Converters (PC)

Correctors magnetsCorrection CPUs

Page 13: 3 rd Libera Users Meeting – June 2009 Preparation work for ALBA’s Closed-Orbit BPMs 1/33 Preparation work for ALBA’s Closed-Orbit BPMs 3rd Libera Users

3rd Libera Users Meeting – June 2009

Preparation work for ALBA’s Closed-Orbit BPMs 13/33

ALBA FAST ORBIT FEEDBACK

Beam Position Monitors BPM readout electronics

FOFB network

Correctors Power Converters (PC)

Correctors magnetsCorrection CPUs

Page 14: 3 rd Libera Users Meeting – June 2009 Preparation work for ALBA’s Closed-Orbit BPMs 1/33 Preparation work for ALBA’s Closed-Orbit BPMs 3rd Libera Users

3rd Libera Users Meeting – June 2009

Preparation work for ALBA’s Closed-Orbit BPMs 14/33

BEAM POSITION MONITORSBeam Position Monitor block On chamber welded block including 4 button-type feedthroughs

Feedthroughs and BPM blocks tested during different stages at factory and at site

Page 15: 3 rd Libera Users Meeting – June 2009 Preparation work for ALBA’s Closed-Orbit BPMs 1/33 Preparation work for ALBA’s Closed-Orbit BPMs 3rd Libera Users

3rd Libera Users Meeting – June 2009

Preparation work for ALBA’s Closed-Orbit BPMs 15/33

BEAM POSITION MONITORS

TDR head for reflection measurement 1- After manufacturing + Check manufacturing process + Calculate electrical behavior + Sort the buttons before welding

2- After welding on the BPM block + Prove that buttons are OK

3- After baking of the chambers + Final OK before delivery

Buttons measurements at factory (FMB)

Capacitance Dispersion < 1%

Page 16: 3 rd Libera Users Meeting – June 2009 Preparation work for ALBA’s Closed-Orbit BPMs 1/33 Preparation work for ALBA’s Closed-Orbit BPMs 3rd Libera Users

3rd Libera Users Meeting – June 2009

Preparation work for ALBA’s Closed-Orbit BPMs 16/33

BEAM POSITION MONITORS

- Offset due to non perfect buttons and their placement in the block holes- Measured by external means. No wired method possible

S-paremeters measurement using a 4-ports network analyzer

BPMs Electrical Offset measurement at site

Page 17: 3 rd Libera Users Meeting – June 2009 Preparation work for ALBA’s Closed-Orbit BPMs 1/33 Preparation work for ALBA’s Closed-Orbit BPMs 3rd Libera Users

3rd Libera Users Meeting – June 2009

Preparation work for ALBA’s Closed-Orbit BPMs 17/33

BEAM POSITION MONITORS

Processingof Tx coefficients

H/V offsets

Booster caseMax offset kept below 150 µm

BPMs Electrical Offset measurement at site

Page 18: 3 rd Libera Users Meeting – June 2009 Preparation work for ALBA’s Closed-Orbit BPMs 1/33 Preparation work for ALBA’s Closed-Orbit BPMs 3rd Libera Users

3rd Libera Users Meeting – June 2009

Preparation work for ALBA’s Closed-Orbit BPMs 18/33

ALBA FAST ORBIT FEEDBACK

Beam Position Monitors BPM readout electronics

FOFB network

Correctors Power Converters (PC)

Correctors magnetsCorrection CPUs

Page 19: 3 rd Libera Users Meeting – June 2009 Preparation work for ALBA’s Closed-Orbit BPMs 1/33 Preparation work for ALBA’s Closed-Orbit BPMs 3rd Libera Users

3rd Libera Users Meeting – June 2009

Preparation work for ALBA’s Closed-Orbit BPMs 19/33

RF CABLES

- First stage of semi-rigid PEEK dielectric cables being installed (as Soleil case)

Tight space between magnets makes impossible to plug any cable without a pre-stage

After chamber bakeout

Chamber movement on top of half-opened magnets

Page 20: 3 rd Libera Users Meeting – June 2009 Preparation work for ALBA’s Closed-Orbit BPMs 1/33 Preparation work for ALBA’s Closed-Orbit BPMs 3rd Libera Users

3rd Libera Users Meeting – June 2009

Preparation work for ALBA’s Closed-Orbit BPMs 20/33

- RF cables from the semi-rigids to the Liberas are on the way of production

RF CABLES

- 4 Andrew CNT-240 cables in a hosepipe (Copy+Paste cheap version of thecommonly used Time Microwave LMR-240)

- 5000m of cable ordered. Assembly of SMA connector to be done by cabling company

Page 21: 3 rd Libera Users Meeting – June 2009 Preparation work for ALBA’s Closed-Orbit BPMs 1/33 Preparation work for ALBA’s Closed-Orbit BPMs 3rd Libera Users

3rd Libera Users Meeting – June 2009

Preparation work for ALBA’s Closed-Orbit BPMs 21/33

LIBERA ELECTRONICS

- As said, not much has happened

- Release 2.0 installed on 3 units but not yet tested

- Last tested software release was 1.82 (the one on the installed units)

- Matlab GUI for 2.0 developed but not really used

- About TANGO device server ... still “forking” on others job

- Small pseudo-server developed for LINAC beam peaks analysis

- HW installation of 120 Storage Ring units on the Service Area done

- Only 12 of the 28 Booster units installed. The others kept for Lab testing

- Report of failures/interventions:

+ Hardware patch (30). Ethernet cable length...Corrected

+ Wrong voltages (8) ... not used on Libera

+ Out of specs on BCM (2)

+ Out of specs on TbT rms, low # ADCs (2)

+ Noisy channel (1)

+ PM buffer not triggered (1)

Not corrected

Page 22: 3 rd Libera Users Meeting – June 2009 Preparation work for ALBA’s Closed-Orbit BPMs 1/33 Preparation work for ALBA’s Closed-Orbit BPMs 3rd Libera Users

3rd Libera Users Meeting – June 2009

Preparation work for ALBA’s Closed-Orbit BPMs 22/33

ALBA FAST ORBIT FEEDBACK

Beam Position Monitors BPM readout electronics

FOFB network

Correctors Power Converters (PC)

Correctors magnetsCorrection CPUs

Page 23: 3 rd Libera Users Meeting – June 2009 Preparation work for ALBA’s Closed-Orbit BPMs 1/33 Preparation work for ALBA’s Closed-Orbit BPMs 3rd Libera Users

3rd Libera Users Meeting – June 2009

Preparation work for ALBA’s Closed-Orbit BPMs 23/33

Distributed architecture using 4 racks per sector (NT, Diagnostics, Controls, PCs)

FOFB NETWORK

Page 24: 3 rd Libera Users Meeting – June 2009 Preparation work for ALBA’s Closed-Orbit BPMs 1/33 Preparation work for ALBA’s Closed-Orbit BPMs 3rd Libera Users

3rd Libera Users Meeting – June 2009

Preparation work for ALBA’s Closed-Orbit BPMs 24/33

Topology based on the use of network spare optical fibers to Sector 09

FOFB NETWORK

Page 25: 3 rd Libera Users Meeting – June 2009 Preparation work for ALBA’s Closed-Orbit BPMs 1/33 Preparation work for ALBA’s Closed-Orbit BPMs 3rd Libera Users

3rd Libera Users Meeting – June 2009

Preparation work for ALBA’s Closed-Orbit BPMs 25/33

FOFB NETWORKPatch panel on Sector 09 will allow any combination of interconnections

Page 26: 3 rd Libera Users Meeting – June 2009 Preparation work for ALBA’s Closed-Orbit BPMs 1/33 Preparation work for ALBA’s Closed-Orbit BPMs 3rd Libera Users

3rd Libera Users Meeting – June 2009

Preparation work for ALBA’s Closed-Orbit BPMs 26/33

ALBA FAST ORBIT FEEDBACK

Beam Position Monitors BPM readout electronics

FOFB network

Correctors Power Converters (PC)

Correctors magnetsCorrection CPUs

Page 27: 3 rd Libera Users Meeting – June 2009 Preparation work for ALBA’s Closed-Orbit BPMs 1/33 Preparation work for ALBA’s Closed-Orbit BPMs 3rd Libera Users

3rd Libera Users Meeting – June 2009

Preparation work for ALBA’s Closed-Orbit BPMs 27/33

CORRECTION CALCULATION

- Original plan was to use MicroResearch reading board + distributed processing CPUs

- Pentium M running Linux 2.6 already installed but “under investigation”

- Not possibility of DMA on MicroResearch boards turns us to look for other solutions VMETRO? ... Tell me!!!!

- Distribution of data using Diamond Communication Controller internally agreed few weeks ago (discussions since who knows when)

- We will pay ITech for the integration job in our design

- Correction done with widely used SVD algorithm + PID controller

Page 28: 3 rd Libera Users Meeting – June 2009 Preparation work for ALBA’s Closed-Orbit BPMs 1/33 Preparation work for ALBA’s Closed-Orbit BPMs 3rd Libera Users

3rd Libera Users Meeting – June 2009

Preparation work for ALBA’s Closed-Orbit BPMs 28/33

CORRECTION CALCULATION

- Even though we have 120 BPMs and their corresponding Libera electronics, only position data from 88 BPMs will be used for orbit correction Why?

- Representation of β functions vs. phase advance shows that some BPMs give almost the same information (same info = no info)

- BPMs are better distributed according the vertical plane were more precision is needed

Page 29: 3 rd Libera Users Meeting – June 2009 Preparation work for ALBA’s Closed-Orbit BPMs 1/33 Preparation work for ALBA’s Closed-Orbit BPMs 3rd Libera Users

3rd Libera Users Meeting – June 2009

Preparation work for ALBA’s Closed-Orbit BPMs 29/33

ALBA FAST ORBIT FEEDBACK

Beam Position Monitors BPM readout electronics

FOFB network

Correctors Power Converters (PC)

Correctors magnetsCorrection CPUs

Page 30: 3 rd Libera Users Meeting – June 2009 Preparation work for ALBA’s Closed-Orbit BPMs 1/33 Preparation work for ALBA’s Closed-Orbit BPMs 3rd Libera Users

3rd Libera Users Meeting – June 2009

Preparation work for ALBA’s Closed-Orbit BPMs 30/33

POWER CONVERTERSPower

converter

I/V transducer

ADC

PSIController

TxBoard

IPmodules

Carrier

cPCI Bus

RS232 service port

Electrical Optical

Optical protocol management

Commercial

Diamond

CorrectionCalculation

CPU

Optical

ALBA Controls rack

Correctos PCs rack

• Provide ±1mrad of DC deflection and ±40µrad @ 100Hz• Resolution of 18 bits• OCEM-Diamond PCs

Tested at factory but

not yet delivered

Page 31: 3 rd Libera Users Meeting – June 2009 Preparation work for ALBA’s Closed-Orbit BPMs 1/33 Preparation work for ALBA’s Closed-Orbit BPMs 3rd Libera Users

3rd Libera Users Meeting – June 2009

Preparation work for ALBA’s Closed-Orbit BPMs 31/33

- Eddy currents on the vacuum chamber reduce the effect of the magnetic field at high frequencies fH=235

HzfV=1550

Hz

Horizontal Steering

Vertical Steering

- All delivered and on installation process

- Chamber thickness reduction to 2mm in the correctors

CORRECTOR MAGNETS

FOFB limiting factor

- ALBA sextupoles have extra coils to provide H/V beam steering

Page 32: 3 rd Libera Users Meeting – June 2009 Preparation work for ALBA’s Closed-Orbit BPMs 1/33 Preparation work for ALBA’s Closed-Orbit BPMs 3rd Libera Users

3rd Libera Users Meeting – June 2009

Preparation work for ALBA’s Closed-Orbit BPMs 32/33

- Half of the Storage Ring BPMs still pending. Measurement goes together with installation

WHAT’S NEXT?

- LTB, BTS and BOOSTER BPMs electrical offset measured

- On site measurement of RF cables lengths (by cabling company) connec. assembly- All RF cables will be checked after installation one by one

- Test Libera release version 2.03 in the Lab (probably our production version)- Develop graphical utilities for Booster and Storage commissionings

- Take decisions about “sniffer” boards and processing CPUs

- Implement an small FOFB in the lab before final installation

- Receive and test the correctors power converters

LINAC full commissioning by Sep-Oct 09 Booster commissioning right after LINAC

Storage Ring commissioning May-10

Page 33: 3 rd Libera Users Meeting – June 2009 Preparation work for ALBA’s Closed-Orbit BPMs 1/33 Preparation work for ALBA’s Closed-Orbit BPMs 3rd Libera Users

3rd Libera Users Meeting – June 2009

Preparation work for ALBA’s Closed-Orbit BPMs 33/33

Preparation work for ALBA’s Closed-Orbit BPMs

3rd Libera Users Meeting – June 2009

Angel Olmos