SCAFF-001CHO/2012/DFHD/193 : PROVISION FOR HOOK-UP, COMMISSIONING AND TOPSIDE MAJOR MAINTENANCE SERVICES FOR 2013-2017

Work Order No & TitleDFHD/2014/042A/001 : PROVISION FOR HUC WORK FOR TOPSIDE MODIFICATION FOR SKO PIPELINE REJUVENATION PROJECT PL 381/210

JOBCARD ID NO----

AGENERALJOB DESCRIPTIONWORK CATEGORYOPS MODESISOErect scaffolds for removal of spool at Line 150-D-008-1101 (TP-007/008) & new spools installationOnshoreOffshoreSIPRODSIPCOMPrefabricationHook-UpWORK PHASEPre ShutdownSYS NOXXXSYS DESCN/AHook-UpDemolitionShutdownDISCIPLINESCAFFOLDINGLOCATIONSUMPCommissioningDecommissioningPost ShutdownSCHEDULEEarly StartLate StartActual StartPlan DurationPercent WeightEarly FinishLate FinishActual FinishActual DurationBHEALTH, SAFETY & ENVIRONMENT (HSE)PERSONNEL PROTECTIVE EQUIPMENTPERMIT TO WORKJOB SAFETY ANALYSISStandart PPEBody HarnessPersonal H2S MonitorCold WorkLiftingHearing ProtectionChemical ProtectionOthers (specify below)Hot WorkRadiationLENGTH0OKWork VestBreathing Apparatus_____________________ElectricalCQUALITYTEST REQUIREMENTVIUTHydrotestValve Leak TestCable TestsCalibrationFunction Test / Test RunRTMPIReinstatementRV Pop TestTubing Leak TestLoopcheckOthers LENGTHOKDMANPOWER RESOURCESTower Below 3.658 M1.184mhrs/ square m1TASK NOTASK DESCRIPTIONTRADEWORK VOLUMEPLAN MHRSACT MHRSTower Above 3.658 M1.292mhrs/ square m2UnitTotalUnitTotalHanger 3.658 M not exceed 6.401 M drop1.83mhrs/ square m4RSPAX2.000.901.80TypeArea m2Nom.Mhr11.51.1841.95362Erect scaffolds for removal of spool at Line 150-D-008-1101 (TP-007/008) & new spools installationRSM21.501.422.13

3Tools / Equipments & Scaffold HandlingRSM22.131.503.20RG PREPARE - 0.5 x 1.1 OFF FACRS PREPARED-0.75 x 1.2 OFF FAC4HousekeepingRSPAX2.000.91.80HOUSEKEEPING - 0.75RGPAX1.000.8250.83SCAF MAT HAND-1.5

DIRECT MANHOURS SUMMARYContractor PersonnelRSPFPWLSFSWLFWMWITIFELEBPRGTotal8.92800000000001.37510.30Third Party PersonnelNDTPTBTISCCVRWHTotal00000000.00Total, Direct Manhours10.30Special Services RequirementJob Constraints / Hold Points

ETOOL & EQUIPMENT RESOURCESItem NoUnitQtyDescriptionItem NoUnitQtyDescription

Utility RequirementsUtility AirInstrument AirService / FirewaterPotable WaterPowerVACOthers ___________FMATERIALSItem NoMESC NoDescriptionTypeUnitQty

Material Type CodesP = Project MaterialT = Temporary (construction) MaterialC = Consumable MaterialS = Commissioning SparesGREFERENCE DRAWINGS & DOCUMENTSDwg / Doc NoRevDrawing / Document Title

HNOTES

JOBCARD APPROVALCONTRACTORPCSBApproved byPrepared ByReviewed ByAgreed ByNameMuhd Hasril RahamanDesignationPiping EngineerWorkpack Team LeaderProject ManagerHUC EngineerSignatureDateJOBCARD APPROVALCONTRACTORPCSBPresented ByVerified ByConfirmed ByAccepted ByNameDesignationForeman / SupervisorConstruction SuperintendentDiscipline InspectorHUC EngineerSignatureDate

&A&8Page &P of &N

SCAFF-002CHO/2012/DFHD/193 : PROVISION FOR HOOK-UP, COMMISSIONING AND TOPSIDE MAJOR MAINTENANCE SERVICES FOR 2013-2017

Work Order No & TitleDFHD/2014/042A/001 : PROVISION FOR HUC WORK FOR TOPSIDE MODIFICATION FOR SKO PIPELINE REJUVENATION PROJECT PL 381/210

JOBCARD ID NO----

AGENERALJOB DESCRIPTIONWORK CATEGORYOPS MODESISOErect scaffolds for removal of spool at Line 250-PL-101-6101X (TP-003/004) & new spools installationOnshoreOffshoreSIPRODSIPCOMPrefabricationHook-UpWORK PHASEPre ShutdownSYS NOXXXSYS DESCN/AHook-UpDemolitionShutdownDISCIPLINESCAFFOLDINGLOCATIONCDCommissioningDecommissioningPost ShutdownSCHEDULEEarly StartLate StartActual StartPlan DurationPercent WeightEarly FinishLate FinishActual FinishActual DurationBHEALTH, SAFETY & ENVIRONMENT (HSE)PERSONNEL PROTECTIVE EQUIPMENTPERMIT TO WORKJOB SAFETY ANALYSISStandart PPEBody HarnessPersonal H2S MonitorCold WorkLiftingHearing ProtectionChemical ProtectionOthers (specify below)Hot WorkRadiationLENGTH0OKWork VestBreathing Apparatus_____________________ElectricalCQUALITYTEST REQUIREMENTVIUTHydrotestValve Leak TestCable TestsCalibrationFunction Test / Test RunRTMPIReinstatementRV Pop TestTubing Leak TestLoopcheckOthers LENGTHOKDMANPOWER RESOURCESTower Below 3.658 M1.184mhrs/ square m1TASK NOTASK DESCRIPTIONTRADEWORK VOLUMEPLAN MHRSACT MHRSTower Above 3.658 M1.292mhrs/ square m2UnitTotalUnitTotalHanger 3.658 M not exceed 6.401 M drop1.83mhrs/ square m4RSPAX4.000.903.60TypeArea m2Nom.MhrRS OFF FACT1101.18413.024X1.22Erect scaffolds for removal of spool at Line 250-PL-101-6101X (TP-003/004) & new spools installationRSM210.001.4214.21

3Tools / Equipments & Scaffold HandlingRSM214.211.5021.31RG PREPARE - 0.5 x 1.1 OFF FACRS PREPARED-0.75 x 1.2 OFF FAC4HousekeepingRSPAX4.000.93.60HOUSEKEEPING - 0.75RGPAX1.000.8250.83SCAF MAT HAND-1.5

DIRECT MANHOURS SUMMARYContractor PersonnelRSPFPWLSFSWLFWMWITIFELEBPRGTotal42.7200000000001.92544.65Third Party PersonnelNDTPTBTISCCVRWHTotal00000000.00Total, Direct Manhours44.65Special Services RequirementJob Constraints / Hold Points

ETOOL & EQUIPMENT RESOURCESItem NoUnitQtyDescriptionItem NoUnitQtyDescription

Utility RequirementsUtility AirInstrument AirService / FirewaterPotable WaterPowerVACOthers ___________FMATERIALSItem NoMESC NoDescriptionTypeUnitQty

Material Type CodesP = Project MaterialT = Temporary (construction) MaterialC = Consumable MaterialS = Commissioning SparesGREFERENCE DRAWINGS & DOCUMENTSDwg / Doc NoRevDrawing / Document Title

HNOTES

JOBCARD APPROVALCONTRACTORPCSBApproved byPrepared ByReviewed ByAgreed ByNameMuhd Hasril RahamanDesignationPiping EngineerWorkpack Team LeaderProject ManagerHUC EngineerSignatureDateJOBCARD APPROVALCONTRACTORPCSBPresented ByVerified ByConfirmed ByAccepted ByNameDesignationForeman / SupervisorConstruction SuperintendentDiscipline InspectorHUC EngineerSignatureDate

&A&8Page &P of &N

SCAFF-003CHO/2012/DFHD/193 : PROVISION FOR HOOK-UP, COMMISSIONING AND TOPSIDE MAJOR MAINTENANCE SERVICES FOR 2013-2017

Work Order No & TitleDFHD/2014/042A/001 : PROVISION FOR HUC WORK FOR TOPSIDE MODIFICATION FOR SKO PIPELINE REJUVENATION PROJECT PL 381/210

JOBCARD ID NO----

AGENERALJOB DESCRIPTIONWORK CATEGORYOPS MODESISOErect scaffolds for removal of spool at Line 200-PL-011-1101X (TP-011/012) & new spools installationOnshoreOffshoreSIPRODSIPCOMPrefabricationHook-UpWORK PHASEPre ShutdownSYS NOXXXSYS DESCN/AHook-UpDemolitionShutdownDISCIPLINESCAFFOLDINGLOCATIONMDCommissioningDecommissioningPost ShutdownSCHEDULEEarly StartLate StartActual StartPlan DurationPercent WeightEarly FinishLate FinishActual FinishActual DurationBHEALTH, SAFETY & ENVIRONMENT (HSE)PERSONNEL PROTECTIVE EQUIPMENTPERMIT TO WORKJOB SAFETY ANALYSISStandart PPEBody HarnessPersonal H2S MonitorCold WorkLiftingHearing ProtectionChemical ProtectionOthers (specify below)Hot WorkRadiationLENGTH0OKWork VestBreathing Apparatus_____________________ElectricalCQUALITYTEST REQUIREMENTVIUTHydrotestValve Leak TestCable TestsCalibrationFunction Test / Test RunRTMPIReinstatementRV Pop TestTubing Leak TestLoopcheckOthers LENGTHOKDMANPOWER RESOURCESTower Below 3.658 M1.184mhrs/ square m1TASK NOTASK DESCRIPTIONTRADEWORK VOLUMEPLAN MHRSACT MHRSTower Above 3.658 M1.292mhrs/ square m2UnitTotalUnitTotalHanger 3.658 M not exceed 6.401 M drop1.83mhrs/ square m4RSPAX3.000.902.70TypeArea m2Nom.MhrRS OFF FACT141.1845.68321.22Erect scaffolds for removal of spool at Line 200-PL-011-1101X (TP-011/012) & new spools installationRSM24.001.425.68

3Tools / Equipments & Scaffold HandlingRSM25.681.508.52RG PREPARE - 0.5 x 1.1 OFF FACRS PREPARED-0.75 x 1.2 OFF FAC4HousekeepingRSPAX3.000.92.70HOUSEKEEPING - 0.75RGPAX1.000.8250.83SCAF MAT HAND-1.5

DIRECT MANHOURS SUMMARYContractor PersonnelRSPFPWLSFSWLFWMWITIFELEBPRGTotal19.60800000000001.92521.53Third Party PersonnelNDTPTBTISCCVRWHTotal00000000.00Total, Direct Manhours21.53Special Services RequirementJob Constraints / Hold Points

ETOOL & EQUIPMENT RESOURCESItem NoUnitQtyDescriptionItem NoUnitQtyDescription

Utility RequirementsUtility AirInstrument AirService / FirewaterPotable WaterPowerVACOthers ___________FMATERIALSItem NoMESC NoDescriptionTypeUnitQty

Material Type CodesP = Project MaterialT = Temporary (construction) MaterialC = Consumable MaterialS = Commissioning SparesGREFERENCE DRAWINGS & DOCUMENTSDwg / Doc NoRevDrawing / Document Title

HNOTES

JOBCARD APPROVALCONTRACTORPCSBApproved byPrepared ByReviewed ByAgreed ByNameMuhd Hasril RahamanDesignationPiping EngineerWorkpack Team LeaderProject ManagerHUC EngineerSignatureDateJOBCARD APPROVALCONTRACTORPCSBPresented ByVerified ByConfirmed ByAccepted ByNameDesignationForeman / SupervisorConstruction SuperintendentDiscipline InspectorHUC EngineerSignatureDate

&A&8Page &P of &N

SCAFF-004CHO/2012/DFHD/193 : PROVISION FOR HOOK-UP, COMMISSIONING AND TOPSIDE MAJOR MAINTENANCE SERVICES FOR 2013-2017

Work Order No & TitleDFHD/2014/042A/001 : PROVISION FOR HUC WORK FOR TOPSIDE MODIFICATION FOR SKO PIPELINE REJUVENATION PROJECT PL 381/210

JOBCARD ID NO----

AGENERALJOB DESCRIPTIONWORK CATEGORYOPS MODESISOErect scaffolds for removal of spool at Line 50-V-002-1101 (TP-001/002) & new spools installationOnshoreOffshoreSIPRODSIPCOMPrefabricationHook-UpWORK PHASEPre ShutdownSYS NOXXXSYS DESCN/AHook-UpDemolitionShutdownDISCIPLINESCAFFOLDINGLOCATIONCDCommissioningDecommissioningPost ShutdownSCHEDULEEarly StartLate StartActual StartPlan DurationPercent WeightEarly FinishLate FinishActual FinishActual DurationBHEALTH, SAFETY & ENVIRONMENT (HSE)PERSONNEL PROTECTIVE EQUIPMENTPERMIT TO WORKJOB SAFETY ANALYSISStandart PPEBody HarnessPersonal H2S MonitorCold WorkLiftingHearing ProtectionChemical ProtectionOthers (specify below)Hot WorkRadiationLENGTH0OKWork VestBreathing Apparatus_____________________ElectricalCQUALITYTEST REQUIREMENTVIUTHydrotestValve Leak TestCable TestsCalibrationFunction Test / Test RunRTMPIReinstatementRV Pop TestTubing Leak TestLoopcheckOthers LENGTHOKDMANPOWER RESOURCESTower Below 3.658 M1.184mhrs/ square m1TASK NOTASK DESCRIPTIONTRADEWORK VOLUMEPLAN MHRSACT MHRSTower Above 3.658 M1.292mhrs/ square m2UnitTotalUnitTotalHanger 3.658 M not exceed 6.401 M drop1.83mhrs/ square m4RSPAX3.000.902.70TypeArea m2Nom.Mhr32.51.3464.0382Erect scaffolds for removal of spool at Line 50-V-002-1101 (TP-001/002) & new spools installationRSM22.501.624.04

3Tools / Equipments & Scaffold HandlingRSM24.041.506.06RG PREPARE - 0.5 x 1.1 OFF FACRS PREPARED-0.75 x 1.2 OFF FAC4HousekeepingRSPAX3.000.92.70HOUSEKEEPING - 0.75RGPAX1.000.8250.83SCAF MAT HAND-1.5

DIRECT MANHOURS SUMMARYContractor PersonnelRSPFPWLSFSWLFWMWITIFELEBPRGTotal15.49500000000001.37516.87Third Party PersonnelNDTPTBTISCCVRWHTotal00000000.00Total, Direct Manhours16.87Special Services RequirementJob Constraints / Hold Points

ETOOL & EQUIPMENT RESOURCESItem NoUnitQtyDescriptionItem NoUnitQtyDescription

Utility RequirementsUtility AirInstrument AirService / FirewaterPotable WaterPowerVACOthers ___________FMATERIALSItem NoMESC NoDescriptionTypeUnitQty

Material Type CodesP = Project MaterialT = Temporary (construction) MaterialC = Consumable MaterialS = Commissioning SparesGREFERENCE DRAWINGS & DOCUMENTSDwg / Doc NoRevDrawing / Document Title

HNOTES

JOBCARD APPROVALCONTRACTORPCSBApproved byPrepared ByReviewed ByAgreed ByNameMuhd Hasril RahamanDesignationPiping EngineerWorkpack Team LeaderProject ManagerHUC EngineerSignatureDateJOBCARD APPROVALCONTRACTORPCSBPresented ByVerified ByConfirmed ByAccepted ByNameDesignationForeman / SupervisorConstruction SuperintendentDiscipline InspectorHUC EngineerSignatureDate

&A&8Page &P of &N

SCAFF-005CHO/2012/DFHD/193 : PROVISION FOR HOOK-UP, COMMISSIONING AND TOPSIDE MAJOR MAINTENANCE SERVICES FOR 2013-2017

Work Order No & TitleDFHD/2014/042A/001 : PROVISION FOR HUC WORK FOR TOPSIDE MODIFICATION FOR SKO PIPELINE REJUVENATION PROJECT PL 381/210

JOBCARD ID NO----

AGENERALJOB DESCRIPTIONWORK CATEGORYOPS MODESISOErect scaffolds for removal of spool at Line 80-DD-001-11430 (TP-013/014) & new spools installationOnshoreOffshoreSIPRODSIPCOMPrefabricationHook-UpWORK PHASEPre ShutdownSYS NOXXXSYS DESCN/AHook-UpDemolitionShutdownDISCIPLINESCAFFOLDINGLOCATIONCDCommissioningDecommissioningPost ShutdownSCHEDULEEarly StartLate StartActual StartPlan DurationPercent WeightEarly FinishLate FinishActual FinishActual DurationBHEALTH, SAFETY & ENVIRONMENT (HSE)PERSONNEL PROTECTIVE EQUIPMENTPERMIT TO WORKJOB SAFETY ANALYSISStandart PPEBody HarnessPersonal H2S MonitorCold WorkLiftingHearing ProtectionChemical ProtectionOthers (specify below)Hot WorkRadiationLENGTH0OKWork VestBreathing Apparatus_____________________ElectricalCQUALITYTEST REQUIREMENTVIUTHydrotestValve Leak TestCable TestsCalibrationFunction Test / Test RunRTMPIReinstatementRV Pop TestTubing Leak TestLoopcheckOthers LENGTHOKDMANPOWER RESOURCESTower Below 3.658 M1.184mhrs/ square m1TASK NOTASK DESCRIPTIONTRADEWORK VOLUMEPLAN MHRSACT MHRSTower Above 3.658 M1.292mhrs/ square m2UnitTotalUnitTotalHanger 3.658 M not exceed 6.401 M drop1.83mhrs/ square m4RSPAX3.000.902.70TypeArea m2Nom.Mhr331.3464.84562Erect scaffolds for removal of spool at Line 80-DD-001-11430 (TP-013/014) & new spools installationRSM23.001.624.85

3Tools / Equipments & Scaffold HandlingRSM24.851.507.27RG PREPARE - 0.5 x 1.1 OFF FACRS PREPARED-0.75 x 1.2 OFF FAC4HousekeepingRSPAX3.000.92.70HOUSEKEEPING - 0.75RGPAX1.000.8250.83SCAF MAT HAND-1.5

DIRECT MANHOURS SUMMARYContractor PersonnelRSPFPWLSFSWLFWMWITIFELEBPRGTotal17.51400000000001.37518.89Third Party PersonnelNDTPTBTISCCVRWHTotal00000000.00Total, Direct Manhours18.89Special Services RequirementJob Constraints / Hold Points

ETOOL & EQUIPMENT RESOURCESItem NoUnitQtyDescriptionItem NoUnitQtyDescription

Utility RequirementsUtility AirInstrument AirService / FirewaterPotable WaterPowerVACOthers ___________FMATERIALSItem NoMESC NoDescriptionTypeUnitQty

Material Type CodesP = Project MaterialT = Temporary (construction) MaterialC = Consumable MaterialS = Commissioning SparesGREFERENCE DRAWINGS & DOCUMENTSDwg / Doc NoRevDrawing / Document Title

HNOTES

JOBCARD APPROVALCONTRACTORPCSBApproved byPrepared ByReviewed ByAgreed ByNameMuhd Hasril RahamanDesignationPiping EngineerWorkpack Team LeaderProject ManagerHUC EngineerSignatureDateJOBCARD APPROVALCONTRACTORPCSBPresented ByVerified ByConfirmed ByAccepted ByNameDesignationForeman / SupervisorConstruction SuperintendentDiscipline InspectorHUC EngineerSignatureDate

&A&8Page &P of &N

SCAFF-006CHO/2012/DFHD/193 : PROVISION FOR HOOK-UP, COMMISSIONING AND TOPSIDE MAJOR MAINTENANCE SERVICES FOR 2013-2017

Work Order No & TitleDFHD/2014/042A/001 : PROVISION FOR HUC WORK FOR TOPSIDE MODIFICATION FOR SKO PIPELINE REJUVENATION PROJECT PL 381/210

JOBCARD ID NO----

AGENERALJOB DESCRIPTIONWORK CATEGORYOPS MODESISOErect scaffolds for removal of spool at Line 80-D-007-1101X (TP-015/016/017/020) & new spools installationOnshoreOffshoreSIPRODSIPCOMPrefabricationHook-UpWORK PHASEPre ShutdownSYS NOXXXSYS DESCN/AHook-UpDemolitionShutdownDISCIPLINESCAFFOLDINGLOCATIONCDCommissioningDecommissioningPost ShutdownSCHEDULEEarly StartLate StartActual StartPlan DurationPercent WeightEarly FinishLate FinishActual FinishActual DurationBHEALTH, SAFETY & ENVIRONMENT (HSE)PERSONNEL PROTECTIVE EQUIPMENTPERMIT TO WORKJOB SAFETY ANALYSISStandart PPEBody HarnessPersonal H2S MonitorCold WorkLiftingHearing ProtectionChemical ProtectionOthers (specify below)Hot WorkRadiationLENGTH0OKWork VestBreathing Apparatus_____________________ElectricalCQUALITYTEST REQUIREMENTVIUTHydrotestValve Leak TestCable TestsCalibrationFunction Test / Test RunRTMPIReinstatementRV Pop TestTubing Leak TestLoopcheckOthers LENGTHOKDMANPOWER RESOURCESTower Below 3.658 M1.184mhrs/ square m1TASK NOTASK DESCRIPTIONTRADEWORK VOLUMEPLAN MHRSACT MHRSTower Above 3.658 M1.292mhrs/ square m2UnitTotalUnitTotalHanger 3.658 M not exceed 6.401 M drop1.83mhrs/ square m4RSPAX3.000.902.70TypeArea m2Nom.Mhr341.3466.46082Erect scaffolds for removal of spool at Line 80-D-007-1101X (TP-015/016/017/020) & new spools installationRSM24.001.626.46

3Tools / Equipments & Scaffold HandlingRSM26.461.509.69RG PREPARE - 0.5 x 1.1 OFF FACRS PREPARED-0.75 x 1.2 OFF FAC4HousekeepingRSPAX3.000.92.70HOUSEKEEPING - 0.75RGPAX1.000.8250.83SCAF MAT HAND-1.5

DIRECT MANHOURS SUMMARYContractor PersonnelRSPFPWLSFSWLFWMWITIFELEBPRGTotal21.55200000000001.92523.48Third Party PersonnelNDTPTBTISCCVRWHTotal00000000.00Total, Direct Manhours23.48Special Services RequirementJob Constraints / Hold Points

ETOOL & EQUIPMENT RESOURCESItem NoUnitQtyDescriptionItem NoUnitQtyDescription

Utility RequirementsUtility AirInstrument AirService / FirewaterPotable WaterPowerVACOthers ___________FMATERIALSItem NoMESC NoDescriptionTypeUnitQty

Material Type CodesP = Project MaterialT = Temporary (construction) MaterialC = Consumable MaterialS = Commissioning SparesGREFERENCE DRAWINGS & DOCUMENTSDwg / Doc NoRevDrawing / Document Title

HNOTES

JOBCARD APPROVALCONTRACTORPCSBApproved byPrepared ByReviewed ByAgreed ByNameMuhd Hasril RahamanDesignationPiping EngineerWorkpack Team LeaderProject ManagerHUC EngineerSignatureDateJOBCARD APPROVALCONTRACTORPCSBPresented ByVerified ByConfirmed ByAccepted ByNameDesignationForeman / SupervisorConstruction SuperintendentDiscipline InspectorHUC EngineerSignatureDate

&A&8Page &P of &N

SCAFF-007CHO/2012/DFHD/193 : PROVISION FOR HOOK-UP, COMMISSIONING AND TOPSIDE MAJOR MAINTENANCE SERVICES FOR 2013-2017

Work Order No & TitleDFHD/2014/042A/001 : PROVISION FOR HUC WORK FOR TOPSIDE MODIFICATION FOR SKO PIPELINE REJUVENATION PROJECT PL 381/210

JOBCARD ID NO----

AGENERALJOB DESCRIPTIONWORK CATEGORYOPS MODESISOErect scaffolds for removal of spool at Line 150-BD-004-1101X (TP-005/006) & new spools installationOnshoreOffshoreSIPRODSIPCOMPrefabricationHook-UpWORK PHASEPre ShutdownSYS NOXXXSYS DESCN/AHook-UpDemolitionShutdownDISCIPLINESCAFFOLDINGLOCATIONSUMPCommissioningDecommissioningPost ShutdownSCHEDULEEarly StartLate StartActual StartPlan DurationPercent WeightEarly FinishLate FinishActual FinishActual DurationBHEALTH, SAFETY & ENVIRONMENT (HSE)PERSONNEL PROTECTIVE EQUIPMENTPERMIT TO WORKJOB SAFETY ANALYSISStandart PPEBody HarnessPersonal H2S MonitorCold WorkLiftingHearing ProtectionChemical ProtectionOthers (specify below)Hot WorkRadiationLENGTH0OKWork VestBreathing Apparatus_____________________ElectricalCQUALITYTEST REQUIREMENTVIUTHydrotestValve Leak TestCable TestsCalibrationFunction Test / Test RunRTMPIReinstatementRV Pop TestTubing Leak TestLoopcheckOthers LENGTHOKDMANPOWER RESOURCESTower Below 3.658 M1.184mhrs/ square m1TASK NOTASK DESCRIPTIONTRADEWORK VOLUMEPLAN MHRSACT MHRSTower Above 3.658 M1.292mhrs/ square m2UnitTotalUnitTotalHanger 3.658 M not exceed 6.401 M drop1.83mhrs/ square m4RSPAX3.000.902.70TypeArea m2Nom.Mhr13.51.1844.97282Erect scaffolds for removal of spool at Line 150-BD-004-1101X (TP-005/006) & new spools installationRSM23.501.424.97

3Tools / Equipments & Scaffold HandlingRSM24.971.507.46RG PREPARE - 0.5 x 1.1 OFF FACRS PREPARED-0.75 x 1.2 OFF FAC4HousekeepingRSPAX3.000.92.70HOUSEKEEPING - 0.75RGPAX1.000.8250.83SCAF MAT HAND-1.5

DIRECT MANHOURS SUMMARYContractor PersonnelRSPFPWLSFSWLFWMWITIFELEBPRGTotal17.83200000000001.92519.76Third Party PersonnelNDTPTBTISCCVRWHTotal00000000.00Total, Direct Manhours19.76Special Services RequirementJob Constraints / Hold Points

ETOOL & EQUIPMENT RESOURCESItem NoUnitQtyDescriptionItem NoUnitQtyDescription

Utility RequirementsUtility AirInstrument AirService / FirewaterPotable WaterPowerVACOthers ___________FMATERIALSItem NoMESC NoDescriptionTypeUnitQty

Material Type CodesP = Project MaterialT = Temporary (construction) MaterialC = Consumable MaterialS = Commissioning SparesGREFERENCE DRAWINGS & DOCUMENTSDwg / Doc NoRevDrawing / Document Title

HNOTES

JOBCARD APPROVALCONTRACTORPCSBApproved byPrepared ByReviewed ByAgreed ByNameMuhd Hasril RahamanDesignationPiping EngineerWorkpack Team LeaderProject ManagerHUC EngineerSignatureDateJOBCARD APPROVALCONTRACTORPCSBPresented ByVerified ByConfirmed ByAccepted ByNameDesignationForeman / SupervisorConstruction SuperintendentDiscipline InspectorHUC EngineerSignatureDate

&A&8Page &P of &N

SCAFF-008CHO/2012/DFHD/193 : PROVISION FOR HOOK-UP, COMMISSIONING AND TOPSIDE MAJOR MAINTENANCE SERVICES FOR 2013-2017

Work Order No & TitleDFHD/2014/042A/001 : PROVISION FOR HUC WORK FOR TOPSIDE MODIFICATION FOR SKO PIPELINE REJUVENATION PROJECT PL 381/210

JOBCARD ID NO----

AGENERALJOB DESCRIPTIONWORK CATEGORYOPS MODESISOErect scaffolds for removal of spool at Line 50-IA-1003-1808/13411 (TP-009/010) & new spools installationOnshoreOffshoreSIPRODSIPCOMPrefabricationHook-UpWORK PHASEPre ShutdownSYS NOXXXSYS DESCN/AHook-UpDemolitionShutdownDISCIPLINESCAFFOLDINGLOCATIONCDCommissioningDecommissioningPost ShutdownSCHEDULEEarly StartLate StartActual StartPlan DurationPercent WeightEarly FinishLate FinishActual FinishActual DurationBHEALTH, SAFETY & ENVIRONMENT (HSE)PERSONNEL PROTECTIVE EQUIPMENTPERMIT TO WORKJOB SAFETY ANALYSISStandart PPEBody HarnessPersonal H2S MonitorCold WorkLiftingHearing ProtectionChemical ProtectionOthers (specify below)Hot WorkRadiationLENGTH0OKWork VestBreathing Apparatus_____________________ElectricalCQUALITYTEST REQUIREMENTVIUTHydrotestValve Leak TestCable TestsCalibrationFunction Test / Test RunRTMPIReinstatementRV Pop TestTubing Leak TestLoopcheckOthers LENGTHOKDMANPOWER RESOURCESTower Below 3.658 M1.184mhrs/ square m1TASK NOTASK DESCRIPTIONTRADEWORK VOLUMEPLAN MHRSACT MHRSTower Above 3.658 M1.292mhrs/ square m2UnitTotalUnitTotalHanger 3.658 M not exceed 6.401 M drop1.83mhrs/ square m4RSPAX2.000.901.80TypeArea m2Nom.Mhr121.1842.84162Erect scaffolds for removal of spool at Line 50-IA-1003-1808/13411 (TP-009/010) & new spools installationRSM22.001.422.84

3Tools / Equipments & Scaffold HandlingRSM22.841.504.26RG PREPARE - 0.5 x 1.1 OFF FACRS PREPARED-0.75 x 1.2 OFF FAC4HousekeepingRSPAX2.000.91.80HOUSEKEEPING - 0.75RGPAX1.000.8250.83SCAF MAT HAND-1.5

DIRECT MANHOURS SUMMARYContractor PersonnelRSPFPWLSFSWLFWMWITIFELEBPRGTotal10.70400000000001.37512.08Third Party PersonnelNDTPTBTISCCVRWHTotal00000000.00Total, Direct Manhours12.08Special Services RequirementJob Constraints / Hold Points

ETOOL & EQUIPMENT RESOURCESItem NoUnitQtyDescriptionItem NoUnitQtyDescription

Utility RequirementsUtility AirInstrument AirService / FirewaterPotable WaterPowerVACOthers ___________FMATERIALSItem NoMESC NoDescriptionTypeUnitQty

Material Type CodesP = Project MaterialT = Temporary (construction) MaterialC = Consumable MaterialS = Commissioning SparesGREFERENCE DRAWINGS & DOCUMENTSDwg / Doc NoRevDrawing / Document Title

HNOTES

JOBCARD APPROVALCONTRACTORPCSBApproved byPrepared ByReviewed ByAgreed ByNameMuhd Hasril RahamanDesignationPiping EngineerWorkpack Team LeaderProject ManagerHUC EngineerSignatureDateJOBCARD APPROVALCONTRACTORPCSBPresented ByVerified ByConfirmed ByAccepted ByNameDesignationForeman / SupervisorConstruction SuperintendentDiscipline InspectorHUC EngineerSignatureDate

&A&8Page &P of &N

SCAFF-009CHO/2012/DFHD/193 : PROVISION FOR HOOK-UP, COMMISSIONING AND TOPSIDE MAJOR MAINTENANCE SERVICES FOR 2013-2017

Work Order No & TitleDFHD/2014/042A/001 : PROVISION FOR HUC WORK FOR TOPSIDE MODIFICATION FOR SKO PIPELINE REJUVENATION PROJECT PL 381/210

JOBCARD ID NO----

AGENERALJOB DESCRIPTIONWORK CATEGORYOPS MODESISOErect scaffolds for removal of spool at Line 50-P-13512-11432 (TP-021/022) & new spools installationOnshoreOffshoreSIPRODSIPCOMPrefabricationHook-UpWORK PHASEPre ShutdownSYS NOXXXSYS DESCN/AHook-UpDemolitionShutdownDISCIPLINESCAFFOLDINGLOCATIONSUMPCommissioningDecommissioningPost ShutdownSCHEDULEEarly StartLate StartActual StartPlan DurationPercent WeightEarly FinishLate FinishActual FinishActual DurationBHEALTH, SAFETY & ENVIRONMENT (HSE)PERSONNEL PROTECTIVE EQUIPMENTPERMIT TO WORKJOB SAFETY ANALYSISStandart PPEBody HarnessPersonal H2S MonitorCold WorkLiftingHearing ProtectionChemical ProtectionOthers (specify below)Hot WorkRadiationLENGTH0OKWork VestBreathing Apparatus_____________________ElectricalCQUALITYTEST REQUIREMENTVIUTHydrotestValve Leak TestCable TestsCalibrationFunction Test / Test RunRTMPIReinstatementRV Pop TestTubing Leak TestLoopcheckOthers LENGTHOKDMANPOWER RESOURCESTower Below 3.658 M1.184mhrs/ square m1TASK NOTASK DESCRIPTIONTRADEWORK VOLUMEPLAN MHRSACT MHRSTower Above 3.658 M1.292mhrs/ square m2UnitTotalUnitTotalHanger 3.658 M not exceed 6.401 M drop1.83mhrs/ square m4RSPAX2.000.901.80TypeArea m2Nom.Mhr121.1842.84162Erect scaffolds for removal of spool at Line 50-P-13512-11432 (TP-021/022) & new spools installationRSM22.001.422.84

3Tools / Equipments & Scaffold HandlingRSM22.841.504.26RG PREPARE - 0.5 x 1.1 OFF FACRS PREPARED-0.75 x 1.2 OFF FAC4HousekeepingRSPAX2.000.91.80HOUSEKEEPING - 0.75RGPAX1.000.8250.83SCAF MAT HAND-1.5

DIRECT MANHOURS SUMMARYContractor PersonnelRSPFPWLSFSWLFWMWITIFELEBPRGTotal10.70400000000001.37512.08Third Party PersonnelNDTPTBTISCCVRWHTotal00000000.00Total, Direct Manhours12.08Special Services RequirementJob Constraints / Hold Points

ETOOL & EQUIPMENT RESOURCESItem NoUnitQtyDescriptionItem NoUnitQtyDescription

Utility RequirementsUtility AirInstrument AirService / FirewaterPotable WaterPowerVACOthers ___________FMATERIALSItem NoMESC NoDescriptionTypeUnitQty

Material Type CodesP = Project MaterialT = Temporary (construction) MaterialC = Consumable MaterialS = Commissioning SparesGREFERENCE DRAWINGS & DOCUMENTSDwg / Doc NoRevDrawing / Document Title

HNOTES

JOBCARD APPROVALCONTRACTORPCSBApproved byPrepared ByReviewed ByAgreed ByNameMuhd Hasril RahamanDesignationPiping EngineerWorkpack Team LeaderProject ManagerHUC EngineerSignatureDateJOBCARD APPROVALCONTRACTORPCSBPresented ByVerified ByConfirmed ByAccepted ByNameDesignationForeman / SupervisorConstruction SuperintendentDiscipline InspectorHUC EngineerSignatureDate