@b2_tke Teknologi Konversi Energi b2tke.bppt www.b2tke.bppt.go.id PROGRES CAPAIAN KINERJA PRIORITAS NASIONAL BPPT 30 September 2019

30 September 2019 - b2tke.bppt.go.idb2tke.bppt.go.id/images/Gallery_Zona_Integritas... · Testing dan Kommisioning SG P.Pramuka Uji coba Inverter no 5 SMG Sumba Capaian TW III Pemasangan

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 30 September 2019 - b2tke.bppt.go.idb2tke.bppt.go.id/images/Gallery_Zona_Integritas... · Testing dan Kommisioning SG P.Pramuka Uji coba Inverter no 5 SMG Sumba Capaian TW III Pemasangan

@b2_tke Teknologi Konversi Energi b2tke.bppt

www.b2tke.bppt.go.id

PROGRES CAPAIAN KINERJA

PRIORITAS NASIONAL BPPT

30 September 2019

Page 2: 30 September 2019 - b2tke.bppt.go.idb2tke.bppt.go.id/images/Gallery_Zona_Integritas... · Testing dan Kommisioning SG P.Pramuka Uji coba Inverter no 5 SMG Sumba Capaian TW III Pemasangan

@b2_tke Teknologi Konversi Energi b2tke.bpptwww.b2tke.bppt.go.id 2

OUTLINES

SMARTGRID

PLTP SKALA KECIL

BARON TECHNOPARK

KONSERVASI & AUDIT ENERGI

CHARGING STATION

LAYANAN JASA TEKNOLOGI (PNBP)

KESIMPULAN

Page 3: 30 September 2019 - b2tke.bppt.go.idb2tke.bppt.go.id/images/Gallery_Zona_Integritas... · Testing dan Kommisioning SG P.Pramuka Uji coba Inverter no 5 SMG Sumba Capaian TW III Pemasangan

@b2_tke Teknologi Konversi Energi b2tke.bpptwww.b2tke.bppt.go.id 3

PPT KONVERSI ENERGI

PNBP

SMARTGRID

PLTP SKALA KECIL

KONSERVASI & AUDIT ENERGI

CHARGING STATION

KENDARAAN LISTRIK

BARON TECHNOPARK

LAYANAN

PERKANTORAN

Page 4: 30 September 2019 - b2tke.bppt.go.idb2tke.bppt.go.id/images/Gallery_Zona_Integritas... · Testing dan Kommisioning SG P.Pramuka Uji coba Inverter no 5 SMG Sumba Capaian TW III Pemasangan

@b2_tke Teknologi Konversi Energi b2tke.bpptwww.b2tke.bppt.go.id

Target TW III

Pemasangan Micro grid controller pada SG 100 kWp Serpong

Testing dan Kommisioning SG P.Pramuka

Uji coba Inverter no 5 SMG Sumba

Capaian TW IIIPemasangan Micro grid controller pada SG 100 kWpSerpong

Persiapan Instalasi SG P.Pramuka

Uji coba Inverter no 5 SMG Sumba

2019Alih Tek SG Serpong(Lo)

ALih Tek SMG Sumba

4

K: KinerjaA: Anggaran

K: 75%A: 75%

K: 71%A: 87%

Page 5: 30 September 2019 - b2tke.bppt.go.idb2tke.bppt.go.id/images/Gallery_Zona_Integritas... · Testing dan Kommisioning SG P.Pramuka Uji coba Inverter no 5 SMG Sumba Capaian TW III Pemasangan

@b2_tke Teknologi Konversi Energi b2tke.bpptwww.b2tke.bppt.go.id

➢ Implementasi IoT untuk memonitor dan

mengontrol smart micro grid

➢ Otomatisasi distribusi jaringan listrik

➢ Demand respons (tarif variasi) yang memerlukan

automatisasi

➢ Monitoring dan kontrol trafo/substation berbasis

GIS yang di link dengan system database untuk

asset manajemen

➢ Peak shaping

• Sistem Rooftop PV

menghasilkan energi listrik

kurang lebih 450 kWh/hari,

Page 6: 30 September 2019 - b2tke.bppt.go.idb2tke.bppt.go.id/images/Gallery_Zona_Integritas... · Testing dan Kommisioning SG P.Pramuka Uji coba Inverter no 5 SMG Sumba Capaian TW III Pemasangan

@b2_tke Teknologi Konversi Energi b2tke.bpptwww.b2tke.bppt.go.id

PV 400 kWp

PV CONVERTER

BATTERY BANK DC/AC

INVERTER

STEP UPTRANSFORMER

0.4/20 kV

SUMBA

Kaitan dengan industry 4.0 :

➢ Automatisasi untuk memberikan

daya yang konstan dan stabil

ke jaringan PLN dari sistem

existing

➢ Automatisasi untuk sistem

manajemen baterai cerdas

untuk memperpanjang usia

baterai

Page 7: 30 September 2019 - b2tke.bppt.go.idb2tke.bppt.go.id/images/Gallery_Zona_Integritas... · Testing dan Kommisioning SG P.Pramuka Uji coba Inverter no 5 SMG Sumba Capaian TW III Pemasangan

@b2_tke Teknologi Konversi Energi b2tke.bpptwww.b2tke.bppt.go.id

Target TW III

Persiapan SLO PLTP 500 kW

Koord dgn Industri DN

Capaian TW III

Proses SLO PLTP BC 500 kW

Koord dgn Industri DN

2019Alih Tek PLTP BC 500 kW (Lo)

7

K: 75%A: 75%

K: 78%A: 61% (C: 86%)

K: KinerjaA: AnggaranC: Realisasi + Commited

Page 8: 30 September 2019 - b2tke.bppt.go.idb2tke.bppt.go.id/images/Gallery_Zona_Integritas... · Testing dan Kommisioning SG P.Pramuka Uji coba Inverter no 5 SMG Sumba Capaian TW III Pemasangan

@b2_tke Teknologi Konversi Energi b2tke.bpptwww.b2tke.bppt.go.id8

B2TKE- Strictly confidentialB2TKE- Strictly confidentialB2TKE- Strictly confidential

02

STATUS PLTP SKALA KECIL

• Pilot #1 PLTP Kamojang 3 MW, Teknologi flash dry steam

• TKDN ±63,14%, seluruh komponen utama dibuatmanufaktur lokal

• Status: proses mendapatkan SLO (target Nov 2019)– Sertifikat Laik Sinkron (SLS), uji operasi sinkron selama >150 jam

(~ 187 MWh ke Grid 20 kV PLN Kamojang)

– Telah diuji operasi kontinyu 3x24 jam, dengan beban dibatasi 40% disain

– Perkiraan Capex komersial ~Rp.40 M/MW (USD 2.6 Jt/MW)

• PLTP Lahendong 500 kW, Teknologi Organic Rankine Cycle,

memanfaatkan Brine Water PGE

• TKDN ±30%, Disain bersama Tim BPPT – GFZ, Siklus ORC

dibuat di Jerman, Siklus Utilitas Heating dan Cooling

dibuat manufaktur lokal.

• Status: proses mendapatkan SLO (target Nov 2019)– Telah dioperasikan secara kontinyu sejak September 2017, uji operasi

selama > 6200 jam (~ 1,5 GWh ke grid 20 kV PLN Lahendong)

– Perkiraan Capex komersial ~ Rp 46/MW (USD 3 Jt/MW)

Page 9: 30 September 2019 - b2tke.bppt.go.idb2tke.bppt.go.id/images/Gallery_Zona_Integritas... · Testing dan Kommisioning SG P.Pramuka Uji coba Inverter no 5 SMG Sumba Capaian TW III Pemasangan

@b2_tke Teknologi Konversi Energi b2tke.bpptwww.b2tke.bppt.go.id

Target TW III

Pengelolaan Bersama Baron TP

Pelatihan EBT

3000 eduwista

Capaian TW III

Mou BPPT - DIY

Prospek pelatihan EBT

5206 eduwisata

20192 Pelatihan EBT

4000 eduwisata

9

K: 75%A: 75%

K: 75%A: 54% (C: 67%)

Page 10: 30 September 2019 - b2tke.bppt.go.idb2tke.bppt.go.id/images/Gallery_Zona_Integritas... · Testing dan Kommisioning SG P.Pramuka Uji coba Inverter no 5 SMG Sumba Capaian TW III Pemasangan

@b2_tke Teknologi Konversi Energi b2tke.bpptwww.b2tke.bppt.go.id

STATUS BARON TP

Page 11: 30 September 2019 - b2tke.bppt.go.idb2tke.bppt.go.id/images/Gallery_Zona_Integritas... · Testing dan Kommisioning SG P.Pramuka Uji coba Inverter no 5 SMG Sumba Capaian TW III Pemasangan

@b2_tke Teknologi Konversi Energi b2tke.bpptwww.b2tke.bppt.go.id

Target TW III

Analisa hasil audit

Prototipe system pendingin berbasis EBT

Penyusunan bukupedoman teknispenghematan energi

Capaian TW IIIAnalisa & rekomendasiaudit PLTU Muara Enim

Prototipe system pendingin berbasis EBT

Penyusunan bukupedoman teknispenghematan energi

2019Rekomendasi penghematanenergi di Industri

Prototipe penerapan Tek Konservasi Energi

Pedoman Teknispengehematan energi

11

K: 75%A: 75%

K: 90%A: 49% (C: 70%)

Page 12: 30 September 2019 - b2tke.bppt.go.idb2tke.bppt.go.id/images/Gallery_Zona_Integritas... · Testing dan Kommisioning SG P.Pramuka Uji coba Inverter no 5 SMG Sumba Capaian TW III Pemasangan

@b2_tke Teknologi Konversi Energi b2tke.bpptwww.b2tke.bppt.go.id

Pengembangan Sistem Pemanasdan Sistem Pendingin dengan EnergiSurya

Sistem Pendingin:Absoption Refrigerator 3 Way: AC 110V/ 12DC/Gas Propane

Inovasi:Refrigerasi dengan biogasSolar PV, atau Solar Thermal

Page 13: 30 September 2019 - b2tke.bppt.go.idb2tke.bppt.go.id/images/Gallery_Zona_Integritas... · Testing dan Kommisioning SG P.Pramuka Uji coba Inverter no 5 SMG Sumba Capaian TW III Pemasangan

@b2_tke Teknologi Konversi Energi b2tke.bpptwww.b2tke.bppt.go.id

Target TW III

Hasil Pengujian Unjuk kerjaSmart CS

Instalasi & komisioningpengujian baterai

Instalasi & komisioningpengujian fuel cell

Capaian TW IIIHasil Pengujian Unjuk kerjaSmart CS

Proses pengadaan alat uji baterai

Instalasi & komisioningpengujian fuel cell

2019Alih Tek Smart CS

Layanan uji baterai

13

K: 75%A: 75%

K: 70%A: 14% (C: 51%)

Page 14: 30 September 2019 - b2tke.bppt.go.idb2tke.bppt.go.id/images/Gallery_Zona_Integritas... · Testing dan Kommisioning SG P.Pramuka Uji coba Inverter no 5 SMG Sumba Capaian TW III Pemasangan

@b2_tke Teknologi Konversi Energi b2tke.bpptwww.b2tke.bppt.go.id

STATUS ALIH TEKNOLOGI CS

Design 3D Charging Station LEN

Page 15: 30 September 2019 - b2tke.bppt.go.idb2tke.bppt.go.id/images/Gallery_Zona_Integritas... · Testing dan Kommisioning SG P.Pramuka Uji coba Inverter no 5 SMG Sumba Capaian TW III Pemasangan

@b2_tke Teknologi Konversi Energi b2tke.bpptwww.b2tke.bppt.go.id

PERALATAN UJI BATERAI

✓ Sedang dilakukan proses tender.

Page 16: 30 September 2019 - b2tke.bppt.go.idb2tke.bppt.go.id/images/Gallery_Zona_Integritas... · Testing dan Kommisioning SG P.Pramuka Uji coba Inverter no 5 SMG Sumba Capaian TW III Pemasangan

@b2_tke Teknologi Konversi Energi b2tke.bpptwww.b2tke.bppt.go.id

Target TW III

3 Layanan Teknologisenilai Rp. 4.1 M

Capaian TW III3 Layanan Teknologisenilai Rp. 7.2 M

20193 Layanan Teknologi senilaiRp. 5.5 M

16

K: 75%A: 75%

K: 100%A: 75%

Page 17: 30 September 2019 - b2tke.bppt.go.idb2tke.bppt.go.id/images/Gallery_Zona_Integritas... · Testing dan Kommisioning SG P.Pramuka Uji coba Inverter no 5 SMG Sumba Capaian TW III Pemasangan

@b2_tke Teknologi Konversi Energi b2tke.bpptwww.b2tke.bppt.go.id

Page 18: 30 September 2019 - b2tke.bppt.go.idb2tke.bppt.go.id/images/Gallery_Zona_Integritas... · Testing dan Kommisioning SG P.Pramuka Uji coba Inverter no 5 SMG Sumba Capaian TW III Pemasangan

@b2_tke Teknologi Konversi Energi b2tke.bpptwww.b2tke.bppt.go.id

NO KEGIATAN TARGET 2019 PERKIRAAN

HASIL

1 Smartgrid Alih Tek SG Serpong Tercapai

Alih Tek SMG Sumba Tercapai

2 PLTP Alih Teknologi PLTP BC 500 kW Tercapai

3 Charginng

Station

Alih Teknologi CS Kendaraan Listrik Tercapai

Layanan Uji Baterai Tercapai

4 Baron TP 2 Layanan pelatihan EBT Tercapai

4000 eduwisata Tercapai

5 Konservasi Energi Prototipe penerapan Tek konservasi

energi

Tercapai

Buku pedoman hemat energi Tercapai

Rekomendasi audit energi Tercapai

6 PNBP 3 Layanan teknologi senilai Rp. 5,5 M Tercapai

18

Page 19: 30 September 2019 - b2tke.bppt.go.idb2tke.bppt.go.id/images/Gallery_Zona_Integritas... · Testing dan Kommisioning SG P.Pramuka Uji coba Inverter no 5 SMG Sumba Capaian TW III Pemasangan

@b2_tke Teknologi Konversi Energi b2tke.bpptwww.b2tke.bppt.go.id

TERIMA KASIH@b2_tke Teknologi Konversi Energi b2tke.bppt

www.b2tke.bppt.go.id

Kontak:

Bidang Layanan Jasa Teknologi – B2TKE

Cluster Energi Gedung 620-625 Kawasan PUSPIPTEK Serpong

Tangerang Selatan 15314

Telp. +62 21 756 0916, 756 0550, 756 0092

Fax. +62 21 756 0904

[email protected]