3.0 PROJECT DESCRIPTION City of Berkeley 651 Addison Street Mixed-Use Project August 2008 Draft Environmental Impact Report 3.0-1 The 651 Addison Street Mixed-Use Project is a proposed mixed-use development that would involve construction of a 5-story housing project with 2,600 square feet (SF) of street-level commercial near the foot of University Avenue across from the new Amtrak station. The project would consist of 94 residential units, two retail spaces, and a 102-space parking garage with 28 bicycle spaces. The project would also construct all necessary infrastructure to connect to existing City services. 3.1 PROJECT LOCATION, OWNERSHIP, AND CURRENT USE The proposed 651 Addison Street (also 2020 Third Street) Mixed-Use Project (project) is located within the West Berkeley Area Plan in the City of Berkeley, Alameda County. Regional access is provided by Interstate 580 (I-580) and Interstate 80 (I-80), which are located approximately two- tenths of a mile west of the site. Figure 3.0-1 depicts the regional location of the project site. The project site is located on the northwest corner of the intersection of Addison and Third Streets (Figure 3.0-2). The project site consists of one parcel (Assessor’s Parcel No. 056-1954-009) under single ownership (Aquatic Park Enterprises, LLC) that encompasses approximately 36,400 square feet (0.84 acres). The site is generally rectangular (with a notch at the northwest corner of the site) north-south along Third Street and east-west along Addison Street. The site is flat and paved with a concrete pad. The site has historically been used as a manufacturing facility, and more recently was used as a work, storage, commercial, and light-manufacturing facility. The project site previously included the one-story, 19,400 square foot Drayage building, which was demolished in June 2007 (Figure 3.0-3). The Drayage building was constructed in 1935 and was declared unsafe by the Berkeley Fire Department and Building Department in 2005, which later lead to eviction and demolition of the building. The area surrounding the project site includes a variety of different land uses from manufacturing including the Truitt White lumber company on Second Street to boutique retailers along Fourth Street (Figure 3.0-4). The project study area has experienced much redevelopment within the last decade, including a renovated train stop and transit hub, streetscape improvements, housing developments, live/work facilities, pedestrian/bicycle transportation improvements, new office building, and reinvestment in stores located along University Avenue, San Pablo Avenue, Fourth Street, and additional surrounding streets. Additionally, two of the City’s largest open spaces are located within close proximity to the project site. These include the Berkeley Aquatic Park and the Berkeley Waterfront and Marina. 3.2 SURROUNDING PROJECTS There are four major projects that were approved recently in the general vicinity of the project site that may contribute to overall cumulative impacts. Cumulative impact criteria are determined by each resource topic area. Additional projects in the vicinity that were not included for the discussion of cumulative impacts are listed in Table 4.0-2. One additional project that is not yet approved includes amendments that would allow for automobile sales in West Berkeley. These projects include the following: 700 University Avenue – 173 one- and two-bedroom residential units and commercial/ retail on an approximately two-acre site Read Building at 2039 4 th Street – mixed-use development with 7,747 SF general office space, 8,540 SF retail, one 2,962 SF residential dwelling unit in single two- to three-story tiered building (49-foot maximum height) with garden courtyard

3.1 P ROJECT LOCATION OWNERSHIP AND CURRENT USE · 3.0 PROJECT DESCRIPTION City of Berkeley 651 Addison Street Mixed-Use Project August 2008 Draft Environmental Impact Report 3.0-1

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

3.0 PROJECT DESCRIPTION

City of Berkeley 651 Addison Street Mixed-Use Project August 2008 Draft Environmental Impact Report

3.0-1

The 651 Addison Street Mixed-Use Project is a proposed mixed-use development that would involve construction of a 5-story housing project with 2,600 square feet (SF) of street-level commercial near the foot of University Avenue across from the new Amtrak station. The project would consist of 94 residential units, two retail spaces, and a 102-space parking garage with 28 bicycle spaces. The project would also construct all necessary infrastructure to connect to existing City services.

3.1 PROJECT LOCATION, OWNERSHIP, AND CURRENT USE

The proposed 651 Addison Street (also 2020 Third Street) Mixed-Use Project (project) is located within the West Berkeley Area Plan in the City of Berkeley, Alameda County. Regional access is provided by Interstate 580 (I-580) and Interstate 80 (I-80), which are located approximately two-tenths of a mile west of the site. Figure 3.0-1 depicts the regional location of the project site. The project site is located on the northwest corner of the intersection of Addison and Third Streets (Figure 3.0-2). The project site consists of one parcel (Assessor’s Parcel No. 056-1954-009) under single ownership (Aquatic Park Enterprises, LLC) that encompasses approximately 36,400 square feet (0.84 acres). The site is generally rectangular (with a notch at the northwest corner of the site) north-south along Third Street and east-west along Addison Street. The site is flat and paved with a concrete pad.

The site has historically been used as a manufacturing facility, and more recently was used as a work, storage, commercial, and light-manufacturing facility. The project site previously included the one-story, 19,400 square foot Drayage building, which was demolished in June 2007 (Figure 3.0-3). The Drayage building was constructed in 1935 and was declared unsafe by the Berkeley Fire Department and Building Department in 2005, which later lead to eviction and demolition of the building.

The area surrounding the project site includes a variety of different land uses from manufacturing including the Truitt White lumber company on Second Street to boutique retailers along Fourth Street (Figure 3.0-4). The project study area has experienced much redevelopment within the last decade, including a renovated train stop and transit hub, streetscape improvements, housing developments, live/work facilities, pedestrian/bicycle transportation improvements, new office building, and reinvestment in stores located along University Avenue, San Pablo Avenue, Fourth Street, and additional surrounding streets. Additionally, two of the City’s largest open spaces are located within close proximity to the project site. These include the Berkeley Aquatic Park and the Berkeley Waterfront and Marina.

3.2 SURROUNDING PROJECTS

There are four major projects that were approved recently in the general vicinity of the project site that may contribute to overall cumulative impacts. Cumulative impact criteria are determined by each resource topic area. Additional projects in the vicinity that were not included for the discussion of cumulative impacts are listed in Table 4.0-2. One additional project that is not yet approved includes amendments that would allow for automobile sales in West Berkeley. These projects include the following:

• 700 University Avenue – 173 one- and two-bedroom residential units and commercial/ retail on an approximately two-acre site

• Read Building at 2039 4th Street – mixed-use development with 7,747 SF general office space, 8,540 SF retail, one 2,962 SF residential dwelling unit in single two- to three-story tiered building (49-foot maximum height) with garden courtyard

3.0 PROJECT DESCRIPTION

651 Addison Street Mixed-Use Project City of Berkeley Draft Environmental Impact Report August 2008

3.0-2

• 1885 University Avenue/1950 Martin Luther King Jr Way – 148 one- and two-bedroom residential units and commercial/retail on an approximately one-acre site

• West Berkeley Bowl – 920 Heinz Avenue – grocery retail and distribution center

• West Berkeley Auto Sales – Zoning Ordinance, General Plan, and West Berkeley Plan amendments to allow automobile sales in West Berkeley

All the pending, proposed, and approved projects occurring within the City of Berkeley are depicted in Figure 3.0-5. Table 4.0-1 provides further details of these projects and projects located in the project vicinity of the West Berkeley Area.

S o l a n oC o u n t yS o l a n oC o u n t y

M a r i nC o u n t yM a r i nC o u n t y

A l a m e d aC o u n t yA l a m e d aC o u n t y

S o n o m aC o u n t yS o n o m aC o u n t y

C o n t r a C o s t aC o u n t yC o n t r a C o s t aC o u n t y

S a n M a t e oC o u n t yS a n M a t e oC o u n t y

N a p aC o u n t yN a p aC o u n t y

S a n t a C l a r aC o u n t yS a n t a C l a r aC o u n t y

S a n F r a n c i s c oC o u n t yS a n F r a n c i s c oC o u n t y

S a c r a m e n t oC o u n t yS a c r a m e n t oC o u n t y

Napa River

Carquinez Strait Sacramento RiverSherman Lake

Kent LakeBroad Slough

Calaveras Reservoir

Nicasio Reservoir

San Antonio Reservoir

San Pablo ReservoirBriones Reservoir

Montezuma Slough

Lake Chabot

San Andreas Lake

Upper San Leandro Reservoir

Alpine Lake

Laguna Lake

New York Slough

Lower Crystal Springs Reservoir

Upper Crystal Springs Reservoir

San Jose

Concord

AntiochSan Rafael--Novato

Santa Rosa

Vallejo

Fairfield

VacavilleNapa

Petaluma

Livermore

SonomaSonoma

Half Moon BayHalf Moon Bay

Fairfield SouthwestFairfield Southwest

YountvilleYountville

§̈¦880

§̈¦280

§̈¦580

§̈¦680

§̈¦80

§̈¦780

§̈¦380

§̈¦505

§̈¦980

§̈¦280

§̈¦80

£¤101

£¤1

£¤101Golden Gate National Rec AreaGolden Gate National Rec Area Mount Diablo State ParkMount Diablo State Park

Mount Tamalpais State ParkMount Tamalpais State Park

Source: ESRI; CaSIL

T:\_G

IS\AL

AMED

A_CO

UNTY

\MXD

S\BE

RKEL

EY\R

EGIO

NAL.M

XD - 8

/21/2

007 @

5:58

:48 PM

´4 0 4

MILES

ProjectLocation

Figure 3.0-1Regional Vicinity Map

San FranciscoOakland

Berkeley

P a c i f i c Oc e a n

Addison St

James Kenney Rec Center ParkJames Kenney Rec Center Park

5TH

4TH

6TH

2ND 7TH

ADDISON

BOLIVAR

HEARST

FRONTAGE

UNIVERSITY

BANCROFT

ALLSTONEASTSHORE

UNIVERSITY OVERPASS

UNION PACIFIC RAILROAD

CHANNING

HEARST

DELAWARE

FRONTAGE

Eastshore State ParkEastshore State Park

Berkeley Aquatic ParkBerkeley Aquatic Park

Figure 3.0-2Source: GlobeXplorer 2005, PMC 2007

T:\_G

IS\AL

AMED

A_CO

UNTY

\MXD

S\BE

RKEL

EY\A

DDISO

N_ST\

PROJ

ECTLO

CATIO

N2.M

XD - 8

/22/2

007 @

3:46

:07 PM

´200 0 200

FEET Project Location Map

!"c$

Project LocationParcels

NOTES:1 Elevations are based on

City of Berkeley datum.2 Utility locations as shown are

based on a combination of surface structure observations, utility company markings and utility company and City of Berkeley maps. Due to inherent uncertainties in mapping underground utility facilities, these locations cannot be guaranteed. Locations should be verified prior to construction.

Figure 3.0-3Existing Project Site

T:\_

CS\

Wor

k\Be

rkel

ey_6

51 A

dd

ison

St_

27-0

098\

fi gur

es

Source: Moran Engineering; December 2005

FEET

160 32

HARRISON

GILMAN

CAMELIA

PAGE

JONES

CEDAR

VIRGINIA

DELAWARE

HEARST

UNIVERSITY

ADDISON

ALLSTON WAY

BANCROFT WAY

CHANNING WAY

DWIGHT WAY

PARKER

CARLETON

PARDEE

GRAYSON

HEINZ

POTTER ASHBYMURRAY

FOLGER

ANTHONY

SAN

PA

BLO

NIN

TH

TENTH

FIFTH

EIGH

TH

SEVEN

TH

SIXTH

FOU

RTH

SECO

ND

SAN

PA

BLO

S & P

Rig

ht 0

f Way

S & P

Rig

ht 0

f Way

Manufacturing

Mixed- Manufacturing

Mixed Use/ Light Industrial

Mixed Use/ Residential

General Commercial

Residential

Outdoor Recreation Subzone

PROJECT LOCATION

Source: City of Berkeley Planning Department; July,1998

T:\_

CS\

Wor

k\Be

rkel

ey_6

51 A

dd

ison

St_

27-0

098\

fi gur

es

Figure 3.0-4West Berkeley Plan Land Use Districts

#*!(!(

!(

!(

Cesar Chavez State ParkCesar Chavez State Park

San Pablo ParkSan Pablo Park

Berkeley Aquatic ParkBerkeley Aquatic Park

University ParkUniversity Park

James Kenney Rec Center ParkJames Kenney Rec Center Park

EastshoreState ParkEastshoreState Park

!"c$San

FranciscoBay

651 Addison St

UCBerkeley

UCBerkeley

Codornices Ck

Eastshore State ParkEastshore State Park

Berke ley Aquatic ParkBerke ley Aquatic Park

2039 4th St

920 Heinz Ave

700 University Ave

1950 Martin Luther King Dr

7TH

9TH

4TH

10TH

5TH

6TH

3RD2ND

PARKER

GRANT

BLAKE

DERBY

CHANNING

ALLSTON

SAN PABLO

VINE

VIRGINIA

OREGON

DELAWARE

MC GEE

SACRAMENTO

ADDISON

DWIGHT

MILVIA

8TH

HASTE

FULTON

FRONTAGE

DANA

PAGE

JONES

KING

ADA

OXFORD

EUCLID

ELLIS

CURTIS

ROSE

BOLIVAR

CAMELIA

TELE

GRAP

H

WALNUT

ASHBY

DURANT

67TH

KAINS

HARMON

HEARST

HEINZ

BONAR

RUSSELL

BONITA

PRINCE

WARD

ELLSWORTH

STUART

FAIRVIEW

CEDAR

STANNAGE

CALIFORNIA

FOLGER

HARRISON

66TH

MATHEWS

JOSEPHINE

SATHER

GRAYSON

NEILS

ON

CENTER

CHESTNUT

MC KINLEY

JULIA

BROWNING

WOOLSEY

ESSEX

CARLETON

SPAULDING

ALCATRAZ, OA

WEST

ROOSEVELT

FRANCISCO

HILGARD

RIDGE

ADEL

INE

ORDW

AY

EDITH

TYLER

PARK

SCENIC

LE CONTE

67TH, EM

SANT

A FE

HARPER

CORNELL

PERA

LTA

66TH, OA

HOPKINS

BYRON

UNIVERSITY

BUENA

FRANKLIN

ARCH

BAY

TALBOT

JEFFERSON

BURNETT

BERKELEY

PARDEE

MABEL

HASKELL

WHEELER

VALLEY

MURRAY

ALCATRAZ

ACTO

NCARRISON

EMERSON

BUCHANAN

HOLLY

OTIS

WEBSTER

EDWARDS

JAYNES

DOHR

EVELYN

SPINNAKER

ANTHONY

SPRUCE

SEAWALL

CUTTER

BANCROFTKITTREDGE

TEVL

IN

MARTIN LUTHER KING J

67TH, OAAL

BINA

HENRY

63RD, OANORTH, OA

TREMONT

POTTER

SHATTUCK, OA

HOWE

BELVEDERE

65TH, OA

IDAHO

LINCOLN

SHATTUCK

STANTON

SHASTASOUTH HALL

BREAKWATER

HILL

LORINA

DEAKIN

LEROY

DOVER

SHORT

HAVILA

ND

CHAUCER

GILMAN

BARROWS

NEWBURY

MASONIC

HAWTHORNE

FLORENCE

WHITNEY, OA

BATAAN

MACFARLANE

DOWLING

TOMLEE

CHILT

ON

WALKER

POE

CYPRESS

ACROFT

BERRYMAN

SPRING

ASHBY

LEROY

MC GEE

GILMAN

ADDISON

WESTSAN PABLO

66TH, OA

MC GEE

POTTER

BANCROFT

WEST

DANA

LEROY

ADEL

INE

RUSSELL

SACRAMENTO

RUSSELL

BANCROFT

ACTON

66TH, OA

WEST

ARCH

FRONTAGE

LINCOLN

WOOLSEY

BONITA

WALNUT

HENRY

BYRON

HEARST

ACTON

FULTON

HEARST

UNIVERSITY

MARTIN LUTHER KING J

CEDAR

MILVIA

DOHRSTANTON

PARK

BERKELEY

OXFORD

9TH

DEAKIN

ACTON

SHATTUCK

MABELUNIVERSITY

VIRGINIA

ADEL

INE

CALIFORNIA

STUART

SEAWALL

66TH, OA

ROSE

ARCHHOPKINS

VIRGINIA

KAINS

ADDISON

SHATTUCK

WARD

PAGE

DWIGHT

RUSSELL

LINCOLN

CEDAR

BERK

ELEY

ROSE

CURTIS

CARLETON

ACTON

STUART

CALIFORNIA

HENRY

DWIGHT

FULT

ON

ASHBY

PRINCE

EDITH

FRANCISCO

SPRUCE

CORNELL

CEDAR

ACTON

8TH

Source: City of Berkeley 2007, PMC 2007

T:\_G

IS\AL

AMED

A_CO

UNTY

\MXD

S\BE

RKEL

EY\A

DDISO

N_ST\

SURR

ONDI

NG PR

OJEC

TS.MX

D - 9

/17/

2007

@ 2:

48:40

PM

´1,000 0 1,000

FEET

#* Current Project

!( Surrounding ProjectsWest Berkeley Auto SalesCity of Berkeley

Figure 3.0-5Surrounding Projects

West Berkeley Auto Sales

3.0 PROJECT DESCRIPTION

City of Berkeley 651 Addison Street Mixed-Use Project August 2008 Draft Environmental Impact Report

3.0-13

3.3 PROJECT OBJECTIVES

The following objectives have been identified for the proposed project:

• To generally implement the concepts of the West Berkeley Area Plan with the development of the proposed project;

• To develop an economically feasible project;

• To construct some form of commercial, residential, or mixed-use project that is consistent with the Avenue Commercial land designation in the Berkeley General Plan.

3.4 PROJECT CHARACTERISTICS

The proposed project would consist of the development of an approximately 36,400 square foot lot (0.84 acre) with a 5-story building consisting of four levels of housing over ground-level parking and street retail. The project would include a café with outdoor seating, another commercial space, and 94 units of residential housing. A breakdown of square footage for each use is provided in Table 3.0-1.

TABLE 3.0-1 PROPOSED 651 ADDISON LAND USES

Development Classification Lots, Units, and/or Spaces Square Feet Percentage of

Total Units

Two-Bedroom 23 units 23,237 24.5%

One-Bedroom 56 units 39,652 59.5%

Studio 15 units 9,336 16.0%

Misc. (floors, corridors, stairs, etc.) - 15,927 -

Total Residential (floors 1-4) 94 units 88,152 100%

Ground-Level Commercial 2 retail spaces 2,600 -

Ground-Level Parking 102 car spaces 27,269 -

Misc. (lobby, corridors, utilities, etc.) 28 bike spaces 3,330 -

Total Ground Level - 33,199 -

Other Misc. (mechanical, etc.) - 1,581 -

Total Structural Area - 122,932 -

Gross Floor Area* - 92,470 -

Useable Open Space** - 14,319 -

Total Lot Area - 36,400 - *Gross Floor Area excludes parking area, per Berkeley Zoning Ordinance Title 23F **Defined by City of Berkeley as open to the sky and common space; includes courtyard and roof deck areas

Defined Building Envelopes

The building envelope is the portion of a lot in which all graded and/or impermeable surfaces must occur and defines where structural setbacks occur. The building itself would constitute 95 percent of the impervious surface, including the parking garage, driveways, patios, and

3.0 PROJECT DESCRIPTION

651 Addison Street Mixed-Use Project City of Berkeley Draft Environmental Impact Report August 2008

3.0-14

impervious decking. The total building footprint would be 33,199 square feet (see Figures 3.0-6 through 3.0-10). The average building height would be 60 feet with a maximum height of 63 feet, for a total of five stories. The landscaping and open space is designed for a range of public and private uses. Public open space uses include courtyard and landscaped roof deck areas. Private open space uses include residential patios and balconies. Residential patios would face the courtyard area and balconies would be west-facing. The sidewalk would include street-level landscaping and seasonal shade trees. The applicant shall implement the Aquatic Park Connection Streetscape Improvement Project’s sidewalk and stormwater drainage improvements. The residential lobby, courtyard, and roof would integrate landscaping, benches, and art to include common places for neighbors in which to interact.

Residential and Commercial

The project proposes the development of 94 residential units as follows: two-bedroom, one-bedroom, and studio. Seventy of these units are considered base units of housing. Twenty percent of the base units, or 14 units, would be sold at a price that is affordable to an appropriate-sized household whose income is no more than 80 percent of the area median income reported for the Oakland PMSA for households of that size.1 Commercial space would include 2,600 square feet of ground-floor retail, including the following possible uses: café, restaurant, and other small-scale neighborhood-serving retail. The mixed-use development would occur on a 36,400 square foot lot, resulting in a gross floor area of approximately 92,470 square feet (with density bonus) at a Floor Area Ratio (FAR) of 2.54.

LAND USE

The proposed project is located in the West Berkeley Area of the Berkeley General Plan. The site is designated by the General Plan as Avenue Commercial (AC) and zoned as West Berkeley Commercial (C-W), with MU-LI and MU-R (Mixed-Use Industrial and Mixed-Use Residential) nearby. The General Plan designation of Avenue Commercial allows for a range of uses characterized by pedestrian-oriented commercial developments and multi-family residential structures. Further discussion and details on land use and the project’s consistency with applicable General Plan policies are provided in Section 4.1, Land Use, Population, and Housing, of this EIR.

The General Plan Land Use map designates lands to the south and east of the project site as manufacturing and manufacturing mixed-use. To the west of the project site are manufacturing uses, the Aquatic Park, and a recreational trail. North of the project site are manufacturing, commercial uses, and the University Avenue viaduct.

CONSTRUCTION PHASING

Construction of the project is proposed to begin in September 2009 and be complete near the beginning of 2011. The proposed project would not be phased. Development of the proposed project would require excavation of the upper seven feet below ground surface to be replaced with engineered fill.

1 PMSA (primary metropolitan statistical area) as defined by the U.S. Census Bureau is a geographic entity defined by the Federal OMB for use by federal statistical agencies.

3.0 PROJECT DESCRIPTION

City of Berkeley 651 Addison Street Mixed-Use Project August 2008 Draft Environmental Impact Report

3.0-15

WATER

Water service for the proposed project would be served by East Bay Municipal Utility District’s (EBMUD) existing water supply, distribution system, and treatment facilities. The water treatment facilities that serve the project site and area include the EBMUD Orinda Water Treatment Plant. Further discussion and details regarding water are provided in Section 4.10, Public Services and Utilities, of this EIR.

WASTEWATER

The City of Berkeley provides wastewater collection and transmission from properties located within its boundaries to EBMUD for treatment. The EBMUD’s Main Wastewater Treatment Plant, located in Oakland near the entrance to the San Francisco-Oakland Bay Bridge, services the project area. Wastewater infrastructure currently servicing the project area consists of a 16-inch sewer main on Addison Street. Further discussion and details regarding wastewater are provided in Section 4.10, Public Services and Utilities, of this EIR.

STORM DRAINAGE

The project site drains to the southwest. Runoff from the proposed project is to be collected by the existing storm drains on Addison Street. Further discussion and details are provided in Section 4.8, Hydrology and Water Quality, of this EIR.

ELECTRICITY/NATURAL GAS/TELEPHONE

The proposed project would utilize existing electricity, gas, and telephone lines that serve the surrounding project area. These lines are located along Addison Street. Electricity and gas would be provided by Pacific Gas & Electric Company (PG&E) and telephone service by AT&T. The project proposes to connect to electric, gas, and telephone lines during the construction of the project. Additionally, this project would be part of the Aquatic Park Connection Streetscape Improvement Project, which would include plans for undergrounding the utility line along Addison Street. The environmental impacts of the Streetscape Improvement Project are analyzed in the Aquatic Park Connection Streetscape Improvement Project Initial Study (City of Berkeley, 2006). Therefore, the environmental effects of undergrounding the utility lines are not analyzed in this document. Further discussion and details regarding electricity, natural gas, and telephone are provided in Section 4.10, Public Services and Utilities, of this EIR.

OTHER SERVICES

Fire protection in the City of Berkeley is provided by Berkeley Fire Department. The City of Berkeley Police Department provides law enforcement services within the City limits. Further discussion regarding fire and law enforcement services is provided in Section 4.10, Public Services and Utilities, of this EIR.

Figure 3.0-6Parking Garage First Floor

T:\_

CS\

Wor

k\Be

rkel

ey_6

51 A

dd

ison

St_

27-0

098\

fi gur

es

Source: Baum Thornley Architects; October 2007

FEET

150 30

Figure 3.0-7Second Floor Plan

T:\_

CS\

Wor

k\Be

rkel

ey_6

51 A

dd

ison

St_

27-0

098\

fi gur

es

Source: Baum Thornley Architects; October 2007

FEET

150 30

Figure 3.0-8Proposed Grading Site Plan

T:\_

CS\

Wor

k\Be

rkel

ey_6

51 A

dd

ison

St_

27-0

098\

fi gur

es

Source: Baum Thornley Architects; October 2007

FEET

80 16

FEET

150 30 Figure 3.0-9Street Elevations

South Elevation

East Elevation

T:\_

CS\

Wor

k\Be

rkel

ey_6

51 A

dd

ison

St_

27-0

098\

fi gur

es

Source: Baum Thornley Architects; October 2007

3.0 PROJECT DESCRIPTION

651 Addison Street Mixed-Use Project City of Berkeley Draft Environmental Impact Report August 2008

3.0-20

This page intentionally left blank.

Figure 3.0-10Proposed Landscape Plan

T:\_

CS\

Wor

k\Be

rkel

ey_6

51 A

dd

ison

St_

27-0

098\

fi gur

es

Source: Baum Thornley Architects; August 2007

FEET

150 30

3.0 PROJECT DESCRIPTION

City of Berkeley 651 Addison Street Mixed-Use Project August 2008 Draft Environmental Impact Report

3.0-23

3.5 REGULATORY REQUIREMENTS, PERMITS, AND APPROVALS

This EIR may be used for the following direct and indirect actions regarding the proposed project:

CITY OF BERKELEY

Actions that would be required from the Berkeley City Council, Design Review Commission, Berkeley Zoning Adjustment Board, and/or City staff may include, but are not limited to, the following:

1) Use Permit for a mixed-use building greater than 20,000 square feet per City of Berkeley Municipal Code (BMC) Section 23E.64.030;

2) Use Permit for height of mechanical room over the height limit per City of Berkeley

Municipal Code (BMC) Section 23E.04.020;

3) Use Permit for new construction over 5,000 square feet per BMC Section 23.64.050.B.1;

4) Variance to allow height of 5 stories to accommodate placement of density bonus units per State Density Bonus Law (Zoning Ordinance Section 23C.12.050 and California Government Code Section 65915);

5) Use Permit for a full-service restaurant per BMC Section 23E.64.030;

6) Use Permit to allow the incidental sales of beer and wine sales within a quick or full-

service restaurant per BMC Section 23E.64.030 and 23E.16.040;

7) Use Permit for sidewalk seating with benches and planters per BMC Section 23E.24.010;

8) Building and Grading Permits;

9) Encroachment Permit for undergrounding the utility lines per BMC Section 16.24.050; and

10) Encroachment Permit for public improvements including stormwater and sewer per BMC Section 17.16.030.

OTHER GOVERNMENTAL AGENCY APPROVALS

Additional subsequent approvals and other permits that may be required from local, regional, state, and federal agencies for which the EIR may be used are identified below.

California Regional Water Quality Control Board (RWQCB)

CWA Section 402 regulates construction-related stormwater discharges to surface waters through the National Pollution Discharge Elimination System (NPDES) program. The NPDES General Permit for Storm Water Discharges Associated with Construction Activity (Construction Activity General Permit, #CA-S029831) requires the applicant to file a public notice of intent to discharge stormwater and to prepare and implement a stormwater pollution prevention plan (SWPPP).

3.0 PROJECT DESCRIPTION

651 Addison Street Mixed-Use Project City of Berkeley Draft Environmental Impact Report August 2008

3.0-24

In addition, the City of Berkeley is a co-permittee under the NPDES Municipal Stormwater Permit (Municipal Stormwater Permit No. CAS0029831), operating under the Alameda Countywide Clean Water Program for 2003. This permit requires that discharges of pollutants from areas of new development be reduced to the maximum extent practicable. Compliance with this standard requires that control measures be incorporated into the design of new development to reduce pollution discharges in site runoff over the life of the project. Each permittee shall include conditions of approval in permits for applicable projects, as defined in Provision C.3.c, to ensure that stormwater pollutant discharges are reduced by incorporation of treatment measures and other appropriate source control and site design measures, and increases in runoff flows are managed in accordance with Provision C.3.f, to the maximum extent practicable.

3.0 PROJECT DESCRIPTION

City of Berkeley 651 Addison Street Mixed-Use Project August 2008 Draft Environmental Impact Report

3.0-25

REFERENCES

Aquatic Park Enterprises, LLC. 2007. Final Application Materials. Prepared for the City of Berkeley. Revised October 2, 2007.

City of Berkeley. 2002. Berkeley General Plan. Adopted April 23, 2002.

City of Berkeley. 1992. West Berkeley Area Plan. Adopted December 14, 1993.

City of Berkeley. 2006. City of Environmental Initial Study for the Aquatic Park Connection Streetscape Improvement Project. October 30, 2006.

City of Berkeley. 1999. City of Berkeley Zoning Ordinance. Adopted March 9, 1999.

U.S. Census Bureau. 2007. American Community Survey Office. Page last modified September 17, 2007. http://www.census.gov/acs/www/UseData/geo.htm [Website accessed December 17, 2007].