WINDOW HEIGHT 1173 MM
WALL THICKNESS 191 MM
CUPBOARD
FUSE BOARD
TILE FLOOR
CHIMNEY
WALL THICKNESS 319 MM
ARCHWING OVER THE DOORS
5400
6646
850
1650
KITCHEN CUPBOARD
VELUX WINDOW
KITCHEN CUPBOARD ISLAND
STEEL BEAM
WINDOW
BATHROOM
NEW SLIDING GLAZED DOOR
WALL THICKNESS 300 MM
CUPBOARD
CUPBOARD
CORNER
BOILER FLEW TROUGH ATIC
CHIMNEY BREAST
CHIMNEY BREAST
PVC DOUBLE WINDOW
BRICK LINE
BRICK CLADING
ROOF
BRICK LINE
WINDOW WITH DIAMONT LEADED
WATER GUTTER PIPE (50MM)
+0000
+3200
+7657
GUTTER+ FUSION BOARD
MARLEY ROOF TILE
PITCH ROOF
VELUX WINDOW
STEP
OBSCURE GLADED WINDOW
+2400
+5000
6646
+0000
+7157
+5000
+7657
+0000
+2400
5095
2611
+0000
+1840
+420
+1840
+0000
Garden
level
Rear entry level
(lower than
garden level)
+0000
+2310
5400
+0000
+2400
+0000
+2400
5400
6095
4286
+0000
+2310
+3310
+420
+1840
+0000
Garden
level
Rear entry level
(lower than
garden level)
+2840
+0000
+1840
+2840
+420
+1840
+0000
Garden
level
Rear entry level
(lower than
garden level)
+2840
Revision A 15/09/15 M.C.P. Dimensions and notes
added onto drawing sheet
Project
title
31 TORBAY ROAD
Drg
title
Plans and
Elevations
The Drawing Desk, Coventry
Drawn M C P
Checked P S B
Date
30/07/2015
Scale
1:100
Project No.
2015/03
Drg No.
02
Revision
B
Existing Floor Plan Rear Elevation Existing Rear Elevation Existing Elevation
Existing Ground Floor
Plan
Existing+ Proposed First Floor
Plan
Proposed Ground Floor Plan
Extension Elevation
Existing+ Proposed Elevation Existing Rear Elevation
Existing Side Elevation 1 (29)
Existing Side Elevation (33) Proposed Side Elevation (29) Proposed Side Elevation (33)
Proposed Floor
Plan
Proposed Rear
Elevation
Proposed Side
Elevation
Proposed Side
Elevation
Proposed Front
Elevation
Notes
All new bricks and roof tiles to match
existing
All new drainage to connect into existing
Garage hip roof will have minimum
150mm overhang on all sides
Revision B 05/10/15 M.C.P. Garage roof revised to
suit planner comments