^ƚƌƵĐƚƵƌĂů /ŶƐƉĞĐƚŝŽŶƐ ĐŽŶĚƵĐƚĞĚ ĚƵƌŝŶŐ ƚŚĞ ŶŽƌŵĂů ǁŽƌŬŝŶŐ ǁĞĞŬ ;^ƵŶĚĂLJ ƚŽ dŚƵƌƐĚĂLJ ďĞƚǁĞĞŶ ϳϯϬĂŵ ƚŽ ϰϯϬƉŵͿ ǁŝƚŚ ƚŚĞ ĞdžĐĞƉƚŝŽŶ ŽĨ ƉƵďůŝĐ ŚŽůŝĚĂLJƐ >ĂƚĞ /ŶƐƉĞĐƚŝŽŶ ^ƚƌƵĐƚƵƌĂů /ŶƐƉĞĐƚŝŽŶƐ ĐŽŶĚƵĐƚĞĚ ĂĨƚĞƌ ǁŽƌŬŝŶŐ ŚŽƵƌƐ ;^ƵŶĚĂLJ ƚŽ dŚƵƌƐĚĂLJ ĂĨƚĞƌ ϰϯϬƉŵͿ ,ŽůŝĚĂLJ /ŶƐƉĞĐƚŝŽŶ ^ƚƌƵĐƚƵƌĂů /ŶƐƉĞĐƚŝŽŶƐ ĐŽŶĚƵĐƚĞĚ ĚƵƌŝŶŐ ǁĞĞŬĞŶĚƐ ĂŶĚ ŽŶ ƉƵďůŝĐ ŚŽůŝĚĂLJƐ ^dEZ ^dZhdhZ> /E^Wd/KE ZYh^d ĞĮŶŝƚŝŽŶ ,Žǁ ƚŽ ƉƉůLJ Required eJubNctqdž >d ,K>/z /E^Wd/KE^ ZYh^d 1tNm Ťdž 1JVNLu`N }eup WcqmNJtWec Wc mNpqec At uqtebNp euctNpq AcL bA_N tVN pNouWpNL payment. 1tNm ťdž AUNct {W`` JectAJt }eu te Jecpb tVN appointment timing, date and location. 1tNm Ŧdž 3VN AUNct {W`` JecLuJt tVN WcqmNJtWec as scheduled. -`NAqN NcqupN tVAt }eu VAzN tVN pNouWpNL documents available to give to the agent for inspection completion. 1tNm Ťdž AUNct {W`` JectAJt }eu te Jecpb tVN appointment timing, date and location. 1tNm ťdž 3VN AUNct {W`` JecLuJt tVN WcqmNJtWec Aq scheduled. -`NAqN NcqupN tVAt }eu VAzN tVN pNouWpNL documents available to give to the agent for inspection completion. ŚƚƚƉƐĚĐĐĂŐŽǀĂĞĞŶĐŽŶƚĂĐƚƵƐ &Z KE ,ŽŵĞ х &ƌĞĞ ŽŶĞ х ŽŶŝŶŐ ƐĞƌǀŝĐĞƐ х ĞǀĞůŽƉŵĞŶƚ ŽŶƚƌŽů х ^ƚƌƵĐƚƵƌĂů /ŶƐƉĞĐƚŝŽŶ ^ƚƌƵĐƚƵƌĂů /ŶƐƉĞĐƚŝŽŶ ZĞƋƵĞƐƚ ŚƚƚƉƐĚĐĐĂŐŽǀĂĞĞŶĐŽŶƚĂĐƚƵƐ ŚƚƚƉƐĚĐĐĂƐĞĐƵƌĞĨŽƌĐĞĐŽŵƐƚĂŶĚĂƌĚƐƚƌƵĐƚƵƌĂůŝŶƐƉĞĐƚŝŽŶƌĞƋƵĞƐƚ NNqdž upAtWecdž Not applicable ŤLJŢŢŢ mNp pNouNqt At the arranged time: %c`WcN WcqmNJtWec pNouNqt pNJNWzNL LupWcU the working days, between 12am – 7am: Conducted on the same day. After working hours: 1ucLA} te 3VupqLA}LJ AStNp ŦdžťŢmbǍ upWcU {NN_NcLq AcL muI`WJ Ve`WLA}q %c`WcN WcqmNJtWec pNouNqt pNJNWzNL LupWcU the working days, between 7am – 12am: Conducted on the next working day. %c`WcN cqmNJtWec pNouNqt pNJNWzNL ec {NN_NcLq or public holidays: Conducted on the next working day. Contractor engineer and consultant engineer must be at site at the time of Inspection. The Contractor should cast the inspected member within one week from the date of approval, if this is not completed within the required time frame then a further inspec- tion will need to take place. Passenger Hoist shall not exceed 4 floors. The below documents must be available at site at the time of inspection: Scaffolding Certificate from third party (if applicable) Structural Inspection Checklist – Foundation (Form No. ZA-DC-F-11) and Slab (ZA-DC-F-12) Confirmation Letter from soil laboratory in the foundation stage Piling/Shoring Completion Certificate (if applicable) Ready mixed concrete plants conformity certificate from DM Cubes and steel tests results along with Confirmation Letter stamped and signed by consultant Environmental Approval for swimming pool from DM (if applicable) Notes: https://dcca.gov.ae/wp-content/uploads/2015/05/ZA-DC-F-10-Structural-Inspection-Request.pdf 1. 2. 3. 4. 5. 6. 7. Notes: https://dcca.gov.ae/wp-content/uploads/2015/05/ZA-DC-F-10-Structural-Inspection-Request.pdf Contractor engineer and consultant engineer must be at site at the time of Inspection. The Contractor should cast the inspected member within one week from the date of approval, if this is not completed within the required time frame then a further inspec- tion will need to take place. Passenger Hoist shall not exceed 4 floors. The below documents must be available at site at the time of inspection: Scaffolding Certificate from third party (if applicable) Structural Inspection Checklist – Foundation (Form No. ZA-DC-F-11) and Slab (ZA-DC-F-12) Confirmation Letter from soil laboratory in the foundation stage Piling/Shoring Completion Certificate (if applicable) Ready mixed concrete plants conformity certificate from DM Cubes and steel tests results along with Confirmation Letter stamped and signed by consultant Environmental Approval for swimming pool from DM (if applicable) 1. 2. 3. 4. 5. 6. 7.

32-Structural InspectionRequest Nov13 (Main Page)-A-3 · 2019-11-19 · the working days, between 12am – 7am: Conducted on the same day. After working hours: 1ucLA} te 3VupqLA}

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 32-Structural InspectionRequest Nov13 (Main Page)-A-3 · 2019-11-19 · the working days, between 12am – 7am: Conducted on the same day. After working hours: 1ucLA} te 3VupqLA}

Required

7.based on availability on previous permit.

8. Ready mixed concrete plants conformity

9. Cubes and Steel tests approved by Consultant.

7.based on availability on previous permit.

8. Ready mixed concrete plants conformity

9. Cubes and Steel tests approved by Consultant.

Not applicable

At the arranged time:

payment.

appointment timing, date and location.

as scheduled.

documents available to give to the agent for inspection completion.

appointment timing, date and location.

scheduled.

documents available to give to the agent for inspection completion.

at the site at the time of Inspection.

the working days, between 12am – 7am: Conducted on the same day. After working hours:

the working days, between 7am – 12am: Conducted on the next working day.

or public holidays:Conducted on the next working day.

The Contractor should cast the inspected member within one week from the date of approval: if this is not completed within the

will need to take place.

at the site at the time of Inspection.

The Contractor should cast the inspected member within one week from the date of approval: if this is not completed within the

will need to take place.

Required

7.based on availability on previous permit.

8. Ready mixed concrete plants conformity

9. Cubes and Steel tests approved by Consultant.

7.based on availability on previous permit.

8. Ready mixed concrete plants conformity

9. Cubes and Steel tests approved by Consultant.

Not applicable

At the arranged time:

payment.

appointment timing, date and location.

as scheduled.

documents available to give to the agent for inspection completion.

appointment timing, date and location.

scheduled.

documents available to give to the agent for inspection completion.

at the site at the time of Inspection.

the working days, between 12am – 7am: Conducted on the same day. After working hours:

the working days, between 7am – 12am: Conducted on the next working day.

or public holidays:Conducted on the next working day.

The Contractor should cast the inspected member within one week from the date of approval: if this is not completed within the

will need to take place.

at the site at the time of Inspection.

The Contractor should cast the inspected member within one week from the date of approval: if this is not completed within the

will need to take place.

Required

7.based on availability on previous permit.

8. Ready mixed concrete plants conformity

9. Cubes and Steel tests approved by Consultant.

7.based on availability on previous permit.

8. Ready mixed concrete plants conformity

9. Cubes and Steel tests approved by Consultant.

Not applicable

At the arranged time:

payment.

appointment timing, date and location.

as scheduled.

documents available to give to the agent for inspection completion.

appointment timing, date and location.

scheduled.

documents available to give to the agent for inspection completion.

at the site at the time of Inspection.

the working days, between 12am – 7am: Conducted on the same day. After working hours:

the working days, between 7am – 12am: Conducted on the next working day.

or public holidays:Conducted on the next working day.

The Contractor should cast the inspected member within one week from the date of approval: if this is not completed within the

will need to take place.

at the site at the time of Inspection.

The Contractor should cast the inspected member within one week from the date of approval: if this is not completed within the

will need to take place.

Required

7.based on availability on previous permit.

8. Ready mixed concrete plants conformity

9. Cubes and Steel tests approved by Consultant.

7.based on availability on previous permit.

8. Ready mixed concrete plants conformity

9. Cubes and Steel tests approved by Consultant.

Not applicable

At the arranged time:

payment.

appointment timing, date and location.

as scheduled.

documents available to give to the agent for inspection completion.

appointment timing, date and location.

scheduled.

documents available to give to the agent for inspection completion.

at the site at the time of Inspection.

the working days, between 12am – 7am: Conducted on the same day. After working hours:

the working days, between 7am – 12am: Conducted on the next working day.

or public holidays:Conducted on the next working day.

The Contractor should cast the inspected member within one week from the date of approval: if this is not completed within the

will need to take place.

at the site at the time of Inspection.

The Contractor should cast the inspected member within one week from the date of approval: if this is not completed within the

will need to take place.

Contractor engineer and consultant engineer must be at site at the time of Inspection.

The Contractor should cast the inspected member within one week from the date of approval, if this is not completed within the required time frame then a further inspec-tion will need to take place.

Passenger Hoist shall not exceed 4 floors.

The below documents must be available at site at the time of inspection:

Scaffolding Certificate from third party (if applicable)

Structural Inspection Checklist – Foundation (Form No. ZA-DC-F-11) and Slab (ZA-DC-F-12)

Confirmation Letter from soil laboratory in the foundation stage

Piling/Shoring Completion Certificate (if applicable)

Ready mixed concrete plants conformity certificate from DM

Cubes and steel tests results along with Confirmation Letter stamped and signed by consultant

Environmental Approval for swimming pool from DM (if applicable)

Notes:

https://dcca.gov.ae/wp-content/uploads/2015/05/ZA-DC-F-10-Structural-Inspection-Request.pdf

1.

2.

3.

4.

5.

6.

7.

Notes:

https://dcca.gov.ae/wp-content/uploads/2015/05/ZA-DC-F-10-Structural-Inspection-Request.pdf

Contractor engineer and consultant engineer must be at site at the time of Inspection.

The Contractor should cast the inspected member within one week from the date of approval, if this is not completed within the required time frame then a further inspec-tion will need to take place.

Passenger Hoist shall not exceed 4 floors.

The below documents must be available at site at the time of inspection:

Scaffolding Certificate from third party (if applicable)

Structural Inspection Checklist – Foundation (Form No. ZA-DC-F-11) and Slab (ZA-DC-F-12)

Confirmation Letter from soil laboratory in the foundation stage

Piling/Shoring Completion Certificate (if applicable)

Ready mixed concrete plants conformity certificate from DM

Cubes and steel tests results along with Confirmation Letter stamped and signed by consultant

Environmental Approval for swimming pool from DM (if applicable)

1.

2.

3.

4.

5.

6.

7.