3D Weaving Innovation Centre Disruption to Clothworker South Refurbishment works are continuing within the Clothworkers South building as part of the 3D Weaving Innovation Centre project. The works have been extended beyond the original completion dates due to additional asbestos removal works having to be carried out in the buildings below ground duct zones. The duct zones required clearance to allow for the buildings services to be connected and completed. We are aware that the ongoing works are creating some issues in terms of noise disruption. To minimize the impact of the ongoing works we are implementing the following measures: Works onsite commencing at 6.00am to carry out the most intrusive and prolonged noisy work, prior to commencement of teaching Teaching timetables have been provided to the project team so that other ongoing works can be targeted around scheduled teaching periods All operatives onsite are undergoing tool box talks by William Birch to raise awareness of the impact their refurbishment activities can have on the occupants of Clothworkers South, and the need for them to work considerately. Floor plans of the building, depicting where works are still ongoing and showing current forecasted completion dates, follow within this pdf document. We are continuing to work closely with the occupants of Clothworkers to complete the works as speedily as possible, whilst also being mindful of the buildings day-to-day activities. We apologise for any inconvenience caused. Should you require any further information, please do not hesitate to contact Estates Helpdesk on 0113 343 5491 or [email protected]

3D Weaving Innovation Centre - University of Leeds...3D Weaving Innovation Centre Disruption to Clothworker South Refurbishment works are continuing within the Clothworkers South building

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 3D Weaving Innovation Centre - University of Leeds...3D Weaving Innovation Centre Disruption to Clothworker South Refurbishment works are continuing within the Clothworkers South building

3D Weaving Innovation CentreDisruption to Clothworker SouthRefurbishment works are continuing within the Clothworkers South building as part of the 3D Weaving Innovation Centre project. The works have been extended beyond the original completion dates due to additional asbestos removal works having to be carried out in the buildings below ground duct zones. The duct zones required clearance to allow for the buildings services to be connected and completed. We are aware that the ongoing works are creating some issues in terms of noise disruption. To minimize the impact of the ongoing works we are implementing the following measures: • Works onsite commencing at 6.00am to carry out the most

intrusive and prolonged noisy work, prior to commencement of teaching

• Teaching timetables have been provided to the project team so that other ongoing works can be targeted around scheduled teaching periods

• All operatives onsite are undergoing tool box talks by William Birch to raise awareness of the impact their refurbishment activities can have on the occupants of Clothworkers South, and the need for them to work considerately.

Floor plans of the building, depicting where works are still ongoing and showing current forecasted completion dates, follow within this pdf document. We are continuing to work closely with the occupants of Clothworkers to complete the works as speedily as possible, whilst also being mindful of the buildings day-to-day activities.

We apologise for any inconvenience caused.

Should you require any further information, please do not hesitate to contact Estates Helpdesk on 0113 343 5491 or [email protected]

Page 2: 3D Weaving Innovation Centre - University of Leeds...3D Weaving Innovation Centre Disruption to Clothworker South Refurbishment works are continuing within the Clothworkers South building

3D Weaving InnovationCentre Seminar Room

75m²

Female ToiletsA02

Stairs

A11Circulation

G10Office

G07Printing Making

G08Screen Wash

G06Store

G05Office

G04aOffice

G04Office

A16Circulation

G03Office

G03aOffice

G02Office

G20Plant

G01Cleaner's A15

Lobby

A01Circulation

X15Display Space

G19Office

A10Circulation

G18Office

G17Office

G14Studio

G15Computer Room

G14aComputer Room

A04Lift

A12Circulation

G13Cleaner's

A03Stairs

New Entrance

G11aStudio

G11bStudio

Max 60persons

Raise section offlooring and install

new steps, asStructural Engineer's

details

Riser - X11

Riser -R0/14

Riser - R0/15

Wall tiles to be replaced withcoloured wall cladding, as NBSref K13/145. Decorate walls

above cladding and soffit as NBSref M60/110.

Riser - R0/21

Riser - R0/17

Riser - R0/16

Riser - R0/01

Ris

er-R

0/02

Riser - X07

Ris

er-X

09

Ris

er-X

03

Soffit hung system forsuspending artwork

above the MainEntrance, as NBS ref

N10/351

Ris

er-R

0/04

Riser - X04

Ris

er-X

05

Ris

er-R

0/06

Riser - R0/07

Riser - R0/18

Riser - R0/19

Riser - R0/08

Replace existingironmongery to doorsand make emergencyescape only

Riser - X01

Existing riser removed,walls and floor madegood, as StructuralEngineer's details

Interactive display wallwith radiator relocated

Interactive display wall

Riser -R0/09

Glazed entrancecanopy, as NBS B91/330

Existing paving to be ramped up tonew entrance, allow for relocating

electric car charging points anddisabled parking spaces, asdrawing no. 143/154/285

Ris

er-R

0/10

Ris

er-R

0/11

Ris

er-X

13

Glass fronted display cases withlighting, as drawing no. 143/154/302

Trespa benching withmobile underbenchunits, as drawing no.143/154/290 or 291

S

Decorate walls andsoffits as NBS ref

M60/110

Sand and varnishexisting handrails, as

NBS ref M60/160

Sand and varnishexisting handrails, as

NBS ref M60/160

Bin store as NBSref N10/352

New screen printsink and drainer,

as NBS ref N10/355

DryingRack

New table withan acrylic top,as drawing no.143/154/290 or291

Riser -R0/13

Drying Cabinet asNBS ref N10/357

Replace risercovers, seedrawing no.143/154/276

Replace riser covers,see drawing no.

143/154/276

Section of existinglandscaping to be removed

and paving extended tomatch existing, refer to

drawing no. 143/154/285

Sand and varnishexisting handrails, as

NBS ref M60/160

New screen printsink and drainer, as

NBS ref N10/355

Replace risercovers, see drawingno. 143/154/276

DG.01

DG.02DG.03

DG.04 DG.48

Line out existing columnsas NBS ref K10/205

DG.05

Decorate walls and skirtings as NBSrefs M60/110 and M60/160

DG.06DG.07DG.09DG.10

DG.11Artwork hanging system

as NBS ref N10/350

DG.12

SG.01Artwork hanging system

as NBS ref N10/350

Freestanding drying rackas NBS ref N10/356

DG.15

DG.13

S

DG.16

Carefully remove secondaryglazing, install new Trespawindow cills and re-install

secondary glazing as NBS refP20/120. Allow for makinggood existing windows and

painting as NBS ref M60/130

ExistingRackDrying

Cabinet

Safety stationas drawing no.143/154/290or 291

DG.14

Washing Machine(Client Supplied)

ExistingWashout Booth Existing

Chemical Trays

Trespa spur shelvingas NBS ref N10/161

DG.17

DG.08

DG.18DG.19

DG.21

Decoratewalls and

skirtings asNBS refsM60/110

andM60/160

Decorate walls andskirtings as NBS refs

M60/110 and M60/160

DG.20

Decorate walls andskirtings as NBS refs

M60/110 and M60/160

Spur shelving asNBS ref N10/160

DG.22

DG.23

S

Decorate walls, soffitand skirtings as NBSrefs M60/110 and

M60/160

DG.24

G09AWC

DG.25

DG.26

DG.27

DG.28

Refer to drawing no.143/154/280

W.03

W.04

W.06

W.05

DG.29

Decorate walls, soffit andskirtings as NBS refs

M60/110 and M60/160

Teaching wall, as ElectricalEngineer's specification

DG.30

W.07

DG.31

Glass fronted displaycase with lighting, as

drawing no. 143/154/302

Riser X01 reduced in size,existing walls and floor

made good, as StructuralEngineer's details

DG.32

DG.33SG.02

DG.34DG.35

DG.36

Decorate walls, soffitand skirtings as NBSrefs M60/110 and

M60/160

DG.37

Decoratewalls and

skirtings asNBS refs

M60/110 andM60/160

DG.38

DG.39

DG.40

DG.41DG.42

Decoratewalls and

skirtings asNBS refs

M60/110 andM60/160

Artwork hanging systemas NBS ref N10/350

Make good existing walls, where dividingwall has been demolished. Allow for

replacing raised access floor tiles andsupports on line of former dividing wall.

Decorate walls and soffit as NBS refM60/110.

Allow for altering the existingraised access floor to form

steps down to new emergencyescape door

DG.43DG.44

DG.45

DG.46DG.47

Artwork hanging systemas NBS ref N10/350

Decorate walls, soffit and skirtingsas NBS refs M60/110 and M60/160

Allow for maintaining abulkhead and retaining

suspended ceiling, along wallline

Replace existing tiled cills withnew painted MDF cills and

install new skirting board, asNBS refs P20/110 and P20/200

Make good and paint existingwindow frames as NBS ref

M60/130. Fit new blinds as NBSref N10/240 to all windows

Curtain rail in line withexisting, as NBS ref

N10/220

Artwork hanging systemas NBS ref N10/350

Size of riser to suitnew service layout

Area of existing floor tiles to bereplaced with perforated floor

tiles, as the MechanicalEngineer's specification

125mm thick 30 minute fire rated stud partitionas NBS ref K10/125

125mm thick 60 minute fire rated stud partitionas NBS ref K10/126100mm thick moisture resistant stud partition asNBS ref K10/127

FARRELL & CLARK LLP ©Do not scale this drawingC.A.D Ref. - 143-154-231_Proposed Ground Floor.dwg

DescriptionRev ByDate

Construction Design Management Regulations 2015

Status:

Leeds0113 259 [email protected]

www.farrellandclark.co.uk

London020 7580 [email protected]

Drawn:Scale: Date:

Drawing No.: Rev.:

Check:

Title:

Project:

Client:

CLOTHWORKER'SSOUTH

CONTRACT

UNIVERSITY OF LEEDS

PROPOSEDGROUND FLOOR PLAN

1/100 @A1 SEPT 2016AWS

143/154/231 C01

IW

0 1 2 3 4 5m

Scale 1:100

LEGENDSite Boundary / Area of WorksArtwork Hanging System as NBS ref N10/350

Room/Department signage as dwg no.143/154/305

S

PARTITION TYPES

G07 End of October 17

G30 End ofNovember 17

G10 End of October 17

Contractor allocatedaccess stairs. Requiredfor use until the end ofthe project

G08 End of October 17

New Rear EntranceWorks not progressing at thisstage due to structural issues

G15 End of November 17

GROUND FLOORShowing the current estimated completion dates

Page 3: 3D Weaving Innovation Centre - University of Leeds...3D Weaving Innovation Centre Disruption to Clothworker South Refurbishment works are continuing within the Clothworkers South building

Blockwork infill as StructuralEngineer's details, plaster skim

and install new skirting tomatch existing on both sides asNBS refs M20/212 and P20/110

Decorate walls and soffit, timber and exposed metalworkas NBS refs M60/110, M60/150 and M60/130

Make good and paint existingwindow frames as NBS ref

M60/130. Fit new blinds as NBSref N10/240 to all windows

Make good and paint existingwindow frames as NBS ref

M60/130. Fit new blinds as NBSref N10/240 to all windows

Make good and paint existingwindow frames as NBS ref

M60/130. Fit new blinds as NBSref N10/240 to all windows

Refer to drawingno. 143/154/281for kitchenette

layout

Plasterboard line overexisting metal deck as

NBS ref K10/245

Decorate walls and soffit, timber andexposed metalwork as NBS refsM60/110, M60/150 and M60/130.

Tile the first 1.2m of the walls from thefinished floor level, as NBS ref M40/111

Make good and paint existingwindow frames as NBS ref

M60/130. Fit new blinds as NBSref N10/240 to all windows

Section of wall to be infilled asStructural Engineer's details,plaster skin and skirting tomatch existing as NBS refs

M20/212 and P20/110

Seal and insulateriser at roof level,

Replace risercovers, see drawing

no. 143/154/278

Extract to be installed throughexisting window, as Mechanical

Engineer's specification

Drainage channel covers tobe removed and channel tobe infilled to floor level.

Seal and insulateriser at roof level,see drawing no.143/154/278

Metal cover to be removedand section of flooring tobe infilled, as StructuralEngineer's specification.

Upright racking for 2m longrolls of fabric to be fitted,as dwg no. 143/154/290 or

291

New rooflight to beinstalled, see dwgno. 143/154/277

Install noticeboardsand hanging systems,

as dwg no.143/154/304

Infill above existing wallswith stud partitioningand acoustic insulation

Truss u/s 3418

Trussu/s

4565

Ris

er-X

12

Ris

er-X

02106Office

A11Circulation

105ServerRoom

A02Stairs

X11

102aStore

102bPost GraduateResearch Area

A12Circulation

A01Stairs101

Office113

Office112

Office

A10Circulation

111Laser Cutting

Machine

A04Lift

A03Stairs

108Office

109Office

LiftingGantry

Max 60 persons

9

10

11

12

13

14

15

16

17

18

1920

21

22

22

22

23

24

28

29

30

31

32

16

4

25

26

27

1

2

3

5

A08Truss

u/s4565

Ris

er-X

12

Ris

er-X

02106Office

A11Circulation

105ServerRoom

A02Stairs

Through toTextile Link Block

104Post GraduateStudy Room(50 Desks)

X11

102aStore

102bPost GraduateResearch Area

102Knit & Weave

Studio

A12Circulation

A01Stairs

103Office

101Office

113Office

112Office

A10Circulation

111Laser Cutting

Machine

111aServer Room

110aFabric store

110Digital Printing Room

A04Lift

A09Circulation

A03Stairs

108Office

109Office

LiftingGantry107

Wet ProcessingLaboratory

184m²

ChemicalStore7.3m²

Max 60 persons

Max 60 persons

9

10

11

12

13

14

15

17

18

1920

21

22

22

22

23

24

28

29

30

31

32

16

4

25

26

27

1

2

3

5

6

7

8

33

34

35

Ris

erR

1/1

Lockable, heavy dutystorage units for dyesand polymers, as NBS

ref N10/135

Allow for flexible Trespalaboratory bench units withmovable underbench units,as dwg no. 143/154/290 or

291

Paper MakingMachine

(Client supplied)

Photocopier

Decorate walls andsoffits as NBS ref

M60/110

Sand and varnishexisting handrails, as

NBS ref M60/160

D1.01

Artwork hanging systemas NBS ref N10/350

D1.02

D1.03

D1.04

D1.05

D1.06

Riser

D1.07

D1.08

S1.01

D1.09

Replace riser covers,see drawing no.

143/154/276

D1.11

D1.12

Decorate walls andskirtings as NBS refs

M60/110 and M60/160

Artworkhanging

system as NBSref N10/350

S1.02

S1.03

S1.04

Riser R1/15

Riser R1/14D1.10

S1.05

Replace riser covers,see drawing no.

143/154/276

D1.13

ElectricalCupboard

Decorate walls, soffitand skirtings as NBS refsM60/110 and M60/160

D1.14

D1.15

D1.16

D1.17D1.18

D1.19

Sand and varnishexisting handrails, as

NBS ref M60/160

Safety stationas drawing no.143/154/290or 291

Floor drain to be installed andconnected to existing foul

drainage, as Mechanical Engineer'sdetails , as NBS ref R11/315

Make good and paintexisting window frames as

NBS ref M60/130.

Floor drain to be installed andconnected to existing foul

drainage, as Mechanical Engineer'sdetails , as NBS ref R11/315

D1.20

D1.21

D1.22

Heavy dutyshelving, as

NBS refN10/162

D1.23

Stainless steel sinkunit, as NBS ref

N11/351

D1.24 D1.25

Decorate walls, soffitand skirtings as NBS refsM60/110 and M60/160

D1.26

S1.06

Sand and varnishexisting handrails, as

NBS ref M60/160

Make good and paintexisting window frames as

NBS ref M60/130.

Refer to drawingno. 143/154/281for kitchenette

layout

SS

S

SS

S1.07

D1.27

S1.08

Decoratewalls and

skirtings asNBS refs

M60/110 andM60/160

D1.28

D1.29D1.30

Decoratewalls and

skirtings asNBS refs

M60/110 andM60/160

Artwork hangingsystem as NBS ref

N10/350

S1.09

D1.31

D1.32D1.33

D1.34 Extract to be installed throughexisting window, as Mechanical

Engineer's specificationS1.10

Make good and paint existingwindow frames as NBS ref

M60/130. Fit new blinds as NBSref N10/240 to all windows

D1.35

D1.36

Replace risercovers, see drawing

no. 143/154/276

Artwork hanging systemas NBS ref N10/350

D1.36

Riser - X04

Ris

er-X

06R

iser

-R1/

12

Riser - R1/19

Riser - R1/13

Riser - R1/18

Ris

er-X

05

Riser - X01

Riser - R1/9

Ris

er -

R1/

6

Riser R1/7

Riser R1/8

Riser - R1/21

D1.37

All for making goodexisting suspended ceiling

on new wall line

D1.38

S1.11S1.12Decorate walls andskirtings as NBS refs

M60/110 and M60/160D1.39

New rooflight to beinstalled, see dwgno. 143/154/277

New rooflight to beinstalled, see dwgno. 143/154/277

New rooflight to beinstalled, see dwgno. 143/154/277

New rooflight to beinstalled, see dwgno. 143/154/277

New rooflight to beinstalled, see dwgno. 143/154/277

4 Shuttle Loom(Client Supplied)

Existing Machinery(Client Supplied)

Existing Machinery(Client Supplied)

Existing Looms(Client Supplied)

D1.39

Seal and insulateriser at roof level,see drawing no.143/154/278

Form openings in soffit fornew ventilation, as

Structural Engineer's detailsDecorate walls andskirtings as NBS refs

M60/110 and M60/160

Freestanding glassscreens as NBS ref

N10/190

Freestanding glassscreens as NBS ref

N10/190

Make good and paint existingwindow frames as NBS ref

M60/130. Fit new blinds as NBSref N10/240 to all windows

ElectricalCupboard

Form a painted timber cupboardaround the existing water heater,providing access to the controls

and for maintenance

125mm thick 30 minute fire rated stud partitionas NBS ref K10/125

125mm thick 60 minute fire rated stud partitionas NBS ref K10/126100mm thick moisture resistant stud partition asNBS ref K10/127

FARRELL & CLARK LLP ©Do not scale this drawingC.A.D Ref. - 143-154-232_Proposed First Floor.dwg

DescriptionRev ByDate

Construction Design Management Regulations 2015

Status:

Leeds0113 259 [email protected]

www.farrellandclark.co.uk

London020 7580 [email protected]

Drawn:Scale: Date:

Drawing No.: Rev.:

Check:

Title:

Project:

Client:

CLOTHWORKER'SSOUTH

CONTRACT

UNIVERSITY OF LEEDS

PROPOSEDFIRST FLOOR PLAN

1/100 @A1 SEPT 2016AWS

143/154/232 C01

IW

0 1 2 3 4 5m

Scale 1:100

LEGENDSite Boundary / Area of WorksArtwork Hanging System as NBS ref N10/350

Room/Department signage as dwg no.143/154/305

S

PARTITION TYPES

107 End of October 17

110 and Corridor End of October 17

110 and Server Room End of October 17

111 Completion date to be confirmed

102 End of December 17

FIRST FLOORShowing the current estimated completion dates

Page 4: 3D Weaving Innovation Centre - University of Leeds...3D Weaving Innovation Centre Disruption to Clothworker South Refurbishment works are continuing within the Clothworkers South building

A02Stairs

A11Circulation

Riser -R2/13

Riser - X11

205Tech Office

203bStore

Riser - X10

203Studio

Riser - R2/15

203aComputer Room

Riser - R2/01

Riser - X01

Ris

er-X

09

Replace roof coveringand insulate, includingwalkways, as NBS ref

J41/115

Riser - X07

Ris

er-X

06

202Office

201Office

A10Circulation A01

Circulation

211Office

Ris

er-R

2/03

Ris

er-R

2/04

X27

210Office

Ris

er-X

05

Riser - X04

Riser - R2/18

Riser - X02

Riser - R2/06

FC

FC

FC

FC

209Chemistry Laboratory

Riser - R2/07

ChemStore

Riser - X03

A03Stairs

A12Circulation

Riser - X13

Riser - R2/09

207OfficeR

iser

-X12

A04Lift

RoofAccessLadder

A09Circulation

Ris

er-X

08

208AWC

Digital EyeVisual System

LED CubeLighting Room

as NBS refN10/358

Luminaire and VisualCabinets Laboratory

PsychophysicsLaboratory

Imaging Laboratory

OfficeOfficeOffice

209a

FC

FC

209bAnalytical Laboratory

Measurement Lab

2no. new monodraughtsas Mechanical Engineer's

specification

Install noticeboardsand hanging systems,

as dwg no.143/154/304

Decorate walls andsoffits as NBS ref

M60/110

Sand and varnishexisting handrails, as

NBS ref M60/160

D2.01

Bin store as NBSref N10/352

D2.02

Artwork hanging systemas NBS ref N10/350

Decorate walls andskirtings as NBS refs

M60/110 and M60/160

D2.03

D2.04

D2.05

D2.06

Artwork hanging systemas NBS ref N10/350

Decorate walls, soffitand skirtings as NBS refsM60/110 and M60/160

Sand and varnishexisting handrails, as

NBS ref M60/160

204Cleaning

SupervisorOffice

D2.07 D2.08

D2.09

D2.10

D2.11

D2.12

Make good and paintexisting window frames asNBS ref M60/130. Fit newblinds as NBS ref N10/240

to all windows.

Spur shelving as NBSref N10/160

Large whiteboard asNBS ref N10/193

S2.01

Spur shelving asNBS ref N10/160

Small whiteboardas NBS refN10/193

S2.02 D2.13

Spur shelving asNBS ref N10/160

Small whiteboardas NBS refN10/193

Office

D2.14D2.15

S

Decorate walls as NBS refsM60/110 and M60/160

Make good and paintexisting window frames asNBS ref M60/130. Fit newblinds as NBS ref N10/241

to all windows.

D2.16

Decorate walls as NBS refsM60/110 and M60/160

All loose furnitureclient supplied

S

S

D2.17

D2.18D2.19

Artwork hanging systemas NBS ref N10/350

Artwork hanging systemas NBS ref N10/350

All loose furnitureclient supplied

Make good and paint existingwindow frames as NBS ref

M60/130, replace broken panesand apply black out film to allpanes. Internally line with studpartition, as NBS ref K10/125

All loose furnitureclient supplied

Curtain rail across roomwidth, as NBS ref N10/220

Plasterboard bulkheadaround lifting mechanismfor LED cube, as dwg no.

143/154/266

Curtain rail acrossroom width, as

NBS ref N10/220

All loose furnitureclient supplied

Make good and paint existingwindow frames as NBS ref

M60/130, replace broken panesand apply black out film to allpanes. Internally line with studpartition, as NBS ref K10/125

New rooflight to beinstalled, see dwgno. 143/154/277

New rooflight to beinstalled, see dwgno. 143/154/277

New rooflight to beinstalled, see dwgno. 143/154/277

New rooflight to beinstalled, see dwgno. 143/154/277

New rooflight to beinstalled, see dwgno. 143/154/277

New rooflight to beinstalled, see dwgno. 143/154/277

Seal and insulateriser at roof level,see drawing no.143/154/278

D2.20

S

Seal and insulateriser at roof level,see drawing no.143/154/278

D2.21

D2.22

D2.23

S2.03 S2.04

S2.05

Refer todrawing no.143/154/280

Sand and varnishexisting handrails, as

NBS ref M60/160

SD2.24

Decorate walls, soffitand skirtings as NBS refsM60/110 and M60/160

Artwork hanging systemas NBS ref N10/350

Full height spur shelvingas NBS ref N10/160

D2.25

Heavy duty shelvingfor washers / dryersand fridges as dwgno. 143/154/290 or

291Balance bench as

dwg no. 143/154/290or 291 Island bench with reagent

shelf and underbench unitsas dwg no. 143/154/290 or

291

Make good and paintexisting window frames as

NBS ref M60/130.

Install reagent shelf toexisting benching as dwg

no. 143/154/290 or 291

Install reagent shelf toexisting benching as dwg

no. 143/154/290 or 291

Make good andpaint existing

window frames asNBS ref M60/130.

Safety stationas drawing no.143/154/290or 291

D2.26

Heavy duty glassstorage racking asNBS ref N10/162

D2.27

Decorate wallsand soffit as NBS

ref M60/110

Make good and paint existingwindow frames as NBS ref

M60/130. Fit new blinds as NBSref N10/240 to all windows

S2.06 S2.07

Gas bottlerack

Decoratewalls as NBSref M60/110

Replace riser covers withproprietary covers as NBS

ref L20/630

Make good and paint existingwindow frames as NBS ref

M60/130. Fit new blinds as NBSref N10/240 to all windows

D2.28

D2.29

Decorate walls andskirtings as NBS refs

M60/110 and M60/160

D2.30

D2.31

Artwork hanging systemas NBS ref N10/350

Decorate walls, soffitand skirtings as NBS refsM60/110 and M60/160

125mm thick 30 minute fire rated stud partitionas NBS ref K10/125

125mm thick 60 minute fire rated stud partitionas NBS ref K10/126100mm thick moisture resistant stud partition asNBS ref K10/127

FARRELL & CLARK LLP ©Do not scale this drawingC.A.D Ref. - 143-154-233_Proposed Second Floor.dwg

DescriptionRev ByDate

Construction Design Management Regulations 2015

Status:

Leeds0113 259 [email protected]

www.farrellandclark.co.uk

London020 7580 [email protected]

Drawn:Scale: Date:

Drawing No.: Rev.:

Check:

Title:

Project:

Client:

CLOTHWORKER'SSOUTH

CONTRACT

UNIVERSITY OF LEEDS

PROPOSEDSECOND FLOOR PLAN

1/100 @A1 SEPT 2016AWS

143/154/233 C01

IW

0 1 2 3 4 5m

Scale 1:100

LEGENDSite Boundary / Area of WorksArtwork Hanging System as NBS ref N10/350

Room/Department signage as dwg no.143/154/305

S

PARTITION TYPES

206 End of October 17

204 End of October 17

209 and 209a End of October 17Roof

Beginning of December 17

SECOND FLOORShowing the current estimated completion dates

Page 5: 3D Weaving Innovation Centre - University of Leeds...3D Weaving Innovation Centre Disruption to Clothworker South Refurbishment works are continuing within the Clothworkers South building

A02Stairs

A11Circulation

Riser - X11

Riser - R3/14

Riser - R3/15

Riser - R3/01

Cleaner's Store

Riser - X07

Ris

er-X

06

A12Circulation A01

Circulation

Ris

er-R

3/03

Ris

er-R

3/04

Ris

er-X

05

Riser - X04

Ris

er -

X03

Riser - R3/07

Riser - R3/08

A03Stairs

A09Circulation

Ris

er-R

3/09

Ris

er-X

02

A04Lift

A10Circulation

X10

FemaleToilets

MaleToilets

A05Stairs305

Lecture Theatre

304Lecture Theatre

303Meeting Room

302Office

301Office

315Board Room

314RA Office

313Meeting Room

X16X15

Riser - X13

312Lecture Theatre

Riser - R3/08.5

Riser - X01

FemaleToilets

MaleToilets

309Office

308Studio / Work Area

308aStore

308bStore

307AV Room

Ris

er-X

08

Riser - R3/14.5

Decorate walls andsoffits as NBS ref

M60/110

Sand and varnishexisting handrails, as

NBS ref M60/160

D3.01

Bin store as NBSref N10/352

Install noticeboards andhanging systems, as dwg no.

143/154/304

Decorate walls, soffitand skirtings as NBS refsM60/110 and M60/160

D3.02

Artwork hanging systemas NBS ref N10/350

D3.03

D3.04D3.05

D3.06

D3.07Decorate walls, soffit

and skirtings as NBS refsM60/110 and M60/160

Artwork hangingsystem as NBS ref

N10/350

D3.08

D3.09Seating booths as

dwg no. 143/154/303

Sand and varnishexisting handrails, as

NBS ref M60/160

D3.10

D3.11

D3.12

D3.13

D3.14

D3.15

S

D3.16

Decorate walls, soffitand skirtings as NBS refsM60/110 and M60/160

D3.17

S

Decorate walls, soffitand skirtings as NBS refsM60/110 and M60/160

D3.18

D3.19

D3.20

D3.21

Sand and varnishexisting handrails, as

NBS ref M60/160

Seating booths asdwg no. 143/154/303

D3.22

D3.23

Artwork hangingsystem as NBS ref

N10/350

Decorate walls, soffitand skirtings as NBS refsM60/110 and M60/160

D3.24

D3.25D3.26D3.27

D3.28

D3.29

Decorate walls, soffitand skirtings as NBS refsM60/110 and M60/160

Make good and paint existingwindow frames as NBS ref

M60/130. Fit new blinds as NBSref N10/240 to all windows

Replace risercovers, see drawing

no. 143/154/276

Make good and paint existingwindow frames as NBS ref

M60/130. Fit new blinds as NBSref N10/240 to all windows

Allow forundertaking damp

repair works

Allow forundertakingdamp repair

worksD3.30

D3.31D3.34Decorate walls, soffit

and skirtings as NBS refsM60/110 and M60/160

D3.32D3.33

Artwork hanging systemas NBS ref N10/350

D3.35

Cleaner's Storelayout as dwg no.

143/154/280

125mm thick 30 minute fire rated stud partitionas NBS ref K10/125

125mm thick 60 minute fire rated stud partitionas NBS ref K10/126100mm thick moisture resistant stud partition asNBS ref K10/127

FARRELL & CLARK LLP ©Do not scale this drawingC.A.D Ref. - 143-154-234_Proposed Third Floor.dwg

DescriptionRev ByDate

Construction Design Management Regulations 2015

Status:

Leeds0113 259 [email protected]

www.farrellandclark.co.uk

London020 7580 [email protected]

Drawn:Scale: Date:

Drawing No.: Rev.:

Check:

Title:

Project:

Client:

CLOTHWORKER'SSOUTH

CONTRACT

UNIVERSITY OF LEEDS

PROPOSEDTHIRD FLOOR PLAN

1/100 @A1 SEPT 2016AWS

143/154/234 C01

IW

0 1 2 3 4 5m

Scale 1:100

LEGENDSite Boundary / Area of WorksArtwork Hanging System as NBS ref N10/350

Room/Department signage as dwg no.143/154/305

S

PARTITION TYPES

314 and 315Completion - TBC.works in 315 havenot commenced

Seat Boxes and Display AreaWorks on hold in order to prior-itise the teaching spaces. Tar-geted completion in November

THIRD FLOORShowing the current estimated completion dates