Points to be remember :- *window firewall will be turned off Basic IP in Lap- 169.254.1.2 255.255.0.0 Open HyperTerminal $ reload space -- enter $ formathd space /c2 enter $ formathd space /d enter $ reload space -- enter $ ifconfig space le0 space 169.254.1.1 space netmask space 255.255.0.0 enter $ ifconfig enter $ passwd enter $ rbs enter Now minimize HyperTerminal After that open WS FTP, Enter passwd and open Now from Initial CV in Laptop in C Drive select c2 and d and transfer in remote system. In Remote system before transfer check that data will move on whole memory not in c2 or d only for this check in remote system address bar there is “\” present . After transferring intial cv check vols by hyperterminal,vols will be 3M and 4M. Now go in UP folder located in C drive , copy path in address bar of SW load file of %5 folder .

3g Commisioning Process

Embed Size (px)

DESCRIPTION

3g Commisioning Process

Citation preview

Page 1: 3g Commisioning Process

Points to be remember :-

*window firewall will be turned off

Basic IP in Lap- 169.254.1.2

255.255.0.0

Open HyperTerminal

$ reload space -- enter

$ formathd space /c2 enter

$ formathd space /d enter

$ reload space -- enter

$ ifconfig space le0 space 169.254.1.1 space netmask space 255.255.0.0 enter

$ ifconfig enter

$ passwd enter

$ rbs enter

Now minimize HyperTerminal

After that open WS FTP, Enter passwd and open

Now from Initial CV in Laptop in C Drive select c2 and d and transfer in remote system.

In Remote system before transfer check that data will move on whole memory not in c2 or d only for this check in remote system address bar there is “\” present.

After transferring intial cv check vols by hyperterminal,vols will be 3M and 4M.

Now go in UP folder located in C drive , copy path in address bar of SW load file of %5 folder.

Page 2: 3g Commisioning Process

Now go in RUN command,open cmd command.

>cd\ enter

C:\>cd space now paste path of SW load file of %5 folder

C:\>cd space UP\CXP9011610_R12F%5\SW_install\CXP9011610%1_R12F%5 enter

C:\>cdspaceUP\CXP9011610_R12F%5\SW_install\CXP9011610%1_R12F%5>sw_load.bat space 169.254.1.1 space rbs space rbs enter

After completing this command check vols they will be 39M and 129M.

In end of this command type exit enter

Now go in Hyperterminal

$ reload enter , wait for some time , in end there will be display in Hyperterminal, “login server ready”

Process for takeing Searial No. Go in RUN and open telnet command telnet>o not zero enter <to>169.254.1.1 enter Username rbs enter Password rbs enter $getAttrObj space subrack space 1 enter

Now open e- explorer http://169.254.1.1 enter

Go in Software--- configuration version --- right click --- create --- cv_p5 --- ok --- apply --- set startable --- ok

For Outdoor Node B

Open element manager

Go in Software --- configuration version --- Basic cv --- right click --- reload with cv --- restart , wait for some time

Page 3: 3g Commisioning Process

In HyperTerminal

$ reload space – enter

$ ifconfig space le0 space 169.254.1.1 space netmask space 255.255.0.0 enter

$ reload enter

Wait for some time

Now open http://169.254.1.1

Go in Configuration --- cabinet equipment --- next --- next --- next --- rbs 3967 --- no of ru’s in sector 1 1 1 --- next --- next --- next ---yes

For P6

Now open http:// 169.254.1.1

Go in software --- upgrade pacakage --- right click --- create --- user label – rbs

ftp server add- 169.254.1.2

user – rbs

passwd – rbs

ftp server path- [ ./ paste path of %9 file located in %9 folder in up folder in c drive .xml ]

in addition this we also open Bulletprof FTP server.

Open BP FTP Server --- then click on single person(user) --- in user accounts window --- right click --- add --- in account name type rbs ok --- now in setup window --- right click --- select location of %9 folder --- tick on all --- ok --- in passwd- type rbs --- ok --- now give online command

After this again go in Element manager window and click on Create pacakage --- install pacakage --- full install --- after some time Verify Pacakage --- upgrade node --- hard upgrade --- wait for some time.

Page 4: 3g Commisioning Process

Now open RBS element manager

Go in software --- upgrade pacakage --- double click --- awaiting --- right click --- confirm upgrade --- yes --- create cv --- cv_p6 --- set startable --- ok

OAM script:-

Now go configuration --- OAM Access --- next --- browse script location --- next --- next --- next --- next --- next --- time zone (UTC) --- note down ip

Now go in LAN and change ip , after that close all window.

Now open RBS Element manager by new ip,

Go in software --- configuration version --- create cv

External Hardware Sript :-

Go in Configuration --- site equipment --- next --- browse sript location --- next --- next --- anteena type (for single anteena -5 ) --- anteena supervision threshold (10) in up and down both and F Q band low edge (0.1 MHz) 21500-21500-21500 and FQ band high edge (0.1 MHz) 21550-21550-21550--- next --- give value of attenuation and delay --- next --- next--- finish

Now again create cv

IUB Script :-

Element manager --- configuration --- run command file --- browse location --- start --- wait for some time, now again create cv.

For Licensence :-

Element manager --- configuration --- licensing --- update key file --- same process as we done in P6 except that here we give location of license file in place of %9 file. After completing we create cv named cv_p6_complete_wth license and set startable and also add in rollback list.