5
• 4” Diameter tube inserted into 21” riser at the seafloor (5000’) • New riser allowing flow to the drillship Enterprise • Oil separated & shipped ashore • System designed to minimize the formation of hydrates • Riser tube will also be equipped with methanol injection system to control hydrates • Enterprise is capable of processing 15,000 bbls / day and can store 139,000 bbls • Support barge is capable of storing 137,000 bbls Riser Insertion Tube

4” Diameter tube inserted into 21” riser at the seafloor (5000’) New riser allowing flow to the drillship Enterprise Oil separated & shipped ashore System

Embed Size (px)

Citation preview

Page 1: 4” Diameter tube inserted into 21” riser at the seafloor (5000’) New riser allowing flow to the drillship Enterprise Oil separated & shipped ashore System

• 4” Diameter tube inserted into 21” riser at the seafloor (5000’)• New riser allowing flow to the drillship Enterprise • Oil separated & shipped ashore• System designed to minimize the formation of hydrates• Riser tube will also be equipped with methanol injection system to control hydrates• Enterprise is capable of processing 15,000 bbls / day and can store 139,000 bbls• Support barge is capable of storing 137,000 bbls

Riser Insertion Tube

Page 2: 4” Diameter tube inserted into 21” riser at the seafloor (5000’) New riser allowing flow to the drillship Enterprise Oil separated & shipped ashore System

Blowout Preventer - Top Kill

Page 3: 4” Diameter tube inserted into 21” riser at the seafloor (5000’) New riser allowing flow to the drillship Enterprise Oil separated & shipped ashore System
Page 4: 4” Diameter tube inserted into 21” riser at the seafloor (5000’) New riser allowing flow to the drillship Enterprise Oil separated & shipped ashore System

The Incident Command PostsUnified Source Control – Houston Tx.

• Stack Intervention

− Top Kill

− Swing Valve

− Split Stack

• Containment

− Top hat

− Hot tap

• Relief Wells

− DD II

− DD III

• Longer Term Options

Page 5: 4” Diameter tube inserted into 21” riser at the seafloor (5000’) New riser allowing flow to the drillship Enterprise Oil separated & shipped ashore System

The On-Site Command PostTactical Response Team (TRT) – MC 252