    381333272 B50 Hanover Road, Florham Park, New Jersey 079321591 USAFor sales or service call 1 800 8002726 (ASCO) www.ascopower.com

    ASCO POWER TECHNOLOGIES CANADA PO Box 1238, 17 Airport Road, Brantford, Ontario, Canada N3T 5T3

    telephone 519 7588450, fax 519 7580876, for service call 1 888 2342726 (ASCO) www.asco.ca

    OperatorsManual

    4000 Series ADTSAutomatic DelayedTransition Transfer Switche

    Jdesign 150600A, Hdesign 8001200A,Gdesign 16003000A, Fdesign 4000A

    DANGER is used in this manual to warn of high

    voltages capable of causing shock, burns, or death.

    WARNING is used in this manual to warnof possible personal injury.

    CAUTION is used in this manual to warnof possible equipment damage.

    Refer to the outline and wiring drawings providedwith your 4000 Series ADTS for all installation andconnection details and accessories.

    Refer toGroup 5 Controller Users Guide 381333126for ATS status display messages, time delays, pickup& dropout settings, and adjustments.

    An experienced licensed electrician must install the ACTS

    Rating Label

    Each automatic closedtransition transfer switch contains arating label to define the loads and fault circuit withstand /closing ratings. Refer to the label on the transfer switch forspecific values.

    Do not exceed the values on the rating label.Exceeding the rating can cause personal injury

    or serious equipment damage.

    NameplateThe Transfer Switch nameplate includes data for eachspecific 4000 Series ADTS. Use the switch only within thelimits shown on this nameplate. A typical Catalog Numberis shown on the next page with its elements explained.

    TABLE OF CONTENTS

    section-page

    INSTALLATION 1-1. . . . . . . . . . . . . . . . . . . . . . . .

    Mounting and Line Connections 1-1. . . . . . . . .

    Auxiliary Circuits and Harness 1-2. . . . . . . . . . .

    Engine Starting Contacts 1-2. . . . . . . . . . . . . . .

    Functional Test 1-3 through 1-8. . . . . . . . . . . . . .

    TESTING & SERVICE 2-1. . . . . . . . . . . . . . . . . .

    Transfer Test 2-1. . . . . . . . . . . . . . . . . . . . . . . . . .

    Preventive Maintenance 2-1. . . . . . . . . . . . . . . .Disconnecting the Controller 2-1. . . . . . . . . . . .

    Manual Load Transfer 2-2. . . . . . . . . . . . . . . . . .

    Trouble-Shooting 2-2. . . . . . . . . . . . . . . . . . . . . .

    INDEX back cover. . . . . . . . . . . . . . . . . . . . . . . . .

  • 8/13/2019 4000 Series ADTS

    2/13

    Catalog Number Identification

    Typical 4000 Series catalog no. for Jdesign, 2 pole, 260 amp, 240 V, ADTS in Type 1 enclosure:

    4ADTS A 2 260 F 5 C

    Phase PolesNeutral

    A solid

    Amperes Voltage Controller Enclosure

    B switched 5X ifaccessories

    ordered

    5 standard

    G type 4

    C type 1F type 3R

    H type 4X

    3 three 2 single

    B 120

    D 220

    A 115

    C 208

    E 230

    K 415

    M 460

    J 400

    L 440

    N 480

    G 277

    F 240

    H 380

    Q 575

    P 550

    R 600

    1200

    2000

    1000

    1600

    2600

    3000

    150

    blank none

    blank open type

    Jdesignprefixletter

    C overlapping

    600

    800

    260

    4000

    400

    L type 12

    TransferSwitch

    powerconnections

    Group 5Controller

    transfercontrol& lights

    Jdesign 260 ampere size in typical enclosure with location of customer connections

    powerconnections

    field connectionsterminal block TB

  • 8/13/2019 4000 Series ADTS

    3/13

    SECTION 1 INSTALLATION

    1---1

    ASCO 4000 Series Automatic DelayedTransition Trans-fer Switches are factory wired and tested. Field installa-tion simply requires mounting and connection of service

    cables, and auxiliary control circuits (if required).

    Remove the Shipping Skid

    For large switches, open the front door and remove the

    four lag screws (2 in front, 2 in rear)securing enclosure to

    the wood skid.

    Supporting Foundation

    The supporting foundation for the enclosure must leveland straight. Refer to the applicable enclosure outlinedrawing included with the 4ADTS for all mounting

    details including door opening space.

    If bottom cable entry is used, the foundation must beprepared so that the conduit stubs are located correctly.Refer to the enclosure outline drawing for specified area

    and location. Provide cable bending space and clearanceto live metal parts. When a concrete floor is poured, use

    interlocking conduit spacer caps or a wood or metaltemplate to maintain proper conduit alignment.

    Mounting

    Refer to the outline and mounting diagram provided with

    the ATS; it shows all mounting details and instructions.

    Protect the switch from construction gritand metal chips to prevent malfunction or

    shortened life of the automatic switch switch.

    Mount the ATS vertically to a rigid supporting structure.

    Level allmountingpoints by using flat washers behind theholes to avoid distortion of the switch.

    The controller is mounted on the cabinet door. An add-on DIN railis provided for some optional accessoriesand

    is mounted below controller on the door.

    Deenergize the conductors before making anyline or auxiliary circuitry connections. Be surethat Normal and Emergency line connectionsare in proper phase rotation. Place engine gen-erator starting control in the OFF position. Make

    sure engine generator is not in operation.

    Testing Power Conductors

    Do not connect the power conductors to the transferswitch until they are tested. Installing power cables inconduit, cable troughs and ceiling-suspended hangers

    often requires considerable force. The pulling of cablescan damage insulation and stretch or break theconductors strands. For this reason, after the cables are

    pulled into position, and before they are connected, they

    should be tested to verify that they are not defective orhave been damaged during installation.

    Connecting Power Conductors

    AWiringDiagramis furnished with theASCO 4000 Series4ADTS (separate from this manual). Refer to this

    drawing. All wiringmust be made in accordance with theNational Electrical Code and local codes.

    After the power cables have been tested, connect them to

    the appropriate terminal lugs on the transfer switch asshown on the wiring diagram provided with the switch.Make sure the lugs provided are suitable for use with the

    cables being installed. Standard terminal lugs are solder-less screw type and will accept the wire sizes listed on thedrawings provided with the switch. Be careful whenstripping insulation from the cables; avoid nicking or

    ringing the conductor. Remove surface oxides fromcables by cleaning with a wire brush. When aluminumcable is used, apply joint compound to conductors.

    Tighten cable lugs to the torque specified on rating label.

    Do not run cables in front of or behind theswitch. Cablescan be bundled on the right side of the switch. Maintain

    proper electrical clearance between the live metal partsand grounded metal: inch minimum for 150-400 amps,1 inch minimum over 400 amps.

    It is not necessary to remove the barriers from the

    transfer switches to install the cables. If you do removethem,however, be sure to reinstall the barriers carefully.

    Bus Connections

    For large switches use grade 5 hardware to connect bus toappropriate terminal plates. Wipe off the bus surfacesbefore they are joined. If the busis very dirty, gentlyclean

    the surfaces with a non--- flammable solvent. Avoidtouching the cleaned surfaces.

    Tighten bolted joints to the torque specified in Table A.

    The reliability of the connection dependson how clean and how tight the joint is.

    Table A. Tightening torque values for bolted joints(Grade 5 hardware)

    Bolt Diameterin inches

    Tightening Torquein foot pounds

    1/4 7

    5/16 12

    3/8 20

    1/2 50

    5/8 95

    3/4 155

  • 8/13/2019 4000 Series ADTS

    4/13

    INSTALLATION (continued)

    1---2

    Controller Ground

    A grounding wire must be connected to the controllers

    lower left mounting stud. Because the controller ismounted on the enclosure door, a conductive strap mustbe used between the enclosure and the door. This

    connection provides proper grounding which does notrely upon the door hinges.

    HarnessesThe transfer switch is connected to the left side of thecontrol panel by a plug-in harness (two plugs).

    Auxiliary Circuits

    Connect auxiliary circuit wires to appropriate terminalson the transfer switch. Note the control features that arefurnished on this switch. Make the necessary auxiliary

    connections by referring to the Wiring Diagram.

    Engine Starting Contacts

    The engine control contact connections (if used) arelocated on the transfer switch. Connect signal wires toappropriate terminals as specified in Table B and shownin Figures 11 and 12. See the wiring diagram too.

    Table B. Engine start connections

    When normalsource fails

    Terminals ontransfer switch

    contact closes TB1 and TB2

    contact opens TB1 and TB3

    COMMON

    FEATURE 7closes to start

    FEATURE 8opens to start

    COMMON

    FEATURE 14Bclosed on emergency

    FEATURE 14Aclosed on normal

    COMMON

    FEATURE 14BAclosed on emergency

    FEATURE 14AAclosed on normal

    Engine StartingSignals

    5 amps, 32 V DC

    5 amps resistive 28 V DC

    or 120 V AC max.

    TS Auxiliary ContactsFeature 14A & 14B

    10 amps, 32 V DC

    10 amps 250 V AC

    general purpose

    OptionalTS Auxiliary ContactsFeature 14AA & 14BA

    10 amps, 32 V DC

    10 amps 250 V AC

    general purpose

    left side of transfer switch

    Figure 1-1. Connections to engine starting contactterminal block for 150 through 1200 amp.

    J & Hdesign transfer switches.

    TB Terminal Block(field connections)accepts wire range2212 AWG

    Engine StartingSignals

    5 amps, 32 V DC

    5 amps resistive 28 V DCor 120 V AC max.

    TS Auxiliary ContactsFeature 14A & 14B

    10 amps, 32 V DC

    10 amps 250 V ACgeneral purpose

    FEATURE

    7

    closesto

    start

    FEATURE

    8

    opensto

    start

    Figure 1-2. Connections to engine starting contact

    terminal block located on 1600 through 3000 amp.Gdesign transfer switches.

  • 8/13/2019 4000 Series ADTS

    5/13

    INSTALLATION (continued)

    1---3

    Functional Test

    The Functional Test consists of three checks:

    1 Manual Operation Test, pages 13 through16

    2 Voltage Checks, page 17

    3 Electrical Operation, page 18

    Do these checks in the order presentedto avoid damaging the ATS.

    Read all instructions on the Wiring Diagram and labelsaffixed to the ATS. Note the control features that areprovided and review their operation before proceeding.

    Continue to1 Manual Operation Test starting below.

    1 Manual Operation Test

    A detachable operator handle is provided on the transferswitchfor maintenance purposes only. Manual operationof the transfer switch must be checked before it isoperated electrically.

    Do not manually operate the transfer switchuntil both power sources are disconnected:

    open both circuit breakers.

    1. Select the appropriate switch design / amp. size andfollow directions for installing and using the handle:

    1501200 amp J, HdesignsFig. 1-3, -4, -6 thru -11.Attach the manual handle onto the shaft hub, left

    side of the operator.

    1600 3000 amp. Gdesign See Figures 1-5, 1-12.

    Installthe hub (withpin) ontothe shaftand insert the

    manual firmly into the side hole in the hub. Push in

    or pull out hub to engage opposite source contacts.

    4000 amp. Fdesign See Figure 1-13.Insert the manual handle into the hole in the weight.

    2. Move the handle as shown to manually operate theTransfer Switch. The switch should operate smooth-

    ly without binding. If it does not, check for shippingdamage or construction debris. Repeat the manualoperation check on the other Transfer Switch.

    3. Return the transfer switch to theN(closed on normal)position. If removable, remove the maintenancehandle and store it on the transfer switch in the placeprovided.

    window indicators

    Ois open

    Cis closed

    Emergency contacts(upper shaft)

    Normal contacts(lower shaft)

    contactposition

    indicators(right side)

    Figure 1-3. Contact position indicators on150600 amp. Jdesign transfer switches .

    Shown with Emergency open and Normal closed.

    window indicators

    Ois openCis closed

    Emergency contacts

    (upper shaft)

    Normal contacts(lower shaft)

    contactposition

    indicators(right side)

    Figure 1-4. Contact position indicators on8001200 amp. Hdesign transfer switches .

    Shown with Emergency open and Normal closed.

    windowindicators

    OPENorCLOSED

    Emergencycontacts

    Normalcontacts

    contactposition

    indicators(left side)

    Figure 1-5. Contact position indicators on16003000 amp. Gdesign transfer switches .

    Shown with Emergency closed and Normal open.

  • 8/13/2019 4000 Series ADTS

    6/13

    INSTALLATION (continued)

    1---4

    maintenancehandle

    left side oftransfer switch

    clip

    Emergency sourcecontact shaft hub

    Normal sourcecontact shaft hub

    Jdesign 150600 amp

    Figure 1-6. Maintenance handle on 150600 amp.Jdesign transfer switches. Hubs shown with Normal

    contacts closed & Emergency open.

    handle

    hub

    UP opens theEmergency sourcecontacts

    DOWN closes theEmergency sourcecontacts

    frame

    UPPER SHAFT

    Figure 1-7. Emergency (upper shaft) operationon 150600 amp. Jdesign transfer switches.

    handle

    hub

    UP closes theNormal sourcecontacts

    DOWN opens theNormal sourcecontacts

    frame

    LOWER SHAFT

    Figure 1-8. Normal (lower shaft) operationon 150600 amp. Jdesign transfer switches..

    maintenancehandle

    left side oftransfer switch

    clips

    Emergency sourcecontact shaft hub

    Normal sourcecontact shaft hub

    lobes on weights

    prevent bothN & E contactsfrom being

    closed at thesame time

    Hdesign 8001200 amp

    Figure 1-9. Maintenance handle on 8001200 amp.Hdesign transfer switches. Hubs shown withNormal contacts closed & Emergency open.

    handle

    hub

    UP opens theEmergency sourcecontacts

    DOWN closes theEmergency sourcecontacts

    frame

    UPPER SHAFT

    Figure 1-10. Emergency (upper shaft) operationon 8001200 amp. Hdesign transfer switches.

    handle

    hub

    UP closes theNormal sourcecontacts

    DOWN opens theNormal sourcecontacts

    frame

    LOWER SHAFT

    Figure 1-11. Normal (lower shaft) operationon 8001200 amp. Hdesign transfer switches..

  • 8/13/2019 4000 Series ADTS

    7/13

    INSTALLATION (continued)

    1---5

    Do not manually operate the transfer switchuntil both power sources are disconnected:

    open both circuit breakers.

    Table C. Maintenance handle positions on 1501200 amp. transfer switches. .

    Transfer SwitchPosition

    Jdesign 150---600 A

    Interlocked Shafts 1

    Link between contactshafts prevents closing

    both N & E contacts

    Hdesign 800---1200 A

    Interlocked Weights 2

    Lobes preventclosing both N & E

    contacts

    MaintenanceHandle

    Shaft Indicators

    E

    hub weight hub up

    E = O

    upper contacts open

    Normal

    N link

    contact shafts

    hub

    o e lobe

    weight

    hub

    upN = C

    lower contacts closed

    LoadE

    up

    E = O

    upper contacts open

    Disconnected

    N

    down

    N = O

    lower contacts open

    Edown

    E = Cupper contacts closed

    mergency

    N

    down

    N = O

    lower contacts open

    Note 1: The hub and contact shaft turn in opposite directions through a cam follower mechanism.

    Note 2: The hub and contact shaft turn in the same directions.

    Note: If Normal and Emergency connections are reversed this operation is also reversed.

  • 8/13/2019 4000 Series ADTS

    8/13

    INSTALLATION (continued)

    1---6

    clockwise DOWNOPENS the contactsPull out shaft to close Emergencysource contacts (upper)Push in shaft to close Normalsource contacts (lower)

    counterclockwise DOWNOPENS the contactsPull out shaft to open Emergencysource contacts (upper)Push in shaft to open Normalsource contacts (lower)

    window

    indicatorsOPENorCLOSED

    Emergencycontacts

    Normalcontacts

    contact positionindicators (left side)

    Turn counterclockwiseto OPEN contacts.

    Turn clockwise toCLOSE contacts.

    Insert handleinto hole

    (spring fullycompressed)

    Grasp handlefirmly withboth hands

    Slide the hub onto theshaft and insert the pin.

    Figure 1-12. Removable maintenance handle and positions on 1600 3000 amp. Gdesign transfer switches.

    maintenance

    handle

    weight

    hole

    Figure 1-13. Removable maintenance handle on4000 amp. Fdesign transfer switch.

    Verify that the maintenance handle has beenremoved and stored properly before proceeding!

    Now continue to2 Voltage Checkson page 17.

  • 8/13/2019 4000 Series ADTS

    9/13

    INSTALLATION (continued)

    1---7

    observethese lights

    Press for 15 Sec.

    Figure 1-14. Standard controls and indicators.

    2 --- Voltage Checks

    First check the nameplate on the transfer switch; therated voltage must be the same as the normal andemergency line voltages.

    Verify that the feeders have beenconnected to the proper terminal lugs.

    Use extreme caution when using a meterto measure voltages. Do not touch power

    terminals; shock, burns, or death could result !

    Perform steps 1 through 6 at the right. Observe thestatus

    lights. See Figure 114.

    Black circle means light is on.

    White circle means light is off.

    * If necessary, adjust the voltage regulator on thegenerator according to the manufacturers recommenda-

    tions. The automatic transfer switch will respond only to

    the rated voltage specified on the transfer switchnameplate.

    Note: Refer to Section 3 of the Group 5 ControllerUsers Guide381333126 for how to display the status ofthe ATS and the voltage and frequency of each source.

    Note: Press the Lamp Test button to verify that all fivelights work.

    Now continue to3 --- Electrical Operationon next page.

    1

    Close the normal source (utility)circuit breaker. Two two leftlights should come on. Thenormal sourceAccepted(upperleft) and theTransfer SwitchPositionconnected to normal(lower left) lights should be on.

    2

    Carefully use an accuratevoltmeter to check the phase tophase and phase to neutralvoltages present at the transferswitch normal source terminals.

    3

    Close the emergency source

    (generator) circuit breaker.(Start generator, if necessary.)Another light should come on.The emergency sourceAcceptedlight (upper right)should be on.

    4

    Carefully use an accuratevoltmeter to check the phase tophase and phase to neutralvoltages present at the transferswitch emergency sourceterminals.*

    5

    Carefully use a phase rotation

    meter to check the phaserotation of the emergencysource; it must be the same asthe phase rotation of the normalsource (refer to wiring diagram).

    A B C

    6

    Shut down the generator, ifapplicable. The emergencysourceAcceptedlight (upperright) should go off. Then setthe generators starting controlswitch toautomatic. Remove allmeters; close enclosure door.

  • 8/13/2019 4000 Series ADTS

    10/13

    INSTALLATION (continued)

    1---8

    observethese lights

    pressthese buttons

    step 2 step 4

    If this light is on, the buttons will notwork until the controls are unlocked.If this light is blinking, the usercontrols are unlocked for 5 minutes.

    Press for 15 Sec.

    Figure 1-15. User controls and indicators.

    3 --- Electrical Operation

    This procedure will check the electrical operation of the

    automatic transfer switch. See Figure 115.

    Be sure to close the enclosure doorbefore proceeding to prevent personal injury

    in case of electrical system fault.

    Transfer Test

    Both normal and emergency sources must be available

    and the emergency source generator (if used) must be

    capable of being started in this procedure.

    Perform steps 1 through 5 at the right. Observe thestatuslights.

    Black circle means light is on.

    White circle means light is off.

    If the User Controls Locked light is on, the Transfer TestandRetransfer to Normalbuttons will not work until youunlock them.

    How to unlock the User Controls

    Press up or down arrow keys on Transfer ControlCenter(Group 5 Controller), enter the password, andpressEnterkey. The user controls are now unlockedfor 5 minutes. During that time the light will blink.

    To lock or unlock the user controls refer to the Group 5Controller Users Guide 381333126. Password informa-tion and time delay settings are also provided there.

    This completes the functional test of the ATS.

    1

    The two left lights should be on;the normal source Accepted(upper left) and theTransferSwitch Positionconnected tonormal (lower left) should be on.

    2

    Press and hold theTransfer Testbutton until the generator startsand runs (this should happenwithin 15 sec.). The emergencysourceAcceptedlight (upperright) should come on.

    3

    Then the transfer switch shouldoperate to emergency.TheTransfer Switch Positionconnected to emergency light(lower right) should come on andthe connected to normal light(lower left) should be off.If Feature 2B is used, the transferto emergency will occur after thetime delay.

    4

    The transfer switch shouldoperate back to normal afterFeature 3A time delay.For immediate retransfer presstheRetransfer to Normalbutton.TheTransfer Switch Positionconnected to normal light(lower left) should come on andthe connected to emergency(lower right) light should be off.

    5

    The generator will stop afterFeature 2E time delay (unloadedrunning engine cooldown).The emergency sourceAcceptedlight (upper right) should go off.

  • 8/13/2019 4000 Series ADTS

    11/13

    SECTION 2 TESTING & SERVICE

    2---1

    TRANSFER TEST

    Operate the 4000 Series ADTS at least once a month byfollowing the fivestep Electrical Operation TransferTestprocedure on page 17.

    PREVENTIVE MAINTENANCE

    Reasonable care in preventive maintenance will insurehigh reliability and long life for the 4000 Series ADTS.

    An annual preventive maintenance program is recom-mended.

    ASCO Services, Inc. (ASI) is ASCO PowerTechnologiess national service organization. In theUS ASI can be contacted at 1-800-800-2726 for in-formation on preventive maintenance agreements.

    Checklist for Yearly Inspection

    Hazardous voltage capable of causing shock,burns, or death is used in this transfer switch.Deenergize both Normal Emergency power

    sources before performing inspections!

    Clean the 4ADTS enclosure. Brush and vacuumaway any excessive dust accumulation. Remove anymoisture with a clean cloth.

    Check the transfer switch contacts. Remove thetransfer switch barriers and check contact condition.Replace the contacts if they become pitted or wornexcessively. Reinstall the barriers carefully.

    Maintain transfer switch lubrication. If thetransfer switch is subjected to severe dust orabnormal operating conditions, renew factorylubrication on all movements and linkages.Relubricate the solenoid operator if the TS coil isreplaced. Do not use oil; orderlubrication kit 75-100.

    Check all cable connections & retighten them.

    REPLACEMENT PARTS

    Replacement parts are available in kit form. When or-

    dering parts provide the Serial No., Bill of Material No.(BOM), and Catalog No. from the transfer switch name-plate. Contact your local ASCO Power TechnologiesSales Office or ASI:

    In the United Statescall 1 800 800 ASCO( 2726 )

    In Canada

    call 1 888 234 ASCO( 2726 )

    DISCONNECTING THE CONTROLLER

    The harness disconnect plugs are furnished for repairpurposes only and should not have to be unplugged. Ifthe controller must be isolated, follow these steps:

    Disconnecting the Plugs

    Do not unplug the controlleruntil steps 1a or 1b is completed.

    1. Observe the position of the transfer switch.

    a. If the transfer switch is in theNormalposition, firstplace standby engine starting control in the offposition. Second, then open the emergency sourcecircuit breaker. Third, open the normal sourcecircuit breaker.

    b. Ifthe transferswitch is in theEmergency position,first open the normalsource circuit breaker. Sec-

    ond, place the engine starting control in the testorrun position. Third, openthe emergency sourcecircuit breaker.

    2. Separate the two quick disconnect plugs by squeez-ing the latches. Do not pull on the harness wires.

    Reconnecting the Plugs

    Do not reconnect the controlleruntil steps 1a or 1b is completed.

    1. Observe the position of the transfer switch.

    a. If the transfer switch is in the Normal position,first be sure that both normal and emergencysource circuit breakers are open. Second, be surethat the standby engine starting control is still intheoffposition.

    b. If the transfer switch is in theEmergencyposition,first be sure that both normal and emergencysource circuit breakers are open.

    2. The two harness plugs and sockets are keyed. Care-fully align the plugs with the sockets and pressstraight in until both latches click. Close the door!

    3. Restore the two sources in sequence as follows:

    a. If the transfer switch is in the Normal position,first close the normal source circuit breaker.Second, closethe emergencysource circuit break-er. Third, place the standby engine startingcontrol in theautomaticposition.

    b. Ifthe transferswitch is in theEmergency position,first close the emergency source circuit breaker.Second close the normal source circuit breaker.

  • 8/13/2019 4000 Series ADTS

    12/13

    TESTING & SERVICE (continued)

    2---2

    MANUAL LOAD TRANSFER

    This procedure will manually transfer the load if thecontroller is disconnected.

    Do not manually operate the transfer switchuntil both power sources are disconnected

    (all conductors deenergized).

    1. Deenergize both the normal and emergency sourceconductors (remove fuses or open circuit breakers).

    2. Use the maintenance handle to manually operate thetransfer switch to the opposite source. First open theclosed contacts, then close the other contacts. Do nottry to close both Normal and Emergency contact. SeeManual Operationon page 13 through 16.

    3. Then remove the maintenance handle..

    Verify that the maintenance handlehas been removed before proceeding!

    4. If the transfer switch is in the Emergency positionmanually start the engine generator and then installemergency source fuse or close the circuit breaker.

    TROUBLE-SHOOTING

    Note any optional accessories that may be furnished onthe ADTS and review their operation. Refer to any

    separatedrawingsand/or instructions that may be packedwith the ADTS.

    Hazardous voltage capable of causing shock,burns, or death is used in this switch.

    Do not touch the power or load terminalsof the transfer switch!

    Table 2-1. Trouble-Shooting Checks.

    CHECK IN NUMERICAL SEQUENCE

    1 OPERATION 2 GEN-SET 3 VOLTAGE

    Enginegenerator set doesnot start when theTransferControlswitch is turned andheld inTransfer Testposition

    or when normal source fails.

    HoldTransfer Testswitch 15seconds or the outage mustbe long enough to allow forFeature 1C time delay plus

    engine cranking and starting.

    Starting control must be in theautomatic position. Batteriesmust be charged andconnected. Check wiring to

    engine starting contacts.

    ---

    Transfer switch does nottransfer the load to theemergency source after theenginegenerator set starts.

    Wait for Feature 2B time delay

    to time out.

    Generator output circuitbreaker must be closed.Generator frequency must beat least 95% of nominal (57 Hz

    for a 60 Hz system.) *

    Voltmeter should read at least90% of nominal phase tophase voltage betweenterminals EA and EC (or EL1and EL2 for 2 pole switches)*

    Transfer switch does nottransfer the load to normalsource when normal returnsor when theTransfer Controlswitch is released.

    Wait for Feature 3A time delayto time out.

    ---

    Voltmeter should read at least90% of nominal phase tophase voltage betweenterminals NB and NC, NC andNA, and NA and NB (or NL1and NL2 for 2 pole switches).

    Gen. does not stop after loadretransfer to normal source.

    Wait for Feature 2E time delayto time out.

    Starting control must be in theautomatic position.

    ---

    * These are factory settings. Refer to Group 5 Controller Users Guide.

    If the problem is isolated to circuits on the controller or the transfer switch, call your local ASCO Power Technologiessales office or ASI: in the United States, call 18008002726 or in Canada call 18882342726. Furnish the Serial No.,Catalog No., and Bill of Material (BOM) No. from the transfer switch nameplate.

  • 8/13/2019 4000 Series ADTS

    13/13

    INDEX

    Printed in U.S.A. ASCO Power Technologies, L.P. 2007

    Aauxiliary circuits, 12

    C

    cablelugs, 12preparation, 12

    catalog number, inside cover

    cleaning, 21

    connectionsline, 11

    contact position indicators, 13

    controller, 11disconnecting, 21seeController Users Guide

    Eelectrical operation, 18

    emergency source accepted light,17

    engine starting contacts, 12

    Ffrequency, generator, 22

    functional test, 13 through 18

    Gground, controller, 11

    Hharness, 11

    disconnect plugs, 21

    [email protected]

    Iindicators, contact position, 13

    inspection, 21

    installation, 11

    interlocked weights, 16

    Llabels,

    engine start contacts, 12rating, cover

    lights, 17, 18

    Load Disconnected light, 18

    load disconnected, 13

    lubrication, 21

    Mmaintenance handle, 13 through 6

    maintenance, preventive, 21

    manual load transfer, 22warning, 22

    manual operation, 13, 14, 15, 16illustration of, 13, 14, 15, 16

    warning, 13

    N

    nameplate, covernormal source accepted light, 16

    Ooperation

    electrical, 17manual, 13, 14, 15, 16

    illustration of, 13, 14, 15, 16warning, 13

    optional accessoriesseeController Users Guide

    Pparts, 21

    phase rotation check, 15

    problem, 22

    Rrating label, cover

    replacement parts, 21

    Sservicein the U.S call 18008002726in Canada call 18882342726

    settingsseeController Users Guide

    shaft indicators, 13

    Ttest, functional, 13 through 18

    time delays, 21seeController Users Guide

    transfer switch connected to emer-gency light, 18, 21

    transfer switch connected to normallight, 18, 21

    transfer switch positions, 13

    Transfer Test, 18

    transfer to emergency, 18

    transfer to normal, 18, 21

    troubleshooting, 22

    Uuser controls and indicators

    Retransfer to Normal, 18Transfer Test, 18

    Vvoltage checks, 17

    voltage, pickup and dropout settingsseeController Users Guide