NRC Docket 71-9355 AREVA Federal Services LLC July 2013 435-B Leakage Rate Test Records Notes: Each set of records consists of two leakage rate test results: Main Containment O-ring seal (designated ‘A’), and the Vent Port Seal (designated ‘B’). The test after Series D3 was a hard vacuum. A pressure of 7.5(10 -4 ) Torr was maintained at the test port. The containment and vent port seals were not disturbed until after test series D4, thus the D4 post-test leakage rate data also applies to D3. Consequently, there is no ‘before’ leak test data for series D4. The final three leakage rate test records are for the containment boundaries of the CTUs.

435-B Leakage Rate Test Records. · NRC Docket 71-9355 AREVA Federal Services LLC July 2013 . 435-B Leakage Rate Test Records . Notes: • Each set of records consists of two leakage

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 435-B Leakage Rate Test Records. · NRC Docket 71-9355 AREVA Federal Services LLC July 2013 . 435-B Leakage Rate Test Records . Notes: • Each set of records consists of two leakage

NRC Docket 71-9355

AREVA Federal Services LLC July 2013

435-B Leakage Rate Test Records

Notes:

• Each set of records consists of two leakage rate test results: Main Containment O-ring seal (designated ‘A’), and the Vent Port Seal (designated ‘B’).

• The test after Series D3 was a hard vacuum. A pressure of 7.5(10-4) Torr was maintained at the test port. The containment and vent port seals were not disturbed until after test series D4, thus the D4 post-test leakage rate data also applies to D3.

• Consequently, there is no ‘before’ leak test data for series D4.

• The final three leakage rate test records are for the containment boundaries of the CTUs.

Page 2: 435-B Leakage Rate Test Records. · NRC Docket 71-9355 AREVA Federal Services LLC July 2013 . 435-B Leakage Rate Test Records . Notes: • Each set of records consists of two leakage

~ FORM 6-3 USE PROCEDURE: 6343-P-03

LANL-B Containment Seal Leakage Rate Test CUSTOMER: AREVA FEDERAL SERVICES CONTRACT:P0#10C3003776 PROJECT: LANL-B

.. _ ........................ _ ...... ___ .......... __ .......................... or ... _""" Package Information ...... _ .. __ ....... ___ '"" ____ _ w ...... __ ... .............. _ ............. _ .... __ ........

LI}J./ l- f) . ~ t!)l Ll-15 -t.L Package serial Number Date

........... "'" .•.... '" """"'" ._ ......... lnstrumentation Records ..... """ .......................... "_"""

UI./I.IAIJ 1S1 IIIICp.o/-0 rY' Ltl/{)I t..o3 </ /.?uoc. -1-6 (}SE. Mass Spectrometer Leak Detector (MSLD) DescrpJon MSLD Serial No. MSLD Ca/IbnJlion Due Date

rJ..l}/I£ ..5).. Ii: A-BW<;tP" ~g .... t')(""ll/ Temperature MeaSlmi'Ig Device (TMD) DescrpJon TAID Serial No. TMD ClJIitmJtion Due Date

3. 25'y /()-f (J 7ft) r A-8. fJ.} ft;.tI1 6Z .... Q8-L2-CsJibnJted Standard Leak (CSt) Leak Rate (Ho-cc/s) CSt. Selial No. CS/. catibr8tion Due Date

~A-t::.e ,4.f$l.e P~eS5atJe h1eIt?R- AS()J ?3() IO .... 2-~""Li-Pressure Measuring Devu (PAID) Description PMD &trial No . PAID catibr8tion Due Dare

........................•................... Pre-Test calibration Records .........................................

1:.$51111 ~Ot:Jr 2:.. 2-SI (0 -8" ~YI()"..9 <D ;, , if If.. t(;-'O CsJibratJonTime cst. Tempe.rature Temperature-AdjUsted Cst MSLD "Zero" ~ing MSf..D C8libr8tion Reading

Ihh .,."., . .,., I ("For-C) Leak Ratft (He-cc/s) (HB-cc/uc) .(H6-cc/s6C)

..................•................................ Leak Test Recor:ds ..................................................

~#;W Pressure (psi(j) -/I.I( 7'1 ~~

EvsclRJlion ea-UTe (psigJ tiJot$'J: Cav Backtit Pressure (psig)

>3 ® 8" 't. (o ... f ® t.x/o-1 ® ~ 2·o.Y to--'! Test (DweI) Time MSLD start Test Reading MSLD Finish Test Reading Non-Adjusted MeasU18d LeakRate

(mmutas) (He-cc/s) (He-ee!s) (®- ®J {Ho-cc/sec}

......................•.....•.............. Post-Test calibration Records ........................................

~i' 0.5' 11M ~r(/f 2. .tj f.. /IJ--<{ lJt to"-" (5) 2.~Y to-<i caJibtaJion Tme cst. Tfllflperaiure Temperal.uTe-Adjusted cst. MSLD "Zero· Reading MSLD Ca!iINation Reading ~ (OFor-CJ Leak Rate (He-ccls) (He-cc/sec) (He-ccIsec)

................................................... Leak Rate Records .................................................. 4-- 11-($'41

@ 'L t tu .-f < i 'lv~ I()-? 2.2 x 10-7

Pre-TestIPost-Test CaJlbraliort Reading I

Adjusred Leak. R8te Corrected Leak Rate Criterion DBerence [® - @] (~c/sJ I® - 11>] (He-cc/sec) (He-ccIsec)

.......................................... Technician and Witness Records ......................................

/.WL~ Ilil W4.li.ht 1Lt/i LttAeL tfJ Ii.l4IJJ./ (l9 a-- r.~-l{

Ji-77~A Printl:d Name Date

::s-O\,~, (". K~~"CL1H a?A tl-(S~II..

r I Wlnes~ Printed Name 1 Dste

'--../ ."

·.'\{5

pnoss
Text Box
CTU 1 Before D1 Series, A
Page 3: 435-B Leakage Rate Test Records. · NRC Docket 71-9355 AREVA Federal Services LLC July 2013 . 435-B Leakage Rate Test Records . Notes: • Each set of records consists of two leakage

)

FORM 6-4 USE PROCEDURE: 6343-P-03

LANL-B VENT PORT LEAKAGE RATE TEST CUSTOMER: AREVA FEDERAL SERVICES CONTRACT: PO# 10C3003776 PROJECT: LANL·B

Pack~e Information ... ___ ... ___ .... _._ .... ___ ... ____ ... ___ ... ____ ..

........ ____ ,_,_ ._ ............ _ .... _ ..... ____ .. Instrumentation Records ... _ .. _ ... __ . _ ... __ ... _ .. _ ... ____ ._. ____ ..... .

MSW Serla'No.

fl.tt I<e ...5;. ff AEuJ eg05 OY "12J - J z" Temper8tuTe MeasUTfng Device (TMD) Description TMD SerlaJ No. TMD caJIbniIim Due Date

:3.25X'ltr~ cf) 78() F k13W (g{fj 07-c8-/ ~ CsJibratsd Standard !eak (CSL) UNJk Rate (He-ccIs) cst Serial No. cst Calibration Due Date

71Ik.e4lJtp ?/?e$5()e~ ;nef~ Al!()J 82() / D-26-/2-Pressure Measuring Device (PMD) DescrlpJion PMD Serial No. PAID C8IifIraIKm Due Date

...... __ .. _ ...... __ . ___ .. __ .. _ .. ___ ..... __ .. Pre-Test Calibration Records ... _ ..... ___ .. , ........ '_"" __ ' ....... __

//~'b61t11t It'lfJp a.£{xIOoAt6 ~ X IO~ <D :1. "y 10-8' Calibration Time cst. Temperature T~AdjlJsted CSt. MSLD "Zero- Reading MSLD CaJibtation Reading

("F or "C) Leak Rate (He-cc/$ (He-cc/$ec

. ___ .... ____ ... ___ .... __ ._. ____ •.. ___ ....... _ ... ___ leak Test Records _____ ... __ ..... ___ ... ____ a •• ___ ••••• __ •• _. ____ •• __

o

> 3 @ ')..)( If) ... f a> {z. 6 X Ib"~ ® .5,?X IO-'f! Test(Dwe~ Time MSLD start Test Reading MSLD Finish Test Reading Non-Adjusted Measured UNJkRate

(minutes) (He-ccIs) (HfH;cIs) [(I). ®l } . ____ ... ____ .. ____ .... ____ . _____ ... __ ..... _ Post-Test Calibration Records _ .... ___ .. ____ .. _____ ...... _ .. _____ . ___ _

It' I(PAnt ~q De g.qYlO-'i' J.. x to-9 ®2,·flyttJ-"1 Ca1ibration Tane cst Temperature T~Adjusted CSt MSW "Zero- Reading MSW caIIbratkm Reading

~ . . ("F or "C) Leak Rate (He-ccls) (Jte....cc/$ec) (He-cc.Isecj

. ___ ... ____ .... ___ ... _____ .. ___ .... ___ ... ____ . " ___ leak Rate Records. ___ .. _____ .. ______ . _____ .. ____ ... ___ ... ____ ..... .

@ 0 -S,~XJ()",F 2.2 x 10-7

~Test/Post-Test CaJitJration Reading Adjusted Leak Rate Leak Rate Criterion D6ference- ® - tIl1 (±He-ccIs) I® • (iI) (He-cclsec) (He-ccIsec)

.................................... _ ..... Technician and Witness Records ............ __ ._ ...... _ ......... ____ ..

~ ;Jd ill WItHfI1(J;(i Jeve/J1J 11 rLlLf'l ~1 /1w/tYll Prtnted Name

PrInted Name

pnoss
Text Box
CTU 1 Before D1 Series, B
Page 4: 435-B Leakage Rate Test Records. · NRC Docket 71-9355 AREVA Federal Services LLC July 2013 . 435-B Leakage Rate Test Records . Notes: • Each set of records consists of two leakage

(' A AREVA

SPECIFICATION PKG-LT-SPC-006 REVISION: o PROJECT NO: 01916.01.C004 PAGE: 9 of 11

Form 6-1 " LANL-B CTU Containment Seal Leakage Rate Test

I •••• I ••••••• ~ •••••••• , •••• 1 •• I 1" •••• , •••• I ••• " • Package Information • .................... ,1 ••••••• , ••••• 11 ••••••••••••• ,

CTL{:i±/ RFTER. D[ 11. t1. crJ± l fl~9t / Jsv)l Paokage Set/al Number Dale

-~= ..

.................................................. Instrumentation Records ................................................

J..p( IloL'D 11'1 ACON U L 1: (fV 6:).07 t2f. 'R ~L. Mass Spectrometer Leak Detector (MSLD) Description MSLD Serial No. MSLD Calibration Due Date

HEI cS 0 ~lnel.£f'F.5S) ~I)(/~ E 5'8 V - 13-o} -cx)~ 10 L) J / )V 11-Tempera/ure Akasu'!30DeV]Ce (TMD) DescrlplljJ TMD Serial No. TMD JaHbt'0n Due Date

/r'AC4(J;n TEO! t..N7 'i' '2,2l\/0- 5'f34 - t{O-..C9'j -&).1 to 31 ;20 t /.....

UA-sIIfII G.5 /,2XJr? '58'1 ~ "h -03 - 00 ~ u L3 L au / J-Ca/ibra/ed Standard Leak (CSL) Leak Rafe (He-co/s) CSL Serial No. CSL CaHbralion Due Date

l sa TJ'1D AWUE'J Pressure Measuring DevIce (PMDI Deso~ PMD Serial No. PMD Calibration Due Dat~

........................ " ..................... Pre-Test Calibration Records ...........................................

( If; 4 G at] JlftJ'F B,h'i((}-8 Ml){(J- 1O CD /,& /lJ-?

Calibration Time CSL Temperature Temperalure-Adjus(ed CSL MSLD "Zero" Reading MSLD Calibration Reading

(hh:mm:ss) ._~or'cl Leak Ra/e (He-ccIL~ (He-cc/seal (He-co/seal

........................ ' .............................. Leak Test Records .......... 1 ..........................................

/ LLt 7 P51 If (]) 'P.JJ A 15 @?1J4 AtmospherIc Pressure (P.::iig)fCC. Evacuation Cavity PressureYpsigJ-, Helium CavIty Backfill Pressure (p,?@'

>3 (J) /(h.5 X/,:;-8 Q) 6,).j i/cr 8 ~lJETECTflfjZ.EJ ~i: Test (Dwellj Time MSLD start Tes/ ReadIng MSLD FinIsh Test Reading Non-Adjusted Measured Leak Rate

(minutes) (He-eels) (He-eels) [® - <N (He-cc/sec) .. ..

.............................................. Post-Test CalibratiDn Reccirds ...........................................

) .'do; PM. .te;o {,6,( 9 X!()~8 L,vX/J- b ~ ~ / )(/('F I CalIbration Time CSL Temperature Temperature-Adjusted CSL MSLD "Zero" Reading MSLD Calibrallon Reading

~hh:mJJJl Cf~~~L==.J.He-cc/seg.L .. (He-Ge/secl=~

...................................................... Leak Rate Records .......................... : ..........................

® (2-t L Ylo ~ 7 ;}yJk. 7l-~',4Bl E i E 4k 2.2 )( 10.7

. - Pre-TestIPost-Test Callbrat/onReadlng - - .. . .. Adjusted Leak Rate - - ._- - - .... - Corrected·Leak Rate Criterion .. - --

=~~~f~ (He-Gc/~L~ __ .~

............. : .............................. Technician and Witness Records ........................... : ............

~~ 111 L c.4-S1GJ L s- :::r ~~ {~¥ Technician Sf nature ' Printid Name ale

( ;~~gnature - Dr 'LCI IA FlCi IrlcWoa"" 11/...2'711-011

I Prlntedame 1 Date

pnoss
Text Box
CTU 1 After D1 Series, A
Page 5: 435-B Leakage Rate Test Records. · NRC Docket 71-9355 AREVA Federal Services LLC July 2013 . 435-B Leakage Rate Test Records . Notes: • Each set of records consists of two leakage

68l(,' I

( A AREVA

SPECIFICATION PKG-L T-SPC-006 REVISION: o PROJECT NO: 01916.01.C004 PAGE: 10 of 11

Form 6-2 - LANL-B CTU Vent Port Seal Leakage Rate Test .......................................... , .... , .. Package Information .., .............................................. ,.

CT(J. *-l A~ Dl 21NIT ::ibl III i!:t JJ.u " Package

i Serial Number Date -

.................................................. Instrumentation Records ................................................

(k-y0o(D INFICON UL'U.rV 0d-.-v) ()f.)?,. eA-L Mass Spectrometer Leak Detecior (MSLD) Description MSLD Serfal No. MSLD Calibration Due Date

I+EI5 E Tl:::MpLe&8Sj CJlIl£r:;- s [3LJ-13~/-ucJ(, lo!.."J f /)..u I ~ II Temperature Measuring Device (TMD) DescriptIon TMD Serial No. TMD fallbr110n Due Date

A-LUI./yn ft-C~, ~J.. y:.1"~ B ~f:? 4-1.(01-0 3 ~O.;l-7' ttl "3 I )..J)L

I+tJ. S.II N6.S Il2'f:l.0Ir' "7 58 q- 4,; ~vj -uV.b Iv L3LL~/~ Calibrated standard Leak (CSL) Leak Rate (He-cc/s) CSL Serial No. CSL Calibration Due Date

/sec TMD tl~,? dE 1 ,--. Pressure Measuring Device (PMDl Descr[l!!,ion PMD Serhil No. PMD Caiibratlon Due Date

............................................... Pre-Test Calibration Records ...........................................

\ LI f!)O P {(\ Scr,~ ¢ F 1,(j f'li"l Cf-;~ Xlv ~ 13 Lro ,iJlJ~/U CD /' / 'iLu - "I

Calibration Time CSL Temperature Temperature-Adjusted CSL MSLD "Zero" ReadIng MSLD Calibration Reading ~!2!EJJ.!1J2 ~ (,For'C) Leak Ral!!lHe-ccls~, (He-co/sec) (H~ec/sec)o

...................................................... Leak Test Records .....................................................

/J-j, "") P'>J A- rJ,P5 /A IfS pSI4 Atmospheric Pressure (psig) EvacuatIon Cavity Pressure (pslg) Helium Cavity Backfill Pressure (psig)

>3 CD 5( OX/<J-tt Q) 3rO X).r1 (1) /J<J VET6LmB LCLCAA Test (Dwell) Time MSLD 8tari Test Reading MsLD Finish Test Reading Non-Adjusted Measured Leak Rate

= (mInutes) (He-cc/s) (He-ccls)

= [® - mJ (He-cclsec) .-

\

.............................................. Post-Test Calibration Records ....................... i .. i~'.i~ ....... . I ,II ~ Pm &,d () F ~ i<L()~8 /, cJ XI cJ -I cJ ~ r.o X IV - ')

Calibration Time CSL Temperature Temperature-Adjusted CSL MSLD "Zero" ReadIng MSLD Calibration Reading .1hh:mm:ss)

= C£'£c':CI b!,§k Rate (He-eels) ~=.jjj~!!:L -..1~ ...................................................... Leak Rate Records .....................................................

® tp /'Xlv-; N Pe - / J ~-,--ec..TN.3tF t...f3f4!I.... 2.2 x 10-7

f?re-TestIP-ost-Test Calibration Reading. - _. - - - Adjusted LeakRate- - - - _. , - - Leak Rate Criterion- - - ---Differenoe [® - <D] (±He-cc/s) =. [ED • ®] (He-cc/sec)

-(He-cclsec)

........................................... : Technician and Witness Records ........................................

!lr.tbf:,·bI ~~ HL-cA-!> [D /8.-:r: S£WJ)·~ 11I~~1.J l TeehliiCia/77fji)atJe Prillted Name Date

ZJ;~--- /3/'"'1-0. V\ Fla"'CltJ.~""" 1/ [21 LZo!/ -- Witness Signature Printed Name 1 Dale

pnoss
Text Box
CTU 1 After D1 Series, B
Page 6: 435-B Leakage Rate Test Records. · NRC Docket 71-9355 AREVA Federal Services LLC July 2013 . 435-B Leakage Rate Test Records . Notes: • Each set of records consists of two leakage

( A AREVA

SPECIFICATION PKG-LT-SPC-006 REVISION: o PROJECT NO: 01916.01.C004 PAGE: 9 of 11

Form 6-1 • LANL-B CTU ContainmeniSealLeakageRate Test '. '.,

11.'.' •••• 1"1 ••••••••••••• ".,./ ••••••••••••••••• ,. Package Information ...................................................

C-Tvt ~ 1.. I ~e ~Q. (2,\L{~1 'vJe;o • ill.30tJ I 1 Package Serial Number /Jate'

.................................................. Instrumentation Records ................................................

TtJH COr-! Ut--"<OO (}:Jo? (ofr304~ CAl.. ~'\ Mass Spectrometer Leak Detector (MSLD) Deserlpilon MSLD Serfal No. 'MSLD Calibration Due-Date

f:.\I;;;Se- Tr::.'M~ • LtR6SJ, {i,A(A/l.E:. SB!(~ 13-01- 006 foL3 I iL::J. Vhlemperature Me'iisur1ne, DevIce (TMD) DeSCriP~on S£ I{ J1fg}a1a'3~!J. q TMd fallbrrn Due Date

• ~ Y,UM n=C\~tJO/.O,'f ~. 2..1:.10- (Or..Jj .2-

t-\Mr~~S j.:z. "'(0-7 581.( - 'f 0 -03 - OOb I()L~;L[:J. Calibrated Standard Leak (CSL) Leak Rate (He-ce/s) CSL Serial No. csE Calibration Due Dete

(SAM-IE As T\'V\.~. A ~\lEj ~ ~

---Pressure Measurfng Device (PMD) Descrlpl/on PM/J Serfal No. PM/J CalibratIon Due Date

............................................... Pre-Test Calibration Records .......................................... '.

( iQ:~~.q~ ShOp ~, 5')( 1<0 ~8 ,,0 )(lO-W CD 1.5XtO- 7

Calibration Time CSL Temperature Temperature-Adjusted CSL MSLO "Zero" Reading MSLO Calibration Reading

(hh:mm:ss) ('For 'C) Leek Rate (He-cc/s) (He-cc/sec) (He-cc/sec)

...................................................... Leak Test Records ...... , ... 1 ..........................................

11-1.7 f,£M- 0.03 5; ~}A /'-/ -q "} p ~~!'l

Atmospheric Pressure (p.s.!g1", EvacuatIon Cavity Pressureips/g) ... Helium Cavity Backfill Pressure (fWTg),

>3 (i) 3. -< )(.()B ® 3.:2 )(roS ®No~"tS.~ Test (Dwell) Time MSLO Start Test Reading MSLD Finish Test Reading Non-Adjusted Measured Leak Rate

(minutes) (He-cc/s) (He-cc/s) [® • 01. (He-cc/sec)

.............................................. Post-Test Calibration Records ............ ' ..............................

i.2 ~ S'? frt\. s-S@r- B.I? )(10-8 1.0 '1<:.1'0- 10 @ /.2 't-{I'J- 7

CalIbration Time CSL Temperature Temperature-Adjusted CSL MSLO "Zero" ReadIng MSLD Calibration Reading

(hh:mm) ('F or 'C) Leak Rate (He-cc/s) (He-cc/seo) . (He-cc/seol

...................................................... Leak Rate Records .....................................................

® 0 . .5 )<.(O~ 7 Ni)~~tE* 2.2 x 10.7

- - Pre-TesllPost-Test Gal/braflon-Readlng - - - - - Adjusted Leak Rate - - -_.- - - -- - Gorreeted·LeaifRate Crller[on·- -'

~

DIfference [~. (l)j (±He-co/s)_ ~-

[® - ®j (He-cc/sec) (He-c~sec)

............................................ Technician and Witness Records ........................................

~~dJ~·/~~>--. 15.:lcJE\tJA~1r< '--ciJ:~{?) ujs/u v Teohnl{:/an Signature PrinteCj'Naiiie Date

L'~ 4~~s SlQ;;ure iSr¥o,IA. p'~",c;,,~~~ II L.ro LZb'l

. Printed ame i Ddte

pnoss
Text Box
CTU 1 Before D2 Series, A
Page 7: 435-B Leakage Rate Test Records. · NRC Docket 71-9355 AREVA Federal Services LLC July 2013 . 435-B Leakage Rate Test Records . Notes: • Each set of records consists of two leakage

A AREVA

SPECIFICATION PKG-LT-SPC-006 REVISION: o PROJECT NO: 01916.01.C004 PAGE: 10 of 11

Form 6-2 - LANL-B CTU Vent Port Seal Leakage Rate Test ................ , ................................. Package Information ' ... , ................................... , ..........

CTU-i i ~~~ ~~ t.-TlA-1. WGl:.. IIba!J.I i

Package Serial Number Dite 7 .

............. ........................ ...... ....... Instrumentation Records ................................................

rNA'cON tA i.- -2CJo O..Qo2 (Q11C~~ QA~ Mass Spectrometer Leak Delector (MSLD) Description MSLD Serial No. /WSi.D Calibration Due oits

I-h;;t SIC ~M.f'. / PR~~. G,l\ «&£ 584-/3-01-006 (Vis,) (2-\). Temperature Measiffring Device (TMD) DescrlPtlo~

'. b,CUJ.{M. TECHtJO(,O&'f_~ 2. ¥.w.-HAsrtrJ&~ J. 2. '1<.(0-7

{lA.ACi+~ lJ6'

$.'i.£n;M. ~

&1-{ TMD Serial No. q TMD ~1frtn Due Date S -1[0-03- 0...< 10 3f rz-sg I-( .. f.{ 0 -03 -O'Oh 10 }stlr:L

Calibrated standard Leak (CSL) Leak Rate (He-cc/s) CSL Serial No. CSL CalibratIon Due Date

(~AIVvE A-s. TM~. A~J\ii) - -'-F4-essure Measuring DeVice (PMD) DescrIption PMD SerIal No . PMD Calibration Due Dale

....................... " ...................... Pre-Test Calibration Records ......... , " .. , ............................

J~ ! 5"2 PIt-\. 52 ilF g,0 ~(I1-B J 0 -10 , XI£I CD i. R y--{(F I Calibration Time CSL Temperature Temperature-Adjusted CSL MSLD "Zero" Reading MSLD Calibration Reading

-~~l1.!1i!n~~~i:E or 'C) _ Leak Ra!tif1e-ccl§2 .~~clse~l.

, .. ""'" ...... ,,, ................... ,,, .... , ... , .... Leak Test Records .. ,,,. " ............................. ' ...............

1!.-(,7 ("S~ 0.035 pSM· (4.1, P~fA Atmospheiic Pressure (pslg) Evacuation Cavlly Pressure (pslg) Hel/um Cavity Backfill Pressure (psig)

>3 ~ 1-(. I.( ~(O-9 ® ..2. & )(:JO_C} (1) No bGrtc:rt\~tt: Lbflk;'

Test (DwelD Time MSLD start Tesl Reading MSLD Finish Test Reading Non-Adjusted Measured Leak Rate (minutes) (He-ecls) (He-ecls) [® - Q) j (He-celsec)

= - = -

.,. , .. " ....... , .. " .. " ..... " ... " ..... "". POSt-Test Calibration Records .', .. " ... " .. , .. " ... "." ........ , .... , ..

I ~07 PI'll\. s-g uE 8/0 )(lO-S J -flO ',O)UO ® nY-IfF? Calibration Time CSL Temperature Temperature-Adjusted CSL MSLD "Zero" Reading MSLD Calibration Reading

~h;mm:ss) ('£9.CC) Lyak RaleJHe-cc/s) .J!:Ie-cclsee)~

.............. " .......... " .............. """""" Leak Rate Records ..... "" ............ " ........... ". , .. ,,' ..... " .. ,

® (). i X\ 0.-7 tv 0 Da--g.,,~€ Ls~ 2.2 x 10-7 .. F2re-Test/f?osl-Test Calibration Reading. - - -. -AdJusled LeakRate- -- ~ ... , - - Leak Rate Crllerlon- .- . - - -

DIfference .[® - <DI (±He-ce/s) . [8) • ®j (He-cclsee) -

(He-cc/sec)

..... """'"''" ......... "".,, ...... ,''' Technician and Witness Records ..... , .... " .. ,." ................... ".

~~/!1l/~~ Technician Signature

tS . '"3'. Sew\4~ ltv( /.--- cff5 f/) Printed Nime

,·,[soLe { Dalte

/~/. Witness Signature

i3r~o.lA. I=lfA"'&.%Q~ Printed ame

II/!DLZ011 Date

pnoss
Text Box
CTU 1 Before D2 Series, B
Page 8: 435-B Leakage Rate Test Records. · NRC Docket 71-9355 AREVA Federal Services LLC July 2013 . 435-B Leakage Rate Test Records . Notes: • Each set of records consists of two leakage

( A AREVA

SPECIFICATION PKG-L T-SPC-006 REVISION: o PROJECT NO: .01916.01.C004 PAGE: 9 of 11

Form 6-1· LANL-B CTU Containment Seal Leakage Rate Test

........... , ............................... , ...... Package Information .0000 ..................................... 00 .......

CT\1- ~ AFTE~ p~ C,.TtA ~.1.. 12-/ s'il I

Package Serial Number Date

......................... 00 •• 00 ................... Instrumentation Records 0000 ....... 00 •• , ....................... 00 .......

:r:N~toN Ut..-2oo 02JD7 (Of'e-etPtDR CAL) Mass Spectrometer Leak Detector (MSLD) Descrlpilon MSLD Serial No. MstD Calibration Due Date

BGISr:: 1'£:(Vtf. Lf((ESI'. {],AV.GE 5SI(-13 -of-oob !o!.:.3( ~/2. VI {emperature Measuflng Device (TMD) DescrlPti~ g cr. TMD Serial NoO ~ 9 TMD 17!,brr'0n Due Date

~ A- u(.( 1\.1. lE"C-WO(.OGV 2.:'<" KCO- S - 'to-03 - :2 (.J 3( (J!.

. . I-tA~rttJC,j' 1.2- ICM-? s~;tr·-t.co - 03 -rO 0 & t/;h{ L{L

Calibrated Standard Leak (CSL) Leak Rate (He-cc/s) CSL Ser/al No. CSL 6alib~tlon Due Date

ffi A(M.G:: As TM ~ ~V£\ - -PreSsure Measuring Device (PMD) DeseripEron PMD Serial No • PMD Calibration Due Date

..................... 00 ........................ Pre-Test Calibration Records ...........................................

(')~ i ~ sc, f'M.. s-s 0p 7. S ~ (0-8 r 0 -fO . )( to <D I.O~to-7

Calibration Time CSL Temperature Temperature-Adjusted CSL MSLD "Zero" Reading MSLD Calibration Reading

- (hh:mm:ss2 (,For'cl Leak Rate (He-celsl ~ (He-cels~.. (He-celsee)

...................................................... Leak Test Records .......... : ........................... 00 ....... 00 ....

/4. 8 ~.s)ft (J.OO I.( MIA- (S . .2. rS~A

Atmospheric Pressure (p§lg)"". Evacuation Cavity Pressure "(psigr,, Helium Cavity Backfill Pressure (jf§T(j)'

~3 ~ 3. ~ )c;.tO-S Q) 3.7>dO-8 ® fJOJJ k~ {;.a.,~ Test (Dwell) Time MSLD start Test Reading MSLD FInIsh Test Reading Non-Adjusted Measured Leak Rate

(mInutes) (He-eels) (He-eels) I ® • Q) 1. (He-ce/sec)

................ ' ..... 00 •• ;00 ................. Post-Test Calibration Records ...... 0000 .................................

;2.)0::<' I'M. 53P,~ ,.;8)(.(08 '0 1.0 );.(0-< ® r.o 'K«()~ 7

. -. Calibration Time CSL Temperature Temperature-Adjusted CSL MSLD 'Zero" ReadIng MSLD Callbrallon Reading

(hh:mml .. .r.E!2r 'Cl teak Rate (He-ce/sl 1He-celsee) . fHe-celsecl .

.00.00.00 .................... 00 .............. 00 ....... Leak Rate Records ................ 00 ................ 00 .................

® .Li~% }Jo.~~ABr£ t.~k 2.2 x 10.7

• - Pre-TestIPost-TeslGalibration-Readlng - - - • - Adjusted Leak Rate - - -- _ ••• - Gorreeted·LealfRaie Crlterlon·- .,

-=-Dlffe!~.~. <D] (tHe-eels) [S) • ®] (He-cc/see) ~ ~ (He-cclsee)

I ................. 00 ......................... Technician and Witness Records ........................................

~-~6i-.. B. 3". ~£\JAR, 'J 2.-/ sir ( Technician Signature Printed Name 'Date

.. 8ci3:~ !3,..~a.V\. r::-Io. V\ ""-{) Co. '" 'Lb LZlJ'l Printed Name D'ate

pnoss
Text Box
CTU 1 After D2 Series, A (note: P2 was last test in D2 Series)
Page 9: 435-B Leakage Rate Test Records. · NRC Docket 71-9355 AREVA Federal Services LLC July 2013 . 435-B Leakage Rate Test Records . Notes: • Each set of records consists of two leakage

(

(v1Ac(.\ IIJt:' 9YSnSM. :

A AREVA

SPECIFICATION PKG-LT-SPC-006 REVISION: o PROJECT NO: 01916.01.C004 PAGE: 10 of 11

Form 6-2 - LANL-B CTU Vent Port Sea! Leakage Rate Test

••••••••••••••• , ........... J •••••••••••••••••••••• Package Information t • , •• , • I ••••••••• I •••••••••••••••• , •• , • I •••••••• ~ ••

o TU-.1.. A-FTe.~ f:z c...\U *,i /2.L5/(( Package Serial NUmber Date

.................................................. Instrumentation Records ................................................

];:N~CotJ UL-.200 c()~o '7 0r!£MWf' CAl.} Mass speo/inmeter Leak Detec/or (MSLD) Description MSLD SerIal No. MSLD Cal/brat/on Due Date

H~LSE {E-t\{r./ fR.~. tbAv-&E 5£1.(-13 -01- GOG 10!..:?,( Lf"z V Temperat~e~surlng DevIce (TMD) Descrfpilo!l<g g If' TMD Serial No. ~ q TMD ~1rzon Due Date

: A-C-Llu .. J<1/\. EC& NO~O&Y 2 . .:z I<- ['\1- ~ -i{tJ-03- a (0 51 1-'<...

I-IMr\lJ G..s / . .2. K(O-7 sSI.( - LfO-()3 -oo~ /o{3ILf.2...

Calibrated Standard Leak (CSL) Leak Rate (He-eels) CSL Serial No. CSL Calibration Due Date

C~AM£ As T~!b A-&JvE"j - -Pressure Measuri[!Il Device (PMD) Description PMD Serial No . PMD Cailbratlon Due Date

............................................... Pre-Test Calibration Records ...........................................

;<"-'O.Q... f';t,. s..;(JF /.gl'<..co- [3 -to UJ K..fC' CD (.G.'f..-1.0 -7

Calibration Time CSL Temperature Temperature-Adjusted CSL MSLD "Zero" Reading MSLD Calibration ReadIng

~!:!!B!l!!J2_ J.:tor'Q LeakR~~.~~=~(ti!!:::E..~~

...................................................... Leak Test Records .....................................................

Pi. 8 f'~~A 0.00l( f~ ~A ,S. -Z f~~A

Atmospheric Pressure (pslg) EvacuatIon Cavity Pressure (ps/g) Helium Cavity Backfill Pressure (psig)

>3 Q) -<.9 'f.t O- Q ® J.I'dO-9 @ IV f) fb-rEt-TAl51.lS ttEAk:

Test (DweiO Time MSLD Start Test Reading MsLD Finish Test Reading Non-Adjusted Measured Leak Rate

= (minutes) (He-eels)

= (He-eels)

- = .= [® - m] (He-eel sec)

... " ......................................... Post-Test Calibration Records ...........................................

.Q..~ (S PM. 5(,"'F g.SK.!O-B f.O 1'..(0.- 0 ~ /.0 '(:..(0- 7

Calibration Time CSL Temperature Temperature-Adjusted CSL MSLD "Zero" Reading MSLD Calibration Reading

=~~~~('For'q L~!lk Rate (He-ccls) ~.~~~cclse.rV~ lHe-cclsec)

...................................................... Leak Rate Records .....................................................

® A..;.. ¢- N'D k,g.~ Lsttk 2.2 x 10-7

f?re-TestJP-ost-Test Calibration Reading. - .-. -- -Adjusted LeakRate- - - - _., . - Leak Rate Criterion- .. .. --Difference [(j) - (ill (±He-cels)

-[® • ®] (He-colsec)

~

(He-co/see)

........... " ................................ Technician and Witness Records ...................... ~ .................

~dic~fit B.0.&VJA~" f:2 .. L s/({ Printed Name I Datb

~;;Js~ .[5r't.tAV\ F[C'. Vl"",§"V\ /2. LsLzOII --- Witness SIgnature

I Printed Name Dste

pnoss
Text Box
CTU 1 After D2 Series, B (note: P2 was last test in D2 Series)
Page 10: 435-B Leakage Rate Test Records. · NRC Docket 71-9355 AREVA Federal Services LLC July 2013 . 435-B Leakage Rate Test Records . Notes: • Each set of records consists of two leakage

A AREVA

SPECIFICATION PKG-L T-SPC-006 REVISION: o PROJECT NO; 01916.01.C004 PAGE: 9 of 11

Form 6-1 - LANL-B CTU Containment Seal Leakage Rate Test

.......... ........................................ Package Information ................................................. ..

/2/7/2012 Package Serial Number Date

.................................................. Instrumentation Records .............................................. ..

Mass Spectronieter Leak Deiector (MSLO) Deseripiion MSLO Serial No.

£8L( ~ 13-dFrJV,b Temperature Measuring Device (TMD) DescrilJ,tion

V AC Tt';Cf-/ < .2 Xld - (j

TMD Serfal No. 584 - 4()~oJ -6 2- ')

HIlSTlI'{l}5 /.GXI() ~ 7 S84- lIo-03 -dOG

Calibrated Standard Leak (CSL) Leak Rate (He-cels) . CSL Serfal No.

S lEe T 11 D 4130 tJE

I

{JP'R C-4L I B MSLo Calibration Due Date

1&-3/- 20/2 TMD Calibration Due Date

IcJ-J/-20/"G ,h-)1 r Cd rL CSL Calibration Due Date

Pressure Measuring Device (PMD) Desc!fE!!£ll. PMD Serial No. PMD Calibration f!ue ~e=

............................................... Pre-Test Calibration Records .......................................... .

1038 51°F 71'-1y/0-8 l(u){!O-'u CD I,d &0-)

Calibration Time CSL Temperature Temperature-Adjusted CSL MSLD "Zero" Reading MSLD Calibration Reading

(hh:mm:ss) = (,F or 'C) Leak Rate (fie-eels) _._<tf!!:;,.oclse.El..._ (He-col sec)

....................... : .......................... , ... Leak Test Records .......... , ........................................ ..

(?,Q 1'31 A: Atmospheric Pressure (ps}gL, Evacuatfon Cavity Pressure "Cps/g)", Helium Cavity Backfifl Pressure (P$lg)'

> 3 0 2,0 i/o - 9 Q) 1.5 X/t.F 7 @NuVW"-CTP6L&Lmi:. Test (DWellj Time MSLo Start Test Reading MSLO FinIsh Test Reading Non-Adjusted Measured Leak Rate

=_ (mInutes) (He-eels) = (He-ce(!L [® - @l. (He-cclsee) _ .

......................... ..................... Post-Test Calibration Records .......................................... .

/I 00 . ,52,(/ F /,8 X((}-eJ ho )(fa-1d ® l,uUa-) Calibration Time CSL Temperature Temperature-Adjusted CSL MSLD "Zero" Reading MSLD Calibration Reading

~~~ Leak Rate ~L=~He-ce/see2_ (fje-eclseel..

...................................................... Leak Rate Records .......................... : ........................ ..

illL J NJYt;;~~TAi3L-F AEfhI( () 2.2 X 10-7

® - - -. - - - - - Pre-Test/Posl-TesI8aHbration-Reading - - - - - AdjusiedLeakRaie - --- - - -- - Gorreeled-LeakRale Crllerion··- _. - -

~J;2, -<D] (±He-c£l!2. §~ {® - ®] (He-cc/sec)~~~_,_~ ....

............................................ Technician and Witness Records ........................... : ... Qo/'j'/lW

>r;L~~ 11L cA3fV1J)L~(J/,I--TechnIcian Signature Printed Name Date

If? '7 tJ . - lJr~M F(QlI\cx<)C(V\.. a/71z-vi!

~ Printed Name 'bate

8~d 'I

pnoss
Text Box
CTU 2 Before D3/D4 Series, A
Page 11: 435-B Leakage Rate Test Records. · NRC Docket 71-9355 AREVA Federal Services LLC July 2013 . 435-B Leakage Rate Test Records . Notes: • Each set of records consists of two leakage

A AREVA

SPECIFICATION PKG-LT-SPC-D06 REVISION: o PROJECT NO: 01916.D1.C004 PAGE: 10 of 11

Form 6-2 - LANL-B CTU Vent Port Seal Leakage Rate Test ••••• " ...... ~ •••••••••••••• , ••• t I •• I ., •• , 'I •• " • I Package Information ,.11.," •••••••••••••• , •• , •• , ••••••••••••••••••••••

etLi-2 BERJ1e-/)-~ t2-L2L20fL =

Package Serial Number Date

., ................................................ Instrumentation Records ................................................ t

t.N 1=1 CoAl 7/ L 'CO\) 0202 CJPIC ML IB I Mass Spectrometer Lesk Detector (MSLD) Description MSLD Serlal No. MSLD Calibration Due Date

HEISt? 7C-mjJ /Ptr£S!J 56"4- 13r-o/- CXJ ~ /0 -3/- '&.J/c Temperature Measuring DeViCe (TMD) DeSCrillon TMD Serial No. TMD Callbrat/on Due Dais

tlk. T£U-l ' 2,< X,tJ - . 58t/-IjcJ~(j)-0cl Id~ ') f - CD (Z. I-h4..sTl N G S 1~2 X/cJ~? 5,a IJ.-'-Iu ~cJ3 -0cJ LcJ~ 1,/- 2u I?...,

Calibrated standard Leak (CSL) Leak Ride (He-ec/s) CsL Serial No. CSL Cslibration Due Date

'sEE. T'MD Afuvc Pressure Measuring Device (PMD~ Deserletion PMD Ser/al No, PMD Calibration Due Date

.,' ........................ " .................. Pre-Test Calibration Records ...........................................

llOQ 52,6 OJ:- 7,,9 X/o-8. /r 0 i/cr lO CD L J,£u- ') Csllbration Tlm& CSL Temperature Temperature-Adjusted CSL MSLD "Zero" Reading MSLD Callbraflon Reading

=--.C!2!EI2.!!lL Cpor'cL LeakRate (He-~~~els~=. ~

.................................... ; ................. Leak Test Records .. , ............................ , ....... , .............

IY,7P.5(A- c?,(?PS l4 f!5.1P,s/A Atmospheric Pressure (pslg) Evacuation Cavity Pressure (ps/g) Helium Cavity Backfill Pressure (pslg)

::::3 Q) Ij. () XI!.!. -9 d) 2/2X[Q .... ' GJ)~~ I.L:::lfi'Ak. Test (Dwe/lj Time MSLD Start Test Reading MsLD Finish Test Reading Non-Adjusted Measured Leak Rate

(minutes) (He-eels) (He-eels) [® • ill] (He-eel sec) . = . =

... ....................... ......... ........... Post-Test Calibration Records ...........................................

uo8 5.3()j:. 11 Z1X!u- 8 I Ii) va- IU ® /,t.J~Q-7 Calibration Time cst Temperature Temperature-Adjusted CSL MSLD ~'Zero" Reading MSLD Calibration Reading

iblE!Jm:ss) - CfJ?r'C;:L ~ak Rste (He-eels) {j-Ie-cclsecl J,He-cc/secL ~

................................................. " ... Leak Rate Records .................................... , .. , .............

® 0 - f\!oVE:/'EcIAl3U:: LtA-~ 2.2 x 10.7

. Rre-TesllP-ost-Test Calibration Reading. .•. -- -Adjusted LeakRafe. -- . _. , - - Leak Rate Criter/on- - . ---Difference [®. Ul] (±He-ccls) [®. ®] (He-eel sec) (He-~seG)

~--~--~~= .-"~2~" Technician ~~ ::s;;ecordS ,.....,;;j;jjjd "",

Technician Signature Printed Name Dale

~ieJ.~ !3 r ~{)tV' FIOIVlt?oCijct ...... I ZL7/Z 0' / • Witness S/ana/ure Prinled Namr}- bale

pnoss
Text Box
CTU 2 Before D3/D4 Series, B
Page 12: 435-B Leakage Rate Test Records. · NRC Docket 71-9355 AREVA Federal Services LLC July 2013 . 435-B Leakage Rate Test Records . Notes: • Each set of records consists of two leakage

A AREVA

SPECIFICATION PKG-LT-SPC-006 REVISION: o PROJECT NO: .01916.01.C004 PAGE: . 9 of 11

Form 6-1 • LANL-B CTU Containment Seal Leakage Rate Test

................ ,.................................. Package Information ................................................. ..

Q:r1A. *..2 AFrER.);)L[ S;/SR.(~ UrJ\i *,2. p-/is/t I Package Serial Numbec~~ _= i Oats

.................................................. Instrumentation Records ................................ , ............. ..

r!JPic.Ot-J tILL ~.R.oO 0.20 7 (<DPE:~A:TDR. CAL \

Ma~s Spectromefer.Leak Deleelor (MSLO) Descrlpiion MSLD Serial No, MSLD Calibration Due [JElle

H'GS£-~W\FJ frcES.s . bA-cti¥ 5'31( -1'3 -0 r,... f}rtJb to /3 ( (,2 WI A , " ~Ne I j Temperature Meadurlng Dtl'1..~e (TMQ) DescrIption;, 5' 0 I'F TMD Seri§) No. t.1 TM~ C~!brat(on Due Daia

I'\~~ ~VwAI~t~~~~~~~~~I~~·~~~O~~~~L-[~~~.~~~K~rO~~~ __ ~~O~T~-~~~O~-~O~~-~O~~~l ______ ~/'~O~/"~~(/~lf~~=-__ --4

S-ySTEM.~ /-tASn't-lG-S J~;Z 'K(O-7 S8l(:-4o-0S -OOp tD{3(/I~

Calibrated Standard Leak (CSL) Leak Rale (He-eols) CSL SerIal No. CSL Callbra/ion DUe Dale

(SAMe As TfYlfJ AroVr£ \ Prfissure Measuring DevIce (PMD) Descr~ = PMD Serial No. PMD Calibration (Jue ~

.................. , ............................ Pre-Test Calibration Records .......................................... .

/!S{ f-TM. 5s<:'[ fU{ )<,.(O-§ /.0 >'-[0-1" <D /.OX(O~7 Calibration Time CSL Temperature Temperature-Adjusted CSL MSLO "Zero" Reading MSLD Calibration Reading

(hh:mm:ss) = ~E2L.'C) = .!zakRa~r.t!2::Ec/sl= (He-~o).. (He-ccls8o)

....... " ........................................ : .... Leak Test Records ......... d ........................................ ..

IS. r ('s(~ AtmospherIo Pressure (psM,,, B/acus/lon Cavity Pressureypslg)." Helium Cavity Backfill Pressure (ij'~rg)'

~3 Q) .2.S X;ft"2J ® .,2,S'XtO-6 @N<{)'tE:TE.~4?tk. Test (Dwell) Time MSLD Start Test Reading MSLD Finish Test Reading Non-Adjusted Measured Leak Rata

(minutes) (He-eels) (He-cc/s) == [®. ml. (He-~sec) , ..

, ............... , ............................. Post-Test Calibration Records .......................................... .

g~f{4M.. S'i(°F B.2X(O-8 lO'l<--[o-(O ® ).O'f-(O-7

Calibration Time CSL Temperature Temperature-Adjusted CSL MSLD "Zero" ReadIng MSLD Callbrallon Reading

~1f2l1~~~Leak Rs!!...(1f:;;Rc./}.~---f.He;22!se~Jle-:cc/~ ~

.............................................. , .. " .... L'eak Rate Records .................................................... .

® g-- N~ ~E~~l£ l..E.Prk. 2.2 }( 10.7

- - - . ' .. - Pre-TestIPost-Tesl Gallbrst/onReadlng - - - - - Adjusted Leak Rate - - -- -. .. - Gorreeted,Leaif Ra/a Crlterion·- -,

~~~f_{s) _______ e [@'®Jl!:!!~~~' __ -J

............................................ Technician and Witness Records ..................................... , ..

Printed Name 't~/'S/((

, Date

Printed Name o.J

pnoss
Text Box
CTU 2 After D3/D4 Series, A
Page 13: 435-B Leakage Rate Test Records. · NRC Docket 71-9355 AREVA Federal Services LLC July 2013 . 435-B Leakage Rate Test Records . Notes: • Each set of records consists of two leakage

fA AREVA

SPECIFICATION PKG·LT·SPC·006 REVISION: o PROJECT NO: 01916.01.C004 PAGE: . 10 of 11

Form 6·2 - LANL·B CTU Vent Port Seal Leakage Rate Test. .... ...... ...................... ..... ............. Package Information ................................................. ..

C Tl{ #2. APTER tLf S£R\~~ V\vh- 4\02. /,!)--!f3(U Package Serial Number I Date

.................................................. Instrumentatlon Records ............. : .... : ............................ .

:rwF~C.ON t.1t--~ <DOe 2.0 "? ~f\:'=RATD~ CAt-) Mass Spectrometer Leak De/ector (MSLO) Desoription MSLO Serlsl No. MS Calibration Due Dare

............................................... Pre-Test Calibration Records ......................................... ..

g~(IA-M ~tr(:)F fJ.:<'1<-C()-8 /'.()l'.to- iO CD /.0,'(;..1 0 - 7 Calibration Time CSL Temperature Temperature-Adjusted CSL MSLO ''Zero'' Reading MSLD Calibration Reading

~t!.iJ;Ell!!2 _ J:£or'cL= . Leak~~_~SJ21=~=.,d~o/se£~ ...................................................... Leak Test Records ................................................... ..

Atmospherio Pressure (pslg) Evaouatlon Cavity pressura (pslg) HelIum Cavity Backfill Pressure (ps/g)

~3 G) s.Oy(g-6 ® J.l[Y-ft:P-q @N.o~a-aTMI€LEAk Test (DweJO Time MSLO Start Test Reading MsLD Finish Test Reading Non-Adjusted Measured Leak Rate

~~= (minutes) (He-co/s) (He-eels) = .. [® - 0] (He-Gelsee)

.............................................. Post-Test Callbration Records .......................................... .

8.-'.2.7 AM... 5G tJr= S.l.[ 'K(tFB 1,0 ><fo~ro (5) /'.0)<. (0-7 Calibrqtlon Time CSL Temperature Temperalure-Adjusted CSL MSLD "Zero" Reading MSLD Calibration Reqdlng

-.;....~mm:sL_ n ......... ~~Rate (He-ee/s) J!je-co/sew_ _ (He~

...................................................... Leak Rate Records .................................................... .

® -e- _ No ~TU(A~(£ LEAk 2.2 x 10.7

. - - .. , _. - ... P-re-TestIP-ost-Test Calibration Reqdlng. - _. - .- -Adjusted LeakRate- . - ..... - - Leak Role Crlletion- _ •.. -Olff~e [(j). CD] (±He-oels) .~ [@ • ~e-co/sec) ~~~ (He:5!seo)

............................................ Technician and Witness Records ....................................... ..

Printed Name

iJ",%Co,v-- FICl """"l"' ....... / Printed Name <..j

/2.-'(r:s/u Dale

l2.h:s/ei>'/ I oite

B9't I

pnoss
Text Box
CTU 2 After D3/D4 Series, B
Page 14: 435-B Leakage Rate Test Records. · NRC Docket 71-9355 AREVA Federal Services LLC July 2013 . 435-B Leakage Rate Test Records . Notes: • Each set of records consists of two leakage

\. '-.. ~ FORM 6-3

USE PROCEDURE: 6343-P-03 , LANl-B Containment Seal leakage Rate Test

CUSTOMER: AREVA FEDERAL SERVICES CONTRACT:P0#10C3003776 PROJECT: LANL-B

........................... --_ ...... _-_ .............. _ ........ _ ................ ~ .. -- .. Package Information ..................... -................. _ ..... -................. _ ................................

Lt}J.) L- a ~:3 /L-L7-1f Package Serial Number Date

""" ...................... _ ......... _ ........ lnstrumentation Records ................................. , ............

JAP./A/.J I/st !lfl-cd-orr- Ltl/!)I J.,.03 </ i'1UOC.1-6 ('}s~ Mass Spectrometer Leak Detector (MSLD) DescrjJtlon MSLD Serial No. MSLD CBJibnJtion Due Date

rJ.l}/$..5).. Ii: A-B()J?~ O<J-t!)(--lv T~ MeaSuring Device (TMD) DescrjJtion TMD Serial No. TMD CB1ibnJlion Due DaIs

3. 25'y 10-5' () 7i.." F- A-d. IJ} '-'.di' !5 Z"OB -L 2-caBbnJled standard Leak (CSt) Leak Rate (He-<;cts) Cst. Serial No. CSL CsIibration Due Date

-r1<,t~e l1-~e P~eS5af)e Mep- A /3 (,IJ &":3 0 /O ... .2.~ ... l2-Pressure Measuring Device (PMD) DesctfJtion PAW Serial No. PMD Calibration Due DB1B

............................................ Pre-Test calibration Records ........................ _ ................

iia~-oPM _,7 <J r l)..,~ tt:r~ 2..-It to" <; (J) 2· If)C JC) --8' btationTime cst. Temperature Temperatme-AdjuslBd Cst MSLD "Zero- Reading MSI.D C81ibt8tion Reading

fhh·mm·",,1 C-For-C) IAak Rate (HB-ccts) (He-cclsec) (He-cc/sec)

................................. _ ................. leak Test, Records ............................•.....................

o D~/~ -1l/.3~ Atmosphe;frPress (pslfi) EVacuation cavity Pressure (pslg)

,J "~ Helium cavJYSt Pressure (psig)

:?!:3 ® 4.1)<. tb-Y ® tI. cJ jt. lo-q ® L: ;J...o X t rr9

Test (DweJ1) Time MSLD start Test Rflading MSLD Finish Test Retiding Non-MjusIBd Measured LeakRate (mtJu/.e$) {~clsJ (HfH:c/$) l®· ®J (He-cctsec)

........................................... Post-Test calibration Records ........................................

:2: (0 lerrt Sffop .,"8' & k'1(f" r G> ..iIOX/!)";? 2. z,xto

Ca/ibtalion T. CSL TfJlTJperature T~justedCst. MSLD "Zero- Reading MSLD CaJibratian Reading ~ (-For-C) Leak Rate (He-ccl8) (He-cctsec) (He-ccIsec)

................................................... Leak Rate Records ..••..............................................

@ ".Pi' (P.If 1./. OX t{)~ 2.2 X 10-7

Pre-TestIPost-TflSt CallbtaIion Rflading Adjusted LBak RatlIJ COrrected Leak Rate Crtenon Dlfetem:e (~ - 0] (±He-ccls) (@ - OJ (He-ccfsee) (He-4;c/seC)

..................................•....... Technician and Witness Records ............................... _ ......

,Ibk&~ ~ If tJiJltn(J;f// dr# [tltltf ti/t d·,'!?",,!1 Printed e Dale

~-=-\c, l<~,': \<'''':,l Afs ~~ "/,1)11 Wlne.ss SVnawm Printed Name Date

pnoss
Text Box
CTU 3 Before D5 Series, A
Page 15: 435-B Leakage Rate Test Records. · NRC Docket 71-9355 AREVA Federal Services LLC July 2013 . 435-B Leakage Rate Test Records . Notes: • Each set of records consists of two leakage

~ FORM 6-4 USE PROCEDURE: 6343-P-03 ,

LANL·B VENT PORT LEAKAGE RATE TEST CUSTOMER: AREVA FEDERAL SERVICES CONTRACT: PO# 10C3003776 PROJECT: LANL-B

... ~ . ..- .............. _ .... __ ..... _ ....................... -......... -..................... - Package Information ................................................

LIIIJt- 13. • ()3 II-,,-I( .. Package Serial Number Date

..................................... , ...... , .. Instrumentation Records ..............................................

tlAIUdJi qstJ I11Ac~ rr LLI/Of Lo3 <I (flflfl. to use Mass Spectrometer Leak Detector (MSLD) Description MSLD Serial No. MSLD CaJibnJtion Due Date

rt.tt"'~.5)"5 A5WRo.5 O~-O(-IL Temperature Measuring Device (TMD) Description TMD SerlalNo. TMDcaJibnJ1ion Due Date

.:! I 2.5" X LO~ .fi?u 7~ (J F A-BW Goer (22 -08' -i L ClJIibrated Standard Leak (C )Leak Rate {He-ccIs) CSL SeritJl No. cst CaIibtation Due Date

rAA-CeABUE lM~5()le' lI1rt-MtL fodW<3:!;o Ib"-2&-Il-Pressure Measuring Device (PMD) Descrj1tion PMD Serial No . PMD Ca1ibration Due Date

................... ~ ........................ Pre-Test calibration Records .........................................

£,:£7 //4\ ~~r g.LY (O-"if 2-X {[7'1' (j) 2. t(y / (J.2 caDbm/ion Time cst Temperature Temperature....Ajusted CSL MSLD "Zero" Reading MSLD cafbnJtion Reading

(1:J!lJJm) ("Foree) Leak Rate (He-cc/$) (He-cclsec) (He-cclsec)

................................................... Leak Test Records .•.................. _'_' ..........................

0 -*y,~ !dfav: !c'tl~{Je (pstJ) Atmospheric Pressure (pstJ) EvacUstion cavSU18 (psig)

>3 ® g. () )I ItJ-f ® 2.ox 10"'1 ® L.. 2.K/t/..$/ Test (DweI) Time MSLD start Test Reading MSLD Finish Test Reading Non-Adjusted Measured Leak Rate

(mintJtes) (He-ccI$) (fffHxIs) l®- ®) (~c/secJ

.......................•................... Post-Test calibration Records ........................................

tdttm I~"f" j, .)Jt t{}"~ J,. ()J. 1'0 ... 9 G> 2~"Y tfJA" cali . Time CSL Temperature T~AdjustedCSL MSLD "Zero- Reading MSLD cafbnJtion Reading

am:~ rFor-C) Leak Rate (He-cc/$) (H&-cc/sec) (He-4;cI:;ec)

................................................... Leak Rate Records ...•..............................................

@ a d: J. ()x tel" 2.2 X 10-7

Pre-Test/Po$t-Test Calibration Reading Adjusted Leak Rate Leak Rate Criterion Difference {® - (i») (±He-cc/s) [® - @) (Ha-ccIsec) (Hs-cc/sec)

.........................................• Technician and Witness Records ......................................

I £,.~ ;gil mJJfl£1l M'1fi .:II- ItftI~ ~ /1474f

Technician SIgnature PrinlBd Name Date

~-' ~. 1<~\l1~ l<,?antfS QAe 11 L'U" WA'ne.ss Signature PdrIted

.,'.,

pnoss
Text Box
CTU 3 Before D5 Series, B
Page 16: 435-B Leakage Rate Test Records. · NRC Docket 71-9355 AREVA Federal Services LLC July 2013 . 435-B Leakage Rate Test Records . Notes: • Each set of records consists of two leakage

~ (/YlU-1-/ . (S6)

tm 3 AP~ DS- S .g12/~S fi'9r A

AREVA SPECIFICATION PKG-L T-SPC-006 REVISION: 0

PROJECT NO: 01916.01.COO4 PAGE: 9 of 11

Form 6-1 • LANL-8 CTU Containment Seal Leakage Rate Test

I •• , •• , ~., ••• f'l ••••••••••••••••••••••••••• II ••••• Package Information .., ••••• 11 ••• , ............... , ••••••• '.1 ••••••••••••

CT<1- 3, 0.ETE& 0.- :i. 1'2- iL t:.2 Lz() .iL Package Serial Number Date

=~

" .......................... "'"'' .. , ...... , ..... I nstrumentation Records ........................................... " ...

It:1f/Ca.N '21L~f2. 0 0202 cJf'R CA-l-J ~ Mass Spectrometer Leak Defecior (MSLD) Descriptfon MSLD Serial No. MSLD Calibration Due Date

H EJ..5 E.,-cm e fi2. f1. c s 3> . 58L/ -t"z;-UL-uoh ! rJ I J{i.IJ-;;t,mperature Measuring Device (TMD) Description TMD Serial No. TMD ca';;atlon Due Date

4C-l Ti:=C-H, ,;2. ,J.. J..I tJ - 8 584 -t/?I-O) - O:J-! tJ /:u. 12..

L±i15. Ti .IV c.. ~ L')'f.-/~ -7 1l.1tJ. '- !:itl ~CJ -'5 - 0 cJ l(} tJr,/L2 Calibrated Standard Leak (CSL) Leak Rate (He-cc/s) CSL Serial No. CSL Calibration Due Date

DI!£ ( 71 D£J-&J(!'E" J "- Pressure MeasurIng Device (PMD) DesG~ PMD Serial No. PMD Calibration Due DatL

.................. , ............................ Pre-Test Calibration Records ...........................................

12.-/- 1 .

/ S /.2IJ. f21 ;r~(jr ~ Wo~8 b () t:.1cL- /0 CD b l 'i&.-7 Calibration Time CSL Temperature Temperature-Adjusted CSL MSLD "Zero" Reading MSLD Calibration Reading

(hh:mm:ssl ('F or 'C~ ,b2ak Rate ~cclEL==. (He-cclsec) .. JHe-eq/secl

....................................................... Leak Test Records .......... 1 ..........................................

It;t 8 ps (tJ. aU'!$IA / :;;, cJ I's L. g;]

Atmospheric Pressure (ps,ig)". 12.-/-11'·

Evacuation Cavity Pressure '(psig)". IZ-2-JI

Helium cavi~ Back/ill Pressure (p§@' 12,- -1/

~3 en 2" IJ.X~7-3 ® 23X1J- ~ (f)N4TEcrAdLl=LEAJ! Test (DWell) Time MSLD Start Test Reading MSLD Finish Tesl Reading Non-Adjusted Measured LeakRate

-(minutes) -

(He-eels) =

(He-eels) [<» -@l. (He-cc/sec) . -

........ 2, ... ( ............................... Post-Test Calibration Records ........................................... I z- _I

9.a A-M S't;().r:- 7/1XfJ~8 IrcJ ~LJ~cJ ~ If cJ '/:/cJ-7 CallbraUonTime CSL Temperature Temperature-Adjusted CSL MSLD IZero" Reading MSLD CalibratIon Reading

(!2f2:pJ!!2 ~ Lea~ Rale ~~_.1.He--cc/secL . (Ife-co/sec)

...................................................... Leak Rate Records .......................... : ....................... :'· ..

® 0 dJ.2E1£Ci41~L~ f'=~L 2.2 x '10-7

- Pre-TesUPost-Test Gallbration-Readlng - - .. .. - Adjusted Leak Rale .. ------ .. .... Gorrected-Leak Rafe Criterion .. - ..

Dme~nc~[@'@l ~H~cI~ ~

[@)-@l(He-~~~ecL ____ ~

............. ; .............................. Technician and Witness Records ........................... : ............

7.~--,

mi/\ Technician Signature f1 L. t4S/v J;l.--?-J-JIL

Prinled Name Dale

/~~ /3,.~u.~, F/o.Vlo,ft"'" ) 2 b.izi'lll I Wllness SI~nsture Prlnted-ams 'Date

pnoss
Text Box
CTU 3 After D5 Series, A
Page 17: 435-B Leakage Rate Test Records. · NRC Docket 71-9355 AREVA Federal Services LLC July 2013 . 435-B Leakage Rate Test Records . Notes: • Each set of records consists of two leakage

A AREVA

SPECIFICATION PKG-LT-SPC·006 REVISION: o PROJECT NO: 01916.01.C004 PAGE: 10 of 11

Form 6-2 - LANL·B CTU Vent Port Seal Leakage Rate Test

•••••• ••• ••••••••• •••••••••••••••• , •••••• , •• ' ••• 11 Package Information ...... , ..... ' .................................... "

C-TU-3 APTE/c D-S IZ-2-2.a/ I Package Serial Number Date

................................................. '.Instrumentation Records ................................................

I~FI GOI'I U' cz.c-v c92..()7 ap'i~ C41..1 Jj

Mass Spectrometer Leak Detecior (MSLD) Description MSLD SerIal No. MSLD Calibration Due Date

j}i?IS l? "n:lrI P [i) 8. tsS 5B(/-I.'3-c.J/-vJ (0 t~/3r//2 Temkerature Measuring Device (TMD) Descrigilon TMD Serial No. TMD Calibration Due Daie

v,.A-'c. (c~J1 ;2...,).. 'flu -8 §"8Lj -4d-u3 ~o'-r l<lh5! flY-.. l+~!>nN6)' 1,)..'Md- 7 SBIf-4dd /3 -av k to.3. t,u)---

Ca/ibra/ed standard Leak (CSL) Leak Rate (He-cels) CSL Serial No. CSL Callbrat/on Due Date

(..,SC-'~/I'1D AJfuiVEj , - Pressure Measuring Devrce IPMD) DescrIption PMD Serial No . PMD Caiibratlon Due Date

............................................... Pre-Test Calibration Records ...........................................

1J1'dG 14-11\ 5'll 7,'1'J../u- :0 ~t) X/D,-Ie) <D l(tJAtu-) Caf/brat/on Time CSL Temperature Temperature-Adjusted CSL MSLD ''Zero'' Reading MSLD Calibration ReadIng

~hh:m.1J1L ~ (OF or °01 Leal£!i~~L.....,.~~c)

...................................................... Leak Test Records .....................................................

/4.9 PSI A- 0,/ PSI (J. I~,O PSr 4-Atmospheric Pressure (ps/g) Evacuation Cavity Pressure (pslg) Helium Cav/ly Backfilf Pressure (psig)

>3 Q) 3,0 X/a- 9 @ Jt 3 X/c)-~ ®1~JM!;L E LEf/< Test (DweiO Time MSLD Start Test Reading MsLD Finish Test Reading Non--AcfJusted Measured Leak Rate

= (minutes) (He-ecls)

='l= (He-ce/s)

= ="'~ (® - mJ (He-cc/see)

.............................................. Post-Test Calibration Records ...........................................

(sys) !31"d-u IP"1 S'1--J,6 cJr:::- 81 ojyrJ~8 /,0 [/0-10 ® 1,/ X/o-7 Calii5ratlon Time CSL Temperature Temperature-Adjusted CSL MSLD "Zero" Reading MSLD Calibration Readrng

i!1h:mm;ss) .~f£2L'.9L LI~ak Rate (He-ce/s) =r.t:!2-0clsec) JHe-cclsecL

...................................................... Leak Rate Records .....................................................

, - -, 1/-;-"" I R .1 XIJ ' OJJ;iRTfltlL'" I--B'JI< 2.2 x 10.7

. f2re-TestiP-os/-TestCalibratfonReading . . -... -AdjustedLeakRate-. . ..•. ,. - Leal<RateCrilerion- _ ... "

Difference IGl· (j)J (±He-cc(s) I@) - ®J (He-cc/sec) (He-celsec)

......... ~ .......... Technician and Witness Records ........................................

~ /'?' . h /30 f t

?z2 t1 i-Ct4-S tv i;"- 1."),-,,:1.

Teohnician Signature Printed Name Date

( ~~---- /:3,'!-O,VI Flo,V\(, ~I'-V\ IzL2'[ZO 1/

I Witness SIf!.nalure Printed Name Date

pnoss
Text Box
CTU 3 After D5 Series, B
Page 18: 435-B Leakage Rate Test Records. · NRC Docket 71-9355 AREVA Federal Services LLC July 2013 . 435-B Leakage Rate Test Records . Notes: • Each set of records consists of two leakage

('

VV\'\;tC-I-~ ";6::

£,)St"€t'-\. !

fA AREVA

SPECIFICATION PKG-L T-SPC-006 REVISION: o , ,

PROJECT NO: ,01916.01.C004 PAGE: 9 of 11

Form 6-1" LANL-B CTU Containment Seal Leakage Rate Test

Iltl."'.' •• ' ••••••••••• '.I •.•.••.• , •••• ' •• " •••• , Package Information ...................................................

G,\{~3 \S~E ~b U~IT:i*=3 /-2ls'L / I Package Serial Number Date

., ................................................ Instrumentation Records ................................................

:t:~R toJJ L.\.l, -,::w'O O~O? (Of"EM~c.~t) Mass Spectrometer Leak Deteator (MSLD) DescriptIon MSLD Serial No. Mst.D Calibration Due Date

t-t6,s E 16Mf'. J rll\~ ,l1A!.tGE >81.f-13-ot -00& Klf:31 it 2.

Teinperature Mdasuring Device (TMD) Description TMD Serial No. ~q TM~~allbrtiOn Due Date

I v Muu'oIA T';CIt"'o~.o&"( .2, ~ '1<10- 8 58'1-'-tO -03 -():< (tfJ 31 (2...

IAAS~ tJ&-S , • ~ ')C to-7 sg't.('-l.f.o ·03 -l9oh (o['3,{' ~

Calibrated standard Leak (CSL) Leak Rale (He-aa/s) CSL Serial No. CSL Calibration Due Date

(S~ 4.s 11Mb AW2\ - -'f>re§sure MeasuTlug Devfce (PMDl De<&crie,tion PMD Serial No. PMD Calibration Due Date -

............................................... Pre-Test Calibration Records ...........................................

&:'&AM Lt(pP(- . 8 -9 4J, ~\O 3.0 )<-,\0-111 0) ).1 'J.,(o-7

Calibration Time CSL Temperature Temperature-Adjusted CSL MSLD "Zero" Reading MSLD Cal/bra/Jon Reading

(hh:mm:ssl (,F or 'C) Leak Rate (He-cc/s) (He-cclsec) (He-cc/sec)

...................................................... Leak Test Records .......... : ..........................................

f Lf. 8 f'~ \1\ {)./O3 F~}14 /5.2 p~M

Atmospheric Pressure (Plilg)", Evacuation Cavity Pressure-(pslg),., Helium Cavity Backfill Pressura (p"'fjg)'

~3 @ l{.1.( ~..I0-~ ® 3.3~[Q-a @ NotE'I'El.IAI'S£ teA!:;

Test (Dwell) Time MSLD start Test Reading MSLD Finish Test Readfng Non-Adjusted Measured Leak Rate

(minutes) (He-ec/s) (He-ec/s) [® - ml. (He-cc/see) _

............................................... Post-Test Calibration Records ...........................................

&!'-(~ AM I-) ') 0,::- c,. & K«(;7--S ,.OX(o'IO ® 1. Lt 'Xlo-8

, CailbratIQi)_ Time CSL Temperature Temperature-Adjusted CSL MSLD ·Zero" Reading MSLD Callbraiion Readfng

1!!h:mml ('Fo('Cr teak Rate (He-cc/s) (He-cc/sao). . (He-cc/sec) . .

...................................................... Leak Rate Records .....................................................

® I.{;.ry )r...I.o-~ 'No, ~l~S\'~ L£Ak.. 2.2 x 10-7

• - Pre-TestIPost-Test GaJlbratlon-Readlng - . . •• Ad}ustedLeakRate - - -- -. -. - Gorreeted-LeakcRa/e Criterion·· •.

[\,'.,:. \ ,/

= Dlfferenc:. !~.: ()) 1 (±He-cclst - !® - lID) (He-cc/sec) (He-cc/secL..,

............................................ Technician and Witness Records ........................................

B~h4Jad g.:r.~EWA~ /?/1.. sL l( Technician Signature Printed Name Date

l:?v;2-v .. i3 r 'l.ctlr, F/a.."u\.fj·ti\/A 12 bboll Witness Signature i Printed Name I Date

pnoss
Text Box
CTU 3 Before D6 Series, A
Page 19: 435-B Leakage Rate Test Records. · NRC Docket 71-9355 AREVA Federal Services LLC July 2013 . 435-B Leakage Rate Test Records . Notes: • Each set of records consists of two leakage

A AREVA

SPECIFICATION PKG-L T-SPC-006 REVISION: o PROJECT NO: 01916.01.C004 PAGE: 10 of 11

Form 6~2 - LANL~B CTU Vent Port Seal Leakage Rate Test Package Information ................................... , ............. ..

tA,IJ'(( ~ S p-{ 5/( ( Package Serial Number Date

......................... , .. , ................ , .... Instrumentation Records ......... , ......... "."." .. , ........... " .... .

rN n~ON C;tC- :2..()O () ';<'07 @.f'BeA-~ CM) Mass spectrometer Leak Detector (MSLD) Description MSLD Serial No, MSLD Calibration Due Date

HG,'Jf: TBIVIP-! fRJES t, &AUG-G 5"!Ji{ -)3 -0 (~ c{)o0 ('0 /~ I{ f 2- ,

Temperature Medsuring DevIce (TMD) Deserlptlqp 0 TMD Serial No. TMD Calibratirn Due Date ~t(4~"'S: V.AtcLu.W<.Ti8::(-\/JOLffiY 2.2'!--f.(}-r::; Sjl~[-LtO·()3~IO..:2q 1,j1,~I/I~

F-~~~~~~~~~~~~~--~~~~~~~~----~~~----~ S'fSr-tM-~ t-\"'.sn~.i 1'))<..(0-7 58!{~Lf.tJ-0S-iJ(!Jb (0/t:.1/12..

Calibrated standard Leak (CSL) Leak Rate (He-eels) CSL Serial No. CSL Callbraaon DUe Date

(~f\% As IMO A(5DVS) - --= PrM'sure Measurinfl. Device (PMD) Description PMD Serial No. ~ PMD Gaiibratlon Due Date

............................................... Pre-Test Calibration Records .................................... " .... ,

Calibration Time CSL Temperature Temperature-Adjusted CSL MSLD ''Zero'' Reading MSLD Calibration Reading ===r1f.!!l:.m!E2 . J:!. or'C) Leak Rate (He-pc!..sL........,~_~~He-c~

" ....... " .... , .. " ...... , .................. , .. " .... Leak Test Records .............. , ................... " ............... ..

0.(03 f,!\,A Atmosphei-lc Pressure (pslg) Evaouatlon Cavity Pressure (pslg) Helium Cavity Backfill Pressure (psig)

> 3 Q) ),~ )(10-8 d) J.L( Y- (0- q @) {IJ.Q~g£~l~l£ ~ Test (DweJO Time MSLD Start Test Reading MsiD FinIsh Test Reading NorrAdjusted Measured Leak Rale

(minutes) (Hrr-ce/s).. (He-eels) .=' J®. (1)] (He-col sec)

, .. "" ....................................... Post-Test Calibration Records ............. ", ......................... ..

C(:·OSAVVI.. .liB or '7.0't.(9-S ),0,)( IOdO G) 1.(, 'j:/o-(3 Calibration Time CSL Temperature Temperature-Adjusted CSL MSLD "Zero" Reading MSLD Calibration Reading

_ J!jJJ:rnm:ss) ==~,.= __ f For 'C) L~ak Rate..lHe-cc/s) , (Jje-cc/se!?t J~-cclsec)

..................... "." ............................ Leak Rate Records .................................................... .

® 0 .2 ~(<? -3 N<D Dg-sl:r~vt LEAk:::.. 2.2 x 10-7

, ...... _. - .. , P-rrr-Test/P-ost-TestCallbrationReadlng . .. - .- -AdjustedLeakRsfe.. .- . .,.,. - Leak Rate Criterlon- ....... Di~erence [® - <D] (±He-ec~ [@. ®] (He-colse~~~_ ~ ___ ~ (He-cc/sec) =

............................................ Technician and Witness Records ............ , ........... , .............. .

K() ~oJcd:;-' is .'::::r. S~~'r '12-/ S ) t( ~Techniclan Signature Printed Name 'Date

/~25c<=-Witness Slanature PrInted Name

pnoss
Text Box
CTU 3 Before D6 Series, B
Page 20: 435-B Leakage Rate Test Records. · NRC Docket 71-9355 AREVA Federal Services LLC July 2013 . 435-B Leakage Rate Test Records . Notes: • Each set of records consists of two leakage

( A AREVA

SPECIFICATION PKG-LT-SPC-006 REVISION: o PROJECT NO: ,01916.01,C004 PAGE: 9 of 11

Form6-1 - LANL-B CTU Containment Seal Leal<age Rate Test

''''" ........ "'".".,, ................. ,,', .... Package Information , .............. ,,, .......... ,, ................... ,.

C Tt,{ #3 J A PreR. DG ~£R(EOS lA/,fIT ~ 3 f ~!q LDla" tIe

Paekage Serial Number ===='<===~====I

....... " ...... ""." .......................... " Instrumentation Records ....... " ..... "" ............. " ........ , ..... .

Mass Spectrom"eter Leak Detector (MSLD) Descripilon MSLD Serial No, @~ERA'(D{i\ CA~ ') MSLD Cal/bration Dueoate

tlEtSE: T§.Mr) f'RF-SJ 0AUGE SS'{ -f3 ~O[-ooG rob I /(2.. Tempe"rature Measuring Device (TMD) Descriptj,on TMD Serial No, TMD qal/[,(crllon Due Date

'{v\.<\4I\tJ£~ 1:-"~~~Cs.::=:~~~;,..;"",,-~~6::;..~~ti.:-tJ.::.;oL:.:::."0C~~ 'rL' --:JZ~-_ .z~'..=-l X',(.!::.10_-=b' __ ~5.;:;.8::!-Lf_rLt-!-O~d=-=75==-~.:..:O 2-=' ""'0,--_--'-=" 0'--1:' /.:::: -'S-'S~<l1-} ff-=.!l...~_--I

S"lSTi9\\ I-IA~N~ f,Z xro-'? S'f;5'1[>L[Q"OS -Oob f.o/3( V::z.... Cal/braled standard Leak (CSL) Leak Rate (He-cels) CSL Serial No, CSL'Calib}atlon Due Date

Pressure Measurmg Device (PMD) Desc~L PMD Serial No, PMD Calibration Due Date

" ........... ""."," " ................ " .... Pre-Test Calibration Records .......... '" ................. " .... " .... ,

Sys. --'---' Ca/ibratlon Time CSL Temperature Temperature-Adjusted CSL MSLD "Zero" Reading MSLD Calibration Reading

(hh:mm:ss) ~'ForOC) =LeakRate(!je-ceIL ..JHe-cc/se21~.. (He-'?E;;.;/s;;;'~~=_1

................................... ," .... " .. " ...... Leak Test Records .... , " ... : ......... " ............ ' .... " .......... ..

Atmospheric Pressure (ps/g» Evacuation Cavity Pressure«psig),> Helium Cavity Backfill Pressure (R~lgl

>3 Test (DWell) Time MSLD start Test Reading MSLD Finish Test Reading Non-Adjusted Measurad Leak Rate

__ (minutes) (He-eels) (He-eels) ~~ [0). <N. (He-Celse,c) ....

, ............. "', ..... ,, " ..... "." ......... Post-Test Calibration Records ........... "" .................. " " ... ".

Calibration Time CSL Temperature Tempera/ure-Adjusted CSL MSLD "Zero" Reading MSLD Calibration Reading

~1.t]l1~~= ~eak Ra~(Jie-ce/2~_ iHe-cc/s~~ (He-cc/secl =

......... " ..... "" ......... " ................ " ..... Leak Rate Records ............. , ......... ,,, ..... , ............. ,, .... ..

® 2.2 X 10.7

, - - , . , . - Pre-TestIPost-Test GalIbratlon'Readlng - " .. ' Adjusted Leak Rate - , '-' -, "- Gorreeted,LeakRaie en'terion .. ' -- ,

~~~~~-~'-~---~......J

"."" ..................................... Technician and Witness Records " ... " ........... " .................. ..

Printed Name

'/~./Cfl{( I Date

( I,

12/'/Z()II Date

Witness Sianature Printed Name

pnoss
Text Box
CTU 3 After D6 Series, A
Page 21: 435-B Leakage Rate Test Records. · NRC Docket 71-9355 AREVA Federal Services LLC July 2013 . 435-B Leakage Rate Test Records . Notes: • Each set of records consists of two leakage

)'lIADff(fJ£ " S"'f.stF-t'v'I. ~

BlOtj

A AREVA

SPECIFICATION REVISION: o PROJECT NO: 01916.01.C004 PAGE: 10 of 11

Form 6-2 - LANL-B CTU Vent Port Seal Leakage Rate Test •• I • ~ " •••••••••••• & , •••••••• , ••• , ••••••••••• ,., •• Package Information • ••••• , •••••••••••• , •• , •• ' •• 11 ••••••• , •••••••••• 1 ••

tTl{ :l!:-3 AFrrR. Db ~£R~6~ VtIJiT #' :s 12-/qL{( /

I Date = Package Serial Number

.................................................. !nstrumentation Records ............................. , ..................

'rNf~e.DN G\t- ~ :<'00 ():<-O? (Of'EAArDR tAL) Mass Spectrometer Leak Detector (MSLD) Description MSLD Serial No. /wm;D CallbratJon Due Dste

H6.(~E ItSJ'o\P Ip~I£!.\'. ~AVJ66.. 58¥. ~1'3r or ~(}()G COLS! LI!L. . V Temperature Meadu;J;8 Device (TMD) DescrlP~n t) TMD Serial No. q TMD )/i'br7t Due Date At.~"", ~4{tJ.9t ~y .2. • .z y...W- 5 CS l( ~ £-{ 0 -«).5 - 02 to S ( (.2..

!+.AS/'aJlOS }.2'1<..19- 7 52,'(- 40-<03 - 00(7 to/!J.(L (1-

CalIbrated Standard Leak (CSL) Leak Rate (He-eels) CSL Serial No. CSL 'Calibration Due Date

(~fV\G As. flY\.cD Ao&JlJE-\ -- .-

Pressure Measurlnl1 Device (?MDl Desciiei/on PMD Serial No. - PMD Cailbratlon Due Date

.. , ..... , ......... , .. , .. , ...................... Pre-Test Calibration Records, .................... , , ....................

.;2!.Q'j PM S'?of 8" 5:<. ')(..(g-S r. tJ ~[.9 -(0 CD ,. ( 'KW-?

Calibration Tim& CSL Temperature Temperature-Adjusted CSL MSLD "Zero" Reading MSLD Calibration Reading ~!Jl!i!JJ!!]L (,For'ct LeaiSJiat&(He:~.~1f.~elsec)

..................................................... , Leak Test Records ........ , ........... , ........................... , ....

/L[.9 rSrA 0. 002 E~).A r'S~2 f'Slft Atmospheric Pressure (psig) Evacuation Cavity Pressure (pslg) Hellum CavJty Backfill Pressure (psig)

>3 Q) if.e 'K.(Q":"~ ® ~·3 Kf9-9 (1) ,.., 0 ~g-&A1SL€ LEA", Test (DweiO Time MSLD Start Test Reading MsiD Finish Test Reading Non-Adjusted Measured Leak Rate

=, (m(nutes) (He-eels)

_I'" (He-eels) .~cclsec)

....... , ........................... '''''' ..... Post-Test Calibration Records ....................................... ' ...

.2: I ~ PM S7f},c 8.5' K(O i3 ~lrQ r.D xco CD f. ( K(O-?

... -Calibration Time CSL Temperature Temperature-Adjusted CSL MSLD "Zero" Reading MSLD Calibration Reading

(hh:mm:ss):"'" _=u~('F or 'ql L.,eak Rate. (He-ea/s) ~He-cclseel . .. (He-eel sec) ...

..................................... , ................ Leak Rate Records .....................................................

® .-e----- )J 0 ibt=n~::c:lA:&£ LEA:J;;. 2,2 x 10-7

o. Rre-Test/P-ost-Test Calibration Reading. ... - .. -Adjusted LeakRa/e. . ~ ..... ~ - Leak Rate Criterlon- - - ---(fl7ftere~® - <D] (±He-eels) [~®](He-e~ (He-cal sec)

............................................ Technician and Witness Records ...................... ~ ............ ' ....

£S ~~ct g.T s.£~( !'b{cr/u ?t2hnlcian SIgnature Printed Name ' t Date

~~ i3rttlv, F 1",V'~<,<v- I Z i1 Izatt / -' --------- Itness Signature Printed Name I Date

pnoss
Text Box
CTU 3 After D6 Series, B
Page 22: 435-B Leakage Rate Test Records. · NRC Docket 71-9355 AREVA Federal Services LLC July 2013 . 435-B Leakage Rate Test Records . Notes: • Each set of records consists of two leakage

(. A AREVA

SPECIFICATION· PKG-L T-SPC-006 REVISION:' o PROJECT NO: 01916.01.C004 PAGE: 11 of 11

Form 6-3 M LANL-8 CTU Containment structure Leakage Rate Test ",., .... t ..... ,..,.., ••••• ", .......... , •• I.I., ... ' •••• , Package Information ....... t.~.' ••• I' •• t ... , ••••• J ... , ••• ·.tL'I' ••••••••• 1

w," ••••••• IO'.~.,.' •••• ,. 1'"1 ••• 11"" .,It 'I'"l".' Instrumentation Records '"111',. ,. '.,1 •••• '.".' .... 1H." ••• ".· •• IIIJ.' _;'.1.,.

Mass Spectrometer Leak Detector (MSLD) DescriptIon MSLD Serial No.

TMD Serial No. MA-OAhJ~1 ~'f.!~i\\. !

Temperature MeasurIng Device (TMD) De8criPtla~ V Ac.u.u~ TISt!+r-JIJ(.ai.'1 ,,2. • ...t ')<W-t\A-SrtN~£ ).:J.. xlfr7

SBL(-l.(O·",(}3·0.2/1 $1',I-{-'tO-(i;'1S.:.006

CSL SerIal No.

~\I~. ,~

)

Callbra/ed Siandard Leak (CSL) Leak Rate (H~c!8) OSL Calibration Due Date

(gAVVv~ A-~ ~b Af;tjv£ \ PteeBure MeIJsurlna DevIce (PMD) DescrlQ/fdn PMD Ser/al No. PMD CalIbration Due Date

................................................ Pre~ Test Calibration Records .......................................... ,

2:42.. AM. G't°P 9. S ~II;r6 1.0 't,(OfO <D t,O'l<.fO-7 Calibration Time CSL Temperature

1~ ___ I'C(h_h:m_m""'1 ...... __ ~=d,.J:.E..or 'QL Temperature-Adjusted CSL MSLD "Zero" ReadinfJ MSLO Oallbratlon ReadIng

Leak Rate (He-cc!sL (He-I?Elsec) {He-co/sElo]

.Ill"'I'&"'I&t.l.& •• I •• II,."" "''' •• ,I' •••• I •••.• ,~. Leak Test Records ........... , ..... , ...... ,." .. .!t •••••••••••••••••••••••

/1+ oIt HeUum cavlt'/6aOkf/1l Pressure (pslg) evaouatlon Cavity PreS8ure (pslg) AtmospherIc Pressure (pslg)

GO~\N. @ 3.9')(co-S ® ?p~(O-B @ .,z.GKJO-fJ Test (DWelq Time MSlO.§1sJi Test Reading MSLO FlnHh Test ReadIng Non-Adjusted Measured Leak Rate ~(mlnutes) (He-cc:/s)' ..1! e-cc!s) ~ ,:2J (He-co&or-

.............................................. Post-Test Calibration Records ......................................... ..

Cal/bratlon Time (hh:mm)

CSL ,!empe!!:lure ('por'CI

9.& ~rg-~ 1.5 'f;.((r ~ ® r.Lf)C l/l~7 Temperature-~~JustedySL MSLD "Zero" R~~dlng MSlO Callbrat/an R~adlng

Leak Rata (He-ee/sl (He-cclsecL (He-cc:/seci

-- --'t.- .. -'".-•• -.-•• t.-..-.'t.' •• -II ••• -t.., .. '11'~.l~ •••• ' ••• -, •••• ,-.II.Leak Rate Re_cordsA ... I.,.t ••• " ...... ,.' ••• ~4'.".~.I.II.I •••••••• • '11 •••• ,

, NOTE: In order to assure a conservative leak test, entrapped air Inside of the sealed plastic-bag shroud was removed by vacuum pump ~ntll-·I . the plastic shrank to Intimate contact with the cask. The helium supply was then Injected at the!2I!. of the plastic shroud and forced to flow to I'

the bottom of the plastic shroud where it was monitored for concentr.atlon. A separate hel1um mass spectrometer operating In the sampling ("sniffer") mode was used to provide evidence of required helium concentration throughout the duration of the test. Additional helium gas was bl~d Into the plastic shroud approximately every five minutes over the 60 minute test time. _ .

BIOI

Page 23: 435-B Leakage Rate Test Records. · NRC Docket 71-9355 AREVA Federal Services LLC July 2013 . 435-B Leakage Rate Test Records . Notes: • Each set of records consists of two leakage

"""" ~4; 'N,E:

~'f .l'rt:'f\\. r

BI02

A AREVA

SPECIFICATION PKG-L T~SPC-006 REVISION: a PROJECT NO: 01916.01. C004 PAGE: 11 of 11

Form 6-3 ~ LANL~B CTU Containment struGture Leakage Rate Test • , • I ••••• .. 1. i t "' • I ~ I ., •• _ 1 •• f f I I • I ••• ~ • I I I , • I I I • I I Package Information ., ......................... , .... , ..................

()OtJ"rAhJM.GtJT but.~ ~1f;JT C-TQ ~t-J't-r@ ~/wa:, lL.>-'P tb~ ll!2..

Paok§ge SerIal Number -- Dale

.......... " .......................... ", ......... Instrumentation Records ..... , ............................ · ....... "i·, ...

rj-J\,::kO'N Ul..-20o S/(J ~ O,2.0E:. W~~C-Ai-\ Mass Sp$ctrometer Leak Deteclor (MSLo) Deser/pllon MSLO Serial No, MSi:D Calibration Due bate

f-)Els£ IEM/'. /e.~~! &, A-iJ..&.G 581( - t:s -Or-GoG /0 bJ!.t!2 Temperalure MeasurIng Devloe (TMD) Description '8 TMD Serial No. TMD c~tratt Due Date

VAt.tl.s . .t~ T6O&.ItJOLOfb'{ :2,,2. "(.:..Ur sBf{-I..[O-03 -o~q 10 s( /2.. ' JJ.4S,T(NG- Q f,.!).. ')c; to-7 S'$IJ.-lfO-103 ... 00G " 1{)-'1S(/(~ Callbraled Standard Leak (CSL) Leak Rate (H~cols) CSL Ser/al No. GSL Canbrallon Due Dale

GiAM£ A-~ T¥V\Q:, A15o\Jf:) -- ,.--

Pre)sure Measuring De vIce (PIVIDl Descrl/?Ji§.n PMD SerIal No. ~

PMD Calibration Due Date

" ... ,""" ...................... " ... " .. , .. , Pre-Test Calibration Records ......... " .. "" ..........................

.2 :.30 rM. S,of 8.5' 'f;,1()~·e ' -/0 '.0 )<./0 (j) I. ~ 'F-IO- 7 , Calibration Time CSL. Temperalure Temperature-Adjusted CSL MSLD "Zero" Reading MSLD 'Callbratlon ReadIng ~(!]j£~For'C) Leak Rate (He-ce/s) (He-eclses:), J1je-cclsec)

" ........ ", ... , ..... " ... " .. '" ....... " ......... :. Leak Test Records ....... , .......... "., ... " ............... , ..........

> N. Z eS~A: ...e- L:~J'A JJ[A ,~

AtmospherIc Pressure (pslg) Evaouatlon Cavity Pressure (pslg)' Helium Cavity B'eckfllJ Press~re (pslg)

GO r,vl\L (6) .,2,3y.w- 7 ® 3,1{ Y.«) ~ '? (1) j,OX((T' Tesl (Dwel~ Time MSLO Slart Test ReadIng ~_ (H&-Oo/S)

MSLD FInIsh Test Reading Non-Adjusted Measured Leal< Rate '~IRe-cc/s) ~1 (He-cd/sec)

" .......... ",,,. """., ...... " ... " ....... Post-Test Calibration Records ........ " .. " ................... " ....... ,

~)}2.A"'I. as ~F f.O~fo-7 1'.0 )c co ~IQ

® ;./ 'Kro~7 Callbrollon Time CSL Tempe~lure Temperature-Adjusted OSL MSL~ 'Zero· R~r'ng MSLO b(f'bratlon ~r .. dJng

(hh:mmJ ("For '0 Leak Rala 1f1e-cels) . He-cc/sec He-co/sec

~ ........ ~: .; .. ~. ;.:~; ......... " ........... ~~cordS ........... ' ......... ~:~. ~.~. ~_; ............. Pre-Test/Pos/-Test Gal/brallon Reading

'[@ ~TI~~~(~~~~~seQ) .. _ _ _ • _ ' __ l"e§k,B§le. CrUeIloB ., , .• - ..

- - -!J[lferenQe,]fjf'(:fHe:oo!s~__ .- (He-co/1l6o)

.......... Q ............. ~;~clan ~n~~=e;: ~~~;;; ..... ;.J;!;~ .. ~W __ furo . PM"'","" • do,

~.~.~ J"'r2. J5 J 0./ A;N A ".J I Ie; [ L-- Witness SI,mature Printed Name 1 bate.

• nO

NOTE:' In order to assure a conservative leak test, entrapped air Inside ofthe sealed plastic-bag shroud was removed by vacuum pump until the plastic shrank to Intimate contact with the cask. The helium supply was then injected at the!QQ ofthe plastiC shroud and forced to flow to i the bottom of the plastic shroud where It was monitored for concentration. A separate helium mass spectrometer operating In the sampling ("sniffer") mode was used to provide evidence of required helium concentration throughout the duration of the test. Additional helium gas was bled into the plastic shroud approximately every five minutes over the 60 minute test time.

Page 24: 435-B Leakage Rate Test Records. · NRC Docket 71-9355 AREVA Federal Services LLC July 2013 . 435-B Leakage Rate Test Records . Notes: • Each set of records consists of two leakage

A AREVA

SPECIFICATION' PKG~LT~SPC~006 REVISION: o PROJECT NO: 01916.01.C004 PAGE: 11 of 11

Form 6~3 - LANL-B CTU Containment Structure Leakage Rate Test

~;:~~:~:;;::=~~ ~:ge lnfor~: ~~~;@n.n.n9tflfiFii Package Serfel Number Dale '

......... , " .......................... ", ......... Instrumentation Records ............................................ ; .... .

MElSS Spectrometer Leal< Detector (MSLO) Desoriptlon

= PreS:wre Measuring Device (PMD) DescriptIon ,== PMD Serial No. • =PMD Gallbratlon DUe Date

............................................... Pre-Test Calibration Records ................................. , ....... ..

fPS'{ AM. ,8b~F J.o X(o": '1 /.0 xro-{o <D r,2. X(r 7 Oal/bral/on 77me CSL Temperature Temperature-Adjusted GSL MSLO "Zero" Reading MSLO CalibratIon Reading

~£9L~LeaI<Rate (He-ccls) (He-cc/sec) . (He-co/sec)

.................................................... ;. Leak Test Records ............................................. , ..... ..

tJ/A *' Atmospherlo Pressure (ps/g) Evacuation Cavity Pressure (pslgJ Helfum Cavity 8a6/(f/ll Pressure (pslg)

{Ju1\(!N. @ 3.('{.(O-7 ® 5.0y.:.ro·' @) J~?)(.,o-7 Test (DWell) Time MSLO start Test Reading MaLO FinIsh Test Reading Norr-Adjusted Measured Lea/(Rate

~lE!.n.!!.tes) = (Re-co/s) (Re:-cc/s) _~J (He-cc/seo)

....................... ,," ................... Post-Test Calibration Records ............................ " ........... ..

&.'55 AM Calibration TIme CSL Tempec~ture TemperatlJre-~~Justed CSL MSLD 'Zero" Reading MSLD Calibration F/eading .

(hh:mm) _ ('F Dr 'C) Leak RafetHe-cclsJ (He-ccJsec) (He-co/seo)

.... " ................................................ Leak Rate Records .................................................... .

~- ;<,.3 y;..(O~ ~ 2.2 x 10.7

Pre--Tesl/Posf.> Test Gal/brnlion Reading. ... • ~e. .. .. .. • • .... _ ~ l..e§kB§if;!. Criler!o_o ., ... . . _ - - -DIfference "[~~'. mJJ:rHi":colsr~~ (@. ®] x SCF (HHo/seo) _ (HHc/sec) •

···~········3:=;····: .. ·aCla~;.=.;:~~:~'.; .......... ;"i~;~'" fjj r.'if!ii/., S!W~ "",., N",. r oJ.

~,1-3b· In C vC H1?:'+l Ij q /f;r<.., Witness Signature Printed Name r bale * NOTE: In order to assure a conservative leak test, entrapped air inside of the sealed plastic-bag shroud was removed by vacuum pump until

the plastic shrank to Intimate contact with the cask. The hel1um supply was then injected at the iQQ of the plastic shroud and forced to flow to ·the bottom of the plastic shroud where It was monitored for concentration. A separate helium mass spectrometer operating In the sampling . ("sniffer") mode was used to provide evidence of required hellum concentration throughout the duration of the test. Additional helium gas was bled Into the plastIc shroud approximately every five minutes over the 60 mlnutetesttime. .