4
CADD PLOT sswanger 14:38 28-NOV-2017 c Sheet No. Date Checked Drawn Job No. Sheet Title Revisions No. Date Description 109 P a r k o f C o mm e r ce Dr i v e , S u it e 6 S a v a nn a h , Ge o r g i a 31405 T h i s d r a wi ng a nd a ll p r i n t s o f it a r e t h e p r op e r t yo f f o r wh i c h t h e ywe r e i ss u e d . Re p r odu c ti on s o f t h i s d r a wi ng wit hou t t h e E:\BOE Southwest Elementary U-G CW Piping Replacement - 17079.00\CADD\T0_1.dgn 1 INCH Stamp P HONE ( 912 ) 238 - 2400 F AX ( 912 ) 238 - 2412 C h a t h a m E ng i n ee r i ng C o m p a ny , LL C P r i n t s a r e t o b e r e t u r n e d t o C h a t h a m E ng i n ee r i ng C o m p a ny , LL C upon c o m p l e ti on o f u s e wr itt e n c on s e n t o f C h a t h a m E ng i n ee r i ng C o m p a ny , LL C i s no t p e r m itt e d 17079.00 2017 S AVANNAH, GE O R GI A U / G C HI LLE D W A TE R R E P L A C E M E NT S OU T HW E S T ELE M E NT A R Y R ELE A S E D F OR C ONS T R U C T I ON 11/28/2017 T0.1 TITLE SHEET DRAWING LIST: CONTACT LIST: CODE REQUIREMENTS: 2014 Edition 2012 Edition 2009 Edition 2012 Edition 2012 Edition 2012 Edition 2012 Edition National Electrical Code ............................. International Fire Code ............................... International Energy Conservation Code ... International Fuel Gas Code ....................... International Mechanical Code .................. International Plumbing Code ...................... International Building Code ........................ LOCATION: (912) 238-2400 SAVANNAH, GA 31405-1396 109 PARK OF COMMERCE DRIVE, SUITE 6 CHATHAM ENGINEERING COMPANY, LLC PLAN M2.2 PART PLAN AREA 5 - ENLARGED MECHANICAL ROOM HVAC PIPING M2.1 PART PLAN AREA 5 - HVAC PIPING PLAN M1.1 PART PLAN AREA 5 - HVAC PIPING DEMOLITION PLAN T0.1 TITLE SHEET BOARD OF EDUCATION SCHOOL SYSTEM FOR SAVANNAH CHATHAM COUNTY PUBLIC PIPING REPLACEMENT UNDERGROUND CHILLED WATER SOUTHWEST ELEMENTARY SCHOOL SNS SNS

5041 3 ia rgoe h 214 anava UNDERGROUND CHILLED WATER …internet.savannah.chatham.k12.ga.us/district/finance/Purchasing... · mov motor operated (2-way) valve gpm gallons per minute

Embed Size (px)

Citation preview

Page 1: 5041 3 ia rgoe h 214 anava UNDERGROUND CHILLED WATER …internet.savannah.chatham.k12.ga.us/district/finance/Purchasing... · mov motor operated (2-way) valve gpm gallons per minute

CADD PLOT

sswanger

14:38

28-NOV-2017

c

Sheet No.Date

Checked

Drawn

Job No.

Sheet Title

Revisions

No. Date Description

109 P

ark of

Co

mm

erc

e Drive, Suite 6

Savannah,

Georgia 3

1405

This dra

win

g a

nd all prints of it are the pro

perty of

for

whic

h they w

ere issued.

Repro

ductions of this dra

win

g without th

e

E:\BOE Southwest Elementary U-G CW Piping Replacement - 17079.00\CADD\T0_1.dgn1 INCH

Stamp

PH

ON

E (912) 238-2

400 F

AX (912) 238-2

412

Chath

am E

ngin

eering C

om

pany, LLC

Prints are to b

e return

ed to C

hath

am E

ngin

eering C

om

pany, LLC u

pon c

om

pletion of use

written c

onsent of

Chath

am E

ngin

eering C

om

pany, LLC is n

ot permitte

d

17079.00

2017

SA

VA

NN

AH,

GE

OR

GIA

U/G C

HIL

LE

D W

ATE

R R

EP

LA

CE

ME

NT

SO

UT

HW

ES

T E

LE

ME

NT

AR

Y

RELE

ASE

D

FO

R

CO

NSTR

UC

TIO

N

11/28/2017T0.1

TITLE SHEET

DRAWING LIST: CONTACT LIST:

CODE REQUIREMENTS:

2014 Edition

2012 Edition

2009 Edition

2012 Edition

2012 Edition

2012 Edition

2012 Edition

National Electrical Code .............................

International Fire Code ...............................

International Energy Conservation Code ...

International Fuel Gas Code .......................

International Mechanical Code ..................

International Plumbing Code ......................

International Building Code ........................

LOCATION:

(912) 238-2400

SAVANNAH, GA 31405-1396

109 PARK OF COMMERCE DRIVE, SUITE 6

CHATHAM ENGINEERING COMPANY, LLC

PLAN

M2.2 PART PLAN AREA 5 - ENLARGED MECHANICAL ROOM HVAC PIPING

M2.1 PART PLAN AREA 5 - HVAC PIPING PLAN

M1.1 PART PLAN AREA 5 - HVAC PIPING DEMOLITION PLAN

T0.1 TITLE SHEET

BOARD OF EDUCATION

SCHOOL SYSTEM

FOR SAVANNAH CHATHAM COUNTY PUBLIC

PIPING REPLACEMENT

UNDERGROUND CHILLED WATER

SOUTHWEST ELEMENTARY SCHOOL

SNS

SNS

Page 2: 5041 3 ia rgoe h 214 anava UNDERGROUND CHILLED WATER …internet.savannah.chatham.k12.ga.us/district/finance/Purchasing... · mov motor operated (2-way) valve gpm gallons per minute

DS

DS

DS

DS DS

DSDSDS DS DS

DS

DS

23 1/4 11 5/8

11

5/

8

46 1/234 7/8 46 1/211 5/8 11 5/834 7/8 46 1/2

46

1/

234

7/

846

1/

246

1/

2

11 5/8

23

1/

4

34 7/8 34 7/8

46

1/

234

7/

846

1/

2

23 1/4

46

1/

223

1/

4

11 5/8 11 5/8

46

1/

246

1/

234

7/

846

1/

2

46 1/2

23

1/

4

11

5/

8

EJ NO.4

CJ

CJ

CJ

CJ

EJ

CJ

CJ

CJ

CJCJ CJCJCJ

EJ

CJ

CJ

CJ

CJ

CJ

CJ

EJ

CORRIDOR

501

CORRIDOR

502

CORRIDOR

503

ELECTRICAL

505

MECHANICAL

506

EQUIPMENTSTORAGE

507

GIRLS

508

JANITOR

509

BOYS

510

OFFICE

513A

TOILET

513B

TOILET

513C

TOILET

513D

MECHANICAL

513E

CAFETERIA

514

STAGE

514B

DRESSINGROOM

514A

DRESSINGROOM

514C

KITCHEN

514D

DRYSTORAGE

514E

CHEMICALSTORAGE

514F

TOILET

514G

LOCKERS

514H

OFFICE

514I

RECEIVING

514J

LOADING

CAN

WASH

MECH. YARD

CADD PLOT

sswanger

14:37

28-NOV-2017

c

Sheet No.Date

Checked

Drawn

Job No.

Sheet Title

Revisions

No. Date Description

109 P

ark of

Co

mm

erc

e Drive, Suite 6

Savannah,

Georgia 3

1405

This dra

win

g a

nd all prints of it are the pro

perty of

for

whic

h they w

ere issued.

Repro

ductions of this dra

win

g without th

e

E:\BOE Southwest Elementary U-G CW Piping Replacement - 17079.00\CADD\M1_1.dgn1 INCH

Stamp

PH

ON

E (912) 238-2

400 F

AX (912) 238-2

412

Chath

am E

ngin

eering C

om

pany, LLC

Prints are to b

e return

ed to C

hath

am E

ngin

eering C

om

pany, LLC u

pon c

om

pletion of use

written c

onsent of

Chath

am E

ngin

eering C

om

pany, LLC is n

ot permitte

d

17079.00

2017

SA

VA

NN

AH,

GE

OR

GIA

U/G C

HIL

LE

D W

ATE

R R

EP

LA

CE

ME

NT

SO

UT

HW

ES

T E

LE

ME

NT

AR

Y

RELE

ASE

D

FO

R

CO

NSTR

UC

TIO

N

11/28/2017

FLOOR PLAN 5

FLOOR PLAN 3

FLOOR PLAN 1 FLOOR PLAN 2

FLOOR PLAN 4

M1.1

1 SCALE: 1 / 8 " = 1' - 0"

PART PLAN AREA 5 - HVAC PIPING

M1.1

DEMOLITIONHVAC PIPING

PART PLAN AREA 5 -

SNS

SNS

GCO

GCO

GCOGREASE TRAP

3" S. U/G 6" S. U/G

6" S. U/G

4" S. U/G

6" F U/G

4" CW U/G

4" CHR U/G

5" CHS U/G

5" CHS U/G

4" CHR U/G

4" CHR/CHS U/G

4" CHR/CHS U/G

STORM WATER DRAIN STORM WATER DRAIN15" PERF DRAIN LINE

15" PERF DRAIN LINE

NOTES:

EXISTING TO REMAIN

EXISTING TO BE REMOVED

CUT AND CAP PIPE UNGERGROUND.

1

2

3

CAP PIPE IN RISE, FLUSH WITH EXISTING CONCRETE.4

5 EXISTING EQUIPMENT UNDERGROUND SHOWN FOR INFORMATION ONLY. FIELD VERIFY LOCATION AND SIZE PRIOR TO NEW WORK.

CH

1 CH

2

TRANSFORMER

6 EXISTING PIPE TO BE REMOVED AND PROPERLY DISPOSED OF.

EXISTING PIPE TO BE ABANDONED IN PLACE UNDER EXISTING CONCRETE.

2

5" CHS U/G

3

3

3

4 4

5

5

5

5

6

6

PLAN OF THIS AREA

ENLARGED DEMOLITION

REFER TO 1/M2.2 FOR

7

7

FIELD VERIFY EXACT LOCATION, ROUTING, AND SIZE OF EXISTING.

EXISTING TEMPORARY PVC PIPE SHALL BE MOVED AS REQUIRED TO ALLOW DEMOLITION OF EXISTING UNDERGROUND PIPING.

ABBREVIATION DESCRIPTIONSYMBOL ABBREVIATION DESCRIPTION

MLD/MD

A/C

MANUAL DAMPER

ABOVE CEILING

AHU AIR HANDLING UNIT

AD DUCT ACCESS DOOR

T'STAT THERMOSTAT

BTUH BRITISH THERMAL UNITS PER HOUR

CFM CUBIC FEET PER MINUTE

HOT WATER SUPPLY HWS

HOT WATER RETURN HWR

CLG CEILING

DN DOWN

DWGS DRAWINGS

EF EXHAUST FAN

METERED BALANCING VALVE MBV

GATE VALVE GV

ELEC ELECTRIC

CHECK VALVE CV

CHILLED WATER SUPPLY CHS

EXH EXHAUST

CHILLED WATER RETURN CHR

EXIST EXISTING

MOTOR OPERATED (2-WAY) VALVE MOV

GPM GALLONS PER MINUTE

HVAC HEATING VENTILATING & AIR CONDITIONING

STRAINER

UNION

FIRE DAMPER FD

MAX MAXIMUM

MIN MINIMUM

SINGLE LINE DUCT

FLEXIBLE DUCT

DUCT TRANSITION

ROUND

PIPE UP

PIPE OR DUCT DOWN

HWS

HWR

TG TRANSFER GRILLE

TYP TYPICAL

VAV VARIABLE AIR VOLUME UNIT

AFF ABOVE FINISHED FLOOR

LEGEND & ABBREVIATIONS

DIRECTION OF FLOW

GENERAL NOTES:

1. COORDINATE ALL WORK WITH OTHER TRADES PRIOR TO INSTALLATION.

CTE CONNECT TO EXISTING

CHS

CHR

TT

OR

2.

U/G UNDERGROUND

P PUMP

CH CHILLER

F FIRE SPRINKLER PIPE

CW DOMESTIC COLD WATER

GCO GRADE CLEAN OUT

S SANITARY

J WP WEATHERPROOF JUNCTION BOX

IN MECHANICAL ROOMS PRIOR TO FABRICATION OF PIPING.

MODIFICATIONS MAY BE REQUIRED. CONTRACTOR SHALL ALSO VERIFY SPACE ABOVE CEILINGS AND

THE DESIGN DOCUMENTS, THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY AS

DEVIATIONS ARE DISCOVERED BETWEEN THE ACTUAL CONDITIONS AND THE CONDITIONS SHOWN ON

PLANS WHERE AVAILABLE. AS SUCH, THE CONTRACTOR SHALL FIELD VERIFY CONDITIONS. IF ANY

EXISTING CONDITIONS: THE DESIGN IS BASED ON BASIC FIELD INVESTIGATIONS AND EXISTING

Page 3: 5041 3 ia rgoe h 214 anava UNDERGROUND CHILLED WATER …internet.savannah.chatham.k12.ga.us/district/finance/Purchasing... · mov motor operated (2-way) valve gpm gallons per minute

DS

DS

DS

DS DS

DSDSDS DS DS

DS

DS

23 1/4 11 5/8

11

5/

8

46 1/234 7/8 46 1/211 5/8 11 5/834 7/8 46 1/2

46

1/

234

7/

846

1/

246

1/

2

11 5/8

23

1/

4

34 7/8 34 7/8

46

1/

234

7/

846

1/

2

23 1/4

46

1/

223

1/

4

11 5/8 11 5/8

46

1/

246

1/

234

7/

846

1/

2

46 1/2

23

1/

4

11

5/

8

EJ NO.4

CJ

CJ

CJ

CJ

EJ

CJ

CJ

CJ

CJCJ CJCJCJ

EJ

CJ

CJ

CJ

CJ

CJ

CJ

EJ

CORRIDOR

501

CORRIDOR

502

CORRIDOR

503

ELECTRICAL

505

MECHANICAL

506

EQUIPMENTSTORAGE

507

GIRLS

508

JANITOR

509

BOYS

510

OFFICE

513A

TOILET

513B

TOILET

513C

TOILET

513D

MECHANICAL

513E

CAFETERIA

514

STAGE

514B

DRESSINGROOM

514A

DRESSINGROOM

514C

KITCHEN

514D

DRYSTORAGE

514E

CHEMICALSTORAGE

514F

TOILET

514G

LOCKERS

514H

OFFICE

514I

RECEIVING

514J

LOADING

CAN

WASH

MECH. YARD

CADD PLOT

sswanger

14:37

28-NOV-2017

c

Sheet No.Date

Checked

Drawn

Job No.

Sheet Title

Revisions

No. Date Description

109 P

ark of

Co

mm

erc

e Drive, Suite 6

Savannah,

Georgia 3

1405

This dra

win

g a

nd all prints of it are the pro

perty of

for

whic

h they w

ere issued.

Repro

ductions of this dra

win

g without th

e

E:\BOE Southwest Elementary U-G CW Piping Replacement - 17079.00\CADD\M2_1.dgn1 INCH

Stamp

PH

ON

E (912) 238-2

400 F

AX (912) 238-2

412

Chath

am E

ngin

eering C

om

pany, LLC

Prints are to b

e return

ed to C

hath

am E

ngin

eering C

om

pany, LLC u

pon c

om

pletion of use

written c

onsent of

Chath

am E

ngin

eering C

om

pany, LLC is n

ot permitte

d

17079.00

2017

SA

VA

NN

AH,

GE

OR

GIA

U/G C

HIL

LE

D W

ATE

R R

EP

LA

CE

ME

NT

SO

UT

HW

ES

T E

LE

ME

NT

AR

Y

RELE

ASE

D

FO

R

CO

NSTR

UC

TIO

N

11/28/2017

GCO

GCO

GCOGREASE TRAP

3" S. U/G 6" S. U/G

6" S. U/G

4" S. U/G

6" F U/G

4" CW U/G

STORM WATER DRAIN STORM WATER DRAIN15" PERF DRAIN LINE

15" PERF DRAIN LINE

CH

1 CH

2

FLOOR PLAN 5

FLOOR PLAN 3

FLOOR PLAN 1 FLOOR PLAN 2

FLOOR PLAN 4

1 SCALE: 1 / 8 " = 1' - 0"

PART PLAN AREA 5 - HVAC PIPING

SNS

SNS

M2.1

M2.1

HVAC PIPING PLANPART PLAN AREA 5 -

NOTES:

EXISTING TO REMAIN

1

THIS AREA

ENLARGED PLAN OF

REFER TO 2/M2.2 FOR

2 EXISTING CHILLED WATER PIPE TO REMAIN. PIPES ABANDONED IN PLACE UNDERGROUND.

3 EXISTING EQUIPMENT UNDERGROUND. FIELD VERIFY LOCATION AND ROUTING PRIOR TO MANUFACTURE OF NEW PIPES.

4

5 VALVE FOR FUTURE CHILLER CONNECTION.

6

7 PRE-INSULATED PIPE U/G.

2

2

NEW WORK

3

3

3

UNDERGROUND PIPE

4" CHR

4" CHS

4" CHS4" CHR

5" CHS

4" CHR U/G

5" CHS U/G

5 5

6

CTE

CTE

CTE

4

4

4

4

7

CORE DRILL THROUGH EXISTING BRICK WALL. ROUTE NEW PIPE THROUGH PENETRATION. SEAL GAP BETWEEN PIPE AND PENETRATION

8

9

8

8

9

FIELD VERIFY EXACT LOCATION, ROUTING, AND SIZE OF EXISTING.

MORE INFORAMTION.

TEMPORARY CHILLER UTILIZING THE TEMPORARY CONNECTIONS LOCATED IN THE MECHANICAL ROOM. REFER TO 1/M2.2 FOR

OPERATIONAL DURING INSTALLATION OF UNDERGROUND PIPING. AS AN OPTION THE CONTRACTOR SHALL PROVIDE A

CONTRACTOR SHALL MOVE TEMPORARY CHILLED WATER PIPING AS REQUIRED TO KEEP BUILDING CHILLED WATER SYSTEM

10

PROCEDURES PRIOR TO OPERATING SYSTEM WITH NEW PIPING. COORDINATE START UP WITH OWNER.

COORDINATE SYSTEM FILL WITH CHEMICAL TREATMENT CONTRACTOR. CONTRACTOR SHALL FOLLOW ALL START UP

CONTRACTOR SHALL FOLLOW ALL PRESTART UP PROCEDURES PRIOR TO FILLING SYSTEM WITH WATER. CONTRACTOR SHALL

10

10

INSTALL PIPES ON PIPE RACK.

EXISTING PANEL PE

BRANCH CIRCUIT BELOW GRADE TO PANEL PE LOCATION.

BREAKER. FRAME STYLE TO MATCH EXISTING, FURNISH AND INSTALL WEATHERPROOF JUNCTION BOX FOR CONNECTION POINT. ROUTE

AVAILABLE IN PANEL PE. USE SPARE 20 AMP, 1 POLE BREAKER OR FURNISH AND INSTALL IN AVAILABLE SPARE A 20 AMP, 1 POLE

EXPOSED PIPING SHALL HAVE HEAT TRACE INSTALLED. BRANCH CIRCUIT HOMERUN - CONNECT HEAT TRACE TO BRANCH CIRCUIT

11

11

J J JWP WP

WP

8

PE

TO HEAT TRACE

PVC RACEWAY BELOW GRADE. USE NO. 12 COPPER CONDUCTORS WITH GROUND. INSTALL IN ACCORDANCE WITH 2014 NEC.

EMT BRANCH CIRCUIT EXPOSED, ROUTE LOW. PENETRATE EXTERIOR WALL LOW. LB TO POINT BELOW GRADE. USE SCH 40

Page 4: 5041 3 ia rgoe h 214 anava UNDERGROUND CHILLED WATER …internet.savannah.chatham.k12.ga.us/district/finance/Purchasing... · mov motor operated (2-way) valve gpm gallons per minute

DS

DS

DS

EJ NO.4

CORRIDOR

502

ELECTRICAL

505

MECHANICAL

506

EQUIPMENTSTORAGE

507

CADD PLOT

sswanger

14:36

28-NOV-2017

c

Sheet No.Date

Checked

Drawn

Job No.

Sheet Title

Revisions

No. Date Description

109 P

ark of

Co

mm

erc

e Drive, Suite 6

Savannah,

Georgia 3

1405

This dra

win

g a

nd all prints of it are the pro

perty of

for

whic

h they w

ere issued.

Repro

ductions of this dra

win

g without th

e

E:\BOE Southwest Elementary U-G CW Piping Replacement - 17079.00\CADD\M2_2.dgn1 INCH

Stamp

PH

ON

E (912) 238-2

400 F

AX (912) 238-2

412

Chath

am E

ngin

eering C

om

pany, LLC

Prints are to b

e return

ed to C

hath

am E

ngin

eering C

om

pany, LLC u

pon c

om

pletion of use

written c

onsent of

Chath

am E

ngin

eering C

om

pany, LLC is n

ot permitte

d

17079.00

2017

SA

VA

NN

AH,

GE

OR

GIA

U/G C

HIL

LE

D W

ATE

R R

EP

LA

CE

ME

NT

SO

UT

HW

ES

T E

LE

ME

NT

AR

Y

RELE

ASE

D

FO

R

CO

NSTR

UC

TIO

N

11/28/2017

DS

DS

DS

EJ NO.4

CORRIDOR

502

ELECTRICAL

505

MECHANICAL

506

EQUIPMENTSTORAGE

507

P

4

P

3 P

2

P

1

4" CHR

5" CHS

5" CHR

BYPASS LINE

5" CHS

4" CHR

FLOOR PLAN 5

FLOOR PLAN 3

FLOOR PLAN 1 FLOOR PLAN 2

FLOOR PLAN 4

M2.2

1 SCALE: 1 / 4 " = 1' - 0"

MECHANICAL ROOM PART PLAN AREA 5 - HVAC DEMOLITION

M2.2

2 SCALE: 1 / 4 " = 1' - 0"

MECHANICAL ROOM PART PLAN AREA 5 - HVAC

M2.2

SNS

SNS

PIPIING PLAN

MECHANCIAL ROOM HVAC

PART PLAN 5 - ENLARGED

NOTES:

EXISTING TO REMAIN

EXISTING TO BE REMOVED

1

NOTES:

EXISTING TO REMAIN

NEW WORK

UNDERGROUND PIPE

1 FIELD VERIFY EXACT LOCATION AND SIZE OF EXISTING.FIELD VERIFY EXACT LOCATION. SIZE, AND ROUTING OF EXISTING PIPE.

2 EXISTING UNDERGROUND PIPE TO BE REMOVED AND PROPERLY DISPOSED OF.

3

FUTURE USE.

TEMPORARY CHILLED WATER CONNECTIONS MADE IN PIPE RISE. TEMPORARY CONNECTIONS SHALL BE CAPPED FOR

2

3

P

4

P

3 P

2

P

1

WATER HEATER TO REMAIN

PIPE PIT

AIR SEPERATOR4" CHR

5" CHS

5" CHR

BYPASS LINE

5" CHS

4" CHR

2 CONNECT TO EXISTING PIPE IN RISE.

2

PIPE PIT