12
5/31/2019

5/31/2019 - Minnesota Department of Transportation - 2029 CHIP Document.pdf$ 1,800,000 mn999 8808-pd-20 districtwide internal project delivery sf $ 1,400,000 mn999 8808-ma-20 districtwide

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

  • 5/31/2019

  • ³±19

    Reclaim & Overlay

    Reclaim & Overlay

    Replace Bridges

    Construct4-Lane

    Reclaim & Overlay!

    Mill & Overlay

    Reclaim & Overlay

    !

    Replace Bridge

    RCI

    Replace Bridge

    CPR & Diamond Grind

    !

    !

    Seeinset map 1

    Slide RepairReclaim & Overlay + ADA

    Replace Bridge

    !

    Slope Stabilization

    !

    ! !

    *Project is funded in 2020but constructed in 2019

    *Project is funded in 2022but constructed in 2021

    *Project is funded in 2023but constructed in 2022

    Turnback!

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !!

    !

    !

    !

    ! !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    Mid-blockcrossing ! RCI!

    !

    !

    Replace Bridge ! Bridge re-deck!!

    CIR &Overlay

    CIR &Overlay

    Mill &Overlay

    Reconstruct

    CIR + ADA

    Mill & Overlay

    Reclaim & Overlay

    !

    CIR &Overlay +ADA

    LY ON

    R E N V ILLE

    M U R RAY

    R E D W OOD

    M E E KER

    K A N D I YOHI

    L I N C OLN

    M C L EOD

    C H I P PEWA

    L A C Q U I PARLE

    P I P E S TONE

    Y E L L O W M E DICINE

    ³±23

    ³±7

    ³±19

    ³±4

    ³±15

    ³±22³±67

    ³±40

    ³±55

    ³±29³±91

    ³±119 ³±

    277

    ³±271

    ³±274

    ³±267

    ³±330 _̀14

    _̀12

    _̀212

    _̀59

    _̀75

    _̀71

    UTBWC + HIR

    CIR & Overlay + ADA

    Major CPR + Diamond Grinding

    Reclaim & Overlay

    Reconstruction

    Mill & Overlay + ADA

    Seeinset map 2.Upgrade RR Crossing Signal

    Mill & Overlay +ADA Reclaim & Overlay

    Mill & Overlay + ADA

    Overlay + Reconstruct

    Concrete Overlay,Turn Lanes

    Mill & Overlay + UTBWC

    Bridge Overlay

    Seeinset map 3

    Mill & Overlay

    Replace Bridge

    Replace Bridge

    Replace Bridges

    Replace Bridges

    Replace Bridge

    Bridge Overlay

    Replace Bridges

    Replace Bridge

    Replace Bridges

    Replace Bridges

    Lynd

    Iona

    Echo

    Boyd

    Arco

    Wanda

    Vesta

    TylerTracy

    Regal

    Plato

    Milan

    Lucan

    Ghent

    Fulda

    Delhi

    Canby

    Avoca

    Watson

    Trosky

    Spicer

    Revere

    Porter

    Olivia

    Nassau

    Morton

    MorganMilroy

    Jasper

    Hector

    Hadley

    Garvin

    Dovray

    Dawson

    DasselDarwin

    Danube

    Currie

    Cosmos

    Biscay

    Winsted

    Willmar

    Watkins

    Wabasso

    Taunton

    Sunburg

    Stewart

    Slayton

    Sanborn

    St. Leo

    Ruthton

    Russell

    Raymond

    Pennock

    Maynard

    Madison

    Holland

    Glencoe

    Fairfax

    Belview

    Balaton

    Atwater

    Seaforth

    Renville

    Minneota

    Marshall

    Marietta

    Kingston

    Hatfield

    Florence

    Edgerton

    Clements

    Chandler

    Brownton

    Blomkest

    The Lakes

    Prinsburg

    Pipestone

    Louisburg

    Lamberton

    Kandiyohi

    Hendricks

    Hazel Run

    Montevideo

    Litchfield

    Hutchinson

    Grove City

    Cottonwood

    Clarkfield

    Clara City

    Bellingham

    Silver Lake

    Lake Wilson

    Lake Benton

    Eden Valley

    Cedar Mills

    Bird Island

    Walnut Grove

    Lake Lillian

    Buffalo Lake

    Redwood Falls

    Granite FallsLester Prairie

    !

    CPR & Diamond GrindUTBWC + ADA

    Urban Reconstruct

    Biscay

    HutchinsonSilver Lake

    Shoulderwidening &Replace Culverts

    Snow Fence

    HIR +UTBWC

    !

    Reconstruct!

    Minor CPR +DiamondGrinding

    !

    Replace Bridges

    Mill &Overlay

    !

    !!

    !

    CIR &Overlay!Lynd

    GhentMinneota

    Marshall

    !

    !

    !

    ! !

    Mill & Overlay +ADA

    !

    !

    Replace Bridge

    !

    RCI

    CPR & Diamond Grind

    Mill & Overlay

    Reclaim &Overlay Un-bonded Concrete Overlay

    Spicer

    Willmar

    PennockKandiyohi

    1.

    3.

    2.

    !

    !

    District 8's Ten-Year Capital Highway Investment Plan (CHIP) 2020-2029

    Willmar inset map

    Hutchinson inset map

    !

    Marshall inset map

    !

    !

    !

    !

    !

    !

    !

    !

    !

    Projects are mapped by fiscal year which is usually the construction year, unless otherwise noted.Data represented here are the best available at the time ofproduction and are subject to change.Project line or dot colors indicate the project's first year.Segments with multiple projects planned use an offset.Project questions -- contact Lindsey [email protected] (phone: 320-979-5534)Map produced upon request by MnDOT PlanningMap date: May 31, 2019

    20202021202220232024

    20252026202720282029

  • Rte_Sys Prime S.P. Non-Prime SP Project ID PM Description Length Beg Ref End Ref Proposed Funds Inflat Rounded

    MN4 3418-12M D3**MN234 & MN112**ELLA** MN 4, MN 55 TO KANDIYOHI/STEARNS COUNTY LINE, RECLAMATION (DISTRICT 3 IS THE LEAD, DISTRICT 8'S SHARE IS $1,048,412) (ASSOCIATED TO SP 7301-38)

    1.8 143.197 145+00.048 FFM 1,048,412$

    MN7MN22 4302-94 T8A950

    Ron Mortensen

    ON MN 7, 0.03 MILES W OF HIGH STREET NE TO 0.07 MILES E OF GARDEN ROAD NE (HUTCHINSON), SIDEWALK IMPROVEMENTS; ON MN 15, GROVE STREET TO MAIN STREET S (HUTCHINSON), TRAIL IMPROVEMENTS (LPP PROJECT)

    1.0 142.422100.371143+00.100100+00.674 SF 370,000$

    US12 4704-89ACT81863T8A594T8A708

    **AC** 4TH STREET TO HOLCOMBE AVE. (LITCHFIELD) (INCLUDES WORK ON MN 22 FROM RP 142+00.968 TO 143+00.08), RECONSTRUCT (INFLATED COST $5.6M)

    0.6 100+00.541 100+00.925 NHPP P 1,000,000$

    MN15 4304-53 T81178 TRWSP430453 Gene East**AC** 5TH AVE. SW TO 2ND AVE. NE IN HUTCHINSON (TIED TO SP 4304-96), URBAN RECONSTRUCT (INFLATED = $6.3M) 0.5 100+00.989 101+00.517 NHPP P 2,600,000$

    MN15 4304-96 T8A598 Gene East CSAH 115 (ROUNDABOUT) TO 5TH AVE. SE (HUTCHINSON) (TIED TO SP 4304-53), UTBWC & ADA 1.7 099+00.286 100+00.989 STBGP P 2,000,000$

    MN15 4304-97 T8C035 Ron MortensenJCT. OF MN 15 & S GRADE ROAD (HUTCHINSON), SIGNAL LIGHT REPLACEMENT (LPP PROJECT) 0.2 100+00.1 100+00.3 SF 141,000$

    MN23 4203-508701-371211-898712-33

    T81377T81378

    TRWSP420350

    Lance Kalthoff

    **AC** CSAH 24 (COTTONWOOD) TO JCT. US 212 (GRANITE FALLS), MILL 3" & 7" CONCRETE OVERLAY PLUS REPLACE BRIDGES 91419 (NEW BRIDGE 87X03), 91420 (NEW BRIDGE 87X04), & 91459 (NEW BRIDGE 87X05), ADA, & TURN LANES (INFLATED COST @ $27.8M MINUS $1.1M FOR HSIP) (INCLUDES 2.9 MILES OF 4 LANE & ON US 212 GRADE, PAVE, & STORM SEWER FROM MN 23 TO BRIDGE #12000 AND BRIDGE #12000 TO 0.15 MILES E. OF LINCOLN STREET, TWLTL & ADA)

    #VALUE! 085+00.676049+00.094103+00.364049+00.823 NHPP P 9,000,000$

    MN23 4203-50S Lance Kalthoff MN 23 & LYON CSAH 9, MN 23 & LYON CSAH 10, LEFT TURN LANES 0.4086+00.676,088+00.373

    086+00.876,088+00.573 HSIP 1,222,222$

    MN23 4207-59 T8A756TRWSP420759Mark

    Klema MN 23 & CSAH 7, SNOW FENCE 0.3 071+00.234 071+00.535 STBGP P 100,000$

    MN29 1206-91 T8A043 Justin Attipou0.9 MILES N. OF US 212, REPLACE BRIDGE #9287 WITH BRIDGE 12016 (CITY STREET X-ING) 0.3 000+00.827 001+00.127 NHPP B 1,588,061$

    MN55 3410-18M D3**ELLA** STEARNS/KANDIYOHI COUNTY LINE TO KANDIYOHI/STEARNS COUNTY LINE, RECLAIMATION (DISTRICT 3 IS THE LEAD, DISTRICT 8'S SHARE IS $1.727M) (ASSOCIATED TO SP 7314-39)

    6.0 100+00.643 106+00.831 STBGP P 1,727,000$

    US59 4208-616401-405105-274202-28

    T8A943TRWSP420861

    MULTIPLE AREAS (US 59 & US 14), REPAIR SLIDE AREAS FROM THE 2018 FLOOD EVENT (ER FUNDED, PERMANENET REPAIRS) 0.5

    59+00.72757+00.00041+00.95939+00.488

    59+00.98057+00.13442+00.02339+00.561

    STBGP P 962,609$

    MN67 8707-95 T8A722 7 MILES SE OF GRANITE FALLS, INSLOPE REPAIR AND STABILIZATION (NON-ER FUNDED) 0.7 040+00.013 040+00.688 SF 500,000$

    US75 3703-25 3702-360607-22

    T8A266T8A592

    TRWSP370325

    Jesse Vlaminck

    **17 NEW** TWP 127 TO MN 7 (EXEMPT IN MADISON), CIR & OVERLAY PLUS ADA, CULVERT LINERS, RR X-ING, AND GUARDRAIL 23.1 104+00.938 127+01.102 BF 7,200,000$

    US75 5906-42 T8A600 T84501 TRWSP590642Chris

    Nienaber0.1 MILES N. OF N JCT MN 23 (PIPESTONE), REPLACE BRIDGE #6572 WITH NEW BRIDGE #59011 0.3 036+00.494 036+00.791 STBGP B 1,300,000$

    MN91 5107-14AC T81820 TRWSP510714

    **AC** MURRAY/NOBLES COUNTY LINE TO MN 30 (LAKE WILSON), 2" MILL & 2" OVERLAY PLUS REPLACE BRIDGES #6753 (NEW BRIDGE 51X02) (CHANARAMBIE CREEK X-ING), #8759 (NEW BRIDGE 51X03) (DITCH X-ING), & #6754 (NEW BRIDGE 51X04) (DITCH X-ING) (INFLATED COST = $3.8M)

    10.2 028+00.27 038+00.407 STBGP P 1,768,000$

    MN91 5108-12AC 4211-15

    T8A270T8A271

    TRWSP510812 TRWSP421115

    **AC** MN 30 (LAKE WILSON) TO MN 23, 2" MILL & 2" OVERLAY PLUS REPLACE BRIDGE #9094 WITH BRIDGE 42X07 (DITCH X-ING) (INFLATED COST = $5.7M)

    22.7 038+00.712 061+00.462 STBGP P 3,180,000$

    MN277 1213-90 Lowell Flaten **17NEW** MN 277, MN 40 TO MN 7, CASH TRANSFER FOR TURNBACK 11.0 000+00.001 011+00.023 BF 9,600,000$

    MN999 8828-195 T8A436 DISTRICTWIDE STRIPING SF 700,000$ MN999 8828-196 T8A435 DISTRICTWIDE PURCHASE SIGNS SF 550,000$

    MN999 8828-197 T8A437 John Hager DISTRICTWIDE HIRE CONTRACTOR TO INSTALL SIGNS STBGP P 1,100,000$

    MN999 8828-203 T8A461 Chris Nienaber DISTRICTWIDE BRIDGE PREVENTIVE MAINTENANCE SF 125,000$

    MN999 8808-AM-20 DISTRICTWIDE LOCAL PARTNERSHIP PROGRAM SF 89,000$ MN999 8808-CA-20 DISTRICTWIDE CONSULTANT AGREEMENTS SF 4,300,000$

    MN999 8808-CA-20A DISTRICTWIDE CONSULTANT AGREEMENTS ($1.8M OF 17 NEW FUNDING) SF 1,800,000$

    MN999 8808-PD-20 DISTRICTWIDE INTERNAL PROJECT DELIVERY SF 1,400,000$ MN999 8808-MA-20 DISTRICTWIDE MISCELLANEOUS AGREEMENTS SF 2,500,000$ MN999 8808-PM-20 DISTRICTWIDE PREVENTIVE MAINTENANCE SF 919,398$ MN999 8808-RB-20 DISTRICTWIDE LANDSCAPE PARTNERSHIP SF 40,000$ MN999 8808-RW-20 DISTRICTWIDE R/W COSTS SF 600,000$ MN999 8808-RX-20 DISTRICTWIDE BARC (ROAD REPAIR) SF 1,000,000$ MN999 8808-SA-20 DISTRICTWIDE OVERRUNS AND S.A. SF 2,500,000$ MN999 8808-SH-20 DISTRICTWIDE HSIP HSIP -$

    Cost= 62,930,702$ = Federally Funded projects

    Notes:

    FY 2020- FY2029District 8's 10 Year Capital Highway Investment Proposal

    FY 2020 APPROVED 5/31/19

  • Rte_Sys Prime S.P. Non-Prime SP Project ID PM Description Length Beg Ref End RefProposed

    Funds Inflat Rounded

    MN7 4302-93 T8A949 Ron MortensenE JCT. MN 22 TO MCLEOD/CARVER COUNTY LINE, SAFETY ASSESSMENT (LPP PROJECT) 16.1 143+00.769 159+00.959 SF $ 75,000

    MN7 4302-95 T8C037 Ron Mortensen JCT. MN 7 & CSAH 15, INTERSECTION LIGHTING (LPP PROJECT) 0.2 153+00.853 154+00.053 SF $ 20,000

    MN15 4304-53AC T81178 TRWSP43045**AC** 5TH AVE. SW TO 2ND AVE. NE IN HUTCHINSON (TIED TO SP 4304-96), URBAN RECONSTRUCT (INFLATED = $6.3M) 0.5 100+00.989 101+00.517 NHPP P $ 3,200,000

    MN19 6403-37 T8A445 Ben Sandoz0.2 MILES W. OF W. JCT US 71, SCARIFY & LOW SLUMP OVERLAY ON BRIDGE 5133 (REDWOOD RIVER X-ING) 0.3 71+00.74 72+00.05 NHPP B 930,000$

    MN23 4203-50ACT81377T81378

    TRW420350

    **AC** CSAH 24 (COTTONWOOD) TO JCT. US 212 (GRANITE FALLS), MILL 3" & 7" CONCRETE OVERLAY PLUS REPLACE BRIDGES 91419 (NEW BRIDGE 87X03), 91420 (NEW BRIDGE 87X04), & 91459 (NEW BRIDGE 87X05), ADA, & TURN LANES (INFLATED COST @ $27.8M MINUS $1.1M FOR HSIP) (INCLUDES 2.9 MILES OF 4 LANE & 0.5 MILES OF ADA WORK ON US 212 PLUS GRADE, PAVE, & STORM SEWER FROM MN 23 TO BRIDGE #12000)

    17.6 085+00.676 103+00.364 NHPP P 18,800,000$

    MN40 3409-19 1210-891207-22

    T81802 TRWSP340919

    T81874 TRW121089

    Justin Attipou

    0.12 MILES E. OF CHIPPEWA/KANDIYOHI COUNTY LINE, REPLACE BRIDGE #91681 WITH BRIDGE 34X08 (DITCH X-ING) & 2.4 MILES E. OF MN 277, REPLACE BRIDGE #6864 WITH BRIDGE 12X03 (COUNTY DITCH X-ING) (INCLUDES WORK ON MN 29 @ RP 12.13, REPLACE CULVERT TO BRIDGE 12X04)

    0.8064+00.693055+00.974013+00.020

    064+00.993056+00.274013+00.220

    STBGP B 1,500,000$

    MN68 4210-49 4106-89 8709-24

    T81705T81706T81707

    TRW421049

    Chris Nienaber

    **AC** MINNEOTA TO MARSHALL, SHOULDER WIDENING (27+00.029 TO 37+00.987) & CULVERT/BRIDGES (5324 (NEW BRIDGE 42X09), 5629 (NEW BRIDGE 42X08), 8323 (NEW BRIDGE 87X07), 6220 (NEW BRIDGE 41X01), & 6222 (NEW BRIDGE 87X06)) PLUS CULVERTS @ 15+00.29 & 15+00.993. ALSO ADA IN MARSHALL & GHENT (INFLATED COST = $8.8M) (THIS PROJECT HAS TO BE BEFORE SP'S 6512-15 & 4210-56)

    11.0 015+00.14 037+00.94 STBGP P 2,500,000$

    US71 3412-73 3419-11 T8A599 Mark Klema

    US 71 & CR 90 (WILLMAR), J-TURN (ALSO INCLUDES WORK ON MN 294 BY THE INTERSECTION OF CSAH 24, SIDEWALK AND LEFT TURN LANE) (TIED TO SP 3412-74)

    0.3 126+00.387 126+00.687 HSIP 1,200,000$

    US71 3412-74 3419-12 T8A923 ON US 71, MN 294 TO N. JCT MN 23 & ON MN 294, CSAH 24 TO US 71 - CPR AND DIAMOND GRIND (SBL ONLY) (TIED TO SP 3412-73) 3.60126+00.345000+00.000

    129+00.097000+00.662 SF 500,000$

    US71 6405-68 T8A040 Ryan Barney2.8 MILES S. OF US 14, REPLACE BRIDGE #5543 WITH BRIDGE #64011 (COTTONWOOD RIVER X-ING) 0.3 51+00.269 51+00.609 NHPP B 3,200,000$

    US71 6509-30Jeff

    Knofczynski

    US 71, TCWR RR, UPGRADE EXSITING SIGNAL SYSTEM, USTH 71, OLIVIA, RENVILLE COUNTY 0.1 99+00.371 99+00.471 RRS 255,000$

    US212 6510-67 T8A628 Ron Mortensen

    **17 NEW** 2.3 MILES E. OF MN 23 TO CSAH 6 (RENVILLE), UNBONDED CONCRETE OVERLAY & PASSING LANE PLUS RECONSTRUCT IN SACRED HEART

    10.9 054+00.58 065+00.526 BF 19,300,000$

    US212 8713-10 T8C036 Ron Mortensen JCT. US 212 & CSAH 19, INTERSECTION LIGHTING (LPP PROJECT) 0.2 35+00.022 35+00.222 SF 20,000$

    MN999 8828-204 T8A462 DISTRICTWIDE PURCHASE SIGNS SF 250,000$ MN999 8828-205 T8A463 DISTRICTWIDE STRIPING SF 750,000$

    MN999 8828-222 T8A735 Kent Medalen DISTRICTWIDE ADA STBGP B 1,400,000$

    MN999 8828-223 T8A737 Cody Brand

    **ELLA** DISTRICTWIDE MICRO MILL & UTBWC:US 59 - CSAH 33 (MARSHALL) TO CSAH 3TH 19 - E. JCT. MN 23 TO 0.2 MILES E. OF 280TH AVE.

    17.9 075+00.541036+00.493092+00.683037+00.293 STBGP B 2,500,000$

    MN999 8808-AM-21 DISTRICTWIDE LOCAL PARTNERSHIP PROGRAM SF 485,000$ MN999 8808-CA-21 DISTRICTWIDE CONSULTANT AGREEMENTS SF 4,800,000$

    MN999 8808-CA-21A DISTRICTWIDE CONSULTANT AGREEMENTS ($2.3M FROM 17 NEW FUNDING) SF 1,600,000$

    MN999 8808-PD-21 DISTRICTWIDE INTERNAL PROJECT DELIVERY SF 1,400,000$ MN999 8808-MA-21 DISTRICTWIDE MISCELLANEOUS AGREEMENTS SF 500,000$ MN999 8808-PM-21 DISTRICTWIDE PREVENTIVE MAINTENANCE SF 330,000$ MN999 8808-RB-21 DISTRICTWIDE LANDSCAPE PARTNERSHIP SF 40,000$ MN999 8808-RW-21 DISTRICTWIDE R/W COSTS SF 500,000$ MN999 8808-RX-21 DISTRICTWIDE BARC (ROAD REPAIR) SF 1,000,000$ MN999 8808-SA-21 DISTRICTWIDE OVERRUNS AND S.A. SF 2,600,000$

    Cost= 69,655,000$ = Federally Funded projects

    Notes:

    FY 2020- FY2029District 8's 10 Year Capital Highway Investment Proposal

    FY 2021 APPROVED 5/31/19

  • Rte_Sys Prime S.P. Non-Prime SP Project ID PM Description Length Beg Ref End RefProposed

    Funds Inflat Rounded

    MN7/MN22 4308-35 MN 22, JCT OF MN 7/22 & MONTANA STREET (HUTCHINSON), INSTALL A HAWK SIGNAL (THIS IS THE MATCH FOR SP 133-010-006, COUNTY IS THE LEAD) 0.1 122+00.68 122+00.78 SF 40,000$

    MN9 3408-90 3413-91 3407-93 T8C046Mark

    Klema

    **SEC164** MN 23, JCT OF MN 23 & MN 9, CONSTRUCT A REDUCED CONFLICT INTERSECTION (WORK ON MN 9 FROM 1000' W. OF MN 23 TO JCT MN 23 & BY THE HIGH SCHOOL, REFUGE ISLANDS/BUMP OUTS)

    0.2 +00.3 +00.4 NHPP P 200,000$

    MN23 3408-90S 3413-91 3407-93 T8A725Mark

    Klema**SEC164** MN 23, JCT OF MN 23 & MN 9, CONSTRUCT A REDUCED CONFLICT INTERSECTION (WORK ON MN 9 FROM 1000' W. OF MN 23 TO JCT MN 23) 0.6 160+00.897 161+00.097 NHPP P $ 1,700,000

    US12 3403-70 T81676 Gene East 0.5 MI E OF CSAH 1 (PENNOCK) TO 1.1 MILES E. OF CSAH 5 (W. END BR #5526), 3" MILL & 3" OVERLAY 3.4067+00.372,072+00.145

    070+00.014,072+00.915 NHPP P 1,600,000$

    US12 3403-81 T8A928 Gene East 6TH STREET EAST TO 24TH STREET (WILLMAR), MEDIUM MILL & OVERLAY 1.3 074+00.058 075+00.334 164 680,000$

    MN23 7305-124 T8A280 Lance Kalthoff**COC** MN 23, PAYNESVILLE TO RICHMOND, CONSTRUCT 4 LANE ROADWAY (NORTH GAP) 8.5 177+00.099 185+00.616 STBGP P 44,400,000$

    MN30 5103-91 T8A446T84494Justin Attipou

    **AC**ELLA** 0.1 MILES E. OF US 59 TO MURRAY/COTTONWOOD COUNTY LINE, 2.5" MILL & 2.5" OVERLAY PLUS SCARIFY & LOW SLUMP OVERLAY OF BRIDGE #6782 (DES MOINES RIVER X-ING) (INFLATED $4.3M)

    14.4 041+00.885 056+00.246 NHPP P 1,640,000$

    US59 4208-60 5105-26 T8A739 Cody Brand0.3 MILES N. OF N. JCT MN 30 TO US 14 & 0.3 MILES N. OF CSAH 6 TO MN 23, MAJOR CPR & DIAMOND GRINDING 13.0

    047+00.128071+00.054

    058+00.638072+00.873 SF 2,000,000$

    US59 4209-27 T8A449 Justin Attipou5.6 MILES N. OF MARSHALL, REPLACE BRIDGES 8886 (STREAM X-ING) & 8887 (DITCH X-ING) 0.5

    080+00.66,080+00.79

    080+00.68,080+00.81 SF 1,400,000$

    MN68 4210-49AC

    T81705T81706T81707

    TRW421049

    **AC** MINNEOTA TO MARSHALL, SHOULDER WIDENING (27+00.029 TO 37+00.987) & CULVERT/BRIDGES (5324 (NEW BRIDGE 42X09), 5629 (NEW BRIDGE 42X08), 8323 (NEW BRIDGE 87X07), 6220 (NEW BRIDGE 41X01), & 6222 (NEW BRIDGE 87X06)) PLUS CULVERTS @ 15+00.29 & 15+00.993. ALSO ADA IN MARSHALL & GHENT (INFLATED COST = $8.8M) (THIS PROJECT HAS TO BE BEFORE SP'S 6512-15 & 4210-56)

    11.0 015+00.14 037+00.94 STBGP P 6,300,000$

    MN68 4210-56 T8A740 Alex Weniger

    N. GRANT ST. IN MINNEOTA TO JCT. US 59 (MARSHALL), UTBWC & ADA (THIS PROJECT HAS TO BE AFTER 4210-49 AND AFTER 6512-15. 6512-15 & 4210-56 HAVE TO BE IN THE SAME SEASON)

    11.6 027+00.02 038+00.613 NHPP P 2,400,000$

    US71 6508-69 T8A741 Kent Medalen VIKING DRIVE IN OLIVIA TO E. JCT. US 212, MEDIUM MILL & OVERLAY PLUS ADA 0.7 096+00.975 097+00.705 NHPP P 1,300,000$

    US212 4309-33 6511- 41 6512-14 T8A742Alex

    Weniger0.1 MILES E. OF CSAH 16 TO CSAH 7, UTBWC (THIS PROJECT HAS TO BE AFTER 6512-15. 6512-15 & 4309-33 HAVE TO BE IN THE SAME SEASON) 14.7 088+00.101 102+00.82 HSIP 3,000,000$

    US212 4310-93 T8A743Ron

    Mortensen

    US 212, JCT OF US 212 & CSAH 1, CONSTRUCT A REDUCED CONFLICT INTERSECTION 0.4 123+00.108 123+00.508 NHPP P 1,800,000$

    US212, MN68 6512-15

    4309-344210-57 T8A744

    Alex Weniger

    US 212 - 0.1 MILES E. OF CSAH 16 TO CSAH 7 & MN 68 - N. GRANT ST. IN MINNEOTA TO CSAH 33 (MARSHALL) (EXEMPT IN GHENT), HOT INPLACE RECYCLE (THIS PROJECT HAS TO BE AFTER 4210-49 BUT BEFORE 4210-56 & 4309-33. 6512-15, 4309-33, & 4210-56 HAVE TO BE IN THE SAME SEASON)

    25.8 088+00.101027+00.02102+00.820038+00.098 SF 1,500,000$

    MN999 8828-139 T81864 Nathan Pederson DISTRICTWIDE CULVERT REPAIRS SF 800,000$

    MN999 8828-213 T8A629 Mofeed Issa DISTRICTWIDE HIRE CONTRACTOR TO INSTALL SIGNS SF 900,000$

    MN999 8828-214 T8C047 DISTRICTWIDE PURCHASE SIGNS SF 450,000$ MN999 8828-233 T8C048 DISTRICTWIDE STRIPING SF 750,000$

    MN999 8828-224 T8A757 Erika Coudron DISTRICTWIDE BRIDGE PREVENTIVE MAINTENANCE SF 150,000$

    MN999 8808-AM-22 DISTRICTWIDE LOCAL PARTNERSHIP PROGRAM SF 560,000$ MN999 8808-CA-22 DISTRICTWIDE CONSULTANT AGREEMENTS SF 3,400,000$ MN999 8808-CA-22A DISTRICTWIDE CONSULTANT AGREEMENTS ($0.9M FROM 17 NEW FUNDING) SF -$ MN999 8808-PD-22 DISTRICTWIDE INTERNAL PROJECT DELIVERY SF 1,400,000$ MN999 8808-MA-22 DISTRICTWIDE MISCELLANEOUS AGREEMENTS SF 150,000$ MN999 8808-PM-22 DISTRICTWIDE PREVENTIVE MAINTENANCE SF 770,000$ MN999 8808-RB-22 DISTRICTWIDE LANDSCAPE PARTNERSHIP SF 40,000$ MN999 8808-RW-22 DISTRICTWIDE R/W COSTS SF 300,000$ MN999 8808-RX-22 DISTRICTWIDE BARC (ROAD REPAIR) SF 1,000,000$ MN999 8808-SA-22 DISTRICTWIDE OVERRUNS AND S.A. HSIP 1,800,000$

    Cost= 82,430,000$ = Federally Funded projects

    Notes:

    APPROVED 5/31/19FY 2022

    District 8's 10 Year Capital Highway Investment ProposalFY 2020- FY2029

  • Rte_Sys Prime S.P. Non-Prime SP Project ID PM Description Length Beg Ref End RefProposed

    Funds Inflat Rounded

    MN4 4701-32 T8A726 Justin Attipou**FLEX**AC** N. CITY LIMITS OF COSMOS TO 0.5 MILES S. OF CSAH 23, RECLAIM & OVERLAY (INFLATED COST IS $5.3M) 9.0 108+00.600 117+00.584 STBGP P 1,800,000$

    US12 4705-46 T8A633 Lowell Flaten

    HOLCOMBE AVE. (LITCHFIELD) TO 0.2 MILES E. OF CSAH 14 (DARWIIN), MEDIUM MILL & OVERLAY, MICRO MILL & UTBWC (R.P. 102+00.360 TO R.P. 106+00.996)

    6.1 100+00.925 106+00.996 NHPP P 1,900,000$

    MN15 4707-26 4708-13T81868T81869T81870

    Ben Sandoz

    **AC** JCT. US 12 (DASSEL) TO MEEKER/STEARNS COUNTY LINE, RECLAIM & OVERLAY (INFLATED COST IS $9.4M) 14.0 116+00.139 130+00.491 NHPP P 3,800,000$

    MN19 4103-11 T8A636 Justin Attipou0.1 TO 0.8 MILES W. OF US 75, REPLACE BRIDGE'S 826, 8736, & 8737 (YELLOW MEDICINE RIVER X-ING) 1.0 009+00.390 010+00.416 STBGP B 2,700,000$

    MN22 4307-47 T8A738 Kent Medalen**ELLA** US 212 TO CEDAR AVENUE (GLENCOE), MEDIUM MILL & OVERLAY PLUS ADA 1.5 106+00.65 108+00.141 NHPP P 2,400,000$

    MN23 3408-18 T81476 Chris Nienaber**COC** MN 23, NEW LONDON TO PAYNESVILLE, CONSTRUCT 4 LANE ROADWAY (SOUTH GAP) 7.2 163+00.155 170+00.361 COC 29,800,000$

    MN23 4206-23 T8A637 Erika Coudron 1.1 MILES E. OF FLORENCE, REPLACE BRIDGE 5746 (REDWOOD RIVER X-ING) 0.3 053+00.361 053+00.661 NHPP B 1,600,000$

    MN30 5103-91AC T8A446T84494Justin Attipou

    **AC** 0.1 MILES E. OF US 59 TO MURRAY/COTTONWOOD COUNTY LINE, 2.5" MILL & 2.5" OVERLAY PLUS SCARIFY & LOW SLUMP OVERLAY OF BRIDGE #6782 (DES MOINES RIVER X-ING) (INFLATED $4.3M)

    14.4 041+00.885 056+00.246 STBGP P 2,660,000$

    MN40, US7 3701-92 3703-28 T8A748 Jesse VlaminckMN 40 - E. JCT US 75 TO WESTERN AVENUE & US 75 - N. JCT MN 40 TO 8TH STREET (MADISON), MEDIUM MILL & OVERLAY PLUS ADA 1

    012+00.672108+00.949

    013+00.252109+00.392 STBGP P 1,800,000$

    MN67 8706-89 T8A046 Lowell Flaten**AC** CLARKFIELD RECONSTRUCT (LIMITS NOT DEFINED) (INFLATED COST IS $4.5M) 0.6 019+00.013 019+00.539 STBGP P 3,200,000$

    MN271 4110-14 T81586 Cody Brand**FLEX** MN 19 TO RAILROAD STREET (HENDRICKS), RECLAIM & OVERLAYMAPLE STREET (HENDRICKS) TO STATE LINE, THIN M&O 8.2 000+00.000 008+00.719 STBGP P 3,100,000$

    MN999 8828-225 T8C049 Erika Coudron DISTRICTWIDE BRIDGE PREVENTIVE MAINTENANCE SF 150,000$

    MN999 8808-AM-23 DISTRICTWIDE LOCAL PARTNERSHIP PROGRAM SF 600,000$ MN999 8828-235 DISTRICTWIDE PURCHASE SIGNS SF 250,000$ MN999 8828-234 DISTRICTWIDE STRIPING SF 750,000$ MN999 8808-CA-23 DISTRICTWIDE CONSULTANT AGREEMENTS SF 4,400,000$ MN999 8808-PD-23 DISTRICTWIDE INTERNAL PROJECT DELIVERY SF 1,400,000$ MN999 8808-MA-23 DISTRICTWIDE MISCELLANEOUS AGREEMENTS SF 150,000$ MN999 8808-PM-23 DISTRICTWIDE PREVENTIVE MAINTENANCE SF -$ MN999 8808-RB-23 DISTRICTWIDE LANDSCAPE PARTNERSHIP SF 40,000$ MN999 8808-RW-23 DISTRICTWIDE R/W COSTS SF 250,000$ MN999 8808-RX-23 DISTRICTWIDE BARC (ROAD REPAIR) SF 1,000,000$ MN999 8808-SA-23 DISTRICTWIDE OVERRUNS AND S.A. SF 2,300,000$

    MN999 8808-SH-23 John Hager DISTRICTWIDE HSIP HSIP 1,222,222$

    Cost= 67,272,222$ = Federally Funded projects

    Notes:

    FY 2023

    District 8's 10 Year Capital Highway Investment ProposalFY 2020- FY2029

    APPROVED 5/31/19

  • Rte_Sys Prime S.P. Non-Prime SP Project ID PM Description Length Beg Ref End RefProposed

    Funds Inflat Rounded

    MN4 4701-32AC T8A726 Justin Attipou**FLEX**AC** N. CITY LIMITS OF COSMOS TO 0.5 MILES S. OF CSAH 23, RECLAIM & OVERLAY (INFLATED COST IS $5.3M) 9.0 108+00.600 117+00.584 STBGP P 3,500,000$

    MN4 6502-17 T8C050 Justin Attipou**AC** MN 19 (FAIRFAX) TO US 212 (HECTOR), RECLAIM & OVERLAY (INFLATED COST = $9.5M) 14.8 079+00.399 094+00.212 STBGP P 3,100,000$

    US12 4705-49 8601-69 T8C051 Alex Weniger0.1 MI. E. OF CSAH 14 (DARWIN) TO 0.1 MI. E. OF PITTMAN AVE. (COKATO), MAJOR CPR & DIAMOND GRINDING & ADA 10.3 106+00.997 117+00.267 NHPP P 5,000,000$

    MN15 4707-26AC Ben Sandoz**AC** JCT. US 12 (DASSEL) TO MEEKER/STEARNS COUNTY LINE, RECLAIM & OVERLAY (INFLATED COST IS $9.4M) 14.0 116+00.139 130+00.491 NHPP P 6,600,000$

    MN23 5902-25 4105-094206-24 T8A749Erika

    Coudron**AC** US 75 (PIPESTONE) TO 1.8 MILES N. OF MN 91, MEDIUM MILL & OVERLAY & RE-DECK BRIDGE 59002 (INFLATED COST IS $11.1M) 30.6 30+00.555 61+00.239 NHPP P 7,100,000$

    MN29, MN40 1210-91 1207- T8A751

    Justin Attipou

    **AC** MN 29 - W. JCT. MN 40 TO E. JCT. MN 40MN 40 - E. JCT. MN 29 TO MN 277, MEDIUM MILL & OVERLAY (INFLATED TO $3.6M) 12.0

    012+00.299047+00.719

    018+00.283053+00.696 STBGP P 1,720,000$

    MN30 5904-26 T8A752 Mark Klema3.5 MILES W. OF PIPESTONE/MURRAY COUNTY LINE, REPLACE BRIDGES 4566 & 4468 (STREAM X-ING) 0.3 016+00.393 016+00.693 STBGP B 710,000$

    MN40 1209-90 T8A641 Justin Attipou**AC** US 59 (MILAN) TO W. JCT. MN 29, MEDIUM MILL & OVERLAY (INFLATED COST = $3.1M) 9.3 032+00.394 041+00.733 STBGP P 2,100,000$

    MN67 8706-89AC T8A046 Lowell Flaten**AC** CLARKFIELD RECONSTRUCT (LIMITS NOT DEFINED) (INFLATED COST IS $4.5M) 0.6 019+00.013 019+00.539 STBGP P 2,832,222$

    MN999 8828-226 T8C052 Chris Nienaber DISTRICTWIDE BRIDGE PREVENTIVE MAINTENANCE SF 150,000$

    MN999 8828-227 T8C053 Mofeed Issa DISTRICTWIDE HIRE CONTRACTOR TO INSTALL SIGNS SF 1,200,000$

    MN999 8828-228 T8C054 DISTRICTWIDE PURCHASE SIGNS SF 550,000$ MN999 8808-AM-24 DISTRICTWIDE LOCAL PARTNERSHIP PROGRAM SF 600,000$ MN999 8808-CA-24 DISTRICTWIDE INTERNAL PROJECT DELIVERY/CONSULTANT AGREEMENTS SF 5,400,000$ MN999 8808-MA-24 DISTRICTWIDE MISCELLANEOUS AGREEMENTS SF 250,000$ MN999 8808-PM-24 DISTRICTWIDE PREVENTIVE MAINTENANCE SF 566,000$ MN999 8808-RB-24 DISTRICTWIDE LANDSCAPE PARTNERSHIP SF 40,000$ MN999 8808-RW-24 DISTRICTWIDE R/W COSTS SF 800,000$ MN999 8808-RX-24 DISTRICTWIDE BARC (ROAD REPAIR) SF 1,000,000$ MN999 8808-SA-24 DISTRICTWIDE OVERRUNS AND S.A. SF 3,000,000$ MN999 8808-SC-24 DISTRICTWIDE MISCELLANEOUS CONSTRUCTION SF 800,000$ MN999 8808-SHS-24 DISTRICTWIDE HSIP HSIP 1,222,222$

    Cost= 48,240,444$ = Federally Funded projects

    Notes:

    APPROVED 5/31/19FY 2020- FY2029

    District 8's 10 Year Capital Highway Investment Proposal

    FY 2024

  • Rte_Sys Prime S.P. Non-Prime SPProject

    ID PM Description Length Beg Ref End RefProposed

    Funds Inflat Rounded

    MN4 4701-33 T8C055 Kent Medalen 2.6 MILES N. OF RENVILLE/MEEKER COUNTY LINE, REPLACE BRIDGE 6801 0.3 107+00.464 107+00.766 STBGP B 1,400,000$

    MN4 6502-17AC **AC** MN 19 (FAIRFAX) TO US 212 (HECTOR), RECLAIM & OVERLAY (INFLATED COST = $11.2M) 14.8 079+00.399 094+00.212 STBGP P $ 6,400,000

    MN7 1003-38 T8C056 Ben Sandoz1.8 MILES E. OF MCLEOD/CARVER COUNTY LINE, REPLACE BRIDGE 8518 (STREAM X-ING) (METRO ATP) 0.3 161+00.621 161+00.922 NHPP B 650,000$

    US14 4101-90 T8C057 Ryan Barney1.8 MILES E. OF SOUTH DAKOTA/MINNESOTA STATE LINE, REPLACE BRIDGE 1686 (STREAM X-ING) 0.3 001+00.642 001+00.942 NHPP B 610,000$

    MN19 4204-40 4205-92 T8A933 Gene East **AC** MARSHALL, RECONSTRUCT (INFLATED $10.1M) 1.2 034+00.311 035+00.481 NHPP P 5,500,000$

    MN23 5902-25AC 4105-094206-24 T8A749Erika

    Coudron**AC** US 75 (PIPESTONE) TO 1.8 MILES N. OF MN 91, MEDIUM MILL & OVERLAY & RE-DECK BRIDGE 59002 (INFLATED COST IS $11.1M) 30.6 030+00.555 061+00.239 NHPP P 4,000,000$

    MN29, MN40 1210-91AC

    **AC** MN 29 - W. JCT. MN 40 TO E. JCT. MN 40MN 40 - E. JCT. MN 29 TO MN 277, MEDIUM MILL & OVERLAY (INFLATED TO $3.6M) 12.0

    012+00.299047+00.719

    018+00.283053+00.696 STBGP P 1,880,000$

    MN40 1209-90AC T8A641 Cody Brand**AC** US 59 (MILAN) TO W. JCT. MN 29, MEDIUM MILL & OVERLAY (INFLATED COST = $3.1M) 9.3 032+00.394 041+00.733 STBGP P 1,000,000$

    MN40 3701-90 1209-89 T8A638T8A639Justin Attipou MN 119 TO US 59/MN 7 (MILAN), MEDIUM M&O 8.4 24+00.065 32+00.394 STBGP P 3,400,000$

    MN40 3701-91 T8A640 Justin Attipou 3.5 MILES S. OF MN 119, REPLACE BRIDGE 6706 0.3 20+00.384 20+00.684 STBGP B 810,000$

    US75 4109-30 T8C058 Ryan Barney1.6 MILES S. OF LINCOLN/YELLOW MEDICINE COUNTY LINE, REPLACE BRIDGE 8373 (STREAM X-ING) 0.3 079+00.231 079+00.531 STBGP B 550,000$

    MN999 8828-201 T8A453 Alex Weniger DISTRICTWIDE CULVERT REPAIRS SF 1,000,000$

    MN999 8828-236 T8C059 Erika Coudron DISTRICTWIDE BRIDGE PREVENTIVE MAINTENANCE SF 150,000$

    MN999 8808-AM-25 DISTRICTWIDE LOCAL PARTNERSHIP PROGRAM SF 600,000$ MN999 8808-CA-25 DISTRICTWIDE INTERNAL PROJECT DELIVERY/CONSULTANT AGREEMENTS SF 5,500,000$ MN999 8808-MA-25 DISTRICTWIDE MISCELLANEOUS AGREEMENTS SF 250,000$ MN999 8808-PM-25 DISTRICTWIDE PREVENTIVE MAINTENANCE SF 1,650,000$ MN999 8808-RB-25 DISTRICTWIDE LANDSCAPE PARTNERSHIP SF 40,000$ MN999 8808-RW-25 DISTRICTWIDE R/W COSTS SF 100,000$ MN999 8808-RX-25 DISTRICTWIDE BARC (ROAD REPAIR) SF 1,000,000$ MN999 8808-SA-25 DISTRICTWIDE OVERRUNS AND S.A. SF 2,400,000$ MN999 8808-SC-25 DISTRICTWIDE MISCELLANEOUS CONSTRUCTION SF 1,000,000$ MN999 8808-SHS-25 DISTRICTWIDE HSIP HSIP 1,222,222$

    Cost= 41,112,222$ = Federally Funded projects

    Notes:

    APPROVED 5/31/19

    District 8's 10 Year Capital Highway Investment ProposalFY 2020- FY2029

    FY 2025

  • Rte_Sys Prime S.P. Non-Prime SPProject

    ID PM Description Length Beg Ref End RefProposed

    Funds Inflat Rounded

    MN7, MN29 1202- 1206-

    MN 7 - 0.3 MILES W. OF S. JCT MN 29 TO 0.3 MILES E. OF 28TH STREETMN 29 - US 212 TO N. JCT MN 7 (MONTEVIDEO), THIN M&O 3.4

    072+00.279,000+00.00

    075+00.515,001+00.434 NHPP P 850,000$

    MN19 4204-40AC 4205-92 **AC** MARSHALL, RECONSTRUCT (INFLATED $10.1M) 1.2 034+00.311 035+00.481 NHPP P 4,600,000$

    MN40 1210- 3409- **AC** MN 277 TO WILLMAR, RECLAIM & OVERLAY (INFLATED COST IS $12.6M) 19.0 053+00.696 072+00.68 STBGP P 6,530,000$

    US71 6405- **AC** '0.1 MILES N OF CSAH 115 (SANBORN) TO S. JCT. MN 68, RECLAIM & OVERLAY (INFLATED COST = $8.5M) 12.6 053+00.245 065+00.814 NHPP P 2,350,000$

    US75 5906- 4107-PIPESTONE CREEK (BR. 59001) TO S. VALLEY STREET (BEG. OF C&G IN LAKE BENTON), CIR & OVERLAY 12.2 042+00.018 054+00.195 SF 4,800,000$

    MN999 8828- Chris Nienaber **AC** UNIDENTIFIED SHOULDER WIDENING (INFLATED COST IS $8.5M) STBGP P 3,500,000$

    MN999 8828- DISTRICTWIDE BRIDGE PREVENTIVE MAINTENANCE STBGP B 150,000$ MN999 8828- DISTRICTWIDE HIRE CONTRACTOR TO INSTALL SIGNS SF 1,500,000$ MN999 8828- DISTRICTWIDE PURCHASE SIGNS SF 800,000$ MN999 8808-AM-26 DISTRICTWIDE LOCAL PARTNERSHIP PROGRAM SF 600,000$

    MN999 8808-CA-26 DISTRICTWIDE INTERNAL PROJECT DELIVERY/CONSULTANT AGREEMENTS SF 5,500,000$

    MN999 8808-MA-26 DISTRICTWIDE MISCELLANEOUS AGREEMENTS SF 250,000$ MN999 8808-PM-26 DISTRICTWIDE PREVENTIVE MAINTENANCE SF 2,120,000$ MN999 8808-RB-26 DISTRICTWIDE LANDSCAPE PARTNERSHIP SF 40,000$ MN999 8808-RW-26 DISTRICTWIDE R/W COSTS SF 100,000$ MN999 8808-RX-26 DISTRICTWIDE BARC (ROAD REPAIR) SF 1,000,000$ MN999 8808-SA-26 DISTRICTWIDE OVERRUNS AND S.A. SF 2,300,000$ MN999 8808-SC-26 DISTRICTWIDE MISCELLANEOUS CONSTRUCTION SF 400,000$ MN999 8808-SHS-26 DISTRICTWIDE HSIP HSIP 1,222,222$

    Cost= 38,612,222$ = Federally Funded projects

    Notes:

    APPROVED 5/31/19

    District 8's 10 Year Capital Highway Investment ProposalFY 2020- FY2029

    FY 2026

  • Rte_Sys Prime S.P. Non-Prime SPProject

    ID PM Description Length Beg Ref End RefProposed

    Funds Inflat Rounded

    US12 3403-78 T8A632 0.1 MILES W. OF 11TH STREET WEST (WILLMAR) TO 6TH STREET EAST, CPR & MEDIUM MILL & OVERLAY PLUS ADA 1.2 072+00.925 074+00.063 NHPP P 1,700,000$

    US14 4102- JESSE STREET (LAKE BENTON) TO 0.2 MILES E. OF LICOLN/LYON COUNTY LINE, CIR PLUS ADA IN TYLER 11.0 8+00.736 19+00.757 NHPP P 6,000,000$

    US14 4201- 4202-**AC** 0.2 MILES E OF LINCOLN/LYON COUNTY LINE TO 4TH ST. E. (TRACY), CIR & MEDIUM OVERLAY PLUS ADA IN TRACY (INFLATED COST = $9.1M)

    23.4 19+00.757 43+00.139 NHPP P 5,450,000$

    MN23 4203- TIGER DRIVE (MARSHALL) TO 1 MILE N. OF CSAH 33 (END OF 4-LANE), THIN MILL & OVERLAY (BOTH DIRECTIONS) 2.0 075+00.527 077+00.51 NHPP P $ 1,200,000

    MN30 5101- 4.1 MILES E. OF PIPESTONE/MURRAY COUNTY LINE, REPLACE BRIDGES 8172 & 8716 0.3 024+00.02 024+00.321 STBGP B 1,200,000$

    MN40 1210-XXAC 3409- **AC** MN 277 TO WILLMAR, RECLAIM & OVERLAY (INFLATED COST IS $12.6M) 19.0 053+00.696 072+00.68 STBGP P 6,070,000$

    US71 6405-XXAC **AC** '0.1 MILES N OF CSAH 115 (SANBORN) TO S. JCT. MN 68, RECLAIM & OVERLAY (INFLATED COST = $8.5M) 12.6 053+00.245 065+00.814 NHPP P 6,150,000$

    US75, US14 4107-19 T8A642 Gene East

    **AC** US 75 - NEAR S. VALLEY STREET (BEG. OF C&G IN LAKE BENTON) TO S. JCT US 14, RECONSTRUCTUS 14 - 0.05 MILES W. OF S. JCT US 75 (BR 41003) TO JESSE STREET (LAKE BENTON), MILL & OVERLAY (INFLATED COST = $5.5M)

    0.8 054+00.195008+00.482054+00.777008+00.736 STBGP P 3,130,000$

    MN999 8828-XXAC Chris Nienaber **AC** UNIDENTIFIED SHOULDER WIDENING (INFLATED COST IS $8.5M) STBGP P $ 5,000,000

    MN999 8828- DISTRICTWIDE CULVERT REPAIRS SF 1,500,000$ MN999 8828- DISTRICTWIDE BRIDGE PREVENTIVE MAINTENANCE STBGP B 150,000$ MN999 8808-AM-27 DISTRICTWIDE LOCAL PARTNERSHIP PROGRAM SF 600,000$

    MN999 8808-CA-27 DISTRICTWIDE INTERNAL PROJECT DELIVERY/CONSULTANT AGREEMENTS SF 5,500,000$

    MN999 8808-MA-27 DISTRICTWIDE MISCELLANEOUS AGREEMENTS SF 250,000$ MN999 8808-PM-27 DISTRICTWIDE PREVENTIVE MAINTENANCE SF 1,560,000$ MN999 8808-RB-27 DISTRICTWIDE LANDSCAPE PARTNERSHIP SF 40,000$ MN999 8808-RW-27 DISTRICTWIDE R/W COSTS SF 100,000$ MN999 8808-RX-27 DISTRICTWIDE BARC (ROAD REPAIR) SF 1,000,000$ MN999 8808-SA-27 DISTRICTWIDE OVERRUNS AND S.A. SF 3,100,000$ MN999 8808-SC-27 DISTRICTWIDE MISCELLANEOUS CONSTRUCTION SF 1,000,000$ MN999 8808-SHS-27 DISTRICTWIDE HSIP HSIP 1,222,222$

    Cost= 51,922,222$ = Federally Funded projects

    Notes:

    APPROVED 5/31/19

    District 8's 10 Year Capital Highway Investment Proposal FY 2020- FY2029

    FY 2027

  • Rte_Sys Prime S.P. Non-Prime SP Project ID PM Description Length Beg Ref End RefProposed

    Funds Inflat Rounded

    MN7, MN22 4302- 4307-

    MN 7 - JCT. MN 22 TO 0.15 MILES E. OF GROVE AVE. (SILVER LAKE) & MN 22 - 0.6 MILES S. OF CR 115 TO SHADY RIDGE RD., CPR & DIAMOND GRIND 13.5

    141+00.975118+00.386

    151+00.191123+00.661 NHPP P 6,600,000$

    US14 4201-XXAC 4202- **AC** 0.2 MILES E OF LINCOLN/LYON COUNTY LINE TO 4TH ST. E. (TRACY), CIR & MEDIUM OVERLAY PLUS ADA IN TRACY (INFLATED COST = $9.1M) 23.4 019+00.757 043+00.139 NHPP P 3,650,000$

    US59 4208- JCT. US 14 TO 0.4 MI. N. OF CSAH 6 (MARSHALL), CIR & MEDIUM OVERLAY 12.4 058+00.633 071+00.055 NHPP P 5,900,000$ US59 8703- 5 MILES S OF MN 67, REPLACE BRIDGE 6751 0.3 092+00.791 093+00.091 STBGP B 590,000$

    MN68 8709-4106-4210-8708-

    **AC** 400' SE. OF CUSTER AVE. N. (CANBY) TO N. GRANT ST. (MINNEOTA), RECLAIM & OVERLAY, ADA IN PORTER, TAUNTON, & MINNEOTA, & ALL THE W BOX CULVERT/BRIDGES FROM RP 6+00.091 TO 16+00.587 (INFLATED COST = $13M)

    17.8 09+00.251 027+00.02 STBGP P 6,600,000$

    US71, MN23 3412-

    3411-3405-

    **AC** US 71 SOUTHBOUND - S. JCT MN 23 TO MN 294 (R.P. 120+00.962 - R.P. 126+00.361), US 71 NORTHBOUND - MN 294 TO N. JCT MN 23 (R.P. 126+00.078 - R.P. 128+00.971) & MN 23 - 0.25 MILES W. OF CSAH 5 TO W. JCT US 71, UNBONDED CONCRETE OVERLAY (INFLATED COST = $25M)

    11.7 120+00.962141+00.228128+00.971144+00.520 NHPP P 22,300,000$

    US75, US14 4107-19AC T8A642 Gene East

    **AC** US 75 - NEAR S. VALLEY STREET (BEG. OF C&G IN LAKE BENTON) TO S. JCT US 14, RECONSTRUCTUS 14 - 0.05 MILES W. OF S. JCT US 75 (BR 41003) TO JESSE STREET (LAKE BENTON), MILL & OVERLAY (INFLATED COST = $5.5M)

    0.8 054+00.195008+00.482054+00.777008+00.736 STBGP P 2,370,000$

    US75 5905- COUNTY LINE TO MN 30 (PIPESTONE), CIR & OVERLAY 11.0 024+00.605 035+00.649 STBGP P 5,600,000$ US75 3703- 3 MILES S OF MN 7, REPLACE BRIDGE 9017 0.3 125+00.479 125+00.779 STBGP P 2,100,000$

    MN999 8828- DISTRICTWIDE BRIDGE PREVENTIVE MAINTENANCE STBGP B 150,000$ MN999 8808-AM-28 DISTRICTWIDE LOCAL PARTNERSHIP PROGRAM SF 600,000$ MN999 8808-CA-28 DISTRICTWIDE INTERNAL PROJECT DELIVERY/CONSULTANT AGREEMENTS SF 5,500,000$ MN999 8808-MA-28 DISTRICTWIDE MISCELLANEOUS AGREEMENTS SF 250,000$ MN999 8808-PM-28 DISTRICTWIDE PREVENTIVE MAINTENANCE SF 730,000$ MN999 8808-RB-28 DISTRICTWIDE LANDSCAPE PARTNERSHIP SF 40,000$ MN999 8808-RW-28 DISTRICTWIDE R/W COSTS SF 100,000$ MN999 8808-RX-28 DISTRICTWIDE BARC (ROAD REPAIR) SF 1,000,000$ MN999 8808-SA-28 DISTRICTWIDE OVERRUNS AND S.A. SF 4,200,000$ MN999 8808-SC-28 DISTRICTWIDE MISCELLANEOUS CONSTRUCTION SF 1,000,000$ MN999 8808-SHS-28 DISTRICTWIDE HSIP HSIP 1,222,222$

    Cost= 70,502,222$ = Federally Funded projects

    Notes:

    APPROVED 5/31/19

    District 8's 10 Year Capital Highway Investment ProposalFY 2020- FY2029

    FY 2028

  • MN19 4204- 4104- **AC** IVANHOE TO CSAH 5, RECLAIM & OVERLAY (MEDIUM MILL & OVERLAY IN IVANHOE) (INFLATED COST = $14.3M) 8 010+00.394 018+00.368 STBGP P 11,210,000$

    MN23 4207-58 4203-55 T8A750 Erika Coudron

    **AC** 1.8 MILES N. OF MN 91 TO 0.1 MILES N. OF TIGER DRIVE (MARSHALL), MINOR CPR & DIAMOND GRIND (BOTH DIRECTIONS OF 4 LANE SEGMENT) (INFLATED COST = $6.2M)

    14.4 061+00.239 075+00.655 NHPP P 4,050,000$

    MN68 8709-XXAC4106-4210-8708-

    **AC** 400' SE. OF CUSTER AVE. N. (CANBY) TO N. GRANT ST. (MINNEOTA), RECLAIM & OVERLAY, ADA IN PORTER, TAUNTON, & MINNEOTA, & ALL THE W BOX CULVERT/BRIDGES FROM RP 6+00.091 TO 16+00.587 (INFLATED COST = $13M)

    17.8 09+00.251 027+00.02 STBGP P 6,400,000$

    US71, MN23 3412-XXAC

    3411-3405-

    **AC** US 71 SOUTHBOUND - S. JCT MN 23 TO MN 294 (R.P. 120+00.962 - R.P. 126+00.361), US 71 NORTHBOUND - MN 294 TO N. JCT MN 23 (R.P. 126+00.078 - R.P. 128+00.971) & MN 23 - 0.25 MILES W. OF CSAH 5 TO W. JCT US 71, UNBONDED CONCRETE OVERLAY (INFLATED COST = $25M)

    11.7 120+00.962141+00.228128+00.971144+00.520 NHPP P 2,750,000$

    US 71 6405- S. JCT. MN 68 TO 0.2 MI. N. OF CSAH 101 (REDWOOD FALLS), RECLAIM & OVERLAY 8.9 065+00.814 074+00.775 NHPP P 6,800,000$

    MN999 8828- DISTRICTWIDE BRIDGE PREVENTIVE MAINTENANCE STBGP B 150,000$ MN999 8808-AM-29 DISTRICTWIDE LOCAL PARTNERSHIP PROGRAM SF 600,000$ MN999 8808-CA-29 DISTRICTWIDE INTERNAL PROJECT DELIVERY/CONSULTANT AGREEMENTS SF 5,500,000$ MN999 8808-MA-29 DISTRICTWIDE MISCELLANEOUS AGREEMENTS SF 250,000$ MN999 8808-PM-29 DISTRICTWIDE PREVENTIVE MAINTENANCE SF 700,000$ MN999 8808-RB-29 DISTRICTWIDE LANDSCAPE PARTNERSHIP SF 40,000$ MN999 8808-RW-29 DISTRICTWIDE R/W COSTS SF 100,000$ MN999 8808-RX-29 DISTRICTWIDE BARC (ROAD REPAIR) SF 1,000,000$ MN999 8808-SA-29 DISTRICTWIDE OVERRUNS AND S.A. SF 4,200,000$ MN999 8808-SC-29 DISTRICTWIDE MISCELLANEOUS CONSTRUCTION SF 1,000,000$ MN999 8808-SHS-29 DISTRICTWIDE HSIP HSIP 1,222,222$

    Cost= 45,972,222$ = Federally Funded projects

    Notes:

    APPROVED 5/31/19

    District 8's 10 Year Capital Highway Investment ProposalFY 2020- FY2029

    Rte_Sys Prime S.P. Non-Prime SPProject

    ID PM Description Length Beg Ref End RefProposed

    Funds Inflat Rounded

    FY 2029