燃气管道三维空间定向穿越施工监测_李素贞

Embed Size (px)

DESCRIPTION

燃气管道三维空间定向穿越施工监测_李素贞

Citation preview

  • 2011 6 Pipeline Technique and Equipment

    2011No. 6

    :(08PJ14097) ;(2006BAJ16B02 01):2011 01 05 :2011 06 22

    1 2 1

    (1 200092;2 200240)

    :

    ::;;;;

    :TE83 :B :1004 9614(2011)06 0039 04

    Construction Monitoring of a Gas Pipeline during3 D Horizontal Directional Drilling

    LI Su-zhen1CHEN Jun2XIE Qiang1

    (1 Department of Building EngineeringTongji UniversityShanghai 200092China;

    2 Department of Civil EngineeringShanghai Jiaotong UniversityShanghai 200240China)

    Abstract:It is of great significance for municipal pipeline engineering construction to implement 3 D horizontal directional

    drilling (HDD) In virtue of a practical projectthis work carries out the onsite monitoring of a gas pipeline during 3 D HDD

    construction Based on gyroscopic position-detection system and a fiber optic sensing techniquean integrated scheme for the pipe-

    line construction monitoring is designed and conducted The 3 D spatial coordinates of the overall pipeline are measured The

    mechanic responses of the tested section running through the whole drilling track are obtained It testifies that the longitudinal

    strains and the sectional moments are sharply increased as the tested pipe traverses with a rotation simultaneously on the horizon-

    tal and vertical planes The recorded data are informative for a further theoretical analysis and the monitoring strategy can provide

    a reference for such similar projects

    Key words:gas pipeline;3 D HDD;construction monitoring;fiber optic sensor;gyroscope

    0

    ;

  • 40 Pipeline Technique and Equipment Nov. 2011

    ;

    1

    0. 4 MPa GB1 (SS400)D325 8

    520m 21. 4 m 2 ( 300m 220 m)

    2

    1

    1

    :

    4 m 4 m

    (300 mm)(520m) () ()

    3

    4 m 300 mm 4 m 2 2 m 2 2 350 mm 2 4 2

    2

    ()

    USB

    2 :300 m

    220 m 8:50PM 10:30PM 00:30AM 01:50AM

  • 6 : 41

    3 1 Hz s 1 s

    4 4 1

    4 :;

    ;

    ;

    4 2

    AutoCAD 3

    3

    a b a a ;b

    m 1 /3 ()4 3

    4 :

    (1);

    (2) 4 3 AutoCAD

    ;

    (3)1 216 ;

    (4)

    4

    4 4 5

    ABC AC xB x y x' E

    5

    ABC A = EA (1)B = EB (2)C = EC (3)

    (

    M N):

    A =NA +

    MyIyhA =

    NA +

    sinIyhA (4)

    B =NA +

    MxIxhB =

    NA +

    cosIxhB (5)

    C =NA

    MyIyhC =

    NA

    sinIyhC (6)

    :A;MxIx x ;MyIy y;hAhBhC ABC

    :

    Ix = Iy =R44 (1 r

    4 /R4) (7)

  • 42 Pipeline Technique and Equipment Nov. 2011

    A = (R2 r2) (8)hA = hB = hC = r (9)

    :R;r(4)(6):

    N =AhC + ChA

    hA + hCA =

    A + C2 (R

    2 r2) (10)

    (4)(5):

    M = R3

    4 (1 r4 /R4) A

    N( )A 2 + B N( )A2

    (11)

    6

    6

    160 kN:

    ;

    ( 4 22) ;

    ( 23 27) ;

    ( 28 32) ;( 33 36) ;

    5

    (1)

    (2)

    2

    (3)

    :

    1 GB 5025194

    2 GB 5025103

    3 Li SuzhenWu Zhishen Development of Distributed Long-

    gage Fiber Optic Sensing System for Structural Health Moni-

    toring Structural Health Monitoring20076(2) :133 143

    4

    :2009

    :(1978)