GENERAL ELEVATION
PLAN
61'-3…" 93'-0"
SPAN (1-2) SPAN (2-3) SPAN (3-4)
1
2
3
4
Pr. Gr. Elev. 876.69
Beg. Sta. 652+93.72
Pr. Gr. Elev. 877.00
Sta. 653+55.00 Pr. Gr. Elev. 877.47
Sta. 654+48.00
Pr. Gr. Elev. 877.77
Sta. 655+09.28
@ Ë Roadway
@ End of Slab
Pr. Gr. Elev. 876.70
Sta. 652+94.37
@ Ë Roadway
@ End of Slab
Pr. Gr. Elev. 877.77
Sta. 655+08.63
2'-
0"
2'-
0"
20'-0" 20'-0"
15"
21"
3'-0"
15"
21"
3'-0"
12'-
0"
12'-
0"
24'-
0"
Roa
dwa
yProfile Grade
Ë Roadway &
Ë Structure,
End Bent No. 1
Fill Face of
End Bent No. 4
Fill Face of
17†"
5'-1•"
5'-1•"
17†"
5'-1•"
5'-1•"
9'-6"
9'-6"
& Ë Rock Socket
Ë Drilled Shaft
Ë Int. Bent No. 2
3 Spaces
@ 10'-3"
Ë Pile
Ë Pile
3 Spaces
@ 10'-3"
Elev. 841.00
Top of Sound Rock
Anticipated
Fix.Fix. Fix.Fix.
+0.50% Grade
Elev. 833.00
Bottom of Rock Socket
(to be removed)
Existing Structure (X-186)
(Typ.)
Elev. 861.50
Berm
Elev. 867.29
Top of Drilled Shaft
61'-3…"
215'-6ƒ"
(Survey Date 2011)
Ground Line
From Design
Notice and Disclaimer Regarding Boring Log Data
10.
00
00
8.3910
13.0541
40°00'00"
50°00'00"
90°00'00"
Dimensions
Horizontal
Elev. 859.18
Bott. of Encasement
Ë Pile
Ë Int. Bent No. 3
Annotation
in Tasks: General
available as a cell
Front Sheet Text
From Layout folder
Fr
om
Desi
gn
La
yo
ut
or
Plat
Sheet
Fr
om
desi
gn (sla
b)
From Design Layout
From design
From design
in Layout folder
From Profile sheet
Cell in Tasks: Front Sheets (Boring Symbol)
Always 90°
3 spa.
@ 9'-2"
is shown on this front sheet.
on the following sheets may not necessarily match what
covering a variety of structural components. Some details
projects. It is intended to be used for reference only,
This set of example plans is based on several bridge
Medium Text (Titles)
Tasks: General Annotation
Annotation)
(Use Tasks: General
text shall be "small".
All note and dimension
Design Layout)
(when specified on
If required
Note E1.1, EPG 751.50
if required.
Note E1.4, EPG 751.50
sheet, North arrow should be shown there.
If Location Sketch is shown on front
Cell in Tasks: Front Sheets (North Arrow)
Note: This drawing is not to scale. Follow dimensions.
*
BR
*
*
26 34N 29WSEC/SUR TWP RGE
ROUTE B FROM RTE. 71 TO RTE. 97
ABOUT 2.5 MILES WEST OF RTE. 97
RTE. B, ELEV. 973.158'
OF BRIDGE HEADWALL AT HORSE CREEK BRIDGE ON
B.M. 306 = SET "Ô" SQUARE CUT AT S.E. CORNER
Small Text (Bold)
Tasks: General Annotation
Calculate
(59'-93'-59') PRESTRESSED CONCRETE I-GIRDER SPANS
new bents.
close to
if they are
footings only
Show existing
EXAMPLE
1
Sheet No. 1 of 30Checked Aug. 2019
Detailed Aug. 2019
Designed Aug. 2019
From Design Layout/Bridge Memo
(Typ.)
Control Geotextile (Rdwy. item)
Blanket with Permanent Erosion
with 2'-0" Type 2 Rock
2:1 Slope (Normal)
(See EPG 751.5.2.1.1)
Design Layout)
Skew angle (from
D.F. Elev. 869.00
See EPG 751.5.2.1.3
in Layout folder.
From Plat sheet
BRIDGE: ROUTE B OVER HORSE CREEK
See EPG 751.5.2.1.1
From design.
MoDOT pulldown menu.
option under the
using Place Border
a Reference File,
Border is attached as
are driven for any bents falling within the embankment section.
feet in back of the fill face of the end bents before any piles
within the limits of the structure and for not less than 25
and up to the elevation of the bottom of the concrete beam
Roadway fill shall be completed to the final roadway section
roadway excavation.
considered completely covered by the contract unit price for
as shown. Removal of old roadway fill will be
Old roadway fill under the ends of the bridge shall be removed
and add a line stating "For Notice and Disclaimer Regarding Boring Log Data, see Sheet No. X."
If the note will not fit on this sheet, keep the "Indicates location of borings." portion
Cell in Tasks: Bridge Detailing Notes (E3.2 Notice and Disclaimer).
BEG. STA. 652+93.72
corner of layout sheets, or in TMS.
"Location"), in lower right
(Structure Location Information,
Inventory and Appraisal Sheet
From layout folder, Structural
or Bridge Memo
From Design Layout
or Bridge Memo
in Layout folder
From Profile sheet
questions or suggestions.
Contact Development Section with any
current standards or practices.
only. They may not necessarily reflect
These plans are to serve as an example
MoDOT pulldown menu.
option under the
using Place Border
a Reference File,
Border is attached as
Show location of all borings
Layout folder or eProjects.
Boring locations from
Memo
From Bridge
See EPG 751.5.2.1.3.6.
From Bridge Memo
on front sheet details.
information
See EPG 751.5 for more
10.0000
Always
From Bridge Memo
Indicates location of borings.
available from the district or elsewhere.
depicted on the plan sheets than is given to the subsurface data
No greater significance or weight should be given to the boring data
will also be available from the Project Contact upon written request.
30 and may be included in the Electronic Bridge Deliverables. They
the department for the design of the project, are shown on Sheet No.
factual records of subsurface data and investigations performed by
all locations indicated, as well as any other boring logs or other
shown on the plan sheet(s) for this structure. The boring data for
The locations of all subsurface borings for this structure are
which the contractor may obtain from the Commission.
district, or on any other documentation not expressly warranted,
on the boring data depicted here or those available from the
encounter in basing its bid prices, time or schedule of performance
constructing this project. A contractor assumes all risks it may
data accurately depicts the conditions to be encountered in
The Commission does not represent or warrant that any such boring
Example_plans_001_2020Front.dgn 3:36:15 PM 12/28/2020
DOCUMENT."
A CERTIFIED
NOT BE CONSIDERED
"THIS MEDIA SHOULD
COUNTY
JOB NO.
CONTRACT ID.
ROUTE STATE
DISTRICT
DA
TE
DE
SC
RI
PTI
ON
MO
DATE PREPARED
BRIDGE NO.
PROJECT NO.
SHEET NO.
12/28/2020
IF
A
SE
AL I
S
PR
ES
EN
T
ON
THI
S
SH
EE
T I
T
HA
S
BE
EN
EL
EC
TR
ONI
CA
LL
Y
SE
AL
ED
AN
D
DA
TE
D.
PROJECT NO.
1-
88
8-
AS
K-
MO
DO
T (
1-
88
8-
27
5-
66
36)
JE
FF
ER
SO
N
CI
TY,
MO
65
10
2
10
5
WE
ST
CA
PI
TO
L
CO
MMI
SSI
ON
MI
SS
OU
RI
HI
GH
WA
YS
AN
D
TR
AN
SP
OR
TA
TI
ON
- -
Estimated Quantities
Item Substr. Superstr. Total
Reinforcing Steel (Bridges)
linear foot
pound
cu. yard
linear foot
Class B Concrete (Substructure)
sq. yard
eachVertical Drain at End Bents
eachPlain Neoprene Bearing Pad
linear foot
linear foot
each
Foundation Inspection Holes linear foot
Sonic Logging Testing each
44
4
6 6
2
4
Design Specifications:
Design Loading:
General Notes:
Design Unit Stresses:
Neoprene Pads:
Joint Filler:
Reinforcing Steel:
Traffic Handling:
Steel Pile (ASTM A709 Grade 50) fy = 50,000 psi
Reinforcing Steel (Grade 60) fy = 60,000 psi
Class B Concrete (Substructure) f'c = 3,000 psi
Class B-2 Concrete (Drilled Shafts & Rock Sockets) f'c = 4,000 psi
Drilled Shafts (3 ft. 6 in. Dia.)
Rock Sockets (3 ft. 0 in. Dia.)
each 12 12
Class B-1 Concrete (Barrier) f'c = 4,000 psi
For precast prestressed panel stresses, see Sheet No. 18.
For prestressed girder stresses, see Sheets No. 14 & 15.
Item
Reinforcing Steel (Epoxy Coated)
Total
pound
cu. yardClass B-2 Concrete
Slab on Concrete I-Girder
Estimated Quantities for
Slab on Concrete I-Girder
Laminated Neoprene Bearing Pad
each 6 6Steel Intermediate Diaphragm for P/S Concrete Girders
linear footType 6 (54 in.), Prestressed Concrete I-Girder
94
32
72
8 8
72
32
94
Pile Point Reinforcement each
1lump sum
Class 1 Excavation cu. yard
40°
Ë Structure
Ë Rte. B &
Beg. Sta. 652+93.72
A7987
Proposed Structure
LOCATION SKETCH
Flo
w
each 36 36Slab Drain
Removal of Bridges (X-186)
196 196
70.4 70.4
635 635
491 491
632 632
80 80
15,270 15,270
If not specified, use "A"
From Design Layout.
From Design Layout
Prestressed Girders and Barrier) f'c = 4,000 psi
Class B-2 Concrete (Superstructure, except
(To be removed)
Existing Structure X-186
Detailing Notes.
in EPG are available as cells in Tasks: Bridge
Quantities notes. Notes marked with [MS Cell]
See EPG 751.50 for General Notes and Estimated
Notes B, EPG 751.50
Notes A, EPG 751.50
Notes B3c, EPG 751.50
(B3.21 "Estimated Quantities For)
Cell in Tasks: Bridge Detailing Notes
Design Layout
Info from design &
(E2.1 Foundation Data)
Detailing Notes
Cell in Tasks: Bridge
Notes E2, EPG 751.50
Cell in Tasks: Bridge Detailing Notes (B3.1 "Estimated Quantities" Box)
GENERAL NOTES AND QUANTITIES
(North Arrow)
Front Sheets
Cell in Tasks:
Hydrologic Data
Roadway Overtopping
Estimated Backwater = 0.77 ft
Overtopping Flood Discharge = 3,700 cfs
Overtopping Flood Frequency = 10 years
Freeboard (50-year)
Freeboard = 1.7 ft
Drainage Area = 18 miÁ
Design Flood Frequency = 50 years
Base Flood (100-year)
Average Velocity thru Opening = 5.7 ft/s
Overtopping Flood Elevation = 354.1
Design Flood (D.F.) Elevation = 354.4
Design Flood Discharge = 5,700 cfs
Base Flood Elevation = 354.8
Base Flood Discharge = 6,700 cfs
crossing only.
Info from Design Layout for stream
See EPG 751.5.2.1.5
Cell in Tasks: Front Sheets (Hydrologic Data)
See EPG 751.5.2.1.5
in Layout folder.
Based on Plat sheet
for Slab on Concrete I-Girder.
All concrete above the intermediate beam cap is included in the Estimated Quantities
Concrete I-Girder.
embedded in the beam cap is included in the Estimated Quantities for Slab on
All reinforcement in the intermediate bent concrete diaphragms except reinforcement
Concrete I-Girder.
All reinforcement in the end bents is included in the Estimated Quantities for Slab on
Quantities for Slab on Concrete I-Girder.
All concrete above the construction joint in the end bents is included in the Estimated
otherwise shown.
Minimum clearance to reinforcing steel shall be 1 1/2", unless
sponge rubber expansion and partition joint filler, except as noted.
All joint filler shall be in accordance with Sec 1057 for preformed
borings, see Sheet No. 1"
on the front sheet. Add "For locations of
may be placed on this sheet if it would not fit
"Notice and Disclaimer Regarding Boring Log Data"
Miscellaneous:
Constant Joint Filler
Variable Joint Filler
the precast panels for this structure:
the type of joint filler option used under
MoDOT Construction personnel will indicate
Detailing Notes
Bridge
Cell in Tasks:
Foundation Material
ksf
Elevation Range
Foundation Material
ksf
Elevation Range
ksf
La
yer
1La
yer
2
(Side Resistance)
Compressive Resistance
Minimum Nominal Axial
(Side Resistance)
Compressive Resistance
Minimum Nominal Axial
(Tip Resistance)
Compressive Resistance
Minimum Nominal Axial
ft
ft
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
Socket
Rock
eaNumber
Foundation Data
Bent Number
1 3 4Design DataType
DF = FHWA-modified Gates Dynamic Formula
Resistance Factor
Maximum Factored Loads Minimum Nominal Axial Compressive Resistance =
(Side Resistance + Tip Resistance) Resistance Factors
Maximum Factored Loads Minimum Nominal Axial Compressive Resistance =
Sonic logging testing shall be performed on all drilled shafts and rock sockets.
Manufactured pile point reinforcement shall be used on all piles in this structure.
2 2
Rock Rock
838-835 844-839
28.6 28.6
Rock Rock
835-821 839-830
28.6 28.6
12.0 12.0
2
---
---
---
---
---
---
(Second Sheet Text)
Border text cell in Tasks: General Annotation
49,540
on other routes. See roadway plans for traffic control.
Structure to be closed during construction. Traffic to be maintained
Galvanized Structural Steel Piles (12 in.)
Video Camera Inspection
Continuous Composite for live load.
Superstructure: Simply-Supported, Non-Composite for dead load.
Equivalent Fluid Pressure = 45 lb/cf
Earth = 120 lb/cf
with Sec 716.
Neoprene bearing pads shall be 60 durometer and shall be in accordance
Creek
Horse
(Note A3.8)
From Bridge Memo
Seismic Performance Category A
Future Wearing Surface = 35 lb/sf (Min.)
Note: This drawing is not to scale. Follow dimensions. Sheet No. 2 of 30
*
BR 2
*
*
EXAMPLE
Checked Aug. 2019
Detailed Aug. 2019
variations cannot be used for an adjustment in the contract unit price.
contract unit price for the slab. Variations may be encountered in the estimated quantities but the
forms, all concrete and epoxy coated reinforcing steel will be considered completely covered by the
the horizontal dimensions as shown on the plan of slab). Payment for prestressed panels, conventional
longitudinally from end of slab to end of slab and transversely from out to out of bridge slab (or with
estimate for concrete slabs. The area of the concrete slab will be measured to the nearest square yard
The table of Estimated Quantities for represents the quantities used by the State in preparing the cost
Class B-2 Concrete quantity is based on minimum top flange thickness and minimum joint material thickness.
I-Girder.
The prestressed panel quantities are not included in the table of Estimated Quantities for Slab on Concrete
The Estimated Quantities for Slab on Concrete I-Girder are based on skewed precast prestressed end panels.
with ASTM A123 or ASTM B633 with a thickness class SC 4 and a finish type I, II or III.
for forming the slab to be left in place as a permanent part of the structure shall be coated in accordance
Method of forming the slab shall be as shown on the plans and in accordance with Sec 703. All hardware
ft
Pile
Bearing
Load
ea
Approximate Length Per Each
Number
kip
Pile Driving Verification Method
ftMin. Galvanized Penetration (Elev.)
Pile Point Reinforcement ea
Pile Type and Size
Compressive Resistance
Minimum Nominal Axial
Resistance Factor
---
---
---
---
---
---
---
---
---
---
HP 12x53 HP 12x53
4 4
30 30
All All
Full length Full length
DF DF
0.4 0.4
505 505
Vehicular = HL-93
204 (see EPG 751.50, notes after B3.21)
Round to nearest 1 cubic yard
Type D Barrier
2020 AASHTO LRFD Bridge Design Specifications (9th Ed.)
Example_plans_002_2020_qty.dgn 3:36:25 PM 12/28/2020
DOCUMENT."
A CERTIFIED
NOT BE CONSIDERED
"THIS MEDIA SHOULD
COUNTY
JOB NO.
CONTRACT ID.
ROUTE STATE
DISTRICT
DA
TE
DE
SC
RI
PTI
ON
MO
DATE PREPARED
BRIDGE NO.
PROJECT NO.
SHEET NO.
12/28/2020
IF
A
SE
AL I
S
PR
ES
EN
T
ON
THI
S
SH
EE
T I
T
HA
S
BE
EN
EL
EC
TR
ONI
CA
LL
Y
SE
AL
ED
AN
D
DA
TE
D.
PROJECT NO.
1-
88
8-
AS
K-
MO
DO
T (
1-
88
8-
27
5-
66
36)
JE
FF
ER
SO
N
CI
TY,
MO
65
10
2
10
5
WE
ST
CA
PI
TO
L
CO
MMI
SSI
ON
MI
SS
OU
RI
HI
GH
WA
YS
AN
D
TR
AN
SP
OR
TA
TI
ON
- -
3'-
0"
18"
18"
3"
Ë Bent & Ë Key
PLAN OF BEAM
Ë Bearing & Ë Pile
4'-4‚" 13'-0†" 13'-0†" 4'-4‚"
6•"
10'-3" 10'-3"
23" 3'-4…" 9'-0"
5'-2"
8'-4" 3'-4…" 2'-7" 6•"
14'-9‡"14'-9‡"
17'-4‡" 17'-4‡"
34'-9ƒ"
(Typ.)
1"
40°00'00"
Ë Pile Ë Pile
12'-0"
& Ë Roadway
Ë Structure
(Except as shown)
Symm. abt. Ë Bent
Fill Face
DETAILS OF END BENT NO. 1
5'-1•" 5'-1•"
2'-7" 2'-7"
From design
Neoprene Bearing Pad (Typ.)
9" x 22 1/2" x 1/2" Plain
Large Text (Sheet Titles)
Tasks: General Annotation
All other bents are shown looking ahead-station.
End Bent No. 1 is shown looking back-station.
EPG 751.35 Concrete Pile Cap Integral End Bents.
for Integral Bent)
(Section thru Key
End Bents
Cell in Tasks:
Detail)
(Pile Splice
Tasks: Piles
Cell in
(Typ.)
22•"
18"
18"
17†"
15„"
2'-0…"2'-0…"
18"
18"
16"
16"
General Notes:
with 1/2" jt. filler (Typ.)
Fill area under girder
Pile spacing from design
rotate as needed.
Use appropriate size,
(Pile Section)
Cell in Tasks: Piles
tapered, omit thickness here.
pad. If bearing pad is
Match thickness of bearing
STEEL PILE SPLICE(If required)
45°
„"
to be cut square)
of lower section
Butt Splice (Top
\
accordance with Sec 702.
clear of weld locations in
omitted or removed one inch
* Galvanizing material shall be
9'-0" 12" 10'-0" 12" 9'-0" 12"
4‡" 6'-0"
@ 12"
4 Spa. 3'-0"
@ 12"
2 Spa. 4'-0"
@ 12"
2 Spa. 3'-0"
@ 12"
4 Spa. 6'-0" 4‡"
3'-4‡" \ \ \11'-0" 11'-0" 3'-4‡"
PLAN OF BEAM SHOWING REINFORCEMENT
* 4 Spaces @ 6"
Ë Structure
Fill Face
Ë Key
Ë Bent &
18-#5-U100 ( )
15-#4-U101 ( )
Fr
om
desi
gn
16‡" 12" 16‡"
Keys not shown for clarity.
Substructure Quantity Table for Bent No. 1
Pile Point Reinforcement each
40
120
4
16.7
Note G4.2, EPG 751.50
Tasks: Bridge Detailing Notes (G4.1, Substructure Quantity)
Item Quantity
Class 1 Excavation
Class B Concrete (Substructure)
linear foot
cu. yard
cu. yard
2-#6-H100
(T
op
&
bott
om)
4-
#7-
H1
01
8 Pr. #5-V100 ( )
Adjust scale as needed
or Crosshatching)
Patterns (Hatching
Tasks: Area
10'-0"
(Typ.)
9" SECTION THRU KEY
Ë Bent
Ë Key &
6"
3"
3"
3"
Galvanized Structural Steel Piles (12 in.)
Note: This drawing is not to scale. Follow dimensions. Sheet No. 3 of 30
*
BR 3
*
*
EXAMPLE
Checked Aug. 2019
Detailed Aug. 2019
EPG 751.50
Notes from
G1.7.1
G1.20
Ë Girder3'-4"
Ë Girder
U bars shall clear piles by at least 1 1/2 inches.
Reinforcing steel shall be shifted to clear piles.
parallel to centerline of roadway.
All U bars and pairs of V bars shall be placed
Work this sheet with Sheets No. 4 & 5.
Sheet No. 2.
These quantities are included in the estimated quantities table on
Key" (Typ.)
Const. Jt.
3" x 6"
Example_plans_003_2019_bt1.dgn 3:36:34 PM 12/28/2020
DOCUMENT."
A CERTIFIED
NOT BE CONSIDERED
"THIS MEDIA SHOULD
COUNTY
JOB NO.
CONTRACT ID.
ROUTE STATE
DISTRICT
DA
TE
DE
SC
RI
PTI
ON
MO
DATE PREPARED
BRIDGE NO.
PROJECT NO.
SHEET NO.
12/28/2020
IF
A
SE
AL I
S
PR
ES
EN
T
ON
THI
S
SH
EE
T I
T
HA
S
BE
EN
EL
EC
TR
ONI
CA
LL
Y
SE
AL
ED
AN
D
DA
TE
D.
PROJECT NO.
1-
88
8-
AS
K-
MO
DO
T (
1-
88
8-
27
5-
66
36)
JE
FF
ER
SO
N
CI
TY,
MO
65
10
2
10
5
WE
ST
CA
PI
TO
L
CO
MMI
SSI
ON
MI
SS
OU
RI
HI
GH
WA
YS
AN
D
TR
AN
SP
OR
TA
TI
ON
- -
@ End of Slab
Ë Structure
(Except as shown)
Symm. abt. Ë Bent
A
A
B
B
C
C
3'-
0"
Elev. 871.06
@ End of Slab
Elev. 876.68
Top of Slab
(Typ.)
Elev. 869.56
Pile Cut-off
SECTION NEAR END BENT
Elev. 868.06
1†"
2†"
DETAILS OF END BENT NO. 1
3'-
1"
From design
From design
EPG 751.35 Concrete Pile Cap Integral End Bents
type of stirrup bar in beam
One section for each different
From design
(T
yp.)
18"
Web, 18" Embedded)
(Pile Elevation,
Tasks: Piles
Fr
om
desi
gn
Detail A
General Notes:
DETAIL A
2'-0" 2'-0"
Parabolic Crown
4'-0"
‚"
‚"Top of Slab
Profile Grade
Crown of Slab
2% Cross SlopeË Roadway(
Fill face)
4-
#6-
H1
00
2"
9"
15-#6-
V103
@ 12" cts. (Each face)
13'-6"
6'-6
…"
20'-0
…"
@ Top of Wing
Elev. 876.44
2"
15-#6-
V105
@ 12" cts. (Each face)
13'-6"
17'-9†"
4'-3†"
PART PLAN
Ë Bent
4•"
10'-0"3'-4"
(T
yp.)
4"
6"
18"
18"
3'-
0"
123
6"
6"
12'-0"
40°00'00"
& Ë Roadway
Ë Structure
Ë Girder Ë Girder
of Diaphragm
Front Face
#6 & #8-H Bars
#6 & #8-H Bars
End of Slab
Fill Face
(Except as shown)
Symm. abt. Ë Bent
D
D
E
11-#6-F10011-#6-F102
Tie Rods (Typ.)
Two 3/4"Ó Coil
EPG 751.22.3.14
EPG 751.22.3.7
Design Layout)
Skew angle (from
Girder spacing from design
Fro
m design
Fro
m design
15„"
2'-0"
2'-0…"
9"
24-#5-U105 @ 12" cts. (See Bridge Approach Slab details)
#6-V102
& 2-#6-H105
2-#6-H104
tie bar) (Typ.)
#5-H108 (Strand
From design
Usually, 0.125'Ó is adequate.
Reinforcing Steel (In Section)
Use Tasks: Geometry,
section large enough to see.
Draw reinforcing bars in
4‡"
from Tasks: End Bents
Coil Tie Insert cell
(T
op)
4-
#7-
H1
01
5-#6-F101
4-#6-H100
girders) (Typ.)
(Between
2-#6-H103
2-#6-H102 &
21-#6-U102 @ 9" cts.
(Spaced with U100 & V100)
13-#5-U103 & 13-#6-U104
2-#6-H105
2-#6-H104 &
#6-V104
5-#6-F103
9" cts.(Typ.)
5-#6-V101 @
@ Top of Wing
Elev. 876.30 From design
E(Section Arrow)
Cell in Tasks: End Bents
(Parabolic Crown Detail - 2% Slope)
Tasks: End Bents
if areafill causes a cluttered look.
Pattern Cluster in Tasks: End Bents
Area Patterns, or use Concrete
Use concrete areafill under Tasks:
871.14
Elev.
4-#7-H101
2-#6-H100
(Typ.)
(Btwn. gdrs.)
(Front face)
#6-H102
accordingly.
other bar marks
if #6 bar and adjust
Use H100 bar mark
From design.
EPG 751.50
Notes from
G1.7.1
G1.7
G1.8
G1.9
G1.9.1
G1.25
G1.30
Note: This drawing is not to scale. Follow dimensions. Sheet No. 4 of 30
*
BR 4
*
*
EXAMPLE
Checked Aug. 2019
Detailed Aug. 2019
face) (Typ.)
#6-H104 (Front(Typ.)
(Btwn. gdrs.)
(Front face)
#6-H103
face) (Typ.)
#6-H105 (Front
4-#7-H101
No. 26.
For details of bridge approach slab, see Sheet
Sheet No. 6.
For details of vertical drain at end bents, see
(strand tie bar), see Sheet No. 14.
For location of coil tie rods and #5-H108
face of end bent.
maintain 1 1/2-inch minimum clearance to fill
bent or, if necessary, cut in field to
Strands at end of girders shall be field
beam and below top of slab shall be Class B-2.
All concrete in the end bent above top of
centerline of roadway.
The U bars shall be placed parallel to
field to clear girders.
The #6-F100 and #6-F102 bars shall be bent in the
D-D & E-E, see Sheet No. 5.
For Sections A-A, B-B & C-C and Elevations
Work this sheet with Sheets No. 3 & 5.
Example_plans_004_2019_bt1.dgn 3:36:44 PM 12/28/2020
DOCUMENT."
A CERTIFIED
NOT BE CONSIDERED
"THIS MEDIA SHOULD
COUNTY
JOB NO.
CONTRACT ID.
ROUTE STATE
DISTRICT
DA
TE
DE
SC
RI
PTI
ON
MO
DATE PREPARED
BRIDGE NO.
PROJECT NO.
SHEET NO.
12/28/2020
IF
A
SE
AL I
S
PR
ES
EN
T
ON
THI
S
SH
EE
T I
T
HA
S
BE
EN
EL
EC
TR
ONI
CA
LL
Y
SE
AL
ED
AN
D
DA
TE
D.
PROJECT NO.
1-
88
8-
AS
K-
MO
DO
T (
1-
88
8-
27
5-
66
36)
JE
FF
ER
SO
N
CI
TY,
MO
65
10
2
10
5
WE
ST
CA
PI
TO
L
CO
MMI
SSI
ON
MI
SS
OU
RI
HI
GH
WA
YS
AN
D
TR
AN
SP
OR
TA
TI
ON
- -
Cl.
3"
3"
3'-
1"
2"
9" 15-#6-V103 @ 12" cts. (Each face)
13'-6" 6'-6…"
20'-0…"
2"
9"15-#6-V105 @ 12" cts. (Each face)
13'-6"
17'-9†"
4'-3†"
Cl.
3"
3"
8'-
2‡"5'-
2‡"
3'-
0"
@
3"
3
Spa.
2"
Const. Jt. Const. Jt.
Elev. 876.30
2"
2"
2"
2"
Elev. 868.06 Elev. 868.06
21" 15"
Ë Pile
(Typ.)
Elev. 868.06
(Typ.)
3'-0"
5'-
4‡"
3'-
2†"
8'-
7•"
(Typ.)
Const. Jt.
(Typ.)
Fill Face
Reinforcement (Typ.)
Transverse Slab(Typ.)
6"
(T
yp.)
6"
(Typ.)
Reinforcement
Longitudinal Slab
@ Ë Roadway
Elev. 876.68
Top of Slab
(Typ.)
End of Slab
DETAILS OF END BENT NO. 1
ELEVATION D-D ELEVATION E-E
SECTION C-C
SECTION B-BSECTION A-A
#6-
U1
02)
(T
yp. f
or
3"
Cl.
@
3"
3
Spa.
2"
From design
From design From design
From design
From design
Fr
om
desi
gn
Fr
om
desi
gn
From design
Fr
om
desi
gn
From design
EPG 751.35, Concrete Pile Cap Integral End Bents
See EPG 751.35.4.3
(Typical Section thru Square Wing)
Tasks: End Bents
From design
General Notes:
#5-U105 (Typ.)
(T
yp.)
2•"
Cl.
(Typ.)
Detail
Chamfer
See EPG 751.35.5.3.
Tasks: End Bents (Chamfer Detail)
@
11" cts.
5-
#6-
F1
01
@
8" cts.
11-
#6-
F1
00
#6-V Bars
of Wing
Inside Face
(Each face)(Place with grade)
* #8-H Bars at 3" cts.
2"
Varies
Const. Joint
THRU WING
TYPICAL SECTION
#6-H Bars
Const. Jt.#5-K Bar
(Typ.)
2" Cl.
(Each face)
#6-
H
Bars at
8" cts.
(Mi
n.)
3"
Cl.
3"
16"
with grade)
(Place
2-#8-H106
15‚"
(Typ.)
2•"
Detail
Chamfer
2-#6-V102
@
8" cts.
11-
#6-
F1
02
@
11" cts.
5-
#6-
F1
03
2-#6-V104
2-#6-H107
Detail
Chamfer
6…"
(Typ.)
#6-U104
(Typ.)
4-#7-H101
(Typ.)
4-#7-H101
(Typ.)
#6-H100
#5-U100
#4-U101
tie bar)
#5-H108 (Strand
(Typ.)
#6-U102
(Typ.)
4-#7-H101
#5-U103 (Typ.)(
Ty
p.)
4-
#6-
H1
00
#5-V100
14"
14"
6•"
11…" max.
6…" min/
11…" max.
6…" min./
8" cts. (
Each face)
11-
#6-
H1
07
@ a
bt.
min/max.
not allow for this
using 8" cts. does
Use "abt." only if
Note: This drawing is not to scale. Follow dimensions. Sheet No. 5 of 30
*
BR 5
*
*
EXAMPLE
Checked Aug. 2019
Detailed Aug. 2019
Elev. 876.44
8'-
4•" 5'-
3•"
cts. (
Each face)
11-
#6-
H1
07
@
8"
2-#6-H107
(Btwn. gdrs.)
#6-H103 (Typ.)
(Btwn. gdrs.)
#6-H102 (Typ.)
(Btwn. gdrs.)
#6-H103 (Typ.)
#6-V101
Sheet No. 24.
For reinforcement of the safety barrier curb, see
E-E, see Sheet No. 4.
For location of Sections A-A, B-B & C-C and Elevations D-D &
Work this sheet with Sheets No. 3 & 4.
Note G1.6
EPG 751.50
at
Ë
Rd
wy
Di
mensions
(Dim at CL Rdwy Bracket)
Tasks: End Bents
CHAMFER DETAIL
…"
…"
Joint
Const.
with grade)
(Place
2-#8-H106
Example_plans_005_2019_bt1.dgn 3:36:53 PM 12/28/2020
DOCUMENT."
A CERTIFIED
NOT BE CONSIDERED
"THIS MEDIA SHOULD
COUNTY
JOB NO.
CONTRACT ID.
ROUTE STATE
DISTRICT
DA
TE
DE
SC
RI
PTI
ON
MO
DATE PREPARED
BRIDGE NO.
PROJECT NO.
SHEET NO.
12/28/2020
IF
A
SE
AL I
S
PR
ES
EN
T
ON
THI
S
SH
EE
T I
T
HA
S
BE
EN
EL
EC
TR
ONI
CA
LL
Y
SE
AL
ED
AN
D
DA
TE
D.
PROJECT NO.
1-
88
8-
AS
K-
MO
DO
T (
1-
88
8-
27
5-
66
36)
JE
FF
ER
SO
N
CI
TY,
MO
65
10
2
10
5
WE
ST
CA
PI
TO
L
CO
MMI
SSI
ON
MI
SS
OU
RI
HI
GH
WA
YS
AN
D
TR
AN
SP
OR
TA
TI
ON
- -
A
A
ELEVATION OF WING PART PLAN
VERTICAL DRAIN AT END BENTS
L
Ground
D
Unperforated
ELEVATION OF WING
DETAIL A
Beam
Lower
Note: This drawing is not to scale. Follow dimensions.
*
*
*
BR 6
OPTIONAL TURNED DRAIN
PART SECTION A-A
General Notes:
(Squared end bent shown, skewed end bent similar)
ELEVATION OF END BENT
PLAN OF END BENT
Drain Core
Vertical
Rodent Screen
Drain Pipe
Fabric Wrap
Fabric Wrap
Fabric
Geotextile
Drain Pipe
Perforated
Drain Pipe
Unperforated
Line
Detail A
Elbow
Elbow
Drain Pipe
Perforated
Drain Pipe
Unperforated
Unperforated Drain Pipe
90Ñ (Min.)
Cap
Perforated Drain Pipewith ground line
Cut coupler flush
Beam
ground line
to slope of
Cut coupler
Vertical Drain Core
Line
Ground
Drain Pipe
Perforated
Cap
(Typ.)
Core (Along wing)
Vertical Drain
Ground Line
Cap
with ground line
Cut coupler flush
Drain Pipe
Perforated
Unperforated Drain Pipe
Coupler
(Typ.)
Coupler
Fabric (Typ.)
Geotextile
(Section thru wing similar)
ground line.
where the vertical drain ends to the exit at
of end bent and plain pipe shall be used
side and inside face of wings at the bottom
Perforated pipe shall be placed at fill face
minimum of 1 1/2 inches.
also missing the lower beam of end bent by a
shall slope to lowest grade of ground line,
end bent and inside face of wings. The pipe
Drain pipe shall be placed at fill face of
drain pipe.
4-inch diameter corrugated polyethylene (PE)
polyvinyl chloride (PVC) drain pipe, or
underdrain, 4-inch diameter corrugated
corrugated metallic-coated steel pipe
Drain pipe may be either 6-inch diameter
percent.
All drain pipe shall be sloped 1 to 2
(Min.)
6"
(Mi
n.)
6"
(Mi
n.)
6"
Mi
n.
1•"
Cl.
(Use only when straight drain is not practical.)
EXAMPLE
V_DRA01_i Effective: Apr. 2020 Supersedes: Aug. 2016 (DRAIN01)
Sheet No. 6 of Checked July 2020
Detailed July 2020
Open Read-only and Save As to your job's folder.
Bridge/A_BR_Std_Dwgs/Drains V_DRA-S_DRA/Current/V_DRA
Use current standard sheet, found in ProjectWise under
Bridge Standard Drawing V_DRA03_midwing.
For end bents with intermediate wing, use
such as for a drainage ditch.
or for situations where there is no side slope,
Needs to be included where rock may be present,
SPM may prefer to remove this if it's not applicable.
Example_plans_006_2020_vertdra.dgn 3:37:13 PM 12/28/2020
DOCUMENT."
A CERTIFIED
NOT BE CONSIDERED
"THIS MEDIA SHOULD
COUNTY
JOB NO.
CONTRACT ID.
ROUTE STATE
DISTRICT
DA
TE
DE
SC
RI
PTI
ON
MO
DATE PREPARED
BRIDGE NO.
PROJECT NO.
SHEET NO.
12/28/2020
IF
A
SE
AL I
S
PR
ES
EN
T
ON
THI
S
SH
EE
T I
T
HA
S
BE
EN
EL
EC
TR
ONI
CA
LL
Y
SE
AL
ED
AN
D
DA
TE
D.
PROJECT NO.
1-
88
8-
AS
K-
MO
DO
T (
1-
88
8-
27
5-
66
36)
JE
FF
ER
SO
N
CI
TY,
MO
65
10
2
10
5
WE
ST
CA
PI
TO
L
CO
MMI
SSI
ON
MI
SS
OU
RI
HI
GH
WA
YS
AN
D
TR
AN
SP
OR
TA
TI
ON
- -
Item
Substructure Quantity Table for Bent No. 2
Quantity
Class B Concrete (Substructure)
Reinforcing Steel (Bridges) pound
cu. yard
Foundation Inspection Holes
Sonic Logging Testing
linear foot
linear foot
each
linear foot
each
Drilled Shafts (3 ft. 6 in. Dia.)
2
2
‚"
‚"
†"
(Typ.)
„"1"
6"
1"
15"
3"
12"
9"
53
16
36
Rock Sockets (3 ft. 0 in. Dia.)
4'-
1"
4'-
0"
7-
#6-
H2
03
7-
#6-
H2
03
Elev. 867.29
& Bottom of Beam
Top of Drilled Shaft
2ƒ"
1ƒ"
3" 7'-6" 30 Spa. @ 6" 3"7'-6"
9"
@ 6"
6 Spa. 23'-0"
@ 6"
6 Spa. 9"
4'-3" 16'-0"
@ 12"
3 Spa. 4'-3"
@ 12"
3 Spa.
Elev. 871.29 Elev. 871.37
5'-9"9'-6"9'-6"5'-9"
14" x 14" x 2"
Const. Jt. Key
(Each face)
5-
#6-
H2
02
A
A
B
B
C
C
D D
E E
F F
ELEVATION
(Except as shown)
Symm. abt. Ë Bent
& Ë Rock Socket
Ë Drilled Shaft
DETAILS OF INTERMEDIATE BENT NO. 2
(T
yp.)
& Ë Rock Socket
Ë Drilled Shaft
(Mi
n.)
2'-
11"
3"
3'-6"Ó O.D.
3'-0"Ó
Steel Casing
Permanent
Pa
y
Li
mits
of
Roc
k
Soc
ket
8'-
0"
Pa
y
Li
mits
of
Drille
d
Shaft
26'-
3•"
Elev. 833.00
Bottom of Rock Socket
3"
12"
Elev. 841.00
Top of Sound Rock
Anticipated
Elev. 840.00
Tip of Casing
Anticipated
18.5
10-#8-H200
10-#8-H201
33-#4-U200 ( )
7,820
Steel Shim Plate
8 3/4" x 22 1/4" x 1/8"
folder
From Layout Fr
om
desi
gn
(Section thru Key)
Tasks: Intermediate Bents
Tasks: Bridge Detailing Notes (G4.1 Substructure Quantity)
See EPG 751.11
From design
Fr
om
desi
gn
General Notes:
From design
From design
From design
From design
EPG 751.37 Drilled Shafts
EPG 751.31 Open Concrete Intermediate Bents
NEOPRENE BEARING PAD
SECTION THRU LAMINATED
Beam keys not shown for clarity.
roc
k i
n accor
da
nce
wit
h
Sec
70
1
Set steel casi
ng i
nt
o s
ou
nd
Note: This drawing is not to scale. Follow dimensions. Sheet No. 7 of 30
*
BR 7
*
*
EXAMPLE
Checked Aug. 2019
Detailed Aug. 2019
Video Camera Inspection
EPG 751.50
Notes from
G4.2
E2.29
the substructure quantities.
All reinforcement in drilled shafts and rock sockets is included in
Sheet No. 2.
These quantities are included in the estimated quantities table on
G4.3
E2.30
E2.31
8-#4-U202 ( )
#6-D200
22-
#4-
P2
00
@ a
bt.
12" cts.
14-#9-V200
19-
#6-
P2
01
@
8" cts.
14 Pr. #4-U201 ( )
From design
From design
Fill in
Sonic logging testing shall be performed on all drilled shafts and rock sockets.
less than 6-inch centers.
shown in Elevation, if required, or a lesser spacing if not required but not
reinforcement lap if not required. The P bars shall be spaced similarly to that
length. The additional V-bar length shall be cut off or included in the
bars have been added for possible change in drilled shaft or rock socket
An additional 4 feet has been added to V-bar lengths and additional 12-#6-P201
Thickness of permanent steel casing shall be in accordance with Sec 701.
Work this sheet with Sheet No. 8.
SECTION D-D SECTION E-E
(To o
utsi
de6‚
" Cl.
of c
asin
g)
Cl.
3"
(Typ.)
#9-V200
#4-P200
#6-P201
(Typ.)
#9-V200
(2)
(1)
(1)
3'-6"Ó O.D.
Casing
Steel
Permanent
3'-6"Ó O.D.
(1)
(To o
utsi
de6" Cl.
(2)
of c
asin
g)
Casing
Steel
Permanent
(Typ.)
#9-V200
#6-P201
as the Plan of Beam if space allows.
Pad details are shown on the same sheet
It is preferred that Key and Bearing
SECTION THRU KEY
(2)
3'-0"Ó
SECTION F-F
testing (3 each shaft)
(2) 2"Ó Steel Pipe for sonic logging
(Stagger adjacent bar splices)
3'-1" Min. Lap (#6-P201)
(1) 2'-1" Min. Lap (#4-P200)
Example_plans_007_2019_bt2.dgn 3:37:22 PM 12/28/2020
DOCUMENT."
A CERTIFIED
NOT BE CONSIDERED
"THIS MEDIA SHOULD
COUNTY
JOB NO.
CONTRACT ID.
ROUTE STATE
DISTRICT
DA
TE
DE
SC
RI
PTI
ON
MO
DATE PREPARED
BRIDGE NO.
PROJECT NO.
SHEET NO.
12/28/2020
IF
A
SE
AL I
S
PR
ES
EN
T
ON
THI
S
SH
EE
T I
T
HA
S
BE
EN
EL
EC
TR
ONI
CA
LL
Y
SE
AL
ED
AN
D
DA
TE
D.
PROJECT NO.
1-
88
8-
AS
K-
MO
DO
T (
1-
88
8-
27
5-
66
36)
JE
FF
ER
SO
N
CI
TY,
MO
65
10
2
10
5
WE
ST
CA
PI
TO
L
CO
MMI
SSI
ON
MI
SS
OU
RI
HI
GH
WA
YS
AN
D
TR
AN
SP
OR
TA
TI
ON
- -
4'-
0"
& Ë Rock Socket
Ë Drilled Shaft
Ë Bent, Ë Key,
(Typ.)
8-#6-D200 @ 12" cts.
4'-9"7'-6"3'-0"3'-0"7'-6"4'-9"
12'-3"6'-0"12'-3"
30'-6"
5'-9"9'-6"9'-6"5'-9"
U Bars (Spaced as shown in Elevation)
Ë Bent
& Ë Rock Socket
Ë Drilled Shaft
& Ë Rock Socket
Ë Drilled Shaft
(Typ.)
3" x 6" Key(Typ.)
3"
(Typ.)
3"
PLAN SHOWING REINFORCEMENT
(Typ.)
4"
10'-0" 10'-0"
Ë GirderË GirderË Girder40°0'0"
Ë BentË Structure
Ë Roadway &
6‡"
6‡"
4'-
0"
Ë Bearing
Ë Bent & Ë Key
2'-
0"
2'-
0"
17„"
17„"
13'-0†"
15'-3"
2'-2…" 13'-0†"
15'-3"
2'-2…"(
Ty
p.)
6ƒ"
(T
yp.)
2‚"
PLAN OF BEAM
DETAILS OF INTERMEDIATE BENT NO. 2
4'-0"
4'-
0"
4'-0"
4'-
0"
4'-0"
4'-
0"
SECTION A-A
SECTION C-C
Const. Jt. Key
14" x 14" x 2"(Typ.)
3"
(B
ott
om)
10-
#8-
H2
01
SECTION B-B
Steel Casing
Permanent
2'-
0"
2'-
0"
3" 3"
20„"
From design
From design
From design
EPG 751.50
Note G1.40,
See EPG 751.22.3.10
joint filler,
For details of
From design
Fr
om
desi
gn
From design
from design
Girder spacing
Fr
om
desi
gn
General Notes:
(Typ.)
22•"
joint filler (Typ.)
girder with 5/8"
Fill area under
1 2 3
(Each face)
5-
#6-
H2
02
(Each face)
5-
#6-
H2
02
(Each face)
5-
#6-
H2
02
Bit. Pile Paint (Typ.)
(Min.) Roofing Felt or
1 Layer of 30-lb
7‚" (Typ.)
23•" (Typ.)
Bearing Pad (Typ.)
Laminated Neoprene
9" x 22 1/2" x 5/8"
Design Layout
Skew angle from
(Typ.)
Filler
1/2" Jt.
(Typ.)
Filler
1/2" Jt.
filler up vertical face.
For steps 2 inches or more, use 2 1/4 x 1/2-inch joint
Work this sheet with Sheet No. 7.
10-#8-H200
7-#6-H2037-#6-H2035-#6-H202
#4-U201
10-#8-H201
(T
op)
10-
#8-
H2
00
10-#8-H200
#4-U202
#4-P200
10-#8-H201
14-#9-V200
10-#8-H200
#4-U200
10-#8-H201
Note: This drawing is not to scale. Follow dimensions. Sheet No. 8 of 30
*
BR 8
*
*
EXAMPLE
Checked Aug. 2019
Detailed Aug. 2019
Example_plans_008_2019_bt2.dgn 3:37:31 PM 12/28/2020
DOCUMENT."
A CERTIFIED
NOT BE CONSIDERED
"THIS MEDIA SHOULD
COUNTY
JOB NO.
CONTRACT ID.
ROUTE STATE
DISTRICT
DA
TE
DE
SC
RI
PTI
ON
MO
DATE PREPARED
BRIDGE NO.
PROJECT NO.
SHEET NO.
12/28/2020
IF
A
SE
AL I
S
PR
ES
EN
T
ON
THI
S
SH
EE
T I
T
HA
S
BE
EN
EL
EC
TR
ONI
CA
LL
Y
SE
AL
ED
AN
D
DA
TE
D.
PROJECT NO.
1-
88
8-
AS
K-
MO
DO
T (
1-
88
8-
27
5-
66
36)
JE
FF
ER
SO
N
CI
TY,
MO
65
10
2
10
5
WE
ST
CA
PI
TO
L
CO
MMI
SSI
ON
MI
SS
OU
RI
HI
GH
WA
YS
AN
D
TR
AN
SP
OR
TA
TI
ON
- -
1"
6"
1"
15"
3"
12"
PLAN OF BEAM
PLAN SHOWING REINFORCEMENT
Ë
Girder
Ë
Girder
1 2 3 4
bott.)
DETAILS OF INTERMEDIATE BENT NO. 3
Item
Substructure Quantity Table for Bent No. 3
Quantity
Class B Concrete (Substructure)
Reinforcing Steel (Bridges)
x
x
x
linear foot
pound
cu. yard
Bent Details
EPG 751.32.3 Concrete Pile Cap Intermediate
See EPG 751.11
From design.
(Section thru Key)
Cell in Tasks: Intermediate Bents
From design
From design
From design Closed Intermediate Bent Diaphragms
P/S Concrete I Girders,
For details of joint filler, see EPG 751.22.3.10,
(G4.1 Substructure Quantity)
Cell in Tasks: Bridge Detailing Notes
Note G4.2, EPG 751.50
THRU KEY
SECTION
on Sheet No. 2.
These quantities are included in the estimated quantities table see Sheet No. 10.
For details of Intermediate Bent No. 3 not shown,
NEOPRENE BEARING PAD
SECTION THRU LAMINATED
match information shown on other sheets.
example plans. Therefore, some details may not
a different structure than the rest of the
Example plans for Int. Bent No. 3 were taken from
#6-D301
6"
6"
13•"
13•"
19•"
19•"
3'-
3"
2'-2„"11'-6†"11'-6†"11'-6†"2'-2„"
39'-0"
(T
yp.)
2‚"
(T
yp.)
2‚"
8'-2"
8'-2"
4'-1"
4'-1"
45°00'00"
19•"
Ë Structure
Ë Roadway &Ë Bent
Ë Bearing
Ë Bent & Ë Key
4'-2"7'-6"4'-1"7'-6"4'-1„"7'-6"4'-2"
9'-0"9'-0"18" 19'-6"
Ë Pile Ë Pile
3" x 6" Key (Typ.)
19•"
19•"
3'-
3"
Ë Pile Encasement
Ë Pile, &
Ë Bent, Ë Key,
6" U Bars (Spaced as shown in Elevation) 6"
3" 3" 3" 3"
(Typ.)8
" (Typ.)
15•"
(Typ.)
„"
†"
8"
‚"
„"‚"
3"3"
(Pile Section)
Cell in Tasks: Piles
See EPG 751.22.3.10
from design
Pile spacing
from design
Girder spacing
Design Layout
Skew angle from
From design
Steel Shim Plate
7 3/4" x 15 1/4" x 1/8"
(Except as shown)
Symm. abt. Ë Bent
joint filler (Typ.)
girder with 5/8"
Fill area under
12" cts.
8-#6-D301 @
12" cts.
8-#6-D301 @
12" cts.
8-#6-D301 @
(T
op
&
4-
#7-
H3
01
4-#6-H3032-#6-H302
23•" (Typ.)
7‚" (Typ.)
(Typ.)
4"
Galvanized Structural Steel Piles (12 in.)
(Typ.)
1/2" Jt. FillerPaint (Typ.)
or Bituminous Pile
(Min.) Roofing Felt
1 Layer of 30-lb
General Notes:
Work this sheet with Sheet No. 10.
Note: This drawing is not to scale. Follow dimensions. Sheet No. 9 of 30
*
BR 9
*
*
EXAMPLE
Checked Aug. 2019
Detailed Aug. 2019
Bearing Pad (Typ.)
Laminated Neoprene
8" x 15 1/2" x 5/8" (Typ.)
Filler
1/2" Jt.
Example_plans_009_2019_bt3.dgn 3:37:41 PM 12/28/2020
DOCUMENT."
A CERTIFIED
NOT BE CONSIDERED
"THIS MEDIA SHOULD
COUNTY
JOB NO.
CONTRACT ID.
ROUTE STATE
DISTRICT
DA
TE
DE
SC
RI
PTI
ON
MO
DATE PREPARED
BRIDGE NO.
PROJECT NO.
SHEET NO.
12/28/2020
IF
A
SE
AL I
S
PR
ES
EN
T
ON
THI
S
SH
EE
T I
T
HA
S
BE
EN
EL
EC
TR
ONI
CA
LL
Y
SE
AL
ED
AN
D
DA
TE
D.
PROJECT NO.
1-
88
8-
AS
K-
MO
DO
T (
1-
88
8-
27
5-
66
36)
JE
FF
ER
SO
N
CI
TY,
MO
65
10
2
10
5
WE
ST
CA
PI
TO
L
CO
MMI
SSI
ON
MI
SS
OU
RI
HI
GH
WA
YS
AN
D
TR
AN
SP
OR
TA
TI
ON
- -
4"
2"
12"
12"
2'-
0"
& Ë Pile Encasement
Ë Bent, Ë Pile,
Symm. abt. Ë Bent
ELEVATION
6"
10"
2'-6" 2'-0"7 spa. @ 12"
9'-0"9'-0"
12"
15"
Cl.
3"
2"
7 spa. @ 12"
6"
3'-
0"
4-
#6-
H3
03
2'-6"20"
@ 10" cts.
10-#4-U30110"
14"10"8'-4"9'-2"
19"10"
10"10'-0"
10"
10"
4'-7"
Elev. 454.52
Elev. 451.52
Elev. 441.94
9'-
7"
(Typ.)
Elev. 453.02
Pile Cut-Off
C
C
12"12"
2'-0"
Ë Encasement
Ë Bent &
Ë Encasement
Ë Pile, &
Ë Bent,
(T
yp.)
17"
3'-3"
3'-
0"
15"
Cl.
3"
7•" 7•"
9'-
7"
18"
AA
B
B
SECTION B-B SECTION C-C
SECTION A-A
DETAILS OF INTERMEDIATE BENT NO. 3
@
12" cts.
10-
#4-
H3
05
From design
From design
From design
Fro
m design
Tasks: Piles (Pile Splice Detail)
From design
Fro
m
design
EPG 751.32 Concrete Pile Cap Intermediate Bents
Bents (Section Arrow)
Tasks: Intermediate
(Pile Section)
Tasks: Piles
( ) 16-#4-U303
General Notes:
(Except as shown)
Symm. abt. Ë Bent
STEEL PILE SPLICE(If required)
45°
„"
to be cut square)
of lower section
Butt Splice (Top
\
accordance with Sec 702.
clear of weld locations in
omitted or removed one inch
* Galvanizing material shall be
Work this sheet with Sheet No. 9.
#4-U302#4-U302 #4-U302
#4-U304
@ 10" cts.
9-#4-U301
#4-U301
2-#6-H302
4-#7-H301
#4-V301
cts. (
Each face)
9-
#4-
H3
06
@
12"
2-#4-H304
in Section A-A)
16-#4-U303 & 4 Pr. #4-V301 (Spa. as shown
(Typ.)
4-#7-H301
(Typ.)
#6-H302#4-U302
#4-U304
#4-U301 (Typ.)
#6-H302
#4-U302
4 Pr. #4-V301
(Typ.)
4-#7-H301
#4-V301 #4-V3018-#4-H305
(Each face)(
Ty
p.)
9-
#4-
H3
06
@
12" cts.
& #4-H306
#4-H304 (Bott.)
(Typ.)
#4-H304
Flange)
(Pile Elev,
Tasks: Piles
(T
yp.)
18"
Note: This drawing is not to scale. Follow dimensions. Sheet No. 10 of 30
*
BR 10
*
*
EXAMPLE
Checked Aug. 2019
Detailed Aug. 2019
Key (Typ.)
Const. Jt.
12"x 8"x 2"
Example_plans_010_2019_bt3.dgn 3:37:51 PM 12/28/2020
DOCUMENT."
A CERTIFIED
NOT BE CONSIDERED
"THIS MEDIA SHOULD
COUNTY
JOB NO.
CONTRACT ID.
ROUTE STATE
DISTRICT
DA
TE
DE
SC
RI
PTI
ON
MO
DATE PREPARED
BRIDGE NO.
PROJECT NO.
SHEET NO.
12/28/2020
IF
A
SE
AL I
S
PR
ES
EN
T
ON
THI
S
SH
EE
T I
T
HA
S
BE
EN
EL
EC
TR
ONI
CA
LL
Y
SE
AL
ED
AN
D
DA
TE
D.
PROJECT NO.
1-
88
8-
AS
K-
MO
DO
T (
1-
88
8-
27
5-
66
36)
JE
FF
ER
SO
N
CI
TY,
MO
65
10
2
10
5
WE
ST
CA
PI
TO
L
CO
MMI
SSI
ON
MI
SS
OU
RI
HI
GH
WA
YS
AN
D
TR
AN
SP
OR
TA
TI
ON
- -
3'-
0"
18"
18"
3"
Ë Bent & Ë Key
PLAN OF BEAM
Ë Bearing & Ë Pile
4'-4‚" 13'-0†" 13'-0†" 4'-4‚"
6•"
10'-3" 10'-3"
23" 3'-4…" 9'-0"
5'-2"
8'-4" 3'-4…" 2'-7" 6•"
14'-9‡"14'-9‡"
17'-4‡" 17'-4‡"
34'-9ƒ"
(Typ.)
1"
40°00'00"
Ë Pile Ë Pile
12'-0"
& Ë Roadway
Ë Structure
(Except as shown)
Symm. abt. Ë Bent
Fill Face
DETAILS OF END BENT NO. 4
5'-1•" 5'-1•"
2'-7" 2'-7"
Neoprene Bearing Pad (Typ.)
9" x 22 1/2" x 1/2" Plain
(Typ.)
22•"
18"
18"
17†"
15„"
2'-0…"2'-0…"
18"
18"
16"
16"
General Notes:
with 1/2" jt. filler (Typ.)
Fill area under girder
STEEL PILE SPLICE(If required)
45°
„"
to be cut square)
of lower section
Butt Splice (Top
\
accordance with Sec 702.
clear of weld locations in
omitted or removed one inch
* Galvanizing material shall be
9'-0" 12" 10'-0" 12" 9'-0" 12"
4‡" 6'-0"
@ 12"
4 Spa. 3'-0"
@ 12"
2 Spa. 4'-0"
@ 12"
2 Spa. 3'-0"
@ 12"
4 Spa. 6'-0" 4‡"
3'-4‡" \ \ \11'-0" 11'-0" 3'-4‡"
PLAN OF BEAM SHOWING REINFORCEMENT
* 4 Spaces @ 6"
Ë Structure
Fill Face
Ë Key
Ë Bent &
18-#5-U400 ( )
15-#4-U401 ( )
16‡" 12" 16‡"
Keys not shown for clarity.
Substructure Quantity Table for Bent No. 4
Pile Point Reinforcement each
40
120
4
16.7
Item Quantity
Class 1 Excavation
Class B Concrete (Substructure)
linear foot
cu. yard
cu. yard
2-#6-H400
(T
op
&
bott
om)
4-
#7-
H4
01
8 Pr. #5-V400 ( )
10'-0"
(Typ.)
9" SECTION THRU KEY
Ë Bent
Ë Key &
6"
3"
3"
3"
Galvanized Structural Steel Piles (12 in.)
Note: This drawing is not to scale. Follow dimensions. Sheet No. 11 of 30
*
BR 11
*
*
EXAMPLE
Checked Aug. 2019
Detailed Aug. 2019
Ë Girder3'-4"
Ë Girder
Bent No. 1. See design.
Wing dimensions for End Bent No. 4 may not be the same as End
See notations for End Bent No. 1.
U bars shall clear piles by at least 1 1/2 inches.
Reinforcing steel shall be shifted to clear piles.
parallel to centerline of roadway.
All U bars and pairs of V bars shall be placed
Work this sheet with Sheets No. 12 & 13.
on Sheet No. 2.
These quantities are included in the estimated quantities table
Key (Typ.)
Const. Jt.
3" x 6"
Example_plans_011_2019_bt4.dgn 3:38:00 PM 12/28/2020
DOCUMENT."
A CERTIFIED
NOT BE CONSIDERED
"THIS MEDIA SHOULD
COUNTY
JOB NO.
CONTRACT ID.
ROUTE STATE
DISTRICT
DA
TE
DE
SC
RI
PTI
ON
MO
DATE PREPARED
BRIDGE NO.
PROJECT NO.
SHEET NO.
12/28/2020
IF
A
SE
AL I
S
PR
ES
EN
T
ON
THI
S
SH
EE
T I
T
HA
S
BE
EN
EL
EC
TR
ONI
CA
LL
Y
SE
AL
ED
AN
D
DA
TE
D.
PROJECT NO.
1-
88
8-
AS
K-
MO
DO
T (
1-
88
8-
27
5-
66
36)
JE
FF
ER
SO
N
CI
TY,
MO
65
10
2
10
5
WE
ST
CA
PI
TO
L
CO
MMI
SSI
ON
MI
SS
OU
RI
HI
GH
WA
YS
AN
D
TR
AN
SP
OR
TA
TI
ON
- -
@ End of Slab
Ë Structure
(Except as shown)
Symm. abt. Ë Bent
A
A
B
B
C
C
3'-
0"
Elev. 871.06
@ End of Slab
Elev. 876.68
Top of Slab
(Typ.)
Elev. 869.56
Pile Cut-off
SECTION NEAR END BENT
Elev. 868.06
1†"
2†"
DETAILS OF END BENT NO. 4
3'-
1"
(T
yp.)
18"
Detail A
General Notes:
DETAIL A
2'-0" 2'-0"
Parabolic Crown
4'-0"
‚"
‚"Top of Slab
Profile Grade
Crown of Slab
2% Cross SlopeË Roadway(
Fill face)
4-
#6-
H4
00
2"
9"
15-#6-
V403
@ 12" cts. (Each face)
13'-6"
6'-6
…"
20'-0
…"
@ Top of Wing
Elev. 876.44
2"
15-#6-
V405
@ 12" cts. (Each face)
13'-6"
17'-9†"
4'-3†"
PART PLAN
Ë Bent
4•"
10'-0"3'-4"
(T
yp.)
4"
6"
18"
18"
3'-
0"
123
6"
6"
12'-0"
40°00'00"
& Ë Roadway
Ë Structure
Ë Girder Ë Girder
of Diaphragm
Front Face
#6 & #8-H Bars
#6 & #8-H Bars
End of Slab
Fill Face
(Except as shown)
Symm. abt. Ë Bent
D
D
E
11-#6-F40011-#6-F402
Tie Rods (Typ.)
Two 3/4"Ó Coil
15„"
2'-0"
2'-0…"
9"
24-#5-U405 @ 12" cts. (See Bridge Approach Slab details)
#6-V402
& 2-#6-H405
2-#6-H404
tie bar) (Typ.)
#5-H408 (Strand
4‡"
5-#6-F401
4-#6-H400
girders) (Typ.)
(Between
2-#6-H403
2-#6-H402 &
21-#6-U402 @ 9" cts.
(Spaced with U400 & V400)
13-#5-U403 & 13-#6-U404
2-#6-H405
2-#6-H404 &
#6-V404
5-#6-F403
9" cts.(Typ.)
5-#6-V401 @
@ Top of Wing
Elev. 876.30
E
871.14
Elev.
4-#7-H401
2-#6-H400
(Typ.)
(Btwn. gdrs.)
(Front face)
#6-H402
Note: This drawing is not to scale. Follow dimensions. Sheet No. 12 of 30
*
BR 12
*
*
EXAMPLE
Checked Aug. 2019
Detailed Aug. 2019
face) (Typ.)
#6-H404 (Front(Typ.)
(Btwn. gdrs.)
(Front face)
#6-H403
face) (Typ.)
#6-H405 (Front
4-#7-H401
(T
op)
4-
#7-
H4
01
No. 26.
For details of bridge approach slab, see Sheet
Sheet No. 6.
For details of vertical drain at end bents, see
tie bar), see Sheet No. 14.
For location of coil tie rods and #5-H408 (strand
minimum clearance to fill face of end bent.
if necessary, cut in field to maintain 1 1/2-inch
Strands at end of girders shall be field bent or,
and below top of slab shall be Class B-2.
All concrete in the end bent above top of beam
of roadway.
The U bars shall be placed parallel to centerline
field to clear girders.
The #6-F400 and #6-F402 bars shall be bent in the
E-E, see Sheet No. 13.
For Sections A-A, B-B & C-C and Elevations D-D &
Work this sheet with Sheets No. 11 & 13.
Example_plans_012_2019_bt4.dgn 3:38:10 PM 12/28/2020
DOCUMENT."
A CERTIFIED
NOT BE CONSIDERED
"THIS MEDIA SHOULD
COUNTY
JOB NO.
CONTRACT ID.
ROUTE STATE
DISTRICT
DA
TE
DE
SC
RI
PTI
ON
MO
DATE PREPARED
BRIDGE NO.
PROJECT NO.
SHEET NO.
12/28/2020
IF
A
SE
AL I
S
PR
ES
EN
T
ON
THI
S
SH
EE
T I
T
HA
S
BE
EN
EL
EC
TR
ONI
CA
LL
Y
SE
AL
ED
AN
D
DA
TE
D.
PROJECT NO.
1-
88
8-
AS
K-
MO
DO
T (
1-
88
8-
27
5-
66
36)
JE
FF
ER
SO
N
CI
TY,
MO
65
10
2
10
5
WE
ST
CA
PI
TO
L
CO
MMI
SSI
ON
MI
SS
OU
RI
HI
GH
WA
YS
AN
D
TR
AN
SP
OR
TA
TI
ON
- -
Cl.
3"
3"
3'-
1"
2"
9" 15-#6-V403 @ 12" cts. (Each face)
13'-6" 6'-6…"
20'-0…"
2"
9"15-#6-V405 @ 12" cts. (Each face)
13'-6"
17'-9†"
4'-3†"
Cl.
3"
3"
8'-
2‡"5'-
2‡"
3'-
0"
@
3"
3
Spa.
2"
Const. Jt. Const. Jt.
Elev. 876.30
2"
2"
2"
2"
Elev. 868.06 Elev. 868.06
21" 15"
Ë Pile
(Typ.)
Elev. 868.06
(Typ.)
3'-0"
5'-
4‡"
3'-
2†"
8'-
7•"
(Typ.)
Const. Jt.
(Typ.)
Fill Face
Reinforcement (Typ.)
Transverse Slab(Typ.)
6"
(T
yp.)
6"
(Typ.)
Reinforcement
Longitudinal Slab
@ Ë Roadway
Elev. 876.68
Top of Slab
(Typ.)
End of Slab
DETAILS OF END BENT NO. 4
ELEVATION D-D ELEVATION E-E
SECTION C-C
SECTION B-BSECTION A-A
Const. Jt.
#6-
U4
02)
(T
yp. f
or
3"
Cl.
@
3"
3
Spa.
2"
General Notes:
#5-U405 (Typ.)
(T
yp.)
2•"
Cl.
CHAMFER DETAIL
(Typ.)
Detail
Chamfer
@
11" cts.
5-
#6-
F4
01
@
8" cts.
11-
#6-
F4
00
#6-V Bars
of Wing
Inside Face
(Each face)(Place with grade)
* #8-H Bars at 3" cts.
2"
Varies
Const. Joint
THRU WING
TYPICAL SECTION
#6-H Bars
Const. Jt.#5-K Bar
(Typ.)
2" Cl.
(Each face)
#6-
H
Bars at
8" cts.
(Mi
n.)
3"
Cl.
3"
16"
with grade)
(Placed
2-#8-H406
15‚"
(Typ.)
2•"
Detail
Chamfer
with grade)
(Placed
2-#8-H406
2-#6-V402
@
8" cts.
11-
#6-
F4
02
@
11" cts.
5-
#6-
F4
03
2-#6-V404
2-#6-H407
Detail
Chamfer
6…"
(Typ.)
#6-U404
(Typ.)
4-#7-H401
(Typ.)
4-#7-H401
(Typ.)
#6-H400
#5-U400
#4-U401
tie bar)
#5-H408 (Strand
(Typ.)
#6-U402
(Typ.)
4-#7-H401
#5-U403 (Typ.)(
Ty
p.)
4-
#6-
H4
00
#5-V400
14"
14"
6•"
8" cts. (
Each face)
11-
#6-
H4
07
@ a
bt.
Note: This drawing is not to scale. Follow dimensions. Sheet No. 13 of 30
*
BR 13
*
*
EXAMPLE
Checked Aug. 2019
Detailed Aug. 2019
Elev. 876.44
8'-
4•" 5'-
3•"
cts. (
Each face)
11-
#6-
H4
07
@
8"
2-#6-H407
(Btwn. gdrs.)
#6-H403 (Typ.)
(Btwn. gdrs.)
#6-H402 (Typ.)
(Btwn. gdrs.)
#6-H403 (Typ.)
#6-V401
…"
…"
at
Ë
Rd
wy
Di
mensions
Sheet No. 24.
For reinforcement of the safety barrier curb, see
E-E, see Sheet No. 12.
For location of Sections A-A, B-B & C-C and Elevations D-D &
Work this sheet with Sheets No. 11 & 12.
Example_plans_013_2019_bt4.dgn 3:38:20 PM 12/28/2020
DOCUMENT."
A CERTIFIED
NOT BE CONSIDERED
"THIS MEDIA SHOULD
COUNTY
JOB NO.
CONTRACT ID.
ROUTE STATE
DISTRICT
DA
TE
DE
SC
RI
PTI
ON
MO
DATE PREPARED
BRIDGE NO.
PROJECT NO.
SHEET NO.
12/28/2020
IF
A
SE
AL I
S
PR
ES
EN
T
ON
THI
S
SH
EE
T I
T
HA
S
BE
EN
EL
EC
TR
ONI
CA
LL
Y
SE
AL
ED
AN
D
DA
TE
D.
PROJECT NO.
1-
88
8-
AS
K-
MO
DO
T (
1-
88
8-
27
5-
66
36)
JE
FF
ER
SO
N
CI
TY,
MO
65
10
2
10
5
WE
ST
CA
PI
TO
L
CO
MMI
SSI
ON
MI
SS
OU
RI
HI
GH
WA
YS
AN
D
TR
AN
SP
OR
TA
TI
ON
- -
4'-
6"
6"
7"
2'-
7•"
5"
4•"
8ƒ"
6•"
(***) (***)
not required3/4" Bevel
4"
7"
18"
22"
NO.MARK
SIZE &
LENGTH
ACTUALSHAPE
BILL OF REINFORCING STEEL - EACH GIRDER
BENDING DIAGRAM
20
SHAPE 20 SHAPE 11
SHAPE 9
SHAPE 10
5"
9•"
4'-10•"
4'-4" B2
B1
X B1 11
16 6 B2 11
10
4 D1 9
4 C1 2~2"
5•"
#4-B1 bar
SECTION B-B
Strands not shown for clarity.
AT ALL BENTS
INTERIOR GIRDERS
AT END BENTS
EXTERIOR GIRDERSAT INT. BENTS
EXTERIOR GIRDERS
VENT HOLE
PART SECTION NEAR
OF GIRDER
PART ELEVATION
point of girder
or near upgrade 1/3
Ë 3" Ó Vent Hole at
11"
ƒ" (Typ.)
girder
End of
C
C
ƒ" (
Ty
p.)
22•" 15"
Grade 36)
Plate (ASTM A709
1/2" Bearing
3/4" Chamfer
Grade 36)
Plate (ASTM A709
1/2" Bearing
SECTION C-CEND OF GIRDER
PART ELEVATION AT
BEARING PLATE DETAILS
5"
2"
#4-D1
#4-C1
#4-D1
#6-B2
SECTION A-AStrands not shown for clarity.
girder
End of
Loops
Ë Lifting
18"
3" (Min.)
6" (Typ.)
4" (
Typ.)
2'-6" (Typ.)
END BENT INTERMEDIATE BENT
STRAND DETAILS AT GIRDER ENDSGIRDER DIMENSIONS Ë GIRDER END OF GIRDER
accordance with ASTM A123.
Galvanize the 1/2" bearing plate (ASTM A709 Grade 36) in
girder
Top of
STRAND ARRANGEMENTS
Symm. about Ë girder except as shownË Bearing
HALF ELEVATION OF GIRDER SPAN ( - )
#4-C1
A
A B
5~11"
5~4"
3~0"
6"
Pair-#4-D1
3"
3"
8ƒ"
2'-0"
2'-0"
8ƒ"
#4-D1
#4-C1
#4-D1
5•"
21"±
leg
Top
DETAILS OF COIL TIES
(1/2" x 4")
Ë Two Welded Studs
#6-A1 2-#6-A1
4„"
#6-A1
#4-B1
2~6" long *
Coil Tie Rods
Ë 3/4" Ó (Min.)
girder (**).
wit
hin 1" of end of
re
maining bott
om strands
2~
6" projecti
on.
Cut
Cut and shop bend
wit
h
within 1" of end of girder.
Cut any remaining top strands
12" projection and bend in shop.
Cut top 2 rows of strands with a
5‚" 5‚" 4" 4"7"
ƒ"
ƒ"
3-Spa.
@ 3•"
1ƒ"
" 12"
B
(+) indicates prestressing strand.only. No additional payment will be made if additional strand tie bars are required.
layer of bent-up strands except at end bents which require one bar on the bottom layer of strands
total number of bent-up strands shall not be changed. One strand tie bar is required for each
** At the contractor's option the location for bent-up strands may be varied from that shown. The
intermediate diaphragms.
ties, and coil inserts for slab drains and holes for steel
Exterior and interior girders are the same, except for coil
Pretensioned members shall be in accordance with Sec 1029.
strands, 1/2 inch diameter in accordance with AASHTO M 203, Grade 270.
Prestressing tendons shall be uncoated, seven-wire, low-relaxation
bolt connections by 6" minimum.
1 1/2" minimum and steel intermediate diaphragm
girders and clear reinforcing steel or strands by
Place vent holes at or near upgrade 1/3 point of
price for Prestressed Concrete I-Girder.
girder will be considered completely covered by the contract unit
plate (ASTM A709 Grade 36) and welded studs in the prestressed
Cost of furnishing, galvanizing, and installing the 1/2" bearing
(Normal to girder)
#5 Strand Tie Bars (Typ.)
LIFTING LOOPS
LOCATION OF
All B1 bars shall be epoxy coated.
fabricator's option.
The two D1 bars may be furnished as one bar at the
All reinforcement shall be Grade 60.
Minimum clearance to reinforcing shall be 1".
to the nearest inch.
Actual lengths are measured along centerline of bar
Concrete Structures, Stirrup and Tie Dimensions.
Manual of Standard Practice for Detailing Reinforced
Hooks and bends shall be in accordance with the CRSI
All dimensions are out to out.
SHAPE
ALTERNATE
PERMISSIBLE
B1 BAR
gdr4_type6_4-6 Effective: Jan. 2014 Supersedes: Aug. 2008
Note: This drawing is not to scale. Follow dimensions.
*
BR *
*
*
Checked
Detailed
material for the prestressed panels.
placement of preformed fiber expansion joint material or expanded or extruded polystyrene bedding
*** At contractor's option a 3" to 3 1/4" smooth finish strip is permitted to facilitate
From design
From design
crossings only
stream
Required for
From design
From design
From design
From design
From design
EPG 751.22 P/S Concrete I Girders
on standard sheet.
Display. See instructions
can be turned on in Level
in a reference file that
arrangements are available
From design. Most strand
Detailer calculates marked values.
lar
ger t
ha
n
#4
Omit if
B1
bar is
From design
Use 18 strands with an initial prestress force of 558 kips.
13-Spa. @ 6" 6-Spa. @ 12"3ƒ" 9-Spa. @ 18"
that don't apply.
Remove underlined portions
(Typ.)
•"
Detailer calculates
30-Pairs-#4-B1, 30-#4-C1, and 30-Pairs-#4-D1 (Spaced as shown)
Modify these dimensions as needed.
31 kips per strand
(Prestressing Strand)
Prestressed Girders
available in Tasks:
Strand symbol (+) is
because it is si
milar t
o t
his s
heet.
Omitte
d
Sheet
No.
15 (
Prestresse
d
Gir
der)
6 A12
120
68
136
59~0"
58~3" Ë - Ë Bearing
6~0" From design
5•"
or edit text.
in these blanks,
toolbox) to fill
tools (in Text
Enter Data Field
or Auto Fill In
Can use Fill In
Pair-#6-B2
and f'ci = 4500 psi.
Concrete for prestressed girders shall be Class A-1 with f'c = 6000 psi
EXAMPLE
Sheet No. 14 of 30
(use appropriate girder type and size)
PSI Girders_PSI/Current/
under Bridge/A_Bridge_Standard_Drawings/
Use current standard sheet, found in ProjectWise
end bents = 2~4".
* Length of coil tie rods at exterior girders at
For Girder Camber Diagram, see Sheet No. .
For details of diaphragms, see Sheet No. .
intermediate diaphragms. Drilling is not allowed.
The 1 1/2" Ó holes shall be cast in the web for steel
For location of coil ties, see Sheets No. & .
Sheet No. .
For location of coil inserts at slab drains, see
replaced by coil tie rods.
temporary plugs until girders are erected, then
Studs are to be left in place or replaced with
slotted wire-setting-studs projecting through forms.
Coil ties shall be held in place in the forms by
unit price for Prestressed Concrete I-Girder.
will be considered completely covered by the contract
Cost of 3/4" Ó coil tie rods placed in diaphragms
See EPG 751.22.3.14
Omit if length is Ï 2'-6"
Example_plans_014_2019_gdr.dgn 3:38:31 PM 12/28/2020
DOCUMENT."
A CERTIFIED
NOT BE CONSIDERED
"THIS MEDIA SHOULD
COUNTY
JOB NO.
CONTRACT ID.
ROUTE STATE
DISTRICT
DA
TE
DE
SC
RI
PTI
ON
MO
DATE PREPARED
BRIDGE NO.
PROJECT NO.
SHEET NO.
12/28/2020
IF
A
SE
AL I
S
PR
ES
EN
T
ON
THI
S
SH
EE
T I
T
HA
S
BE
EN
EL
EC
TR
ONI
CA
LL
Y
SE
AL
ED
AN
D
DA
TE
D.
PROJECT NO.
1-
88
8-
AS
K-
MO
DO
T (
1-
88
8-
27
5-
66
36)
JE
FF
ER
SO
N
CI
TY,
MO
65
10
2
10
5
WE
ST
CA
PI
TO
L
CO
MMI
SSI
ON
MI
SS
OU
RI
HI
GH
WA
YS
AN
D
TR
AN
SP
OR
TA
TI
ON
- -
2"
2"
3"
3 @ 2" 6" 3 @ 2"
3"
2"
3" 9 @ 2" 3"
11" 11"
2"
2
@
2"
4"
2
@
2"
C15 x 33.9 (Typ.)
STEEL DIAPHRAGM NOTES:
2"
2"
C C
3"
3•"
3"
12"
2ƒ"
2ƒ"
•"
•"
15"
3"
3•"
3"
2ƒ"
2ƒ"
•"
15"
•"
12"
2"
2"D D
1‡"
2"
C15 x 33.9
` 4 x 6 x 1/2 x 16"
4" x 3/8" x 16" plate
1•"
2"
2"
2„"
1•"
2„"
2"
1‡"
4" x 3/8" x 16" plate
SECTION C-C SECTION D-D
2"
2"
Note: This drawing is not to scale. Follow dimensions.
*
BR
*
*
AT DIAPHRAGM
SECTION THRU INT. GIRDER
AT DIAPHRAGM
SECTION THRU EXT. GIRDER
3'-4"9
ƒ"
9ƒ"
9ƒ"
9ƒ"
Ë Girder
INTERMEDIATE DIAPHRAGMS
PART SECTION SHOWING
C15 x 33.9 C15 x 33.9
DIA01_psi_skewed Effective: July 2020 Supersedes: Apr. 2020
and plate
nuts, washers,
(ASTM A307), hex
Ë Holes, boltsand washers
**, hex nuts
bolts (ASTM A307)
Ë Slotted holes,
and plate
nuts, washers,
(ASTM A307), hex
Ë Holes, bolts
For location of intermediate diaphragms, see Sheet No. .
Shop drawings will not be required for steel intermediate diaphragms and angle connections.
Concrete Girders.
completely covered by the contract unit price for Steel Intermediate Diaphragm for P/S
Payment for furnishing and installing steel intermediate diaphragms will be considered
Fabricated structural steel shall be ASTM A709 Grade 36 except as noted.
All diaphragm materials including bolts, nuts, and washers shall be galvanized.
and installed in accordance with the requirements for the specified ASTM A307 bolts.
high strength bolt installation. ASTM F3125 Grade A325 Type 1 bolts may be substituted for
** Bolts shall be tightened to provide a tension of one-half that specified in Sec 712 for
thickness) plate with four 15/16" Ó holes and one hardened washer per bolt.
* In lieu of 2 1/2" outside diameter washers, contractor may substitute a 3/16" (Min.
STEEL INTERMEDIATE DIAPHRAGMS
3/8" x 16" plate
angle and in 4" x
4 x 1/2 x 16"
in 4" leg of 6 x
Ë 1 1/16"Ó Hole
2 1/2" O.D. washers and 8 hardened washers *
bolts (ASTM A307) ** with hex nuts, four
Four 15/16"Ó holes in channel, four 7/8"Ó
holes in 6" leg of 6 x 4 x 1/2 x 16" angle.
Ë Four 1 1/16" x 2 1/4" horizontal slotted
washers. Tighten and burr threads
(ASTM A307) bolt, hex nut and 2 hardened
1 1/2"Ó Holes cast in beam with 7/8"Ó
3/8" x 16" plate
angle and in 4" x
4 x 1/2 x 16"
in 4" leg of 6 x
Ë 1 1/16"Ó Hole
EXAMPLE
16
Sheet No. 16 of Checked July 2020
Detailed July 2020
SPAN (1-2) SPAN (2-3)
10'-0"
10'-0"
33'-3‡" 24'-11„"
24'-11„" 33'-3‡"
49'-11…" 41'-6†"
41'-6†" 49'-11…"
24'-11„"
24'-11„"
33'-3‡"
33'-3‡"
SPAN (3-4)
Ë Girder
Ë Brg.
Ë Brg.
Ë Brg. Ë Brg.
Ë Brg. Ë Brg.
End Bent No. 1
Fill Face of
End Bent No. 4
Fill Face of
21"
21"
6‡"
6‡" 6
‡"
6‡"
Ë Int. Bent No. 2 Ë Int. Bent No. 3
Ë Structure
(Typ.)
Int. Diaph.
58'-3" 91'-6" 58'-3"
PLAN SHOWING LOCATION OF STEEL INTERMEDIATE DIAPHRAGMS
Longitudinal dimensions are horizontal.
From design
Fr
om
desi
gn
2
3
1
Calculates
Detailer
Calculates
Detailer
Girder spacing from design
(Use appropriate version for girder type and skew)
Bridge/A_BR_Std_Dwgs/Diaphragms_DIA/Current/
Use current standard sheet, found in ProjectWise under
need to be adjusted.
concrete girders. Diaphragm spacing may
1 1/2" to any prestressing strands in
will provide a minimum clearance of
for the diaphragms shown on the plans
Check that the 1 1/2"Ó holes
See EPG 751.22.3.13 Intermediate Diaphragms
be shown on the following sheet.)
Diaphragms is on this sheet. (Due to space limitations, it may
Remove this note if Plan Showing Location of Steel Intermediate
Remove panels for CIP (cast in place) slab.
10'-0"
Example_plans_016_2020_sdia.dgn 3:38:47 PM 12/28/2020
DOCUMENT."
A CERTIFIED
NOT BE CONSIDERED
"THIS MEDIA SHOULD
COUNTY
JOB NO.
CONTRACT ID.
ROUTE STATE
DISTRICT
DA
TE
DE
SC
RI
PTI
ON
MO
DATE PREPARED
BRIDGE NO.
PROJECT NO.
SHEET NO.
12/28/2020
IF
A
SE
AL I
S
PR
ES
EN
T
ON
THI
S
SH
EE
T I
T
HA
S
BE
EN
EL
EC
TR
ONI
CA
LL
Y
SE
AL
ED
AN
D
DA
TE
D.
PROJECT NO.
1-
88
8-
AS
K-
MO
DO
T (
1-
88
8-
27
5-
66
36)
JE
FF
ER
SO
N
CI
TY,
MO
65
10
2
10
5
WE
ST
CA
PI
TO
L
CO
MMI
SSI
ON
MI
SS
OU
RI
HI
GH
WA
YS
AN
D
TR
AN
SP
OR
TA
TI
ON
- -
(Normal)
3'-0"
12" (#4-U51)
14" (#6-U50)
(#
6-
U5
0)
3"
Cl.
(#
4-
U5
1)
3‚"
Cl.
#4-U51
#6-U50 or
#6-H50
#6-H50
#4-H51
10'-0" (Typ.)
(Typ.)
7 Pr.-#4-
U51
@ 11‚" cts.
Ë
Girder
Pr.-#6-
U50 (Typ.)
15"
15"
11‚"
11‚"
40°0'0"Ë Bent
(Except as shown)
Symm. abt. Ë Structure
3"
12"
2'-4•"
4-#5-
V50
SECTION A-A
B
B
2'-4•"
4-#5-
V50
@
12" cts.
5
Pr.-
#5-
H5
2
@
12" cts.
5
Pr.-
#5-
H5
2
(T
yp.)
Eq
ual
Spaces
AA
(Typ.)
7 Pr.-#4-U51 @ 11‚" cts.
(Except as shown)
Symm. abt. Ë Structure
(T
yp.)
4"
Ë Diaphragm
Ë Bent &
3"
18"
18"
3'-
0"
SECTION NEAR INTERMEDIATE BENT
15" 11‚" 11‚" 15"Ë Girder Ë Girder
2-#6-H50 (Typ.) 2-#4-H51 (Typ.)
Pr.-#6-U50 (Typ.)4-#5-V50
4-#5-V50
#5-H52
#4-H51 (Typ.)#6-H50 (Typ.)
(Strand tie bar)
2-#5-H54(Typ.)
(Strand tie bar)
2-#5-H53
#5-H52Filler
1/2" Joint
fro
m design
Girder spacing
EPG 751.50
Note H2c8.1,
Tie Rods (Typ.)
Two 3/4"Ó x 2'-6" Coil
Tie Rod (Typ.)
3/4"Ó x 2'-6" Coil
General Notes:
All U-bars in diaphragms are to be placed parallel to Ë Roadway.
Diaphragms at intermediate bents shall be built vertical.
For location and details of Coil Tie Rods, see Sheets No. 14 & 15.
For location of Strand Tie Bars, see Sheets No. 14 & 15.
Normal to Ë Structure
Prestressed Girders
cell in Tasks:
Coil Tie Insert
CONCRETE DIAPHRAGMS AT INTERMEDIATE BENTS NO. 2 & 3
Closed Intermediate Bent Diaphragms
See EPG 751.22.3.10
Coil Ties
See EPG 751.22.3.14
Diaphragm
Face of
Be
vel
Bevel
ƒ"
•"
ƒ"
3"
Filler
•" Jt.
EDGE DETAIL
(Diaphragm Edge Detail for Fixed Bents)
Cell in Tasks: Intermediate Bents
Bevel •"
ƒ"
4ƒ"
Be
vel
ƒ"
Diaphragm
End ofGirder
under girder
Jt. Filler
•" Jt. Filler
END DETAIL
SECTION B-B
(Diaphragm End Detail for I-Girders)
Cell in Tasks: Intermediate Bents
Note: This drawing is not to scale. Follow dimensions. Sheet No. 17 of
*
BR 17
*
*
EXAMPLE
Checked July 2020
Detailed July 2020
Example_plans_017_2020_cdia.dgn 3:39:07 PM 12/28/2020
DOCUMENT."
A CERTIFIED
NOT BE CONSIDERED
"THIS MEDIA SHOULD
COUNTY
JOB NO.
CONTRACT ID.
ROUTE STATE
DISTRICT
DA
TE
DE
SC
RI
PTI
ON
MO
DATE PREPARED
BRIDGE NO.
PROJECT NO.
SHEET NO.
12/28/2020
IF
A
SE
AL I
S
PR
ES
EN
T
ON
THI
S
SH
EE
T I
T
HA
S
BE
EN
EL
EC
TR
ONI
CA
LL
Y
SE
AL
ED
AN
D
DA
TE
D.
PROJECT NO.
1-
88
8-
AS
K-
MO
DO
T (
1-
88
8-
27
5-
66
36)
JE
FF
ER
SO
N
CI
TY,
MO
65
10
2
10
5
WE
ST
CA
PI
TO
L
CO
MMI
SSI
ON
MI
SS
OU
RI
HI
GH
WA
YS
AN
D
TR
AN
SP
OR
TA
TI
ON
- -
(1
3)
EXAMPLE
(T
yp.)
12"
6" (Max.)
1•" (Min.)
6" (Max.)
1•" (Min.)
3" (Max.)
1•" (Min.)
Panel Width
3" (Max.)
1•" (Min.)
B B
3" (Max.)
1•" (Min.)
Panel Width
3" (Max.)
1•" (Min.)
18" (
Ma
x.)
8•" (
Mi
n.)
6" (
Ma
x.)
(1
2~
0"
ma
x.)
Pa
nel
Le
ngt
h
PLAN OF OPTIONAL SKEWED END PANEL
Note: This drawing is not to scale. Follow dimensions.
18" (
Ma
x.)
8•" (
Mi
n.)
18" (
Ma
x.)
8•" (
Mi
n.)
6" cts. at top
#3-P2 at abt.
3" (
Ma
x.)
2•" (
Mi
n.)
3" (
Ma
x.)
2•" (
Mi
n.)
3" (
Ma
x.)
2•" (
Mi
n.)
18" (
Ma
x.)
8•" (
Mi
n.)
(7)(7)
1"
Height
SECTION A-A
SKEWED END PANELS
at top (6)
#3-P1 at 12" cts.
6" cts. at top
#3-P2 at abt.
at
4•" cts.
…"
Ó
Stra
nds
(11)
5•" (
Min.)
3"
(12)
1•" (Typ.)
between P2 bars (8)
5-#3-P3 at 6" cts.
B B
(2
~0"
mi
n.)
"L"
cts. (
Ma
x. s
pa.)
#3-
U1 at
3'-
0"
4•" cts. (
9)
…"
Ó
Stra
nds at
cts. (
Ma
x. s
pa.)
#3-
U1 at
3'-
0"
(2
~1
0"
mi
n.-
8~
0"
ma
x.)
Pa
nel
Le
ngt
h
Prestressed Panels:
Reinforcing Steel:
General Notes:
Joint Filler:
WidthMin. Max.
*
BR
*
*
BENDING DIAGRAM FOR U1 BAR
3ƒ"
L
L/4
L/4
L/4
L/4
2"
2"
2"
2"
2"
2"
Filler
Joint
Panel
sawn to skew
square and
May be castbe placed between P1 bars.
location and spacing shown. U1 Bars shall
U1 Bars may be oriented at right angles to
Dimensions
Joint Filler
before slab reinforcement is placed.
Edges of panels shall be uniformly seated on the joint filler
match haunch height above top of flange.
polystyrene bedding material may be cut with a transition to
thickness between adjacent panels shall be 1/4 inch. The
where top flange thickness may be stepped. The maximum change in
shall be used under any one edge of any panel except at locations
The same thickness of preformed fiber expansion joint material
Joint Filler Dimensions.
thickness of joint filler within the limits noted in the table of
Use Slab Haunching Diagram on Sheet No. XX for determining
bedding material in accordance with Sec 1073.
accordance with Sec 1057 or expanded or extruded polystyrene
Joint filler shall be preformed fiber expansion joint material in
manufacturer.
glue used shall be the type recommended by the joint filler
1 1/2 inches, the joint filler shall be glued top and bottom. The
Joint filler shall be glued to the girder. When thickness exceeds
to reduce cast-in-place concrete thickness to within tolerances.
Thicker material may be used on one or both sides of the girder
4"3"
3"
(4)
at abt.
#5-S Bars
3"
3"
A
A
grout leak (Typ.)
Prevent excessive
abt. 6" cts.
#5-S Bars at
of End Bent
Front Face
(2)
(3)
(1)
(1)
6" cts.
(4)
(4)
(3)
3"
(2)
(4)
(3)
\\ \
\\
(Typ.)
of End Bent
Front Face
\\
3"
3"
\\
\\
(4)
at abt.
#5-S Bars
Int. Bent
B B
3" (Max.)
1•" (Min.)
Panel Width
3" (Max.)
1•" (Min.)
18" (
Ma
x.)
8•" (
Mi
n.)
6" (
Ma
x.)
(8
~0"
ma
x.)
Pa
nel
Le
ngt
h3" (
Ma
x.)
2•" (
Mi
n.)
18" (
Ma
x.)
8•" (
Mi
n.)
6" cts. at top
#3-P2 at abt.
between P2 bars (8)
5-#3-P3 at 6" cts.
(2
~0"
mi
n.)
"L"
4•" cts. (
9)
…"
Ó
Stra
nds atsawn to skew
square and
May be cast
PLAN OF OPTIONAL TRUNCATED END PANEL
(10)
at top (6)
#3-P1 at 12" cts.
\\\
\\\
*** 3" (Min.), 6" (Max.)
3'-
0" cts.
#3-
U1
@
(Ma
x. s
pa.)
(10)
(10)
Reference Notes:
Plans of Panels:
Section A-A:
be shown on the shop drawings.
the girder top flange thickness. Dimensions shall
eliminated or reduced by increasing and varying
slab thickness over prestressed panels may be
(13) At the contractor's option, the variation in
under and between panels.
(12) Contractor shall ensure proper consolidation
adjustment.
labor or materials required for necessary grade
structure. No payment will be made for additional
raise the grade uniformly throughout the
minimum slab thickness, it may be necessary to
varies due to girder camber. In order to maintain
(11) Slab thickness over prestressed panels
SQUARED END PANELS OR TRUNCATED END PANELS
SECTION B-B
3"
1•"
(Typ.)
3" (Min.) 6" cts. at top
#3-P2 at abt.
Panel Width3" (Max.)
1•" (Min.)
3" (Max.)
1•" (Min.)
#3-U1
3"
3"
Strand
3/8"Ó
(7)(7)
& U1 Bar
Ë Strand
(4)
6" cts. (1)(5)
#5-S Bars @ abt.
(7)(7)
(7) (7)
PLAN OF SQUARED PANEL
(Typ.)
Int. Bent
(3)
(1)(2)
6" cts.
Plan of Panels Placement:
PLAN SHOWING PANELS PLACEMENT
(Typ.)
Edge
Girder(
2)
\
(2)(5)
(2)(5)
estimated quantities for the slab.
The prestressed panel quantities are not included in the table of
free standing water on the panels or in the area to be cast.
(SSD) condition just prior to the deck pour. There shall be no
Prestressed panels shall be brought to saturated surface-dry
compressive strength.
skewed end until cast-in-place concrete has reached 3,000 psi
Support from diaphragm forms is required under the optional
made for additional concrete and reinforcing required.
portion shall be cast full depth. No separate payment will be
When squared end panels are used at skewed bents, the skewed
the contractor and shown on the shop drawings.
approved by the engineer. Panel lengths shall be determined by
panels, provided the devices are shown on the shop drawings and
Suitable anchorage devices for lifting panels may be cast in
on the shop drawings.
The method and sequence of releasing the strands shall be shown
Initial prestressing force = 17.2 kips/strand.
used with the same spacing and initial tension.
ultimate strength = 22.95 kips (270 ksi). Larger strands may be
strand = 3/8" and nominal area = 0.085 sq.in. and minimum
accordance with AASHTO M 203 Grade 270, with nominal diameter of
seven-wire, low-relaxation strands for prestressed concrete in
Prestressing tendons shall be high-tensile strength, uncoated,
strands in the panels.
a depth of scoring of 1/8" perpendicular to the prestressing
The top surface of all panels shall receive a scored finish with
f'c = 6,000 psi, f'ci = 4,000 psi.
Concrete for prestressed panels shall be Class A-1 with
4x4-W7xW7.
bars at 6" crossings in openings, or min.
(5) For truncated end panels, use a min. of #5-S
1 1/2" max. from the inside face of diaphragm.
(4) End panels shall be dimensioned 1/2" min. to
(Typ.).
(3) Extend S-bars 9 inches beyond edge of girder
truncated end panels only.
of end bents and int. bents for squared and
(2) Extend S-bars 18 inches beyond the front face
panels only.
panels and used with squared and truncated end
(1) S-bars shown are bottom steel in slab between
DETAILS OF PRESTRESSED PANELS
** #3-P1 at 12" cts. (End panels only)
* #5-S Bars at abt. 9" cts. (1)
sides at bottom.
(10) Optional 1/2" x 45° Chamfer one or both
be debonded at the fabricator's option.
between strands. Strands 2~0" or shorter may then
reinforcing bar on each side of it, centered
(9) Any strand 2~0" or shorter shall have a #4
greater.
(8) Use #3-P3 bars if panel is skewed 45° or
(under strands).
(7) #3-P2 bars near edge of panel at bottom
required for panels at squared integral end bents.
in length and embedded 12". P1 bars will not be
(6) For end panels only, P1 bars shall be 2'-0"
contract unit price for the slab.
Cost of S-bars will be considered completely covered by the
S-bars are not listed in the bill of reinforcing.
diaphragms.
Precast panels may be in contact with stirrup reinforcing in
coated.
All reinforcement other than prestressing strands shall be epoxy
Minimum reinforcement steel length shall be 2~0".
strands (when placed between P1 bars) at about 3-foot centers.
The #3-U1 bars shall be tied securely to #3-P2 bars, to WWR or to
WWR at 24 inches.
#3-P2 bars at 16 inches.
strands with the following maximum spacing in each direction:
The following reinforcing steel shall be tied securely to the
when required, and placed over a width not less than 2 feet.
reinforcement criteria may be used in lieu of the #3-P3 bars,
not be larger than 0.375 inch. The above alternative
may be used in lieu of the #3-P2 bars shown. Wire diameter shall
spacing parallel to strands sufficient to ensure proper handling,
of reinforcing perpendicular to strands of 0.22 sq in./ft, with
Deformed welded wire reinforcement (WWR) providing a minimum area
be bent over, as necessary, to clear slab steel.
If U1 bars interfere with placement of slab steel, U1 loops may
otherwise shown.
Minimum clearance to reinforcing steel shall be 1 1/2", unless
Stirrup and Tie Dimensions.
Standard Practice for Detailing Reinforced Concrete Structures,
Hooks and bends shall be in accordance with the CRSI Manual of
All dimensions are out to out.
(2)(5)
PSP2_psi_Type_6 Effective: Nov. 2019 Supersedes: Sept. 2015
Checked July 2020
Detailed July 2020
Sheet No. 18 of
18
Stay-in-Place Bridge Deck Forms
EPG 751.10.2 General Superstructure,
Fill in
girder type)
PSP/Current/ (Use appropriate version for
under Bridge/A_BR_Std_Dwgs/Prestressed Panels
Use current standard sheet found in ProjectWise
Example_plans_018_2020_pcp.dgn 3:39:27 PM 12/28/2020
DOCUMENT."
A CERTIFIED
NOT BE CONSIDERED
"THIS MEDIA SHOULD
COUNTY
JOB NO.
CONTRACT ID.
ROUTE STATE
DISTRICT
DA
TE
DE
SC
RI
PTI
ON
MO
DATE PREPARED
BRIDGE NO.
PROJECT NO.
SHEET NO.
12/28/2020
IF
A
SE
AL I
S
PR
ES
EN
T
ON
THI
S
SH
EE
T I
T
HA
S
BE
EN
EL
EC
TR
ONI
CA
LL
Y
SE
AL
ED
AN
D
DA
TE
D.
PROJECT NO.
1-
88
8-
AS
K-
MO
DO
T (
1-
88
8-
27
5-
66
36)
JE
FF
ER
SO
N
CI
TY,
MO
65
10
2
10
5
WE
ST
CA
PI
TO
L
CO
MMI
SSI
ON
MI
SS
OU
RI
HI
GH
WA
YS
AN
D
TR
AN
SP
OR
TA
TI
ON
- -
Note: This drawing is not to scale. Follow dimensions.
*
BR
*
*
EXAMPLE
General Notes:
PART PLAN OF SLAB AT DRAIN
2"
Roa
dwa
y
Traffic
Drain
•" (Min.)
PART SECTION SHOWING BRACKET ASSEMBLY
Œ" Slot in L2x2x‚
washers, lock washer, and nut
1/2"Ó bolt with 2 hardened
Ë 9/16"Ó Hole in angle for
washer and nut (Typ.)
1/2"Ó bolt with lock
Ë 9/16"Ó Holes for
(Min.) x 2"
10 Gage
Bent Strip
L2x2x‚
Drain
(3" min. legs) x 2" long
1/2" max. thickness)
Angle (1/4" min. -
PLAN OF SLAB SHOWING SLAB DRAIN LOCATIONS
Girder Web
Prestressed
lock washer
1/2"Ó bolt with
9/16"Ó Hole for
Ë Coil Insert &
PART SECTION NEAR DRAIN
accordance with ASTM A123.
The drains shall be galvanized in
Outside dimensions of drains are 8" x 4".
ASTM A500 or A501.
steel or from 1/4" structural steel tubing
1/4" welded sheets of ASTM A709 Grade 36
Slab drains may be fabricated of either
Connector (Typ.)
or 1/2"Ó x 3"± Shear
(ASTM A709 Grade 36)
1/2"Ó x 3" Rod
1•"
4•"
ELEVATION OF DRAIN
Ë Drain
Roadway Slab
Bottom of
8"
X'-
X"
Lock Washer (Typ.)
with Hex Nut and
Carriage Bolt
1/2"Ó x 3" Galv.
Ë Drain
Typ.
Ë Drain
Ë Drain
8" (Nom.)
8"
Ë Drain
4"
Notes for FRP Drain:
Notes for Steel Drain:
‚"
•" (
Max.)
„" (
Min.)
2"
8•"
18"
girder fabricator.
web shall be supplied by the prestressed
bracket assembly to the prestressed girder
The bolt required to attach the slab drain
least 2,500 pounds in 5,000 psi concrete.
pull-out strength (ultimate load) of at
Coil inserts shall have a concrete
the prestressed girder shop drawings.
assembly attachment shall be located on
The coil insert required for the bracket
slab drains and the bracket assembly.
Shop drawings will not be required for the
accordance with ASTM A153.
washers and nuts shall be galvanized in
All bolts, hardened washers, lock
ASTM A123.
shall be galvanized in accordance with
The coil inserts and bracket assembly
clear drains.
Reinforcing steel shall be shifted to
in Part Section Near Drain.
Locate drains in slab by dimensions shown
A709 Grade 36 steel.
Slab drain bracket assembly shall be ASTM
All drains shall be of same type.
construct either steel or FRP slab drains.
Contractor shall have the option to
PLAN OF STEEL DRAIN OPTION
PLAN OF FRP DRAIN OPTION
cut.
manufacturer to ensure a smooth, chip free
drain shall be as recommended by the
field cut. The method of cutting FRP slab
At the contractor's option, drains may be
acceptance of the slab drains.
the required ultraviolet testing prior to
contractor shall furnish the results of
without any physical deterioration. The
testing with only minor discoloration and
shall withstand at least 500 hours of
D4329 Cycle A. The representative material
for UV resistance in accordance with ASTM
manufacture of the drains shall be tested
The combination of materials used in the
coating used.
be uniform throughout the resin and any
(Federal Standard 26373). The color shall
The color of the slab drain shall be gray
coating for additional UV resistance.
throughout. Drains may have an exterior
resistant and/or have UV inhibitors mixed
The resin used shall be ultraviolet (UV)
1/4 inch.
Minimum reinforced wall thickness shall be
outside nominal dimensions of 8" x 4".
Shape of drains shall be rectangular with
following exceptions:
requirements of ASTM D2996 with the
thermosetting resin tubing meeting the
Drains shall be machine filament-wound
Roadway Slab
Top of
Coil I
nsert
Loc
k
Was
her
&
1/
2"
Ó
Bolt,
Ë
9/
16"
Ó
Hole,
No. 4
at End Bent
End of Slab
(N
om.)
4"
(Min.)
1"
10'-0"6'-6"6'-6"4 Slab Drains @ 10'-0" cts.6'-6"6'-6"10'-0"
22"
18"
18"
22"
10'-0"6'-6"6'-6"4 Slab Drains @ 10'-0" cts.6'-6"6'-6"10'-0"Edge of Slab
Ë Exterior Girder
Edge of Slab
Ë Exterior Girder
Ë Slab Drain (Typ.)
Ë Structure
Ë Slab Drain (Typ.)
(Mi
n.)
9"
X'-
X"
Ë Int. Bent No. 3Ë Int. Bent No. 2
End Bent No. 1
End of Slab at
S_DRA05_psi Effective: Apr. 2020 Supersedes: April 2017 (DRAIN08)
Barrier
Face of
Inside
SLAB DRAINS
Drainage - Slab Drains
EPG 751.10.3 Bridge Deck
Gir
der
hei
ght
Detailer calculates
20" if drain placed parallel to Ë Roadway
Drain spacing from design
calc
ulates
Detailer
This portion drawn by detailer.
Modify as needed or replace.
shown in this example.
use those in place of details for transverse drains
to Roadway are drawn outside the border. If needed,
On Standard Drawing, Details of Drains Parallel
(Use appropriate version for girder type)
Bridge/A_BR_Std_Dwgs/Drains V_DRA-S_DRA/Current/S_DRA
Use current standard sheet found in ProjectWise
Checked July 2020
Detailed July 2020
Sheet No. 19 of
19
Example_plans_019_2020_sdra.dgn 3:39:47 PM 12/28/2020
DOCUMENT."
A CERTIFIED
NOT BE CONSIDERED
"THIS MEDIA SHOULD
COUNTY
JOB NO.
CONTRACT ID.
ROUTE STATE
DISTRICT
DA
TE
DE
SC
RI
PTI
ON
MO
DATE PREPARED
BRIDGE NO.
PROJECT NO.
SHEET NO.
12/28/2020
IF
A
SE
AL I
S
PR
ES
EN
T
ON
THI
S
SH
EE
T I
T
HA
S
BE
EN
EL
EC
TR
ONI
CA
LL
Y
SE
AL
ED
AN
D
DA
TE
D.
PROJECT NO.
1-
88
8-
AS
K-
MO
DO
T (
1-
88
8-
27
5-
66
36)
JE
FF
ER
SO
N
CI
TY,
MO
65
10
2
10
5
WE
ST
CA
PI
TO
L
CO
MMI
SSI
ON
MI
SS
OU
RI
HI
GH
WA
YS
AN
D
TR
AN
SP
OR
TA
TI
ON
- -
SPAN (1-2)
THEORETICAL SLAB HAUNCHING DIAGRAM
SPAN (3-4)
Girder No. 2
Girder No. 3
Girder No. 1
Ë Bearing
4 Equal Spaces 4 Equal Spaces
Ë Bearing
Bottom of Slab
Top of Girder
.25 .50 .75 Ë brg.
10 Equal Spaces
Ë Bearing
SPAN (2-3)
.25 .50 .75
1Ž"
1‡"
1Ž"
1…"
1‹"
1…"
1Š"
1Š"
1Š"
1•"
1•"
1•"
2‹"
2…"
2‹"
2Œ"
2‹"
2Œ"
2„"
2„"
2„"
1ƒ"
1Ž"
1ƒ"
1•"
1Œ"
1•"
1Š"
1‹"
1Š"
1Š"
1‹"
1Š"
1‹"
1†"
1‹"
1ƒ"
1‡"
1ƒ"
2„"
2‰"
2„"
2•"
2†"
2•"
3‚"
3„"
3‚"
3Š"
3‚"
3Š"
2‚"
2‰"
2‚"
1•"
1•"
1•"
1‚"
1Š"
1Š"
1‹"
58'-3" 91'-6" 58'-3"
875.75
875.98
875.84
875.84
876.06
875.92
875.92
876.14
876.00
875.99
876.21
876.07
876.05
876.27
876.13
876.05
876.28
876.14
876.13
876.36
876.22
876.21
876.44
876.29
876.28
876.52
876.36
876.34
876.58
876.42
876.39
876.63
876.47
876.43
876.67
876.51
876.46
876.70
876.55
876.48
876.72
876.57
876.50
876.73
876.58
876.51
876.73
876.59
876.52
876.74
876.60
876.60
876.83
876.69
876.68
876.91
876.77
876.75
876.97
876.83
876.81
877.03
876.89
1‹"
1‹"
Span (1-2) (58'-3" Ë brg. - Ë brg.)
Span (2-3) (91'-6" Ë brg. - Ë brg.)
Span (3-4) (58'-3" Ë brg. - Ë brg.)
(Bottom of Slab Elevation Diagram)
Cell in Tasks: Slab Sheet Details
Fill in information from design.
or Bottom of Slab Elevations - Tenth Pts)
(Bottom of Slab Elevations - Quarter Pts
Cell in Tasks: Slab Sheet Details
Fill in information from design.
Pts or Haunching Diagram - Tenth Pts)
Cell in Tasks: Slab Sheet Details (Haunching Diagram - Quarter
Fill in information from design.
(P/S Girder Camber Diagram)
Cell in Tasks: Slab Sheet Details
GIRDER CAMBER DIAGRAM
A B CGirder
Exterior
Interior
B
A
C
A B C A B C
0.4 pt. = 0.952 x 0.5 pt.
0.3 pt. = 0.813 x 0.5 pt.
0.2 pt. = 0.593 x 0.5 pt.
0.1 pt. = 0.314 x 0.5 pt.
Conversion factors for girder camber (estimated at 90 days)
0.25 pt. = 0.7125 x 0.5 pt.
required for variation in haunching, slab thickness or grade adjustment.
be necessary. No payment will be made for additional labor or materials
in slab thickness or a raise in grade uniformly throughout the structure shall
to maintain minimum slab thickness adjustment of the slab haunches, an increase
If girder camber is different from that shown in the camber diagram, in order
.I-Girderon Concrete
Concrete in the slab haunches is included in the Estimated Quantities for Slab
‡"
Ž"
1ˆ" ƒ"1Œ"
1Š"
2‡" 1‚"‡"
Ž"
1ˆ" ƒ"
Span (1-2) Span (2-3) Span (3-4)
Use tenth points for spans 75' or more.
Use quarter points for spans less than 75'.
(Estimated at 90 days)
Theoretical Camber after erection
Ë BearingË Bearing
Ë Girder
TYPICAL SLAB ELEVATIONS DIAGRAM
Ë Bearing
and barrier curb
weight of slab
Deflections due to
Slab Elevations
Finished Bottom of
to forming for slab)
Ë of Girder (Prior
of Slab Elevation at
Theoretical Bottom
is poured (Estimated at 90 days)
Theoretical Final Camber after slab
release (Estimated at 7 days)
Theoretical Camber after strand
Note: This drawing is not to scale. Follow dimensions. Sheet No. 20 of 30
B
BR 20
VERNON
J7S0546
EXAMPLE
Checked Nov. 2014
Detailed Nov. 2014
Ë brg.
Ë brg. .10 .20 .30 .40 .50 .60 .70 .80 .90 Ë brg.
Ë brg. Ë brg.
Number
Girder
1
2
3
1
2
3
1
2
3
(Prior to forming for slab) **Theoretical Bottom of Slab Elevations at Ë of Girder
dead load deflections due to weight of slab (including precast panel and barrier curb).
** Elevations are based on a constant slab thickness of 8 1/2" and include allowance for theoretical
Example_plans_020_2015_hnch.dgn 3:39:57 PM 12/28/2020
DOCUMENT."
A CERTIFIED
NOT BE CONSIDERED
"THIS MEDIA SHOULD
COUNTY
JOB NO.
CONTRACT ID.
ROUTE STATE
DISTRICT
DA
TE
DE
SC
RI
PTI
ON
MO
DATE PREPARED
BRIDGE NO.
PROJECT NO.
SHEET NO.
12/28/2020
IF
A
SE
AL I
S
PR
ES
EN
T
ON
THI
S
SH
EE
T I
T
HA
S
BE
EN
EL
EC
TR
ONI
CA
LL
Y
SE
AL
ED
AN
D
DA
TE
D.
PROJECT NO.
1-
88
8-
AS
K-
MO
DO
T (
1-
88
8-
27
5-
66
36)
JE
FF
ER
SO
N
CI
TY,
MO
65
10
2
10
5
WE
ST
CA
PI
TO
L
CO
MMI
SSI
ON
MI
SS
OU
RI
HI
GH
WA
YS
AN
D
TR
AN
SP
OR
TA
TI
ON
- -
PLAN OF SLAB SHOWING REINFORCEMENT
End Bent No. 1
End of Slab
2'-0‡" 41-#6-S1 @ 6" cts. (Top)
2'-0‡"41-#6-S1 @ 6" cts. (Top)
6"
6"
214'-3‚"
93'-0"
7†"
3'-7†"
SPAN (3-4)PART SPAN (2-3)
PART SPAN (2-3)SPAN (1-2)
3"
@
10"
2
Spa.
3"
@
10"
2
Spa.
Match Line
Match Line
10.
00
00
8.3910
13.0541
40°00'00"
50°00'00"90°00'00"
End Bent No. 4
End of Slab
13'-6" 22'-9"
11'-0"39'-9"
10
Spaces
@
15"
(S
pa. as s
ho
wn)
23-
#6-
S3
3"
7"
TOP REINFORCEMENT
BOTTOM REINFORCEMENT
15"
20"
15"
20"
13'-6"
39'-9"11'-0"
22'-9"
TOP REINFORCEMENT
BOTTOM REINFORCEMENT
(Except as shown)
Symm. abt. Ë Structure
Ë Int. Bent No. 3
Ë Int. Bent No. 2
(Mi
n. la
p
3'-
10")
(
4
Units
@
56'-
5")
60'-7†"
384-#6-S2 @ 6" cts. (Top)
(Spa.
bet
ween
S3
&
S5)
20-
#7-
S4
@
15" cts.
(S
pa.
bet
ween
S3
&
S4)
20-
#7-
S5
@
15" cts.
(S
pa.
bet
ween
S3
&
S4)
20-
#7-
S5
@
15" cts.
(S
pa.
bet
ween
S3
&
S5)
20-
#7-
S4
@
15" cts.
(Min. lap 3'-1") (Each side)
#6-S6 (4 Units @ 55'-10")
211-#5-S7 @ 12" cts. (Bottom) (Each side)
60'-7†"
Skew angle
Always 90°
From design
From design
From designDetailer calculatesDetailer calculates
Detailer calculates
design
From
calculates
Detailer
From designFrom design
From designcalculates
Detailer
From design
From design
EPG 751.10.1.7.2 Standard Partial Depth Precast Prestressed Panel Bridge Deck...
General Notes:
For details and locations of Slab Drains, see Sheet No. 19.
For Theoretical Bottom of Slab Elevations, see Sheet No. 20.
For Details of Precast Prestressed Panels, see Sheet No. 18.
For Theoretical Slab Haunching Diagram, see Sheet No. 20.
13'-
4"
13'-
4"
26'-
8"
10.0000
Always
Note: This drawing is not to scale. Follow dimensions. Sheet No. 21 of 30
*
BR 21
*
*
EXAMPLE
Checked July 2020
Detailed July 2020
Note H11.8 (EPG 751.50)
Curb not shown, see Sheets No. 23, 24 & 25.
For Details and Reinforcement of Safety Barrier
Sequence, see Sheet No. 22.
For Section Thru Slab and Slab Pouring
Longitudinal slab dimensions are measured horizontally.
calculates
Detailer
need to cut bars) (Typ.)
unit (to reduce the
units and one smaller
When possible, use 60'
Detailer calculates.
Example_plans_021_2020_slabplan.dgn 3:40:18 PM 12/28/2020
DOCUMENT."
A CERTIFIED
NOT BE CONSIDERED
"THIS MEDIA SHOULD
COUNTY
JOB NO.
CONTRACT ID.
ROUTE STATE
DISTRICT
DA
TE
DE
SC
RI
PTI
ON
MO
DATE PREPARED
BRIDGE NO.
PROJECT NO.
SHEET NO.
12/28/2020
IF
A
SE
AL I
S
PR
ES
EN
T
ON
THI
S
SH
EE
T I
T
HA
S
BE
EN
EL
EC
TR
ONI
CA
LL
Y
SE
AL
ED
AN
D
DA
TE
D.
PROJECT NO.
1-
88
8-
AS
K-
MO
DO
T (
1-
88
8-
27
5-
66
36)
JE
FF
ER
SO
N
CI
TY,
MO
65
10
2
10
5
WE
ST
CA
PI
TO
L
CO
MMI
SSI
ON
MI
SS
OU
RI
HI
GH
WA
YS
AN
D
TR
AN
SP
OR
TA
TI
ON
- -
SLAB DETAILS
SLAB CONSTRUCTION JOINT
Panel Joint
radius edging tool
of joint with 1/4"
Finish each side radius edging tool
of joint with 1/4"
Finish each side
Const. Jt.
‚"
‚"
1"
3•"
2ƒ"
2‚"
FULL DEPTH SLAB SLAB ON PANELS
full depth slab
width of
extend full
Key to
width of deck)
(Extend full
Const. Joint
DETAIL A
2'-0" 2'-0"
Parabolic Crown
4'-0"
‚"
‚"Top of Slab
Profile Grade
Crown of Slab
2% Cross SlopeË Roadway
1 2 3 4
Ë Girder Ë Girder
Crown of Slab
3'-5"6'-10"3'-1" 3'-5" 6'-10" 3'-1"
Cl.
1"
Detail A
SECTION THRU SLAB
2% Slope
(Mi
n.)
1"
Cl.
#6-S_
#5-S_#5-S_ *
#_-S_
2†"
#6-S_ #_-S_
#_-S_
HALF SECTION NEAR MIDSPAN HALF SECTION NEAR INTERMEDIATE BENT
Const. Jt.
DETAIL B
…"
…"
3"Groove (Typ.)
Ë 3/4" Drip
8•"
Detail B
4"
Cl.
(Mi
n.)
Cl.
\\
minimum from the panel joint.
to a clearance of 6 inches
** Adjust the construction joint
For Plan of Slab Showing Reinforcement, see Sheet No. .
Theoretical Slab Haunching Diagram, see Sheet No. .
For Theoretical Bottom of Slab Elevations, Girder Camber Diagram and
For reinforcement of barrier not shown, see Sheet No. .
For details of precast prestressed panels, see Sheet No. .
Notes:
Symm. about Ë Structure
* Alternate bar shape available, see barrier sheet.
16"24'-0" Roadway16"
12'-0"12'-0"
SLAB01_24ft_symm Effective: Apr. 2020 Supersedes: June 2016
TOP BARS AT BARRIER
OPTIONAL SHIFTING
in barrier
tie R2 bar
needed to
bar as
may shift
Contractor (4" min. bar
in barrier
to tie R3 bar
bars as needed
shift or swap
Contractor may
spacing)
1 2 3
of c
ur
bs
Out t
o
out
60'-7†" 93'-0" 60'-7†"
60'-7†"61'-0"48'-7†"
Ë Structure
End Bent No. 4
End of Slab at
End Bent No. 1
End of Slab at12~0" 32~0"
Const. Jt.
Ë Int. Bent
SPAN (1-2) SPAN (2-3) SPAN (3-4)
From design
EPG 751.10.1.12
using formulae from
Detailer calculates,
EP
G
75
1.
10.
1.
12
usi
ng f
or
mulae fro
m
Detailer calc
ulates,
Direction
1 225
SLAB POURING SEQUENCE
With Retarder
End to 2 2 to End
End to End
3
1 to 3
1 + 2 + 3
2 to EndEnd to 3
1 + 2 3
in accordance with Sec 703.
Alternate pours to the basic sequence are subject to the approval of the engineer
Pours
Alternate A
Pours
Alternate B
Sequence of Pours
Sequence
Basic
Cu. Yds./Hr.
Min. Rate of Pour
a minimum of 30 minutes and a maximum of 2 hours before the slab is poured.
The concrete diaphragm at the intermediate bents and integral end bents shall be poured
to 2.5 hours, and shall pour and satisfactorily finish the slab pours at the rate given.
The contractor shall furnish an approved retarder to retard the set of the concrete
25
25
(Use appropriate version for roadway width)
Bridge/A_BR_Std_Dwgs/Slab Sections SLAB/Current
Use current standard sheet found in ProjectWise
the border of the standard drawing.
Slab sections for other types of girders are available outside
(Parabolic Crown Detail - 2% Slope)
in Tasks, Slab Sheet Details
Included on std dwg, but also available as a cell
(Opt Shifting Top Bars at Type D or H Barrier)
in Tasks, Slab Sheet Details
Included on std dwg, but also available as a cell
(Drip Groove & Chamfer Detail)
as a cell in Tasks, Slab Sheet Details
Included on std dwg, but also available
(Const. Joint Detail - P/C P/S Panel Deck)
as a cell in Tasks, Slab Pouring Sequences
Included on std dwg, but also available
Note: This drawing is not to scale. Follow dimensions. Sheet No. 22 of Checked July 2020
Detailed July 2020
*
*
EXAMPLE
*
BR 22
outside border.
See guidance
See design.
Dimensions may be different.
Adjust detail to the appropriate skew.
and see EPG 751.50 (H6) for proper notes.
If using Case 1 for a prestressed girder bridge, remove "No Retarder" column
Insert cell from Tasks: Slab Pouring Sequences. See EPG 751.10.1.12
Example_plans_022_2020_slab.dgn 3:40:38 PM 12/28/2020
DOCUMENT."
A CERTIFIED
NOT BE CONSIDERED
"THIS MEDIA SHOULD
COUNTY
JOB NO.
CONTRACT ID.
ROUTE STATE
DISTRICT
DA
TE
DE
SC
RI
PTI
ON
MO
DATE PREPARED
BRIDGE NO.
PROJECT NO.
SHEET NO.
12/28/2020
IF
A
SE
AL I
S
PR
ES
EN
T
ON
THI
S
SH
EE
T I
T
HA
S
BE
EN
EL
EC
TR
ONI
CA
LL
Y
SE
AL
ED
AN
D
DA
TE
D.
PROJECT NO.
1-
88
8-
AS
K-
MO
DO
T (
1-
88
8-
27
5-
66
36)
JE
FF
ER
SO
N
CI
TY,
MO
65
10
2
10
5
WE
ST
CA
PI
TO
L
CO
MMI
SSI
ON
MI
SS
OU
RI
HI
GH
WA
YS
AN
D
TR
AN
SP
OR
TA
TI
ON
- -
R-BAR PERMISSIBLE ALTERNATE SHAPE
(Each face)
(Each face)
AT FORMED JOINT
PART ELEVATION
TYPE D BARRIER slip-formed option only
(1) Four feet long, centered on joint,
@ abt. 12" cts.
#5-R1, R2 and R3
(Span 1-2)
(Each face)
5-#5-R5
(Span 2-3)
(Each face)
5-#5-R4
(Each face)
5-#5-R4(Each face)
5-#5-R6
Cl.
1•"
Cl.
1•" Cl.
1•"
Bars (Typ.) *
Fiberglass
#4 Textured
General Notes:
SECTION B-B
Longitudinal dimensions are horizontal.
ELEVATION OF BARRIER
(Left barrier shown, right barrier similar)
SAW CUT JOINT
SECTION THRU
(Typ.)
2"
1"
BB
3"
*
#5-C1
(Each face)
SECTION A-A
(2) To top of bar
the slab is 3.52 square feet.
The cross-sectional area above
#5 horizontal barrier bars.
Use a minimum lap of 3'-1" for
(3)
Bar
#5-R
7…"
J
Const.
B
Fiberglass
#4 Textured
PART ELEVATION OF BARRIER
JOINT LOCATION
PART PLAN SHOWING
B
Ë Int.
A
A
1†"
@ abt. 12" cts.
#5-R1, R2 and R3
2•"
2•"
3"
5"
3"
5"
3'-
6…"
…"
…"
3'-
6"
8"8"
16"
5"
3"
3'-
3"
3'-
3"
X'-XX"
@
8•" cts.
5-
#5-
R
Bars
@
8•" cts.
5-
#5-
R
Bars
@
8•" cts.
5-
#5-
R
Bars
Joi
nt
Wi
dt
h
‚"
Sa
we
d
12'-0" 12'-0"
4ƒ"
4ƒ"
BAR01_D_elev Revised: Apr. 2020 Supersedes: Aug. 2018 (BAC18)
13'-6" 15'-6"60'-0"60'-0"
22•"
15"(
2)
9†"
1†"
#5-R2
\
Const. Joint #5-R3
#5-R3Joint
C
Bent
3/8" Backer Rod
(Sec 1057)
Filler
1/4" Joint
Barrier
Face of
Roadway
Bars (1)
Bar (4)
#5-R
(Typ.)
Sealant
Joint
Silicone
…" Backer Rod
to this line
depth at joint
Saw cut full
Fiberglass Bar (1)
#4 Textured
Sealant
Silicone Joint
#5-C2 *#5-C1 *
#5-C1 *#5-C1 * #5-C1 *#5-C1 *
(3)
Bar
#5-R
#5-C1 (Typ.) *
#5-R3
Const. Jt.
(Typ.)
(Barrier only)
Ë 1/4" Joint
Saw Cut)
(Formed or
Ë 1/4" Joint#5-R1
#5-R2
(Typ.)
(Barrier only)
Ë 1/4" Joint
#5-R1
•"
•"
xx-#5-R1, #5-R2 & #5-R3 (Spa. as shown in Part Elevation of Barrier)
forming is not used. (All dimensions are out to out.)
shown, at the contractor's option, only when slip
(3) The R1 bar may be separated into two bars as
contractor's option.
be furnished as one bar as shown, at the
cantilever (prestressed panels only) combination may
(4) The R2 bar and #5 bottom transverse slab bar in
saw cut joints.
Plastic waterstop shall not be used with
transversely broomed finish.
finish and the top shall have a
barrier shall have a vertically broomed
For slip-formed option, both sides of
sealant for saw cut and formed joints.
accordance with Sec 717 for silicone joint
Joint sealant and backer rods shall be in
Type D Barrier.
covered by the contract unit price for
delineators will be considered completely
both sides. Concrete traffic barrier
shall have retroreflective sheeting on
bridges with two-lane, two-way traffic
accordance with Sec 617. Delineators on
on Missouri Standard Plan 617.10 and in
be placed on top of the barrier as shown
Concrete traffic barrier delineators shall
wing to end of wing.
along the outside top of slab from end of
linear foot for each structure, measured
Measurement of barrier is to the nearest
Concrete in barrier shall be Class B-1.
linear foot.
contract unit price for Type D Barrier per
considered completely covered by the
reinforcement, complete in place, will be
Payment for all concrete and
bevel, unless otherwise noted.
either a 1/2-inch radius or a 3/8-inch
All exposed edges of barrier shall have
bents) normal to grade.
grade and barrier joints (except at end
Top of barrier shall be built parallel to
conventional forming.
be used. Saw cut joints may be used with
Conventional forming or slip forming may
* Slip-formed option only.
outside the border of the standard drawing.
Guidance and additional or alternate details are available
(Use appropriate version for barrier type, noted on Bridge Memo or Design Layout)
Use current standard sheet found in ProjectWise Bridge/A_BR_Std_Dwgs/Barriers BAR-BAC
front face of end bent on skewed structures.
Barrier curb at end bent extends past
Front Face
Drawn by detailer
bridge), two elevations will be needed.
If left and right barriers are different (such as on a curved
13…"
Detailer calculates
not required for squared bridges.
border, for LA and RA bridges. Detail
This detail is available outside the
Note: This drawing is not to scale. Follow dimensions. Sheet No. 23 of Checked July 2020
Detailed July 2020
*
*
EXAMPLE
*
BR 23
as others
same length
C1 if it can be
used in the slab.
panels are not
Remove if precast
calculates
Detailer
Example_plans_023_2020_BarrierElev.dgn 3:40:59 PM 12/28/2020
DOCUMENT."
A CERTIFIED
NOT BE CONSIDERED
"THIS MEDIA SHOULD
COUNTY
JOB NO.
CONTRACT ID.
ROUTE STATE
DISTRICT
DA
TE
DE
SC
RI
PTI
ON
MO
DATE PREPARED
BRIDGE NO.
PROJECT NO.
SHEET NO.
12/28/2020
IF
A
SE
AL I
S
PR
ES
EN
T
ON
THI
S
SH
EE
T I
T
HA
S
BE
EN
EL
EC
TR
ONI
CA
LL
Y
SE
AL
ED
AN
D
DA
TE
D.
PROJECT NO.
1-
88
8-
AS
K-
MO
DO
T (
1-
88
8-
27
5-
66
36)
JE
FF
ER
SO
N
CI
TY,
MO
65
10
2
10
5
WE
ST
CA
PI
TO
L
CO
MMI
SSI
ON
MI
SS
OU
RI
HI
GH
WA
YS
AN
D
TR
AN
SP
OR
TA
TI
ON
Note: This drawing is not to scale. Follow dimensions.
*
BR
*
*
8"
…"
…"
13
…"
8"20"
7†"
7†"
13
…"
21"
22"
1"
1"
11"
20"
7†"
11"
8"
7'-4"
3
13/
16" cts.
5-
1"
Ó
Holes
@
SECTION A-A
SECTION D-D
4‚"
4‚"
(Other K bars not shown for clarity)8"
8"
22"
DETAILS OF GUARD RAIL ATTACHMENT
Ë 1"Ó Holes
8"20"
SECTION C-C SECTION F-F
3Ž"
2•"
4‚"
3Ž"
2•"
4‚"
Joint
Const.
#5-K2
SECTION B-B SECTION E-E
3Ž"
4‚"
3Ž"
4‚"
Joint
Const.
#5-K2
#5-K BarConst. Jt.
Const. Joint
G
G
ELEVATION
PLAN
ELEVATION G-G
Ë 1"Ó Holes
Joint
Const.
#5-K1 #5-K1Joint
Const.
#5-K2 Joint
Const.
Joint
Const.
#5-K2
2'-
7"
3'-
6…"
11
…"2'-
7…"
6‰"
3'-
6"
16"
1"
…"
…"
2" Cl.
2" Cl.
2" Cl. 2" Cl.
2" Cl.
2" Cl. 2" Cl.
2" Cl. 2" Cl.
2" Cl.
Chamfer *
1"
13
‡"
2„"
SECTION H-H
3Ž"
2•"
4‚"
2" Cl.Const. Joint
SECTION I-I
3Ž"
2•"
4‚"
2" Cl.Const. Joint
TYPE D BARRIER AT END BENTS(Left barrier shown, right barrier similar)
Reinforcing Steel:
Minimum clearance to reinforcing steel shall be 1 1/2" except as shown for bars embedded into end bent.
General Notes:
2" 12"
4"
2"12" 6"
4"
4"
A B C DEF
2•"
3Ž"
4‚"
2•"
3Ž"
4‚"
X'-XX"
X'-XX"7'-4" X'-XX" 7'-4"
X'-XX"
Joint
Const.
Joint
Const.
Joint
Ë 1/4"
t
A B C F E D
2"
4"
12"
4"
2"
4"
12"
4"
X'-XX"
X'-XX"7'-4"
X'-XX"
X'-XX" 7'-4"Joint
Ë 1/4"
tJoint
Ë 1/4"
t
12" 2•" 2•" 12"
IH
IH
(Each face)
K
Bars
abt. 12"
X Spa. @
abt. 12"
X Spa. @
2•" 2•" 12"12"
abt. 12"
X Spa. @
abt. 12"
X Spa. @
will be considered completely covered by the contract unit price for Type D Barrier.
two-way traffic shall have retroreflective sheeting on both sides. Concrete traffic barrier delineators
Missouri Standard Plan 617.10 and in accordance with Sec 617. Delineators on bridges with two-lane,
Concrete traffic barrier delineators shall be placed on top of the barrier as shown on
Roadway Face of Barrier
ALTERNATE SHAPEK10-K11 BAR PERMISSIBLE
X-#5-K2 (Spa. as shown)
X-#5-K2 (Spa. as shown)
X-#5-K2 (Spa. as shown)
X-#5-K2 (Spa. as shown)
#5-K3
(1)
(1)(2)
4"
(4) 6"
(3)
(1)
(3)
(2)
(4) 6"
(2)
(3)(4)
(1)(2)
(4)
(3)6"
#5-K3#5-K3
(8)
17"
(8)
17"
(8)
17"
(8)
17"
gutter lines to match.
at Type A curb for
* Transition to zero
Cl.
1•"
Cl.
1•"
Cl.
1•"
Cl.
1•"
Cl.
1•"
Cl.
1•"
Cl.
1•"
Cl.
1•"
C-C and F-F
in Sections
to those shown
position close
be kept with
bars shall
The top two
contractor's option.
furnished as one bar as shown, at the
The K10-K11 bar combination may be
6-
#5-
K1
2 (
7)
(6)
8"
6-
#5-
K1
2 (
7)
(6)
8"
(5)
6-
#5-
K1
2 (
7)
#5-K11
(6)
8"
#5-K13
(5)
(6)
8"
(6)
8" (7)
6-
#5-
K1
4
(7)
6-
#5-
K1
4
(6)
8"
(7)
6-
#5-
K1
4
(5)
6-
#5-
K1
2 (
7)
(8)
17"
(6)
8"
(5)
(6)
8" (7)
6-
#5-
K1
4
6-
#5-
K1
2 (
7)
12" 9 Spa. @ 6" 2†"12"9 Spa. @ 6"2†"
(5)
8"
(6)
9-#5-K8 & K9
9-#5-K8 & K9X-#5-K10 & K11X-#5-K10 & K11
(5)
8"
(6)
(7)
6-#
5-
K1
4
3-#5-K13 3-#5-K15
X-#5-K10 & K11X-#5-K10 & K11
2†"
#5-K3 #5-K3
2†"
(R
dw
y. face)
3-
#5-
K1
5
(R
dw
y. face)
3-
#5-
K1
3
12" 9 Spa. @ 6"
9-#5-K8 & K9
9-#5-K8 & K9
(R
dw
y.
6-
#5-
K1
2
face)
(R
dw
y.
6-
#5-
K1
4
face)
6-#5-K12 6-#5-K14
9 Spa. @ 6"
10"
10"
3'-
3"
3'-
2…"
6‡"
5„"
4"
#5-K4
#5-K5
Var.
#5-K6
#5-K7
Var.
#5-K10
#5-K5
#5-K4
Var.
Var.
#5-K7
#5-K6
#5-K11
#5-K10
#5-K11
#5-K10
#5-K11
#5-K10
#5-K15
(8)
17"
(8)
17"
(8)
17"
Spaced with K1, K2 & K3 Spaced with K1, K2 & K3
Spaced with K1, K2 & K3 Spaced with K1, K2 & K3
PART ELEVATION
PART PLAN
BAR02_D_end_i Revised: July 2020 Supersedes: Apr. 2020
(8) To top of bar
each face
(7) Spaced as shown,
(6) 3 spaces @ 3Ž"
4•" cts., each face
(5) 3-#5-K13 or K15 @
(4) 3-#5-K6 & K7
(3) 5-#5-K4 & K5
(2) 2 spaces @ 4"
(1) 5-#5-K1 @ 4" cts.
Checked July 2020
Detailed July 2020
Sheet No. 24 of
24
EXAMPLE
If required because of skew
skew
because of
If required
Marked items determined by detailer.
See EPG 751.12.
Bridge/A_Br_Std_Dwgs/Barriers BAR-BAC/Current.
Use current standard sheet found in Projectwise under
Example_plans_024_2020_BarrierEnd.dgn 3:41:21 PM 12/28/2020
DOCUMENT."
A CERTIFIED
NOT BE CONSIDERED
"THIS MEDIA SHOULD
COUNTY
JOB NO.
CONTRACT ID.
ROUTE STATE
DISTRICT
DA
TE
DE
SC
RI
PTI
ON
MO
DATE PREPARED
BRIDGE NO.
PROJECT NO.
SHEET NO.
12/28/2020
IF
A
SE
AL I
S
PR
ES
EN
T
ON
THI
S
SH
EE
T I
T
HA
S
BE
EN
EL
EC
TR
ONI
CA
LL
Y
SE
AL
ED
AN
D
DA
TE
D.
PROJECT NO.
1-
88
8-
AS
K-
MO
DO
T (
1-
88
8-
27
5-
66
36)
JE
FF
ER
SO
N
CI
TY,
MO
65
10
2
10
5
WE
ST
CA
PI
TO
L
CO
MMI
SSI
ON
MI
SS
OU
RI
HI
GH
WA
YS
AN
D
TR
AN
SP
OR
TA
TI
ON
- -
BRIDGE
bottom of the approach slab to match the crown of the roadway surface.
With the approval of the engineer, the contractor may crown the
(Typ.) *
Filler
3/4" Jt.
to bridge crown as necessary
Transition from roadway crown
Barrier Curb (Typ.)
Bridge Safety
(If required)
#4 Bars at 12" cts.
Joint
Const.edging tool
1/4" radius
of joint with
Finish each side
Sand
Material
Sealing
Joint
Ë
Roa
dwa
y
(Integral end bent)
Concrete Bridge Approach Slab
JOINT DETAIL
CONCRETE CONST.
(Non-integral end bent)
gutter line)
(At bridge
12" (Min.)
to bridge crown as necessary
Transition from roadway crownBarrier Curb (Typ.)
Bridge Safety
APPROACH SLAB
CONCRETE BRIDGE
BRI
DG
E
(Typ.) *
Filler
3/4" Jt.
(Bott.)
9-#4 Bars
(Top)
3-#4 Bars
SECTION A-A
SECTION B-B
PART SECTION B-B
SECTION C-C
Aggregate Base
SECTION D-D
bridge gutter line)
12" (Min.) (At
Type 5Bridge End Bent
Fill Face of
(Slope to drain)
Perforated Drain Pipe
PART PLAN
1/4" Joint Filler (Typ.) *
PART PLAN OF SQUARED STRUCTURE
20'-0" (Pay limits)
skewed structure similar)
(Squared structure shown,
#4 Bars at 18" cts.
drain)
(Slope to
Drain Pipe
Perforated
Aggregate Base
Type 5
Performance Class A
base in accordance with ASTM E 1745
between bridge approach slab and granular
2 Layers of 4 Mil Polyethylene Sheeting
at 8" cts.
#6 Bars
bridge gutter line)
12" (Min.) (At
at 12" cts.
#5 Bars
(3)
(4)
(R
oa
dwa
y ite
m)
PA
VE
ME
NT
Asphalt Bridge Approach Slab
(R
oa
dwa
y ite
m)
PA
VE
ME
NT
APPROACH SLAB
ASPHALT BRIDGE
bottom of the approach slab to match the crown of the roadway surface.
With the approval of the engineer, the contractor may crown the
OPTIONAL CONCRETE SLAB
2•"
2•"
PART ELEVATIONSECTION E-E
Remove timber header when concrete pavement is placed.
Wood Block
3" x 8"
Wood Scab
6" x 1"
8"
(Min.)
DETAILS OF TIMBER HEADER
3" x 10" Timber Header
Roadway Surface and
Tie Insert
head) with 4" Coil
Bolt (Washer under
Ë 3/4"Ó x 8" Lag
Bridge Approach Slab
Roadway Face of
Optional 3" Wedge Blocks
3" x 8" Wood Block or
6" x 1" Wood Scab (Nail to block)
Top of Aggregate Base
Aggregate Base
Top of
at abt 3'-0" cts.
Header Supports
Block
3" Wedge
Optional
4" TYPE A CURB
Type A Curb 5'-6" long (Typ.)
5'-6" long (Typ.)
Type S Curb
bridge curb
end of the
the transition
chamfer at
with the
Curb aligns
of Type A
Gutter line
3/4" Jt. Filler *
1/4" Jt. Filler *
Curb
Safety Barrier
End of Bridge
Ö
1" Chamfer
Ö
End of Wing
at this point
and barrier
Align curb
and traced here.
shown on end bent sheets
order) #5 bars as
DO NOT PLACE (or
bridge approach slab used for this structure:
MoDOT Construction personnel will indicate the
DETAILS OF BRIDGE APPROACH SLAB (MINOR ROAD)
End of Slab
Slab
End of
General Notes:
Concrete Slab Only:
Notes For
Asphalt Slab Only:
Notes For
OPTIONAL ASPHALT SLAB
End of Slab
En
d
of
Sla
b
4" TYPE S CURB
Curb.
for details of Type S
Plans Drawing 609.00
See Missouri Standard
(See end bent sheets)
abt. 12" cts.
#5-H Bars at
sheets)
(See end bent
at abt. 12" cts.
#5-H Bars
drain pipe.
or 4" diameter corrugated polyethylene (PE)
corrugated polyvinyl chloride (PVC) drain pipe,
metallic-coated pipe underdrain, 4" diameter
Drain pipe may be either 6" diameter corrugated
bridge approach slab.
finish the bridge slab before placing the
The contractor shall pour and satisfactorily
either slab except as noted.
Contractor shall have the option to construct
BAS_minor Effective: Jan. 2020 Supersedes: May 2018
per Sec 403.
Application of tack is required between lifts
Approach Slab (Minor Road) per square yard.
by the contract unit price for Bridge
place, will be considered completely covered
within the pay limits shown, complete in
curb, underdrain and Type 5 aggregate base
asphalt bridge approach slab, including tack,
and excavation necessary to construct the
Payment for furnishing all materials, labor
Integral end bents shown, non-integral end bent similar.
HOLE DETAIL
UNDERSEAL ACCESS
(If required)
details of Type A Curb.
See Missouri Standard Plans Drawing 609.00 for
Approach Slab (Minor Road) per square yard.
covered by the contract unit price for Bridge
complete in place, will be considered completely
and incidental work as shown on this sheet,
base, joint filler, and all other appurtenances
timber header, underdrain, Type 5 aggregate
concrete bridge approach slab, including the
and excavation necessary to construct the
Payment for furnishing all materials, labor
filler except as noted.
Sec 1057 for preformed fiber expansion joint
All joint filler shall be in accordance with
with Sec 710.
Mechanical bar splices shall be in accordance
splice.
splicing the #4 bars 23" or by mechanical bar
reinforcing steel may be made continuous by lap
slab shall be continuous. The transverse
The reinforcing steel in the bridge approach
be 1 1/2", unless otherwise shown.
Minimum clearance to reinforcing steel shall
construction joints in bridge slab.
approach slab shall be aligned with longitudinal
Longitudinal construction joints in bridge
fy = 60,000 psi.
slab shall be epoxy coated Grade 60 with
The reinforcing steel in the bridge approach
be in accordance with Sec 503 (f'c = 4,000 psi).
All concrete for the bridge approach slab shall
accordance with Sec 717.
Sealant for Saw Cut and Formed Joints" in
approach slab and wing with "Silicone Joint
* Seal joint between vertical face of bridge
(NOT ALLOWED WITH CONCRETE PAVEMENT)
to crown.
actual length vary due
Stirrup height (8") and
90° stirrup hook at bottom;
length = 5~10" (Min.);
out to out; Actual
12" cts.; 2~0"x 8" (Min.)
(4) #4 Stirrup Bars at abt.
(3) Ë 3/4" Jt. Filler
(2) 9-#4 Bars
(1) 3-#4 Bars
Filler
Ë 3/4" Jt.
not applicable.
May be removed if
not applicable.
May be removed if
Wing
End of
4"
18"
14"
Wing
End of
Ë
Roa
dwa
y
3"
Header
Timber
3" x 10"
(Typ.)
13"
(Typ.)
13"
(T
yp.)
13"
(T
yp.)
13"
13"
of Slab
End
(see roadway plans)
Bituminous Pavement
(2)(Bott.)
(1)(Top)
‚"
‚"
2"
1/
3
De
pt
h
#6 Bars at 8" cts.
#5 Bars at 12" cts.
#4 Bars at 12" cts. (Bottom)
#4 Bars at 18" cts. (Top)
6"
Cl.
2"
4"
Cl.
2"
18"
14"
6"
(See e
nd
be
nt s
heets)
#5
Bars at a
bt.
12" cts. (
Ep
ox
y c
oate
d)
#6
Bars at
8" cts. (
Bott
om)
#5
Bars at
12" cts. (
To
p)
#4
Stirru
p
Bars at a
bt.
12" cts.
Sla
b
Thic
kness
Ap
pr
oach
#4 Bars at 12" cts. (Bottom)
#4 Bars at 18" cts. (Top)
20~0"
opening)
2ƒ"Ó (Clear
1"
(each side)
20~0" (Pay limits)
4"
Bridge/A_BR_Std_Dwgs/Approach Slabs APP/Current
Use current standard drawing found in ProjectWise under
Note: This drawing is not to scale. Follow dimensions. Sheet No. 25 of
*
BR 25
*
*
EXAMPLE
Checked July 2020
Detailed July 2020
Additional guidance shown outside std dwg border.
Example_plans_025_2020_appslab.dgn 3:41:42 PM 12/28/2020
DOCUMENT."
A CERTIFIED
NOT BE CONSIDERED
"THIS MEDIA SHOULD
COUNTY
JOB NO.
CONTRACT ID.
ROUTE STATE
DISTRICT
DA
TE
DE
SC
RI
PTI
ON
MO
DATE PREPARED
BRIDGE NO.
PROJECT NO.
SHEET NO.
12/28/2020
IF
A
SE
AL I
S
PR
ES
EN
T
ON
THI
S
SH
EE
T I
T
HA
S
BE
EN
EL
EC
TR
ONI
CA
LL
Y
SE
AL
ED
AN
D
DA
TE
D.
PROJECT NO.
1-
88
8-
AS
K-
MO
DO
T (
1-
88
8-
27
5-
66
36)
JE
FF
ER
SO
N
CI
TY,
MO
65
10
2
10
5
WE
ST
CA
PI
TO
L
CO
MMI
SSI
ON
MI
SS
OU
RI
HI
GH
WA
YS
AN
D
TR
AN
SP
OR
TA
TI
ON
- -
BRIDGE
bottom of the approach slab to match the crown of the roadway surface.
With the approval of the engineer, the contractor may crown the
(Typ.) *
Filler
3/4" Jt.
to bridge crown as necessary
Transition from roadway crown
Barrier Curb (Typ.)
Bridge Safety
(If required)
#4 Bars at 12" cts.
Joint
Const.edging tool
1/4" radius
of joint with
Finish each side
Sand
Material
Sealing
Joint
Ë
Roa
dwa
y
(Integral end bent)
Concrete Bridge Approach Slab
JOINT DETAIL
CONCRETE CONST.
(Non-integral end bent)
gutter line)
(At bridge
12" (Min.)
to bridge crown as necessary
Transition from roadway crownBarrier Curb (Typ.)
Bridge Safety
APPROACH SLAB
CONCRETE BRIDGE
BRI
DG
E
1
2
2
(Typ.) *
Filler
3/4" Jt.
(Bott.)
9-#4 Bars
(Top)
3-#4 Bars
SECTION A-A
SECTION B-B
PART SECTION B-B
SECTION C-C
Aggregate Base
SECTION D-D
bridge gutter line)
12" (Min.) (At
Type 5Bridge End Bent
Fill Face of
(Slope to drain)
Perforated Drain Pipe
PART PLAN
1/4" Joint Filler (Typ.) *
PART PLAN OF SQUARED STRUCTURE
3
4
1
20'-0" (Pay limits)
skewed structure similar)
(Squared structure shown,
#4 Bars at 18" cts.
drain)
(Slope to
Drain Pipe
Perforated
Aggregate Base
Type 5
Performance Class A
base in accordance with ASTM E 1745
between bridge approach slab and granular
2 Layers of 4 Mil Polyethylene Sheeting
at 8" cts.
#6 Bars
bridge gutter line)
12" (Min.) (At
at 12" cts.
#5 Bars
(3)
(4)
(R
oa
dwa
y ite
m)
PA
VE
ME
NT
Asphalt Bridge Approach Slab
(R
oa
dwa
y ite
m)
PA
VE
ME
NT
APPROACH SLAB
ASPHALT BRIDGE
bottom of the approach slab to match the crown of the roadway surface.
With the approval of the engineer, the contractor may crown the
OPTIONAL CONCRETE SLAB
2•"
2•"
PART ELEVATIONSECTION E-E
Remove timber header when concrete pavement is placed.
Wood Block
3" x 8"
Wood Scab
6" x 1"
8"
(Min.)
DETAILS OF TIMBER HEADER
3" x 10" Timber Header
Roadway Surface and
Tie Insert
head) with 4" Coil
Bolt (Washer under
Ë 3/4"Ó x 8" Lag
Bridge Approach Slab
Roadway Face of
Optional 3" Wedge Blocks
3" x 8" Wood Block or
6" x 1" Wood Scab (Nail to block)
Top of Aggregate Base
Aggregate Base
Top of
at abt 3'-0" cts.
Header Supports
Block
3" Wedge
Optional
4" TYPE A CURB
Type A Curb 5'-6" long (Typ.)
5'-6" long (Typ.)
Type S Curb
bridge curb
end of the
the transition
chamfer at
with the
Curb aligns
of Type A
Gutter line
3/4" Jt. Filler *
1/4" Jt. Filler *
Curb
Safety Barrier
End of Bridge
Ö
1" Chamfer
Ö
End of Wing
at this point
and barrier
Align curb
and traced here.
shown on end bent sheets
order) #5 bars as
DO NOT PLACE (or
bridge approach slab used for this structure:
MoDOT Construction personnel will indicate the
DETAILS OF BRIDGE APPROACH SLAB (MINOR ROAD)
End of Slab
Slab
End of
General Notes:
Concrete Slab Only:
Notes For
Asphalt Slab Only:
Notes For
OPTIONAL ASPHALT SLAB
End of Slab
En
d
of
Sla
b
4" TYPE S CURB
Curb.
for details of Type S
Plans Drawing 609.00
See Missouri Standard
(See end bent sheets)
abt. 12" cts.
#5-H Bars at
sheets)
(See end bent
at abt. 12" cts.
#5-H Bars
drain pipe.
or 4" diameter corrugated polyethylene (PE)
corrugated polyvinyl chloride (PVC) drain pipe,
metallic-coated pipe underdrain, 4" diameter
Drain pipe may be either 6" diameter corrugated
bridge approach slab.
finish the bridge slab before placing the
The contractor shall pour and satisfactorily
either slab except as noted.
Contractor shall have the option to construct
BAS_minor Effective: Jan. 2020 Supersedes: May 2018
per Sec 403.
Application of tack is required between lifts
Approach Slab (Minor Road) per square yard.
by the contract unit price for Bridge
place, will be considered completely covered
within the pay limits shown, complete in
curb, underdrain and Type 5 aggregate base
asphalt bridge approach slab, including tack,
and excavation necessary to construct the
Payment for furnishing all materials, labor
Integral end bents shown, non-integral end bent similar.
HOLE DETAIL
UNDERSEAL ACCESS
(If required)
Note: This drawing is not to scale. Follow dimensions. Sheet No. of
*
BR *
*
*
Checked
Detailed
details of Type A Curb.
See Missouri Standard Plans Drawing 609.00 for
Approach Slab (Minor Road) per square yard.
covered by the contract unit price for Bridge
complete in place, will be considered completely
and incidental work as shown on this sheet,
base, joint filler, and all other appurtenances
timber header, underdrain, Type 5 aggregate
concrete bridge approach slab, including the
and excavation necessary to construct the
Payment for furnishing all materials, labor
filler except as noted.
Sec 1057 for preformed fiber expansion joint
All joint filler shall be in accordance with
with Sec 710.
Mechanical bar splices shall be in accordance
splice.
splicing the #4 bars 23" or by mechanical bar
reinforcing steel may be made continuous by lap
slab shall be continuous. The transverse
The reinforcing steel in the bridge approach
be 1 1/2", unless otherwise shown.
Minimum clearance to reinforcing steel shall
construction joints in bridge slab.
approach slab shall be aligned with longitudinal
Longitudinal construction joints in bridge
fy = 60,000 psi.
slab shall be epoxy coated Grade 60 with
The reinforcing steel in the bridge approach
be in accordance with Sec 503 (f'c = 4,000 psi).
All concrete for the bridge approach slab shall
accordance with Sec 717.
Sealant for Saw Cut and Formed Joints" in
approach slab and wing with "Silicone Joint
* Seal joint between vertical face of bridge
(NOT ALLOWED WITH CONCRETE PAVEMENT)
to crown.
actual length vary due
Stirrup height (8") and
90° stirrup hook at bottom;
length = 5~10" (Min.);
out to out; Actual
12" cts.; 2~0"x 8" (Min.)
(4) #4 Stirrup Bars at abt.
(3) Ë 3/4" Jt. Filler
(2) 9-#4 Bars
(1) 3-#4 Bars
Filler
Ë 3/4" Jt.
5
5
not applicable.
May be removed if
not applicable.
May be removed ifBridge/A_Bridge_Standard_Drawings/Bridge Approach Slabs_BAS
Use current standard drawing found in ProjectWise under
Wing
End of
4"
18"
14"
Wing
End of
Ë
Roa
dwa
y
3"
Header
Timber
3" x 10"
(Typ.)
13"
(Typ.)
13"
(T
yp.)
13"
(T
yp.)
13"
13"
of Slab
End
(see roadway plans)
Bituminous Pavement
(2)(Bott.)
(1)(Top)
‚"
‚"
2"
1/
3
De
pt
h
#6 Bars at 8" cts.
#5 Bars at 12" cts.
#4 Bars at 12" cts. (Bottom)
#4 Bars at 18" cts. (Top)
6"
Cl.
2"
4"
Cl.
2"
18"
14"
6"
(See e
nd
be
nt s
heets)
#5
Bars at a
bt.
12" cts. (
Ep
ox
y c
oate
d)
#6
Bars at
8" cts. (
Bott
om)
#5
Bars at
12" cts. (
To
p)
#4
Stirru
p
Bars at a
bt.
12" cts.
Sla
b
Thic
kness
Ap
pr
oach
#4 Bars at 12" cts. (Bottom)
#4 Bars at 18" cts. (Top)
20~0"
opening)
2ƒ"Ó (Clear
1"
(each side)
20~0" (Pay limits)
4"
Example_plans_026_2019_appslab.dgn 3:41:54 PM 12/28/2020
DOCUMENT."
A CERTIFIED
NOT BE CONSIDERED
"THIS MEDIA SHOULD
COUNTY
JOB NO.
CONTRACT ID.
ROUTE STATE
DISTRICT
DA
TE
DE
SC
RI
PTI
ON
MO
DATE PREPARED
BRIDGE NO.
PROJECT NO.
SHEET NO.
12/28/2020
IF
A
SE
AL I
S
PR
ES
EN
T
ON
THI
S
SH
EE
T I
T
HA
S
BE
EN
EL
EC
TR
ONI
CA
LL
Y
SE
AL
ED
AN
D
DA
TE
D.
PROJECT NO.
1-
88
8-
AS
K-
MO
DO
T (
1-
88
8-
27
5-
66
36)
JE
FF
ER
SO
N
CI
TY,
MO
65
10
2
10
5
WE
ST
CA
PI
TO
L
CO
MMI
SSI
ON
MI
SS
OU
RI
HI
GH
WA
YS
AN
D
TR
AN
SP
OR
TA
TI
ON
- -
SHAPE 6 SHAPE 7 SHAPE 8
SHAPE 9
B
B
C
SHAPE 10
SHAPE 12
D
SHAPE 14
A
SHAPE 11
G
A
SHAPE 13
B D
SHAPE 15
SHAPE 16
SHAPE 17
SHAPE 18
SHAPE 20
A
A
G
VERTICAL
LEG
SHAPE 19
C
SHAPE 21
B
B
D
SHAPE 23
SHAPE 24
SPOT WELD
AASHTO M32
SIZE W5 WIRE
(TYP.)
C C
SHAPE 25
C
VERTICAL
LEG
SHAPE 26 SHAPE 27
D
SHAPE 28
E
SHAPE 29
A G
SHAPE 31
C
SHAPE 30
D
SHAPE 32
SHAPE 22
1-
1/
2
TU
RN
S
90° STIRRUP
HOOK
A OR G
HOOK
A OR G
APPROX.
H
D
(IN.)
BAR
SIZE
STIRRUP HOOK DIMENSIONS
90 HOOK 135 HOOK
GRADES 40 - 50 - 60 KSI
135° STIRRUP180°
90°
END HOOK DIMENSIONS
180° HOOKS
ALL GRADES
BAR
SIZE
D
(IN.) 90° HOOKS
NOTE:
E = EPOXY COATED REINFORCEMENT.
S = STIRRUP.
X = BAR IS INCLUDED IN SUBSTRUCTURE QUANTITIES.
NO. EA. = NUMBER OF BARS OF EACH LENGTH.
ACTUAL LENGTHS ARE MEASURED ALONG CENTERLINE BAR TO THE NEAREST INCH.
PAYWEIGHTS ARE BASED ON ACTUAL LENGTHS.
SHAPE 35
1-
1/
2
TU
RN
S
C
D
SHAPE 33
135°
HOOK
SHAPE 34
BENDING DIAGRAMS
6d FOR #4 AND #5,
DETAILING DIMENSION
DETAILING DIMENSION
C
D
C
B
B
E
K
K
H
H
K
D
H
B
E
B
E
D
C
C
B
H
C K
B
D
B
D
E
B
C
D
B
E
K C F
E
B
B
C
B
C
D K
H
K C F
H
E
D K K
H
H
B
H
K D
C K
H
B
E
H
B
B
B
C K
F
C
E
B
D
B
D
H
K
C
C
B
D
D K
B
K
H
H
C
K
H
B
B
A OR G
D
D
d
D
d
H
D
6d
d J
D
d
D
12d
C
D
C
PI
TC
H
B
B
K
F
H
E
B
3"
PI
TC
H
H
A
OR
G
AND THE FOLLOWING LINE.
V = BAR DIMENSIONS VARY IN EQUAL INCREMENTS BETWEEN DIMENSIONS SHOWN ON THIS LINE
A OR G
HOOK
ON A BAR.
"D" IS THE SAME FOR ALL BENDS AND HOOKS
NOTE: UNLESS OTHERWISE NOTED DIAMETER
12d FOR #6
DI
ME
NSI
ON
DE
TAI
LI
NG
DI
ME
NSI
ON
DE
TAI
LI
NG
A
OR
G
HO
OK
A OR G J A OR G
#4 3" 6" 4" 8"
#8 6" 11" 8" 16"
#4 2" 4 1/2" 4 1/2" 3"
#5 2 1/2" 6" 5 1/2" 3 3/4"
#6 4 1/2" 12" 8" 4 1/2"
4d OR 2 1/2" MIN.
#3 2 1/4" 5" 3" 6"
#5 3 3/4" 7" 5" 10"
#6 4 1/2" 8" 6" 12"
#7 5 1/4" 10" 7" 14"
#9 9 1/2" 15" 11 3/4" 19"
#10 10 3/4" 17" 13 1/4" 22"
#11 12" 19" 14 3/4" 2'-0"
#14 18 1/4" 2'-3" 21 3/4" 2'-7"
HOOKS AND BENDS SHALL BE IN ACCORDANCE WITH THE PROCEDURES AS SHOWN ON THIS SHEET.
barbill_i Effective: Aug. 2008 Supercedes: Feb. 2006
REINFORCING STEEL (GRADE 60) FY = 60,000 PSI.
PROCEDURE AS FOR 90 DEGREE STANDARD HOOKS.
ALL STANDARD HOOKS AND BENDS OTHER THAN 180 DEGREE ARE TO BE BENT WITH SAME
SHAPE 36
A
G
B
C
SPIRAL BAR OR WIRE.)
DEFORMED OR PLAIN
(SHAPE 35 SHALL BE A
ARE LISTED FOR FABRICATORS USE. (NEAREST INCH)
NOMINAL LENGTHS ARE BASED ON OUT TO OUT DIMENSIONS SHOWN IN BENDING DIAGRAMS AND
SPLICES OR SPACERS.
BE PLACED ON INSIDE OF SPIRALS. LENGTH AND WEIGHT OF COLUMN SPIRALS DO NOT INCLUDE
FOUR ANGLE OR CHANNEL SPACERS ARE REQUIRED FOR EACH COLUMN SPIRAL. SPACERS ARE TO
Note: This drawing is not to scale. Follow dimensions.
BR
NO.
RE
Q'
D.
SI
ZE
MA
RK LOCATION
DIMENSIONS
FT. IN. FT. IN. FT. IN. FT. IN. FT. IN. FT. IN. FT. IN.FT.IN.FT.IN. LBS.
WEIGHT
B C D E F H K
BILL OF REINFORCING STEEL
EP
OX
Y (
E)
SH
AP
E
NO.
STI
RR
UP (
S)
SU
BS
TR. (
X)
VA
RI
ES (
V)
NO.
EA
CHNO.
MARK
LE
NG
TH
NO
MI
NA
L
LE
NG
TH
AC
TU
AL
NO.
RE
Q'
D.
SI
ZE
MA
RK LOCATION
DIMENSIONS
FT. IN. FT. IN. FT. IN. FT. IN. FT. IN. FT. IN. FT. IN.FT.IN.FT.IN. LBS.
WEIGHT
B C D E F H K
BILL OF REINFORCING STEEL
EP
OX
Y (
E)
SH
AP
E
NO.
STI
RR
UP (
S)
SU
BS
TR. (
X)
VA
RI
ES (
V)
NO.
EA
CHNO.
MARK
LE
NG
TH
NO
MI
NA
L
LE
NG
TH
AC
TU
AL
SUBSTRUCTURE
INT. BENT 2
16 6 D200 KEY 20 X 2 6.000 2 6 2 6 60
10 8 H201 BEAM 20 X 30 3.000 30 3 30 3 808
10 6 H202 BEAM 20 X 30 3.000 30 3 30 3 454
14 6 H203 BEAM 10 S X 22.000 3 8.000 7 4 7 0 147
44 4 P200 SHAFT 16 X 2 5.500 2 1.000 8 7 8 7 252
50 6 P201 SHAFT 16 X 2 6.000 3 1.000 9 2 9 2 688
33 4 U200 BEAM 13 S X 3 9.000 3 9.000 3 9.000 3 9.000 15 9 15 6 342
28 4 U201 BEAM 13 S X 2 6.000 3 9.000 2 6.000 3 9.000 13 3 13 0 243
8 4 U202 BEAM 10 S X 3 9.000 3 9.000 11 3 11 1 59
28 9 V200 SHAFT 20 X 41 1.000 41 1 41 1 3911
INT. BENT 3
16 6 D300 KEY 20 X 2 6.000 2 6 2 6 60
10 8 H300 BEAM 18 X 30 3.000 32 1 32 1 857
10 8 H301 BEAM 20 X 30 3.000 30 3 30 3 808
10 6 H302 BEAM 20 X 30 3.000 30 3 30 3 454
14 6 H303 BEAM 10 S X 22.000 3 8.000 7 4 7 0 147
34 4 P300 SHAFT 16 X 2 5.500 2 1.000 8 7 8 7 195
33 4 U300 BEAM 13 S X 3 9.000 3 9.000 3 9.000 3 9.000 15 9 15 6 342
28 4 U301 BEAM 13 S X 2 6.000 3 9.000 2 6.000 3 9.000 13 3 13 0 243
8 4 U302 BEAM 10 S X 3 9.000 3 9.000 11 3 11 1 59
28 9 V300 SHAFT 20 X 35 6.000 35 6 35 6 3380
SUPERSTR.
END BENT 1
11 6 F100 WING E 15 S 14.000 3 8.000 14.000 12.750 5.875 12.750 5.875 6 0 5 10 96
5 6 F101 DIAPHRAGM E 23 S 3 5.625 4 11.000 2 7.875 2 2.750 8 5 8 4 63
11 6 F102 WING E 15 S 14.000 7 2.000 14.000 5.875 12.750 5.875 12.750 9 6 9 6 157
5 6 F103 DIAPHRAGM E 21 S 6 10.125 3 5.625 5 2.875 4 4.750 10 4 9 9 73
24 5 U105 DIAPHRAGM E 20 2 6.000 2 6 2 6 63
4 6 H105 DIAPHRAGM E 20 2 8.000 2 8 2 8 16
4 6 H104 DIAPHRAGM E 20 3 8.000 3 8 3 8 22
3 5 H108 STRAND TIE E 23 S 15.000 2 0.000 15.000 9.625 11.500 9.625 11.500 4 6 4 5 14
4 6 H103 DIAPHRAGM E 20 10 1.000 10 1 10 1 61
4 6 H102 DIAPHRAGM E 20 12 0.000 12 0 12 0 72
16 8 H106 WING E 20 17 5.000 17 5 17 5 744
48 6 H107 WING E 20 16 5.000 16 5 16 5 1184
18 5 U100 BEAM E 10 S 4 11.000 3 7.000 13 5 13 3 249
15 4 U101 BEAM E 13 S 3 7.000 2 7.500 3 7.000 2 7.500 13 2 12 11 129
42 6 U102 DIAPHRAGM E 19 S 2 11.000 5 6.000 8 5 8 3 520
26 5 U103 DIAPHRAGM E 10 S 4 9.500 2 11.000 12 6 12 4 334
26 6 U104 DIAPHRAGM E 19 S 3 10.500 3 7.000 7 6 7 4 286
16 5 V100 BEAM E 20 4 11.000 4 11 4 11 82
9 6 V101 DIAPHRAGM E 20 3 10.000 3 10 3 10 52
2 6 V102 WING E 20 8 1.000 8 1 8 1 24
30 6 V103 WING E 20 8 1.000 8 1 8 1 364
2 6 V104 WING E 20 7 11.000 7 11 7 11 24
30 6 V105 WING E 20 7 11.000 7 11 7 11 357
END BENT 4
DIAPH. AT
INT. BENTS
16 6 H50 DIAPHRAGM E 20 10 1.000 10 1 10 1 242
16 4 H51 DIAPHRAGM E 20 12 0.000 12 0 12 0 128
40 5 H52 DIAPHRAGM E 19 S 10.750 3 1.500 4 0 3 11 163
16 5 H53 STRAND TIE E 23 S 15.000 2 1.500 9.625 11.500 3 5 3 4 56
16 6 U50 DIAPHRAGM E 28 S 3 1.000 4 11.000 14.000 9 2 8 10 212
*
27
Sheet No. 27 of 30Checked Aug. 2019
Detailed Aug. 2019
EXAMPLE
C
E
8 5 H54 STRAND TIE E 23 S 15.000 2 0.000 15.000 9.625 11.500 9.625 11.500 4 6 4 5 37
12 7 H101 BEAM & DIAPH E 20 34 5.000 34 5 34 5 845
8 6 H100 BEAM & DIAPH E 20 34 5.000 34 5 34 5 414
11 6 F400 WING E 15 S 14.000 3 8.000 14.000 12.750 5.875 12.750 5.875 6 0 5 10 96
5 6 F401 DIAPHRAGM E 23 S 3 5.625 4 11.000 2 7.875 2 2.750 8 5 8 4 63
11 6 F402 WING E 15 S 14.000 7 2.000 14.000 5.875 12.750 5.875 12.750 9 6 9 6 157
5 6 F403 DIAPHRAGM E 21 S 6 10.125 3 5.625 5 2.875 4 4.750 10 4 9 9 73
4 6 H405 DIAPHRAGM E 20 2 8.000 2 8 2 8 16
4 6 H404 DIAPHRAGM E 20 3 8.000 3 8 3 8 22
3 5 H408 STRAND TIE E 23 S 15.000 2 0.000 15.000 9.625 11.500 9.625 11.500 4 6 4 5 14
4 6 H403 DIAPHRAGM E 20 10 1.000 10 1 10 1 61
4 6 H402 DIAPHRAGM E 20 12 0.000 12 0 12 0 72
16 8 H406 WING E 20 17 5.000 17 5 17 5 744
48 6 H407 WING E 20 16 5.000 16 5 16 5 1184
12 7 H401 BEAM & DIAPH E 20 34 5.000 34 5 34 5 845
8 6 H400 BEAM & DIAPH E 20 34 5.000 34 5 34 5 414
24 5 U405 DIAPHRAGM E 20 2 6.000 2 6 2 6 63
18 5 U400 BEAM E 10 S 4 11.000 3 7.000 13 5 13 3 249
15 4 U401 BEAM E 13 S 3 7.000 2 7.500 3 7.000 2 7.500 13 2 12 11 129
42 6 U402 DIAPHRAGM E 19 S 2 11.000 5 6.000 8 5 8 3 520
26 5 U403 DIAPHRAGM E 10 S 4 9.500 2 11.000 12 6 12 4 334
26 6 U404 DIAPHRAGM E 19 S 3 10.500 3 7.000 7 6 7 4 286
16 5 V400 BEAM E 20 4 11.000 4 11 4 11 82
9 6 V401 DIAPHRAGM E 20 3 10.000 3 10 3 10 52
2 6 V402 WING E 20 8 1.000 8 1 8 1 24
30 6 V403 WING E 20 8 0.000 8 0 8 0 360
2 6 V404 WING E 20 8 2.000 8 2 8 2 25
30 6 V405 WING E 20 8 1.000 8 1 8 1 364
by t
he
detailer.
is s
uccessf
ull
y e
ntere
d a
nd r
un
after t
he
bar
bill i
nf
or
mati
on
Bill
of
Rei
nf
orci
ng
Steel
pr
ogra
m
This s
heet is create
d
by t
he
10 8 H200 BEAM 18 X 30 3.000 32 1 32 1 857
C
*
*
66 6 P301 SHAFT 16 X 2 6.000 3 1.000 9 2 9 2 909
LAP
Example_plans_027_2019_bb1.dgn 3:42:04 PM 12/28/2020
DOCUMENT."
A CERTIFIED
NOT BE CONSIDERED
"THIS MEDIA SHOULD
COUNTY
JOB NO.
CONTRACT ID.
ROUTE STATE
DISTRICT
DA
TE
DE
SC
RI
PTI
ON
MO
DATE PREPARED
BRIDGE NO.
PROJECT NO.
SHEET NO.
12/28/2020
IF
A
SE
AL I
S
PR
ES
EN
T
ON
THI
S
SH
EE
T I
T
HA
S
BE
EN
EL
EC
TR
ONI
CA
LL
Y
SE
AL
ED
AN
D
DA
TE
D.
PROJECT NO.
1-
88
8-
AS
K-
MO
DO
T (
1-
88
8-
27
5-
66
36)
JE
FF
ER
SO
N
CI
TY,
MO
65
10
2
10
5
WE
ST
CA
PI
TO
L
CO
MMI
SSI
ON
MI
SS
OU
RI
HI
GH
WA
YS
AN
D
TR
AN
SP
OR
TA
TI
ON
- -
SHAPE 6 SHAPE 7 SHAPE 8
SHAPE 9
B
B
C
SHAPE 10
SHAPE 12
D
SHAPE 14
A
SHAPE 11
G
A
SHAPE 13
B D
SHAPE 15
SHAPE 16
SHAPE 17
SHAPE 18
SHAPE 20
A
A
G
VERTICAL
LEG
SHAPE 19
C
SHAPE 21
B
B
D
SHAPE 23
SHAPE 24
SPOT WELD
AASHTO M32
SIZE W5 WIRE
(TYP.)
C C
SHAPE 25
C
VERTICAL
LEG
SHAPE 26 SHAPE 27
D
SHAPE 28
E
SHAPE 29
A G
SHAPE 31
C
SHAPE 30
D
SHAPE 32
SHAPE 22
1-
1/
2
TU
RN
S
90° STIRRUP
HOOK
A OR G
HOOK
A OR G
APPROX.
H
D
(IN.)
BAR
SIZE
STIRRUP HOOK DIMENSIONS
90 HOOK 135 HOOK
GRADES 40 - 50 - 60 KSI
135° STIRRUP180°
90°
END HOOK DIMENSIONS
180° HOOKS
ALL GRADES
BAR
SIZE
D
(IN.) 90° HOOKS
NOTE:
E = EPOXY COATED REINFORCEMENT.
S = STIRRUP.
X = BAR IS INCLUDED IN SUBSTRUCTURE QUANTITIES.
NO. EA. = NUMBER OF BARS OF EACH LENGTH.
ACTUAL LENGTHS ARE MEASURED ALONG CENTERLINE BAR TO THE NEAREST INCH.
PAYWEIGHTS ARE BASED ON ACTUAL LENGTHS.
SHAPE 35
1-
1/
2
TU
RN
S
C
D
SHAPE 33
135°
HOOK
SHAPE 34
BENDING DIAGRAMS
6d FOR #4 AND #5,
DETAILING DIMENSION
DETAILING DIMENSION
C
D
C
B
B
E
K
K
H
H
K
D
H
B
E
B
E
D
C
C
B
H
C K
B
D
B
D
E
B
C
D
B
E
K C F
E
B
B
C
B
C
D K
H
K C F
H
E
D K K
H
H
B
H
K D
C K
H
B
E
H
B
B
B
C K
F
C
E
B
D
B
D
H
K
C
C
B
D
D K
B
K
H
H
C
K
H
B
B
A OR G
D
D
d
D
d
H
D
6d
d J
D
d
D
12d
C
D
C
PI
TC
H
B
B
K
F
H
E
B
3"
PI
TC
H
H
A
OR
G
AND THE FOLLOWING LINE.
V = BAR DIMENSIONS VARY IN EQUAL INCREMENTS BETWEEN DIMENSIONS SHOWN ON THIS LINE
A OR G
HOOK
ON A BAR.
"D" IS THE SAME FOR ALL BENDS AND HOOKS
NOTE: UNLESS OTHERWISE NOTED DIAMETER
12d FOR #6
DI
ME
NSI
ON
DE
TAI
LI
NG
DI
ME
NSI
ON
DE
TAI
LI
NG
A
OR
G
HO
OK
A OR G J A OR G
#4 3" 6" 4" 8"
#8 6" 11" 8" 16"
#4 2" 4 1/2" 4 1/2" 3"
#5 2 1/2" 6" 5 1/2" 3 3/4"
#6 4 1/2" 12" 8" 4 1/2"
4d OR 2 1/2" MIN.
#3 2 1/4" 5" 3" 6"
#5 3 3/4" 7" 5" 10"
#6 4 1/2" 8" 6" 12"
#7 5 1/4" 10" 7" 14"
#9 9 1/2" 15" 11 3/4" 19"
#10 10 3/4" 17" 13 1/4" 22"
#11 12" 19" 14 3/4" 2'-0"
#14 18 1/4" 2'-3" 21 3/4" 2'-7"
HOOKS AND BENDS SHALL BE IN ACCORDANCE WITH THE PROCEDURES AS SHOWN ON THIS SHEET.
barbill_i Effective: Aug. 2008 Supercedes: Feb. 2006
REINFORCING STEEL (GRADE 60) FY = 60,000 PSI.
PROCEDURE AS FOR 90 DEGREE STANDARD HOOKS.
ALL STANDARD HOOKS AND BENDS OTHER THAN 180 DEGREE ARE TO BE BENT WITH SAME
SHAPE 36
A
G
B
C
SPIRAL BAR OR WIRE.)
DEFORMED OR PLAIN
(SHAPE 35 SHALL BE A
ARE LISTED FOR FABRICATORS USE. (NEAREST INCH)
NOMINAL LENGTHS ARE BASED ON OUT TO OUT DIMENSIONS SHOWN IN BENDING DIAGRAMS AND
SPLICES OR SPACERS.
BE PLACED ON INSIDE OF SPIRALS. LENGTH AND WEIGHT OF COLUMN SPIRALS DO NOT INCLUDE
FOUR ANGLE OR CHANNEL SPACERS ARE REQUIRED FOR EACH COLUMN SPIRAL. SPACERS ARE TO
Note: This drawing is not to scale. Follow dimensions.
BR
NO.
RE
Q'
D.
SI
ZE
MA
RK LOCATION
DIMENSIONS
FT. IN. FT. IN. FT. IN. FT. IN. FT. IN. FT. IN. FT. IN.FT.IN.FT.IN. LBS.
WEIGHT
B C D E F H K
BILL OF REINFORCING STEEL
EP
OX
Y (
E)
SH
AP
E
NO.
STI
RR
UP (
S)
SU
BS
TR. (
X)
VA
RI
ES (
V)
NO.
EA
CHNO.
MARK
LE
NG
TH
NO
MI
NA
L
LE
NG
TH
AC
TU
AL
NO.
RE
Q'
D.
SI
ZE
MA
RK LOCATION
DIMENSIONS
FT. IN. FT. IN. FT. IN. FT. IN. FT. IN. FT. IN. FT. IN.FT.IN.FT.IN. LBS.
WEIGHT
B C D E F H K
BILL OF REINFORCING STEEL
EP
OX
Y (
E)
SH
AP
E
NO.
STI
RR
UP (
S)
SU
BS
TR. (
X)
VA
RI
ES (
V)
NO.
EA
CHNO.
MARK
LE
NG
TH
NO
MI
NA
L
LE
NG
TH
AC
TU
AL
56 4 U51 DIAPHRAGM E 28 S 2 9.000 4 11.000 12.000 8 8 8 6 318
16 5 V50 DIAPHRAGM E 20 5 0.000 5 0 5 0 83
SLAB
82 6 S1 SLAB E 20 V 2 2 1.000 2 1 2 1
INCREMENT = 25 11.000 25 11 25 11 1724
7.125 INCH
386 6 S2 SLAB E 20 26 5.000 26 5 26 5 15316
92 6 S3 SLAB E 20 56 5.000 56 5 56 5 7796
40 7 S4 SLAB E 20 50 9.000 50 9 50 9 4149
40 7 S5 SLAB E 20 36 3.000 36 3 36 3 2964
24 6 S6 SLAB E 20 55 10.000 55 10 55 10 2013
422 5 S7 SLAB E 20 3 8.000 3 8 3 8 1614
BARRIER CURB
146 5 K1 BARRIER CURB E 19 S 2 5.000 5.125 2 10 2 9 419
146 5 K2 BARRIER CURB E 14 S 5.125 11.125 18.000 2.000 17.875 2 10 2 9 419
94 5 K3 BARRIER CURB E 27 S 3 0.000 5.125 12.000 2 2.125 9.875 6.875 6 7 6 5 629
44 5 K4 BARRIER CURB E 7 3 0.000 6.000 6 2 6 2 283
4 5 K5 BARRIER CURB E 25 S 2 6.500 6.750 4.375 5.500 4.000 3 6 3 5 14
4 5 K6 BARRIER CURB E 25 S 2 5.500 7.875 4.375 6.500 4.500 3 6 3 5 14
4 5 K7 BARRIER CURB E 25 S 2 4.125 9.625 4.375 7.875 5.500 3 6 3 5 14
4 5 K8 BARRIER CURB E 25 S 2 2.750 11.250 4.375 9.250 6.500 3 6 3 6 15
48 5 K9 BARRIER CURB E 20 5 7.000 5 7 5 7 280
22 4 K10 BARRIER CURB E 20 15 1.000 15 1 15 1 222
4 5 K11 BARRIER CURB E 8 2 2.125 2 2.000 2.375 4 4 4 4 18
8 5 K12 BARRIER CURB E 27 S 17.000 5.125 12.000 7.125 12.000 9.875 6.875 4 5 4 2 35
20 4 K13 BARRIER CURB E 20 16 3.000 16 3 16 3 217
426 5 R1 BARRIER CURB E 26 2 6.000 4.250 2 6.125 2 6.000 3.000 5 2 5 2 2296
426 5 R3 BARRIER CURB E 19 S 17.000 6.000 0 23 0 22 815
426 5 R4 BARRIER CURB E 27 S 6.000 11.250 7.000 12.000 9.250 6.375 3 0 2 10 1259
58 5 R5 BARRIER CURB E 20 9 9.000 9 9 9 9 590
14 5 R6 BARRIER CURB E 20 47 1.000 47 1 47 1 688
28 5 R7 BARRIER CURB E 20 37 10.000 37 10 37 10 1105
14 5 R8 BARRIER CURB E 20 46 0.000 46 0 46 0 672
SLIP FORM
BARRIER CURB
40 5 C1 SLIP FORM E 20 10 0.000 10 0 10 0 417
8 5 C2 SLIP FORM E 20 15 2.000 15 2 15 2 127
TOTALS
4 1735
4 E 1143
5 E 13544
6 2919
6 E 34874
7 E 8942
8 3330
8 E 1581
9 7291
TOTAL 25622
TOTAL E 49737
Slab on
Girder
4 E 704
5 E 3435
6 E 34874
7 E 8942
8 E 1581
TOTAL 49536
Reinforcing
Steel
(Bridges)
4 1735
6 2919
8 3330
9 7291
TOTAL 15275
Safety
Barrier
Curb
4 E 439
5 E 9565
TOTAL 10004
Slip Form
Option
5 E 544
TOTAL 544
*
28
entered and run by the detailer.
barbill infor
mati
on is successfull
y
Barbill progra
m after the
This sheet is created by the
Checked Aug. 2019
Detailed Aug. 2019
Sheet No. 28 of 30
EXAMPLE
C
E
*
*
C
LAP
Example_plans_028_2019_bb2.dgn 3:42:14 PM 12/28/2020
DOCUMENT."
A CERTIFIED
NOT BE CONSIDERED
"THIS MEDIA SHOULD
COUNTY
JOB NO.
CONTRACT ID.
ROUTE STATE
DISTRICT
DA
TE
DE
SC
RI
PTI
ON
MO
DATE PREPARED
BRIDGE NO.
PROJECT NO.
SHEET NO.
12/28/2020
IF
A
SE
AL I
S
PR
ES
EN
T
ON
THI
S
SH
EE
T I
T
HA
S
BE
EN
EL
EC
TR
ONI
CA
LL
Y
SE
AL
ED
AN
D
DA
TE
D.
PROJECT NO.
1-
88
8-
AS
K-
MO
DO
T (
1-
88
8-
27
5-
66
36)
JE
FF
ER
SO
N
CI
TY,
MO
65
10
2
10
5
WE
ST
CA
PI
TO
L
CO
MMI
SSI
ON
MI
SS
OU
RI
HI
GH
WA
YS
AN
D
TR
AN
SP
OR
TA
TI
ON
- -
Note: This drawing is not to scale. Follow dimensions.
*
BR *
*
*
PILE03_dynamic_formula_as_built_pile_data Effective: March 2017 Supercedes: Nov. 2012
Sheet No. of Checked
Detailed
Current/PILE03_dynamic_formula_as_built_pile_data.dgn
Bridge/A_Bridge_Standard_Drawings/PILE_PILE/
Standard sheet found in ProjectWise under
Shaft with Socket_DSS/Current/DSS_01_as_built_dshaft.dgn
ProjectWise under Bridge/A_Bridge_Standard_Drawings/Drilled
As Built Drilled Shaft Data standard drawing can be found in
1
2
3
4
1
2
5
610
9
8
7
& Ë Roadway
Ë Structure
End Bent No. 1
Fill Face of
End Bent No. 4
Fill Face of
Ë Int. Bent No. 2
Ë Int. Bent No. 3
This portion drawn by detailer
11
12
13
EXAMPLE
As-Built Pile Data
(kips)
Resistance
Compressive
Axial
Nominal
Computed
(ft)
Place
in
Length
Remarks
No.
Pile
This sheet to be completed by MoDOT construction personnel.
C. Driven to practical refusal
B. Batter
A. Pile type and grade
Indicate in remarks column:
Note:
End Bent No. 1
End Bent No. 4
1
2
3
4
5
6
7
8
9
10
11
12
13
As-Built Drilled Shaft Data
1
2
Intermediate Bent No. 3
Intermediate Bent No. 2
No.
Shaft
(Elev.)
Rock
Sound
Top of
(Elev.)
Casing
Tip of
(Elev.)
Socket
Rock
of
Bottom
Remarks
AS-BUILT PILE AND DRILLED SHAFT DATA
& AS-BUILT DRILLED SHAFT DATA
RECORDING AS-BUILT PILE DATA
DRILLED SHAFT NUMBERING FOR
PART PLAN SHOWING PILE &
Modify tables as needed
Example_plans_029_2020_PileData.dgn 3:42:24 PM 12/28/2020
DOCUMENT."
A CERTIFIED
NOT BE CONSIDERED
"THIS MEDIA SHOULD
COUNTY
JOB NO.
CONTRACT ID.
ROUTE STATE
DISTRICT
DA
TE
DE
SC
RI
PTI
ON
MO
DATE PREPARED
BRIDGE NO.
PROJECT NO.
SHEET NO.
12/28/2020
IF
A
SE
AL I
S
PR
ES
EN
T
ON
THI
S
SH
EE
T I
T
HA
S
BE
EN
EL
EC
TR
ONI
CA
LL
Y
SE
AL
ED
AN
D
DA
TE
D.
PROJECT NO.
1-
88
8-
AS
K-
MO
DO
T (
1-
88
8-
27
5-
66
36)
JE
FF
ER
SO
N
CI
TY,
MO
65
10
2
10
5
WE
ST
CA
PI
TO
L
CO
MMI
SSI
ON
MI
SS
OU
RI
HI
GH
WA
YS
AN
D
TR
AN
SP
OR
TA
TI
ON
- -
BORING DATANote: For locations of borings, see Sheet No. 1.
BOR01 New: Aug. 2013
Boring Log PDFs to Final Plans
See EPG 751.5.8.4 for a link to Instructions for Attaching
example, but there may be several.
Showing only one boring sheet in this
Note: This drawing is not to scale. Follow dimensions. Sheet No. 30 of 30
*
BR 30
*
*
EXAMPLE
Checked Aug. 2019
Detailed Aug. 2019
may be ignored and deleted.
The magenta box is for ease of placement only and
BOR_02.dgn for one landscape-oriented sheet.
BOR_01.dgn for two portrait-oriented sheets,
Bridge/A_BR_Std_Dwgs/Boring Template BOR/
Standard sheet found in ProjectWise under
Example_plans_030_2020_bor.dgn 3:42:34 PM 12/28/2020
DOCUMENT."
A CERTIFIED
NOT BE CONSIDERED
"THIS MEDIA SHOULD
COUNTY
JOB NO.
CONTRACT ID.
ROUTE STATE
DISTRICT
DA
TE
DE
SC
RI
PTI
ON
MO
DATE PREPARED
BRIDGE NO.
PROJECT NO.
SHEET NO.
12/28/2020
IF
A
SE
AL I
S
PR
ES
EN
T
ON
THI
S
SH
EE
T I
T
HA
S
BE
EN
EL
EC
TR
ONI
CA
LL
Y
SE
AL
ED
AN
D
DA
TE
D.
PROJECT NO.
1-
88
8-
AS
K-
MO
DO
T (
1-
88
8-
27
5-
66
36)
JE
FF
ER
SO
N
CI
TY,
MO
65
10
2
10
5
WE
ST
CA
PI
TO
L
CO
MMI
SSI
ON
MI
SS
OU
RI
HI
GH
WA
YS
AN
D
TR
AN
SP
OR
TA
TI
ON
- -