2
READY INFRASTRUCTURE AND LAND Another factor that makes our region most suitable is, for sure, ready infrastructure and available land facilities to energy investments. There are large and nonarable lands in Konya, especially in Karapinar. 59.586.876 square meters of area that has been declared as Industrial Zone Specialized in Energy which will be given further incentives in addition to the current incentive system, will be available to investors. The installed capacity of region's potential for solar power plants is 4000 MW. The Power Substation which will be connected by the manufacturers is at the border of the declared land. With the investments in the region, we think that in an area of 1 m², between 60 KWh and 90 KWh of energy could be produced annually. This amount of energy production per square meter can bring annualy the minimum income of 8 USD/m2/year. When compared to similar places, this area has approximately U.S. $ 10 billion economic value. Also, the studies for Energy Zone with similar physical characteristics in Ayranci, Karaman have been carried out. One of the most important reasons to make a solar energy investment is the guarantee of purchase of the generated energy by the government for ten years. According to the Renewable Energy Law in Turkey, investments which will start the operating process until 2015, the energy prices base fee is determined as 13,3 USD cent/Kwh. In case of the construction of the production facilities with the domestic resources, government will purchase the generated energy in PV technology for a maximum fee of 20 USD cent / KWh for first 5 years and for a fee of 13,3 USD / cent KWh for the next five years. 59.710.000 m2 (5971 ha) KARAPINAR ENERGY INDUSTRY ZONE KARAPINAR ENERGY INDUSTRY ZONE TOTAL AREA 3.500 MW (1 MW = 1,7 ha) Installed Power Capacity 200 MW (Karapınar PS) Energy Infra Structure Characteristics 20 lt/sec using of process water, Number 1 Zone has a distance to Karapınar - Konya Road 1,5 km, Number 3 Zone 18,5 km, Responsibility to waste - water plant, Borh of two area have %1 gradient value, Both of two area on 5. seismic zone Investment Consultancy Support With its expert staff, Mevlana Development Agency, offers investment consultancy services free of charge for all of the investors wishing to invest in our region. Investment Criteria Location of Area Climate Charecteristics Spatial Features of the site Others Parameter Annual Total Sunshine Duration Annual Solar Radiation Low atmospheric density Distance to Riverbeds Low air polution Low wind potential Arid climate Low Humidity Distance to Sea Low air temerature Inclined terrain Land without the risk of earthquakes Land has not been protected by law Non forest land Non agriculture land Non pasture land Railway, highway land not exceeding Not close to the airport land Military exercies in the field, away from the land Away from the urban area of land Away from the main roads and the coastal strip of land Land is not lookup field for mining or oil Distance to Altitudes The land away from the direction of bird migration Obstacle to investment license Transformers and Trensmission Constraints Incentives Tax Incentives in Industrial Zones Qualified Human Resources Karapınar 2.964 hour/year 2.100 kWh/m2 year Open (02 okta) There is not river Very low 5,5 meter/sec/year Semi arid, Cold &21 265 km/Akdeniz 11,83 C° 1,5° 5. Degree Yes Yes Yes Yes Yes 110 km Enough distance Enough distance Yes Yes Yes Enough Distance There is no obstade to investment license 1000 MVA Transformer and 200 MW Transmission Capacity Customs Duty Exemption, VAT Exemption, Land Allocation, Social Security Premium Support (Employee’s Share), Tax Reduction Working 52 person/m2 ENERGY INCENTIVES Our region has a very strong industrial infrastructure. There are 77 companies in solar energy technology sector operating in areas such as PV panel, metal construction, eva, glass, solar tracking system, gel and gel battery group, electronic control system, inverter, charge control, metering, connection elements, cable and its equipment,collector and reflectives, CSP and PV plant installation engineering, steam turbine etc. Besides, with the foundation of Renewable Energy Center which will be within the Regional Innovation Center that has been planned to build in Konya in 2014, R&D studies will be performed and this center will contribute the development of the sector. 7,3 7,3 10,5 13,3 13,3 a. Hydroelectric Energy Power Plants b. Wind Energy Power Plants c. Jeothermal Energy Power Plants d. Biomass Energy Power Plants e. Solar Energy Power Plants The Prices (USD $ cent/kWh Renewable Energy Source Based Manufacturing Facility Type Energy Incentives STRONG INDUSTRIAL INFRASTRUCTURE 1980 1981 1982 1983 1984 1985 1986 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2750 2500 2250 2000 1750 1500 1250 1000 750 500 250 0 Length of Power Transmission Lines Based on Year 380 KV 154 KV 66 KV Total Length (km) Km

59.710.000 m2 (5971 ha) 3.500 MW (1 MW = 1,7 ha) 200 MW

  • Upload
    ngodang

  • View
    232

  • Download
    3

Embed Size (px)

Citation preview

READY INFRASTRUCTURE AND LAND

Another factor that makes our region most suitable is, for sure, ready infrastructure and available land facilities to energy investments. There are large and nonarable lands in Konya, especially in Karapinar. 59.586.876 square meters of area that has been declared as Industrial Zone Specialized in Energy which will be given further incentives in addition to the current incentive system, will be available to investors. The installed capacity of region's potential for solar power plants is 4000 MW. The Power Substation which will be connected by the manufacturers is at the border of the declared land. With the investments in the region, we think that in an area of 1 m², between 60 KWh and 90 KWh of energy could be produced annually. This amount of energy production per square meter can bring annualy the minimum income of 8 USD/m2/year. When compared to similar places, this area has approximately U.S. $ 10 billion economic value. Also, the studies for Energy Zone with similar physical characteristics in Ayranci, Karaman have been carried out.

One of the most important reasons to make a solar energy investment is the guarantee of purchase of the generated energy by the government for ten years. According to the Renewable Energy Law in Turkey, investments which will start the operating process until 2015, the energy prices base fee is determined as 13,3 USD cent/Kwh. In case of the construction of the production facilities with the domestic resources, government will purchase the generated energy in PV technology for a maximum fee of 20 USD cent / KWh for �rst 5 years and for a fee of 13,3 USD / cent KWh for the next �ve years.

59.710.000 m2 (5971 ha)

KARAPINAR ENERGYINDUSTRY ZONE

KARAPINAR ENERGYINDUSTRY ZONE

TOTALAREA

3.500 MW (1 MW = 1,7 ha)InstalledPower

Capacity

200 MW (Karapınar PS)EnergyInfra

Structure

Characteristics

20 lt/sec using of process water,Number 1 Zone has a distance to Karapınar - Konya Road1,5 km, Number 3 Zone 18,5 km,Responsibility to waste - water plant,Borh of two area have %1 gradient value,Both of two area on 5. seismic zone

InvestmentConsultancy

Support

With its expert sta�, Mevlana Development Agency, o�ers investment consultancy services free of charge for all of the investors wishing to invest in our region.

Investment Criteria

Location of Area

ClimateCharecteristics

Spatial Features of

the site

Others

Parameter

Annual Total Sunshine Duration

Annual Solar Radiation

Low atmospheric density

Distance to Riverbeds

Low air polution

Low wind potential

Arid climate

Low Humidity

Distance to Sea

Low air temerature

Inclined terrain

Land without the risk of earthquakes

Land has not been protected by law

Non forest land

Non agriculture land

Non pasture land

Railway, highway land not exceeding

Not close to the airport land

Military exercies in the �eld, away from the land

Away from the urban area of land

Away from the main roads and the coastal strip of land

Land is not lookup �eld for mining or oil

Distance to Altitudes

The land away from the direction of bird migration

Obstacle to investment license

Transformers and Trensmission Constraints

Incentives

Tax Incentives in Industrial Zones

Quali�ed Human Resources

Karapınar

2.964 hour/year

2.100 kWh/m2 year

Open (02 okta)

There is not river

Very low

5,5 meter/sec/year

Semi arid, Cold

&21

265 km/Akdeniz

11,83 C°

1,5°

5. Degree

Yes

Yes

Yes

Yes

Yes

110 km

Enough distance

Enough distance

Yes

Yes

Yes

Enough Distance

There is no obstade to investment license

1000 MVA Transformer and200 MW Transmission Capacity

Customs Duty Exemption,VAT Exemption,Land Allocation,Social Security Premium Support (Employee’s Share),Tax Reduction

Working

52 person/m2

ENERGYINCENTIVES

Our region has a very strong industrial infrastructure. There are 77 companies in solar energy technology sector operating in areas such as PV panel, metal construction, eva, glass, solar tracking system, gel and gel battery group, electronic control system, inverter, charge control, metering, connection elements, cable and its equipment,collector and re�ectives, CSP and PV plant installation engineering, steam turbine etc. Besides, with the foundation of Renewable Energy Center which will be within the Regional Innovation Center that has been planned to build in Konya in 2014, R&D studies will be performed and this center will contribute the development of the sector.

7,3

7,3

10,5

13,3

13,3

a. Hydroelectric Energy Power Plants

b. Wind Energy Power Plants

c. Jeothermal Energy Power Plants

d. Biomass Energy Power Plants

e. Solar Energy Power Plants

The Prices

(USD $ cent/kWhRenewable Energy Source Based Manufacturing Facility Type

Energy Incentives

STRONG INDUSTRIALINFRASTRUCTURE

1980

1981

1982

1983

1984

1985

1986

1987

1988

1989

1990

1991

1992

1993

1994

1995

1996

1997

1998

1999

2000

2001

2002

2003

2004

2005

2006

2007

2008

2009

2010

2750

2500

2250

2000

1750

1500

1250

1000

750

500

250

0

Length of Power Transmission Lines Based on Year380 KV

154 KV

66 KV

TotalLength(km)

Km

HIGH RENEWABLE ENERGY POTENTIAL

HIGHEST PERMISSIONCAPACITY

Another factor that makes our region most suitable is, for sure, ready infrastructure and available land facilities to energy investments. There are large and nonarable lands in Konya, especially in Karapinar. 59.586.876 square meters of area that has been declared as Industrial Zone Specialized in Energy which will be given further incentives in addition to the current incentive system, will be available to investors. The installed capacity of region's potential for solar power plants is 4000 MW. The Power Substation which will be connected by the manufacturers is at the border of the declared land. With the investments in the region, we think that in an area of 1 m², between 60 KWh and 90 KWh of energy could be produced annually. This amount of energy production per square meter can bring annualy the minimum income of 8 USD/m2/year. When compared to similar places, this area has approximately U.S. $ 10 billion economic value. Also, the studies for Energy Zone with similar physical characteristics in Ayranci, Karaman have been carried out.

It has been con�rmed by the Ministry of Enegy and Natural Resources that Konya&Karaman is the region having the greatest potential for solar enegy investments in Turkey. All the regions in Turkey could be licensed for solar energy investments with a total capacity of 600 MW till the end of 2013 which were listed with the study which was performed by the Ministry and published in the o�cial gazette dated 8 January 2011. With this study, investment permissions have been given for 27 regions in all over Turkey, in total. Among these 27 regions that have been allowed Konya has been determined as the region getting the greatest capacity. 92 MW portion of the investments of 600 MW has been allocated to Konya, which was given 13 power substations. Besides, a capacity of 38 MW has been allocated to Karaman, which was determined to have 3 power substations. An investment capacity of 130 MW in total was given to Konya&Karaman. Thus, 22% of the solar energy investments, which will be made in Turkey till the end of 2013, will be realized in the region. It is told that with its �at, large and nonarable land, our region will continue to attract the investors by being the most intense region in terms of solar enegy plants in the near future. Global Radiation (kWh/m2-day) Global Radiation

(kWh/m2-day) Turkey

Global Radiation(kWh/m2-day) Konya

Global Radiation(kWh/m2-day) Karaman

Global Radiation(kWh/m2-day) Karapınar

January

Hour

14

12

10

8

6

4

2

0

FebuaryMarch April May

June

JulyAutust

SeptemberOcto

berJanuary

DecemberAverage

are more

e�ciency

than Turkey’s avarage.

Konya % 5,53 Karapınar % 6,82 Karaman % 8,92

are more

e�ciency

than Turkey’s avarage.

Konya % 5,66 Karapınar % 8,12 Karaman % 9,88

Sunshine Duration (Hour)Sunshine Duration(Hour) Turkey

Sunshine Duration(Hour) Konya

Sunshine Duration(Hour) Karaman

Sunshine Duration(Hour) Karapınar

January

Hour

14

12

10

8

6

4

2

0

FebuaryMarch April May

June

JulyAutust

SeptemberOcto

berJanuary

DecemberAverage

21.67

12.83

9.67

4.834.504.33

4.33

4.17

3.67

3.50

3.33

3.00

3.00

2.671.83

1.831.50

1.501.50

1.171.33

0.83 0.50 Konya, KaramanVan, AğrıAntalya 1,2MersinK.Maraş, AdıyamanBurdurNiğde, Nevşehir, AksarayKayseriMalatya, AdıyamanHakkariMuğla, AydınIsparta, AfyonDenizliBitlisBingöl, TunceliŞırnakAdana, OsmaniyeMuşSiirt, Batman, MardinSivasElazığŞanlıurfa, DiyarbakırErzurumErzincan

The Ratlos of License Capacity

When based on the percentage of capacity, it is supposed to be given license to 888 MW according to 2023 energy projection in our region

30.000 MW

4.700 MW

100.000 MW

Electrical Energy Markets and Supply Security Strategy Paper target installed capacity of 100,000 MW by the year 2023,

The document in question at least 30% of total installed capacity in 2023, renewable energy, Target of 20,000 MW of installed wind power in 2023, the installed capacity target of 600 MW of geothermal,

Solar and geothermal energy target for 2023, a total of 9,400 MW, When Solar and Geothermal sharing is made of 50% for 2023, the solar power target is 4,700 MW

“Local Leader of National Development”

“Konya and Karaman... These two cities of TR52 Region are waiting for you...”

for more information about our cities and investment climate, please visit;

for Konya : www.investinkonya.com.tr for Karaman : www.investinkaraman.com.tr

MevlanaDevelopment

Agency

Medrese Mahallesi Ulaşbaba Caddesi No:28 Selçuklu/Konya TURKIYE 42060Tel.: 0090 332 236 32 90Fax: 0090 332 236 46 91E-Mail: [email protected]

KonyaInvestment

SupportO�ce

Medrese Mahallesi Ulaşbaba Caddesi No:28 Selçuklu/Konya TURKIYE 42060Tel.: 0090 332 236 32 90Fax: 0090 332 236 46 91E-Mail: [email protected]

KaramanInvestment

SupportO�ce

İmaret Mahallesi Atatürk Bulvarı No:2 Merkez/Karaman TURKIYE 70100Tel.: 0090 338 213 00 20Fax: 0090 338 214 02 30E-Mail: [email protected]

www.mevka.org.tr