33
The State of WTE in North America Bruce Howie, PE Vice President, HDR, Inc. October 5, 2018

5.WTERT Presentation 100518 FINALccnyeec.org/wp-content/uploads/2018/10/Bruce-Howie-The... · 2018. 10. 20. · Microsoft PowerPoint - 5.WTERT Presentation_100518_FINAL Author: sandy

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 5.WTERT Presentation 100518 FINALccnyeec.org/wp-content/uploads/2018/10/Bruce-Howie-The... · 2018. 10. 20. · Microsoft PowerPoint - 5.WTERT Presentation_100518_FINAL Author: sandy

The State of WTE in North AmericaBruce Howie, PE Vice President, HDR, Inc.

October 5, 2018

Page 2: 5.WTERT Presentation 100518 FINALccnyeec.org/wp-content/uploads/2018/10/Bruce-Howie-The... · 2018. 10. 20. · Microsoft PowerPoint - 5.WTERT Presentation_100518_FINAL Author: sandy

01 A Brief History of Energy Recovery from Waste in North America

02 Current State of Industry

03 Recent Projects

04 What’s Next?

Agenda

Page 3: 5.WTERT Presentation 100518 FINALccnyeec.org/wp-content/uploads/2018/10/Bruce-Howie-The... · 2018. 10. 20. · Microsoft PowerPoint - 5.WTERT Presentation_100518_FINAL Author: sandy

A Brief History of Energy Recoveryfrom Waste in North America

Page 4: 5.WTERT Presentation 100518 FINALccnyeec.org/wp-content/uploads/2018/10/Bruce-Howie-The... · 2018. 10. 20. · Microsoft PowerPoint - 5.WTERT Presentation_100518_FINAL Author: sandy

Energy Recovery From Waste: Then & Now

1950’s – 1960’s

Construction of early WTE facilities in Europe and

incinerators in U.S.

Page 5: 5.WTERT Presentation 100518 FINALccnyeec.org/wp-content/uploads/2018/10/Bruce-Howie-The... · 2018. 10. 20. · Microsoft PowerPoint - 5.WTERT Presentation_100518_FINAL Author: sandy

1975 – Construction of 1st modern WTE Facility in North America in

Saugus, Massachusetts

Energy Recovery From Waste: Then & Now

Construction of early WTE facilities in Europe and

incinerators in U.S.

1950’s – 1960’s

Page 6: 5.WTERT Presentation 100518 FINALccnyeec.org/wp-content/uploads/2018/10/Bruce-Howie-The... · 2018. 10. 20. · Microsoft PowerPoint - 5.WTERT Presentation_100518_FINAL Author: sandy

The “Hay Days” of WTE

in North America

1975 – Construction of 1st modern WTE Facility in North America in

Saugus, Massachusetts

Energy Recovery From Waste: Then & Now

Construction of early WTE facilities in Europe and

incinerators in U.S.

1950’s – 1960’s 1970’s

Page 7: 5.WTERT Presentation 100518 FINALccnyeec.org/wp-content/uploads/2018/10/Bruce-Howie-The... · 2018. 10. 20. · Microsoft PowerPoint - 5.WTERT Presentation_100518_FINAL Author: sandy

The “Dark Ages”: Stricter Emission standards in U.S. –

retrofits & some facility closures

The “Hay Days” of WTE

in North America

1975 – Construction of 1st modern WTE Facility in North America in

Saugus, Massachusetts

Energy Recovery From Waste: Then & Now

Construction of early WTE facilities in Europe and

incinerators in U.S.

1950’s – 1960’s 1970’s 1980’s

Page 8: 5.WTERT Presentation 100518 FINALccnyeec.org/wp-content/uploads/2018/10/Bruce-Howie-The... · 2018. 10. 20. · Microsoft PowerPoint - 5.WTERT Presentation_100518_FINAL Author: sandy

The “Dark Ages”: Stricter Emission standards in U.S. –

retrofits & some facility closures

The “Hay Days” of WTE

in North America

1975 – Construction of 1st modern WTE Facility in North America in

Saugus, Massachusetts

Energy Recovery From Waste: Then & Now

1970’s 1980’s

Existing Facility Expansions & new facility construction in

Europe & Asia

1990’s

Page 9: 5.WTERT Presentation 100518 FINALccnyeec.org/wp-content/uploads/2018/10/Bruce-Howie-The... · 2018. 10. 20. · Microsoft PowerPoint - 5.WTERT Presentation_100518_FINAL Author: sandy

Some new facility development but also tough economics &

closures

Existing Facility Expansions & new facility construction in

Europe & Asia

The “Dark Ages”: Stricter Emission standards in U.S. –

retrofits & some facility closures

The “Hay Days” of WTE

in North America

Energy Recovery From Waste: Then & Now

1980’s 1990’s 2000’s

Page 10: 5.WTERT Presentation 100518 FINALccnyeec.org/wp-content/uploads/2018/10/Bruce-Howie-The... · 2018. 10. 20. · Microsoft PowerPoint - 5.WTERT Presentation_100518_FINAL Author: sandy

& InhibitorsCurrent State

of the Industry

Page 11: 5.WTERT Presentation 100518 FINALccnyeec.org/wp-content/uploads/2018/10/Bruce-Howie-The... · 2018. 10. 20. · Microsoft PowerPoint - 5.WTERT Presentation_100518_FINAL Author: sandy

North America: A Wasteful Legacy `

■ Landfill ■ Recycling ■ Energy from Waste

Page 12: 5.WTERT Presentation 100518 FINALccnyeec.org/wp-content/uploads/2018/10/Bruce-Howie-The... · 2018. 10. 20. · Microsoft PowerPoint - 5.WTERT Presentation_100518_FINAL Author: sandy

Push for greater diversion from landfill

Enhancement of 3Rs programs & expansion of organics collection programs

Waste is a Resource…the “4th R”

Interest in alternatives to traditional waste to energy technologies; mixed waste processing and anaerobic digestion

Key Drivers

Page 13: 5.WTERT Presentation 100518 FINALccnyeec.org/wp-content/uploads/2018/10/Bruce-Howie-The... · 2018. 10. 20. · Microsoft PowerPoint - 5.WTERT Presentation_100518_FINAL Author: sandy

Courtice, ON

480 tpd greenfield construction

Energy Recovery in North America TODAY

Edmonton, AB 110,000 tpy greenfield

construction Waste-to-biofuel facility

San Jose, CA 400, 000 tpy mixed waste

processing facility 90,000 tpy AD facility

Honolulu, HI900 tpd expansion

Perham, MN

100 tpd expansion

Pope,DouglasCo., MN

120 tpdexpansion

Olmstead Co., MN200 tpd expansion

Hillsborough Co., FL600 tpd expansion

Lee Co., Fl636 tpd expansion

Palm Beach Co., FL3,000 tpd greenfield construction

▐ States/Territories with WTE Plants

▐ Capacity Addition

Page 14: 5.WTERT Presentation 100518 FINALccnyeec.org/wp-content/uploads/2018/10/Bruce-Howie-The... · 2018. 10. 20. · Microsoft PowerPoint - 5.WTERT Presentation_100518_FINAL Author: sandy

Cheap landfill & lots of it!!!

Relatively cheap energy prices & low cost of fuel (at least in the U.S.)

Pressure on Commodity Markets for many recyclables

Opposition Groups: “NIMBY”’s, “BANANA”’s and other activist groups…OH MY!!!

Regulatory Factors: Greenhouse Gas legislation & carbon taxes

Key Inhibitors

Page 15: 5.WTERT Presentation 100518 FINALccnyeec.org/wp-content/uploads/2018/10/Bruce-Howie-The... · 2018. 10. 20. · Microsoft PowerPoint - 5.WTERT Presentation_100518_FINAL Author: sandy

No regulatory or policy framework currently in place to incentivize programs

Limited to No Funding or support to look beyond traditional linear business model

No compromise between parties and stakeholders on either side of aisle

Challenges to Change in U.S.

Durham York Energy CentreClarington, Ontario

Page 16: 5.WTERT Presentation 100518 FINALccnyeec.org/wp-content/uploads/2018/10/Bruce-Howie-The... · 2018. 10. 20. · Microsoft PowerPoint - 5.WTERT Presentation_100518_FINAL Author: sandy

Broward County, Florida

Harford County, Maryland

Biddeford, Maine

Charleston County, South Carolina

Claremont, New Hampshire

Facility Closures

Page 17: 5.WTERT Presentation 100518 FINALccnyeec.org/wp-content/uploads/2018/10/Bruce-Howie-The... · 2018. 10. 20. · Microsoft PowerPoint - 5.WTERT Presentation_100518_FINAL Author: sandy

Recent Projects

& FutureInnovationA look at the technology

being used today

Page 18: 5.WTERT Presentation 100518 FINALccnyeec.org/wp-content/uploads/2018/10/Bruce-Howie-The... · 2018. 10. 20. · Microsoft PowerPoint - 5.WTERT Presentation_100518_FINAL Author: sandy

Recent Projects in North America

West Palm Beach

Page 19: 5.WTERT Presentation 100518 FINALccnyeec.org/wp-content/uploads/2018/10/Bruce-Howie-The... · 2018. 10. 20. · Microsoft PowerPoint - 5.WTERT Presentation_100518_FINAL Author: sandy

West Palm Beach Renewable Energy FacilityWest Palm Beach, Florida, USA

Page 20: 5.WTERT Presentation 100518 FINALccnyeec.org/wp-content/uploads/2018/10/Bruce-Howie-The... · 2018. 10. 20. · Microsoft PowerPoint - 5.WTERT Presentation_100518_FINAL Author: sandy

West Palm Beach Renewable Energy Facility

Meet Florida State mandate of 75% diversion from landfill

Existing RDF Combustion Facility was over 30 years old and at capacity

Increasing population within region and lack of available landfill capacity

Project Drivers

Page 21: 5.WTERT Presentation 100518 FINALccnyeec.org/wp-content/uploads/2018/10/Bruce-Howie-The... · 2018. 10. 20. · Microsoft PowerPoint - 5.WTERT Presentation_100518_FINAL Author: sandy

West Palm Beach Renewable Energy Facility

Mass Burn technology capable of processing up over 900k tonnes per annum

Features state-of-the-art air pollution control design capable of meeting lowest emission standards in North America

Generates up to 100 MW of electricity

Features a 9 million liter rooftop rainwater collection system

Capital Cost: $672m USDOperating Cost: $20m USD

Project Features

Page 22: 5.WTERT Presentation 100518 FINALccnyeec.org/wp-content/uploads/2018/10/Bruce-Howie-The... · 2018. 10. 20. · Microsoft PowerPoint - 5.WTERT Presentation_100518_FINAL Author: sandy

San Jose

Clarington, Ontario

Page 23: 5.WTERT Presentation 100518 FINALccnyeec.org/wp-content/uploads/2018/10/Bruce-Howie-The... · 2018. 10. 20. · Microsoft PowerPoint - 5.WTERT Presentation_100518_FINAL Author: sandy

Durham- York Energy CentreClarington, Ontario, Canada

Page 24: 5.WTERT Presentation 100518 FINALccnyeec.org/wp-content/uploads/2018/10/Bruce-Howie-The... · 2018. 10. 20. · Microsoft PowerPoint - 5.WTERT Presentation_100518_FINAL Author: sandy

Durham-York Energy Centre

Project Drivers

Growing population and urbanization of Durham Region

Local landfill closures and heavy reliance on long-haul disposal (Michigan and NY)

Goal to divert at least 50% of residential waste from landfill by 2007

Consider an "energy-from-waste" facility for the disposal of residual waste

Page 25: 5.WTERT Presentation 100518 FINALccnyeec.org/wp-content/uploads/2018/10/Bruce-Howie-The... · 2018. 10. 20. · Microsoft PowerPoint - 5.WTERT Presentation_100518_FINAL Author: sandy

Durham-York Energy Centre

Innovative Features

1st true “Greenfield” energy from waste facilities in North America

Mass burn technology capable of processing up to 140,000 tonnes per annum

Features latest boiler design & air pollution control design capable of meeting lowest emission standards in North America & EU

Generates up to 17 MW of electricity to grid & potential to generate up to 7 MW thermal

Capital Cost: $255m CDN Operating Cost: $15m CDN annually

Page 26: 5.WTERT Presentation 100518 FINALccnyeec.org/wp-content/uploads/2018/10/Bruce-Howie-The... · 2018. 10. 20. · Microsoft PowerPoint - 5.WTERT Presentation_100518_FINAL Author: sandy

Clarington, Ontario

Edmonton,Alberta

Page 27: 5.WTERT Presentation 100518 FINALccnyeec.org/wp-content/uploads/2018/10/Bruce-Howie-The... · 2018. 10. 20. · Microsoft PowerPoint - 5.WTERT Presentation_100518_FINAL Author: sandy

Edmonton, Alberta, Canada

Enerkem Alberta Biofuels

Page 28: 5.WTERT Presentation 100518 FINALccnyeec.org/wp-content/uploads/2018/10/Bruce-Howie-The... · 2018. 10. 20. · Microsoft PowerPoint - 5.WTERT Presentation_100518_FINAL Author: sandy

Enerkem Alberta Biofuels

Project Drivers

City of Edmonton’s search for increased diversion from landfill and alternative technologies to incineration

Funding from Alberta Innovates – Energy and Environment Solutions

Renewable Fuel Standards (RFS) program in the U.S. authorized under the Energy Policy Act of 2005 & Energy Independence and Security Act of 2007

Page 29: 5.WTERT Presentation 100518 FINALccnyeec.org/wp-content/uploads/2018/10/Bruce-Howie-The... · 2018. 10. 20. · Microsoft PowerPoint - 5.WTERT Presentation_100518_FINAL Author: sandy

Enerkem Alberta Biofuels

Innovative Features

Edmonton Waste Management Centre:o 70,000 TPY MRF w/manual pick stations, magnets, etc

o Mechanical systems to produce up to RDF feedstock for Enerkem's Waste-to-Biofuels Facility

o Organic waste Composting Facility

o C&D Recycling Facility

o E-Waste Recycling Facility

Enerkem Biofuels Facility:o Designed to process up to 140,000 TPY RDF

o Intended to produce up 38 million litres per year of biofuel (methanol and/or ethanol)

o Currently in final phases of commissioning – intended commercial operation in 2017

Page 30: 5.WTERT Presentation 100518 FINALccnyeec.org/wp-content/uploads/2018/10/Bruce-Howie-The... · 2018. 10. 20. · Microsoft PowerPoint - 5.WTERT Presentation_100518_FINAL Author: sandy

What’s Next for the North American Industry?

Page 31: 5.WTERT Presentation 100518 FINALccnyeec.org/wp-content/uploads/2018/10/Bruce-Howie-The... · 2018. 10. 20. · Microsoft PowerPoint - 5.WTERT Presentation_100518_FINAL Author: sandy

What does the Future in North America Hold?

Page 32: 5.WTERT Presentation 100518 FINALccnyeec.org/wp-content/uploads/2018/10/Bruce-Howie-The... · 2018. 10. 20. · Microsoft PowerPoint - 5.WTERT Presentation_100518_FINAL Author: sandy

What could the future hold for WTE?

An Eye on Tomorrow

WTE economics will continue to be challenging which will push the search for non-traditional energy markets

Push for finding other revenue sources (enhanced metal recovery and ash reuse)

Regulatory uncertainty will remain for some time

The role of new and emerging technologies will evolve – there will be successes & some failures

A need to identify WTE’s important role in diversion from landfill and the circular economy

Page 33: 5.WTERT Presentation 100518 FINALccnyeec.org/wp-content/uploads/2018/10/Bruce-Howie-The... · 2018. 10. 20. · Microsoft PowerPoint - 5.WTERT Presentation_100518_FINAL Author: sandy

© 2014 HDR Architecture, Inc., all rights reserved.© 2014 HDR Architecture, Inc., all rights reserved.© 2014 HDR Architecture, Inc., all rights reserved.© 2014 HDR, Inc., all rights reserved.© 2014 HDR, Inc., all rights reserved.© 2014 HDR, Inc., all rights reserved.© 2016 HDR, Inc., all rights reserved.