6 JULY 2011

6 JULY 2011. Overview of BATOBIC Projects Construction of the Bulembu Road – R167 000 000 – Completed 2009 The Barberton Tourism and Biodiversity

Embed Size (px)

Citation preview

Page 1: 6 JULY 2011. Overview of BATOBIC Projects Construction of the Bulembu Road – R167 000 000 – Completed 2009 The Barberton Tourism and Biodiversity

6 JULY 2011

Page 2: 6 JULY 2011. Overview of BATOBIC Projects Construction of the Bulembu Road – R167 000 000 – Completed 2009 The Barberton Tourism and Biodiversity
Page 3: 6 JULY 2011. Overview of BATOBIC Projects Construction of the Bulembu Road – R167 000 000 – Completed 2009 The Barberton Tourism and Biodiversity
Page 4: 6 JULY 2011. Overview of BATOBIC Projects Construction of the Bulembu Road – R167 000 000 – Completed 2009 The Barberton Tourism and Biodiversity

Overview of BATOBIC Projects• Construction of the Bulembu Road – R167 000 000 – Completed 2009• The Barberton Tourism and Biodiversity Corridor (BATOBIC) is a programme

with the objective of developing sustainable nature based, adventure and cultural tourism within the region;

• BATOBIC is responsible for coordinating the implementation of a number of projects, funded by the National Dept. of Tourism in aid of poverty relief. These include:

Institutional Strengthening of BATOBIC;3 TOURISM ROUTE PROJECTS Tourist Route Development & Marketing; Signposting & beautification of 2 main Umjindi access intersections; Development of Bulembu Road Geotrail;OTHER PROJECTS Cultural Heritage town enhancement programme. Development of 1st phase Bio Park & Visitor Info Centre; Lomshiyo Trust Lodge Development;

• Further projects & interventions identified from strategy

Page 5: 6 JULY 2011. Overview of BATOBIC Projects Construction of the Bulembu Road – R167 000 000 – Completed 2009 The Barberton Tourism and Biodiversity

3 projects

GENESIS ROUTE

MAKHONJWA GEOTRAIL

BARBERTON GATEWAYS

Page 6: 6 JULY 2011. Overview of BATOBIC Projects Construction of the Bulembu Road – R167 000 000 – Completed 2009 The Barberton Tourism and Biodiversity
Page 7: 6 JULY 2011. Overview of BATOBIC Projects Construction of the Bulembu Road – R167 000 000 – Completed 2009 The Barberton Tourism and Biodiversity

Geo-site (10)Viewpoint (6)

Geo-site & Viewpoint (4)

LEGEND

Geo-site (10)Viewpoint (6)

Geo-site & Viewpoint (4)

LEGEND

12

34

56

7

8

910 11

1213

14

15

16

1718

19 20

BARBERTON

BulembuBorderPost

Swazi-land

South Africa

R40R38

0 1 2 3 4 5 Km

ROUTE EXTENT:

• 20 Sites between Barberton & Bulembu:

10x Geological Sites 6 x view sites 4 x geological & view sites 13 require intensive

development 7 require only a signage plinth

Makhonjwa Geotrail

Page 8: 6 JULY 2011. Overview of BATOBIC Projects Construction of the Bulembu Road – R167 000 000 – Completed 2009 The Barberton Tourism and Biodiversity

GEOSITES

Page 9: 6 JULY 2011. Overview of BATOBIC Projects Construction of the Bulembu Road – R167 000 000 – Completed 2009 The Barberton Tourism and Biodiversity

SHEBA ROAD

GENERAAL STREET

Barberton Gateways

Page 10: 6 JULY 2011. Overview of BATOBIC Projects Construction of the Bulembu Road – R167 000 000 – Completed 2009 The Barberton Tourism and Biodiversity

Branding

Page 11: 6 JULY 2011. Overview of BATOBIC Projects Construction of the Bulembu Road – R167 000 000 – Completed 2009 The Barberton Tourism and Biodiversity

GENESIS ROUTE ‘Z’ FOLDER

Page 12: 6 JULY 2011. Overview of BATOBIC Projects Construction of the Bulembu Road – R167 000 000 – Completed 2009 The Barberton Tourism and Biodiversity

GEOTRAIL ‘Z’ FOLDER

Page 13: 6 JULY 2011. Overview of BATOBIC Projects Construction of the Bulembu Road – R167 000 000 – Completed 2009 The Barberton Tourism and Biodiversity

Remaining challenges: