An Overview of Testing• Testing is the process of finding differences between the expected

behavior specified by system models and the observed behavior ofthe system

• The goal of testing is to design tests that detects defects in thesystem and to reveal problems.

• To test a system effectively,– a tester must have a detailed understanding of the whole system,

ranging from the requirements to system design decisions andimplementation issues.

• A tester must also be knowledgeable of testing techniques andapply these techniques effectively and efficiently to meet time,budget, and quality constraints.

Object-Oriented Systems Development Bahrami © Irwin/ McGraw-Hill

Page 3: 6. oose testing

An Overview of Testing• Testing is

– a process of demonstrating that errors are notpresent”

– a systematic attempt to find errors in a plannedway

• Software Testing answers the question

“Does the s/w behave as specified…?”

Testing is a process used to identify the correctness,completeness and quality of developed computersoftware.

Object-Oriented Systems Development Bahrami © Irwin/ McGraw-Hill

Page 4: 6. oose testing

• One of the practical methods commonly used to detect the presenceof errors (failures) in a computer program is to test it for a set ofinputs.

Our programThe output is correct?I1, I2, I3,

…, In, …

Expected results = ?

Obtained results

“Inputs”

Testing………….?Testing………….?

Page 5: 6. oose testing

Developer Independent Tester

Understands thesystem,

tests "gently”, Test is driven by

“delivery”.

learns about the system, attempts to break the

system Test is driven by

“quality”.

Who Tests the Software….?Who Tests the Software….?

Page 6: 6. oose testing

Errors

Requirements conformance

Performance

An indication of quality

What Testing Shows…?What Testing Shows…?

Page 7: 6. oose testing

7

• An early start to testing reduces the cost, time to rework anderror free software that is delivered to the client.

• However in Software Development Life Cycle (SDLC) testing can bestarted from the Requirements Gathering phase and lasts till thedeployment of the software.

• However it also depends on the development model that is beingused.

• For example in Water fall model formal testing is conducted in theTesting phase,

• But in incremental model, testing is performed at the end of everyincrement/iteration and at the end the whole application is tested.

When to start Testing …?When to start Testing …?

Page 8: 6. oose testing

8

• Unlike when to start testing it is difficult to determine when tostop testing, as testing is a never ending process and no one cansay that any software is 100% tested.

• Following are the aspects which should be considered to stopthe testing:

• Testing Deadlines.• Management decision

• Completion of test case execution.• Completion of Functional and code coverage to a certain point.

• Bug rate falls below a certain level

When to stop Testing …?When to stop Testing …?

Page 9: 6. oose testing

An Overview of Testing

Unit testing finds differences between the object design model andits corresponding component.

Structural testing finds differences between the system designmodel and a subset of integrated subsystems.

Functional testing finds differences between the use case modeland the system.

Finally, performance testing finds differences betweennonfunctional requirements and actual system performance.

Object-Oriented Systems Development Bahrami © Irwin/ McGraw-Hill

Page 10: 6. oose testing

Software Reliability• Software reliability is the probability that a software system will

not cause the failure of the system for a specified time underspecified conditions [IEEE Std. 982-1989].

• The goal of testing is to maximize the number of discovered faults,and increase the reliability of the system.

• The three classes of techniques for avoiding faults, detecting faults,and tolerating faults are1. Fault Avoidance Techniques2. Fault Detection Techniques3. Fault Tolerance Techniques

Object-Oriented Systems Development Bahrami © Irwin/ McGraw-Hill

Page 11: 6. oose testing

Quality control Techniques1. Fault Avoidance TechniquesFault avoidance tries to prevent the occurrence of errors and failures byfinding faults in the system before it is released.

• Fault avoidance techniques include:

1. • development methodologies2. • configuration management3. • verification techniques4. • reviews of the system models, in particular the code model.

Object-Oriented Systems Development Bahrami © Irwin/ McGraw-Hill

Page 12: 6. oose testing

Fault Avoidance Techniques

Development methodologies avoid faults by providing techniquesthat minimize fault introduction in the system models and code.Such techniques include

the unambiguous representation of requirements,

the use of data abstraction and data encapsulation,

minimizing of the coupling between subsystems

maximizing of subsystem coherence,

the early definition of subsystem interfaces, and

the capture of rationale information for maintenanceactivities.

Object-Oriented Systems Development Bahrami © Irwin/ McGraw-Hill

Page 13: 6. oose testing

Fault Avoidance TechniquesConfiguration management avoids faults caused by undisciplinedchange in the system models.• it is a common mistake to a change a subsystem interface without

notifying all developers of calling components.• Configuration management can make sure that, if analysis models

and code are becoming inconsistent with one another, analysts andimplementer are notified.

Verification attempts to find faults before any execution of the system.• possible for small operating system kernel• It has limits.• Difficult to verify quality of large complex systems.

Object-Oriented Systems Development Bahrami © Irwin/ McGraw-Hill

Page 14: 6. oose testing

Fault Avoidance Techniques• A review is the manual inspection of parts or all aspects of the

system without actually executing the system.• There are two types of reviews:

– walkthrough– inspection.

• Walkthrough, the developer informally presents the API, the code,and associated documentation of the component to the reviewteam.

• The review team makes comments on the mapping of the analysisand object design to the code using use cases and scenarios from theanalysis phase.

Object-Oriented Systems Development Bahrami © Irwin/ McGraw-Hill

Page 15: 6. oose testing

Fault Avoidance Techniques• An inspection is similar to a walkthrough, but the presentation of the

unit is formal.• In fact, in a code inspection, the developer is not allowed to present

the artifacts (models, code, and documentation).• This is done by the review team, which is responsible for checking

the interface and code of the component against the requirements.• It also checks the algorithms for efficiency with respect to the

nonfunctional requirements.• Finally, it checks comments about the code and compares them with

the code itself to find inaccurate and incomplete comments.

Object-Oriented Systems Development Bahrami © Irwin/ McGraw-Hill

Page 16: 6. oose testing

Fault Avoidance Techniques

Object-Oriented Systems Development Bahrami © Irwin/ McGraw-Hill

Page 17: 6. oose testing

Fault detection techniques• Fault detection techniques, such as debugging and testing, are used

during the development process to identify errors and find theunderlying faults before releasing the system.

• Debugging assumes that– faults can be found by starting from an unplanned failure.– developer moves the system through a succession of states,

ultimately arriving at and identifying the erroneous state.There are two types of debugging:• The goal of correctness debugging is to find any deviation between

the observed and specified functional requirements.• Performance debugging addresses the deviation between observed

and specified nonfunctional requirements, such as response time.

Object-Oriented Systems Development Bahrami © Irwin/ McGraw-Hill

Page 18: 6. oose testing

Fault detection techniques• Testing

– fault detection technique that tries to create failures or errors ina planned way.

– allows the developer to detect failures in the system before it isreleased to the customer.

• Unit testing tries to find faults in participating objects and/orsubsystems with respect to the use cases from the use case model

• Integration testing is the activity of finding faults when testing theindividually tested components together, for example, subsystemsdescribed in the subsystem decomposition, while executing the usecases and scenarios from the RAD.

Object-Oriented Systems Development Bahrami © Irwin/ McGraw-Hill

Page 19: 6. oose testing

Testing

Object-Oriented Systems Development Bahrami © Irwin/ McGraw-Hill

Page 20: 6. oose testing

Fault detection techniques• System testing tests all the components together, seen as a single

system to identify errors with respect to the scenarios from theproblem statement and the requirements and design goals identifiedin the analysis and system design, respectively:

• Functional testing tests the requirements from the RAD and, ifavailable, from the user manual.

• Performance testing checks the nonfunctional requirements andadditional design goals from the SDD. Note that functional andperformance testing are both done by developers.

• Acceptance testing and installation testing check the requirementsagainst the project agreement and should be done by the client, ifnecessary with support by the developers.

Object-Oriented Systems Development Bahrami © Irwin/ McGraw-Hill

Page 21: 6. oose testing

21

Levels of Testing

Page 22: 6. oose testing

Information needed at different Levels of Testing

22

Page 23: 6. oose testing

23

Logical View

Page 24: 6. oose testing

24

• A unit is the smallest testable part of software.• In procedural programming a unit may be an individual

program, function, procedure, etc. In OOP, the smallest unit is amethod.– Unit testing is often neglected but it is, in fact, the most

important level of testing.

Unit Testing

Page 25: 6. oose testing

25

METHOD

• Unit Testing is performed by usingthe method White Box Testing

When is it performed?• First level of testing & performed

prior to Integration Testing

Who performs it?• performed by software developers

themselves or their peers.

Unit Testing

Page 26: 6. oose testing

26

Integration Testing is a level of the software testing processwhere individual units are combined and tested as a group.Integration testing tests interface between components,interaction to different parts of system.

Integration Testing

Page 27: 6. oose testing

27

Big Bang is an approach toIntegration Testing where all or mostof the units are combined togetherand tested at one go.

This approach is taken when thetesting team receives the entiresoftware in a bundle.

Top Down is an approach toIntegration Testing where top levelunits are tested first and lower levelunits are tested step by step afterthat.This approach is taken when topdown development approach isfollowed.

Integration Testing Approaches

Page 28: 6. oose testing

28

Bottom Up is an approach toIntegration Testing wherebottom level units are testedfirst and upper level unitsstep by step after that. Thisapproach is taken whenbottom up developmentapproach is followed.

Sandwich/Hybrid is an approachto Integration Testing whichis a combination of TopDown and Bottom Upapproaches.

Integration Testing Approaches

Page 29: 6. oose testing

System Testing

29

Page 30: 6. oose testing

30

Functional Testing: Goal: Test functionality of system Test cases are designed from the requirements analysis

document (better: user manual) and centered aroundrequirements and key functions (use cases).The system istreated as black box

Unit test cases can be reused, but new test cases have to bedeveloped as well.

Performance Testing: Goal: Try to violate non-functional requirements Test how the system behaves when overloaded. Try unusual orders of execution Check the system’s response to large volumes of data What is the amount of time spent in different use cases?

System Testing

Page 31: 6. oose testing

Types of Performance Testing• Stress Testing

– Stress limits of system• Volume testing

– Test what happens if large amounts of data are handled

• Configuration testing– Test the various software and

hardware configurations • Compatibility test

– Test backward compatibility with existing systems

• Timing testing– Evaluate response times and

time to perform a function

• Security testing– Try to violate security

requirements• Environmental test

– Test tolerances for heat, humidity, motion

• Quality testing– Test reliability, maintain-

ability & availability • Recovery testing

– Test system’s response to presence of errors or loss of data

• Human factors testing– Test with end users.

Page 32: 6. oose testing

Acceptance Testing

Goal: Demonstratesystem is ready foroperational use Choice of tests is

made by client Many tests can be

taken from integrationtesting

Acceptance test isperformed by theclient, not by thedeveloper.

Alpha test:Client uses the software at

the developer’s environment.Software used in a controlled

setting, with the developeralways ready to fix bugs.

Beta test:Conducted at client’s

environment (developer is notpresent)

Software gets a realisticworkout in target environment

Page 33: 6. oose testing

Fault tolerance techniques

Fault tolerance techniques assume that a system can be releasedwith errors and that system failures can be dealt with byrecovering from them at run time.

• Fault tolerance is the recovery from failure while the system isexecuting.

• A component is a part of the system that can be isolated fortesting. A component can be an object, a group of objects, orone or more subsystems.

• A fault, also called bug or defect, is a design or coding mistakethat may cause abnormal component behavior.

Object-Oriented Systems Development Bahrami © Irwin/ McGraw-Hill

Page 34: 6. oose testing

Testing Concepts• An error is a manifestation of a fault during the execution of the

system.• A failure is a deviation between the specification of a component and

its behavior. A failure is triggered by one or more errors.

• A test case is a set of inputs and expected results that exercises acomponent with the purpose of causing failures and detecting faults.

• A test stub is a partial implementation of components on which thetested component depends.

• A test driver is a partial implementation of a component thatdepends on the tested component. Test stubs and drivers enablecomponents to be isolated from the rest of the system for testing.

• •A correction is a change to a component. The purpose of acorrection is to repair a fault.

Object-Oriented Systems Development Bahrami © Irwin/ McGraw-Hill

Page 35: 6. oose testing

Model elements used during Testing

Object-Oriented Systems Development Bahrami © Irwin/ McGraw-Hill

Page 36: 6. oose testing

36

ErrorsAn error is a mistake, misconception, or misunderstanding on the part

of a software developer.Faults /Defects /Bugs• A fault (defect) is introduced into the software as the result of an

error.• It is an anomaly in the software that may cause it to behave

incorrectly, and not according to its specification.Failures• A failure is the inability of a software system or component to

perform its required functions within specified performance requirements

A fault in the code does not always produce a failure.

Faults Failures & ErrorsFaults Failures & Errors

Page 37: 6. oose testing

37

LOC Code

1 program double ();

2 var x,y: integer;

3 begin

4 read(x);

5 y := x * x;

6 write(y)

7 end

Fault: The fault that causes the failure is in line 5. The * operator is used instead of +.

Error: The error that conduces to this fault may be:

• a typing error (the developer has written * instead of +) • a conceptual error (e.g., the developer doesn't know how to double a number)

Failure: x = 3 means y =9 Failure!• This is a failure of the system since the correct output would be 6

Fault - Failure - Error - illustrationsFault - Failure - Error - illustrations

Page 38: 6. oose testing

Fault error failure

Object-Oriented Systems Development Bahrami © Irwin/ McGraw-Hill

An Error due to mechanical cause or earth quake etc

Example of Fault

Page 39: 6. oose testing

Testing Concepts

Object-Oriented Systems Development Bahrami © Irwin/ McGraw-Hill

Test casesA test case is a set of input data and expected results thatexercises a component with the purpose of causing failures anddetecting faults.A test case has five attributes:1. Name2. Location3. Input4. oracle, and5. log (Table 9-1).

The name of the test case allows the tester to distinguish betweendifferent test cases.

Page 40: 6. oose testing

Testing Concepts

Object-Oriented Systems Development Bahrami © Irwin/ McGraw-Hill

Page 41: 6. oose testing

Testing Concepts

Object-Oriented Systems Development Bahrami © Irwin/ McGraw-Hill

Test Cases: A test model where TestA must precede TestB and TestC.,TestA consists of TestA1 and TestA2, meaning that once TestA1andTestA2 are tested, TestA is tested; there is not separate test for TestA.A good test model has as few associations as possible, because teststhat are not associated with each other can be executed independentlyfrom each other. This allows a tester to speed up testing.

Page 42: 6. oose testing

Testing Concepts

Object-Oriented Systems Development Bahrami © Irwin/ McGraw-Hill

Test Cases: Depending on which aspect of the system model istested Test cases are classified into black box tests and white box tests,.

Black box tests focus on the input/output behavior of the component. do not deal with the internal aspects of the component nor

with the behavior or the structure of the components.White box tests focus on the internal structure of the component. makes sure that, independently from the particular

input/output behavior

Page 43: 6. oose testing

Testing Concepts

Object-Oriented Systems Development Bahrami © Irwin/ McGraw-Hill

Correction is a change to a component whose purpose is to repair a

fault. can range from a simple modification to a single

component to a complete redesign of a data structure or asubsystem

Several techniques can be used to handle such faults:a. Problem tracking includes the documentation of each failure,

error, and fault detected, its correction, and the revisions ofthe components involved in the change.

b. Regression testing includes the re-execution of all prior tests after achange. Regression testing is important in object-oriented methods.Regression testing is costly,

Page 44: 6. oose testing

Testing Concepts

Object-Oriented Systems Development Bahrami © Irwin/ McGraw-Hill

c. Rationale maintenance includes the documentation of therationale of the change and its relationship with the rationale ofthe revised component.Rationale maintenance enables developers to avoid introducingnew faults by inspecting the assumptions that were used to buildthe component.

Page 45: 6. oose testing

Documenting Testing

Object-Oriented Systems Development Bahrami © Irwin/ McGraw-Hill

Testing activities are documented in four types of documents,1. the Test Plan,2. the Test Case Specifications,3. the Test Incident Reports, and4. the Test Summary Report

Test Plan. The Test Plan focuses on the managerial aspects of testing. Itdocuments the scope, approach, resources, and schedule of testingactivities. The requirements and the components to be tested areidentified in this document.

The Test Plan (TP) and the Test Case Specifications (TCP) are written early in the process, as soon as the test planning and each test case are completed. These documents are under configuration management and updated as the system models change.

Page 46: 6. oose testing

Documenting Testing

Object-Oriented Systems Development Bahrami © Irwin/ McGraw-Hill

Page 47: 6. oose testing

Student Reading Assignment&

Reference

Object-Oriented Systems Development Bahrami © Irwin/ McGraw-Hill

Page 48: 6. oose testing

48

1. ‘‘If an input condition for the software-under-test is specified as arange of values, select one valid equivalence class that covers theallowed range and two invalid equivalence classes, one outside eachend of the range.’’

For example, suppose the specification for a module says that aninput, the length of a Wire in millimetres, lies in the range 1–499;then select

One valid equivalence class that includes all values from 1 to499.

Two invalid classes That consists of all values less than 1, and That consists of all values greater than 499.

Equivalence Partitioning

Page 49: 6. oose testing

49

2. ‘‘If an input condition for the software-under-test is specified as anumber of values, then select one valid equivalence class that includesthe allowed number of values and two invalid equivalence classes thatare outside each end of the allowed number.’’

For example, if the specification for a real estate-related module says thata house can have one to four owners, then we select

– One valid equivalence class that includes all the validnumber of owners

– Two invalid equivalence classes• Less than one owner and• More than four owners.

Equivalence Partitioning

Page 50: 6. oose testing

50

3. ‘‘If an input condition for the software-under-test is specified as a setof valid input values, then select one valid equivalence class thatcontains all the members of the set and one invalid equivalence classfor any value outside the set.’’

For example, if the specification for a paint module states that thecolours RED, BLUE, GREEN and YELLOW are allowed as inputs, thenselect

– One valid equivalence class that includes the set RED,BLUE, GREEN and YELLOW, and

– One invalid equivalence class for all other inputs.

Equivalence Partitioning

Page 51: 6. oose testing

51

4. ‘‘If an input condition for the software-under-test is specified as a “mustbe” condition, select one valid equivalence class to represent the “mustbe” condition and one invalid class that does not include the “must be”condition.’’

For example, if the specification for a module states that the firstcharacter of a part identifier must be a letter, then select

• One valid equivalence class where the first character is a letterand

• One invalid class where the first character is not a letter.

Equivalence Partitioning

Page 52: 6. oose testing

52

Write Test Cases using Equivalence Partitioning for a requirement that isstated as follows:

“In the examination grading system, if the student scores 0 to less than 40then assign E Grade, if the student scores between 40 to 49 then assignD Grade, if the student scores between 50 to 69 then assign C Grade, ifthe student scores between 70 to 84 then assign B Grade, and if thestudent scores 85 to 100 then assign A Grade.”

In the above problem definition, after analysis, we identify set of Output Values and corresponding set of input values producing same output.

This analysis results in:Values from 0 to 39 produce E GradeValues from 40 to 49 produce D GradeValues from 50 to 69 produce C GradeValues from 70 to 84 produce B GradeValues from 85 to 100 produce A Grade

Equivalence Partitioning - An Illustration

Page 53: 6. oose testing

53

Based on EP, we identify following input values to test each boundary:

For EP in range 0 to 39:EP for producing E Grade, input values are 0 to 39, Here Minimum Value= 0, Maximum Value = 39, Precision is 1. Thus, input values for testing for this EP for Grade E are:

Minimum Value= 0(Minimum Value+ precision)= 1(Maximum Value- precision)= 38Maximum Value= 39

Thus, input values for Boundary Values 0 and 39 are:0, 1, 38, 39

Output Value is: Grade E

Equivalence Partitioning - An Illustration

Page 54: 6. oose testing

54

On the similar lines of analysis, we arrive at following input values for other

EPs and corresponding outputs as:

For 40 to 49, we have 40, 41, 48, 49 and Output Value is “Grade D”For 50 to 69, we have 50, 51, 68, 69 and Output Value is “Grade C”For 70 to 84, we have 70, 71, 83, 84 and Output Value is “Grade B”For 85 to 100, we have 85, 86, 99, 100 and Output Value is “Grade A”

In Addition to this, we have EP with input values -1 and 101 andcorresponding output value is “Error”.

Thus for -1 and 101, we have Output Value as “Error”

Equivalence Partitioning - An Illustration

Page 55: 6. oose testing

55

For these boundaries, test cases based on EP technique are documented in Table. Test Case Design for a given example using EP Technique

Equivalence Partitioning - An Illustration

Page 56: 6. oose testing

56

Boundary Value Analysis (BVA) technique is a test case design techniquethat allows to identify appropriate number of input values to besupplied to test the system.

Human brain is evolved in emotional side and less evolved in logical side Hence during software development, people always get confused in

using < and <=; > and >= relational operators. As such large number of errors tends to occur at boundaries of the input

domain. BVA leads to selection of test cases that exercise boundary values. BVA based test case design helps to write test cases that exercise

bounding values.

Boundary Value Analysis

Page 57: 6. oose testing

57

“Bugs lurk in corners andcongregate at boundaries…”

---Boris Beizer

The test cases developed based on equivalence class partitioning can bestrengthened by use of a technique called boundary value analysis.

Many defects occur directly on, and above and below, the edges ofequivalence classes.

BVA is a software design technique to determine test cases off-by-oneerrors

Boundary Value Analysis

Page 58: 6. oose testing

58

1. If an input condition for the software-under-test is specified as arange of values, develop valid test cases for the ends of the range,and invalid test cases for possibilities just above and below theends of the range.

For example if a specification states that an input value for a modulemust lie in the range between -1.0 and +1.0,

Valid tests that include values -1.0, +1.0 for ends of the range, as well as

Invalid test cases for values just above and below the ends -1.1, +1.1,should be included.

Boundary Value Analysis

Page 59: 6. oose testing

59

2. If an input condition for the software-under-test is specified as anumber of values, develop valid test cases for the minimum andmaximum numbers as well as invalid test cases that include one lesserthan minimum and one greater than the maximum

For example, for the real-estate module mentioned previously thatspecified a house can have four owners,

Valid Tests that includes tests for minimum and maximum values 1, 5owners

Invalid tests that include one lesser than minimum and one greaterthan maximum 0, 6 are developed.

Boundary Value Analysis

Page 60: 6. oose testing

60

If the input or output of the software-under-test is an ordered set, such as a table or a linear list, develop tests that focus on the first and last elements of the set

Example: Loan application

Boundary Value Analysis

Page 61: 6. oose testing

61

Using BVA- RangeWhen the programming element is a range type, we can arrive at test cases

using BVA as follows:

For a range of values bounded by a and b, then test:(Minimum Value - precision)Minimum Value(Minimum Value + precision),(Maximum Value - precision)Maximum Value(Maximum Value + precision)

Boundary Value Analysis

Page 62: 6. oose testing

62

Write Test Cases using BVA for a requirement that is stated as follows:“In the examination grading system, if the student scores 0 to less than 40 then

assign E Grade, if the student scores between 40 to 49 then assign D Grade, if thestudent scores between 50 to 69 then assign C Grade, if the student scoresbetween 70 to 84 then assign B Grade, and if the student scores 85 to 100 thenassign A Grade.”

In the above problem definition, after analysis, we identify following BoundaryValues:0 to 39

40 to 4950 to 6970 to 8485 to 100

BVA - An Illustration

Page 63: 6. oose testing

63

Based on BVA, we identify following input values to test each boundary: For Boundary Values in range 0 to 39:

For 0 to 39 boundary values, Minimum Value= 0, Maximum Value = 39, Precision is 1. Thus, input values for testing for this boundary values are:(Minimum Value-precision)= -1 Minimum Value= 0(Minimum Value+ precision)= 1 (Maximum Value- precision)= 38Maximum Value= 39 (Maximum Value + precision)= 40

Thus, input values for Boundary Values 0 and 39 are:-1, 0, 1, 38, 39, 40.

On the similar lines of analysis, we arrive at following input values for other Boundary values:For 40 to 49, we have 39, 40, 41, 48, 49, 50For 50 to 69, we have 49, 50, 51, 58, 59, 60For 70 to 84, we have 69, 70, 71, 83, 84, 85For 85 to 100, we have 84, 85, 86, 99, 100, 101

BVA - An Illustration

Page 64: 6. oose testing

64

BVA – Test Case Design