Amber HouseAmber HouseStructuralStructural
601 New Jersey Avenue601 New Jersey AvenueAlternative MaterialsAlternative Materials
601 New Jersey Avenue601 New Jersey AvenueWashington, D.C.Washington, D.C.
Alternative Construction MaterialsAlternative Construction Materials
Amber L. HouseAmber L. HouseStructural OptionStructural Option
Amber HouseAmber HouseStructuralStructural
601 New Jersey Avenue601 New Jersey AvenueAlternative MaterialsAlternative Materials
Thesis OverviewThesis Overview Building IntroductionBuilding Introduction Structural Depth Structural Depth Architectural BreadthArchitectural Breadth Construction Management BreadthConstruction Management Breadth Conclusions Conclusions AcknowledgementsAcknowledgements QuestionsQuestions
Presentation Outline:Presentation Outline:
Amber HouseAmber HouseStructuralStructural
601 New Jersey Avenue601 New Jersey AvenueAlternative MaterialsAlternative Materials
Thesis OverviewThesis Overview Building IntroductionBuilding Introduction Structural Depth Structural Depth Architectural BreadthArchitectural Breadth Construction Management BreadthConstruction Management Breadth Conclusions Conclusions AcknowledgementsAcknowledgements QuestionsQuestions
Presentation Outline:Presentation Outline:
Amber HouseAmber HouseStructuralStructural
601 New Jersey Avenue601 New Jersey AvenueAlternative MaterialsAlternative Materials
Replace Existing Floor SystemReplace Existing Floor System Investigate the Impacts of this Change on other Investigate the Impacts of this Change on other
SystemsSystems Determined How this Change will influence the Determined How this Change will influence the
Cost and Construction ScheduleCost and Construction Schedule Summarize Owner’s Options.Summarize Owner’s Options.
Thesis Overview:Thesis Overview:
Amber HouseAmber HouseStructuralStructural
601 New Jersey Avenue601 New Jersey AvenueAlternative MaterialsAlternative Materials
Thesis OverviewThesis Overview Building IntroductionBuilding Introduction Structural Depth Structural Depth Architectural BreadthArchitectural Breadth Construction Management BreadthConstruction Management Breadth Conclusions Conclusions AcknowledgementsAcknowledgements QuestionsQuestions
Presentation Outline:Presentation Outline:
Amber HouseAmber HouseStructuralStructural
601 New Jersey Avenue601 New Jersey AvenueAlternative MaterialsAlternative Materials
Purpose:Purpose: Win the tenancy of the Federal Trade CommissionWin the tenancy of the Federal Trade Commission
Location:Location: Washington, D.C.Washington, D.C.
Size:Size: Office: 258,000 sq ft. (9 stories)Office: 258,000 sq ft. (9 stories) Garage: 90,000 sq ft. (3 levels)Garage: 90,000 sq ft. (3 levels)
Completed:Completed: August 2001August 2001
Building Introduction:Building Introduction:
Amber HouseAmber HouseStructuralStructural
601 New Jersey Avenue601 New Jersey AvenueAlternative MaterialsAlternative Materials
Project Team:Project Team: Owner:Owner: Lowe Enterprises & Lowe Enterprises &
Teacher’s Teacher’s Insurance Insurance Annuity AssociationAnnuity Association
General Contractor:General Contractor: James G. Davis Construction James G. Davis Construction Co.Co.
Architect:Architect: Hickok Warner Fox ArchitectsHickok Warner Fox Architects Civil Engineers: Civil Engineers: Delon Hampton & Delon Hampton &
AssociatesAssociates MEP Engineers: MEP Engineers: Girard Engineering, Ltd.Girard Engineering, Ltd. Structural Engineers: Structural Engineers: Structural Design Group, Structural Design Group,
Ltd. Ltd.
Building Introduction Building Introduction (con’t)(con’t)::
Amber HouseAmber HouseStructuralStructural
601 New Jersey Avenue601 New Jersey AvenueAlternative MaterialsAlternative Materials
Site:Site: ShapeShape Special features:Special features: Limitations:Limitations:
• 110 foot Height110 foot Height• Minimum Site Parking Minimum Site Parking
1 spot per 1800 sq ft.1 spot per 1800 sq ft.
• Square FeetSquare Feet
Building Introduction Building Introduction (con’t)(con’t)::
Amber HouseAmber HouseStructuralStructural
601 New Jersey Avenue601 New Jersey AvenueAlternative MaterialsAlternative Materials
Thesis OverviewThesis Overview Building IntroductionBuilding Introduction Structural Depth Structural Depth Architectural BreadthArchitectural Breadth Construction Management BreadthConstruction Management Breadth Conclusions Conclusions AcknowledgementsAcknowledgements QuestionsQuestions
Presentation Outline:Presentation Outline:
Amber HouseAmber HouseStructuralStructural
601 New Jersey Avenue601 New Jersey AvenueAlternative MaterialsAlternative Materials
Floor SystemFloor System ColumnsColumns FoundationsFoundations
Structural Depth:Structural Depth:
Amber HouseAmber HouseStructuralStructural
601 New Jersey Avenue601 New Jersey AvenueAlternative MaterialsAlternative Materials
Floor SystemFloor System ColumnsColumns FoundationsFoundations
Structural Depth:Structural Depth:
Amber HouseAmber HouseStructuralStructural
601 New Jersey Avenue601 New Jersey AvenueAlternative MaterialsAlternative Materials
Existing Office:Existing Office: 3.25 inch light weight concrete3.25 inch light weight concrete 3”- 203”- 20 gage steel deck gage steel deck Composite steel beamsComposite steel beams Occupies 24.5” Occupies 24.5”
of floor spaceof floor space 40 foot spans40 foot spans
Floor System:Floor System:
Amber HouseAmber HouseStructuralStructural
601 New Jersey Avenue601 New Jersey AvenueAlternative MaterialsAlternative Materials
Existing Garage:Existing Garage: Two way systemTwo way system 9” slab9” slab 3.5” Drop panels3.5” Drop panels
Floor System Floor System (con’t)(con’t)::
Amber HouseAmber HouseStructuralStructural
601 New Jersey Avenue601 New Jersey AvenueAlternative MaterialsAlternative Materials
Redesigned Garage:Redesigned Garage: (same) (same)
Redesigned Office:Redesigned Office: Two way slabTwo way slab 10.5” depth10.5” depth 3.5” Drop panels typical3.5” Drop panels typical 5.5” Drop panels5.5” Drop panels 12” X 17.5” edge beam12” X 17.5” edge beam
Floor System Floor System (con’t)(con’t)::
Amber HouseAmber HouseStructuralStructural
601 New Jersey Avenue601 New Jersey AvenueAlternative MaterialsAlternative Materials
Floor System Floor System (con’t)(con’t)::
Amber HouseAmber HouseStructuralStructural
601 New Jersey Avenue601 New Jersey AvenueAlternative MaterialsAlternative Materials
New Office:New Office: Two Way Slab Design Method (ADOSS)Two Way Slab Design Method (ADOSS)
Floor System Floor System (con’t)(con’t)::
Amber HouseAmber HouseStructuralStructural
601 New Jersey Avenue601 New Jersey AvenueAlternative MaterialsAlternative Materials
New Office:New Office: One WayOne Way
• (1) #6 @12”(1) #6 @12”
Floor System Floor System (con’t)(con’t)::
Amber HouseAmber HouseStructuralStructural
601 New Jersey Avenue601 New Jersey AvenueAlternative MaterialsAlternative Materials
New vs. Old Office Floor System:New vs. Old Office Floor System: Advantages:Advantages:
• Requires 14” less space floor to floor space.Requires 14” less space floor to floor space.• 1010thth floor can be added (28,500 sq ft.) floor can be added (28,500 sq ft.)• Low vibrationsLow vibrations• Easy to form into shapesEasy to form into shapes• Room for SprinklersRoom for Sprinklers• Common material in D.C. areaCommon material in D.C. area
Disadvantages:Disadvantages:• Columns in office spaceColumns in office space• Heavier systemHeavier system• FormworkFormwork
Floor System Floor System (con’t)(con’t)::
Amber HouseAmber HouseStructuralStructural
601 New Jersey Avenue601 New Jersey AvenueAlternative MaterialsAlternative Materials
Floor SystemFloor System ColumnsColumns FoundationsFoundations
Structural Depth:Structural Depth:
Amber HouseAmber HouseStructuralStructural
601 New Jersey Avenue601 New Jersey AvenueAlternative MaterialsAlternative Materials
Existing:Existing: Steel W shapesSteel W shapes Start at first floorStart at first floor Typically span three floorsTypically span three floors
New:New: Square ConcreteSquare Concrete
• F’c = 4000 psi upper levelsF’c = 4000 psi upper levels• F’c = 5000 psi lower levelsF’c = 5000 psi lower levels
Sizes: Sizes: • Typically 16” x 16” to 24” x 24”Typically 16” x 16” to 24” x 24”
9 typical columns were designed9 typical columns were designed
Columns:Columns:
Mx My Mx My Mx MyF10 237.3 46.7 277.9 44 248.2 43.9
D8 -90.6 134.5 -105.9 157.2 -93.3 138.1E8 67.7 89.2 80 106 70.4 92.4F8 17.2 42.4 16.3 40.3 16.3 40D7 95.6 -96.4 -112.6 -112.6 98.2 -98.8D13 -112.4 -146.6 -137.9 -180.5 -121.9 -157.3E13 71.8 -111.4 90.4 -139.6 80.2 -123.3F13 20.1 -93.5 21.7 -99.9 18.7 -87
D10 -11.5 148.4 -10.8 185.3 -11 163.9
E10 -84.5 93.6 -100.1 111.4 -87.6 96.9
COLUMN 2ND
DESIGN JOINT MOMENTSMOMENTS
8TH TYPICAL
Amber HouseAmber HouseStructuralStructural
601 New Jersey Avenue601 New Jersey AvenueAlternative MaterialsAlternative Materials
Impact Analysis:Impact Analysis: At lowest garage levelAt lowest garage level Columns D13 & E7Columns D13 & E7
Columns Columns (con’t)(con’t)::
Amber HouseAmber HouseStructuralStructural
601 New Jersey Avenue601 New Jersey AvenueAlternative MaterialsAlternative Materials
Impact Analysis:Impact Analysis: VehicleVehicle
• Vehicle: Large SUVVehicle: Large SUV• Weight: 5000lb Weight: 5000lb • Bumper height~ 36 inBumper height~ 36 in • Acceleration 0-60mph in 8.5 secondsAcceleration 0-60mph in 8.5 seconds
Assumptions:Assumptions:• Deceleration of vehicle in 0.5 seconds.Deceleration of vehicle in 0.5 seconds.• Central impactCentral impact• Final velocity of automobile = 0Final velocity of automobile = 0• Column velocity = 0Column velocity = 0• Speed from sloped floor ignored Speed from sloped floor ignored
Columns Columns (con’t)(con’t)::
Amber HouseAmber HouseStructuralStructural
601 New Jersey Avenue601 New Jersey AvenueAlternative MaterialsAlternative Materials
Impact Analysis:Impact Analysis:
Columns Columns (con’t)(con’t)::
D13 60.24 120.5 722.88 1518
E7 41.95 83.9 419.5 881.1
FORCE (kip)
MOMENT (ft-kip)
IMPACT INVESTIGATION SUMMARY
COLUMNVELOCITY
(ft/ s)DECELERATION
(ft/ s 2)
COLUMN SIZE REINFORCMENT LOAD (kip) F'c (psi)DISTANCE
(ft)
D13 26" X 26" 12 # 18'S 2805.34 5000 175.29E7 24" X 24" 16 # 14'S 2246.6 5000 170
IMPACT ANAYSIS COLUMN CHARACTERISTICS:
Amber HouseAmber HouseStructuralStructural
601 New Jersey Avenue601 New Jersey AvenueAlternative MaterialsAlternative Materials
COLUMN D13 E7
SIZE 26" X 26" 24" X 24"
REINFORCING 12 # 18'S 16 # 14'S
LOAD 2805.34 2246.6SLAB MOMENT
(in-kip) 4368 4430
IMPACT MOMENT (in-kip)1518 881.1
(converted) TOTAL MOMENT (in-kip) 6002.77 5719.5
COLUMN MOMENT STRENGTH (in-kip) 7121 5270
LOAD RESISTING CAPABILITIES OF COLUMNS
Impact Analysis:Impact Analysis:
Columns Columns (con’t)(con’t)::
Amber HouseAmber HouseStructuralStructural
601 New Jersey Avenue601 New Jersey AvenueAlternative MaterialsAlternative Materials
Floor SystemFloor System ColumnsColumns FoundationsFoundations
Structural Depth:Structural Depth:
Amber HouseAmber HouseStructuralStructural
601 New Jersey Avenue601 New Jersey AvenueAlternative MaterialsAlternative Materials
Existing Structure:Existing Structure: Soil Conditions:Soil Conditions:
• River terrace deposits consisting of clay, silt, sand and River terrace deposits consisting of clay, silt, sand and gravel underlain by residual materialsgravel underlain by residual materials
• Contains concrete, brick and other construction debris Contains concrete, brick and other construction debris • Ground water at depths ranging from 13 to 29 feet below Ground water at depths ranging from 13 to 29 feet below
the existing grade. the existing grade. • Maximum allowable soil bearing pressure of 6000 psf. Maximum allowable soil bearing pressure of 6000 psf.
Interior Foundations:Interior Foundations:• Concrete F’c = 3000 psiConcrete F’c = 3000 psi• ReinforcedReinforced• SquareSquare
Foundations:Foundations:
Type Size Depth (Inches) Reinforcing
F75 7' - 6" 26" (7) # 7
F80 8' 26" (8) # 7F155 15' - 6" 46" (15) # 10F165 16' - 6" 50" (16) # 10
Interior Foundations
Amber HouseAmber HouseStructuralStructural
601 New Jersey Avenue601 New Jersey AvenueAlternative MaterialsAlternative Materials
Existing Structure:Existing Structure: Perimeter Foundations:Perimeter Foundations:
• Concrete F’c = 3000 psiConcrete F’c = 3000 psi• Reinforced Fy= 60 ksiReinforced Fy= 60 ksi• RectangularRectangular• Strap beamStrap beam
Foundations Foundations (con’t)(con’t)::
FA 23' (12) # 11 X 22'- 6" 8' (23) # 9 7'-6" 50"FB 20' (12) # 10 x 19'-6" 8' (20) # 9 7'-6" 48"
Depth (Inches)
Perimeter Foundations
Type Length (Feet)Reinforcing Long
BarsWidth (Feet)
Reinforcing Short Bars
Amber HouseAmber HouseStructuralStructural
601 New Jersey Avenue601 New Jersey AvenueAlternative MaterialsAlternative Materials
Redesigned Structure:Redesigned Structure: Interior FoundationsInterior Foundations
• Only 10. 5” from perimeterOnly 10. 5” from perimeter
foundation.foundation.
Foundations Foundations (con’t)(con’t)::
Foundations EXISTING NEWDimensions 8' X 8' 17.5' X 17.5'
Depth 26" 54.5"Reinforcing 8 # 7's 17 # 10's
NEW VS. OLD FOUNDATION SIZES
Amber HouseAmber HouseStructuralStructural
601 New Jersey Avenue601 New Jersey AvenueAlternative MaterialsAlternative Materials
Redesigned Structure:Redesigned Structure: Perimeter FoundationsPerimeter Foundations
• Loads less than existingLoads less than existing
• Removed strap beamRemoved strap beam• Used a combined footingUsed a combined footing
Foundations Foundations (con’t)(con’t)::
Foundations EXISTING NEWLoad 1698 kips 1431.71 kips
NEW VS. OLD FOUNDATION LOADS
Amber HouseAmber HouseStructuralStructural
601 New Jersey Avenue601 New Jersey AvenueAlternative MaterialsAlternative Materials
Redesigned Structure:Redesigned Structure: Core FoundationsCore Foundations
Foundations Foundations (con’t)(con’t)::
Foundations EXISTING NEWDimensions 17' X 17' 19.5' X 19.5'
Depth 50" 62"Reinforcing 17 # 10's 19 # 10's
NEW VS. OLD FOUNDATION SIZES
Amber HouseAmber HouseStructuralStructural
601 New Jersey Avenue601 New Jersey AvenueAlternative MaterialsAlternative Materials
Thesis OverviewThesis Overview Building IntroductionBuilding Introduction Structural Depth Structural Depth Architectural BreadthArchitectural Breadth Construction Management BreadthConstruction Management Breadth Conclusions Conclusions AcknowledgementsAcknowledgements QuestionsQuestions
Presentation Outline:Presentation Outline:
Amber HouseAmber HouseStructuralStructural
601 New Jersey Avenue601 New Jersey AvenueAlternative MaterialsAlternative Materials
G-Street FacadeG-Street Facade Ceiling & Floor HeightsCeiling & Floor Heights Columns in Office SpaceColumns in Office Space
Architectural Breadth:Architectural Breadth:
Amber HouseAmber HouseStructuralStructural
601 New Jersey Avenue601 New Jersey AvenueAlternative MaterialsAlternative Materials
G-Street FacadeG-Street Facade Ceiling & Floor HeightsCeiling & Floor Heights Columns in Office SpaceColumns in Office Space
Architectural Breadth:Architectural Breadth:
Amber HouseAmber HouseStructuralStructural
601 New Jersey Avenue601 New Jersey AvenueAlternative MaterialsAlternative Materials
G- Street Facade:G- Street Facade:
Amber HouseAmber HouseStructuralStructural
601 New Jersey Avenue601 New Jersey AvenueAlternative MaterialsAlternative Materials
G- Street Façade G- Street Façade (con’t)(con’t)::
Redesigned Redesigned Structure:Structure:
Change in column Change in column locationlocation
Amber HouseAmber HouseStructuralStructural
601 New Jersey Avenue601 New Jersey AvenueAlternative MaterialsAlternative Materials
G-Street FacadeG-Street Facade Ceiling & Floor HeightsCeiling & Floor Heights Columns in Office SpaceColumns in Office Space
Architectural Breadth:Architectural Breadth:
Amber HouseAmber HouseStructuralStructural
601 New Jersey Avenue601 New Jersey AvenueAlternative MaterialsAlternative Materials
Ceiling & Floor Heights:Ceiling & Floor Heights:
Redesigned Structure Ceiling Height:Redesigned Structure Ceiling Height: 8’6” ceilings on floors 2-10 maintained8’6” ceilings on floors 2-10 maintained 11stst floor ceiling height reduced by 4” floor ceiling height reduced by 4”
• Existing: 10’7”Existing: 10’7”• New:New: 10’3”10’3”
Existing Floor-to-Floor Heights:Existing Floor-to-Floor Heights: Floors 2-9, 11.91’Floors 2-9, 11.91’ 11stst floor, 14’ floor, 14’
Redesigned Structure Floor-to-Floor Heights:Redesigned Structure Floor-to-Floor Heights: Floors 2-10, 10’10”Floors 2-10, 10’10” 11stst floor, 12’6” floor, 12’6”
Amber HouseAmber HouseStructuralStructural
601 New Jersey Avenue601 New Jersey AvenueAlternative MaterialsAlternative Materials
G-Street FacadeG-Street Facade Ceiling & Floor HeightsCeiling & Floor Heights Columns in Office SpaceColumns in Office Space
Architectural Breadth:Architectural Breadth:
Amber HouseAmber HouseStructuralStructural
601 New Jersey Avenue601 New Jersey AvenueAlternative MaterialsAlternative Materials
Columns in Office Space:Columns in Office Space:
Parking Garage:Parking Garage: Existing Construction:Existing Construction:
• 198 parking spaces198 parking spaces RedesignRedesign
• Loss Approx 9 % of parkingLoss Approx 9 % of parking• 180 parking spaces remain180 parking spaces remain
Amber HouseAmber HouseStructuralStructural
601 New Jersey Avenue601 New Jersey AvenueAlternative MaterialsAlternative Materials
Columns in Office Space Columns in Office Space (con’t)(con’t)::
Parking Garage:Parking Garage: Minimum site requirementsMinimum site requirements
STRUCTURE EXISTING NEWSquare feet 258000 286500
Number of Spaces 143 160
ONSITE PARKING REQUIERMENTS
Amber HouseAmber HouseStructuralStructural
601 New Jersey Avenue601 New Jersey AvenueAlternative MaterialsAlternative Materials
Columns in Office Space Columns in Office Space (con’t)(con’t)::
Office Space:Office Space: ExistingExisting
Amber HouseAmber HouseStructuralStructural
601 New Jersey Avenue601 New Jersey AvenueAlternative MaterialsAlternative Materials
Columns in Office Space Columns in Office Space (con’t)(con’t)::
Office Space:Office Space: RedesignedRedesigned
Amber HouseAmber HouseStructuralStructural
601 New Jersey Avenue601 New Jersey AvenueAlternative MaterialsAlternative Materials
Columns in Office Space Columns in Office Space (con’t)(con’t)::
Office Space:Office Space: Redesign LayoutRedesign Layout
Amber HouseAmber HouseStructuralStructural
601 New Jersey Avenue601 New Jersey AvenueAlternative MaterialsAlternative Materials
Columns in Office Space Columns in Office Space (con’t)(con’t)::
Amber HouseAmber HouseStructuralStructural
601 New Jersey Avenue601 New Jersey AvenueAlternative MaterialsAlternative Materials
Thesis OverviewThesis Overview Building IntroductionBuilding Introduction Structural Depth Structural Depth Architectural BreadthArchitectural Breadth Construction Management BreadthConstruction Management Breadth Conclusions Conclusions AcknowledgementsAcknowledgements QuestionsQuestions
Presentation Outline:Presentation Outline:
Amber HouseAmber HouseStructuralStructural
601 New Jersey Avenue601 New Jersey AvenueAlternative MaterialsAlternative Materials
ScheduleSchedule CostCost
Construction Management:Construction Management:
Amber HouseAmber HouseStructuralStructural
601 New Jersey Avenue601 New Jersey AvenueAlternative MaterialsAlternative Materials
ScheduleSchedule CostCost
Construction Management:Construction Management:
Amber HouseAmber HouseStructuralStructural
601 New Jersey Avenue601 New Jersey AvenueAlternative MaterialsAlternative Materials
Existing Schedule:Existing Schedule: Design Phase: Design Phase: Start 1/14/ 2000 Start 1/14/ 2000 32.2 weeks32.2 weeks Fabrication/Delivery of Major Building materials: Start Fabrication/Delivery of Major Building materials: Start
1/27/20001/27/2000 Foundations: Foundations: Start 10/18/2000 Start 10/18/2000 16.8 weeks16.8 weeks Superstructure: Superstructure: Start 2/27/2001 Start 2/27/2001 21.2 weeks21.2 weeks Spray on Fireproofing: Spray on Fireproofing: Start 4/20/2001 Start 4/20/2001 22.1 22.1
weeks weeks
Schedule of Redesigned Structure:Schedule of Redesigned Structure: 12 weeks to pour 10 floors12 weeks to pour 10 floors 4 weeks for fabrication of rebar4 weeks for fabrication of rebar Fast track ConstructionFast track Construction Spray on fireproofing eliminatedSpray on fireproofing eliminated
Schedule:Schedule:
Amber HouseAmber HouseStructuralStructural
601 New Jersey Avenue601 New Jersey AvenueAlternative MaterialsAlternative Materials
ScheduleSchedule CostCost
Construction Management:Construction Management:
Amber HouseAmber HouseStructuralStructural
601 New Jersey Avenue601 New Jersey AvenueAlternative MaterialsAlternative Materials
Existing Structure:Existing Structure: Actual: $24,330,000.0Actual: $24,330,000.000 Includes garage and officeIncludes garage and office
R.S. Means Square Foot Cost:R.S. Means Square Foot Cost:
Cost:Cost:
Cost/ SF Square Feet Total Cost
SUB GRADE GARAGE 48.9 90000 $4,401,000.00
NEW CONSRUCTION 83.89 258000 $24,034,485.00
EXISTING CONSTUCTION 83.58 286500 $21,563,640.00
SQUARE FOOT COST ESTIMATE
Amber HouseAmber HouseStructuralStructural
601 New Jersey Avenue601 New Jersey AvenueAlternative MaterialsAlternative Materials
R.S. Means Assemblies Estimate:R.S. Means Assemblies Estimate: Structural system onlyStructural system only
Cost Cost (con’t)(con’t)::
Description Cost/ SF
NEW CONSTRUCTION
Two-Way Concrete Slab and Reinforced Concrete Columns
$13.98
EXISTING CONSTUCTION
Steel Composite Beams and Steel Columns
$14.79
ASSEMBLIES ESTIMATE
STRUCTURAL MEMBER COST/ SF
Concrete Column $2.08Two-Way Concrete Slab $11.90
Steel Column $0.14
Compite Beam and Deck $14.65
ASSEMBLIES ESTIMATE
EXISTING CONSTUCTION
NEW CONSTRUCTION
Amber HouseAmber HouseStructuralStructural
601 New Jersey Avenue601 New Jersey AvenueAlternative MaterialsAlternative Materials
Internal Rate of Return:Internal Rate of Return: Initial CostsInitial Costs
Building MaintenanceBuilding Maintenance• $14.00/square foot a year$14.00/square foot a year
IncomeIncome
Cost Cost (con’t)(con’t)::
Existing Structure $25,745,298.00New Structure $28,215,885.00
COST OF STRUCTURE
Existing Structure $3,612,000.00 per yearNew Structure $4,011,000.00 per year
BUILDING CLEANING AND MANAGING COSTS
GROSS NETExisting Structure $7,843,200.00 $5,490,240.00
New Structure $8,709,600.00 $6,096,720.00Difference $866,400.00 $606,480.00
ANUUAL RENTAL INCOME (80%)
Amber HouseAmber HouseStructuralStructural
601 New Jersey Avenue601 New Jersey AvenueAlternative MaterialsAlternative Materials
Internal Rate of ReturnInternal Rate of Return:: Estimated Sale PriceEstimated Sale Price
• Retained for 25 yearsRetained for 25 years
MARR original structureMARR original structure• 8.2 % with assumptions8.2 % with assumptions
MARR Redesigned StructureMARR Redesigned Structure• 8.97%8.97%
Cost Cost (con’t)(con’t)::
Existing Structure $18,021,708.00New Structure $19,751,119.50
ESTIMATED SALE PRICE
Amber HouseAmber HouseStructuralStructural
601 New Jersey Avenue601 New Jersey AvenueAlternative MaterialsAlternative Materials
Thesis OverviewThesis Overview Building IntroductionBuilding Introduction Structural Depth Structural Depth Architectural BreadthArchitectural Breadth Construction Management BreadthConstruction Management Breadth Conclusions Conclusions AcknowledgementsAcknowledgements QuestionsQuestions
Presentation Outline:Presentation Outline:
Amber HouseAmber HouseStructuralStructural
601 New Jersey Avenue601 New Jersey AvenueAlternative MaterialsAlternative Materials
Redesigned Floor System Key:Redesigned Floor System Key: Advantages:Advantages:
• 1010thth floor (28,500 sq ft.) floor (28,500 sq ft.)• Comparable scheduleComparable schedule• Common material in D.C. & Competitive ContractorsCommon material in D.C. & Competitive Contractors• More flexible for different tenant space requirementsMore flexible for different tenant space requirements
Disadvantages:Disadvantages:• Columns in office spaceColumns in office space• Possible lower rental value Possible lower rental value • Higher initial costHigher initial cost• Loss of parking spacesLoss of parking spaces
Conclusions:Conclusions:
Amber HouseAmber HouseStructuralStructural
601 New Jersey Avenue601 New Jersey AvenueAlternative MaterialsAlternative Materials
Thesis OverviewThesis Overview Building IntroductionBuilding Introduction Structural Depth Structural Depth Architectural BreadthArchitectural Breadth Construction Management BreadthConstruction Management Breadth Conclusions Conclusions AcknowledgementsAcknowledgements QuestionsQuestions
Presentation Outline:Presentation Outline:
Amber HouseAmber HouseStructuralStructural
601 New Jersey Avenue601 New Jersey AvenueAlternative MaterialsAlternative Materials
Michael WeissMichael Weiss Structural Design GroupStructural Design Group Ron SchneckRon Schneck Hickok Warner FoxHickok Warner Fox Tom BickleyTom Bickley Girard EngineeringGirard Engineering Jim AlexanderJim Alexander The Albemarle Group, LLCThe Albemarle Group, LLC Julie KirkwoodJulie Kirkwood James G. Davis ConstructionJames G. Davis Construction Dr. HanaganDr. Hanagan Penn State Penn State
UniversityUniversity AE FacultyAE Faculty
Acknowledgements:Acknowledgements:
Amber HouseAmber HouseStructuralStructural
601 New Jersey Avenue601 New Jersey AvenueAlternative MaterialsAlternative Materials
Thesis OverviewThesis Overview Building IntroductionBuilding Introduction Structural Depth Structural Depth Architectural BreadthArchitectural Breadth Construction Management BreadthConstruction Management Breadth Conclusions Conclusions AcknowledgementsAcknowledgements QuestionsQuestions
Presentation Outline:Presentation Outline:
Amber HouseAmber HouseStructuralStructural
601 New Jersey Avenue601 New Jersey AvenueAlternative MaterialsAlternative Materials
Questions?Questions?
Amber HouseAmber HouseStructuralStructural
601 New Jersey Avenue601 New Jersey AvenueAlternative MaterialsAlternative Materials
New Office:New Office: Two Way Slab Design Method (ADOSS)Two Way Slab Design Method (ADOSS)
• Typical Assumptions:Typical Assumptions: Outside edge was straightOutside edge was straight Ignore elevator Edge beamsIgnore elevator Edge beams Case 1 CantileverCase 1 Cantilever Case 2 RemovedCase 2 Removed
Floor System Floor System (con’t)(con’t)::
Amber HouseAmber HouseStructuralStructural
601 New Jersey Avenue601 New Jersey AvenueAlternative MaterialsAlternative Materials
New Office:New Office: Two Way Slab Design Results (ADOSS)Two Way Slab Design Results (ADOSS)
Floor System Floor System (con’t)(con’t)::
no. size no. size no. size1 5 # 4 4 # 4 23 # 42 6 # 7 5 # 7 23 # 43 10 # 6 10 # 6 20 # 44 10 # 6 10 # 6 19 # 45 6 # 7 5 # 7 23 # 46 5 # 4 4 # 4 23 # 4
COLUMN STRIP MIDDLE STRIPNEGATIVE REINFORCEMENT
Column Number
Long Bars Short Bars Long Bars
VERTICAL ONE
Amber HouseAmber HouseStructuralStructural
601 New Jersey Avenue601 New Jersey AvenueAlternative MaterialsAlternative Materials
New Office:New Office: Two Way Slab Design Results (ADOSS)Two Way Slab Design Results (ADOSS)
Floor System Floor System (con’t)(con’t)::
no. size no. size no. size no. size2 5 # 4 4 # 4 12 # 4 11 # 43 12 # 4 11 # 4 8 # 4 8 # 44 11 # 4 11 # 4 9 # 4 8 # 45 11 # 4 11 # 4 8 # 4 8 # 46 5 # 4 4 # 4 12 # 4 11 # 4
COLUMN STRIP MIDDLE STRIPShort BarsColumn
NumberLong Bars Short Bars Long Bars
POSITIVE REINFORCEMENT
Amber HouseAmber HouseStructuralStructural
601 New Jersey Avenue601 New Jersey AvenueAlternative MaterialsAlternative Materials
New Office:New Office: Two Way Slab Design Results (ADOSS)Two Way Slab Design Results (ADOSS)
Floor System Floor System (con’t)(con’t)::
no. size no. size no. size1 6 # 5 6 # 5 20 # 42 7 # 7 6 # 7 20 # 43 12 # 6 12 # 6 23 # 44 10 # 6 10 # 6 20 # 45 11 # 6 10 # 6 22 # 46 11 # 6 10 # 6 22 # 47 11 # 6 10 # 6 20 # 48 12 # 6 11 # 6 22 # 49 12 # 6 12 # 6 18 # 510 9 # 6 9 # 6 16 # 4
NEGATIVE REINFORCEMENTCOLUMN STRIP MIDDLE STRIP
Column Number
Long Bars Short Bars Long Bars
HORIZONTAL ONE FINAL
Amber HouseAmber HouseStructuralStructural
601 New Jersey Avenue601 New Jersey AvenueAlternative MaterialsAlternative Materials
New Office:New Office: Two Way Slab Design Results (ADOSS)Two Way Slab Design Results (ADOSS)
Floor System Floor System (con’t)(con’t)::
no. size no. size no. size no. size2 7 # 4 7 # 4 10 # 4 10 # 43 9 # 5 8 # 5 9 # 4 8 # 44 9 # 5 9 # 5 9 # 4 9 # 45 9 # 4 8 # 4 9 # 4 8 # 46 9 # 5 9 # 5 10 # 4 9 # 47 9 # 4 8 # 4 9 # 4 8 # 48 9 # 5 9 # 5 9 # 4 9 # 49 11 # 4 11 # 4 8 # 4 8 # 410 11 # 5 10 # 5 11 # 4 10 # 4
POSITIVE REINFORCEMENTCOLUMN STRIP MIDDLE STRIP
Column Number
Long Bars Short Bars Long Bars Short Bars
Amber HouseAmber HouseStructuralStructural
601 New Jersey Avenue601 New Jersey AvenueAlternative MaterialsAlternative Materials
New:New: Column ScheduleColumn Schedule
Columns Columns (con’t)(con’t)::
Location: F8 E8 D8 A10 B10 D13 E13 F13 D7Drop Panel Size - 9.2' x 7.5' 9.2' x 9.25' - 9.2' x 7.5' 10' x 9.1' 10' x 7.5' - 10' x 9.2.5'
Drop Panel Depth - 3.5" 3.5" - 3.5" 5.5" 5.5" - 3.5"Load (kip) 853.4 1576.46 2395.01 853.4 1576.46 2173.69 1736.3 905.44 1919.8Strength 5000 5000 5000 5000 5000 5000 5000 5000 5000
Size 16" X16" 20" x 20" 26" x26 " 16" X16" 20" x 20" 24" x 24" 22" X 22" 16" x 16" 24" x 24"Reinforment 8 #10's 16 #11's 8 #10's 16 #11's 20 #11's 20 #10's 12 #11's 20 #10'sLoad (kip) 830.78 1418.7 2150.62 830.78 1418.7 1955.88 1562.4 796.46 1730
Strength (psi) 4000 4000 5000 4000 4000 5000 4000 4000 4000Size 16" X16" 20" x 20" 24" X 24" 16" X16" 20" x 20" 24" x 24" 22" X 22" 16" x 16" 24" x 24"
Reinforment 12 #10's 16 #11's 20 #11's 12 #10's 16 #11's 16 #11's 20 #10's 12 #11's 20 #10'sLoad (kip) 660.34 1257.18 1907.23 660.34 1261.88 1739.1 1389.2 705.52 1541.4
Strength (psi) 4000 4000 4000 4000 4000 4000 4000 3 4000Size 16" X16" 20" x 20" 24" X 24" 16" X16" 20" x 20" 24" x 24" 22" x 22" 16" x 16" 24" x 24"
Reinforment 4 #10's 12 #11's 20 #11's 4 #10's 16 #10's 16 #11's 16 #10's 12 #11's 16 #10'sLoad (kip)
Strength (psi) 4000 4000 4000 4000 4000 4000 4000 4000 4000Size 16" X16" 20" x 20" 24" X 24" 16" X16" 20" x 20" 24" x 24" 22" x 22" 16" x 16" 24" x 24"
Reinforment 4 #10's 12 #11's 20 #11's 4 #10's 16 #10's 16 #11's 16 #10's 12 #11's 16 #10'sLoad (kip) 489.9 943.1 1420.45 489.9 947.6 1305.5 1042.8 523.64 1164.2
Strength (psi) 4000 4000 4000 4000 4000 4000 4000 4000 4000Size 16" X16" 20" x 20" 24" X 24" 16" X16" 20" x 20" 24" x 24" 22" x 22" 16" x 16" 24" x 24"
Reinforment 4 #8's 8 #10's 12 #10 4 #8's 12 #10's 12 #10 8 #9's 8 #8's 8 #8's
6th
5th
COLUMN SCHEDULE
4th
3rd
2nd
Amber HouseAmber HouseStructuralStructural
601 New Jersey Avenue601 New Jersey AvenueAlternative MaterialsAlternative Materials
New:New: Column ScheduleColumn Schedule
Columns Columns (con’t)(con’t)::
Location: F8 E8 D8 A10 B10 D13 E13 F13 D7Drop Panel Size - 9.2' x 7.5' 9.2' x 9.25' - 9.2' x 7.5' 10' x 9.1' 10' x 7.5' - 10' x 9.2.5'
Drop Panel Depth - 3.5" 3.5" - 3.5" 5.5" 5.5" - 3.5"Load (kip)
Strength (psi) 4000 4000 4000 4000 4000 4000 4000 4000 4000Size 16" X16" 20" x 20" 24" X 24" 16" X16" 20" x 20" 24" x 24" 22" x 22" 16" x 16" 24" x 24"
Reinforment 4 #8's 8 #10's 12 #10 4 #8's 12 #10 12 #10 8 #9's 8 #8's 8 #8'sLoad (kip) 319.46 633.52 933.67 319.46 633.52 871.86 696.43 341.76 787
Strength (psi) 4000 4000 4000 4000 4000 4000 4000 4000 4000Size 16" X16" 18" x 18" 22" X 22" 16" X16" 18" x 18" 22" X 22" 22" x 22" 16" x 16" 22" x 22"
Reinforment 4 #8's 8 #10's 8 #8's 4 #8's 12 #10's 12 #10's 4 #10's 4 #8's 4 #10'sLoad (kip)Strength 4000 4000 4000 4000 4000 4000 4000 4000 4000
Size 16" X16" 18" x 18" 22" X 22" 16" X16" 18" x 18" 22" X 22" 22" x 22" 16" x 16" 22" x 22"Reinforment 4 #8's 8 #10's 8 #8's 4 #8 12 #10's 12 #10's 4 #10's 4 #8's 4 #10'sLoad (kip) 152.4 329.14 453.12 152.4 329.14 451.5 164.04 416.8
Strength (psi) 4000 4000 4000 4000 4000 4000 4000 4000 4000Size 16" X16" 18" x 18" 22" X 22" 16" X16" 18" x 18" 22" X 22" 22" x 22" 16" x 16" 22" x 22"
Reinforment 4 #8's 4 #10's 4 #10's 4 #8's 8 #8's 8 #9's 4 #10's 4 #8's 4 #10'sLoad (kip)
Strength (psi) 4000 4000 4000 4000 4000 4000 4000 4000 4000Size 16" X16" 18" x 18" 22" X 22" 16" X16" 18" x 18" 22" X 22" 22" x 22" 16" x 16" 22" x 22"
Reinforment 4 #8's 4 #10's 4 #10's 4 #8's 8 #8's 8 #9's 4 #10's 4 #8's 4 #10's
Roof
COLUMN SCHEDULE
7th
8th
9th
10th
Amber HouseAmber HouseStructuralStructural
601 New Jersey Avenue601 New Jersey AvenueAlternative MaterialsAlternative Materials
New vs. Old Office Floor SystemNew vs. Old Office Floor System : : Advantages:Advantages:
• Higher long run profitsHigher long run profits• Competitive concrete contractorsCompetitive concrete contractors• Common Construction methodCommon Construction method• Economies of scaleEconomies of scale
Disadvantages:Disadvantages:• Higher initial costHigher initial cost• More interest on loanMore interest on loan• Higher cost for building managementHigher cost for building management• Possible lower rental valuePossible lower rental value
Cost Cost (con’t)(con’t)::